1
DENSO Denso Manufacturing Michigan Inc. Production Control Supplier Manual Section Packaging Title *Packaging Testing Control No. PKG-003 Purpose: Standards: Date Issued : 3-2-99 Date Revised : 6-19-12 define the packaging requirements for packaging testing. (1) G:PRD_CTRL/SUPPLIER MANUAL UPDATES 2009/SUPPLIER MANUAL UPDATES 2011/ Packaging Test Shipments End of Procedure ging Testing MMI or the supplier can request a packaging testing to verify the rt / packaging quality. e supplier and DMMI PCE will coordinate timing of the trial(s). MI PCE may return the parts to the supplier for their quality review once e evaluation is complete. The supplier will provide data of the evaluated parts. Test shipments are to be labeled to the “attention” of the responsible DMMI ssociate. * Denotes change

DENSO

Embed Size (px)

DESCRIPTION

DENSO. Denso Manufacturing Michigan Inc. Production Control Supplier Manual. Control No . PKG-003. Section Packaging. Title *Packaging Testing. Date Issued : 3-2-99Date Revised : 6-19-12. Purpose:. *To define the packaging requirements for packaging testing. Standards:. - PowerPoint PPT Presentation

Citation preview

Page 1: DENSO

DENSODenso Manufacturing Michigan Inc.

Production Control Supplier Manual

Section

Packaging

Title

*Packaging Testing

Control No.

PKG-003

Purpose:

Standards:

Date Issued : 3-2-99 Date Revised : 6-19-12

*To define the packaging requirements for packaging testing.

(1)G:PRD_CTRL/SUPPLIER MANUAL UPDATES 2009/SUPPLIER MANUAL UPDATES 2011/ Packaging Test Shipments

End of Procedure

•*Packaging Testing

• *DMMI or the supplier can request a packaging testing to verify the part / packaging quality.• *The supplier and DMMI PCE will coordinate timing of the trial(s).• DMMI PCE may return the parts to the supplier for their quality review once the evaluation is complete.• * The supplier will provide data of the evaluated parts.• * Test shipments are to be labeled to the “attention” of the responsible DMMI PCE associate.

* Denotes change