Upload
anne-flynn
View
220
Download
0
Embed Size (px)
Citation preview
8/13/2019 Denis O Leary IWEA Conference Final 2
1/35
ESB NetworksIWEA Conference
MARCH 2009
8/13/2019 Denis O Leary IWEA Conference Final 2
2/35
ESB NETWORKS
Developing 21st
centuryElectricity networks
8/13/2019 Denis O Leary IWEA Conference Final 2
3/35
ESBs Strategic Vision To 2020World Class Sustainable Networks
A Renewables Business of Scale
Best Practice Generation Portfolio
Customer Focussed Supply BusinessSignificant International Presence
And to be a Leader in Carbon Managementand Energy Efficiency
8/13/2019 Denis O Leary IWEA Conference Final 2
4/35
Key Initiatives to Date
Networks infrastructure investment
Investment in Smart Systems
Connection of Wind Farms
Distributed automation switches
Smart Metering
8/13/2019 Denis O Leary IWEA Conference Final 2
5/35
Key Initiatives to Date
Networks infrastructure investment
Investment in Smart Systems
Connection of Wind Farms
Distributed automation switches
Smart Metering
8/13/2019 Denis O Leary IWEA Conference Final 2
6/35
Transmission6,300 km of Overhead Network140km of Underground Cables165 HV Stations
1B RAB Value
Distribution160,000 km of Lines/Cables630 HV Substations
230,000 MV Transformers/Units2m meters
4B RAB Value
Transmission
400kV 220kV 110kV 38kV MV20 kV & 10 kV
Distribution
LV400 & 230 V
Network Assets
8/13/2019 Denis O Leary IWEA Conference Final 2
7/35
Networks Infrastructure Delivery 10.5 Billion+ bns
0
1
2
3
4
5
2003-2007 2008-2012 2013-2017 2018-2022
Smart Metering
Other
Transmission
Asset Replacement
Reinforcement
Generation Connections
Customer Connections
8/13/2019 Denis O Leary IWEA Conference Final 2
8/35
8/13/2019 Denis O Leary IWEA Conference Final 2
9/35
8/13/2019 Denis O Leary IWEA Conference Final 2
10/35
Smarter Networks Initiatives Already Commenced
20kVConversion
WindfarmCluster Design
(Gate 2)
IntegratedICT/SAPPlatform
SCADA
OMS
NationalContactCentre
CentralisedControl
1000 MV
AutomatedSwitches
Smarter
Networks
8/13/2019 Denis O Leary IWEA Conference Final 2
11/35
Smart Networks Main Road Map Elements
6,000MW of Renewables
Energy Storage/Voltage Control
Self-HealingNetworks
Green Circuits/Loss Reduction
Smart Circuits/(optimisation)
SmartMetering
Home AreaNetworks/Services
DSM
Microgeneration
TransportElectricity
SmarterNetworks
Exciting Challenge
8/13/2019 Denis O Leary IWEA Conference Final 2
12/35
Key Initiatives to Date
Networks infrastructure investment
Investment in Smart Systems
Connection of Wind Farms
Distributed automation switches
Smart Metering
8/13/2019 Denis O Leary IWEA Conference Final 2
13/35
Other Initiatives
8/13/2019 Denis O Leary IWEA Conference Final 2
14/35
Distribution Automation
8/13/2019 Denis O Leary IWEA Conference Final 2
15/35
Network Fault Performance
100
110
120
130
140
150
160
170
180190
2001 2002 2003 2004 2005 2006 2007 2008
Averageminutes
per customer
YEAR
8/13/2019 Denis O Leary IWEA Conference Final 2
16/35
Key Initiatives to Date
Networks infrastructure investment
Investment in Smart Systems
Connection of Wind Farms
Distributed automation switches
Smart Metering
8/13/2019 Denis O Leary IWEA Conference Final 2
17/35
Pre-Gate Process
Gate 1
Gate 2
Gate 3
Approved Capacity
for Connection
In Queue
760MW
370MW
1300MW
3940MW
6,370MW
4,600MW
Gate 3 roll-out of Wind Generation
8/13/2019 Denis O Leary IWEA Conference Final 2
18/35
Gate1: Blue
Gate2: Red
Gate 3: Green
8/13/2019 Denis O Leary IWEA Conference Final 2
19/35
Wind Connections
1005
Connected
1425
InProgress
3940
Gate 3 ConnectedPost G3
6370
InQueue
4600
February 09
8/13/2019 Denis O Leary IWEA Conference Final 2
20/35
Connecting Wind Generation
MW Wind Connected To 2012
Year
M W
0
500
1000
1500
2000
2500
3000
2005 2006 2007 2008 2009 2010 2011 2012
8/13/2019 Denis O Leary IWEA Conference Final 2
21/35
Key Initiatives to Date
Networks infrastructure investment
Investment in Smart Systems
Connection of Wind Farms
Distributed automation switches
Smart Metering
8/13/2019 Denis O Leary IWEA Conference Final 2
22/35
8/13/2019 Denis O Leary IWEA Conference Final 2
23/35
Smart Meter
8/13/2019 Denis O Leary IWEA Conference Final 2
24/35
Advanced Metering Infrastructure
Head End Datacollection
Meters
RF
Concentrator
GPRSCommunication
Router
WAN.
GPRS
Meter DataManagement
System
HAN
HAN
HAN
HAN
SAP-ISU
Market/Suppliers
DLCDistributionLine Carrier
8/13/2019 Denis O Leary IWEA Conference Final 2
25/35
Electrificationof
Road Transport(E/Vs)
8/13/2019 Denis O Leary IWEA Conference Final 2
26/35
Government Targets for 2020
10% of all Vehicles will be electricBattery or PHEV
250,000 vehicles
10% of all road transport energy will be renewable Assume 4% biofuel and 6% electric
Implies between 2% and 10% of current GWh
Energy Storage opportunity
8/13/2019 Denis O Leary IWEA Conference Final 2
27/35
E-mobility Berlin
8/13/2019 Denis O Leary IWEA Conference Final 2
28/35
Gate 3 Overview
Transmission nodes decided first
3940MW renewables (160 applicants)
Offer process will start end 2009
Grid 25 derived transmission network
All offers issued by end Q2 2011
8/13/2019 Denis O Leary IWEA Conference Final 2
29/35
Gate 3 Outcome
2091
1939
125
35
Operator MWNetwork
Connections
8/13/2019 Denis O Leary IWEA Conference Final 2
30/35
Wind Applications in MW
B-103MW
A-204MW
G-14MW
H1159MW
H2-118MWD-66MW
F-44MWI-2MW
C-13MW
E-594MW
Gate 2 1300 MW
8/13/2019 Denis O Leary IWEA Conference Final 2
31/35
Wind Applications in MW
Gate 2 1300 MWB-1071MW
A-166MW
G-112MW
H1532MW
H2-88MWD-121MW
F-101MWI-61MW
C-70MW
E-689MW
J-772 MW
K-62 MW
Gate 3 3940 MW
8/13/2019 Denis O Leary IWEA Conference Final 2
32/35
Wind Applications in MW
Gate 2 1300 MW
Gate 3 3940 MWMay/Aug
2009
Oct 09 /Feb 10
Mar/Apr 2010
May/Jul2009 June/July
2009
1-19 May09
Aug/Nov2009
Apr/May2010
Mar/Apr 2010
May/Nov2009
Customer Meeting Timelines
Apr/May2009
Oct/Nov2009
8/13/2019 Denis O Leary IWEA Conference Final 2
33/35
Wind Applications in MW
Gate 2 1300 MW
Gate 3 3940 MW
Customer Meeting Timelines
13.10.10
10.06.11
17.06.11
17.09.10
29.07.1002.04.10
23.11.1021.06.11
15.06.11
07.03.11
Offers Issue
13.04.11
17.12.09
8/13/2019 Denis O Leary IWEA Conference Final 2
34/35
Gate 3: Innovations
Transparent method for 110kV node assignments
Facilitate Developer input for group connection methods
Holding of Connection Method Briefings pre offer
Facilitation of cable option pre-offer
Make available full report on LCTA method
Facilitation of demonstration projects on emergingsolutions
Appointment of a Customer Relations Manager
8/13/2019 Denis O Leary IWEA Conference Final 2
35/35