DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Physical and Financial Accomplishment Monitoring Report as of the month of FEBRUARY CY 2018 PROVINCE : PENRO-Agusan del Sur (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (14) (15) (16) (17) (18) (19) (20) Agusan del Sur 4,349,000 100% - - - - - PENRO 2,025,000 100% - CENRO Bayugan City 581,000 100% - CENRO Talacogon 581,000 100% - CENRO Bunawan 581,000 100% - CENRO Loreto 581,000 100% - Agusan del Sur 5 5 5 1 5 20% 100% - PENRO 1 1 1 1 1 100% 100% - CENRO Bayugan City 1 1 1 1 - 100% - CENRO Talacogon 1 1 1 1 - 100% - CENRO Bunawan 1 1 1 1 - 100% - CENRO Loreto 1 1 1 1 - 100% - Agusan del Sur 5 - - - - - PENRO 1 - - - - CENRO Bayugan City 1 - - - - CENRO Talacogon 1 - - - - CENRO Bunawan 1 - - - - CENRO Loreto 1 - - - - Agusan del Sur 5 PENRO 1 CENRO Bayugan City 1 CENRO Talacogon 1 CENRO Bunawan 1 CENRO Loreto 1 Regional Total 16 - - - 15 #DIV/0! 94% Agusan del Sur 5 - - - 5 100% (5) PENRO 1 - - 1 100% (1) CENRO Bayugan City 1 - - 1 100% (1) CENRO Talacogon 1 - - 1 100% (1) CENRO Bunawan 1 - - 1 100% (1) CENRO Loreto 1 - - 1 100% (1) Regional Total 16 Agusan del Sur 5 # ## 5 5 # ## 100% 17% - PENRO 1 1 1 1 1 100% 17% - CENRO Bayugan City 1 1 1 1 1 100% 17% - CENRO Talacogon 1 1 1 1 1 100% 17% - CENRO Bunawan 1 1 1 1 1 100% 17% - CENRO Loreto 1 1 1 1 1 100% 17% - Non-PBB activities 1.4 Preparation of Payroll Payroll Prepared (no.) Agusan del Sur 1 1 1 1 1 100% 17% - FINANCIAL Allotment % (Amount Released/ Allotment * 100) Obligation Disbursement % BUR This month To date This month To date Obligation / Allotment (16/12*100) Disbursem ent/ Obligation (18/16*100) ANNUAL GENERAL MANAGEMENT & SUPERVISION TARGET FEB TO DATE CODE MFO/P/A/P PERFORMANCE INDICATOR LOCATION (Province/City/ Municipality) PHYSICAL BACKLOG % Accomp. (To Date) (9/5*100) FEB ACCOMP TO DATE % Accomp. (This Month) (8/7*100) A. Monitoring/Updating/ submission of statement of Assets, Liabjlities and Net Worth (SALN) 100% submission of SALN to concerned oversight agency B. Compliance to "Service Excellence through continuous Systems Innovation Monitoring and Evaluation (SECSIME) 1 major frontline service (Citizen's Charter) per division based on DMC No. 2015-04 "Service Excellence through continuous Systems Innovation Monitoring and Evaluation (SECSIME)" submitted to DENR Citizen's Charter Team C. Submission of implementation of frontline services under the DENR Citizen's Charter 100% of Offices with complete updated Citizen's Charter processes posted 100% of IPCRs based on approved SPMS guidelines submitted to the Personnel Division/Unit D. Compliance to Strategic Performance Management System (SPMS) -local (inter-agency) - 7 days after attendance 100% of meetings/ workshops/ conferences with reports submitted E. Attendance to Meetings/ Workshops/ Conferences Page 1 of 14

DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES … · DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Physical and Financial Accomplishment Monitoring Report as of the month of FEBRUARY

  • Upload
    others

  • View
    12

  • Download
    0

Embed Size (px)

Citation preview

DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES

Physical and Financial Accomplishment Monitoring Report

as of the month of FEBRUARY

CY 2018

PROVINCE : PENRO-Agusan del Sur

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (14) (15) (16) (17) (18) (19) (20)

Agusan del Sur 4,349,000 100% - - - - -

PENRO 2,025,000 100% -

CENRO Bayugan City 581,000 100% -

CENRO Talacogon 581,000 100% -

CENRO Bunawan 581,000 100% -

CENRO Loreto 581,000 100% -

Agusan del Sur 5 5 5 1 5 20% 100% -

PENRO 1 1 1 1 1 100% 100% -

CENRO Bayugan City 1 1 1 1 - 100% -

CENRO Talacogon 1 1 1 1 - 100% -

CENRO Bunawan 1 1 1 1 - 100% -

CENRO Loreto 1 1 1 1 - 100% -

Agusan del Sur 5 - - - - -

PENRO 1 - - - -

CENRO Bayugan City 1 - - - -

CENRO Talacogon 1 - - - -

CENRO Bunawan 1 - - - -

CENRO Loreto 1 - - - -

Agusan del Sur 5

PENRO 1

CENRO Bayugan City 1

CENRO Talacogon 1

CENRO Bunawan 1

CENRO Loreto 1

Regional Total 16 - - - 15 #DIV/0! 94%

Agusan del Sur 5 - - - 5 100% (5)

PENRO 1 - - 1 100% (1)

CENRO Bayugan City 1 - - 1 100% (1)

CENRO Talacogon 1 - - 1 100% (1)

CENRO Bunawan 1 - - 1 100% (1)

CENRO Loreto 1 - - 1 100% (1)

Regional Total 16

Agusan del Sur 5 # ## 5 5 # ## 100% 17% -

PENRO 1 1 1 1 1 100% 17% -

CENRO Bayugan City 1 1 1 1 1 100% 17% -

CENRO Talacogon 1 1 1 1 1 100% 17% -

CENRO Bunawan 1 1 1 1 1 100% 17% -

CENRO Loreto 1 1 1 1 1 100% 17% -

Non-PBB activities

1.4 Preparation of Payroll Payroll Prepared (no.) Agusan del Sur 1 1 1 1 1 100% 17% -

FINANCIAL

Allotment

% (Amount

Released/

Allotment *

100)

Obligation Disbursement % BUR

This month To date This month To date

Obligation

/

Allotment

(16/12*100)

Disbursem

ent/

Obligation

(18/16*100)

ANNUAL

GENERAL MANAGEMENT & SUPERVISION

TARGET

FEB TO DATE

CODE MFO/P/A/P PERFORMANCE INDICATOR

LOCATION

(Province/City/

Municipality)

PHYSICAL

BACKLOG% Accomp.

(To Date)

(9/5*100)

FEB

ACCOMP

TO

DATE

% Accomp.

(This

Month)

(8/7*100)

A. Monitoring/Updating/

submission of statement of

Assets, Liabjlities and Net Worth

(SALN)

100% submission of SALN to

concerned oversight agency

B. Compliance to "Service

Excellence through continuous

Systems Innovation Monitoring

and Evaluation (SECSIME)

1 major frontline service

(Citizen's Charter) per division

based on DMC No. 2015-04

"Service Excellence through

continuous Systems Innovation

Monitoring and Evaluation

(SECSIME)" submitted to DENR

Citizen's Charter Team

C. Submission of

implementation of frontline

services under the DENR

Citizen's Charter

100% of Offices with complete

updated Citizen's Charter

processes posted

100% of IPCRs based on

approved SPMS guidelines

submitted to the Personnel

Division/Unit

D. Compliance to Strategic

Performance Management

System (SPMS)

-local (inter-agency) - 7 days

after attendance

100% of meetings/

workshops/ conferences with

reports submitted

E. Attendance to Meetings/

Workshops/ Conferences

Page 1 of 14

DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES

Physical and Financial Accomplishment Monitoring Report

as of the month of FEBRUARY

CY 2018

Province : PENRO-Agusan del Sur

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (14) (15) (16) (17) (18) (19) (20)

Agusan del Sur

Water Resource Utilization

10 001 03000 16 Agusan del Sur 56 - - - 1 2% (1)

CENRO Bayugan City 14 - - 1 7% (1)

CENRO Talacogon 14 - - - - -

CENRO Bunawan 14 - - - - -

CENRO Loreto 14 - - - - -

10 001 03000 16 Agusan del Sur 44 - - - 1 2% (1)

CENRO Bayugan City 11 - - 1 9% (1)

CENRO Talacogon 11 - - - - -

CENRO Bunawan 11 - - - - -

CENRO Loreto 11 - - - - -

CODE MFO/P/A/PPERFORMANCE

INDICATOR

LOCATION

(Province/City/

Municipality)

PHYSICAL

TARGET ACCOMP

BACKLOG ANNUAL

Disbursement % BUR

Allotment

% (Amount

Released/

Allotment *

100)

Obligation

% Accomp.

(This Month)

(8/7*100)

% Accomp.

(To Date)

(9/5*100)

FEB TO DATE FEBTO

DATE

Obligation/

Allotment

(16/12*100)

FINANCIAL

Disbursement/

Obligation

(18/16*100)

Soil Conservation and Watershed Management

including River Basin Management & Devt. *

'1. Conduct of Inventory of Water Users Water Users

inventoried and

mapped (No.)

2. Conduct of Identification and mapping of

Water Sources

Water sources

identified and mapped

(No.)

This month To dateThis

monthTo date

Page 1 of 2

(21)

REMARKS /

Justification for those

activities with low and

high percentage

accomplishments

Page 2 of 2

DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES

Physical and Financial Accomplishment Monitoring Report

as of the month of FEBRUARY

CY 2018

Province : PENRO-Agusan del Sur

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (14) (15) (16) (17) (18) (19) (20) (21)

CONTINUING

Agusan del Sur850 - 850 350 350 41% 41% 500

CENRO Bayugan 500 - 500 - 0% 0% 500

CENRO Talacogon 350 - 350 350 350 100% 100% -

2. Seedling Production/ Procurement

2.2 Agroforestry Agusan del Sur 5,000 - 5,000 5,000 5,000 100% 100% -

CENRO Talacogon 5,000 - 5,000 5,000 5,000 100% 100% -

3. Site Preparation and Area

Development2.2 Agroforestry Agusan del Sur 20 - 20 20 20 100% 100% -

CENRO Talacogon 20 - 20 20 20 100% 100% -

CODE MFO/P/A/PPERFORMANCE

INDICATOR

LOCATION (Province/City/

Municipality)

PHYSICAL

TARGET ACCOMP

BACKLOG

REMARKS /

Justification for those

activities with low and

high percentage

accomplishments

ANNUAL

Disbursement

FINANCIAL

% BUR

Allotment

% (Amount

Released/

Allotment *

100)

Obligation

% Accomp.

(This Month)

(8/7*100)

% Accomp.

(To Date)

(9/5*100)

FEB TO DATE FEBTO

DATE

Obligation/

Allotment

(16/12*100)

Disbursement/

Obligation

(18/16*100)

Forest Development, Rehabilitation & Protection

This

monthTo date

This

monthTo date

Site prepared and

area developed (ha.)

seedling produced/

procured (no.)

1. Plantation Maintenance & Protection

(Year 1)

area maintained and

protected (no.)

Page 1 of 1

DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES

Physical and Financial Accomplishment Monitoring Report

as of the month of FEBRUARY

CY 2018

Region: CARAGA

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (14) (15) (16) (17) (18) (19) (20)

REGIONAL TOTAL 1,200,000.00 - - - - 0% #DIV/0!

Agusan del Sur 600,000 - - - - - -

PENRO 256,000 -

CENRO Bayugan City 86,000 -

CENRO Talacogon 86,000 -

CENRO Bunawan 86,000 -

CENRO Loreto 86,000 -

PBB enrolled activities:

10 001 0500072 A. Compliance to Transparency Seal

Requirements

100% Transparency Seal

requirements updated

and posted 3 days upon

receipt

Agusan del Sur 1

C. GIS based control maps

genereated/established/updated

digitized control map

generated/updated using

the NAMRIA base map

uploaded in the website

Agusan del Sur 1 - - - - -

Non-PBB activities:

A. Intensified Maintenance of ICT

Equipment & Information Systems

10 001 0500072 Agusan del Sur 5 5 5 5 5 100% 17% -

PENRO 1 1 1 1 1 100% 17% -

CENRO Bayugan City 1 1 1 1 1 100% 17% -

CENRO Talacogon 1 1 1 1 1 100% 17% -

CENRO Bunawan 1 1 1 1 1 100% 17% -

CENRO Loreto 1 1 1 1 1 100% 17% -

10 001 0500072 1.1 Forestry information System (FIS) data encoder hired (no) Agusan del Sur 1

10 001 0500072 1.2 Electronic Budget (eBudget) and

Enhanced National General Accounting

System (eNGAS)

Agusan del Sur 1 1 1 1 1 100% 17% -

10 001 0500072 1.3 Plans and Programs Information

System (PAPIS)

Agusan del Sur 1 1 1 1 1 100% 17% -

10 001 0500072 1.4 Frontline Service and Transaction

System ( FSTS)

Agusan del Sur 1 1 1 1 1 100% 17% -

10 001 0500072 1.5 Statistical Service Information System

(SSIS)

Agusan del Sur 1 1 1 1 1 100% 17% -

10 001 0500072 1.6 Environmental Law Enforcement

Management Information System (ELEMIS)

Agusan del Sur 1 1 1 1 1 100% 17% -

CODE MFO/P/A/PPERFORMANCE

INDICATOR

LOCATION

(Province/City/

Municipality)

PHYSICAL

TARGET ACCOMP

BACKLOG ANNUAL

Disbursement % BUR

Allotment

% (Amount

Released/

Allotment *

100)

Obligation

% Accomp.

(This Month)

(8/7*100)

% Accomp.

(To Date)

(9/5*100)

FEB TO DATE FEBTO

DATE

Obligation/

Allotment

(16/12*100)

Disbursem

ent/

Obligation

(18/16*100)

FINANCIAL

Data Management including Systems Development and

Maintenance

1. Updating and Maintenance of Data

Information System

data information system

updated/ maintained

(no.)

- hardware & software

This

monthTo date

This

monthTo date

Page 1 of 4

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (14) (15) (16) (17) (18) (19) (20)

CODE MFO/P/A/PPERFORMANCE

INDICATOR

LOCATION

(Province/City/

Municipality)

PHYSICAL

TARGET ACCOMP

BACKLOG ANNUAL

Disbursement % BUR

Allotment

% (Amount

Released/

Allotment *

100)

Obligation

% Accomp.

(This Month)

(8/7*100)

% Accomp.

(To Date)

(9/5*100)

FEB TO DATE FEBTO

DATE

Obligation/

Allotment

(16/12*100)

Disbursem

ent/

Obligation

(18/16*100)

FINANCIAL

This

monthTo date

This

monthTo date

2. Management & Maintenance of VOIP,

Safety & Security System, Connectivity &

other ICT Resources/Facilities

10 001 0500072 Agusan del Sur 5 5 5 5 5 100% 17% -

PENRO 1 1 1 1 1 100% 17% -

CENRO Bayugan City 1 1 1 1 1 100% 17% -

CENRO Talacogon 1 1 1 1 1 100% 17% -

CENRO Bunawan 1 1 1 1 1 100% 17% -

CENRO Loreto 1 1 1 1 1 100% 17% -

10 001 0500072 Agusan del Sur 5

PENRO 1

CENRO Bayugan City 1

CENRO Talacogon 1

CENRO Bunawan 1

CENRO Loreto 1

10 001 0500072 Agusan del Sur 24 24 24 24 24 100% 17% -

PENRO 8 8 8 8 8 100% 17% -

CENRO Bayugan City 4 4 4 4 4 100% 17% -

CENRO Talacogon 4 4 4 4 4 100% 17% -

CENRO Bunawan 4 4 4 4 4 100% 17% -

CENRO Loreto 4 4 4 4 4 100% 17% -

10 001 0500072 2.4 Management of DENR website website updated &

maintained with quarterly

report submitted (no.)

Agusan del Sur 1

10 001 0500072 Agusan del Sur 5 5 5 5 5 100% 17% -

PENRO 1 1 1 1 1 100% 17% -

CENRO Bayugan City 1 1 1 1 1 100% 17% -

CENRO Talacogon 1 1 1 1 1 100% 17% -

CENRO Bunawan 1 1 1 1 1 100% 17% -

CENRO Loreto 1 1 1 1 1 100% 17% -

10 001 0500072 Agusan del Sur 5

PENRO 1

CENRO Bayugan City 1

CENRO Talacogon 1

CENRO Bunawan 1

CENRO Loreto 1

10 001 0500072 Agusan del Sur 5 - - - - -

PENRO 1 - - - - -

CENRO Bayugan City 1 - - - - -

CENRO Talacogon 1 - - - - -

CENRO Bunawan 1 - - - - -

CENRO Loreto 1 - - - - -

2.3 Operationalization & Maintenance of

Safety & Security System Equipment

safety & security (CCTV)

equipment & system

maintained with monthly

report submitted (no.)

B. Start-up the Operationalization of

GIS Database and Integration with

ENR Statistics

1. Installation and Operationalization of

GIS Unit

GIS Unit installed and

operationalized (no.)

2. Compliance to Statistical Reporting

System -

Preparation & submission of Statistical

Reports

statistical reports

prepared & submitted

(no.)

internet connectivity

maintained,

operationalized &

monitored (no. of Offices)

2.2 Operationalization & Maintenance

VOIP equipment & systems

VOIP equipment &

system maintained with

quarterly report

submitted (no. of Office)

6. Update/Publish ENR Profile ENR profile updated/

published (no.)

Page 2 of 4

(21)

REMARKS /

Justification for those

activities with low and

high percentage

accomplishments

Page 3 of 4

(21)

REMARKS /

Justification for those

activities with low and

high percentage

accomplishments

S.O. No. 2018

Page 4 of 4

DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES

Physical and Financial Accomplishment Monitoring Report

as of the month of FEBRUARY

CY 2018

Province : PENRO-Agusan del Sur

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (14) (15) (16) (17) (18) (19) (20)

Agusan del Sur 5,994,000 - - - - -

PENRO 857,000 -

CENRO Bayugan City 1,863,000 -

CENRO Talacogon 225,000 -

CENRO Bunawan 450,000 -

CENRO Loreto

PASu-AMWS 2,599,000 -

1. PAMB Operations

PAMB Operationalized

(no.)

Agusan del Sur 8 - - 1 1 13% (1)

PENRO - PASU 6 - - 1 1 17% (1)

CENRO Bayugan 2 - - - - -

1.2. PAMB Manual Preparation PAMB Manual prepared (n0) Agusan del Sur 2 - - - - - -

PENRO - PASU 1 - - - - -

CENRO Bayugan 1 - - - - -

3. Advocacy

3.1 Conduct of KAP Survey KAP conducted (no) Agusan del Sur 1 - - - - - -

CENRO Bayugan 1 - - - - -

3.2 Communication Planning Agusan del Sur 1 - - - - - -

CENRO Bayugan 1 - - - - -

3.3 Production of IEC Materials Agusan del Sur 500 - - - - - -

CENRO Bayugan 500 - - - - -

Agusan del Sur 1 1 1 1 1 100% 17% -

PENRO - PASU 1 1 1 1 1 100% 17% -

Agusan del Sur 2 1 1 8% (1)

CENRO Bayugan 1 -

PENRO - PASU 1 1 1 17% (1)

-

Agusan del Sur 1 1 1 1 1 100% 17% -

PENRO - PASU 1 1 1 1 1 100% 17% -

CODE MFO/P/A/PPERFORMANCE

INDICATOR

LOCATION (Province/City/

Municipality)

BACKLOGFEB

% Accomp.

(To Date)

(9/5*100)

ACCOMP

TO

DATE

TARGET

ANNUAL

% Accomp.

(This Month)

(8/7*100)

FINANCIAL

Allotment

% (Amount

Released/

Allotment *

100)

Obligation Disbursement % BUR

This

monthTo date

This

monthTo date

Obligation/

Allotment

(16/12*100)

Disbursement/

Obligation

(18/16*100)

TARGET

FEB TO DATE

communication plan prepared

(no.)

IEC materials produced (no.)

Communication Staff hired

(no.)

Natural Resources Sustainably Managed

Protected Areas, Caves, and Wetlands Development and

Management

Protected Areas Development and Management

3.5 Hiring of Communication Staff

Monitoring Staff hired (no.)

1.1. PAMB Meetings

5.2 Implementation of Biodiversity Monitoring

System

Consolidated BMS Reports

(no.)

5.3 Hiring of Monitoring staff (Biologist)

Page 1 of 6

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (14) (15) (16) (17) (18) (19) (20)

CODE MFO/P/A/PPERFORMANCE

INDICATOR

LOCATION (Province/City/

Municipality)

BACKLOGFEB

% Accomp.

(To Date)

(9/5*100)

ACCOMP

TO

DATE

TARGET

ANNUAL

% Accomp.

(This Month)

(8/7*100)

FINANCIAL

Allotment

% (Amount

Released/

Allotment *

100)

Obligation Disbursement % BUR

This

monthTo date

This

monthTo date

Obligation/

Allotment

(16/12*100)

Disbursement/

Obligation

(18/16*100)

TARGET

FEB TO DATE

II. Ecotourism Development

1. Ecotourism Development Planning Regional Total 2 - - - - #DIV/0! 0% -

a. Preliminary Site Evaluation Agusan del Sur 1 - - - - - - b Full Site Assessment CENRO Bayugan 1 - - - - -

2. Ecotourism Site Assessment ecotourism sites assessed Agusan del Sur 1 - - - - - -

CENRO Bayugan 1 - - - - -

4. Site Development

-

4.3 Maintenance of PA Facilities facilities maintained (no.) Agusan del Sur 5 - - - - - -

(Motorized Boat, River Raft, Floating Cottage, Boardwalk

tourism assistance center, monitoring tower) PENRO - PASU 5 - - - - -

Agusan del Sur 1 - - - - - -

PENRO - PASU 1 - - - - -

Conduct of PA Summit Regional Total 2 - - - - - -

a. Agusan Marsh WS Summit summit conducted (no.) Agusan del Sur 1 - - - - - -

PENRO - PASU 1 - - - - -

Regional Office 2 - - - - - -

AMWS 1 - - - - -

Regional Office 3 - - - - - -

Agusan del Sur Sites 1 - - - - -

Surigao del Norte Sites 1 - - - - -

11. Revenue Collection Consolidated statistical report

submitted to BMB

Regional Total

PASu-AMWS

PASu-SIPLAS

5% increase based from the

2017 collection- PA fees collected (peso)

2. Cave Assessment and Classification Cave assessment report with

recommended classification

with map

Agusan del Sur 3 - - - - - -

CENRO Bayugan 1 - - - - -

CENRO Talacogon 1 - - - - -

CENRO Bunawan 1 - - - - -

ecotourism development plan

approved by REC and PAMB

endorsed to BMB (no)

Provision of assistance in the

marketing of Libas Jam &

Katmon Jam Products in

registration to BFAD & DTI

7. Ecotourism Product Development

and Promotion

9. Program and impact monitoring (Region

Target)

Program and impact

monitoring conducted

10. Support to National Ecotourism

Strategy & Action Plan (2013-2022)

Provision of assistance in the marketing of Libas

Jam & Katmon Jam Products in registration to

BFAD & DTI

Validation of identified Ecotourism Sites

(potential/ emerging/ existing)

identified ecotourism sites

validated (no)

- number of visitors (local

& foreign)

Page 2 of 6

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (14) (15) (16) (17) (18) (19) (20)

CODE MFO/P/A/PPERFORMANCE

INDICATOR

LOCATION (Province/City/

Municipality)

BACKLOGFEB

% Accomp.

(To Date)

(9/5*100)

ACCOMP

TO

DATE

TARGET

ANNUAL

% Accomp.

(This Month)

(8/7*100)

FINANCIAL

Allotment

% (Amount

Released/

Allotment *

100)

Obligation Disbursement % BUR

This

monthTo date

This

monthTo date

Obligation/

Allotment

(16/12*100)

Disbursement/

Obligation

(18/16*100)

TARGET

FEB TO DATE

Regional Total 130 - - - - #DIV/0! - -

- helmet (4) Regional Office 26 - - - - #DIV/0! - -

- headlamp (4) Surigao del Norte 26 - - - #DIV/0! - -

- Life Vest (2)

- Dry bag (3)

- Harness chest (4)

- Pulley (3) Agusan del Sur 26 - - - - - -

- Caving rope 60m (3) PENRO 26 - - - - -

- Safety line (3)

IV. Conservation of Inland Wetland

2. Wetland Assessment Agusan del Sur 2 - - - - - -

PASU AMWS 2 - - - - -

assessment report with map

and geotagged photos of

priority wetlands endorsed to

BMB (no.)

2. Procurement of Caving Supplies Caving supplies purchased

(no.)

Page 3 of 6

(21)

Conducted last February 21, 2018

REMARKS / Justification

for those activities with

low and high percentage

accomplishments

Page 4 of 6

(21)

REMARKS / Justification

for those activities with

low and high percentage

accomplishments

Page 5 of 6

(21)

REMARKS / Justification

for those activities with

low and high percentage

accomplishments

Page 6 of 6

DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES

Physical and Financial Accomplishment Monitoring Report

as of the month of FEBRUARY

CY 2018

Province : PENRO-Agusan del Sur

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (15) (16) (17) (18) (19) (20)

REGIONAL TOTAL 176,615,000.00 - - - - -

PENRO 1,873,000.00 -

CENRO Bayugan City 49,066,000.00 -

CENRO Talacogon 36,587,000.00 -

CENRO Bunawan 43,079,000.00 -

CENRO Loreto 46,010,000.00 -

Agusan del Sur 7,328

CENRO Bayugan City 2,046

CENRO Talacogon 1,653

CENRO Bunawan 2,077

CENRO Loreto 1,552

10 001 0500072 AGUSAN DEL SUR 7,658 - - 50 50 0.2% (50)

CENRO Bayugan 2,536 - - - - - -

CENRO Talacogon 1,645 - - 50 50 1% (50)

CENRO Loreto 1,857 - - - - - -

CENRO Bunawan 1,620 - - - - - -

10 001 0500072 Regular (2017 plantations) AGUSAN DEL SUR 6,608 - - 50 50 0.2% (50)

CENRO Bayugan 2,036 - - - - -

CENRO Talacogon 1,295 - - 50 50 1% (50)

CENRO Loreto 1,657 - - - - -

CENRO Bunawan 1,620 - - - - -

SIAD Agusan del Sur 1,050 - - - - - -

CENRO Bayugan City 500 - - - - -

CENRO Talacogon 350 - - - - -

CENRO Loreto 200 - - - - -

10 001 0500072 AGUSAN DEL SUR 12,277 - - - - - -

CENRO Bayugan City 6,454 - - - - - -

CENRO Talacogon 1,928 - - - - - -

CENRO Bunawan 1,463 - - - - - -

CENRO Loreto 2,432 - - - - - -

10 001 0500072 Regular (2016 plantations) Agusan del Sur 8,205 - - - - - -

CENRO Bayugan City 2,774 - - - - -

CENRO Talacogon 1,586 - - - - -

CENRO Bunawan 1,463 - - - - -

CENRO Loreto 2,382 - - - - -

PAMANA (2016 plantations) Agusan del Sur 150 - - - - - -

CENRO Talacogon 100 - - - - -

CENRO Loreto 50 - - - - -

MMFN 2015 (2016 plantations) Agusan del Sur 3,922 - - - - - -

CENRO Bayugan City 3,680 - - - - -

CENRO Talacogon 242 - - - - -

MMFN 2015 Additional target

(2016 plantations)

Regional Total 1,555 - - - - - -

CODE MFO/P/A/PPERFORMANCE

INDICATOR

LOCATION (Province/City/

Municipality)

PHYSICAL

TARGET ACCOMP

BACKLOG ANNUAL

FINANCIAL

Disbursement % BUR

Allotment

Obligation

FEB TO DATE FEBTO

DATE

% Accomp.

(This Month)

(8/7*100)

% Accomp.

(To Date)

(9/5*100)

Total Year-3 (2016 plantations) area effectively

maintained and

protected with at least

85% survival

Obligation/

Allotment

(16/12*100)

Disburseme

nt/

Obligation

(18/16*100)

Forest development, rehabilitation and maintenance

and protection

Total Year-1 (2018 plantations) area effectively

maintained and

protected with at least

85% survival

Total Year-2 (2017 plantations) area effectively

maintained and

protected with at least

85% survival

This

monthTo date

This

monthTo date

Page 1 of 4

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (15) (16) (17) (18) (19) (20)

CODE MFO/P/A/PPERFORMANCE

INDICATOR

LOCATION (Province/City/

Municipality)

PHYSICAL

TARGET ACCOMP

BACKLOG ANNUAL

FINANCIAL

Disbursement % BUR

Allotment

Obligation

FEB TO DATE FEBTO

DATE

% Accomp.

(This Month)

(8/7*100)

% Accomp.

(To Date)

(9/5*100)

Obligation/

Allotment

(16/12*100)

Disburseme

nt/

Obligation

(18/16*100)

This

monthTo date

This

monthTo date

10 001 03000 16 Seedling Production Agusan del Sur 10,574,040 - - - - - -

CENRO Bayugan City 3,408,636 - - - - - -

CENRO Talacogon 2,753,898 - - - - - -

CENRO Bunawan 2,189,666 - - - - - -

CENRO Loreto 2,221,840 - - - - - -

10 001 03000 16 Timber (PO contracted) Agusan del Sur 8,106,756 - - - - - -

CENRO Bayugan City 2,575,636 - - - - -

CENRO Talacogon 2,227,442 - - - - -

CENRO Bunawan 1,611,022 - - - - -

CENRO Loreto 1,692,656 - - - - -

Cacao (Budded-PO contracted) Agusan del Sur 156,000 - - - - - -

CENRO Loreto 156,000 - - - - -

Agusan del Sur 522,000 - - - - - -

CENRO Bunawan 522,000 - - - - -

10 001 03000 16 Agusan del Sur 7,296 - - - - - -

CENRO Bayugan City 2,046 - - - - - -

CENRO Talacogon 1,653 - - - - - -

CENRO Bunawan 2,045 - - - - - -

CENRO Loreto 1,552 - - - - - -

10 001 03000 16 Timber (MMFN) Agusan del Sur 1,074 - - - - -

CENRO Bayugan City 500 - - - - -

CENRO Talacogon 316 - - - - -

CENRO Bunawan 34 - - - - -

CENRO Loreto 224 - - - - -

10 001 03000 16 Timber (PO contracted) Agusan del Sur 4,866 - - - - -

CENRO Bayugan City 1,546 - - - - -

CENRO Talacogon 1,337 - - - - -

CENRO Bunawan 967 - - - - -

CENRO Loreto 1,016 - - - - -

Cacao (PO contracted) Agusan del Sur 312 - - - - -

CENRO Loreto 312 - - - - -

10 001 03000 16 Regional Total 3,348 - - - - -

Agusan del Sur 1,044 - - - - -

CENRO Bunawan 1,044 - - - - -

10 001 0500072 Hiring of Extension Officer FEOs hired (no) Agusan del Sur 56 56 56 56 56 100% 17% -

PENRO 1 1 1 1 1 100% 17% -

CENRO Bayugan City 24 24 24 ## ## ## ## 100% 17% -

CENRO Talacogon 10 10 10 ## ## ## ## 100% 17% -

CENRO Bunawan 9 9 9 9 9 100% 17% -

CENRO Loreto 12 12 12 ## ## ## ## 100% 17% -

Maintenance of SPA seed production areas Agusan del Sur 1

Seedlings Produced (no)

10 001 03000 16 Agroforestry systems within CBFMA areas

with approved CRMF alley cropping (PO

contracted)

Site Preparation and Planting (including

brushing, Hole digging, Staking, Hauling of

seedlings -from sdlngs depot to planting sites

and out planting)

Agroforestry systems within CBFMA areas

with approved CRMF alley cropping (PO

contracted)

Page 2 of 4

(21)

REMARKS /

Justification for those

activities with low and

high percentage

accomplishments

Page 3 of 4

(21)

REMARKS /

Justification for those

activities with low and

high percentage

accomplishments

Page 4 of 4

DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES

Physical and Financial Accomplishment Monitoring Report

as of the month of FEBRUARY

CY 2018

Province : PENRO-Agusan del Sur

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21)

CONTINUING

Mechanized and Modernized Forest

Nursery

Agusan del Sur 2,059 - 2,059 - - - 2,059

CENRO Bayugan 2,059 - 2,059 - - - 2,059

Agusan del Sur 2,059 - 2,059 - - - 2,059

CENRO Bayugan 2,059 - 2,059 - - - 2,059

Maintenance and Protection (Year 2) Agusan del Sur 3,680 - 3,680 - - - 3,680

1ST PASS to 4TH PASS CENRO Bayugan 3,680 - 3,680 - - - 3,680

Prepared by: Approved by:

CODE MFO/P/A/PPERFORMANCE

INDICATOR

LOCATION

(Province/City/

Municipality)

PHYSICAL

TARGET ACCOMP

BACKLOG

FINANCIAL

REMARKS /

Justification for those

activities with low and

high percentage

accomplishments

ANNUAL

Disbursement % BUR

Allotment Released

% (Amount

Released/

Allotment *

100)

Obligation

FEB TO DATE FEBTO

DATE

% Accomp.

(This Month)

(8/7*100)

% Accomp.

(To Date)

(9/5*100)

3. Plantation Maintenance and

Protection (Year 1)

2. Mobilization of students, civil

organizations, partner

agencies/groups/individuals prior tree

planting-SOCMOB

Area developed (has.)

Obligation/

Allotment

(16/12*100)

Disbursement/

Obligation

(18/16*100)

A.03.b. Forest Development Rehabilitation and Protection

This

monthTo date

This

monthTo date

DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES

Physical and Financial Accomplishment Monitoring Report

as of the month of FEBRUARY

CY 2018

Province : PENRO-Agusan del Sur

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (14) (15) (16) (17) (18) (19) (20)

REGIONAL TOTAL 4,902,000 - - - - 0% #DIV/0!

Agusan del Sur 2,451,000 - - - - - -

PENRO 366,000 -

CENRO Bayugan City 358,000 -

CENRO Talacogon 693,000 -

CENRO Bunawan 533,000 -

CENRO Loreto 501,000 -

Land Survey, Disposition and Records

Management

PBB indicators:

10 001 0500072 Agusan del Sur 740 - - - - - -

CENRO Bayugan City 107 - - - - -

CENRO Talacogon 268 - - - - -

CENRO Bunawan 207 - - - - -

CENRO Loreto 158 - - - - -

non-PBB indicators:

1. Land Disposition/Distribution

Patents issued on:

10 001 0500072 B. Agricultural Free Patent patent issued (no.) Agusan del Sur 85 - - - - - -

CENRO Bayugan City 21 - - - - -

CENRO Talacogon 12 - - - - -

CENRO Bunawan 21 - - - - -

CENRO Loreto 31 - - - - -

D. Other Patents

10 001 0500072 (Commercial & Industrial) patent issued (no.) Agusan del Sur 2 - - - - - -

CENRO Bayugan City 1 - - - - -

CENRO Bunawan 1 - - - - -

3. Land Survey

10 001 0500072 3.1 Survey of residential land areas Agusan del Sur 882 - - - - - -

CENRO Bayugan City 138 - - - - -

CENRO Talacogon 310 - - - - -

CENRO Bunawan 213 - - - - -

CENRO Loreto 221 - - - - -

4. Resolution of Land Disputes/ Cases

10 001 0500072 Agusan del Sur 6 - - - - - -

CENRO Bayugan City 2 - - - - -

CENRO Talacogon 2 - - - - -

CENRO Bunawan 1 - - - - -

CENRO Loreto 1 - - - - -

CODE MFO/P/A/PPERFORMANCE

INDICATOR

LOCATION

(Province/City/

Municipality)

PHYSICAL

TARGET ACCOMP

BACKLOG ANNUAL

Disbursement % BUR

Allotment

% (Amount

Released/

Allotment *

100)

Obligation

% Accomp.

(This Month)

(8/7*100)

% Accomp.

(To Date)

(9/5*100)

FEB TO DATE FEBTO

DATE

Obligation/

Allotment

(16/12*100)

Disbursem

ent/

Obligation

(18/16*100)

To date

FINANCIAL

Land Management

A. Residential Patents (disposed under RA 10023

or residential free patent)

patent issued (no.)

Lot surveyed & approved

(no)

This

monthTo date

This

month

4.1 Resolution of Land Dispute/ Cases Land Dispute/Cases

resolved (no.)

Page 1 of 4

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (14) (15) (16) (17) (18) (19) (20)

CODE MFO/P/A/PPERFORMANCE

INDICATOR

LOCATION

(Province/City/

Municipality)

PHYSICAL

TARGET ACCOMP

BACKLOG ANNUAL

Disbursement % BUR

Allotment

% (Amount

Released/

Allotment *

100)

Obligation

% Accomp.

(This Month)

(8/7*100)

% Accomp.

(To Date)

(9/5*100)

FEB TO DATE FEBTO

DATE

Obligation/

Allotment

(16/12*100)

Disbursem

ent/

Obligation

(18/16*100)

To date

FINANCIAL

This

monthTo date

This

month

5. Land Records Management

10 001 0500072 Agusan del Sur 5 - - - - - -

PENRO 1 - - - - -

CENRO Bayugan City 1 - - - - -

CENRO Talacogon 1 - - - - -

CENRO Bunawan 1 - - - - -

CENRO Loreto 1 - - - - -

10 001 0500072 8. Support to DAR-DENR-LRA-NCIP JAO Joint Regional/Provincial

Committee

Operationalized

Agusan del Sur 1 - - - - -

5.1. Land Records Maintenance Land Records maintained

(no.)

Page 2 of 4

(21)

No autrorized PENRO to sign

patents

For approval Patents

28/0.9916

10/0.4349

3/0.0900

15/.4667

For approval Patents

3/5.1192

1/0.0956

2/5.0236

REMARKS /

Justification for those

activities with low and

high percentage

accomplishments

Page 3 of 4

(21)

REMARKS /

Justification for those

activities with low and

high percentage

accomplishments

Page 4 of 4

DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES

Physical and Financial Accomplishment Monitoring Report

as of the month of FEBRUARY

CY 2018

Province : PENRO-Agusan del Sur

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (14) (15) (16) (17) (18) (19) (20) (21)

ORGANIZATIONAL -FOCUSED

Agusan del Sur 5 5 5 5 5 100% 17% -

PENRO 1 1 1 1 1 100% 17% -

CENRO Bayugan City 1 1 1 1 1 100% 17% -

CENRO Talacogon 1 1 1 1 1 100% 17% -

CENRO Bunawan 1 1 1 1 1 100% 17% -

CENRO Loreto 1 1 1 1 1 100% 17% -

Agusan del Sur 5 - - - - 0% -

PENRO 1 - - - 0% -

CENRO Bayugan City 1 - - - 0% -

CENRO Talacogon 1 - - - 0% -

CENRO Bunawan 1 - - - 0% -

CENRO Loreto 1 - - - 0% -

Agusan del Sur 5 - - - - 0% -

PENRO 1 - - - 0% -

CENRO Bayugan City 1 - - - 0% -

CENRO Talacogon 1 - - - 0% -

CENRO Bunawan 1 - - - 0% -

CENRO Loreto 1 - - - 0% -

Agusan del Sur 5 - - 4 4 80% (4)

PENRO 1 - - 1 1 100% (1)

CENRO Bayugan City 1 - - 1 1 100% (1)

CENRO Talacogon 1 - - 1 1 100% (1)

CENRO Bunawan 1 - - 1 1 100% (1)

CENRO Loreto 1 - - - 0% -

Agusan del Sur 5 - 0% -

PENRO 1 0% -

CENRO Bayugan City 1 0% -

CENRO Talacogon 1 0% -

CENRO Bunawan 1 0% -

CENRO Loreto 1 0% -

Agusan del Sur 5 - -

- - 0% -

PENRO 1 - - - 0% -

CENRO Bayugan City 1 - - - 0% -

CENRO Talacogon 1 - - - 0% -

CENRO Bunawan 1 - - - 0% -

CODE MFO/P/A/P PERFORMANCE INDICATORLOCATION (Province/City/

Municipality)

PHYSICAL

TARGET ACCOMP

BACKLOG

REMARKS /

Justification for those

activities with low and

high percentage

accomplishments ANNUAL

Disbursement % BUR

Allotment

% (Amount

Released/

Allotment *

100)

Obligation

% Accomp.

(This Month)

(8/7*100)

% Accomp.

(To Date)

(9/5*100)

FEB TO DATE FEB TO

DATE

Obligation/

Allotment

(16/12*100)

Disbursement

/ Obligation

(18/16*100)To date

FINANCIAL

This

monthTo date

This

month

GAD Performance

Assessment/Exposure Tour

conducted/attended (no.)

GAD related Training

conducted/attended (no.)

GAD Accomplishment

Reports submitted (no.)

GAD activities

conducted/coordinated and

attended (no.)

GENDER AND DEVELOPMENT

A. Strengthening of GAD Focal Point GAD Focal Points re-

organized/ strengthened

(no.)

GAD-IEC materials

produced/ reproduced with

exhibited bulletin board

(no.)

GAD Sensitivity

Training (GST)

Workshop last

February 13-15, 2018

Page 1 of 3

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (14) (15) (16) (17) (18) (19) (20) (21)

CODE MFO/P/A/P PERFORMANCE INDICATORLOCATION (Province/City/

Municipality)

PHYSICAL

TARGET ACCOMP

BACKLOG

REMARKS /

Justification for those

activities with low and

high percentage

accomplishments ANNUAL

Disbursement % BUR

Allotment

% (Amount

Released/

Allotment *

100)

Obligation

% Accomp.

(This Month)

(8/7*100)

% Accomp.

(To Date)

(9/5*100)

FEB TO DATE FEB TO

DATE

Obligation/

Allotment

(16/12*100)

Disbursement

/ Obligation

(18/16*100)To date

FINANCIAL

This

monthTo date

This

month

CENRO Loreto 1 - - - 0% -

Agusan del Sur 5 - - - - 0% -

PENRO 1 - - - 0% -

CENRO Bayugan City 1 - - - 0% -

CENRO Talacogon 1 - - - 0% -

CENRO Bunawan 1 - - - 0% -

CENRO Loreto 1 - - - 0% -

Agusan del Sur 5 - - - 5 100% (5)

PENRO 1 - - 1 100% (1)

CENRO Bayugan City 1 - - 1 100% (1)

CENRO Talacogon 1 - - 1 100% (1)

CENRO Bunawan 1 - - 1 100% (1)

CENRO Loreto 1 - - 1 100% (1)

B. Mainstreamed Activities

Output 1Integrate gender & culture processes & procedures in program & project design & formulation

Agusan del Sur 2 - - - - 0% -

CENRO Talacogon 1 - - - - 0% -

San Luis 1 - - - 0% -

CENRO Bunawan 1 - - - - 0% -

Trento 1 - - - 0% -

Agusan del Sur 8 - - - - 0% -

CENRO Bayugan City 5 - - - 0% -

CENRO Bunawan 2 - - - 0% -

CENRO Loreto 1 - - - 0% -

2. PA Management Agusan del Sur 1 - - - 0% -

-ANP

gender-sensitive

Communication Plan

prepared (no.)

Agusan del Sur 1 - - - 0% -

3. Ecotourism Development men and women are

provided with opportunities

to fully participate in DENR

programs, projects (no.)

Agusan del Sur 1 - - - 0% -

KAP survey conducted with

gender analysis prepared

(no. of barangays)

Agusan del Sur 3 - - - 0% -

Output 2

Establish relevant database for gender responsive formulation & implementation of policies, programs & projects

1. National Greening Program Agusan del Sur 5PENRO 1CENRO Bayugan City 1CENRO Talacogon 1CENRO Bunawan 1CENRO Loreto 1

VAWC Activity conducted/

coordinated/ attended

GAD Meetings/ Seminar

attended/conducted (no.)

CLIENT- FOCUSED

1. Preparation of Climate Reslient

Plans & Ecosystem-Mgt. Plans

gender-responsive FLUP prepared (no.)

gender-responsive CRMF

with map and FYWP

prepared (no.)

gender-sensitive Initial PA

Management lan prepared

(no.)

sex-disaggregated

database established and

maintained with simple

data analysis at the end of

the year

Page 2 of 3

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (14) (15) (16) (17) (18) (19) (20) (21)

CODE MFO/P/A/P PERFORMANCE INDICATORLOCATION (Province/City/

Municipality)

PHYSICAL

TARGET ACCOMP

BACKLOG

REMARKS /

Justification for those

activities with low and

high percentage

accomplishments ANNUAL

Disbursement % BUR

Allotment

% (Amount

Released/

Allotment *

100)

Obligation

% Accomp.

(This Month)

(8/7*100)

% Accomp.

(To Date)

(9/5*100)

FEB TO DATE FEB TO

DATE

Obligation/

Allotment

(16/12*100)

Disbursement

/ Obligation

(18/16*100)To date

FINANCIAL

This

monthTo date

This

month

No. of men and no. of

women benefitted (inclusive

growth) from the programs

and projects based on

access and control/benefits

analysis

Agusan del Sur 9,616 - - 27 0% (27)

sex-disaggregated

database established and

maintained with simple

data analysis at the end of

the year (FEOs)

Agusan del Sur 51 51 51 51 51 100% 100% -

2. Land Disposition database of female & male

issued with patents (no. Of

patentees)

Agusan del Sur 1,566 - - - 0% -

3. PA Establishment Agusan del Sur 44 - - - - 0% -

-AMWS 39 - - - 0% -

-ANP 5 - - - 0% -

5. PA Management resolutions include

safeguards that address the

specific gender issues of

women and men in PA

Management (no.)

Agusan del Sur 8 - - - 0% -

6. Ecotourism Development men and women are

provided with opportunities

to fully participate in DENR

programs, projects (no.)

Agusan del Sur 1 - - - 0% -

gender dissaggregated

demographic profile of PA

occupants registered

prepared (no. of

barangays)

Page 3 of 3

DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES

Physical and Financial Accomplishment Monitoring Report

as of the month of FEBRUARY

CY 2018

Province : PENRO-Agusan del Sur

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (14) (15) (16) (17) (18) (19) (20)

REGIONAL TOTAL 4,016,000.00 - - - - 0% #DIV/0!

Agusan del Sur 2,008,000 - - - - - -

PENRO 450,000 -

CENRO Bayugan City 367,000 -

CENRO Talacogon 457,000 -

CENRO Bunawan 592,000 -

CENRO Loreto 142,000 -

A. Preparation of Climate Resilient

Plans

10 001 0500072 1.1 Preparation of FLUP (Yr 1) Agusan del Sur 2 - - - - - -

CENRO Talacogon 1 - - - - - -

San Luis 1 - - - - -

CENRO Bunawan 1 - - - - - -

Trento 1 - - - - -

Milestone Targets

10 001 0500072 1.1.1 Data Gathering, Community Mapping

& Validation

data matrix of biophysical &

socio-economic data

prepared (no.)

Agusan del Sur 2 - - - -

CENRO Talacogon 1 - - - -

CENRO Bunawan 1 - - -

10 001 0500072 1.1.2 Conduct of Situational analysis Agusan del Sur 2 - - - - - -

CENRO Talacogon 1 - - - - -

CENRO Bunawan 1 - - - - -

10 001 0500072 Agusan del Sur 2 - - - - - -

CENRO Talacogon 1 - - - - -

CENRO Bunawan 1 - - - - -

10 001 0500072 1.1.4 Plan Formulation Stage FLUP drafted (no.) Agusan del Sur 2 - - - - - -

CENRO Talacogon 1 - - - - -

CENRO Bunawan 1 - - - - -

10 001 0500072 1.2 Finalization & Adoption of Plan (Yr2) Agusan del Sur 2 - - - - - -

CENRO Bayugan City 1 - - - - -

Bayugan City

CENRO Bunawan 1 - - - - -

San Francisco

10 001 0500072 2. Preparation of CRMF with map and

FYWP

area effectively managed

(no.)

Agusan del Sur 8 - - - - - -

CENRO Bayugan City 5 - - - - -

CENRO Bunawan 2 - - - - -

CENRO Loreto 1 - - - - -

CODE MFO/P/A/PPERFORMANCE

INDICATOR

LOCATION

(Province/City/

Municipality)

PHYSICAL

ACCOMP

BACKLOG

TARGET TARGET % BUR

Allotment

% (Amount

Released/

Allotment *

100)

Obligation Disbursement

ANNUAL

% Accomp.

(This Month)

(8/7*100)

% Accomp.

(To Date)

(9/5*100)

FEB TO DATE FEBTO

DATE

Obligation/

Allotment

(16/12*100)

Disbursemen

t/ Obligation

(18/16*100)

Formulation and Monitoring of ENR Sector Plans and Polices,

Plans, Programs and Projects

To dateThis

monthTo date

FINANCIAL

1. Forest Land Use Planning

Area effectively managed

(no. of LGU)

Land Use allocation map

developed (no.)

This

month

1.1.3 Prioritization of Sub-watersheds &

Allocation of Forest & Forestlands

Workshop reports prepared

(no.)

FLUP finalized & adopted by

the Sangunian Bayan (no.)

Page 1 of 6

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (14) (15) (16) (17) (18) (19) (20)

CODE MFO/P/A/PPERFORMANCE

INDICATOR

LOCATION

(Province/City/

Municipality)

PHYSICAL

ACCOMP

BACKLOG

TARGET TARGET % BUR

Allotment

% (Amount

Released/

Allotment *

100)

Obligation Disbursement

ANNUAL

% Accomp.

(This Month)

(8/7*100)

% Accomp.

(To Date)

(9/5*100)

FEB TO DATE FEBTO

DATE

Obligation/

Allotment

(16/12*100)

Disbursemen

t/ Obligation

(18/16*100)To date

This

monthTo date

FINANCIAL

This

month

10 001 0500072 Agusan del Sur 60 4 9 4 9 44% 15% -

PENRO 12

CENRO Bayugan City 12 1 2 1 2 50% 17% -

CENRO Talacogon 12 1 2 1 2 50% 17% -

CENRO Bunawan 12 1 2 1 2 50% 17% -

CENRO Loreto 12 1 2 1 2 50% 17% -

H. Forestry Extension & Services

10 001 0500072 1. PO Strengthening & Capability Building Regional/Provincial PO

Federation strengthened/

consultation conducted (no.)

Agusan del Sur 1 - - - - -

PA MANAGEMENT

10 001 0500072 Agusan del Sur 3 - - - - - -

Andanan Natural Park 3 - - - - -

PLANNING & MANAGEMENT

PBB enrolled activities:

10 001 0500072 Agusan del Sur 5

PENRO 1

CENRO Bayugan City 1

CENRO Talacogon 1

CENRO Bunawan 1

CENRO Loreto 1

10 001 0500072 B. Submission of Budget and Financial

Accountability Reports (BFARs)

Budget and Financial

Accountability Reports

(BFARs) based on DBM-COA

Joint Circular No. 2014-01

Guidelines Prescribing the

Use of Modified Formats of

the Budget and Financial

Accountability Reports

(BFARs)” submitted to COA

and DBM

Agusan del Sur 3 - - - - -

10 001 0500072 Agusan del Sur 80 5 10 5 10 50% 13% -

PENRO 16 1 2 1 2 50% 13% -

CENRO Bayugan City 16 1 2 1 2 50% 13% -

CENRO Talacogon 16 1 2 1 2 50% 13% -

CENRO Bunawan 16 1 2 1 2 50% 13% -

CENRO Loreto 16 1 2 1 2 50% 13% -

Non-PBB activities:

10 001 0500072 1. Preparation and submission of

Regional PENRO/CENRO Work &

Financial Plan

Regional/Provincial

Reprogramming Workshop

conducted (no.)

Agusan del Sur 1

D. Forest Products Utilization and Price

Monitoring Price

monitoring of forest products

consolidated and analyzed

monthly price data report by

PENRO submitted to FMB

(no.)

1. Conduct of SEAMS Socio-Economic Assessment

Monitoring (SEAMS )

conducted (no)

A. Preparation and submission of

Regional PENRO/CENRO Work &

Financial Plan

Regional/PENRO/ CENRO

Work & Financial Plan

prepared and submitted (no.)

C. Preparation and submission of

monthly, quarterly and semi-annual

reports

monthly, quarterly, semi-

annual & annual report

prepared/submitted (no.)

Page 2 of 6

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (14) (15) (16) (17) (18) (19) (20)

CODE MFO/P/A/PPERFORMANCE

INDICATOR

LOCATION

(Province/City/

Municipality)

PHYSICAL

ACCOMP

BACKLOG

TARGET TARGET % BUR

Allotment

% (Amount

Released/

Allotment *

100)

Obligation Disbursement

ANNUAL

% Accomp.

(This Month)

(8/7*100)

% Accomp.

(To Date)

(9/5*100)

FEB TO DATE FEBTO

DATE

Obligation/

Allotment

(16/12*100)

Disbursemen

t/ Obligation

(18/16*100)To date

This

monthTo date

FINANCIAL

This

month

10 001 0500072 2. Consultation/ Preparation and

submission of Regiona/ Provincial

Budget Proposal

Regional/ Provincial Budget

Proposal prepared and

submitted (no.)

Agusan del Sur 1 - - - 0% -

10 001 0500072 Agusan del Sur 20 - - 6 6 30% (6)

PENRO 4 - - 3 3 75% (3)

CENRO Bayugan City 4 - - - 0% -

CENRO Talacogon 4 - - 1 1 25% (1)

CENRO Bunawan 4 - - - 0% -

CENRO Loreto 4 - - 2 2 50% (2)

10 001 0500072 Agusan del Sur 5

PENRO 1

CENRO Bayugan City 1

CENRO Talacogon 1

CENRO Bunawan 1

CENRO Loreto 1

5. Conduct of Field Project Monitoring

of ENR Projects

Project sites monitored (no.)

9. Conduct of Planning Officers Year-

End Assessment

Planning Officers Assembly

Year-End Assessment

conducted/attended (no.)

Page 3 of 6

(21)

REMARKS /

Justification for those

activities with low and

high percentage

accomplishments

Orientation with LGU-Trento

on February 6, 2018

Page 4 of 6

(21)

REMARKS /

Justification for those

activities with low and

high percentage

accomplishments

Page 5 of 6

(21)

REMARKS /

Justification for those

activities with low and

high percentage

accomplishments

Page 6 of 6

DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES

Physical and Financial Accomplishment Monitoring Report

as of the month of FEBRUARY

CY 2018

Province : PENRO-Agusan del Sur

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (14) (15) (16) (17) (18) (19) (20)

REGIONAL TOTAL 21,510,000 - - - - 0% #DIV/0!

Agusan del Sur 10,755,000 - - - - - -

PENRO 1,104,000 -

CENRO Bayugan City 2,705,000 -

CENRO Talacogon 2,186,000 -

CENRO Bunawan 2,428,000 -

CENRO Loreto 2,332,000 -

A. Forest Products Utilization & Land Use

Regulation

10 001 0500072 1. Compliance monitoring of existing

agreements and permits

tenurial intruments monitored/

evaluated (no.)

Agusan del Sur 34 - - - - - -

CENRO Bayugan City 23 - - - - -

a. IFMA IFMA holders (no.) CENRO Talacogon 3 - - - - -

b. SIFMA SIFMA holders (no.) CENRO Bunawan 5 - - - - -

c. Rattan rattan holders (no.) CENRO Loreto 3 - - - - -

Agusan del Sur 805 20 30 - - - - 30

CENRO Bayugan City 202 5 8 - - - 8

CENRO Talacogon 201 5 8 - - - 8

CENRO Bunawan 201 5 7 - - - 7

CENRO Loreto 201 5 7 - - - 7

B. Forest Protection Program (Implementation of the Regional Forest Protection Plan)

10 001 0500072 Agusan del Sur 163,835 163,835

PENRO

CENRO Bayugan City 127,017 127,017

CENRO Talacogon 36,818 36,818

CENRO Bunawan

CENRO Loreto

Menu 1. Full logistics & material support essential in forest law enforcement

10 001 0500072 Agusan del Sur 5 - - - - - -

PENRO 1 - - - - -

CENRO Bayugan City 1 - - - - -

CENRO Talacogon 1 - - - - -

CENRO Bunawan 1 - - - - -

CENRO Loreto 1 - - - - -

10 001 0500072 1.21 Acquisition of Tree Caliper Tree caliper purchased (no.) Agusan del Sur 15 - - - - - -

PENRO 3 - - - - -

CENRO Bayugan City 3 - - - - -

CENRO Talacogon 3 - - - - -

CENRO Bunawan 3 - - - - -

CENRO Loreto 3 - - - - -

10 001 0500072 Agusan del Sur 10 - - - - - -

PENRO 2 - - - - -

CENRO Bayugan City 2 - - - - -

CENRO Talacogon 2 - - - - -

CODE MFO/P/A/P PERFORMANCE INDICATOR

LOCATION

(Province/City/

Municipality)

PHYSICAL

TARGET ACCOMP

BACKLOGANNUAL

FINANCIAL

Disbursement % BUR

Allotment

% (Amount

Released/

Allotment *

100)

Obligation

FEB TO DATE FEB TO DATE

% Accomp.

(This Month)

(8/7*100)

% Accomp.

(To Date)

(9/5*100)

1.16 Maintenance of motorcycles/vehicles /

pumboat

motorcycle/vehicles/ pumpboat

repaired (no.)

1.21 Acquisition of Lazer Range Finder Lazer Range Finder purchased

(no.)

Obligation/

Allotment

(16/12*100)

Disbursem

ent/

Obligation

(18/16*100)

1. Natural Resources Management Arrangement/ Agreement and Permit

Issuance

2. CSC Assessment CSCs assessed with categorical

recommendation (no.)

Protection of Untenured Forestlands &

2011-2015 NGP Plantations

areas effectively protected and

managed

This

monthTo date

This

monthTo date

Page 1 of 8

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (14) (15) (16) (17) (18) (19) (20)

CODE MFO/P/A/P PERFORMANCE INDICATOR

LOCATION

(Province/City/

Municipality)

PHYSICAL

TARGET ACCOMP

BACKLOGANNUAL

FINANCIAL

Disbursement % BUR

Allotment

% (Amount

Released/

Allotment *

100)

Obligation

FEB TO DATE FEB TO DATE

% Accomp.

(This Month)

(8/7*100)

% Accomp.

(To Date)

(9/5*100)

Obligation/

Allotment

(16/12*100)

Disbursem

ent/

Obligation

(18/16*100)

This

monthTo date

This

monthTo date

CENRO Bunawan 2 - - - - -

CENRO Loreto 2 - - - - -

10 001 0500072 Agusan del Sur 10 - - - - - -

10 001 0500073 PENRO 2 - - - - -

10 001 0500075 CENRO Bayugan City 2 - - - - -

10 001 0500074 CENRO Talacogon 2 - - - - -

CENRO Bunawan 2 - - - - -

CENRO Loreto 2 - - - - -

1.21 Acquisition of mobile device meter Agusan del Sur 10 - - - - - -

PENRO 2 - - - - -

CENRO Bayugan City 2 - - - - -

CENRO Talacogon 2 - - - - -

CENRO Bunawan 2 - - - - -

CENRO Loreto 2 - - - - -

Menu 2. Improvements of infra- structures, provision of institutional support in investigation, filing of information and/ or criminal complaints and prosecutions of forestry cases

10 001 0500072 Agusan del Sur 16 16 16 16 16 100% 17% -

CENRO Bayugan City 4 4 4 4 4 100% 17% -

CENRO Talacogon 3 3 3 3 3 100% 17% -

CENRO Bunawan 7 7 7 7 7 100% 17% -

CENRO Loreto 2 2 2 2 2 100% 17% -

10 001 0500072 Agusan del Sur 4 4 4 3 4 75% 17% -

CENRO Bayugan City 1 1 1 1 1 100% 17% -

CENRO Talacogon 1 1 1 1 0% 17% -

CENRO Bunawan 1 1 1 1 1 100% 17% -

CENRO Loreto 1 1 1 1 1 100% 17% -

Menu 3. Active collaboration and involvement of forest communities and other stakeholders in forest protection and law enforcement undertakings

10 001 0500072 Agusan del Sur 4 4 4 4 4 100% 17% -

CENRO Bayugan City 1 1 1 1 1 100% 17% -

CENRO Talacogon 1 1 1 1 1 100% 17% -

CENRO Bunawan 1 1 1 1 1 100% 17% -

CENRO Loreto 1 1 1 1 1 100% 17% -

10 001 0500072 Bantay Gubat hired (no.) Agusan del Sur 28 28 28 28 28 100% 17% -

CENRO Bayugan City 8 8 8 8 8 100% 17% -

CENRO Talacogon 6 6 6 6 6 100% 17% -

CENRO Bunawan 8 8 8 8 8 100% 17% -

CENRO Loreto 6 6 6 6 6 100% 17% -

10 001 0500072 3.2 Conduct of Patrolling Agusan del Sur 2,160 180 360 124 439 35% 20% (79)

no. of reports 216 18 36 - 30 0% 14% 6

CENRO Bayugan City 600 50 100 50 131 50% 22% (31)

no. of reports 60 5 10 8 0% 13% 2

CENRO Talacogon 480 40 80 48 102 60% 21% (22)

no. of reports 48 4 8 5 0% 10% 3

CENRO Bunawan 480 40 80 26 80 33% 17% 0

no. of reports 48 4 8 5 0% 10% 3

CENRO Loreto 600 50 100 126 0% 21% (26)

no. of reports 60 5 10 12 0% 20% (2)

10 001 0500072 3.4 Activate & revitalize MFPCs, individual and

group volunteers in the localities and deputize

them as S/DENROs

group strengthened (no.) Agusan del Sur 1 - - - - -

1.21 Acquisition of Global Positioning System

(GPS)

GPS purchased (no.)

Patrol route prepared &

conducted (km)./ 'Patrol reports

submitted with actions taken

(no)

mobile device meter purchased

(no.)

2.1 Improvement/ maintenance of FIve (5) AILTF

Checkpoints

AILTF checkpoints

improved/maintained (no.)

2.2 Support to prosecution of criminal complaint prosecution of criminal

complaint supported (no.)

3.1 Hiring of Forest Protection Officers to support

the implementation of LAWIN Forest and

Biodiversity Protection System

Forest Protection Officers hired

(no.)

Page 2 of 8

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (14) (15) (16) (17) (18) (19) (20)

CODE MFO/P/A/P PERFORMANCE INDICATOR

LOCATION

(Province/City/

Municipality)

PHYSICAL

TARGET ACCOMP

BACKLOGANNUAL

FINANCIAL

Disbursement % BUR

Allotment

% (Amount

Released/

Allotment *

100)

Obligation

FEB TO DATE FEB TO DATE

% Accomp.

(This Month)

(8/7*100)

% Accomp.

(To Date)

(9/5*100)

Obligation/

Allotment

(16/12*100)

Disbursem

ent/

Obligation

(18/16*100)

This

monthTo date

This

monthTo date

Menu 5 : Sustained a well-planned Information, Education and Communication (IEC) campaign region-wide down to CENRO level

Agusan del Sur 4 - - 2 2 13% (2)

CENRO Bayugan City 1 - - - - -

CENRO Talacogon 1 - - 2 2 50% (2)

CENRO Bunawan 1 - - - - -

CENRO Loreto 1 - - - - -

Menu 6. Consistent apprehension and mandatory administrative adjudication and confiscation of undocumented forest products and including conveyances and implements

10 001 0500072 Agusan del Sur 4 - - 5 5 31% (5)

CENRO Bayugan City 1 - - 2 2 50% (2)

CENRO Talacogon 1 - - 1 1 25% (1)

CENRO Bunawan 1 - - 1 1 25% (1)

CENRO Loreto 1 - - 1 1 25% (1)

10 001 0500071 Agusan del Sur 4 - - 31 31 194% (31)

CENRO Bayugan City 1 - - 2 2 50% (2)

CENRO Talacogon 1 - - 1 1 25% (1)

CENRO Bunawan 1 - - 27 27 675% (27)

CENRO Loreto 1 - - 1 1 25% (1)

10 001 0500071

Agusan del Sur 4 - - 5 5 31% (5)

CENRO Bayugan City 1 - - 3 3 75% (3)

CENRO Talacogon 1 - - 1 1 25% (1)

CENRO Bunawan 1 - - 1 1 25% (1)

CENRO Loreto 1 - - - 0% -

10 001 0500073 Menu 8. Barcoding of Color Coded SMF & other transport documents

10 001 0500072 Agusan del Sur 7 7 7 7 7 100% 17% -

PENRO 1 1 1 1 1 100% 17% -

CENRO Bayugan City 2 2 2 2 2 100% 17% -

CENRO Talacogon 1 1 1 1 1 100% 17% -

CENRO Bunawan 2 2 2 2 2 100% 17% -

CENRO Loreto 1 1 1 1 1 100% 17% -

Menu 12. Data Management

10 001 0500072 Agusan del Sur 5 - - 1 1 5% (1)

PENRO 1 - - - - -

CENRO Bayugan City 1 - - - - -

CENRO Talacogon 1 - - 1 1 25% (1)

CENRO Bunawan 1 - - - - -

CENRO Loreto 1 - - - - -

D. Enforcement of PA/ Wildlife, Cave Laws,

Coastal & Marine Rules and Regulation

Regional Total

10 001 0500072 Agusan del Sur 5 - - 1 1 5% (1)

PENRO 1 - - - 0% -

CENRO Bayugan City 1 - - - 0% -

CENRO Talacogon 1 - - 1 1 100% (1)

CENRO Bunawan 1 - - - 0% -

CENRO Loreto 1 - - - 0% -

5.1 IEC Campaign CENRO level meetings,

consultations in support to LAWIN

IEC campaign conducted (no)

6.1 Hauling of apprehended forest products and

vehicles to designated area

apprehended forest products

hauled to designated area (vol)

apprehended vehicles hauled to

designated areas (no)

12.1 Maintenance of E-database of the

Apprehended/Confiscated Forest Products,

Conveyances and Implements and Cases Filed

E-database maintained (no)

4. Mobilization of WEO with quarterly report

including bio-diversity related cases acted

WEOs deputized/mobilized (no.)

/Quarterly report submitted

(no.)

Biodiversity-related cases

reported/acted (no.)

6.2 Apprehend undoccumented

forest products including NTFPs, vehicles,

equipment and other implements

apprehensions conducted (no)

6.3 Immediate administrative & adjudication

proceedings for apprehended forest products

including conveyances and implements

administrative/ adjudication

proceedings conducted (no)

9.3 Internet Subscription for field offices and

AILTF checkpoints

- internet for Field Offices and

AILTF Checkpoints subscribed

(no.)

Page 3 of 8

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (14) (15) (16) (17) (18) (19) (20)

CODE MFO/P/A/P PERFORMANCE INDICATOR

LOCATION

(Province/City/

Municipality)

PHYSICAL

TARGET ACCOMP

BACKLOGANNUAL

FINANCIAL

Disbursement % BUR

Allotment

% (Amount

Released/

Allotment *

100)

Obligation

FEB TO DATE FEB TO DATE

% Accomp.

(This Month)

(8/7*100)

% Accomp.

(To Date)

(9/5*100)

Obligation/

Allotment

(16/12*100)

Disbursem

ent/

Obligation

(18/16*100)

This

monthTo date

This

monthTo date

Page 4 of 8

(21)

REMARKS /

Justification for

those activities

with low and high

percentage

accomplishments

Page 5 of 8

(21)

REMARKS /

Justification for

those activities

with low and high

percentage

accomplishments

Page 6 of 8

(21)

REMARKS /

Justification for

those activities

with low and high

percentage

accomplishments

Page 7 of 8

(21)

REMARKS /

Justification for

those activities

with low and high

percentage

accomplishments

Page 8 of 8

DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES

Physical and Financial Accomplishment Monitoring Report

as of the month of FEBRUARY

CY 2018

Province : PENRO-Agusan del Sur

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (14) (15) (16) (17) (18) (19) (20)

CBFM - CARP

CONTINUING

Agusan del Sur

CENRO Bayugan

2. Seedling Procurement

a. procurement of coffee sdlngs procured sdlngs 12500 - 12,500 12,500 12,500 100% 100% -

3. Site Preparation

a. staking & hole digging staking installed 9500 - 9,500 9,500 9,500 100% 100% -

b. Area developed area developed 20 - 20 20 20 100% 100% -

Agusan del Sur

CENRO Bayugan

2. Seedling Procurement

c.Procurement of fruit tree sdlgs 600 - 600 600 600 100% 100% -

3. Site Preparation

a. staking & hole digging staking installed 12667 - 12,667 11,330 11,330 89% 89% 1,337

b. Area developed area developed 35 - 35 25 25 71% 71% 10

4. Maintenance and protection

a. Procurement of fertilizer

- organic No. of bags procured 250 - 250 250 250 100% 100% -

- in-organic No. of bags procured 50 - 50 50 50 100% 100% -

Agusan del Sur

CENRO Bunawan

2. Seedling procurement

b. procurement of cacao sdlngs 3500 - 3,500 - 0% 0% 3,500

b. procurement of banana suckers 4000 - 4,000 - 0% 0% 4,000

3. Site Preparation

a. staking and hole digging staking installed 14460 - 14,460 - 0% 0% 14,460

b. Area developed area developed 20 - 20 - 0% 0% 20

4. Maintenance and protection

a. Procurement of fertilizer

- organic No. of bags procured 150 - 150 - 0% 0% 150

- in-organic No. of bags procured 30 - 30 - 0% 0% 30

CODE MFO/P/A/PPERFORMANCE

INDICATOR

LOCATION

(Province/City/

Municipality)

PHYSICAL

TARGET ACCOMP

BACKLOGANNUAL

Disbursement % BUR

Allotment

% (Amount

Released/

Allotment *

100)

Obligation

% Accomp.

(This Month)

(8/7*100)

% Accomp.

(To Date)

(9/5*100)

FEB TO DATE FEBTO

DATE

Obligation/

Allotment

(16/12*100)

Disburseme

nt/

Obligation

(18/16*100)

To date

FINANCIAL

This

monthTo date

This

month

Bagani Tribal Returnees Community Development Association Inc.

Location: Sitio Bantolinao, Brgy. Padiay, Sibagat, ADS

Kalambuan Tribal Tree Farmers (KATTFA), Inc.

Location: Brgy. Kolambogan, Sibagat, Agusan del Sur

Kalingayan Community Based Resource Management Peoples Org.

Location : Brgy. Kalingayan, Rosario, Agusan del Sur

Page 1 of 4

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (14) (15) (16) (17) (18) (19) (20)

CODE MFO/P/A/PPERFORMANCE

INDICATOR

LOCATION

(Province/City/

Municipality)

PHYSICAL

TARGET ACCOMP

BACKLOGANNUAL

Disbursement % BUR

Allotment

% (Amount

Released/

Allotment *

100)

Obligation

% Accomp.

(This Month)

(8/7*100)

% Accomp.

(To Date)

(9/5*100)

FEB TO DATE FEBTO

DATE

Obligation/

Allotment

(16/12*100)

Disburseme

nt/

Obligation

(18/16*100)

To date

FINANCIAL

This

monthTo date

This

month

5. Extension Services

- SEES (30%) no. of trainings conducted 1 - 1 - 0% 0% 1

- Capability Building (70%) no. of trainings conducted 1 - 1 - 0% 0% 1

Agusan del Sur

CENRO Loreto

2. Site Preparation

a. staking and hole digging staking installed 5379 - 5,379 - 0% 0% 5,379

b. Area developed area developed 10 - 10 - 0% 0% 10

3. Maintenance and protection

a. Procurement of fertilizer

- organic No. of bags procured 250 - 250 - 0% 0% 250

- in-organic No. of bags procured 50 - 50 - 0% 0% 50

4. Procurement of Working Animal head/s 1 - 1 - 0% 0% 1

5. Extension Services

- SEES (30%) no. of trainings conducted 1 - 1 - 0% 0% 1

- Capability Building (70%) no. of trainings conducted 1 - 1 - 0% 0% 1

Wamvipo Agro-Forestry Development Association (WAMVIPO)

Location : Brgy. Waloe, Magaud, Loreto, Agusan del Sur

Page 2 of 4

(21)

REMARKS /

Justification for those

activities with low and

high percentage

accomplishments

Page 3 of 4

(21)

REMARKS /

Justification for those

activities with low and

high percentage

accomplishments

Page 4 of 4

DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES

Physical and Financial Accomplishment Monitoring Report

as of the month of FEBRUARY

CY 2018

Province : PENRO-Agusan del Sur

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (14) (15) (16) (17) (18) (19) (20)

REGIONAL TOTAL 340,000.00 - - 0%

Agusan del Sur 170,000 - - - - - -

PENRO 35,000 -

CENRO Bayugan 135,000 -

Protection and Conservation of Wildlife

I. Conservation and Protection of

Wildlife

A. Endemic Species Conservation

Population & habitat monitoring & protection of

priority threathed species

10 001 0300016 1. Philippine Eagle

Agusan del Sur 1 - - - - - -

1.1 Confirmatory/ verification surveys on PE

sightings

CENRO Bayugan

Kioya, Sibagat

1 - - - - -

1.2 Organization and mobilization of community

monitoring groups (CMG)

community monitoring

groups (CMG) organized

and mobilized (no.)

Agusan del Sur

Kioya, Sibagat

1

CENRO Bayugan 1

Kioya, Sibagat

1.3 Updating of distribution map Agusan del Sur 1 - - - - -

Kioya, Sibagat

10 001 0500072 Agusan del Sur 1 - 1 - 1 100% -

PENRO-PASu 1 - 1 1 100% -

Agusan Marsh WS

Lake Panlabuhan

Lake Mambagongon

Lake Mihaba

Lake Kelobidan

II. Establishment/ Management of Critical

Habitats

10 001 0500072 1. Establishment of Critical Habitat Agusan del Sur 1 - - - - - -

CENRO Bayugan City 1 - - - - -

Flying Fox & PE Guibonon,

Ezperanza, ADS

CODE MFO/P/A/PPERFORMANCE

INDICATOR

LOCATION

(Province/City/

Municipality)

PHYSICAL

TARGET ACCOMP

BACKLOG

FINANCIAL

ANNUAL

Disbursement % BUR

Allotment

% (Amount

Released/

Allotment *

100)

Obligation

FEB TO DATE FEBTO

DATE

% Accomp.

(This Month)

(8/7*100)

% Accomp.

(To Date)

(9/5*100)

D. Annual Waterfowl Census no. of migratory bird site

monitored

Obligation/

Allotment

(16/12*100)

Disbursement/

Obligation

(18/16*100)

Wildlife Resources Conservation Sub-Program

No. of population count

1.2 Monitoring and survey of Philippine eagle

population/ nesting sites outside PAs

Philippine eagle

population/ nesting sites

outside PAs monitored

and surved (no.)

This month To date This month To date

assessment conducted

stakeholders consultation

conducted

Page 1 of 2

(21)

REMARKS /

Justification for those

activities with low and

high percentage

accomplishments

Page 2 of 2

DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES

Physical and Financial Accomplishment Monitoring Report

as of the month of FEBRUARY

CY 2018

Province : PENRO-Agusan del Sur

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (14) (15) (16) (17) (18) (19) (20) (21)

Continuing Appropriation - SAA No. RI3-101-2017-09-668

Lawin Forest and Biodiversity

Protection System Implementation

on-going construction

Agusan del Sur 4 - 4 - - - 4

CENRO Bayugan 1 - 1 - - - 1

CENRO Talacogon 1 - 1 - - - 1

CENRO Bunawan 1 - 1 - - - 1

CENRO Loreto 1 - 1 - - - 1

Agusan del Sur 3 - 3 - - - 3

CENRO Bayugan 1 - 1 - - - 1

CENRO Talacogon 1 - 1 - - - 1

CENRO Loreto 1 - 1 - - - 1

1.8 Fabrication of Pump Boat (motorized

banca)

Pumpboat fabricated

(no.)

Depository shed/ area

established (no.)

1.7 Estbalishment of Depository shed/ area

CODE MFO/P/A/PPERFORMANCE

INDICATOR

LOCATION

(Province/City/

Municipality)

PHYSICAL

TARGET ACCOMP

BACKLOG

FINANCIAL

REMARKS /

Justification for those

activities with low and

high percentage

accomplishments

ANNUAL

Disbursement % BUR

Allotment

% (Amount

Released/

Allotment *

100)

Obligation

FEB TO DATE FEBTO

DATE

% Accomp.

(This Month)

(8/7*100)

% Accomp.

(To Date)

(9/5*100)

Obligation/

Allotment

(16/12*100)

Disbursement/

Obligation

(18/16*100)

This

monthTo date

This

monthTo date

DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES

Physical and Financial Accomplishment Monitoring Report

as of the month of FEBRUARY

CY 2018

Province : PENRO-Agusan del Sur

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (14) (15) (16) (17) (18) (19) (20)

Agusan del Sur

Environment and Natural Resources Resiliency

Program

Forest Production Management

Watershed Management

2. Conduct of Vulnerability Assessment watershed vulnerability

assessed (no./ha.)

Regional Total 1 - - - - - -

Agusan del Sur 1 - - - - - -

CENRO Bayugan 1 - - - - -

CODE MFO/P/A/PPERFORMANCE

INDICATOR

LOCATION

(Province/City/

Municipality)

PHYSICAL

TARGET ACCOMP

BACKLOG

FINANCIAL

ANNUAL

Disbursement % BUR

Allotment

% (Amount

Released/

Allotment *

100)

Obligation

FEB TO DATE FEBTO

DATE

% Accomp.

(This Month)

(8/7*100)

% Accomp.

(To Date)

(9/5*100)

(Andanan River

Watershed)

* the target is transferred to Andanan

River Watershed considering its crtitical

classified status

Obligation/

Allotment

(16/12*100)

Disbursement

/ Obligation

(18/16*100)

OO2: Adaptive Capacities of Human Communities

and Natural Systems Improved

This month To date This month To date

(21)

REMARKS /

Justification for those

activities with low and

high percentage

accomplishments

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (14) (15) (16) (17) (18) (19) (20)

FINANCIAL

Allotment

% (Amount

Released/

Allotment *

100)

Obligation Disbursement % BUR

This month To date This month To date

Obligation

/

Allotment

(16/12*100)

Disbursem

ent/

Obligation

(18/16*100)

ANNUAL

TARGET

FEB TO DATE

CODE MFO/P/A/P PERFORMANCE INDICATOR

LOCATION

(Province/City/

Municipality)

PHYSICAL

BACKLOG% Accomp.

(To Date)

(9/5*100)

FEB

ACCOMP

TO

DATE

% Accomp.

(This

Month)

(8/7*100)

Regional Total 1,084

Agusan del Sur 241

PENRO

CENRO Bayugan City

CENRO Talacogon

CENRO Bunawan

CENRO Loreto

Regional Total 16 Agusan del Sur 5

PENRO 1

CENRO Bayugan City 1

CENRO Talacogon 1

CENRO Bunawan 1

CENRO Loreto 1

Agusan del Sur 5 - - 5 5 100% (5)

PENRO 1 - - 1 1 100% (1)

CENRO Bayugan City 1 - - 1 1 100% (1)

CENRO Talacogon 1 - - 1 1 100% (1)

CENRO Bunawan 1 - - 1 1 100% (1)

CENRO Loreto 1 - - 1 1 100% (1)

Agusan del Sur 5 # ## 5 5 5 100% 17% -

PENRO 1 1 1 1 1 100% 17% -

CENRO Bayugan City 1 1 1 1 1 100% 17% -

CENRO Talacogon 1 1 1 1 1 100% 17% -

CENRO Bunawan 1 1 1 1 1 100% 17% -

CENRO Loreto 1 1 1 1 1 100% 17% -

1.10 Conduct of IPCR Performance

Review

IPCR performance review

conducted with report

submitted to Region/Central

Office (no.)

Agusan del Sur 1 - - - - -

2. Procurement

PBB-enrolled activities:

Regional Total 6 - - - - #DIV/0! - -

Agusan del Sur 1 - - - - -

Regional Total 18 - - - - - -

Agusan del Sur 7 - - - - - -

PENRO 5 - - - - -

CENRO Bayugan City 1 - - - - -

CENRO Talacogon 1 - - - - -

CENRO Bunawan 1 - - - - -

CENRO Loreto 1 - - - - -

Implementation of Good Governance Conditions

Personnel records 201 files

maintained/updated (no.)

1.5 Updating of Personnel Records

'-regular, CTI & casual

DPIS maintained/

operationalized (no.)

1.6 Maintenance of DENR Personnel

Information System (DPIS)

1.7 Updating/submission of PDS PDS updated, monitored &

submitted

100% of application/

issuances processed & acted

upon (no. of office)

1.8 Processing of application/

issuance

2018 Annual Procurement Plan

based on DBM Circular Letter

2013-14 dated November 29,

2013 submitted to Procurement

Service-DBM

A. Preparation of Annual

Procurement Plan (APP)

PPMP based on Revised

Implementing Rules and

Regulations of RA 9184

(Government Procurement

Reform Act) submitted to the

Head of BAC Secretariat on

deadline

B. Preparation of Project

Procurement Management Plan

(PPMP)

Page 2 of 14

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (14) (15) (16) (17) (18) (19) (20)

FINANCIAL

Allotment

% (Amount

Released/

Allotment *

100)

Obligation Disbursement % BUR

This month To date This month To date

Obligation

/

Allotment

(16/12*100)

Disbursem

ent/

Obligation

(18/16*100)

ANNUAL

TARGET

FEB TO DATE

CODE MFO/P/A/P PERFORMANCE INDICATOR

LOCATION

(Province/City/

Municipality)

PHYSICAL

BACKLOG% Accomp.

(To Date)

(9/5*100)

FEB

ACCOMP

TO

DATE

% Accomp.

(This

Month)

(8/7*100)

C. Registration with PHIL-GEPS

'-Certificate of Compliance

100% compliance to Phil-GEPs

conditions (no. of RO & PENR

Offices)

Agusan del Sur 1 - - - - -

Non- PBB Activities:

2.1 Posting of ITBs & REIs 100% of ITBs, REIs acted upon

((no. of RO & PENR Offices)

Agusan del Sur 1 1 1 1 1 100% 17% -

2.2 Conduct of Public Bidding Public Bidding conducted with

report submitted (no.)

Agusan del Sur 3 - - - - -

2.3 Operationalization of Bids &

Awards Committee (BAC)

BAC Meeting/ Conferences,

organized and conducted with

Minutes of meeting and

resolutions prepared (no.)

Agusan del Sur 4 - - 1 1 25%

3. Property Management

PBB-enrolled activities:

A. Reconciliation of Property,

Plant and Equipment Data Based

on Audit Findings

70% of the property, plant and

equipment data for the last 5

years (2008-2016) based on

audit findings submitted to COA

by end of November 2017

Agusan del Sur 1 - - - - -

Non- PBB:

Agusan del Sur 5 - - - - - -

PENRO 1 - - - - -

CENRO Bayugan City 1 - - - - -

CENRO Talacogon 1 - - - - -

CENRO Bunawan 1 - - - - -

CENRO Loreto 1 - - - - -

3.2 Conduct of inventory and

inspection of unserviceable

equipment for disposal

inventory report on

unserviceable equipment

prepared & submitted (no.)

Agusan del Sur 1 - - - - -

3.3 Disposal of Unserviceable

properties

disposal of Unserviceable

properties conducted (no.)

Agusan del Sur 1 - - - - -

Agusan del Sur 2 - - - - - -

PENRO 1 - - - - -

CENRO Talacogon 1 - - - - -

Agusan del Sur 12 - - 5 5 42% (5)

PENRO 2 - - - - -

CENRO Bayugan City 3 - - 3 3 100% (3)

CENRO Talacogon 2 - - - - -

CENRO Bunawan 3 - - - - -

CENRO Loreto 2 - - 2 2 100% (2)

Implementation of Good Governance Conditions

property equipment inventory

conducted (no.)

3.1 Inventory of Semi-Expendable

Items

Radio equipment registered

(No.)

3.4 Registration of Radio Equipment

RP vehicles/ motorcycle insured

and registered (No.)

3.5 Insurance & Registration RP

Vehicles/ Motorcycle

Page 3 of 14

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (14) (15) (16) (17) (18) (19) (20)

FINANCIAL

Allotment

% (Amount

Released/

Allotment *

100)

Obligation Disbursement % BUR

This month To date This month To date

Obligation

/

Allotment

(16/12*100)

Disbursem

ent/

Obligation

(18/16*100)

ANNUAL

TARGET

FEB TO DATE

CODE MFO/P/A/P PERFORMANCE INDICATOR

LOCATION

(Province/City/

Municipality)

PHYSICAL

BACKLOG% Accomp.

(To Date)

(9/5*100)

FEB

ACCOMP

TO

DATE

% Accomp.

(This

Month)

(8/7*100)

3.6 Insurance of Building Building Insured (No.) Agusan del Sur 10 - - 8 8 80% (8)

PENRO 3 - - 3 3 100% (3)

CENRO Bayugan City 1 - - 1 1 100% (1)

CENRO Talacogon 2 - - - 0% -

CENRO Bunawan 3 - - 3 3 100% (3)

CENRO Loreto 1 - - 1 1 100% (1)

Agusan del Sur 20 - - 8 8 40% (8)

PENRO 4 - - - 0% -

CENRO Bayugan City 4 - - 4 4 100% (4)

CENRO Talacogon 4 - - - 0% -

CENRO Bunawan 4 - - 4 4 100% (4)

CENRO Loreto 4 - - - 0% -

Agusan del Sur 9 1 1 11%

PENRO 3 - 0%

CENRO Bayugan City 1 - 0%

CENRO Talacogon 2 - 0%

CENRO Bunawan 2 1 1 50%

CENRO Loreto 1 - 0%

4. Radio Communications Mgt.

Agusan del Sur 5 5 5 5 5 100% 17% -

PENRO 1 1 1 1 1 100% 17% -

CENRO Bayugan City 1 1 1 1 1 100% 17% -

CENRO Talacogon 1 1 1 1 1 100% 17% -

CENRO Bunawan 1 1 1 1 1 100% 17% -

CENRO Loreto 1 1 1 1 1 100% 17% -

5. Records Management

PBB-Enrolled Activities:

Agusan del Sur 5 5 5 5 5 100% 17% -

PENRO 1 1 1 1 1 100% 17% -

CENRO Bayugan City 1 1 1 1 1 100% 17% -

CENRO Talacogon 1 1 1 1 1 100% 17% -

CENRO Bunawan 1 1 1 1 1 100% 17% -

CENRO Loreto 1 1 1 1 1 100% 17% -

Non- PBB:

5.1 Inventory of Records Records inventoried (no.) Agusan del Sur 3,000 - - 181 231 8% (231)

PENRO 600 - - - 0% -

CENRO Bayugan City 600 - - 181 231 39% (231)

CENRO Talacogon 600 - - - 0% -

CENRO Bunawan 600 - - - 0% -

CENRO Loreto 600 - - - 0% -

Agusan del Sur 5 2 2 40%

PENRO 1 - 0%

CENRO Bayugan City 1 - 0%

CENRO Talacogon 1 - 0%

CENRO Bunawan 1 1 1 100%

CENRO Loreto 1 1 1 100%

Building maintained with

quarterly report submitted

(no.)

3.8 Building Maintenance

Radio Facilities maintained/

operationalized with monthly

report submitted (no.)

100% of radio/fax messages

acted upon

- radio messages

transmitted/received (no.)

4.1 Operationalization and

maintenance of radio facility

100% of documents acted

upon (no. of office) simple

- 7 days upon receipt complex

- 15 days upon receipt

A. Actions on Documents/

Requests

-Data and Tracking System (DATS)

-Receiving & Releasing of Documents

5.2 Maintenance of records room records room maintained with

quarterly report submitted

(no.)

Offices provided with Insurance

for CCTV and VOIP Equipments

(no.)

3.7 Provision of Insurance for CCTV

VOIP Equipments in all DENR Offices

Page 4 of 14

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (14) (15) (16) (17) (18) (19) (20)

FINANCIAL

Allotment

% (Amount

Released/

Allotment *

100)

Obligation Disbursement % BUR

This month To date This month To date

Obligation

/

Allotment

(16/12*100)

Disbursem

ent/

Obligation

(18/16*100)

ANNUAL

TARGET

FEB TO DATE

CODE MFO/P/A/P PERFORMANCE INDICATOR

LOCATION

(Province/City/

Municipality)

PHYSICAL

BACKLOG% Accomp.

(To Date)

(9/5*100)

FEB

ACCOMP

TO

DATE

% Accomp.

(This

Month)

(8/7*100)

6. Cashiering

6.1 Issuance of Official Receipts Official Receipts Issued (no.) Agusan del Sur 2,000 150 150 1,038 1,313 692% 66% (1,163)

PENRO 165 165

CENRO Bayugan City 750 50 50 525 575 1050% 77% (525)

CENRO Talacogon 750 50 50 143 275 286% 37% (225)

CENRO Bunawan 250 25 25 72 125 288% 50% (100)

CENRO Loreto 250 25 25 133 173 532% 69% (148)

6.2 Summary of ADA/

PACSVAL/Check Issuance

vouchers prepared with

ADA/PACSVAL/check issued

(no.)

Agusan del Sur 300 25 25 20 0% 7% 5

6.3 Preparation of Monthly Reports monthly reports prepared and

submitted on deadline (no.)

Agusan del Sur 12 1 1 1 2 100% 17% (1)

7. BUDGET

Implementation of Good

PBB-enrolled activities:

A. Budget Utilization Rate Regional Total 90%

- Ratio of Total Obligations to total

releases

budget utilization rate by end

of November 2018

Agusan del Sur 90%

B. Submission of Budget and

Financial Accountability Reports

(BFARs)

Note: PMD (BAR 1), Finance (FAR

Nos. 1-A, 1-B, 1, 2-A, 2)

Budget and Financial

Accountability Reports (BFARs)

based on DBM-COA Joint

Circular No. 2014-01 Guidelines

Prescribing the Use of Modified

Formats of the Budget and

Financial Accountability Reports

(BFARs)” submitted to COA and

DBM

Agusan del Sur 20 - - 3 15% (3)

Non PBB:

7.1 Preparation of Budget Proposal Budget Proposal prepared

compliant to DBM requirements

and submitted to OSPB within 2

months from the issuance of

guidelines (no.)

Agusan del Sur 1 - - - 0% -

7.2 Preparation of Financial Plan Financial Plan prepared

compliant to DBM requirements

submitted to OSEC-FMS within

2 months from the issuance of

planning guidelines

Agusan del Sur 1 - - - 0% -

7.3 Processing of Obligation

Requests/Claims

100% of obligation requests/

claims acted upon

Agusan del Sur 900 100 200 150 270 75% 30% (70)

7.8 Registry of Allotment &

Obligation of PS, MOOE & CO

Registries of allotment &

obligation of PS, MOOE & CO

miantaine/updated (no.)

Agusan del Sur 36 3 6 3 6 50% 17% -

Page 5 of 14

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (14) (15) (16) (17) (18) (19) (20)

FINANCIAL

Allotment

% (Amount

Released/

Allotment *

100)

Obligation Disbursement % BUR

This month To date This month To date

Obligation

/

Allotment

(16/12*100)

Disbursem

ent/

Obligation

(18/16*100)

ANNUAL

TARGET

FEB TO DATE

CODE MFO/P/A/P PERFORMANCE INDICATOR

LOCATION

(Province/City/

Municipality)

PHYSICAL

BACKLOG% Accomp.

(To Date)

(9/5*100)

FEB

ACCOMP

TO

DATE

% Accomp.

(This

Month)

(8/7*100)

8. Accounting

PBB-enrolled activities:

A. Budget Utilization Rate

- Ratio of Total Disbursement to Total

Obligations

budget utilization rate by end

of November 2018

Agusan del Sur 90%

B. Submission of Budget and

Financial Accountability

Reports(BFARs)

- FAR Nos. 3,4,5

Budget and Financial

Accountability Reports (BFARs)

based on DBM-COA Joint

Circular No. 2014-01 Guidelines

Prescribing the Use of Modified

Formats of the Budget and

Financial Accountability Reports

(BFARs)” submitted to COA and

DBM

Agusan del Sur 17 1 2 1 2 50% 12% -

C. Submission of Report on

Ageing Cash Advances for

transactions as of November 15,

2018

Report on Ageing Cash

Advances for transactions as of

November 15, 2018 submitted

to COA

Agusan del Sur 5 - - - 0% -

100% Financial Statements per

Section 41 of PD No. 1445

submitted to COA

Agusan del Sur 1 1 1 1 1 100% 100% -

D. Reconciliation of Property,

Plant and Equipment Data Based

on Audit Findings

70% of the property, plant and

equipment data for the last 5

years (2008-2016) based on

audit findings submitted to COA

by end of November 2018

Agusan del Sur 1 - - - 0% -

Non-PBB Activities:

8.1 Preparation of Remittances

- GSIS, HDMF, PHIC, DECAEMU,

DCCOMPO, FOSLA & MOWEL

monthly remittances prepared

and submitted (no.)

Agusan del Sur 84 7 14 10 18 71% 21% (4)

8.2 Preparation of Tax Remittance

Advice (TRA)

- Forms 1600, 1601-E, 1601-C

TRA prepared monthly and

submitted to BIR (no.)

Agusan del Sur 36 3 6 3 6 50% 17% -

8.3 Reconciliation of Bank Accounts Bank Accounts reconciliation

conducted (no.)

Agusan del Sur 12 1 2 1 1 50% 8% 1

8.4. Processing of Vouchers and

Payrolls

100% of disbursement

vouchers/ claims acted upon

Agusan del Sur 1,200 100 200 209 339 105% 28% (139)

8.5. Preparation of Monthly,

Quarterly and Annual Financial Report

monthly, quarterly and annual

financial reports prepared and

submitted (no.)

Agusan del Sur 16 2 3 2 3 67% 19% -

8.7 Maintenance/Updating Journal

Entry Voucher (JEV)

Journal Entry Voucher (JEV)

maintained/updated (no.)

Agusan del Sur 1,200 100 200 270 400 135% 33% (200)

Implementation of Good Governance Conditions

Page 6 of 14

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (14) (15) (16) (17) (18) (19) (20)

FINANCIAL

Allotment

% (Amount

Released/

Allotment *

100)

Obligation Disbursement % BUR

This month To date This month To date

Obligation

/

Allotment

(16/12*100)

Disbursem

ent/

Obligation

(18/16*100)

ANNUAL

TARGET

FEB TO DATE

CODE MFO/P/A/P PERFORMANCE INDICATOR

LOCATION

(Province/City/

Municipality)

PHYSICAL

BACKLOG% Accomp.

(To Date)

(9/5*100)

FEB

ACCOMP

TO

DATE

% Accomp.

(This

Month)

(8/7*100)

8.8 Preparation of List of Due and

Demandable accounts payable/advice

to debit (LDDAP/ADA)

LDDAP/ADAs prepared and

submitted to LBP (no.)

Agusan del Sur 300 25 50 30 50 60% 17% -

8.9. Maintain/Update PPE Ledger

Cards

PPE Ledger Cards maintained/

updated (no.)

Agusan del Sur 200 - - 1 1% (1)

8.10 Index Payroll Payroll indexed (no.) Agusan del Sur 12 1 2 1 2 50% 17% -

8.11 Preparation of Withholding

Tax schedule (PS, Goods and

Services)

BIR Withholding Tax Schedule

prepared (PS, Goods &

Services) -

(Fixed Target) 101-2, 184-2

Agusan del Sur 12 1 2 2 2 100% 17% -

Agusan del Sur 5 5 5 5 5 100% 17% -

PENRO 1 1 1 1 1 100% 17% -

CENRO Bayugan City 1 1 1 1 1 100% 17% -

CENRO Talacogon 1 1 1 1 1 100% 17% -

CENRO Bunawan 1 1 1 1 1 100% 17% -

CENRO Loreto 1 1 1 1 1 100% 17% -

Security Guards (Blue Guards)

Hired (No.)

9. Hiring of Security Guards (Blue

Guards)

Page 7 of 14

(21)

REMARKS /

Justification for those

activities with low and

high percentage

accomplishments

Page 8 of 14

(21)

REMARKS /

Justification for those

activities with low and

high percentage

accomplishments

Page 9 of 14

(21)

REMARKS /

Justification for those

activities with low and

high percentage

accomplishments

Page 10 of 14

(21)

REMARKS /

Justification for those

activities with low and

high percentage

accomplishments

Page 11 of 14

(21)

REMARKS /

Justification for those

activities with low and

high percentage

accomplishments

Page 12 of 14

(21)

REMARKS /

Justification for those

activities with low and

high percentage

accomplishments

QUEDANCOR, PHILIFE, LBP

Page 13 of 14

(21)

REMARKS /

Justification for those

activities with low and

high percentage

accomplishments

Page 14 of 14