49
Mzansi’s Golden Economy Contribution of the Arts, Culture and Heritage Sector to the New Growth Path Department of Arts and Culture

Department of Arts and Culture

  • Upload
    savea

  • View
    36

  • Download
    0

Embed Size (px)

DESCRIPTION

Mzansi ’ s Golden Economy Contribution of the Arts, Culture and Heritage Sector to the New Growth Path. Department of Arts and Culture. Objectives. 1. - PowerPoint PPT Presentation

Citation preview

Page 1: Department of Arts and Culture

Mzansi’s Golden Economy

Contribution of the Arts, Culture and Heritage Sector to the New Growth Path

Department of Arts and Culture

Page 2: Department of Arts and Culture

Objectives

Project initiated at the request of the Minister to reposition the arts, culture and heritage sector as an economic growth sector and introduce programmes to contribute to large scale employment

The creative and cultural industries included as a priority sector for implementation of the new growth path;

1

Page 3: Department of Arts and Culture

New Growth Path Government commitment envisages the creation of 5 million jobs

over the next ten years Identifying areas where employment creation is possible on a

large scale as a result of substantial changes in conditions in South Africa and globally.

Developing a policy package to facilitate employment creation in these areas, above all through: • A comprehensive drive to enhance both social equity and

competitiveness• Systemic changes to mobilise domestic investment around

activities that can create sustainable employment• Strong social dialogue to focus all stakeholders on

encouraging growth in employment-creating activities2

Page 4: Department of Arts and Culture

Proposed approach General continuity and introduction of new initiatives, as

far as possible building on and expanding existing initiatives Skills development for excellence / high performance in the

arts, culture and heritage sector Large scale interventions aimed to optimise growth and

employment potential of the sector Expansion and co-ordination of supply and demand in the

sector Enhancement of existing production and creation of new

business opportunities to match demand Monitoring and evaluation to guide investment and co-

ordination of current and future resources for the sector

3

Page 5: Department of Arts and Culture

Problem statement - Advocacy

Sector is not visible and regarded as a nice to have

Implicit and explicit messaging from government that priorities are maths and science, technology and engineering

Consequence of progressive removal of the arts from the curriculum is failure to identify and develop talent, failure to develop appreciation and future audiences

4

Page 6: Department of Arts and Culture

Problem statement - research

Considerable research by DAC, DAC Entities, Provinces and other role-players

Duplication and overlaps in researchDifferent methodologies and models resulting in

lack of ability to assess trends in qualitative research and analyze time series data in quantitative research

5

Page 7: Department of Arts and Culture

Problem statement – institutional arrangements

Proliferation of role-players in government resulting in overlapping functions

Fragmentation and duplication of efforts between DAC, DAC Entities, Provinces, Provincial Agencies

Views articulated that the agencies are responsible for implementation and DAC responsible for oversight

Lack of clarity in roles and responsibilities of national departments

Submission of Provinces that initiatives of DAC result in unfunded mandates

Insufficient communication and co-ordination of different role players to ensure optimal performance

6

Page 8: Department of Arts and Culture

Problem statement - programmes

Role clarification required between DAC and DAC emtities

Submission of Provinces that Community Arts Centres are not adequately resourced and functional

Submission of Provinces that Investing in Culture Programme commitments did not materialise

7

Page 9: Department of Arts and Culture

Problem statement - Infrastructure

Unutilised and underutilised infrastructure throughout the country

Inadequate resources for maintenance and operation of existing infrastructure

8

Page 10: Department of Arts and Culture

Problem statement - Funding

Submission by all role players that there are funding challenges

No apparent alignment in disbursement of Lottery funds with policy and plans of the sector

Ad hoc funding of requests to DAC and submission that in certain instances projects funded fall within the mandate of an agency

9

Page 11: Department of Arts and Culture

Position statement Global evidence that countries with a high degree of

social cohesion experience economic growth Arts, culture and heritage are crucial factors for social

cohesion The arts, culture and heritage economy has the

potential to contribute significantly to job creation and economic growth

And: Heritage and culture have intrinsic and intangible value

in contributing to social development

10

Page 12: Department of Arts and Culture

Cultural statistics

Cultural statistics inform future decision making and allows global comparability

It is proposed that a uniform framework be adopted and that the framework serve as an informing factor for organisational structure

11

Page 13: Department of Arts and Culture

Intervention model A simple model is

proposed to ensure that interventions in the sector are systematically planned in all stages of the cycle of creation, production, dissemination, presentation and consumption

PRODUCTION

DISSEMINATIONEXHIBITION, RECEPTION,

TRANSMISSION

CONSUMPTION / PARTICIPATION

CREATION

12

Page 14: Department of Arts and Culture

Conference commitment

• Establishment of multi-stakeholder project task teams, appointed by the Minister, building on existing initiatives, working through existing institutions, to complete detailed plans for implementation, with financial and human resource implications for a variety of strategic programmes.

13

Page 15: Department of Arts and Culture

Mandate of project teams

• Development of a detailed concept and business plan with outcomes, outputs, financial and human resource implications

• Implications for adjustment budget and MTEF budget• Recommendations on implementation agency • Recommendations, if any, for institutional reform and

changes to the organisational structure• Implications arising from the recommendations of the

policy review and the legislative review• Implications for the Strategic Plan and APP

14

Page 16: Department of Arts and Culture

Principles guiding project teams

• Recognising, building on, expanding and scaling-up significantly existing initiatives

• Identification of talent and skills development• Large scale, high impact programmes maximizing

growth and employment potential of the sector• Expansion and co-ordination of supply and demand• Enhancement of existing production and creation of

new business opportunities to match demand• Monitoring and evaluation to guide future decision

making

15

Page 17: Department of Arts and Culture

Stimulating Demand

3 project Interventions

16

Page 18: Department of Arts and Culture

Public art

• Outputs– Large-scale, labour intensive public art

programmes – Small scale, community-based initiatives

• Implementation through commissions managed by the NAC

17

Page 19: Department of Arts and Culture

Public art resource request

• Financial and job estimates– Y1: R19.7m, 1 250 work opportunities– Y2: R45.7m, 2 750 work opportunities– Y3: R69.2m, 5 150 work opportunities

• Use of public art projects for NLHR and Heritage Projects will increase resource request

18

Page 20: Department of Arts and Culture

Art Bank

• Outputs– Procurement and curating of art

• DIRCO, IMC and SATourism offices internationally • Head Offices of National Departments, Premier’s Offices in

Provinces• High footfall service delivery points – Home Affairs (including all

points of entry), SASSA, Hospitals– Procurement and curating of artworks for lease for

minimum period of 2 years– Disposal of 20% of stock per annum

• Implementation by the NAC, advised by an acquisitions committee, based on the Canadian model

19

Page 21: Department of Arts and Culture

Art bank resource request

• 3000 FTEs to be created over a 3 year period;• Financial implications estimate of R 10 m per

annum with 15% administrative overheads and excluding income this would allow procurement of 1 700 artworks at R 10 000 and leveraging of minimum of 2:3 income for practitioners through exposure to consumers

20

Page 22: Department of Arts and Culture

Sourcing enterprise

• Outputs– Virtual Platform to profile all practicing and

credible creative industries and heritage services providers

– Pilot Physical Enterprise to source commodities, activities and experiences, primarily for the public sector

• Implementation by NAC and Advisory Panel appointed by Minister to guide implementation

21

Page 23: Department of Arts and Culture

Sourcing enterprise resource request

• Estimates of income and direct and indirect employment – 1225 FTE’s over 3 years

• Budget for development, establishment and operation– Y1: R39.0m– Y2: R27.4m– Y3: R33.6m

22

Page 24: Department of Arts and Culture

Audience Development and Consumption

4 project interventions to develop audiences and increase consumption in

the arts, culture and heritage sectors

23

Page 25: Department of Arts and Culture

Cultural precincts• Scope of precincts– Cultural programme and development of creative

industries– Commercial development and new investment – Marketing, branding and promotion– Spatial development framework – Institutional development

• Implementation – Province or alternative Development Agency– Core team at DAC responsible for policy, approval of plans,

disbursements, accountability, transversal functions for precincts

24

Page 26: Department of Arts and Culture

Precincts resource request

• Estimates of direct and indirect employment 1675 FTEs over 3 years

• Financial implications per precinct estimated as– Y1: R47m– Y2: R47m– Y3: R59m

25

Page 27: Department of Arts and Culture

Cultural Events• Scope

– Expand offering and duration of existing events, including touring of productions and exhibition to events

– Tour the best of exhibitions and events elsewhere • Combination of identified events and ad-hoc events annually by

– Call for proposals with demonstrable co-financing– Grant funding based on competitive bidding – Marketing and promotion– Entrepreneurial support (grants and seed capital)– Skills development

• Implementation– Identified event organiser / successful bidder for each event– Core team at DAC responsible for policy, approval of plans,

disbursements, accountability, transversal functions for events, management of competitive bidding

26

Page 28: Department of Arts and Culture

Cultural Events resource request

• Estimates of direct and indirect employment – 600 FTEs over 3 years

• Financial implications per annum estimated as– Y1: R20m– Y2: R27m– Y3: R33m

27

Page 29: Department of Arts and Culture

Information centres

• Outputs– Permanent information centres at cultural precincts and

sites of high patronage including marketing material, access to the virtual portal, virtual exhibitions and experiences

– Mobile information centres to travel to events and for awareness and audience development

• Implementation– Core team at DAC responsible for management of

agreements with hosts and transversal functions of content development and marketing for information centres

28

Page 30: Department of Arts and Culture

Information centres resource request

• Estimates of direct and indirect employment 600 FTEs over 3 years

• Financial implications of – R 10 m for mobile information centre– R 40 m for each permanent information centre (to

be reviewed)– R 20 m for content development and marketing

29

Page 31: Department of Arts and Culture

Touring venture• Outputs – Five incubators to pilot specific tour systems, and

establish “best practice” conventions – poetry, music, theatre, fine arts and heritage

– Subsidy programmes for producers and presenters, companies, artists and small companies

– Programme of travelling to precincts and events– Train(s) / truck(s) for travelling countrywide for

education, awareness and audience development• Implementation by the NAC supported by a

Reference Group / Evaluation Committee

30

Page 32: Department of Arts and Culture

Touring venture resource request

• Estimates of direct and indirect employment – 1050 FTEs over 3 years

• Financial implications estimate of R 15 m per annum with administration costs capped at 15% and minimum leveraging from other sources of 2:3.

31

Page 33: Department of Arts and Culture

Human Capital Development

2 projects interventions focused on early talent identification and

development

32

Page 34: Department of Arts and Culture

Basic Education

• Outputs – Formal and extra-mural programmes in collaboration

with DBE– Provincial and national arts competitions and a

national arts week– Provision of basic resources in schools

• Implementation by DBE with supporting role from DAC and Provincial Departments

• Pilot in Eastern Cape in Y1 and scale up in Y2, Y333

Page 35: Department of Arts and Culture

Basic Education resource request

• Arts facilitator for a cluster of 10 schools based as Education District Offices

• 3 000 5/8th facilitators (25% Section Head Educationist and 75% Educationist M+1/M+2)

• Financial implication of R 450m over 3 years

34

Page 36: Department of Arts and Culture

NaCISA• Outputs– Post-school access programme(s)– Post-Graduate National Service Programme– Arts Teacher Education Centres of Excellence– NaCISA Curriculum materials for Arts Education– Provincial centres– NaCISA Master Artists Centres in Midrand, attached

to FET Colleges • Implementation in phased approach with

identification of lead and participating organisations

35

Page 37: Department of Arts and Culture

NaCISA resource request

• Budget for development of curriculum material for arts education at post school and tertiary level

• Budget for incentives for Universities, FET colleges and Private Providers

• Budget for establishment of NaCISA Master Arts Centre including creation of a legal entity, financial feasibility and planning in Year 1 and development in Year 2 and 3

36

Page 38: Department of Arts and Culture

Heritage Projects

3 heritage intervention areas aimed at changing the apartheid bias of the

current heritage offerings

37

Page 39: Department of Arts and Culture

Heritage projects• Output– Low maintenance, non-opex projects– Heritage infrastructure projects to balance the

national heritage landscape which is skewed in favour of colonial and apartheid history

• Implementation– Immediate implementation by core team in DAC with

skills for management of infrastructure planning and development projects

– Medium term decision, together with SAHRA and NHC, on roles and responsibilities set out in legislative review

38

Page 40: Department of Arts and Culture

Heritage projects resource request

• Revision of financial estimates and estimates of direct and indirect employment in progress

39

Page 41: Department of Arts and Culture

NLHR

• Output– Network of sites and/or events linked

geographically or thematically – New interpretation centres and low maintenance

non-opex exhibition and interpretation

• Implementation– Overall management by NHC– Infrastructure development projects by to be

established DAC unit 40

Page 42: Department of Arts and Culture

NLHR resource request

• Revision of financial estimates and estimates of direct and indirect employment in progress

41

Page 43: Department of Arts and Culture

Marine heritage

• Output– Recreational underwater Museum in the waters of

Kosi Bay

• Implementation by UKZN Wild Life Nature Reserve Management Authority

42

Page 44: Department of Arts and Culture

Marine heritage resource request

• Review of estimates of direct and indirect employment in progress

• Feasibility for Kosi Bay Museum development in current financial year – R 250 000

• Kosi Bay Museum development – R 45 m

43

Page 45: Department of Arts and Culture

Statistics and data gathering

44

Page 46: Department of Arts and Culture

Cultural Observatory• Outputs– Five year research agenda, using different research

methodologies, and through networks and partnerships including statistical data collection, monitoring and evaluation, policy focused research

– Physical and online library and tools – Seminar programme and annual conference

• Implementation– Programme Manager and small core support unit

based at the NRF and governed by a Cultural Observatory Advisory Committee

45

Page 47: Department of Arts and Culture

Observatory resource request

• Core funding of DAC to be reallocated. Could potentially result in savings.– Y1: R18m– Y2: R20m– Y3: R24m

46

Page 48: Department of Arts and Culture

Conclusion

• Cabinet memo in preparation to request mandate and resources

• Funding to be sourced from internal reprioritization, MTEF and jobs fund

• Co-operation of Provinces, particularly with submissions from Cultural Precincts and Events essential

47

Page 49: Department of Arts and Culture

Thank you!!!!