10
Department of Energy Research Perspective Ken Thomas Idaho National Laboratory Digital Environment for Advanced Reactors Workshop Argonne National Laboratory June 6, 2018

Department of Energy Research PerspectiveThomas-INL.pdf · Safety System (PSS) Division A Main Control Room (MCR) Operator Console (OC) – 1 for Reactor Operator (RO) -1 PCS Network

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Department of Energy Research PerspectiveThomas-INL.pdf · Safety System (PSS) Division A Main Control Room (MCR) Operator Console (OC) – 1 for Reactor Operator (RO) -1 PCS Network

Department of EnergyResearch Perspective

Ken ThomasIdaho National Laboratory

Digital Environment for Advanced Reactors WorkshopArgonne National Laboratory

June 6, 2018

Page 2: Department of Energy Research PerspectiveThomas-INL.pdf · Safety System (PSS) Division A Main Control Room (MCR) Operator Console (OC) – 1 for Reactor Operator (RO) -1 PCS Network

Research Programs

Nuclear Energy Enabling Technologies (NEET) – Advanced Sensors and Instrumentation (ASI)• Cross-cutting new technologies in measurements, monitoring, control,

and human factors• Innovative methodologies• Communications and data transmission

Light Water Reactor Sustainability• Plant Modernization – digital technologies to modernize nuclear plant

operations and support, transforming the operating model from labor-centric to technology-centric to achieve performance improvement and cost reductions.

• Risk-Informed Systems Analysis (RISA) – new analytical, modeling, and simulation tools to increase plant margins and support risk-informed design and licensing issues.

Page 3: Department of Energy Research PerspectiveThomas-INL.pdf · Safety System (PSS) Division A Main Control Room (MCR) Operator Console (OC) – 1 for Reactor Operator (RO) -1 PCS Network

3

Seamless Digital Environment

IntegratingPlant systems Plant processes Plant workers

Page 4: Department of Energy Research PerspectiveThomas-INL.pdf · Safety System (PSS) Division A Main Control Room (MCR) Operator Console (OC) – 1 for Reactor Operator (RO) -1 PCS Network

Advanced Sensors & Instrumentation

Page 5: Department of Energy Research PerspectiveThomas-INL.pdf · Safety System (PSS) Division A Main Control Room (MCR) Operator Console (OC) – 1 for Reactor Operator (RO) -1 PCS Network

5

Control Room Human Factors

Page 6: Department of Energy Research PerspectiveThomas-INL.pdf · Safety System (PSS) Division A Main Control Room (MCR) Operator Console (OC) – 1 for Reactor Operator (RO) -1 PCS Network

6

Highly-Integrated I&C Architecture

NP-VDU

Processor3/4

1

I-VDUD-VDU

13

Safety Network

PlantSafety System

(PSS)Division A

Main Control Room (MCR) Operator Console (OC) – 1 for Reactor Operator (RO) -1

PCS Network

S*-VDU-1Safety Console (SC)

S-VDU-2 S-VDU-3 S-VDU-4

BB,C,D

DC

Dat

a Li

nk

KVMSwitch

D-VDU

MCR OC-3 forSenior Reactor Operator (SRO)

Opt

ical

Sig

nals

for

Vid

eo a

nd T

ouch

Scr

een

Information Technology System (ITS) Network

-4

P*-VDU Processor

1/2

P-VDU Processor

3/4

D*-VDU Processor

SDCV*S-VDU

AMulti-

division

SDCVS-VDU

BMulti-

division

A B C D N

POD Processor

Plant Overview Display (POD)

Visual Display Unit (VDU)

3 Remote Shutdown Room (RSR) - Remote Shutdown Console (RSC)

Application Processor

1PSSDivision D

PSSDivision C

I-VDU Processor

Video Share Network

Firewall

Internet

3

Redundant

Redundant

Redundant

Application Processor

N

ITS Server

N

AIM

Diverse Actuation

System (DAS) (encompasses SPS

and DAFAS)

DAS I/O BusSensor

Comp/Sensor

PSSDivision BS-VDU

Processor

Maintenance Network

Maintenance Network Maint

VDU

Component Control

ProcessorRedundant

MaintVDU

Maintenance Network

Maintenance Network

KVM*Switch

KVMSwitch

KVMSwitch

KVMSwitch

MCR Master Transfer

A B C D

RT-ESF-TT Actuation

Isolator

Isolator

Comp/Sensor

COM COM

Gateway

Isolator

To DAS

I-VDU

RSR

A B C DMaster

Transfer

I-VDU Processor

I*-VDU Processor

ITS PC

N

Component Control

Processor - 1

IsolatorTT

Turbine Trip (TT)

N

1

1

Plant Protection Processor

1

14

1 13

1

1

MCR OC-2 for RO-2

12 N

1 1N

12

P-VDU-1

MCR OC-N forAuxiliary Operators (AO)

Component Control

Processor - N

MaintVDU

CIM/AIM*

CIM/AIM*

*CIM and AIM located in I&C

cabinets and main control board

P-VDU Processor

1/2

1

CIM/AIM*

*Spatially Dedicated

Continuously Visible (SDCV)

*Safety (S)

Insi

de M

CR

/RS

RO

utsi

de M

CR

or w

ithin

MC

B

*Keyboard, Video, Mouse (KVM)

*Plant Control System (P)

*Diverse Actuation System (D)

*Information Technology System (I)

CEDM Power CabRTSG

AIM

Sensor

BB,C,D

DC

Dat

a Li

nk

Core Protection Processor

1. CCF unlikely for Analog Input Module (AIM), Component Interface module (CIM) and Isolator; CCF is assumed for all other devices.2. Grey boxes comprise Plant Control System (PCS). Controllers and servers are redundant; other components are not.3. Grey/brown boxes are non-safety. Brown box must be diverse from safety; brown box diversity from grey boxes is also preferred.4. All digital communication interfaces are fiber optic, except Maintenance Network in PCS and DAS, IT Network, and between D-VDU/I-VDU/Video Switch/I-VDU-P.5. All digital interfaces are bidirectional, except noted by arrows.6. Safety and PCS Networks are redundant; others are not.7. Audible devices for PCS and DAS alarms are in MCR.8. denotes hardwires; others are digital data communication.

CDM I&C Architecture End-point

AIM

Page 7: Department of Energy Research PerspectiveThomas-INL.pdf · Safety System (PSS) Division A Main Control Room (MCR) Operator Console (OC) – 1 for Reactor Operator (RO) -1 PCS Network

7

NPP Performance Improvement Technologies

Page 8: Department of Energy Research PerspectiveThomas-INL.pdf · Safety System (PSS) Division A Main Control Room (MCR) Operator Console (OC) – 1 for Reactor Operator (RO) -1 PCS Network

8

On-Line Monitoring

input coherent

coda

Page 9: Department of Energy Research PerspectiveThomas-INL.pdf · Safety System (PSS) Division A Main Control Room (MCR) Operator Console (OC) – 1 for Reactor Operator (RO) -1 PCS Network

9

Continuum of Nuclear Plant Monitoring

9

Control Room

Operational Monitoring

Plant Performance Monitoring Failure

Prevention Monitoring Long-Term

Degradation Monitoring

Plant Configuration

Monitoring

Near-TermNow Long-Term

Page 10: Department of Energy Research PerspectiveThomas-INL.pdf · Safety System (PSS) Division A Main Control Room (MCR) Operator Console (OC) – 1 for Reactor Operator (RO) -1 PCS Network

Key Themes

Innovative research leveraging DOE expertise, experience, and facilitiesDeveloping the value propositionResponsive to industry needsCollaborating with industry, universities, and

other research organization to develop new technologiesIdentifying the deployment paths