115
Demolition within Urban Demolition within Urban Environment Environment Lecture Notes prepared by Raymond Wong

Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Demolition within Urban Demolition within Urban EnvironmentEnvironment

Lecture Notes prepared by Raymond Wong

Page 2: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Demolition work is one of the most Demolition work is one of the most dangerous operations in construction.dangerous operations in construction.

Reasons/causes:Easy to cause injury to human workers due to the difficulty of accessing into or working inside a building which is under demolition.Falling of smaller objects or debris from the demolishing building.Falling of partially demolished structure.Collapse of unstable structure due to original structure being disturbed.Employing inappropriate methods to demolsih

Page 3: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Reasons/causes (continued):Collapse of heavy demolition equipment due to inadequate support of the partially demolished structure.Collapse of the partially demolished structure due to the accommodation of large amount of uncleareddebris.Congested site environment that easily cause damages to human workers, or to the third parties and their properties that are situated nearby the demo1ition site.

Page 4: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Difficult access for workers entering into a building under demolition

Page 5: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Further examples of difficult access in demolition jobs

Page 6: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Partially demolished structure is hazardous and may easily collapse and create accident

Page 7: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Heavy machinery used in demolition may have risk of collapse due to insufficient support.

Page 8: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Accommodation of too much debris during demolition can impose intolerable loading to the disturbed structure

Page 9: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Typical congesting neighbour-hood condition for demolishing small buildings within urban environment

Page 10: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

HK Building Department has imposed very strict HK Building Department has imposed very strict control to any form of demolition works by the control to any form of demolition works by the

use of approval & consent procedure.use of approval & consent procedure.

1. Authorized person (AP) should be appointed to submit application for approval of the demolition, which includes an appraisal report with a method statement proposed for the demolition.

2. Building Department will approve the work subject to the satisfying of all precautionary measures pursuant to the Building (Demolition works) Regulations, hoarding and covered walkways or any other conditions as required.

Page 11: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

3. After approva1 is obtained, another 2 stage consent procedure are still required before starting the actual demolition.

4. Stage 1 is to obtain the consent for carrying out all precautionary/temporary works which include the hoardings, covered walkways, scaffolding, catch fans, dust screens and shoring etc.

5. In case the provisions in Stage 1 is completed and to the satisfaction of the Building Department, Stage 2 of consent for the actual demolition can be applied.

Page 12: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

In the appraisal report, the following In the appraisal report, the following information should be includedinformation should be included

1. Structural survey of the building to be demolished2. Photographic record of the site and its adjacent

buildings, slopes and retaining structures.3. The overall height of the structure above ground

level and the proximity to adjoining buildings.4. Information on the type of building, its strudura1

support system, the principal materials of its construction, the degree of deterioration and the effect of demolition etc.

Page 13: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Demolition PlanDemolition Plan

Forming part of the submission information, the Demolition Plan should include:

a) A set of drawings showing :- the location of the building to be demolished- other existing structures and facilities in vicinity

b) Proposed methods of demolition.c) Proposed shoring and precautionary measures for

adjacent buildingsd) Proposed shoring and protection for the building

to be demolished

Page 14: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Demolition PlanDemolition Plan

e) Proposed methods of handling and disposing of the demolished materials

f) Proposed sequence of carrying out work.g) Detai1of equipments used, with methods of

raising, lowering or supporting the equipments.h) Structural calculation to justify the proposal

i) Proposed arrangements for site supervision

Page 15: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Typical dust screen and fans provision to protect building and minimize disturbance to public during demolition

Catch fan

Page 16: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Provision of Hoarding as a protection to public

Page 17: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Provision of Hoarding as a protection to public

Page 18: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Provision of Fence and screen to prevent falling of debris and getting out of dust

Page 19: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Detail of protection scaffold, screen and

catch fan

Page 20: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Common ways to get rid of the demolished debris – to control the falling of the debris into a pre-determined vertical shaft formed on the floor slabs

Shaft for falling of debris

Page 21: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Temporary props erected to support heavy equipment

Page 22: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Erection of shoring to support affected structure

a) Basement demolition (left)

b) A nearby retaining wall (right)

Page 23: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Typical sectioning/ sequencing arrangement of work during demolition – demolish from exterior inward

Page 24: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Typical sectioning/ sequencing arrangement of work during demolition – demolish from one side to the other side of building

Page 25: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Protection measures to public Protection measures to public during demolition processduring demolition process

The following concerns related to the protection and safety of general public or their properties should be provided in the demolition process

1. Overall structure of the adjacent buildings (stability).

2. Party walls and external walls of adjacent buildings (sealing and waterproofing)

3. Foundations of other buildings which may be affected.

4. Public roadway and traffic.

Page 26: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Strengthening of party wall of adjoining building after demolition (by the use of stiffening frame)

Page 27: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Strengthening of party wall of adjoining building after demolition

Stiffening frame to strengthen an exposed party wall

Page 28: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Shoring support to adjoining building after demolition

Timber raking shore as a temporary support to adjacent building

Page 29: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Method of demolitionMethod of demolition

General ConcernsThe choice of choosing a demolition method depends

on a number of factors such as the project conditions, site constraints, sensitivity of the neighbourhood and availability of equipment etc.

In general, top-down methods are applicable for most sites, particularly for those situated in busy urban areas. Other mechanical methods applied from the outside of a building may be suitable for projects that have sufficient clear spaces.

Page 30: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Method of demolitionMethod of demolition

General Concerns (continue)For structural projections such as balconies, canopies

and verandahs extending beyond the building lines, demolition by hand held tools or the cut and lift process may be a safe solution.

Each site has its specific features and conditions. The method, including detail procedures, shall be designed to accommodate the specific project requirements. In general, demolition should be done in the reverse order of construction.

Page 31: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Method of demolitionMethod of demolition

Demolition by human operatives –This method particularly suitable for use in smaller

site with congested space where larger machine cannot be employed.

In this case, human operatives are used in the demolition process using simple electrically or pneumatically powered tools such as picks, hammers, wire cutters, welding cutters or hand driven hydraulic jacks etc. to carry out the demolition of individual elements.

Page 32: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Typical demolition arrangement done by human operatives

Page 33: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Typical demolition arrangement done by human operatives

Slab with the sides disconnected ready for dismantle

Page 34: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Method of demolitionMethod of demolitionDeliberate collapse method –Demolition by deliberate collapse consists of

systematic removal, or weakening of the key structural elements to induce the collapse of the structure.

However, when applying this method, several precautions should be observed, such as:Sufficient distance of collapse should be providedCollapse procedure should be carefully designed so that there is no pre-mature collapse or collapse out of the anticipated area.Control height of building structure to be collapsed

Page 35: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Method of demolitionMethod of demolitionUsing of applied pulling/pushing forcesConnecting structural members are disconnected first

allowing part of the remaining structure to be dragged down by the use of some pulling/pushing equipments such as powered jack, winching machine, pulley systems, pushing arms, powered blocks or from the pull/push of a hydraulic excavator.

However, a firm base in the demolishing building is required such as basing on an undisturbed core wall or a strong column section for the applying of the pulling/pushing force.

Page 36: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Demolition of an external wall by

pull-down method using pully

Page 37: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Demolition of an external wall by pull-down method using

excavator arm

Page 38: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Demolition done by applying a pulling force to a portion of structure

Disconnected external wall ready to be pulled down by an applied force

Remain fragments from pulled-down structure to be removed afterward

Page 39: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Method of demolitionMethod of demolitionUsing of wrecking ball -The use of wrecking ball method requires a crane

equipped with a steel ball. The destruction of the building is caused by the impact energy of the steel ball suspended from a crawler crane.

The wrecking ball can be operated outside or inside a building. In case the process is operated inside a building, sufficient clearance from the building interior should be made first (by having the interior portion of the building demolished)

This method also demands experienced operators in order to handle the wrecking ball and control the demolition sequence in a safe manner.

Page 40: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Vertical drop of wrecking ball

Swing action of wrecking ball

Page 41: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Method of demolitionMethod of demolitionUse of powered plant or demolition machine -The principle of demolition by machine is typically the same as the top-down manual method, except that most of the demolition begins with the lifting of the mechanical plant on to the building top floor.

Powered plant such as crawler mounted breaking hammer are used in the demolition process and excavating machines with bucket are used in the remova1 or handling of the demolished materials. However, due to the weight of these machines, they should be properly supported such as by the use of steel props no matter in still or in operating condition.

Page 42: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Demolition by the help of mechanical plant – pneumatic breaker and bucketed excavator

Page 43: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Demolition using top-down method using machines

Building before demolition

Lifting the mechanical equipment to top of building

Page 44: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Demolition using top-down method using machines

Demolition using properly propped excavating/breaking machine

Page 45: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Demolition using top-down method using machines –

typical floor cycle and machine movement

Page 46: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Moving down of the breaking machine to the lower floor

Demolition using top-down method using machines –

typical floor cycle and machine movement

Page 47: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Demolition using top-down method using machines –

typical floor cycle and machine movement

Page 48: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Demolition of 2-way floor slab using

mechanical breaker

Demolition of floor should be started from the middle

Page 49: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Safe practice – Demolition of cantilever slab

Using manual method Using cut and remove method

Page 50: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Some more examples of mechanical means to demolish

Page 51: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Method of demolitionMethod of demolition

Using saw cut method –This method is suitable for alteration and additional works where accuracy is important and restriction on noise and vibration is required.

It can be used to cut concrete slab and wall elements into segments or for the forming of openings, breaking into existing structure like a basement, servicing tunnel, flyover, or other part of an inhabited building in the process of alteration or renovation works.

Page 52: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Method of demolitionMethod of demolition

Using saw cut method (continue) –Saw cutting can be done using the following methods:

wire saw cutting

diamond core stitch drilling

disc saw

Page 53: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Demolition using dis saw cutting

Set-up and mounting of the saw dis on wall

Page 54: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Demolition using diamond core

An opening formed on floor for the insertion of a steel prop

Page 55: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Demolition using wire sawing

Page 56: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Disc saw

Demolition using saw-cut and drill method for the diversion of a storm water discharge culvert

Page 57: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Method of demolitionMethod of demolitionUsing cut and lifting method –Cut and lifting involves the initial cutting

of the structure into individual pieces or segments, and then lifting the pieces by crane onto the ground for further demolition or hauling away.

Special precaution should be made when applying this method for demolition such as:

weight of the cut segment may cause extra loading to the remaining structure

lowering of the segment can be dangerous Lowering of segment from a

footbridge after dismantled by saw-cut

Page 58: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Method of demolitionMethod of demolition

Using of hydraulic clamp or robotic breaker –Specially designed breaking/cutting machines, usually track mounted, are used to demolish some smaller structural elements such as thin walls, stairs, slab or parapet etc. when using this kind of equipment, planning for accessing the machines into the working spot is essential.

Page 59: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Demolition using hydraulic clamp or robotic breaker

Page 60: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Method of demolitionMethod of demolitionBy implosion (explosive) –

If using this method to demolish a building, contractor should carry out a comprehensive risk and environmental assessment on the effect of implosion on the neighbourhood.

A detail demolition design is also important, which should cover:Method to pre-weaken the structure (e.g. demolish some load taking structures)Placement of explosiveTime-delay design to allow the building to collapse under control director and location

Page 61: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Shenzhen Example – to demolish 7 building block average 16-storey tall using explosive to provide land for the HK-Shenzhen border crossing at Huanggong

Page 62: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration
Page 63: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

How to clear and clear away the unfinished structure after the explosion?

Page 64: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Method of demolitionMethod of demolitionBy implosion (continue) charges of explosive are placed within the fabric of

structure and detonated to cause partial or complete collapse. Competent explosive specialist is required when demolition is to be done by using explosive.

There are numerous types of explosives for use for various types of demolition (sometimes including non-explosive agent). Consideration such as the spacing and depth of explosive to be located, the amount of explosive to be used, or the degree of fragmentation required in order to control the boundary of demolition etc., are required throughout the planning and operation process.

Page 65: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Removal of demolished material or debrisRemoval of demolished material or debris

Demolition will generate huge amount of debris. The safe and effective removal of such construction remains will be a prime concern in the operation.

In this case, before and during demolition, the following provision should thus be provided:Overall debris disposal planningTraffic routing for debris handling and vehicular access etc.Adequate number of chutes for debris disposalSorting of non-structural materials such as timber and metal for recycling.

Page 66: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Removal of demolished material & debrisRemoval of demolished material & debris

Debris created by demolition is usually collected to one or two pre-arranged shafts in the building and the debris are allowed to fall or drop freely from the shafts, by the push of a bulldozer or alike, down to a safe debris collecting areas for further deposal. Since the accommodation of a certain amount of debris is expected, the areas around the shaft should be properly fenced or propped so that the extra weight of the debris can be taken up.

Accommodation of debris is often dangerous for they may impose extra load to the floor or wall (if leaned against onto). Debris should be cleared away the structure at the earliest possible.

Page 67: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

For larger demolished materials, such as a section of a beam or column member, they can be hoisted down using steel rope, lifting arms or winch etc.

If the site area is large enough or where situation allows, a section of building may be demolished first. The area vacated can be used for the handling of the debris. In this case, a mobile crane may be employed to lower the debris using a bucket or skip.

Page 68: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Portion of the building interior being cleared out for debris handling purposes

Page 69: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Collected metal and other valuable scrape for recycle

Page 70: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Demolition for special structureDemolition for special structure

The following structure should require very special attention during demolition:Precast elementsPrestressed elementsCantilever structureHigh headroom or Large-spanned elementsStructural elements under special jointing arrangement (e.g. hinged or pin-jointed)Composite or steel structure

Page 71: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Demolition for special structureDemolition for special structure

The following structure should require very special attention during demolition (continue):Hanging structuresTransfer plate and deep beams Special floor structures - waffle floor, flat slabArches, trusses or girders structuresCladding or curtain wall

Page 72: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Demolition for special structureDemolition for special structure

The following facilities or buildings should require very special attention during demolition:Buildings located in contaminated siteBuildings used as oil or dangerous goods storageMarine structuresUnderground structures (tunnel, basement or foundation)Soil retaining structures

Page 73: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Disconnection of utilities services Disconnection of utilities services before demolitionbefore demolition

The following utilities should be properly sealed or disconnected before the commencement of demolition:Electricity and gasGas and water supplyVent shaft or any underground accessDrainage and sewage systems

Majority of these utilities services are located underground and can hardly be seen visually. A detail survey should be done before hand to ensure they are found and disconnected.

Page 74: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Environment concerns in demolitionEnvironment concerns in demolitionDemolition is a dirty and dangerous process. In view

of ensure such works are done properly without causing any unnecessary interference to general public, the following areas of environmental concern should be noted.The proper recycle or disposal of the construction wasteTreatment of harmful material (e.g. asbestos or contaminated waste)Control of dust generationControl of noiseControl of waste water (including rain water carrying large amount of mud running out from site)

Page 75: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Other precautions to be notedOther precautions to be noted1. When handling the debris, continual spraying of

water onto the debris can help suppressing the creating of dust.

2. Better work coordination should be maintained to ensure no worker is working inside the building when the debris is being pushed down from the debris shafts.

3. Secure all the partially demolished structures by prop, wire or bracing etc. to ensure the areas are save and will not fall down, at least temporary, and hurt the workers who is working around.

Page 76: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

4. When a building is attached to other buildings nearby, the structure to be demolished should first be detached from the adjoining structure by hand demolition techniques.

5. Very special attention should be made to any demolition work that is carried out along the external perimeter of building for the falling of objects may cause great casualty to third party below.

6. Maintain a safe emergency access all the time during demolition.

Page 77: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Jetting water to the spot where demolition takes place

Protect by secure a free standing external wall section by steel ropes

Steel rope

Page 78: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Maintain a safe access for worker during demolition

Fence off the vertical shaft for the removal of debris

Page 79: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Protect exposed retaining structure after demolition by steel shoring or by remaining building frame of the old structure

Page 80: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Avoid letting a long section of wall free standing without support

Free standing wall without support

Page 81: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Safe practice – Demolition of an external column by pull-down method using pull rope

Page 82: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Some other very complicated demolition cases

Page 83: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

The redevelopment of the Lee Gardens Hotel

Various phases of basement demolition – part of the basement being removed for construction of the pile cap for the future building

Page 84: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Continual stages of the basement demolition with the incorporation of other substructure of the future building

Page 85: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

The redevelopment of the Lee Gardens Hotel

The demolition of the basement structure working at the same time with the construction of the future building

Page 86: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

The redevelopment of the Lee Gardens Hotel

Page 87: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

The redevelopment of the Hilton Hotel

Demolition of the basement structure of the previous Hilton Hotel – the lower basement was backfilled to maintain stability of the disrupted basement structure before the commencement of the new basement

Page 88: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

The redevelopment of the Hilton Hotel

Demolition of the basement structure of the previous Garden Road Carpark

Page 89: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

The Millennium City in Kwun Tong

Demolition of the basement working at the same time with the building foundation

Page 90: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Concerns when demolishing a basementConcerns when demolishing a basementBasement is a soil retaining structure. If demolished

not in a proper manner, the basement and the surrounding may collapse and cause serious damage both inside and outside the basement boundary. The following concerns should be taken when doing the demolition work:Careful planning of work is important (usual to demolish in smaller section and in coordinated phases)Proper shoring should be provided to the basement during demolition

Page 91: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Concerns when demolishing a basement Concerns when demolishing a basement (continue)(continue)

Because the upper structure has been remove, the basement (and the soil below) may have uplifting problem.There may have ground water problem.Existence of old foundation structure (usually required to be removed)Accessibility into basement (and removal of debris) is difficult.

Page 92: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Demolition in congested urban environment –Redevelopment project of URA in Wanchai(Spring Garden Street and Lee Tung Street)

Page 93: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Demolition in congested urban environment –Redevelopment project of URA in Wanchai

(Spring Garden Street and Lee Tung Street)

Site with old buildings to be demolished for redevelopment

Site A

Site B

Site C

Site D

Page 94: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Preparation for Site A before and during demolition

Page 95: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Preparation for Site A before and during demolition

Page 96: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Carrying out the demolition at Site C

Page 97: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

The Asian Trade Centre before the collapse

An accident case An accident case –– the collapse of the the collapse of the Asian Trade Centre at Asian Trade Centre at YauYau TongTong

Page 98: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Existing structure of the Asian Trade Centre1. Building size:

about 45m by 50m on plan and 25m high

2. Structural form: - flat slab structure with limited amount of beams on the building edges and corners- non-load bearing reinforced concrete external wall- arranged in approx. 8m span in 5 x 6 bay grid- strength of concrete 30 N/mm2 (judge according to speaker’s experience)

Page 99: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

The site as seen after the collapse on 30.11.01 (viewing north)

Page 100: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

The site as seen on 30.11.01 (viewing south)

Page 101: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

The site as seen on 30.11.01 (viewing west)

Page 102: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

The site as seen on 30.11.01 (viewing at J/O Sze Shan Street and Shung Shun Street)

Page 103: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

The damage – the wreck of two out of the five breaking/excavating machines used for demolition

Page 104: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

The damage – the 6-storey building collapsed inward forming a heap of debris about 6m high from ground

Page 105: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

The damage – fortunately, the collapse does not damage the adjoining building which separated from the collapsed building by a separating joint only a few millimeter apart

Adjoining building Separating joint

Page 106: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

The remain – a section of the external wall on the west side of the building

Page 107: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

The remain – a portion of building structure at the corner at J/O SzeShan Street & Shung Shun Street

Page 108: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Observation – all the fallen columns centered inward indicates that the collapse orientated somewhat from the building center

Party wall being pull inward

Page 109: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Observation – with the columns basically remain intact while no trace of floor slab can be observed in the remain indicates that the floor structure in general is a weak source that may cause the collapse

Page 110: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Observation – the exposed steel bars on the cut-edges indicates the collapsing structure fell rapidly and produced tremendous pulling force that fail to keep the floor in position. There is no trace of floor concrete adhered to the bar, again indicates that strength of concrete may be sub-standard

Page 111: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Observation – further evidence of possible floor failure. More than 3 storeys of floor slab crushed to rubble and detached completely from the columns

Page 112: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Observation – the steel props used as temporary support for the positioning of the heavy breaker machines seem insufficient for the purpose

Steel prop

Page 113: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Props should rest on bearing plate rather than directly on floor to avoid concentration of loading

Page 114: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

Observation – the accommodation of large amount of debris above the floor impose great loads to the structure

Page 115: Demolition within Urban Environmentpersonal.cityu.edu.hk/bswmwong/pl/pdf/demolition0407.pdf · Method of demolition Using saw cut method – This method is suitable for alteration

End of Presentation

Please refer to the “Code of Practice for Demolition of Buildings” published by the

Buildings Department, HKSAR Government

(can be downloaded from the homepage of BD at http://www.info.gov.hk/bd/english/documents/index.html)