Page 1/60 DEMAND FOR CONSTRUCTION MATERIALS Material Cement in Bulk (‘000 Tonnes) Steel Bars (‘000 Tonnes) Granite (‘000 Tonnes) Ready Mixed Concrete ('000 Cubic Metre) Nov 2014 492.61 164.96 2116.63 1305.69 Dec 2014 617.47 152.76 1776.57 1399.92 Jan 2015 590.20 211.08 1907.92 1489.62 Feb 2015 422.89 173.97 1587.68 1112.14 Mar 2015 490.57 210.88 1800.82 1416.07 Apr 2015 469.72 265.44 1909.45 1365.38 May 2015 492.00 113.78 1813.54 1349.09 Jun 2015 461.11 165.98 1738.69 1369.68 Jul 2015 495.98 166.40 1824.78 1448.48 Aug 2015 561.04 227.51 1772.14 1327.67 Sep 2015 522.04 107.74 1742.62 1298.95 Oct 2015 564.29 142.84 1752.09 1373.36 Nov 2015 473.58 147.37 1879.89 1236.07 1,880 474 1,236 0 500 1,000 1,500 2,000 2,500 0 500 1,000 1,500 2,000 2,500 Nov- 2014 Dec- 2014 Jan- 2015 Feb- 2015 Mar- 2015 Apr- 2015 May- 2015 Jun- 2015 Jul- 2015 Aug- 2015 Sep- 2015 Oct- 2015 Nov- 2015 Thousand Cubic Metres Thousand Tonnes Month-Year Monthly Demands for Granite, Cement and Ready-Mixed Concrete Granite (Thousand Tonnes) Cement (Thousand Tonnes) RMC (Thousand Cubic Metres)

DEMAND FOR CONSTRUCTION MATERIALS Steel Bars Granite …

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: DEMAND FOR CONSTRUCTION MATERIALS Steel Bars Granite …

Page 1/60

DEMAND FOR CONSTRUCTION MATERIALS

Material Cement in Bulk

(‘000 Tonnes)

Steel Bars

(‘000 Tonnes)

Granite

(‘000 Tonnes)

Ready Mixed Concrete

('000 Cubic Metre)

Nov 2014 492.61 164.96 2116.63 1305.69

Dec 2014 617.47 152.76 1776.57 1399.92

Jan 2015 590.20 211.08 1907.92 1489.62

Feb 2015 422.89 173.97 1587.68 1112.14

Mar 2015 490.57 210.88 1800.82 1416.07

Apr 2015 469.72 265.44 1909.45 1365.38

May 2015 492.00 113.78 1813.54 1349.09

Jun 2015 461.11 165.98 1738.69 1369.68

Jul 2015 495.98 166.40 1824.78 1448.48

Aug 2015 561.04 227.51 1772.14 1327.67

Sep 2015 522.04 107.74 1742.62 1298.95

Oct 2015 564.29 142.84 1752.09 1373.36

Nov 2015 473.58 147.37 1879.89 1236.07

1,880

474

1,236

0

500

1,000

1,500

2,000

2,500

0

500

1,000

1,500

2,000

2,500

Nov-

2014

Dec-

2014

Jan-

2015

Feb-

2015

Mar-

2015

Apr-

2015

May-

2015

Jun-

2015

Jul-

2015

Aug-

2015

Sep-

2015

Oct-

2015

Nov-

2015

Th

ou

san

d C

ub

ic M

etr

es

Th

ou

san

d T

on

ne

s

Month-Year

Monthly Demands for Granite, Cement and Ready-Mixed Concrete

Granite (Thousand Tonnes) Cement (Thousand Tonnes) RMC (Thousand Cubic Metres)

Page 2: DEMAND FOR CONSTRUCTION MATERIALS Steel Bars Granite …

Page 2/60

CONSTRUCTION MATERIAL MARKET PRICES (Data as at 11 January 2016)

Material

Cement in Bulk (Ordinary

Portland Cement) ($/Tonne)

Steel Bars 1 (16-32mm High

Tensile) ($/Tonne) +

Granite2 (20mm

Aggregate) ($/Tonne)

Concreting Sand 2

($/Tonne)

Ready Mixed Concrete

($/Cubic Metre) #

Nov 2014 96.40 605.90 21.80 23.00 106.40

Dec 2014 95.70 612.50 21.60 22.90 103.30

Jan 2015 95.10 599.70 21.40 22.80 100.10

Feb 2015 94.40 589.60 21.20 23.00 100.50

Mar 2015 94.30 565.50 21.00 23.40 100.50

Apr 2015 93.80 542.90 20.70 23.20 100.90

May 2015 93.60 518.90 20.60 23.20 99.70

Jun 2015 93.00 506.60 19.90 23.20 99.90

Jul 2015 92.60 486.40 19.30 22.90 99.80

Aug 2015 92.60 473.90 19.30 22.90 99.60

Sep 2015 92.40 462.00 18.60 23.00 99.80

Oct 2015 92.00 449.60 18.50 22.00 98.80

Nov 2015 91.00 424.60 18.20 21.40 98.10

Dec 2015 90.50P 402P 17.80P 21P 97.40P p

= Preliminary figures

1 Prices of rebar other than 16-32mm dimensions may subject to surcharge. 2 Prices of granite and concreting sand excluded local delivery charges to concrete batching plants.

+With effect from Jan 2015, the market prices of rebar (without cut & bend) are based on fixed price supply contracts with contract period 1 year or less. #The market prices of ready mixed concrete are based on contracts with non-fixed price, fixed price and market retail price for Grade 40 Pump.

147

0

50

100

150

200

250

300

Nov-

2014

Dec-

2014

Jan-

2015

Feb-

2015

Mar-

2015

Apr-

2015

May-

2015

Jun-

2015

Jul-

2015

Aug-

2015

Sep-

2015

Oct-

2015

Nov-

2015

Th

ou

san

d T

on

ne

s

Month-Year

Monthly Demands for Steel Bars

Page 3: DEMAND FOR CONSTRUCTION MATERIALS Steel Bars Granite …

Page 3/60

VALUE OF CONTRACTS AWARDED1 BY DEVELOPMENT TYPE AND SECTOR (Data as at 7 January 2016) ($ Million)

Sector Residential Commercial Industrial

Institutional & Others

Civil Engineering Total

Public Private Public Private Public Private Public Private Public Private Public Private

Sep 2015 163.62 101.74 12.30 84.45 43.51 423.53 152.80 127.16 156.13 46.30 528.37 783.18

Oct 2015 190.89 241.29 0.00 76.87 131.42 234.19 238.58 40.00 182.56 1134.22 743.45 1726.56

Nov 2015 P 405.78 215.80 11.67 116.97 211.02 86.41 231.88 3.16 871.08 3.26 1731.43 425.61 p

= Preliminary figures 1Excludes reclamation projects

18.2 17.8

21.4 21.0

91.0 90.5

98.1 97.4

0

20

40

60

80

100

120

140

0

10

20

30

40

50

60

Nov-

2014

Dec-

2014

Jan-

2015

Feb-

2015

Mar-

2015

Apr-

2015

May-

2015

Jun-

2015

Jul-

2015

Aug-

2015

Sep-

2015

Oct-

2015

Nov-

2015

Dec-

2015p

$/C

ub

ic M

etre

for

RM

C; $

/To

nn

e fo

r C

emen

t

$/To

nn

e fo

r G

ran

ite

and

San

d

Month-Year

Market Prices of Granite, Sand, Cement and Ready-Mixed Concrete

Market Prices (without delivery) of 20mm Granite ($/Tonne) Market Prices (without delivery) of Sand ($/Tonne)

Market Prices of Cement in Bulk ($/Tonne) Market Prices of RMC Grade 40P ($/Cubic Metre)

Granite (LHS)

Sand (LHS)Cement (RHS)

RMC (RHS)

p - preliminary; RHS- Right Hand Side Y-Axis; LHS- Left Hand Side Y-axis

424.6

402

350

400

450

500

550

600

650

Nov-

2014

Dec-

2014

Jan-

2015

Feb-

2015

Mar-

2015

Apr-

2015

May-

2015

Jun-

2015

Jul-

2015

Aug-

2015

Sep-

2015

Oct-

2015

Nov-

2015

Dec-

2015p

$/To

nn

e

Month-Year

Market Prices of Steel Bars (16-32mm High Tensile)

p - preliminary

Page 4: DEMAND FOR CONSTRUCTION MATERIALS Steel Bars Granite …

Page 4/60

VALUE OF PROGRESS PAYMENTS CERTIFIED BY DEVELOPMENT TYPE AND SECTOR (Data as at 28 December 2015) ($ Million)

Sector Residential Commercial Industrial

Institutional & Others

Civil Engineering

Total

Public Private Public Private Public Private Public Private Public Private Public Private

Sep 2015 P 391.76 676.98 10.60 294.50 72.43 532.62 294.88 97.81 535.05 117.97 1304.72 1719.88

Oct 2015 P 400.00 685.00 15.00 272.00 58.00 520.00 260.00 120.00 520.00 120.00 1253.00 1717.00

Nov 2015 P 390.00 680.00 10.00 270.00 75.00 530.00 260.00 120.00 520.00 110.00 1255.00 1710.00 p

= Preliminary figures SELECTED PROJECTS AWARDED IN NOVEMBER 2015

Project Description Development

Type Consultant Contractor

CONTRACT COST (MORE THAN S$14M TO S$42M)

Primary Education Review & Implementation (PERI) Phase 4: Additions and Alterations to the Existing Teck Ghee Primary School & Zhonghua Primary School at Serangoon Avenue 4 & Ang Mo Kio Street 32 (Contract Cost: $15.60m)

Institutional Architects Vista Kuan Aik Hong Construction

Upgrading of the Existing Maha Bodhi School with the Erection of a 6-Storey Teaching Block with Elevated Field at the 3rd Storey at Ubi Avenue 1 (Contract Cost: $15.90m)

Institutional Interconsultants Kwan Yong Construction

Erection of a 2-Storey 66/22kV Substation with an Eco Deck at One North Phase 2 at Portsdown Road (Contract Cost: $25.20m)

Building (Others)

Interconsultants Expand Construction

CONTRACT COST (MORE THAN S$42M TO S$90M)

Design and Build of an 8-Storey Single User Light Industrial Development comprising a 6-Storey Warehouse and a 2-Storey Production/Ancillary Facility with a Basement Carpark at Leng Kee Road

Industrial AC Consortium LS Construction

Upgrading of Upper Bukit Timah Road and Jalan Anak Bukit (Contract Cost: $47.48m)

Civil Engineering

Not Applicable Feng Ming Construction

CONTRACT COST (ABOVE S$90M)

HDB Building Works at Tampines N6 C2A comprising 1,216 units, a Park and Contingency Works (Contract Cost: $163.98m)

Residential Surbana International Consultants

Qingdao Construction (Singapore)

HDB Building Works at Dawson Contract 3 comprising 1,217 units and Contingency Works (Contract Cost: $236.80m)

Residential Surbana International Consultants

Teambuild Engineering & Construction

The Poiz Residences/Centre: Erection of a 3/4-Storey Retail Podium Block comprising 77 Shops & 7 Restaurants, and 8 Blocks of 18-Storey Residential Development comprising 731 units with a Swimming Pool and Communal Facilities at Meyappa Chettiar Road

Residential ADDP Architects

China Jingye Engineering Corporation

Limited (Singapore

Branch)

Page 5: DEMAND FOR CONSTRUCTION MATERIALS Steel Bars Granite …

Page 5/60

Project Description Development

Type Consultant Contractor

CONTRACT COST (ABOVE S$90M)

Additions and Alterations to an Existing 3-Storey Clubhouse with a Carpark, a Tennis Court, a Driving Range, a Maintenance Facility and a New 6-Storey Hotel and Clubhouse Facility at Laguna Golf Green

Commercial A.M. Associates (Singapore)

Thompson Industries

Construction of a Viaduct from TPE to PIE (Westbound) and Upper Changi Road East (Contract Cost: $94.63m)

Civil Engineering

Not Applicable Or Kim Peow Contractors

Thomson-East Coast MRT Line: Construction of Marine Parade Station & Tunnels (Contract Cost: $555.32m)

Civil Engineering

Not Applicable Samsung C&T Corporation

Page 6: DEMAND FOR CONSTRUCTION MATERIALS Steel Bars Granite …

Page 6/60

DEMAND FOR CONSTRUCTION MATERIALS

Material Cement in Bulk

(‘000 Tonnes)

Steel Bars

(‘000 Tonnes)

Granite

(‘000 Tonnes)

Ready Mixed Concrete

('000 Cubic Metre)

Dec 2014 617.47 152.76 1776.57 1399.92

Jan 2015 590.20 211.08 1907.92 1489.62

Feb 2015 422.89 173.97 1587.68 1112.14

Mar 2015 490.57 210.88 1800.82 1416.07

Apr 2015 469.72 265.44 1909.45 1365.38

May 2015 492.00 113.78 1813.54 1349.09

Jun 2015 461.11 165.98 1738.69 1369.68

Jul 2015 495.98 166.40 1824.78 1448.48

Aug 2015 561.04 227.51 1772.14 1327.67

Sep 2015 522.04 107.74 1742.62 1298.95

Oct 2015 564.29 142.84 1752.09 1373.36

Nov 2015 473.58 147.37 1879.89 1236.07

Dec 2015 476.23 70.07 1686.31 1305.13

1,686

476

1,305

0

500

1,000

1,500

2,000

2,500

0

500

1,000

1,500

2,000

2,500

Dec-

2014

Jan-

2015

Feb-

2015

Mar-

2015

Apr-

2015

May-

2015

Jun-

2015

Jul-

2015

Aug-

2015

Sep-

2015

Oct-

2015

Nov-

2015

Dec-

2015

Tho

usa

nd

Cu

bic

Met

res

Th

ou

san

d T

on

ne

s

Month-Year

Monthly Demands for Granite, Cement and Ready-Mixed Concrete

Granite (Thousand Tonnes) Cement (Thousand Tonnes) RMC (Thousand Cubic Metres)

Page 7: DEMAND FOR CONSTRUCTION MATERIALS Steel Bars Granite …

Page 7/60

CONSTRUCTION MATERIAL MARKET PRICES (Data as at 15 February 2016)

Material

Cement in Bulk (Ordinary

Portland Cement) ($/Tonne)

Steel Bars 1 (16-32mm High

Tensile) ($/Tonne) +

Granite2 (20mm

Aggregate) ($/Tonne)

Concreting Sand 2

($/Tonne)

Ready Mixed Concrete

($/Cubic Metre) #

Dec 2014 95.70 612.50 21.60 22.90 103.30

Jan 2015 95.10 599.70 21.40 22.80 100.10

Feb 2015 94.40 589.60 21.20 23.00 100.50

Mar 2015 94.30 565.50 21.00 23.40 100.50

Apr 2015 93.80 542.90 20.70 23.20 100.90

May 2015 93.60 518.90 20.60 23.20 99.70

Jun 2015 93.00 506.60 19.90 23.20 99.90

Jul 2015 92.60 486.40 19.30 22.90 99.80

Aug 2015 92.60 473.90 19.30 22.90 99.60

Sep 2015 92.40 462.00 18.60 23.00 99.80

Oct 2015 92.00 449.60 18.50 22.00 98.80

Nov 2015 91.00 424.60 18.20 21.40 98.10

Dec 2015 90.80 397.10 17.80 21.20 95.90

Jan 2016 90.50P 395P 17.10P 20.40P 95.90P p

= Preliminary figures

1 Prices of rebar other than 16-32mm dimensions may subject to surcharge. 2 Prices of granite and concreting sand excluded local delivery charges to concrete batching plants.

+With effect from Jan 2015, the market prices of rebar (without cut & bend) are based on fixed price supply contracts with contract period 1 year or less. #The market prices of ready mixed concrete are based on contracts with non-fixed price, fixed price and market retail price for Grade 40 Pump.

70

0

50

100

150

200

250

300

Dec-

2014

Jan-

2015

Feb-

2015

Mar-

2015

Apr-

2015

May-

2015

Jun-

2015

Jul-

2015

Aug-

2015

Sep-

2015

Oct-

2015

Nov-

2015

Dec-

2015

Tho

usa

nd

To

nn

es

Month-Year

Monthly Demands for Steel Bars

Page 8: DEMAND FOR CONSTRUCTION MATERIALS Steel Bars Granite …

Page 8/60

VALUE OF CONTRACTS AWARDED1 BY DEVELOPMENT TYPE AND SECTOR (Data as at 4 February 2016) ($ Million)

Sector Residential Commercial Industrial

Institutional & Others

Civil Engineering Total

Public Private Public Private Public Private Public Private Public Private Public Private

Oct 2015 272.77 254.49 0.00 103.35 132.76 252.17 239.92 41.34 182.19 1136.60 827.64 1787.95

Nov 2015 487.66 221.39 13.01 133.93 212.36 141.05 251.11 26.65 890.80 20.59 1854.94 543.61

Dec 2015 P 278.17 265.78 39.83 128.61 74.69 167.90 270.16 43.57 134.99 42.23 797.84 648.08 p

= Preliminary figures 1Excludes reclamation projects

17.8 17.1

21.2 20.4

90.8 90.5

95.9 95.9

0

20

40

60

80

100

120

140

0

10

20

30

40

50

60

Dec-

2014

Jan-

2015

Feb-

2015

Mar-

2015

Apr-

2015

May-

2015

Jun-

2015

Jul-

2015

Aug-

2015

Sep-

2015

Oct-

2015

Nov-

2015

Dec-

2015

Jan-

2016p

$/C

ub

ic M

etre

for

RM

C; $

/To

nn

e fo

r C

emen

t

$/To

nn

e fo

r G

ran

ite

and

San

d

Month-Year

Market Prices of Granite, Sand, Cement and Ready-Mixed Concrete

Market Prices (without delivery) of 20mm Granite ($/Tonne) Market Prices (without delivery) of Sand ($/Tonne)

Market Prices of Cement in Bulk ($/Tonne) Market Prices of RMC Grade 40P ($/Cubic Metre)

Granite (LHS)

Sand (LHS)Cement (RHS)

RMC (RHS)

p - preliminary; RHS- Right Hand Side Y-Axis; LHS- Left Hand Side Y-axis

397.1 395

350

400

450

500

550

600

650

Dec-

2014

Jan-

2015

Feb-

2015

Mar-

2015

Apr-

2015

May-

2015

Jun-

2015

Jul-

2015

Aug-

2015

Sep-

2015

Oct-

2015

Nov-

2015

Dec-

2015

Jan-

2016p

$/To

nn

e

Month-Year

Market Prices of Steel Bars (16-32mm High Tensile)

p - preliminary

Page 9: DEMAND FOR CONSTRUCTION MATERIALS Steel Bars Granite …

Page 9/60

VALUE OF PROGRESS PAYMENTS CERTIFIED BY DEVELOPMENT TYPE AND SECTOR (Data as at 27 January 2016) ($ Million)

Sector Residential Commercial Industrial

Institutional & Others

Civil Engineering

Total

Public Private Public Private Public Private Public Private Public Private Public Private

Oct 2015 423.65 639.16 11.46 247.90 53.28 524.44 254.55 117.85 624.75 137.83 1367.69 1667.18

Nov 2015 390.00 680.00 10.00 270.00 87.00 540.00 260.00 135.00 638.00 155.00 1385.00 1780.00

Dec 2015 P 410.00 660.00 10.00 270.00 55.00 590.00 265.00 155.00 645.00 160.00 1385.00 1835.00 p

= Preliminary figures SELECTED PROJECTS AWARDED IN DECEMBER 2015

Project Description Development

Type Consultant Contractor

CONTRACT COST (MORE THAN S$14M TO S$42M)

McNair Towers: HDB Building Works at Kallang Whampoa Contract 20C comprising 861 units (Balance of Work; Contract Cost: $35.98m)

Residential Surbana Jurong Consultants

Teambuild Engineering & Construction

Piling & Basement Works for the Design and Build of 9 Blocks of 14/15/16-Storey Executive Condominium comprising 526 units at Chua Chu Kang Avenue 5

Residential ADDP Architects

Qingjian International

(South Pacific) Group Devt Co

Repairs & Redecoration Works to Tampines Industrial Park (Contract Cost: $24.76m)

Industrial Sqft Architects Chiong Construction

Improvement to Sungei Pandan Kechil - West Coast Road to the Sea (Contract Cost: $33.16m)

Civil Engineering

Not Applicable Koon Construction & Transport Co

Additions and Alterations with an Extension to the Existing Transfer Station TS1 and Modifications to the Existing Conveyor at Berth J22 & J23 at Jurong Port Road

Civil Engineering

Bit Architects JS Metal

CONTRACT COST (MORE THAN S$42M TO S$90M)

Capri Hotel by Fraser: Erection of a 16-Storey Hotel Development comprising 304 rooms and Additions and Alterations to the Existing China Square Central's Basements 1 & 2 at South Bridge Road/Cross Street

Commercial DP Architects Nakano Singapore

Erection of a Block of 6-Storey Learning Hub North at Nanyang Drive (Contract Cost: $49.28m)

Institutional DCA Architects Lian Ho Lee Construction

Development of Ulu Pandan Bus Depot (Contract Cost: $70.00m)

Building (Others)

Ong & Ong Tiong Seng Contractors

CONTRACT COST (ABOVE S$90M)

HDB Building Works at Sembawang N1 C6 & N1 C12 comprising 441 and 600 units respectively with a Neighbourhood Centre & Contingency Works (Contract Cost: $152.60m)

Residential SAA Architects Nanjing Dadi Construction (Group) Co.,

Ltd. Singapore Branch

Page 10: DEMAND FOR CONSTRUCTION MATERIALS Steel Bars Granite …

Page 10/60

Project Description Development

Type Consultant Contractor

CONTRACT COST (ABOVE S$90M)

Lake Grande: Erection of 4 Blocks of 17-Storey Condominium Development comprising 710 units with 2 Basement Carparks, a Childcare Centre and Communal Facilities at Jurong West Street 41

Residential ADDP Architects

China Construction

(South Pacific) Development

Co

Page 11: DEMAND FOR CONSTRUCTION MATERIALS Steel Bars Granite …

Page 11/60

DEMAND FOR CONSTRUCTION MATERIALS

Material Cement in Bulk

(‘000 Tonnes)

Steel Bars

(‘000 Tonnes)

Granite

(‘000 Tonnes)

Ready Mixed Concrete

('000 Cubic Metre)

Jan 2015 590.20 211.08 1907.92 1489.62

Feb 2015 422.89 173.97 1587.68 1112.14

Mar 2015 490.57 210.88 1800.82 1416.07

Apr 2015 469.72 265.44 1909.45 1365.38

May 2015 492.00 113.78 1813.54 1349.09

Jun 2015 461.11 165.98 1738.69 1369.68

Jul 2015 495.98 166.40 1824.78 1448.48

Aug 2015 561.04 227.51 1772.14 1327.67

Sep 2015 522.04 107.74 1742.62 1298.95

Oct 2015 564.29 142.84 1752.09 1373.36

Nov 2015 473.58 147.37 1879.89 1236.07

Dec 2015 476.23 70.07 1686.31 1305.13

Jan 2016 439.51 111.85 1740.48 1216.71

1,740

440

1,217

0

500

1,000

1,500

2,000

2,500

0

500

1,000

1,500

2,000

2,500

Jan-

2015

Feb-

2015

Mar-

2015

Apr-

2015

May-

2015

Jun-

2015

Jul-

2015

Aug-

2015

Sep-

2015

Oct-

2015

Nov-

2015

Dec-

2015

Jan-

2016

Tho

usa

nd

Cu

bic

Met

res

Tho

usa

nd

To

nn

es

Month-Year

Monthly Demands for Granite, Cement and Ready-Mixed Concrete

Granite (Thousand Tonnes) Cement (Thousand Tonnes) RMC (Thousand Cubic Metres)

Page 12: DEMAND FOR CONSTRUCTION MATERIALS Steel Bars Granite …

Page 12/60

CONSTRUCTION MATERIAL MARKET PRICES (Data as at 11 March 2016)

Material

Cement in Bulk (Ordinary

Portland Cement) ($/Tonne)

Steel Bars 1 (16-32mm High

Tensile) ($/Tonne) +

Granite2 (20mm

Aggregate) ($/Tonne)

Concreting Sand 2

($/Tonne)

Ready Mixed Concrete

($/Cubic Metre) #

Jan 2015 95.10 599.70 21.40 22.80 100.10

Feb 2015 94.40 589.60 21.20 23.00 100.50

Mar 2015 94.30 565.50 21.00 23.40 100.50

Apr 2015 93.80 542.90 20.70 23.20 100.90

May 2015 93.60 518.90 20.60 23.20 99.70

Jun 2015 93.00 506.60 19.90 23.20 99.90

Jul 2015 92.60 486.40 19.30 22.90 99.80

Aug 2015 92.60 473.90 19.30 22.90 99.60

Sep 2015 92.40 462.00 18.60 23.00 99.80

Oct 2015 92.00 449.60 18.50 22.00 98.80

Nov 2015 91.00 424.60 18.20 21.40 98.10

Dec 2015 90.80 397.10 17.80 21.20 95.90

Jan 2016 88.90 391.60 16.70 20.40 92.90

Feb 2016 87.50P 399P 16.70P 20.40P 92.90P p

= Preliminary figures

1 Prices of rebar other than 16-32mm dimensions may subject to surcharge. 2 Prices of granite and concreting sand excluded local delivery charges to concrete batching plants.

+With effect from Jan 2015, the market prices of rebar (without cut & bend) are based on fixed price supply contracts with contract period 1 year or less. #The market prices of ready mixed concrete are based on contracts with non-fixed price, fixed price and market retail price for Grade 40 Pump.

112

0

50

100

150

200

250

300

Jan-

2015

Feb-

2015

Mar-

2015

Apr-

2015

May-

2015

Jun-

2015

Jul-

2015

Aug-

2015

Sep-

2015

Oct-

2015

Nov-

2015

Dec-

2015

Jan-

2016

Thou

sand

Ton

nes

Month-Year

Monthly Demands for Steel Bars

Page 13: DEMAND FOR CONSTRUCTION MATERIALS Steel Bars Granite …

Page 13/60

VALUE OF CONTRACTS AWARDED1 BY DEVELOPMENT TYPE AND SECTOR (Data as at 4 March 2016) ($ Million)

Sector Residential Commercial Industrial

Institutional & Others

Civil Engineering Total

Public Private Public Private Public Private Public Private Public Private Public Private

Nov 2015 487.66 221.39 13.01 133.93 212.36 141.05 251.11 26.65 890.80 20.59 1854.94 543.61

Dec 2015 278.17 265.78 39.83 128.61 74.69 167.90 270.16 43.57 134.99 42.23 797.84 648.08

Jan 2016 P 226.99 47.06 26.86 16.50 2.39 167.20 904.63 6.07 1196.78 20.88 2357.65 257.71 p

= Preliminary figures 1Excludes reclamation projects

16.7 16.7

20.4 20.4

88.9 87.5

92.9 92.9

0

20

40

60

80

100

120

140

0

10

20

30

40

50

60

Jan-

2015

Feb-

2015

Mar-

2015

Apr-

2015

May-

2015

Jun-

2015

Jul-

2015

Aug-

2015

Sep-

2015

Oct-

2015

Nov-

2015

Dec-

2015

Jan-

2016

Feb-

2016p

$/C

ub

ic M

etre

fo

r R

MC

; $/T

on

ne

for

Cem

ent

$/To

nn

e fo

r G

ran

ite

and

San

d

Month-Year

Market Prices of Granite, Sand, Cement and Ready-Mixed Concrete

Market Prices (without delivery) of 20mm Granite ($/Tonne) Market Prices (without delivery) of Sand ($/Tonne)

Market Prices of Cement in Bulk ($/Tonne) Market Prices of RMC Grade 40P ($/Cubic Metre)

Granite (LHS)

Sand (LHS)Cement (RHS)

RMC (RHS)

p - preliminary; RHS- Right Hand Side Y-Axis; LHS- Left Hand Side Y-axis

391.6399

350

400

450

500

550

600

650

Jan-

2015

Feb-

2015

Mar-

2015

Apr-

2015

May-

2015

Jun-

2015

Jul-

2015

Aug-

2015

Sep-

2015

Oct-

2015

Nov-

2015

Dec-

2015

Jan-

2016

Feb-

2016p

$/To

nn

e

Month-Year

Market Prices of Steel Bars (16-32mm High Tensile)

p - preliminary

Page 14: DEMAND FOR CONSTRUCTION MATERIALS Steel Bars Granite …

Page 14/60

VALUE OF PROGRESS PAYMENTS CERTIFIED BY DEVELOPMENT TYPE AND SECTOR (Data as at 26 February 2016) ($ Million)

Sector Residential Commercial Industrial

Institutional & Others

Civil Engineering

Total

Public Private Public Private Public Private Public Private Public Private Public Private

Nov 2015 420.00 663.00 9.00 255.00 86.00 532.00 260.00 135.00 655.00 150.00 1430.00 1735.00

Dec 2015 444.00 650.00 13.00 245.00 58.00 590.00 275.00 150.00 645.00 150.00 1435.00 1785.00

Jan 2016 P 422.00 655.00 8.00 250.00 55.00 550.00 270.00 140.00 620.00 140.00 1375.00 1735.00 p

= Preliminary figures SELECTED PROJECTS AWARDED IN JANUARY 2016

Project Description Development

Type Consultant Contractor

CONTRACT COST (MORE THAN S$14M TO S$42M)

Erection of a 5-Storey Commercial Development comprising a Hawker Centre, a Supermarket, Shops and a Multi-Storey Carpark at Woodlands Street 12 (Contract Cost: $26.86m)

Commercial Architects Project Group

Conint

Construction of a Flyer from Seletar West Link to SLE (Contract Cost: $16.20m)

Civil Engineering

Not Applicable Samwoh Corporation

Redevelopment of Choa Chu Kang Cemetery Phase 2C - Part 2 comprising Landscaping Works, Amenities and Block C 3-3 Grave Plot (Contract Cost: $19.84m)

Civil Engineering

CPG Consultants

Toh Kim Bock C-E Contractor

CONTRACT COST (MORE THAN S$42M TO S$90M)

Shell Marina LOBP-GMP Project (Re-award): Engineering, Procurement & Construction Contract (EPC) of an Industrial Complex comprising a Lube Oil Blending Plant (LOBP) and a Grease Manufacturing Plant (GMP) with Ancillary Facilities including a Canteen at Tuas South Avenue 5

Industrial CKM Consultants

Amec Foster Wheeler Asia

Pacific

CONTRACT COST (ABOVE S$90M)

HDB Building Works at Punggol North Contracts 6 & 7 comprising 1,402 units with a Neighbourhood Centre and Contingency Works (Contract Cost: $220.00m)

Residential HDB In-House Ken-Pal (S)

Design and Build of a 9-Storey Multi-User Ramp-Up Factory Development comprising 110 units with Mezzanine and 139 Factory units, with a Heavy Vehicle Park, a Canteen and Ancillary Facilities at Tampines North Drive 1

Industrial AC Consortium Lian Beng Construction

(1988)

Outram Community Hospital: Erection of a 19-Storey Community Hospital including the Campus Logistics Centre, Offices with 4 Basements and Contingency Works at Singapore General Hospital in Jalan Bukit Merah (Contract Cost: $674.13m)

Institutional Ciap Architects Penta-Ocean Construction

Company

Erection of an 11-Storey Centre for Oral Health and Services Building with a Basement comprising Ancillary Offices, a Carpark, a Mechanical & Electrical Plant and a Basement Tunnel Connection at Lower Kent Ridge Road (Contract Cost: $204.93m)

Institutional Architects 61 Obayashi Singapore

Page 15: DEMAND FOR CONSTRUCTION MATERIALS Steel Bars Granite …

Page 15/60

Project Description Development

Type Consultant Contractor

CONTRACT COST (ABOVE S$90M)

Thomson-East Coast MRT Line: Construction of Katong Park Station & Tunnels (Contract Cost: $293.45m)

Civil Engineering

DP Architects Shanghai Tunnel

Engineering Co (Singapore)

Thomson-East Coast MRT Line: Construction of Tanjong Rhu Station & Tunnels (Contract Cost: $293.86m)

Civil Engineering

DP Architects Bachy Soletanche

Singapore / Wai Fong

Construction JV

Thomson-East Coast MRT Line: Construction of Marine Terrace Station & Tunnels (Contract Cost: $360.59m)

Civil Engineering

SAA Architects Ssangyong Engineering &

Construction Co / Hyundai

Engineering & Construction Co

JV

Page 16: DEMAND FOR CONSTRUCTION MATERIALS Steel Bars Granite …

Page 16/60

DEMAND FOR CONSTRUCTION MATERIALS

Material Cement in Bulk

(‘000 Tonnes)

Steel Bars

(‘000 Tonnes)

Granite

(‘000 Tonnes)

Ready Mixed Concrete

('000 Cubic Metre)

Feb 2015 422.89 173.97 1587.68 1112.14

Mar 2015 490.57 210.88 1800.82 1416.07

Apr 2015 469.72 265.44 1909.45 1365.38

May 2015 492.00 113.78 1813.54 1349.09

Jun 2015 461.11 165.98 1738.69 1369.68

Jul 2015 495.98 166.40 1824.78 1448.48

Aug 2015 561.04 227.51 1772.14 1327.67

Sep 2015 522.04 107.74 1742.62 1298.95

Oct 2015 564.29 142.84 1752.09 1373.36

Nov 2015 473.58 147.37 1879.89 1236.07

Dec 2015 476.23 70.07 1686.31 1305.13

Jan 2016 439.51 111.85 1740.48 1216.71

Feb 2016 432.92 98.72 1249.88 982.62

1,250

433

983

0

500

1,000

1,500

2,000

2,500

0

500

1,000

1,500

2,000

2,500

Feb-

2015

Mar-

2015

Apr-

2015

May-

2015

Jun-

2015

Jul-

2015

Aug-

2015

Sep-

2015

Oct-

2015

Nov-

2015

Dec-

2015

Jan-

2016

Feb-

2016

Th

ou

san

d C

ub

ic M

etr

es

Th

ou

san

d T

on

ne

s

Month-Year

Monthly Demands for Granite, Cement and Ready-Mixed Concrete

Granite (Thousand Tonnes) Cement (Thousand Tonnes) RMC (Thousand Cubic Metres)

Page 17: DEMAND FOR CONSTRUCTION MATERIALS Steel Bars Granite …

Page 17/60

CONSTRUCTION MATERIAL MARKET PRICES (Data as at 12 April 2016)

Material

Cement in Bulk (Ordinary

Portland Cement) ($/Tonne)

Steel Bars 1

(16-32mm High Tensile)

($/Tonne) +

Granite2

(20mm Aggregate) ($/Tonne)

Concreting Sand 2

($/Tonne)

Ready Mixed Concrete

($/Cubic Metre) #

Feb 2015 94.40 589.60 21.20 23.00 100.50

Mar 2015 94.30 565.50 21.00 23.40 100.50

Apr 2015 93.80 542.90 20.70 23.20 100.90

May 2015 93.60 518.90 20.60 23.20 99.70

Jun 2015 93.00 506.60 19.90 23.20 99.90

Jul 2015 92.60 486.40 19.30 22.90 99.80

Aug 2015 92.60 473.90 19.30 22.90 99.60

Sep 2015 92.40 462.00 18.60 23.00 99.80

Oct 2015 92.00 449.60 18.50 22.00 98.80

Nov 2015 91.00 424.60 18.20 21.40 98.10

Dec 2015 90.80 397.10 17.80 21.20 95.90

Jan 2016 88.90 391.60 16.70 20.40 92.90

Feb 2016 87.30 410.50 16.30 20.60 90.80

Mar 2016 86.80P 446P 16.30P 20.60P 90.80P p

= Preliminary figures

1 Prices of rebar other than 16-32mm dimensions may subject to surcharge. 2 Prices of granite and concreting sand excluded local delivery charges to concrete batching plants.

+With effect from Jan 2015, the market prices of rebar (without cut & bend) are based on fixed price supply contracts with contract period 1 year or less. #The market prices of ready mixed concrete are based on contracts with non-fixed price, fixed price and market retail price for Grade 40 Pump.

99

0

50

100

150

200

250

300

Feb-

2015

Mar-

2015

Apr-

2015

May-

2015

Jun-

2015

Jul-

2015

Aug-

2015

Sep-

2015

Oct-

2015

Nov-

2015

Dec-

2015

Jan-

2016

Feb-

2016

Tho

usa

nd

To

nn

es

Month-Year

Monthly Demands for Steel Bars

Page 18: DEMAND FOR CONSTRUCTION MATERIALS Steel Bars Granite …

Page 18/60

VALUE OF CONTRACTS AWARDED1 BY DEVELOPMENT TYPE AND SECTOR (Data as at 6 April 2016) ($ Million)

Sector Residential Commercial Industrial

Institutional & Others

Civil Engineering Total

Public Private Public Private Public Private Public Private Public Private Public Private

Dec 2015 278.17 265.78 39.83 128.61 74.69 167.90 270.16 43.57 134.99 42.23 797.84 648.08

Jan 2016 229.89 59.29 26.86 16.50 2.39 190.77 930.13 68.59 1171.28 5.67 2360.55 340.82

Feb 2016 P 13.01 51.90 1.97 137.77 0.00 49.92 650.61 32.51 40.96 31.22 706.54 303.32 p

= Preliminary figures 1Excludes reclamation projects

16.3 16.3

20.6 20.6

87.3 86.8

90.8 90.8

0

20

40

60

80

100

120

140

0

10

20

30

40

50

60

Feb-

2015

Mar-

2015

Apr-

2015

May-

2015

Jun-

2015

Jul-

2015

Aug-

2015

Sep-

2015

Oct-

2015

Nov-

2015

Dec-

2015

Jan-

2016

Feb-

2016

Mar-

2016p

$/C

ub

ic M

etr

e f

or

RM

C;

$/T

on

ne

fo

r C

em

en

t

$/T

on

ne

fo

r G

ran

ite

an

d S

an

d

Month-Year

Market Prices of Granite, Sand, Cement and Ready-Mixed Concrete

Market Prices (without delivery) of 20mm Granite ($/Tonne) Market Prices (without delivery) of Sand ($/Tonne)

Market Prices of Cement in Bulk ($/Tonne) Market Prices of RMC Grade 40P ($/Cubic Metre)

Granite (LHS)

Sand (LHS)Cement (RHS)

RMC (RHS)

p - preliminary; RHS- Right Hand Side Y-Axis; LHS- Left Hand Side Y-axis

410.5

446

350

400

450

500

550

600

650

Feb-

2015

Mar-

2015

Apr-

2015

May-

2015

Jun-

2015

Jul-

2015

Aug-

2015

Sep-

2015

Oct-

2015

Nov-

2015

Dec-

2015

Jan-

2016

Feb-

2016

Mar-

2016p

$/T

on

ne

Month-Year

Market Prices of Steel Bars (16-32mm High Tensile)

p - preliminary

Page 19: DEMAND FOR CONSTRUCTION MATERIALS Steel Bars Granite …

Page 19/60

VALUE OF PROGRESS PAYMENTS CERTIFIED BY DEVELOPMENT TYPE AND SECTOR (Data as at 28 March 2016) ($ Million)

Sector Residential Commercial Industrial

Institutional & Others

Civil Engineering

Total

Public Private Public Private Public Private Public Private Public Private Public Private

Dec 2015 474.47 650.24 10.01 241.66 53.76 620.74 269.62 148.62 638.02 168.42 1445.88 1829.68

Jan 2016 400.00 660.00 15.00 240.00 55.00 610.00 285.00 105.00 600.00 140.00 1355.00 1755.00

Feb 2016 P 390.00 600.00 10.00 240.00 60.00 610.00 255.00 130.00 600.00 140.00 1315.00 1720.00 p

= Preliminary figures SELECTED PROJECTS AWARDED IN FEBRUARY 2016

Project Description Development

Type Consultant Contractor

CONTRACT COST (MORE THAN S$14M TO S$42M)

Office Fit-Out Works to 3rd & 4th Storey Main Office Space at Terminal 2 Singapore Changi Airport

Commercial Ata Architects New Art Interior

Erection of a 6-Storey Development, Extension of West Wing L1-4 & Additions and Alterations to Internal Wards on Level 3 of Ang Mo Kio-Thye Hua Kwan Hospital at Ang Mo Kio Avenue 9

Institutional SKM (Singapore)

ACP Construction

NUS Data Storage Institute (DSI): Additions and Alterations to the Existing 7-Storey Data Storage Institute within National University of Singapore (Contract Cost: $21.50m)

Institutional CPG Consultants

Lian Soon Construction

Yishun Polyclinic: Development of a 7-Storey Yishun Polyclinic and a Senior Care Centre with a Basement Carpark at Yishun Avenue 9/Yishun Central (Contract Cost: $25.69m)

Institutional RDC Architects Hytech Builders

Woodlands Nursing Home: Development of a 9-Storey Nursing Home at Woodlands Rise (Contract Cost: $31.20m)

Institutional Surbana Jurong Consultants

Dragages Singapore

Oiltanking Phase 6: Erection of a New Jetty MJ22 at Jurong Island

Civil Engineering

Not Applicable Rotary Engineering

CONTRACT COST (MORE THAN S$42M TO S$90M)

Additions and Alterations to the Existing 4-Storey Northpoint Shopping Centre involving New Linkways from Adjacent Development at Yishun Avenue 2/Central 1

Commercial Liu & Wo Architects

W'Ray Construction

Additions and Alterations to the Existing Grand Park City Hall Hotel comprising a 10-Storey Hotel Development with 2 Basement Carparks and 10 Units of Conservation Shop Houses at Coleman Street

Commercial RSP Architects Planners & Engineers

Gennal Industries

CONTRACT COST (ABOVE S$90M)

New State Courts Complex: Erection of the New State Courts Building with 3 Basement Levels at Havelock Square (Contract Cost: $450.91m)

Institutional CPG Consultants

Samsung C&T Corporation

Page 20: DEMAND FOR CONSTRUCTION MATERIALS Steel Bars Granite …

Page 20/60

DEMAND FOR CONSTRUCTION MATERIALS

Material Cement in Bulk

(‘000 Tonnes)

Steel Bars

(‘000 Tonnes)

Granite

(‘000 Tonnes)

Ready Mixed Concrete

('000 Cubic Metre)

Mar 2015 490.57 210.88 1800.82 1416.07

Apr 2015 469.72 265.44 1909.45 1365.38

May 2015 492.00 113.78 1813.54 1349.09

Jun 2015 461.11 165.98 1738.69 1369.68

Jul 2015 495.98 166.40 1824.78 1448.48

Aug 2015 561.04 227.51 1772.14 1327.67

Sep 2015 522.04 107.74 1742.62 1298.95

Oct 2015 564.29 142.84 1752.09 1373.36

Nov 2015 473.58 147.37 1879.89 1236.07

Dec 2015 476.23 70.07 1686.31 1305.13

Jan 2016 439.51 111.85 1740.48 1216.71

Feb 2016 432.92 98.72 1249.88 982.62

Mar 2016 417.27 148.82 1727.33 1299.35

1,727

417

1,299

0

500

1,000

1,500

2,000

2,500

0

500

1,000

1,500

2,000

2,500

Mar-

2015

Apr-

2015

May-

2015

Jun-

2015

Jul-

2015

Aug-

2015

Sep-

2015

Oct-

2015

Nov-

2015

Dec-

2015

Jan-

2016

Feb-

2016

Mar-

2016

Th

ou

san

d C

ub

ic M

etr

es

Th

ou

san

d T

on

ne

s

Month-Year

Monthly Demands for Granite, Cement and Ready-Mixed Concrete

Granite (Thousand Tonnes) Cement (Thousand Tonnes) RMC (Thousand Cubic Metres)

Page 21: DEMAND FOR CONSTRUCTION MATERIALS Steel Bars Granite …

Page 21/60

CONSTRUCTION MATERIAL MARKET PRICES (Data as at 11 May 2016)

Material

Cement in Bulk (Ordinary

Portland Cement) ($/Tonne)

Steel Bars 1 (16-32mm High

Tensile) ($/Tonne) +

Granite2 (20mm

Aggregate) ($/Tonne)

Concreting Sand 2

($/Tonne)

Ready Mixed Concrete

($/Cubic Metre) #

Mar 2015 94.30 565.50 21.00 23.40 100.50

Apr 2015 93.80 542.90 20.70 23.20 100.90

May 2015 93.60 518.90 20.60 23.20 99.70

Jun 2015 93.00 506.60 19.90 23.20 99.90

Jul 2015 92.60 486.40 19.30 22.90 99.80

Aug 2015 92.60 473.90 19.30 22.90 99.60

Sep 2015 92.40 462.00 18.60 23.00 99.80

Oct 2015 92.00 449.60 18.50 22.00 98.80

Nov 2015 91.00 424.60 18.20 21.40 98.10

Dec 2015 90.80 397.10 17.80 21.20 95.90

Jan 2016 88.90 391.60 16.70 20.40 92.90

Feb 2016 87.30 410.50 16.30 20.60 90.80

Mar 2016 86.70 446.60 16.00 20.60 87.20

Apr 2016 84.60P 534P 16.00P 20.60P 85.70P p

= Preliminary figures

1 Prices of rebar other than 16-32mm dimensions may subject to surcharge. 2 Prices of granite and concreting sand excluded local delivery charges to concrete batching plants.

+With effect from Jan 2015, the market prices of rebar (without cut & bend) are based on fixed price supply contracts with contract period 1 year or less. #The market prices of ready mixed concrete are based on contracts with non-fixed price, fixed price and market retail price for Grade 40 Pump.

149

0

50

100

150

200

250

300

Mar-

2015

Apr-

2015

May-

2015

Jun-

2015

Jul-2015 Aug-

2015

Sep-

2015

Oct-

2015

Nov-

2015

Dec-

2015

Jan-

2016

Feb-

2016

Mar-

2016

Th

ou

san

d T

on

ne

s

Month-Year

Monthly Demands for Steel Bars

Page 22: DEMAND FOR CONSTRUCTION MATERIALS Steel Bars Granite …

Page 22/60

VALUE OF CONTRACTS AWARDED1 BY DEVELOPMENT TYPE AND SECTOR

(Data as at 5 May 2016) ($ Million)

Sector Residential Commercial Industrial

Institutional & Others

Civil Engineering Total

Public Private Public Private Public Private Public Private Public Private Public Private

Jan 2016 229.90 67.21 26.86 172.01 2.39 193.26 930.14 75.15 1171.29 28.83 2360.58 536.46

Feb 2016 13.03 61.77 24.91 142.00 7.95 36.29 651.39 34.48 40.96 54.13 738.24 328.67

Mar 2016 P 1047.35 40.46 8.46 11.65 5.46 158.61 35.45 25.06 3479.99 17.47 4576.71 253.25

16.0 16.0

20.6 20.6

86.7 84.6

87.2 85.7

0

20

40

60

80

100

120

140

0

10

20

30

40

50

60

Mar-

2015

Apr-

2015

May-

2015

Jun-

2015

Jul-

2015

Aug-

2015

Sep-

2015

Oct-

2015

Nov-

2015

Dec-

2015

Jan-

2016

Feb-

2016

Mar-

2016

Apr-

2016p

$/C

ub

ic M

etr

e f

or

RM

C;

$/T

on

ne

fo

r C

em

en

t

$/T

on

ne

fo

r G

ran

ite

an

d S

an

d

Month-Year

Market Prices of Granite, Sand, Cement and Ready-Mixed Concrete

Market Prices (without delivery) of 20mm Granite ($/Tonne) Market Prices (without delivery) of Sand ($/Tonne)

Market Prices of Cement in Bulk ($/Tonne) Market Prices of RMC Grade 40P ($/Cubic Metre)

Granite (LHS)

Sand (LHS)Cement (RHS)

RMC (RHS)

p - preliminary; RHS- Right Hand Side Y-Axis; LHS- Left Hand Side Y-axis

446.6

534

350

400

450

500

550

600

650

Mar-

2015

Apr-

2015

May-

2015

Jun-

2015

Jul-

2015

Aug-

2015

Sep-

2015

Oct-

2015

Nov-

2015

Dec-

2015

Jan-

2016

Feb-

2016

Mar-

2016

Apr-

2016p

$/T

on

ne

Month-Year

Market Prices of Steel Bars (16-32mm High Tensile)

p - preliminary

Page 23: DEMAND FOR CONSTRUCTION MATERIALS Steel Bars Granite …

Page 23/60

p = Preliminary figures

1Excludes reclamation projects

VALUE OF PROGRESS PAYMENTS CERTIFIED BY DEVELOPMENT TYPE AND SECTOR (Data as at 27 April 2016) ($ Million)

Sector Residential Commercial Industrial

Institutional & Others

Civil Engineering

Total

Public Private Public Private Public Private Public Private Public Private Public Private

Jan 2016 395.00 670.00 15.00 240.00 40.00 650.00 300.00 100.00 555.00 145.00 1305.00 1805.00

Feb 2016 350.00 550.00 10.00 240.00 55.00 550.00 255.00 135.00 510.00 125.00 1180.00 1600.00

Mar 2016 P 390.00 590.00 12.00 240.00 53.00 600.00 300.00 200.00 800.00 120.00 1555.00 1750.00 p

= Preliminary figures SELECTED PROJECTS AWARDED IN MARCH 2016

Project Description Development

Type Consultant Contractor

CONTRACT COST (MORE THAN S$14M TO S$42M)

HDB Building Works at Choa Chu Kang N1 C15 comprising 126 units with a Basement Carpark, Social Communal Facilities, an Electrical Substation and Contingency Works (Contract Cost: $16.20m)

Residential ADDP Architects

Kay Lim Construction &

Trading

Home Improvement Programme (HIP): Design and Build of Upgrading Projects for G23D and Contingency Works at Jurong East Street 13 & Tampines Street 81 (Contract Cost: $23.04m)

Residential Surbana Jurong Consultants

HPC Builders

Home Improvement Programme (HIP): Design and Build of Upgrading Projects for G21C and Contingency Works at Tampines Street 12/21 and Tampines Avenue 5 (Contract Cost: $23.71m)

Residential Surbana Jurong Consultants

Incorporated Builders

Home Improvement Programme (HIP): Design and Build of Upgrading Projects for G21D and Contingency Works at Marsiling Lane/Woodlands Streets 31&32/Woodlands Avenue 1 (Contract Cost: $23.73m)

Residential The Architects Circle

B-Construction

Home Improvement Programme (HIP): Design and Build of Upgrading Projects for G21E and Contingency Works at Jurong West Street 52 & Bukit Batok East Avenue 5 (Contract Cost: $24.88m)

Residential Surbana Jurong Consultants

CKR Contract Services

Home Improvement Programme (HIP): Design and Build of Upgrading Projects for G21B and Contingency Works at Yishun Streets 22/72 & Yishun Avenue 3 (Contract Cost: $25.30m)

Residential AWP Progressive Builders

Home Improvement Programme (HIP): Design & Build of Upgrading Projects for G22G and Contingency Works at Lorong Ah Soo & Ang Mo Kio Avenue 3 (Contract Cost: $27.08m)

Residential 3P Ecotecture Fujian Chengjian

Construction Corporation (Singapore

Branch)

Home Improvement Programme (HIP): Design & Build of Upgrading Projects for G20F and Contingency Works at Bukit Batok Street 52 and Clementi Avenues 2/5 (Contract Cost: $27.90m)

Residential Surbana Jurong Consultants

Kay Lim Construction &

Trading

Page 24: DEMAND FOR CONSTRUCTION MATERIALS Steel Bars Granite …

Page 24/60

Project Description Development

Type Consultant Contractor

CONTRACT COST (MORE THAN S$14M TO S$42M)

Active, Beautiful, Clean (ABC) Waters Project at Serangoon Reservoir, Sungei Pinang & Hougang Avenue 10 (Contract Cost: $19.18m)

Civil Engineering

Not Applicable Chye Joo Construction

CONTRACT COST (MORE THAN S$42M TO S$90M)

HDB Building Works at Toa Payoh Bidadari C4 comprising 350 units with Common Green, a 66 kV Electrical Substation and Contingency Works at Bidadari (Contract Cost: $62.40m)

Residential ADDP Architects

Chiu Teng Construction Co

Construction of a 2200mm Diameter Pipeline from PIE/Rifle Road to Tanglin Halt Road (Contract Cost: $34.91m)

Civil Engineering

Not Applicable Sing & San Construction

CONTRACT COST (ABOVE S$90M)

HDB Building Works at Sengkang N4 C30 comprising 1,160 units, Contingency Works and Linear Green at Pasir Ris Street 51 (Contract Cost: $126.00m)

Residential P & T Consultants

Kay Lim Construction &

Trading

HDB Building Works at Punggol North Contract 3 comprising 1,021 units with Common Green and Contingency Works (Contract Cost: $131.00m)

Residential Cesma International

Rich Construction

Company

HDB Building Works at Bidadari Contracts 1/2/3 comprising 1,789 units with Common Green and Contingency Works (Contract Cost: $235.67m)

Residential MKPL Architects

Rich Construction

Company

HDB Building Works at Punggol North Contracts 1 & 2 comprising 1,694 units with Common Greens 1 & 2 and Contingency Works (Contract Cost: $293.67m)

Residential Not Applicable China Construction

(South Pacific) Development

Co

Thomson-East Coast MRT Line: Construction of Siglap Station (Contract Cost: $175.74m)

Civil Engineering

Not Applicable John Holland - Zhenhua (S) Engineering

Joint Venture

Thomson-East Coast MRT Line: Construction of Bayshore Station and Tunnels (Contract Cost: $295.87m)

Civil Engineering

Not Applicable Woh Hup - Shanghai Tunnel

Engineering Joint Venture

Thomson-East Coast MRT Line: Construction of Xilin Station and Tunnels (Contract Cost: $833.61m)

Civil Engineering

Not Applicable Samsung C&T Corporation

East Coast Integrated Depot: Construction of a 4-in-1 Rail and Bus Depot and Reception Tunnels for Thomson-East Coast MRT Line (Contract Cost: $1,988.00m)

Civil Engineering

Not Applicable GS Engineering & Construction

Corp

Page 25: DEMAND FOR CONSTRUCTION MATERIALS Steel Bars Granite …

Page 25/60

DEMAND FOR CONSTRUCTION MATERIALS

Material Cement in Bulk

(‘000 Tonnes)

Steel Bars

(‘000 Tonnes)

Granite

(‘000 Tonnes)

Ready Mixed Concrete

('000 Cubic Metre)

Apr 2015 469.72 265.44 1909.45 1365.38

May 2015 492.00 113.78 1813.54 1349.09

Jun 2015 461.11 165.98 1738.69 1369.68

Jul 2015 495.98 166.40 1824.78 1448.48

Aug 2015 561.04 227.51 1772.14 1327.67

Sep 2015 522.04 107.74 1742.62 1298.95

Oct 2015 564.29 142.84 1752.09 1373.36

Nov 2015 473.58 147.37 1879.89 1236.07

Dec 2015 476.23 70.07 1686.31 1305.13

Jan 2016 439.51 111.85 1740.48 1216.71

Feb 2016 432.92 98.72 1249.88 982.62

Mar 2016 417.27 148.82 1727.33 1299.35

Apr 2016 432.23 91.19 1837.19 1255.60

1,837

432

1,256

0

500

1,000

1,500

2,000

2,500

0

500

1,000

1,500

2,000

2,500

Apr-

2015

May-

2015

Jun-

2015

Jul-

2015

Aug-

2015

Sep-

2015

Oct-

2015

Nov-

2015

Dec-

2015

Jan-

2016

Feb-

2016

Mar-

2016

Apr-

2016

Th

ou

san

d C

ub

ic M

etr

es

Th

ou

san

d T

on

ne

s

Month-Year

Monthly Demands for Granite, Cement and Ready-Mixed Concrete

Granite (Thousand Tonnes) Cement (Thousand Tonnes) RMC (Thousand Cubic Metres)

Page 26: DEMAND FOR CONSTRUCTION MATERIALS Steel Bars Granite …

Page 26/60

CONSTRUCTION MATERIAL MARKET PRICES (Data as at 10 June 2016)

Material

Cement in Bulk (Ordinary

Portland Cement) ($/Tonne)

Steel Bars 1 (16-32mm High

Tensile) ($/Tonne) +

Granite2 (20mm

Aggregate) ($/Tonne)

Concreting Sand 2

($/Tonne)

Ready Mixed Concrete

($/Cubic Metre) #

Apr 2015 93.80 542.90 20.70 23.20 100.90

May 2015 93.60 518.90 20.60 23.20 99.70

Jun 2015 93.00 506.60 19.90 23.20 99.90

Jul 2015 92.60 486.40 19.30 22.90 99.80

Aug 2015 92.60 473.90 19.30 22.90 99.60

Sep 2015 92.40 462.00 18.60 23.00 99.80

Oct 2015 92.00 449.60 18.50 22.00 98.80

Nov 2015 91.00 424.60 18.20 21.40 98.10

Dec 2015 90.80 397.10 17.80 21.20 95.90

Jan 2016 88.90 391.60 16.70 20.40 92.90

Feb 2016 87.30 410.50 16.30 20.60 90.80

Mar 2016 86.70 446.60 16.00 20.60 87.20

Apr 2016 84.50 534.50 16.00 20.10 86.90

May 2016 83.80P 544P 16P 19.10P 86.40P p

= Preliminary figures

1 Prices of rebar other than 16-32mm dimensions may subject to surcharge. 2 Prices of granite and concreting sand excluded local delivery charges to concrete batching plants.

+With effect from Jan 2015, the market prices of rebar (without cut & bend) are based on fixed price supply contracts with contract period 1 year or less. #The market prices of ready mixed concrete are based on contracts with non-fixed price, fixed price and market retail price for Grade 40 Pump.

91

0

50

100

150

200

250

300

Apr-

2015

May-

2015

Jun-

2015

Jul-2015 Aug-

2015

Sep-

2015

Oct-

2015

Nov-

2015

Dec-

2015

Jan-

2016

Feb-

2016

Mar-

2016

Apr-

2016

Th

ou

san

d T

on

ne

s

Month-Year

Monthly Demands for Steel Bars

Page 27: DEMAND FOR CONSTRUCTION MATERIALS Steel Bars Granite …

Page 27/60

VALUE OF CONTRACTS AWARDED1 BY DEVELOPMENT TYPE AND SECTOR

(Data as at 6 June 2016) ($ Million)

Sector Residential Commercial Industrial

Institutional & Others

Civil Engineering

Total

Public Private Public Private Public Private Public Private Public Private Public Private

Feb 2016 11.84 68.02 24.91 141.98 7.94 64.57 615.85 40.49 41.51 54.19 702.05 369.24

Mar 2016 1047.35 45.59 8.48 18.86 5.46 177.12 35.66 26.09 3480.00 17.47 4576.94 285.14

Apr 2016 P 462.00 439.04 1.80 92.35 19.10 588.55 218.57 14.27 278.94 33.90 980.41 1168.11 p

= Preliminary figures 1Excludes reclamation projects

16.0 16.0

20.1 19.1

84.5 83.8

86.9 86.4

0

20

40

60

80

100

120

140

0

10

20

30

40

50

60

Apr-

2015

May-

2015

Jul-

2015

Aug-

2015

Sep-

2015

Oct-

2015

Nov-

2015

Dec-

2015

Jan-

2016

Feb-

2016

Mar-

2016

Apr-

2016

May-

2016p

$/C

ub

ic M

etr

e f

or

RM

C;

$/T

on

ne

fo

r C

em

en

t

$/T

on

ne

fo

r G

ran

ite

an

d S

an

d

Month-Year

Market Prices of Granite, Sand, Cement and Ready-Mixed Concrete

Market Prices (without delivery) of 20mm Granite ($/Tonne) Market Prices (without delivery) of Sand ($/Tonne)

Market Prices of Cement in Bulk ($/Tonne) Market Prices of RMC Grade 40P ($/Cubic Metre)

Granite (LHS)

Sand (LHS)

Cement (RHS)

RMC (RHS)

p - preliminary; RHS- Right Hand Side Y-Axis; LHS- Left Hand Side Y-axis

534.5544

350

400

450

500

550

600

650

Apr-

2015

May-

2015

Jun-

2015

Jul-

2015

Aug-

2015

Sep-

2015

Oct-

2015

Nov-

2015

Dec-

2015

Jan-

2016

Feb-

2016

Mar-

2016

Apr-

2016

May-

2016p

$/T

on

ne

Month-Year

Market Prices of Steel Bars (16-32mm High Tensile)

p - preliminary

Page 28: DEMAND FOR CONSTRUCTION MATERIALS Steel Bars Granite …

Page 28/60

VALUE OF PROGRESS PAYMENTS CERTIFIED BY DEVELOPMENT TYPE AND SECTOR (Data as at 26 May 2016) ($ Million)

Sector Residential Commercial Industrial

Institutional & Others

Civil Engineering

Total

Public Private Public Private Public Private Public Private Public Private Public Private

Feb 2016 340.00 550.00 10.00 240.00 65.00 525.00 265.00 135.00 500.00 150.00 1180.00 1600.00

Mar 2016 350.00 565.00 15.00 240.00 95.00 600.00 295.00 215.00 800.00 130.00 1555.00 1750.00

Apr 2016 P 320.00 530.00 10.00 225.00 65.00 480.00 285.00 140.00 720.00 140.00 1400.00 1515.00 p

= Preliminary figures SELECTED PROJECTS AWARDED IN APRIL 2016

Project Description Development

Type Consultant Contractor

CONTRACT COST (MORE THAN S$14M TO S$42M)

Home Improvement Programme (HIP): Design and Build of HDB Upgrading Projects for G23F and Contingency Works at Yishun Ring Road and Yishun Street 11 (Contract Cost: $19.50m)

Residential Surbana Jurong Consultants

Kuan Aik Hong Construction

Lift Upgrading Programme/Home Improvement Programme (LUP/HIP): Design and Build of HDB Upgrading Projects for G20E and Contingency Works at Jalan Bukit Merah / Queen's Close / Bukit Merah Central/Lane 1 / Bukit Purmei (Contract Cost: $25.10m)

Residential SD Architects & Associates

Asiabuild Construction

Lift Upgrading Programme/Home Improvement Programme (LUP/HIP): Design and Build of HDB Upgrading Projects for G21A and Contingency Works at Hougang Avenue 8 / Hougang Streets 21 & 51 / Hougang Avenues 8 & 10 (Contract Cost: $25.35m)

Residential Surbana Jurong Consultants

Thong Huat Brothers

Lift Upgrading Programme/Home Improvement Programme (LUP/HIP): Design and Build of HDB Upgrading Projects for G21F and Contingency Works at Ang Mo Kio Avenues 1/4/5/8/10 (Contract Cost: $25.29m)

Residential Surbana Jurong Consultants

Chiong Construction

Lift Upgrading Programme/Home Improvement Programme (LUP/HIP): Design and Build of HDB Upgrading Projects for G21G and Contingency Works at West Coast Drive / Clementi Avenue 3/West Street 2 / Chua Chu Kang Avenue 3 / Jurong West Street 91 / Bukit Batok East (Contract Cost: $21.49m)

Residential AWP Wing Tuck Engineering/So

on Thong Construction JV

Lift Upgrading Programme/Home Improvement Programme (LUP/HIP): Design and Build of HDB Upgrading Projects for G21H and Contingency Works at New Upper Changi Road / Simei Street 2 / Bedok South Avenue 3 / Bedok North Road/ Bedok North Street 4/Avenue 4 (Contract Cost: $27.78m)

Residential 3P Ecotecture Fujian Chengjian

Construction Corp (Singapore

Branch)

Lift Upgrading Programme/Home Improvement Programme (LUP/HIP): Design and Build of HDB Upgrading Projects for G22A and Contingency Works at Bishan Street 22 and Serangoon Avenue 4/Jalan Raja (Contract Cost: $24.67m)

Residential AWP Welltech Construction

Lift Upgrading Programme/Home Improvement Programme (LUP/HIP): Design and Build of HDB Upgrading Projects for G22B and Contingency Works at Serangoon Avenues 1 to 3 (Contract Cost: $19.59m)

Residential 3P Ecotecture Expand Construction

Page 29: DEMAND FOR CONSTRUCTION MATERIALS Steel Bars Granite …

Page 29/60

Project Description Development

Type Consultant Contractor

CONTRACT COST (MORE THAN S$14M TO S$42M)

Lift Upgrading Programme/Home Improvement Programme (LUP/HIP): Design and Build of HDB Upgrading Projects for G22C and Contingency Works at Hougang Avenues 5 & 7 / Potong Pasir Avenues 1 & 2 / Lorong 1 Toa Payoh / Sin Ming Avenue (Contract Cost: $25.50m)

Residential The Architects Circle

Wing Tuck Engineering/So

on Thong Construction JV

Lift Upgrading Programme/Home Improvement Programme (LUP/HIP): Design and Build of HDB Upgrading Projects for G22D and Contingency Works at Ang Mo Kio Avenues 5 & 10 (Contract Cost: $25.77m)

Residential Surbana Jurong Consultants

Ken-Pal (S)

Home Improvement Programme (HIP): Design and Build of HDB Upgrading Projects for G22E and Contingency Works at Pending Road / Bukit Batok West Avenue 6 and Bukit Batok Street 11 (Contract Cost: $25.28m)

Residential SD Architects & Associates

Teambuild Engineering & Construction

Lift Upgrading Programme/Home Improvement Programme (LUP/HIP): Design and Build of HDB Upgrading Projects for G22F and Contingency Works at Lorong Ah Soo / Haig Road / Ubi Avenue 1 / Bedok North Street 3 / Bedok Reservoir Road / Eunos Road 5 (Contract Cost: $27.96m)

Residential Surbana Jurong Consultants

LBD Engineering

Lift Upgrading Programme/Home Improvement Programme (LUP/HIP): Design and Build of HDB Upgrading Projects for G23A and Contingency Works at Marine Parade Central / Lengkong Tiga / Aljunied Avenue 2 / Jalan Batu / Geylang East Avenue 1 / Tampines Street 12 (Contract Cost: $26.28m)

Residential Architects SG Expand Construction

Lift Upgrading Programme/Home Improvement Programme (LUP/HIP): Design and Build of HDB Upgrading Projects for G23B and Contingency Works at Bukit Batok Streets 31 & 32/34 / Jurong East Streets 24 & 31 / Petir Road / Clementi Street 14 (Contract Cost: $23.97m)

Residential Surbana Jurong Consultants

Kah Engineering

(1986)

Lift Upgrading Programme/Home Improvement Programme (LUP/HIP): Design and Build of HDB Upgrading Projects for G23C and Contingency Works at Yishun Central 1 / Marsiling Rise / Teck Whye Lane / Yishun Ring Road/Street 21 (Contract Cost: $23.77m)

Residential Surbana Jurong Consultants

Ken-Pal (S)

Lift Upgrading Programme/Home Improvement Programme (LUP/HIP): Design and Build of HDB Upgrading Projects for G23E and Contingency Works at Tampines Streets 23/24/43/44/82/83 / Pasir Ris Streets 13/21/Drive 6 (Contract Cost: $25.85m)

Residential Surbana Jurong Consultants

H P Construction &

Engineering

Design and Build of a 3-Storey Single-User Industrial Development (Business 2) at Tuas Avenue 20

Industrial Ha Architects Boustead Projects

Erection of a 4-Storey Single-User General Industry Material Recovery Facility with a Temporary Ancillary Workers' Dormitory at Tuas South Street 7

Industrial Arya Architects Buildforms Construction

Additions and Alterations to Woodgrove Primary School at Woodlands Drive 14 and Bedok Green Primary School at Bedok South Avenue 2 (Contract Cost: $20.50m)

Institutional Interconsultants Kwan Yong Construction

Erection of Damai Primary School at Bedok Reservoir (Contract Cost: $27.99m)

Institutional MKPL Architects

BHCC Construction

Page 30: DEMAND FOR CONSTRUCTION MATERIALS Steel Bars Granite …

Page 30/60

Project Description Development

Type Consultant Contractor

CONTRACT COST (MORE THAN S$14M TO S$42M)

Additions and Alterations to the Existing Elias Park, Park View, Pasir Ris and Tampines North Primary Schools at Pasir Ris/Tampines (Contract Cost: $37.65m)

Institutional CPG Consultants

Kwan Yong Construction

Supply, Laying of 1800mm/1200m Diameter Potable Water Pipeline along Brickland Road / Bukit Batok Road / Kranji Expressway to Bukit Batok West Avenue 2 (Contract Cost: $18.51m)

Civil Engineering

Not Applicable Shingda Construction

Site Clearance, Earthworks, Construction of Drains, Sewers and Related Ancillary Works at Yio Chu Kang Road / Lentor Drive (Contract Cost: $32.66m)

Civil Engineering

Not Applicable Samwoh Corporation

CONTRACT COST (MORE THAN S$42M TO S$90M)

HDB Building Works at Bukit Batok N4 C12 comprising 636 units and Contingency Works (Contract Cost: $65.39m)

Residential P & T Consultants

BHCC Construction

Watercove Ville: Erection of 47 units of Terrace Houses and 2 Pairs of Semi-Detached Houses each with a Basement, 29 units of Terrace Houses each with a Basement and an Attic at Sembawang Road

Residential P & T Consultants

V3 Construction

TripleOne Somerset: Additions and Alterations to the Existing 17-Storey Commercial Development at Somerset Road

Commercial DCA Architects Sunray Woodcraft

Construction

Additions and Alterations to the Existing Petroleum Additives Chemical Plant at Seraya Rise

Industrial Not Applicable Lend Lease Singapore

Design and Build of a 6-Storey Single-User Factory and Warehouse comprising Ancillary Offices and a 2-Storey Canteen at Tanjong Penjuru

Industrial CPG Consultants

SH Design & Build

Erection of a 5-Storey Single-User Warehouse with an Industrial Canteen at Pioneer Road

Industrial Point Architects Wee Hur Construction

CONTRACT COST (ABOVE S$90M)

City Gate: Erection of a 30-Storey Commercial Mixed Development comprising a 2-Storey with a Basement Commercial Podium comprising 188 units, a 3-Storey Podium Carpark and a 25-Storey Residential Tower comprising 311 units at Beach Road

Residential SAA Architects Woh Hup

Erection of 2 Blocks of 44-Storey Condominium Development comprising 736 units with a Swimming Pool, 3 Retail units, a Childcare Centre and 6 Levels of Carpark at Dundee Road

Residential Aga Architects China Jingye Construction Engineering (Singapore)

TuasOne Waste-to-Energy Plant: Engineering, Procurement and Construction of the 6th Waste-to-Energy Plant at Tuas South Avenue 3

Industrial Tenwit Consultants

Hydrochem (S)

Page 31: DEMAND FOR CONSTRUCTION MATERIALS Steel Bars Granite …

Page 31/60

Project Description Development

Type Consultant Contractor

CONTRACT COST (ABOVE S$90M)

Thomson-East Coast MRT Line: Construction of Bedok South Station and Tunnels (Contract Cost: $188.28m)

Civil Engineering

SAA Architects China Jingye Engineering Corporation (Singapore

Branch)

Page 32: DEMAND FOR CONSTRUCTION MATERIALS Steel Bars Granite …

Page 32/60

DEMAND FOR CONSTRUCTION MATERIALS

Material Cement in Bulk

(‘000 Tonnes)

Steel Bars

(‘000 Tonnes)

Granite

(‘000 Tonnes)

Ready Mixed Concrete

('000 Cubic Metre)

May 2015 492.00 113.78 1813.54 1349.09

Jun 2015 461.11 165.98 1738.69 1369.68

Jul 2015 495.98 166.40 1824.78 1448.48

Aug 2015 561.04 227.51 1772.14 1327.67

Sep 2015 522.04 107.74 1742.62 1298.95

Oct 2015 564.29 142.84 1752.09 1373.36

Nov 2015 473.58 147.37 1879.89 1236.07

Dec 2015 476.23 70.07 1686.31 1305.13

Jan 2016 439.51 111.85 1740.48 1216.71

Feb 2016 432.92 98.72 1249.88 982.62

Mar 2016 417.27 148.82 1727.33 1299.35

Apr 2016 432.23 91.19 1837.19 1255.60

May 2016 449.48 100.11 1697.04 1159.38

1,697

449

1,159

0

500

1,000

1,500

2,000

2,500

0

500

1,000

1,500

2,000

2,500

May-

2015

Jun-

2015

Jul-

2015

Aug-

2015

Sep-

2015

Oct-

2015

Nov-

2015

Dec-

2015

Jan-

2016

Feb-

2016

Mar-

2016

Apr-

2016

May-

2016

Th

ou

san

d C

ub

ic M

etr

es

Th

ou

san

d T

on

ne

s

Month-Year

Monthly Demands for Granite, Cement and Ready-Mixed Concrete

Granite (Thousand Tonnes) Cement (Thousand Tonnes) RMC (Thousand Cubic Metres)

Page 33: DEMAND FOR CONSTRUCTION MATERIALS Steel Bars Granite …

Page 33/60

CONSTRUCTION MATERIAL MARKET PRICES (Data as at 14 July 2016)

Material

Cement in Bulk (Ordinary

Portland Cement) ($/Tonne)

Steel Bars 1 (16-32mm High

Tensile) ($/Tonne) +

Granite2 (20mm

Aggregate) ($/Tonne)

Concreting Sand 2

($/Tonne)

Ready Mixed Concrete

($/Cubic Metre) #

May 2015 93.60 518.90 20.60 23.20 99.70

Jun 2015 93.00 506.60 19.90 23.20 99.90

Jul 2015 92.60 486.40 19.30 22.90 99.80

Aug 2015 92.60 473.90 19.30 22.90 99.60

Sep 2015 92.40 462.00 18.60 23.00 99.80

Oct 2015 92.00 449.60 18.50 22.00 98.80

Nov 2015 91.00 424.60 18.20 21.40 98.10

Dec 2015 90.80 397.10 17.80 21.20 95.90

Jan 2016 88.90 391.60 16.70 20.40 92.90

Feb 2016 87.30 410.50 16.30 20.60 90.80

Mar 2016 86.70 446.60 16.00 20.60 87.20

Apr 2016 84.50 534.50 16.00 20.10 86.90

May 2016 84.20 548.10 15.70 19.70 85.80

Jun 2016 84P 493P 15.70P 19.70P 85.60P p

= Preliminary figures

1 Prices of rebar other than 16-32mm dimensions may subject to surcharge. 2 Prices of granite and concreting sand excluded local delivery charges to concrete batching plants.

+With effect from Jan 2015, the market prices of rebar (without cut & bend) are based on fixed price supply contracts with contract period 1 year or less. #The market prices of ready mixed concrete are based on contracts with non-fixed price, fixed price and market retail price for Grade 40 Pump.

100

0

50

100

150

200

250

May-

2015

Jun-

2015

Jul-2015 Aug-

2015

Sep-

2015

Oct-

2015

Nov-

2015

Dec-

2015

Jan-

2016

Feb-

2016

Mar-

2016

Apr-

2016

May-

2016

Tho

usa

nd

To

nn

es

Month-Year

Monthly Demands for Steel Bars

Page 34: DEMAND FOR CONSTRUCTION MATERIALS Steel Bars Granite …

Page 34/60

VALUE OF CONTRACTS AWARDED1 BY DEVELOPMENT TYPE AND SECTOR (Data as at 8 July 2016) ($ Million)

Sector Residential Commercial Industrial

Institutional & Others

Civil Engineering

Total

Public Private Public Private Public Private Public Private Public Private Public Private

Mar 2016 1048.87 204.78 8.48 35.66 5.46 241.83 48.27 70.40 3629.13 17.47 4740.21 570.14

Apr 2016 462.00 444.20 1.80 97.66 19.10 618.60 254.55 14.27 278.94 33.90 1016.39 1208.63

May 2016 P 10.33 197.27 2.00 249.97 5.55 79.50 494.86 6.48 161.48 38.33 674.22 571.55 p

= Preliminary figures 1Excludes reclamation projects

15.7 15.7

19.7 19.7

84.2 84

85.8 85.6

0

20

40

60

80

100

120

140

0

10

20

30

40

50

60

May-

2015

Jun-

2015

Jul-

2015

Aug-

2015

Sep-

2015

Oct-

2015

Nov-

2015

Dec-

2015

Jan-

2016

Feb-

2016

Mar-

2016

Apr-

2016

May-

2016

Jun-

2016p

$/C

ub

ic M

etr

e f

or

RM

C;

$/T

on

ne

fo

r C

em

en

t

$/T

on

ne

fo

r G

ran

ite

an

d S

and

Month-Year

Market Prices of Granite, Sand, Cement and Ready-Mixed Concrete

Market Prices (without delivery) of 20mm Granite ($/Tonne) Market Prices (without delivery) of Sand ($/Tonne)

Market Prices of Cement in Bulk ($/Tonne) Market Prices of RMC Grade 40P ($/Cubic Metre)

Granite (LHS)

Sand (LHS)

Cement (RHS)

RMC (RHS)

p - preliminary; RHS- Right Hand Side Y-Axis; LHS- Left Hand Side Y-axis

548.1

493

350

400

450

500

550

600

650

May-

2015

Jun-

2015

Jul-

2015

Aug-

2015

Sep-

2015

Oct-

2015

Nov-

2015

Dec-

2015

Jan-

2016

Feb-

2016

Mar-

2016

Apr-

2016

May-

2016

Jun-

2016p

$/T

on

ne

Month-Year

Market Prices of Steel Bars (16-32mm High Tensile)

p - preliminary

Page 35: DEMAND FOR CONSTRUCTION MATERIALS Steel Bars Granite …

Page 35/60

VALUE OF PROGRESS PAYMENTS CERTIFIED BY DEVELOPMENT TYPE AND SECTOR (Data as at 27 June 2016) ($ Million)

Sector Residential Commercial Industrial

Institutional & Others

Civil Engineering

Total

Public Private Public Private Public Private Public Private Public Private Public Private

Mar 2016 400.00 555.00 15.00 240.00 95.00 530.00 295.00 215.00 830.00 130.00 1635.00 1670.00

Apr 2016 320.00 530.00 15.00 240.00 65.00 480.00 285.00 155.00 685.00 140.00 1370.00 1545.00

May 2016 P 340.00 550.00 15.00 215.00 110.00 450.00 270.00 150.00 620.00 140.00 1355.00 1505.00 p

= Preliminary figures SELECTED PROJECTS AWARDED IN MAY 2016

Project Description Development

Type Consultant Contractor

CONTRACT COST (MORE THAN S$14M TO S$42M)

Erection of 2 Blocks of 3-Storey Ancillary Buildings and a Block of Single Storey Guardhouse at Tuas South Boulevard

Industrial Surbana Jurong Consultants

Sing Tec Development

Additions & Alterations to Existing Fajar Secondary School at 31 Gangsa Road (Contract Cost: $27.40m)

Institutional CPG Consultants

Kwan Yong Construction

Construction of Equipment Buildings and Facilities at Singapore Changi Airport (Contract Cost: $29.38m)

Building (Others)

Surbana Jurong Infrastructure

SCB Building Construction

Sewers in North Woodlands Area (Package B) – Contract 1 (Contract Cost: $25.80m)

Civil Engineering

Not Applicable Eng Lee Engineering

Construction of T2 to T4 Service Road at Singapore Changi Airport

Civil Engineering

RSP Architects Planners & Engineers

Chan & Chan Engineering

CONTRACT COST (ABOVE S$90M)

Parc Riviera: Erection of 2 Blocks of 36-Storey Condominium (752 Units) with a 4-Storey MSCP & Communal Facilities at West Coast Vale

Residential ADDP Architects LLP

(DO Team)

Evan Lim & Co

Outpost/Village Hotel Sentosa: Erection of a 7-Storey Hotel with car & coach parks & Additions and Alterations to Conservation Buildings at 12 Artillery Avenue/21 Beach View

Commercial ARC Studio Architecture +

Urbanism

Woh Hup

Page 36: DEMAND FOR CONSTRUCTION MATERIALS Steel Bars Granite …

Page 36/60

DEMAND FOR CONSTRUCTION MATERIALS

Material Cement in Bulk

(‘000 Tonnes)

Steel Bars

(‘000 Tonnes)

Granite

(‘000 Tonnes)

Ready Mixed Concrete

('000 Cubic Metre)

Jun 2015 461.11 165.98 1738.69 1369.68

Jul 2015 495.98 166.40 1824.78 1448.48

Aug 2015 561.04 227.51 1772.14 1327.67

Sep 2015 522.04 107.74 1742.62 1298.95

Oct 2015 564.29 142.84 1752.09 1373.36

Nov 2015 473.58 147.37 1879.89 1236.07

Dec 2015 476.23 70.07 1686.31 1305.13

Jan 2016 439.51 111.85 1740.48 1216.71

Feb 2016 432.92 98.72 1249.88 982.62

Mar 2016 417.27 148.82 1727.33 1299.35

Apr 2016 432.23 91.19 1837.19 1255.60

May 2016 449.48 100.11 1697.04 1159.38

Jun 2016 487.40 129.01 1646.57 1180.83

1,647

487

1,181

0

500

1,000

1,500

2,000

2,500

0

500

1,000

1,500

2,000

2,500

Jun-

2015

Jul-

2015

Aug-

2015

Sep-

2015

Oct-

2015

Nov-

2015

Dec-

2015

Jan-

2016

Feb-

2016

Mar-

2016

Apr-

2016

May-

2016

Jun-

2016

Th

ou

san

d C

ub

ic M

etr

es

Th

ou

san

d T

on

ne

s

Month-Year

Monthly Demands for Granite, Cement and Ready-Mixed Concrete

Granite (Thousand Tonnes) Cement (Thousand Tonnes) RMC (Thousand Cubic Metres)

Page 37: DEMAND FOR CONSTRUCTION MATERIALS Steel Bars Granite …

Page 37/60

CONSTRUCTION MATERIAL MARKET PRICES (Data as at 11 August 2016)

Material

Cement in Bulk (Ordinary

Portland Cement) ($/Tonne)

Steel Bars 1 (16-32mm High

Tensile) ($/Tonne) +

Granite2 (20mm

Aggregate) ($/Tonne)

Concreting Sand 2

($/Tonne)

Ready Mixed Concrete

($/Cubic Metre) #

Jun 2015 93.00 506.60 19.90 23.20 99.90

Jul 2015 92.60 486.40 19.30 22.90 99.80

Aug 2015 92.60 473.90 19.30 22.90 99.60

Sep 2015 92.40 462.00 18.60 23.00 99.80

Oct 2015 92.00 449.60 18.50 22.00 98.80

Nov 2015 91.00 424.60 18.20 21.40 98.10

Dec 2015 90.80 397.10 17.80 21.20 95.90

Jan 2016 88.90 391.60 16.70 20.40 92.90

Feb 2016 87.30 410.50 16.30 20.60 90.80

Mar 2016 86.70 446.60 16.00 20.60 87.20

Apr 2016 84.50 534.50 16.00 20.10 86.90

May 2016 84.20 548.10 15.70 19.70 85.80

Jun 2016 82.60 493.10 15.30 19.40 84.60

Jul 2016 81.20P 490P 15P 18P 83.50P p

= Preliminary figures

1 Prices of rebar other than 16-32mm dimensions may subject to surcharge. 2 Prices of granite and concreting sand excluded local delivery charges to concrete batching plants.

+With effect from Jan 2015, the market prices of rebar (without cut & bend) are based on fixed price supply contracts with contract period 1 year or less. #The market prices of ready mixed concrete are based on contracts with non-fixed price, fixed price and market retail price for Grade 40 Pump.

129

0

50

100

150

200

250

Jun-

2015

Jul-

2015

Aug-

2015

Sep-

2015

Oct-

2015

Nov-

2015

Dec-

2015

Jan-

2016

Feb-

2016

Mar-

2016

Apr-

2016

May-

2016

Jun-

2016

Th

ou

san

d T

on

ne

s

Month-Year

Monthly Demands for Steel Bars

Page 38: DEMAND FOR CONSTRUCTION MATERIALS Steel Bars Granite …

Page 38/60

VALUE OF CONTRACTS AWARDED1 BY DEVELOPMENT TYPE AND SECTOR (Data as at 2 August 2016) ($ Million)

Sector Residential Commercial Industrial

Institutional & Others

Civil Engineering

Total

Public Private Public Private Public Private Public Private Public Private Public Private

Apr 2016 461.99 447.01 1.80 100.74 19.10 611.60 267.57 112.47 278.94 33.90 1029.39 1305.71

May 2016 10.33 212.46 2.00 253.98 5.55 253.72 453.73 6.48 77.31 39.10 548.92 765.74

Jun 2016 P 249.06 145.95 0.00 121.74 111.67 73.50 555.62 12.65 868.31 13.87 1784.66 367.69 p

= Preliminary figures 1Excludes reclamation projects

15.3 15.0

19.4 18

82.6 81.2

84.6 83.5

0

20

40

60

80

100

120

140

0

10

20

30

40

50

60

Jun-

2015

Jul-

2015

Aug-

2015

Sep-

2015

Oct-

2015

Nov-

2015

Dec-

2015

Jan-

2016

Feb-

2016

Mar-

2016

Apr-

2016

May-

2016

Jun-

2016

Jul-

2016p

$/C

ub

ic M

etr

e f

or

RM

C;

$/T

on

ne

fo

r C

em

en

t

$/T

on

ne

fo

r G

ran

ite

an

d S

an

d

Month-Year

Market Prices of Granite, Sand, Cement and Ready-Mixed Concrete

Market Prices (without delivery) of 20mm Granite ($/Tonne) Market Prices (without delivery) of Sand ($/Tonne)

Market Prices of Cement in Bulk ($/Tonne) Market Prices of RMC Grade 40P ($/Cubic Metre)

Granite (LHS)

Sand (LHS)

Cement (RHS)

RMC (RHS)

p - preliminary; RHS- Right Hand Side Y-Axis; LHS- Left Hand Side Y-axis

493.1490

350

400

450

500

550

600

650

Jun-

2015

Jul-

2015

Aug-

2015

Sep-

2015

Oct-

2015

Nov-

2015

Dec-

2015

Jan-

2016

Feb-

2016

Mar-

2016

Apr-

2016

May-

2016

Jun-

2016

Jul-

2016p

$/T

on

ne

Month-Year

Market Prices of Steel Bars (16-32mm High Tensile)

p - preliminary

Page 39: DEMAND FOR CONSTRUCTION MATERIALS Steel Bars Granite …

Page 39/60

VALUE OF PROGRESS PAYMENTS CERTIFIED BY DEVELOPMENT TYPE AND SECTOR (Data as at 26 July 2016) ($ Million)

Sector Residential Commercial Industrial

Institutional & Others

Civil Engineering

Total

Public Private Public Private Public Private Public Private Public Private Public Private

Apr 2016 420.00 520.00 12.00 255.00 45.00 475.00 275.00 153.00 625.00 135.00 1377.00 1538.00

May 2016 400.00 550.00 15.00 230.00 135.00 470.00 285.00 165.00 620.00 140.00 1455.00 1555.00

Jun 2016 P 400.00 600.00 15.00 230.00 55.00 470.00 310.00 150.00 620.00 130.00 1400.00 1580.00 p

= Preliminary figures SELECTED PROJECTS AWARDED IN JUNE 2016

Project Description Development

Type Consultant Contractor

CONTRACT COST (MORE THAN S$14M TO S$42M)

Erection of a Part 3/Part 2-Storey Single User Warehouse Development at Pandan Road

Industrial A Y Consultants

Welltech Construction

Modifications to the Existing Hougang Bus Depot at Defu Avenue 1 (Contract Cost: $21.40m)

Building (Others)

DP Architects Quek & Quek Civil

Engineering

Station Enhancement Works at North-South & East-West Lines for 17 Stations (Contract Cost: $14.85m)

Civil Engineering

DP Architects Sunray Woodcraft

Construction

Construction of Sewers in Bukit Batok East Avenue 3 (Contract Cost: $15.69m)

Civil Engineering

Not Applicable Building Construction Co

Improvement to Roadside Drains V Contract 2 - Lorong 22 to Geylang Areas (Contract Cost: $17.99m)

Civil Engineering

Not Applicable Eng Lam Contractors Co

Road Resurfacing Works along ECP, SLE, BKE, CTE and KPE (Contract Cost: $26.81m)

Civil Engineering

Not Applicable Eng Lam Contractors Co

Road Resurfacing Works along PIE, AYE and Other Expressways (Contract Cost: $27.85m)

Civil Engineering

Not Applicable Eng Lam Contractors Co

Murnane Pipeline Contract 3: Construction of a 2200mm Diameter Pipeline from Tanglin Halt Road to AYE/Henderson Road (Contract Cost: $28.29m)

Civil Engineering

Not Applicable Ah Boon Civil Engineering &

Building Contractor

Murnane Pipeline Contract 4: Construction of a Twin 1600mm Diameter Pipeline from AYE/Henderson Road to Keppel Road and a 1600mm Diameter Pipeline from Keppel Road to Maxwell Road/Shenton Way (Contract Cost: $33.58m)

Civil Engineering

Not Applicable Ley Choon Constructions

and Engineering

Construction of Sewers in North Woodlands Area Package A - Contract 1 (Contract Cost: $39.81m)

Civil Engineering

Not Applicable Eng Lee Engineering

Page 40: DEMAND FOR CONSTRUCTION MATERIALS Steel Bars Granite …

Page 40/60

Project Description Development

Type Consultant Contractor

CONTRACT COST (MORE THAN S$42M TO S$90M)

The Clan: Erection of a 30-Storey Hotel Development with a Basement and Additions and Alterations to the Existing 7-Storey Carpark in Far East Square at Telok Ayer/Cross Street

Commercial DP Architects Hexacon Construction

Design & Build of Road Access at Tuas View Basin (Contract Cost: $84.16m)

Civil Engineering

Not Applicable McConnell Dowell South

East Asia

CONTRACT COST (ABOVE S$90M)

Design and Build of 9 Blocks of 15/16-Storey Executive Condominium comprising 497 units with a Landscaped Deck/Basement Carparks at Chua Chu Kang Avenue 5

Residential ADDP Architects

Qingjian International

(South Pacific) Group Devt Co

Design and Build of HDB Public Housing Project B (Contract Cost: $106.19m)

Residential P & T Consultants

Teambuild Engineering & Construction

Process Upgrading at Choa Chu Kang Waterworks Contract 2: Ozone & Biologically Activated Carbon Facilities and Civil Works (Contract Cost: $111.67m)

Industrial Not Applicable Chye Joo Construction /

Sanli M&E Engineering

Construction of a 1600mm Diameter Pipeline from AYE/Henderson Road to River Valley Road - Contract 5 (Contract Cost: $98.26m)

Civil Engineering

Not Applicable Tiong Seng Contractors

Thomson-East Coast MRT Line: Construction of a Facility Building and Tunnels (Contract Cost: $242.37m)

Civil Engineering

Not Applicable China Railway First Group Co.

(Singapore Branch)

Thomson-East Coast MRT Line: Construction of Sungei Bedok Station and Tunnels (Contract Cost: $417.50m)

Civil Engineering

Not Applicable KTC Civil Engineering & Construction

Page 41: DEMAND FOR CONSTRUCTION MATERIALS Steel Bars Granite …

Page 41/60

DEMAND FOR CONSTRUCTION MATERIALS

Material Cement in Bulk

(‘000 Tonnes)

Steel Bars

(‘000 Tonnes)

Granite

(‘000 Tonnes)

Ready Mixed Concrete

('000 Cubic Metre)

Jul 2015 495.98 166.40 1824.78 1448.48

Aug 2015 561.04 227.51 1772.14 1327.67

Sep 2015 522.04 107.74 1742.62 1298.95

Oct 2015 564.29 142.84 1752.09 1373.36

Nov 2015 473.58 147.37 1879.89 1236.07

Dec 2015 476.23 70.07 1686.31 1305.13

Jan 2016 439.51 111.85 1740.48 1216.71

Feb 2016 432.92 98.72 1249.88 982.62

Mar 2016 417.27 148.82 1727.33 1299.35

Apr 2016 432.23 91.19 1837.19 1255.60

May 2016 449.48 100.11 1697.04 1159.38

Jun 2016 487.40 129.01 1646.57 1180.83

Jul 2016 320.14 172.49 1497.58 1158.47

1,498

320

1,158

0

500

1,000

1,500

2,000

2,500

0

500

1,000

1,500

2,000

2,500

Jul-

2015

Aug-

2015

Sep-

2015

Oct-

2015

Nov-

2015

Dec-

2015

Jan-

2016

Feb-

2016

Mar-

2016

Apr-

2016

May-

2016

Jun-

2016

Jul-

2016

Th

ou

san

d C

ub

ic M

etr

es

Th

ou

san

d T

on

ne

s

Month-Year

Monthly Demands for Granite, Cement and Ready-Mixed Concrete

Granite (Thousand Tonnes) Cement (Thousand Tonnes) RMC (Thousand Cubic Metres)

Page 42: DEMAND FOR CONSTRUCTION MATERIALS Steel Bars Granite …

Page 42/60

CONSTRUCTION MATERIAL MARKET PRICES (Data as at 13 September 2016)

Material

Cement in Bulk (Ordinary

Portland Cement) ($/Tonne)

Steel Bars 1 (16-32mm High

Tensile) ($/Tonne) +

Granite2 (20mm

Aggregate) ($/Tonne)

Concreting Sand 2

($/Tonne)

Ready Mixed Concrete

($/Cubic Metre) #

Jul 2015 92.60 486.40 19.30 22.90 99.80

Aug 2015 92.60 473.90 19.30 22.90 99.60

Sep 2015 92.40 462.00 18.60 23.00 99.80

Oct 2015 92.00 449.60 18.50 22.00 98.80

Nov 2015 91.00 424.60 18.20 21.40 98.10

Dec 2015 90.80 397.10 17.80 21.20 95.90

Jan 2016 88.90 391.60 16.70 20.40 92.90

Feb 2016 87.30 410.50 16.30 20.60 90.80

Mar 2016 86.70 446.60 16.00 20.60 87.20

Apr 2016 84.50 534.50 16.00 20.10 86.90

May 2016 84.20 548.10 15.70 19.70 85.80

Jun 2016 82.60 493.10 15.30 19.40 84.60

Jul 2016 81.20 489.20 15.10 17.90 83.70

Aug 2016 81.10P 500P 15P 16.50P 83.20P p

= Preliminary figures

1 Prices of rebar other than 16-32mm dimensions may subject to surcharge. 2 Prices of granite and concreting sand excluded local delivery charges to concrete batching plants.

+With effect from Jan 2015, the market prices of rebar (without cut & bend) are based on fixed price supply contracts with contract period 1 year or less. #The market prices of ready mixed concrete are based on contracts with non-fixed price, fixed price and market retail price for Grade 40 Pump.

172

0

50

100

150

200

250

Jul-

2015

Aug-

2015

Sep-

2015

Oct-

2015

Nov-

2015

Dec-

2015

Jan-

2016

Feb-

2016

Mar-

2016

Apr-

2016

May-

2016

Jun-

2016

Jul-

2016

Th

ou

san

d T

on

ne

s

Month-Year

Monthly Demands for Steel Bars

Page 43: DEMAND FOR CONSTRUCTION MATERIALS Steel Bars Granite …

Page 43/60

VALUE OF CONTRACTS AWARDED1 BY DEVELOPMENT TYPE AND SECTOR (Data as at 2 September 2016) ($ Million)

Sector Residential Commercial Industrial

Institutional & Others

Civil Engineering

Total

Public Private Public Private Public Private Public Private Public Private Public Private

May 2016 13.13 225.98 2.00 256.77 5.55 279.04 453.73 6.48 77.31 39.14 551.72 807.42

Jun 2016 249.06 153.49 0.00 122.57 111.67 76.72 297.06 16.14 1111.38 14.25 1769.18 383.17

Jul 2016P 302.97 121.46 4.95 74.92 113.13 166.32 86.53 19.40 136.65 61.91 644.23 444.00 p

= Preliminary figures 1Excludes reclamation projects

15.1 15.0

17.9 16.5

81.2 81.1

83.7 83.2

0

20

40

60

80

100

120

140

0

10

20

30

40

50

60

Jul-

2015

Aug-

2015

Sep-

2015

Oct-

2015

Nov-

2015

Dec-

2015

Jan-

2016

Feb-

2016

Mar-

2016

Apr-

2016

May-

2016

Jun-

2016

Jul-

2016

Aug-

2016p

$/C

ub

ic M

etr

e f

or

RM

C;

$/T

on

ne

fo

r C

em

en

t

$/T

on

ne

fo

r G

ran

ite

an

d S

an

d

Month-Year

Market Prices of Granite, Sand, Cement and Ready-Mixed Concrete

Market Prices (without delivery) of 20mm Granite ($/Tonne) Market Prices (without delivery) of Sand ($/Tonne)

Market Prices of Cement in Bulk ($/Tonne) Market Prices of RMC Grade 40P ($/Cubic Metre)

Granite (LHS)

Sand (LHS)

Cement (RHS)

RMC (RHS)

p - preliminary; RHS- Right Hand Side Y-Axis; LHS- Left Hand Side Y-axis

489.2500

350

400

450

500

550

600

650

Jul-

2015

Aug-

2015

Sep-

2015

Oct-

2015

Nov-

2015

Dec-

2015

Jan-

2016

Feb-

2016

Mar-

2016

Apr-

2016

May-

2016

Jun-

2016

Jul-

2016

Aug-

2016p

$/T

on

ne

Month-Year

Market Prices of Steel Bars (16-32mm High Tensile)

p - preliminary

Page 44: DEMAND FOR CONSTRUCTION MATERIALS Steel Bars Granite …

Page 44/60

VALUE OF PROGRESS PAYMENTS CERTIFIED BY DEVELOPMENT TYPE AND SECTOR (Data as at 26 August 2016) ($ Million)

Sector Residential Commercial Industrial

Institutional & Others

Civil Engineering

Total

Public Private Public Private Public Private Public Private Public Private Public Private

May 2016 400.00 545.00 15.00 230.00 135.00 480.00 285.00 165.00 620.00 135.00 1455.00 1555.00

Jun 2016 395.00 580.00 18.00 222.00 55.00 460.00 350.00 160.00 620.00 120.00 1438.00 1542.00

Jul 2016 P 380.00 550.00 15.00 225.00 50.00 440.00 330.00 160.00 620.00 110.00 1395.00 1485.00 p

= Preliminary figures SELECTED PROJECTS AWARDED IN JULY 2016

Project Description Development

Type Consultant Contractor

CONTRACT COST (MORE THAN S$13M TO S$40M)

Renovation & Refurbishment to Tower Wing Guest Rooms, Corridors and Lift Lobbies for Shangri-La Hotel at Orange Grove Road

Commercial Chao Tse Ann & Partners

Shanghai Chong Kee Furniture &

Construction

Changi Water Reclamation Plant Phase 2 Contract C21B: Civil & Structural, Mechanical & Electrical Works for Wet Weather Facility (Contract Cost: $31.30m)

Industrial Not Applicable Koh Brothers Building &

Civil Engineering Contractor

Erection of a 5-Storey Single-User Ramp-Up Warehouse Development with an Ancillary Office at Benoi Road

Industrial CS Consulting Engineers

HPC Builders

Design and Build of a 6-Storey Business Park Development with a Basement Carpark at Pasir Panjang Road (Singapore Science Park 2)

Industrial P & T Consultants

Nakano Singapore

Erection of 3 Blocks of 6-Storey Classroom, a Block of 6-Storey Canteen, a Multi-Purpose Hall, an Indoor Sports Hall, a Block of 6-Storey Administration Office, a Staff Room and an Ancillary Building at Fernvale Link/Street (Contract Cost: $34.78m)

Institutional Architects Vista Zheng Keng Engineering & Construction

Rejuvenation Works (Phase 8-3) to Ngee Ann Polytechnic at Clementi Road (Contract Cost: $23.99m)

Institutional RSP Architects Planners & Engineers

Gennal Industries

Cable Installation, Jointing and Road Reinstatement Works at West Zone B

Civil Engineering

Not Applicable K.H. Lee Engineering & Construction

Construction of 800mm Diameter Pipelines from Pioneer Road to Tuas South Avenue 5 and along Tuas South Boulevard (Contract Cost: $20.99m)

Civil Engineering

Not Applicable HSC Pipeline Engineering

Construction of Sewers in Upper Changi Road East Area - Contract 1 (Contract Cost: $21.78m)

Civil Engineering

Not Applicable Megastone Holdings

Page 45: DEMAND FOR CONSTRUCTION MATERIALS Steel Bars Granite …

Page 45/60

Project Description Development

Type Consultant Contractor

CONTRACT COST (MORE THAN S$40M TO S$85M)

Northwave: Construction of 6 Blocks of 16-Storey Executive Condominium Development comprising 358 units with a Basement Carpark, Communal Facilities and Swimming Pools at Woodlands Avenue 12/Woodlands View

Residential Design Link Architects

China Jingye Construction Engineering (Singapore)

Additions and Alterations & Change of Use to the Existing Raffles City Shopping Centre at North Bridge Road

Commercial RSP Architects Planners & Engineers

Gennal Industries

Erection of a Block of 14-Storey Multiple-User Light Industrial Building at Boon Keng Road/Kallang Place

Industrial ADDP Architects

Lum Chang Building

Contractors

Erection of an 8-Storey Industrial Food Building at Buroh Lane (Contract Cost: $81.83m)

Industrial Surbana Jurong Consultants

HPC Builders

Development of Jurong Lake Gardens West (Contract Cost: $62.89m)

Civil Engineering

CPG Consultants

Hon Industries

CONTRACT COST (ABOVE S$85M)

HDB Building Works at Sengkang N3 C28A comprising 921 units, Common Green and Contingency Works (Contract Cost: $96.00m)

Residential P & T Consultants

LC&T Builder (1971)

HDB Building Works at Bukit Batok N4 C18 to 21 comprising 1,962 units and Contingency Works (Contract Cost: $184.98m)

Residential Surbana Jurong Consultants

Qingjian International

(South Pacific) Group Devt Co

Page 46: DEMAND FOR CONSTRUCTION MATERIALS Steel Bars Granite …

Page 46/60

DEMAND FOR CONSTRUCTION MATERIALS

Material Cement in Bulk

(‘000 Tonnes)

Steel Bars

(‘000 Tonnes)

Granite

(‘000 Tonnes)

Ready Mixed Concrete

('000 Cubic Metre)

Aug 2015 561.04 227.51 1772.14 1327.67

Sep 2015 522.04 107.74 1742.62 1298.95

Oct 2015 564.29 142.84 1752.09 1373.36

Nov 2015 473.58 147.37 1879.89 1236.07

Dec 2015 476.23 70.07 1686.31 1305.13

Jan 2016 439.51 111.85 1740.48 1216.71

Feb 2016 432.92 98.72 1249.88 982.62

Mar 2016 417.27 148.82 1727.33 1299.35

Apr 2016 432.23 91.19 1837.19 1255.60

May 2016 449.48 100.11 1697.04 1159.38

Jun 2016 487.40 129.01 1646.57 1180.83

Jul 2016 320.14 172.49 1497.58 1158.47

Aug 2016 392.81 167.86 1679.67 1189.81

1,680

393

1,190

0

500

1,000

1,500

2,000

2,500

0

500

1,000

1,500

2,000

2,500

Aug-

2015

Sep-

2015

Oct-

2015

Nov-

2015

Dec-

2015

Jan-

2016

Feb-

2016

Mar-

2016

Apr-

2016

May-

2016

Jun-

2016

Jul-

2016

Aug-

2016

Th

ou

san

d C

ub

ic M

etr

es

Th

ou

san

d T

on

ne

s

Month-Year

Monthly Demands for Granite, Cement and Ready-Mixed Concrete

Granite (Thousand Tonnes) Cement (Thousand Tonnes) RMC (Thousand Cubic Metres)

Page 47: DEMAND FOR CONSTRUCTION MATERIALS Steel Bars Granite …

Page 47/60

CONSTRUCTION MATERIAL MARKET PRICES (Data as at 11 October 2016)

Material

Cement in Bulk (Ordinary

Portland Cement) ($/Tonne)

Steel Bars 1 (16-32mm High

Tensile) ($/Tonne) +

Granite2 (20mm

Aggregate) ($/Tonne)

Concreting Sand 2

($/Tonne)

Ready Mixed Concrete

($/Cubic Metre) #

Aug 2015 92.60 473.90 19.30 22.90 99.60

Sep 2015 92.40 462.00 18.60 23.00 99.80

Oct 2015 92.00 449.60 18.50 22.00 98.80

Nov 2015 91.00 424.60 18.20 21.40 98.10

Dec 2015 90.80 397.10 17.80 21.20 95.90

Jan 2016 88.90 391.60 16.70 20.40 92.90

Feb 2016 87.30 410.50 16.30 20.60 90.80

Mar 2016 86.70 446.60 16.00 20.60 87.20

Apr 2016 84.50 534.50 16.00 20.10 86.90

May 2016 84.20 548.10 15.70 19.70 85.80

Jun 2016 82.60 493.10 15.30 19.40 84.60

Jul 2016 81.20 489.20 15.10 17.90 83.70

Aug 2016 81.10 500.30 14.80 16.40 82.80

Sep 2016 81P 495P 14.70P 16.30P 82.40P p

= Preliminary figures

1 Prices of rebar other than 16-32mm dimensions may subject to surcharge. 2 Prices of granite and concreting sand excluded local delivery charges to concrete batching plants.

+With effect from Jan 2015, the market prices of rebar (without cut & bend) are based on fixed price supply contracts with contract period 1 year or less. #The market prices of ready mixed concrete are based on contracts with non-fixed price, fixed price and market retail price for Grade 40 Pump.

168

0

50

100

150

200

250

Aug-

2015

Sep-

2015

Oct-

2015

Nov-

2015

Dec-

2015

Jan-

2016

Feb-

2016

Mar-

2016

Apr-

2016

May-

2016

Jun-

2016

Jul-

2016

Aug-

2016

Tho

usa

nd

To

nn

es

Month-Year

Monthly Demands for Steel Bars

Page 48: DEMAND FOR CONSTRUCTION MATERIALS Steel Bars Granite …

Page 48/60

VALUE OF CONTRACTS AWARDED1 BY DEVELOPMENT TYPE AND SECTOR (Data as at 4 October 2016) ($ Million)

Sector Residential Commercial Industrial

Institutional & Others

Civil Engineering Total

Public Private Public Private Public Private Public Private Public Private Public Private

Jun 2016 253.31 153.47 0.08 127.10 111.67 76.72 308.55 20.44 1100.67 14.36 1774.29 392.10

Jul 2016 304.09 126.60 4.95 76.64 113.13 167.57 93.33 20.47 131.60 61.91 647.10 453.18

Aug 2016P 295.90 91.40 8.70 29.39 126.64 105.26 71.19 2.61 121.44 1123.66 623.86 1352.32 p

= Preliminary figures 1Excludes reclamation projects

14.8 14.7

16.4 16.3

81.1 81.0

82.8 82.4

0

20

40

60

80

100

120

140

0

10

20

30

40

50

60

Aug-

2015

Sep-

2015

Oct-

2015

Nov-

2015

Dec-

2015

Jan-

2016

Feb-

2016

Mar-

2016

Apr-

2016

May-

2016

Jun-

2016

Jul-

2016

Aug-

2016

Sep-

2016p

$/C

ub

ic M

etr

e f

or

RM

C;

$/T

on

ne

fo

r C

em

en

t

$/T

on

ne

fo

r G

ran

ite

an

d S

and

Month-Year

Market Prices of Granite, Sand, Cement and Ready-Mixed Concrete

Market Prices (without delivery) of 20mm Granite ($/Tonne) Market Prices (without delivery) of Sand ($/Tonne)

Market Prices of Cement in Bulk ($/Tonne) Market Prices of RMC Grade 40P ($/Cubic Metre)

Granite (LHS)

Sand (LHS)

Cement (RHS)

RMC (RHS)

p - preliminary; RHS- Right Hand Side Y-Axis; LHS- Left Hand Side Y-axis

500 495

350

400

450

500

550

600

650

Aug-

2015

Sep-

2015

Oct-

2015

Nov-

2015

Dec-

2015

Jan-

2016

Feb-

2016

Mar-

2016

Apr-

2016

May-

2016

Jun-

2016

Jul-

2016

Aug-

2016

Sep-

2016p

$/T

on

ne

Month-Year

Market Prices of Steel Bars (16-32mm High Tensile)

p - preliminary

Page 49: DEMAND FOR CONSTRUCTION MATERIALS Steel Bars Granite …

Page 49/60

VALUE OF PROGRESS PAYMENTS CERTIFIED BY DEVELOPMENT TYPE AND SECTOR (Data as at 30 September 2016) ($ Million)

Sector Residential Commercial Industrial

Institutional & Others

Civil Engineering

Total

Public Private Public Private Public Private Public Private Public Private Public Private

Jun 2016 380.00 560.00 18.00 225.00 55.00 475.00 375.00 160.00 620.00 112.00 1448.00 1532.00

Jul 2016 380.00 540.00 15.00 220.00 50.00 435.00 350.00 180.00 600.00 110.00 1395.00 1485.00

Aug 2016P 380.00 540.00 20.00 220.00 60.00 500.00 340.00 160.00 620.00 120.00 1420.00 1540.00 p

= Preliminary figures SELECTED PROJECTS AWARDED IN AUGUST 2016

Project Description Development

Type Consultant Contractor

CONTRACT COST (MORE THAN S$13M TO S$40M)

Erection of a 2-Storey Detached House with a Basement, an Attic and a Swimming Pool at Yarwood Avenue

Residential Tellus Architects

Eco Energy

Luxus Hills Phase 16: Development of 36 units of 3-Storey Terrace House, 2 units of 3-Storey Semi-Detached House, and a 3-Storey Detached House at Ang Mo Kio Avenue 5/Seletar Road/Yio Chu Kang Road

Residential RSP Architects Planners & Engineers

Seah Construction

Bayview Hotel Singapore: Additions and Alterations to the Existing 13-Storey Hotel Development comprising 131 rooms at Bencoolen Street

Commercial Hyla Architects Shanghai Chong Kee Furniture &

Construction

Design and Build of a Part Single Storey and Part 2-Storey Single User Factory Development with an Ancillary Office at 2nd Storey at Benoi Road

Industrial Liu & Wo Architects

Erecon Construction Co

Aims @ Marsiling: Design and Build of a 5-Storey Single User Industrial Development (Business 2) with an Industrial Canteen on 5th Storey at Marsiling Road

Industrial Ha Architects Boustead Projects

Reconstruction of the Existing Darul Ghufran Mosque to a 4-Storey Mosque with a Semi-Basement Carpark at Tampines Avenue 5 (Contract Cost: $20.60m)

Institutional Ata Architects Khian Heng Construction

Erection of an Interim Bus Terminal and a URA Carpark at Spooner Road, Widening of Kampung Bahru Road, Extension of Spooner Road, Associated Ancillary Works and Contingency Works (Contract Cost: $16.45m)

Civil Engineering

23.5 Degree G-Architects

CCECC Singapore

Supply, Laying and Installation of a 1200mm Diameter Potable Water Pipeline from Marina East Desalination Plant to Joo Seng Road (Contract Cost: $31.99m)

Civil Engineering

Not Applicable Ri Dong Corporation

Murnane Pipeline Contract 1: Construction of a 2200mm Diameter Pipeline from Murnane Service Reservoir from Jalan Kampong Chantek to PIE/Rifle Range Road (Contract Cost: $35.35m)

Civil Engineering

Not Applicable Teacly (S)

Page 50: DEMAND FOR CONSTRUCTION MATERIALS Steel Bars Granite …

Page 50/60

Project Description Development

Type Consultant Contractor

CONTRACT COST (MORE THAN S$40M TO S$85M)

HDB Building Works at Hougang N3 C13 comprising 285 units and a Neighbourhood Centre and Contingency Works (Contract Cost: $73.85m)

Residential ADDP Architects

CKR Contract Services

Changi Water Reclamation Plant Phase 2 Contract C22A: Foundation Works for Train 5 (Contract Cost: $73.46m)

Industrial Not Applicable Sembcorp Design and

Construction

CONTRACT COST (ABOVE S$85M)

HDB Building Works at Toa Payoh Bidadari Contracts 6 & 7 comprising 1,594 units and Contingency Works (Contract Cost: $191.85m)

Residential Surbana Jurong Consultants

CES Engineering & Construction

Development of Changi East to Effect 3 Runway Operations (Package 2) at Singapore Changi Airport

Civil Engineering

Not Applicable Hock Lian Seng Infrastructure -

Sembcorp Design &

Construction JV

Page 51: DEMAND FOR CONSTRUCTION MATERIALS Steel Bars Granite …

Page 51/60

DEMAND FOR CONSTRUCTION MATERIALS

Material Cement in Bulk

(‘000 Tonnes)

Steel Bars

(‘000 Tonnes)

Granite

(‘000 Tonnes)

Ready Mixed Concrete

('000 Cubic Metre)

Sep 2015 522.04 107.74 1742.62 1298.95

Oct 2015 564.29 142.84 1752.09 1373.36

Nov 2015 473.58 147.37 1879.89 1236.07

Dec 2015 476.23 70.07 1686.31 1305.13

Jan 2016 439.51 111.85 1740.48 1216.71

Feb 2016 432.92 98.72 1249.88 982.62

Mar 2016 417.27 148.82 1727.33 1299.35

Apr 2016 432.23 91.19 1837.19 1255.60

May 2016 449.48 100.11 1697.04 1159.38

Jun 2016 487.40 129.01 1646.57 1180.83

Jul 2016 320.14 172.49 1497.58 1158.47

Aug 2016 392.81 167.86 1679.67 1189.81

Sep 2016 450.06 244.89 1538.66 1114.79

1,539

450

1,115

0

500

1,000

1,500

2,000

2,500

0

500

1,000

1,500

2,000

2,500

Sep-

2015

Oct-

2015

Nov-

2015

Dec-

2015

Jan-

2016

Feb-

2016

Mar-

2016

Apr-

2016

May-

2016

Jun-

2016

Jul-

2016

Aug-

2016

Sep-

2016

Th

ou

san

d C

ub

ic M

etr

es

Th

ou

san

d T

on

ne

s

Month-Year

Monthly Demands for Granite, Cement and Ready-Mixed Concrete

Granite (Thousand Tonnes) Cement (Thousand Tonnes) RMC (Thousand Cubic Metres)

Page 52: DEMAND FOR CONSTRUCTION MATERIALS Steel Bars Granite …

Page 52/60

CONSTRUCTION MATERIAL MARKET PRICES (Data as at 11 November 2016)

Material

Cement in Bulk (Ordinary

Portland Cement) ($/Tonne)

Steel Bars 1 (16-32mm High

Tensile) ($/Tonne) +

Granite2 (20mm

Aggregate) ($/Tonne)

Concreting Sand 2

($/Tonne)

Ready Mixed Concrete

($/Cubic Metre) #

Sep 2015 92.40 462.00 18.60 23.00 99.80

Oct 2015 92.00 449.60 18.50 22.00 98.80

Nov 2015 91.00 424.60 18.20 21.40 98.10

Dec 2015 90.80 397.10 17.80 21.20 95.90

Jan 2016 88.90 391.60 16.70 20.40 92.90

Feb 2016 87.30 410.50 16.30 20.60 90.80

Mar 2016 86.70 446.60 16.00 20.60 87.20

Apr 2016 84.50 534.50 16.00 20.10 86.90

May 2016 84.20 548.10 15.70 19.70 85.80

Jun 2016 82.60 493.10 15.30 19.40 84.60

Jul 2016 81.20 489.20 15.10 17.90 83.70

Aug 2016 81.10 500.30 14.80 16.40 82.80

Sep 2016 80.50 496.00 14.60 16.20 82.20

Oct 2016 80.20P 494P 14.60P 16.20P 82P p

= Preliminary figures

1 Prices of rebar other than 16-32mm dimensions may subject to surcharge. 2 Prices of granite and concreting sand excluded local delivery charges to concrete batching plants.

+With effect from Jan 2015, the market prices of rebar (without cut & bend) are based on fixed price supply contracts with contract period 1 year or less. #The market prices of ready mixed concrete are based on contracts with non-fixed price, fixed price and market retail price for Grade 40 Pump.

245

0

50

100

150

200

250

300

Sep-

2015

Oct-

2015

Nov-

2015

Dec-

2015

Jan-

2016

Feb-

2016

Mar-

2016

Apr-

2016

May-

2016

Jun-

2016

Jul-

2016

Aug-

2016

Sep-

2016

Th

ou

san

d T

on

ne

s

Month-Year

Monthly Demands for Steel Bars

Page 53: DEMAND FOR CONSTRUCTION MATERIALS Steel Bars Granite …

Page 53/60

VALUE OF CONTRACTS AWARDED1 BY DEVELOPMENT TYPE AND SECTOR (Data as at 4 November 2016) ($ Million)

Sector Residential Commercial Industrial

Institutional & Others

Civil Engineering Total

Public Private Public Private Public Private Public Private Public Private Public Private

Jul 2016 297.04 142.75 0.78 86.81 113.13 176.07 96.88 20.47 125.90 62.47 633.73 488.57

Aug 2016 295.90 201.63 3.43 44.37 136.94 114.51 69.22 6.57 123.23 1123.76 628.71 1490.84

Sep 2016P 1.09 225.82 0.04 1163.02 2.02 45.86 180.45 80.63 110.04 8.41 293.64 1523.75 p

= Preliminary figures 1Excludes reclamation projects

14.6 14.6

16.2 16.2

80.5 80.2

82.2 82.0

0

20

40

60

80

100

120

140

0

10

20

30

40

50

60

Sep-

2015

Oct-

2015

Nov-

2015

Dec-

2015

Jan-

2016

Feb-

2016

Mar-

2016

Apr-

2016

May-

2016

Jun-

2016

Jul-

2016

Aug-

2016

Sep-

2016

Oct-

2016p

$/C

ub

ic M

etr

e f

or

RM

C;

$/T

on

ne

fo

r C

em

en

t

$/T

on

ne

fo

r G

ran

ite

an

d S

an

d

Month-Year

Market Prices of Granite, Sand, Cement and Ready-Mixed Concrete

Market Prices (without delivery) of 20mm Granite ($/Tonne) Market Prices (without delivery) of Sand ($/Tonne)

Market Prices of Cement in Bulk ($/Tonne) Market Prices of RMC Grade 40P ($/Cubic Metre)

Granite (LHS)

Sand (LHS)

Cement (RHS)

RMC (RHS)

p - preliminary; RHS- Right Hand Side Y-Axis; LHS- Left Hand Side Y-axis

496 494

350

400

450

500

550

600

650

Sep-

2015

Oct-

2015

Nov-

2015

Dec-

2015

Jan-

2016

Feb-

2016

Mar-

2016

Apr-

2016

May-

2016

Jun-

2016

Jul-

2016

Aug-

2016

Sep-

2016

Oct-

2016p

$/T

on

ne

Month-Year

Market Prices of Steel Bars (16-32mm High Tensile)

p - preliminary

Page 54: DEMAND FOR CONSTRUCTION MATERIALS Steel Bars Granite …

Page 54/60

VALUE OF PROGRESS PAYMENTS CERTIFIED BY DEVELOPMENT TYPE AND SECTOR (Data as at 26 October 2016) ($ Million)

Sector Residential Commercial Industrial

Institutional & Others

Civil Engineering

Total

Public Private Public Private Public Private Public Private Public Private Public Private

Jul 2016 365.00 540.00 15.00 230.00 65.00 410.00 355.00 190.00 595.00 115.00 1395.00 1485.00

Aug 2016 360.00 540.00 25.00 220.00 110.00 500.00 325.00 160.00 600.00 120.00 1420.00 1540.00

Sep 2016P 350.00 520.00 15.00 220.00 85.00 480.00 345.00 150.00 600.00 110.00 1395.00 1480.00 p

= Preliminary figures SELECTED PROJECTS AWARDED IN SEPTEMBER 2016

Project Description Development

Type Consultant Contractor

CONTRACT COST (MORE THAN S$13M TO S$40M)

Additions and Alterations to the Existing 32-Storey Commercial Development comprising a Block of 32-Storey Office Building with a Basement, Retail and Elevated Carparks at Raffles Quay/Boulevard

Commercial RSP Architects Planners & Engineers

Dragages Singapore

Design and Build of an 8-Storey Nursing Home at Tampines Street 61 (Contract Cost: $26.10m)

Institutional Forum Architects

LC&T Builder (1971)

Design and Construction of a 66kV Electrical Substation at Tagore Road (Contract Cost: $17.52m)

Building (Others)

DP Architects China Jingye Engineering Corporation

Limited (S'pore Branch)

Design, Supply, Installation, Testing and Commissioning of Passenger Loading Bridge in Terminal 1 at Singapore Changi Airport

Building (Others)

Not Applicable Shinmaywa (Asia)

A) Earthworks and Slope Formation at Bukit Batok N4 (Phase 3) B) Widening of Bukit Batok West Avenue 2, Construction of Bukit Batok West Avenue 5 (Extension) and Bukit Batok West Avenue 8 (Part 3) C) Relocation of Bus Bay and Bus Shelter at Bukit Batok Road (Contract Cost: $16.79m)

Civil Engineering

Not Applicable Huationg Contractor

Supply and Laying of 1200mm Diameter Water Pipeline along Clementi Road and West Coast Highway (Contract Cost: $21.70m)

Civil Engineering

Not Applicable Dongah Geological Engineering

Co., Ltd, Singapore

Branch

Reinstatement Works for North-South Corridor (Contract Cost: $23.70m)

Civil Engineering

Ata Architects CCECC Singapore

Page 55: DEMAND FOR CONSTRUCTION MATERIALS Steel Bars Granite …

Page 55/60

Project Description Development

Type Consultant Contractor

CONTRACT COST (MORE THAN S$40M TO S$85M)

Erection of a Boys' Complex comprising 4 Residential Blocks, a Centre for Education, a Medical Centre, an Administration Block and a Jogging Track and Field, and Construction of a New Road to connect Jalan Bahar and Jurong West Street 25 at Jalan Bahar (Contract Cost: $53.88m)

Institutional CPG Consultants

China Construction

(South Pacific) Development

Co

Erection of a 6-Storey Block with 2 Basements and a 6-Storey Annex Block (Customs Operations Command Complex) at Jalan Bahar (Contract Cost: $61.38m)

Institutional CPG Consultants

Newcon Builders

1) Erection of a Single Storey and Part 2-Storey Airport Passenger Terminal Building with Ancillary Offices, Business Aviation Centre and a Carpark at Seletar Aerospace Road 1 2) Erection of New Aircraft Parking Stands with a Single Storey Cargo Shed and Associated Works at Seletar Aerospace Road 1

Building (Others)

3HPArchitects Takenaka Corporation

CONTRACT COST (MORE THAN S$85M)

Additions, Alterations and Extension to the Existing 52-Storey AXA Tower at Shenton Way

Commercial DCA Architects PBT Engineering

Park Mall: Erection of a 2-Storey Retail/Restaurant comprising 19 units and an 8-Storey Office comprising 184 units with a Basement Carpark at Penang Road

Commercial P & T Consultants

China Construction

(South Pacific) Development

Co

Woods Square: Erection of 2 Blocks of 4-Storey (101 units), a Block of 12-Storey (8 units) and a Block of 16-Storey (365 units) Office Development with a 2-Storey Podium for Retail and Restaurant Uses (39 units), Communal Facilities, a Childcare Centre and 2 Basement Carparks at Woodlands Square

Commercial DP Architects Woh Hup

Paya Lebar Quarter: Erection of 3 Blocks of 17-Storey Residential Development comprising 429 units, a Block of 13-Storey and 2 Blocks of 14-Storey Office Development and a Block of 7-Storey Commercial Development with 2 Basement Shopping Centres (234 units) and 3 Basement Carparks at Paya Lebar Road/Sims Avenue

Mixed DP Architects Lend Lease Singapore

Page 56: DEMAND FOR CONSTRUCTION MATERIALS Steel Bars Granite …

Page 56/60

DEMAND FOR CONSTRUCTION MATERIALS

Material Cement in Bulk

(‘000 Tonnes)

Steel Bars

(‘000 Tonnes)

Granite

(‘000 Tonnes)

Ready Mixed Concrete

('000 Cubic Metre)

Oct 2015 564.29 142.84 1752.09 1373.36

Nov 2015 473.58 147.37 1879.89 1236.07

Dec 2015 476.23 70.07 1686.31 1305.13

Jan 2016 439.51 111.85 1740.48 1216.71

Feb 2016 432.92 98.72 1249.88 982.62

Mar 2016 417.27 148.82 1727.33 1299.35

Apr 2016 432.23 91.19 1837.19 1255.60

May 2016 449.48 100.11 1697.04 1159.38

Jun 2016 487.40 129.01 1646.57 1180.83

Jul 2016 320.14 172.49 1497.58 1158.47

Aug 2016 392.81 167.86 1679.67 1189.81

Sep 2016 450.06 244.89 1538.66 1114.79

Oct 2016 395.91 163.38 1504.14 1111.33

1,504

396

1,111

0

500

1,000

1,500

2,000

2,500

0

500

1,000

1,500

2,000

2,500

Oct-

2015

Nov-

2015

Dec-

2015

Jan-

2016

Feb-

2016

Mar-

2016

Apr-

2016

May-

2016

Jun-

2016

Jul-

2016

Aug-

2016

Sep-

2016

Oct-

2016

Th

ou

san

d C

ub

ic M

etr

es

Th

ou

san

d T

on

ne

s

Month-Year

Monthly Demands for Granite, Cement and Ready-Mixed Concrete

Granite (Thousand Tonnes) Cement (Thousand Tonnes) RMC (Thousand Cubic Metres)

Page 57: DEMAND FOR CONSTRUCTION MATERIALS Steel Bars Granite …

Page 57/60

CONSTRUCTION MATERIAL MARKET PRICES (Data as at 12 December 2016)

Material

Cement in Bulk (Ordinary

Portland Cement) ($/Tonne)

Steel Bars 1 (16-32mm High

Tensile) ($/Tonne) +

Granite2 (20mm

Aggregate) ($/Tonne)

Concreting Sand 2

($/Tonne)

Ready Mixed Concrete

($/Cubic Metre) #

Oct 2015 92.00 449.60 18.50 22.00 98.80

Nov 2015 91.00 424.60 18.20 21.40 98.10

Dec 2015 90.80 397.10 17.80 21.20 95.90

Jan 2016 88.90 391.60 16.70 20.40 92.90

Feb 2016 87.30 410.50 16.30 20.60 90.80

Mar 2016 86.70 446.60 16.00 20.60 87.20

Apr 2016 84.50 534.50 16.00 20.10 86.90

May 2016 84.20 548.10 15.70 19.70 85.80

Jun 2016 82.60 493.10 15.30 19.40 84.60

Jul 2016 81.20 489.20 15.10 17.90 83.70

Aug 2016 81.10 500.30 14.80 16.40 82.80

Sep 2016 80.50 496.00 14.60 16.20 82.20

Oct 2016 80.10 493.60 14.60 15.90 81.60

Nov 2016 79.40P 553P 14.60P 15.80P 81.10P p

= Preliminary figures

1 Prices of rebar other than 16-32mm dimensions may subject to surcharge. 2 Prices of granite and concreting sand excluded local delivery charges to concrete batching plants.

+With effect from Jan 2015, the market prices of rebar (without cut & bend) are based on fixed price supply contracts with contract period 1 year or less. #The market prices of ready mixed concrete are based on contracts with non-fixed price, fixed price and market retail price for Grade 40 Pump.

163

0

50

100

150

200

250

300

Oct-

2015

Nov-

2015

Dec-

2015

Jan-

2016

Feb-

2016

Mar-

2016

Apr-

2016

May-

2016

Jun-

2016

Jul-

2016

Aug-

2016

Sep-

2016

Oct-

2016

Th

ou

san

d T

on

ne

s

Month-Year

Monthly Demands for Steel Bars

Page 58: DEMAND FOR CONSTRUCTION MATERIALS Steel Bars Granite …

Page 58/60

VALUE OF CONTRACTS AWARDED1 BY DEVELOPMENT TYPE AND SECTOR (Data as at 6 December 2016) ($ Million)

Sector Residential Commercial Industrial

Institutional & Others

Civil Engineering Total

Public Private Public Private Public Private Public Private Public Private Public Private

Aug 2016 295.90 227.02 73.23 45.12 136.94 123.07 130.25 6.57 123.33 1123.76 759.64 1525.54

Sep 2016 3.32 243.25 0.04 1162.08 2.90 67.01 253.31 31.32 115.83 8.41 375.39 1512.08

Oct 2016P 141.55 370.80 0.50 47.11 137.40 219.83 162.78 20.44 399.79 14.28 842.02 672.46 p

= Preliminary figures 1Excludes reclamation projects

14.6 14.6

15.9 15.8

80.1 79.4

81.6 81.1

0

20

40

60

80

100

120

140

0

10

20

30

40

50

60

Oct-

2015

Nov-

2015

Dec-

2015

Jan-

2016

Feb-

2016

Mar-

2016

Apr-

2016

May-

2016

Jun-

2016

Jul-

2016

Aug-

2016

Sep-

2016

Oct-

2016

Nov-

2016p

$/C

ub

ic M

etr

e f

or

RM

C;

$/T

on

ne

fo

r C

em

en

t

$/T

on

ne

fo

r G

ran

ite

an

d S

an

d

Month-Year

Market Prices of Granite, Sand, Cement and Ready-Mixed Concrete

Market Prices (without delivery) of 20mm Granite ($/Tonne) Market Prices (without delivery) of Sand ($/Tonne)

Market Prices of Cement in Bulk ($/Tonne) Market Prices of RMC Grade 40P ($/Cubic Metre)

Granite (LHS)

Sand (LHS)

Cement (RHS)

RMC (RHS)

p - preliminary; RHS- Right Hand Side Y-Axis; LHS- Left Hand Side Y-axis

493.6

553

350

400

450

500

550

600

650

Oct-

2015

Nov-

2015

Dec-

2015

Jan-

2016

Feb-

2016

Mar-

2016

Apr-

2016

May-

2016

Jun-

2016

Jul-

2016

Aug-

2016

Sep-

2016

Oct-

2016

Nov-

2016p

$/T

on

ne

Month-Year

Market Prices of Steel Bars (16-32mm High Tensile)

p - preliminary

Page 59: DEMAND FOR CONSTRUCTION MATERIALS Steel Bars Granite …

Page 59/60

VALUE OF PROGRESS PAYMENTS CERTIFIED BY DEVELOPMENT TYPE AND SECTOR (Data as at 25 November 2016) ($ Million)

Sector Residential Commercial Industrial

Institutional & Others

Civil Engineering

Total

Public Private Public Private Public Private Public Private Public Private Public Private

Aug 2016 370.00 540.00 28.00 220.00 110.00 500.00 332.00 160.00 580.00 120.00 1420.00 1540.00

Sep 2016 350.00 520.00 15.00 220.00 85.00 480.00 345.00 150.00 600.00 110.00 1395.00 1480.00

Oct 2016P 350.00 510.00 15.00 300.00 70.00 420.00 345.00 150.00 550.00 120.00 1330.00 1500.00 p

= Preliminary figures SELECTED PROJECTS AWARDED IN OCTOBER 2016

Project Description Development

Type Consultant Contractor

CONTRACT COST (MORE THAN S$13M TO S$40M)

Erection of 20 units of 2-Storey Terrace Factory with Mezzanine Flooring on the First Storey, 4 units of 2-Storey Terrace Factory and a 4-Storey Terrace Factory at Woodlands Sector 2

Industrial Kung & Tan Architects

Yee Hong

Design and Build of a 6-Storey Single-User Business Park Development and 2 Basement Carparks at Changi Business Park Central 2

Industrial Kyoob Architects

Precise Development

Evonik ME6: Erection of a 2-Storey Operational Building and a Single Storey Spare Parts Warehouse at Banyan Avenue

Industrial RSP Architects Planners & Engineers

Amec Foster Wheeler Asia

Pacific

Additions, Alterations and Restoration to the Existing 3-Storey Conserved Main Building comprising 20 beds and 3 Blocks of Single-Storey Conserved Buildings for Kwong Wai Shiu Hospital at Serangoon Road

Institutional Liu & Wo Architects

Guan Ho Construction Co

Erection of a Block of 6-Storey (Zero Energy Building) for School of Design and Environment at Clementi Road/Kent Ridge Crescent (Contract Cost: $33.30m)

Institutional Surbana Jurong Consultants

Kajima Overseas Asia

NUS Deepwater Ocean Basin: Erection of Deepwater Ocean Basin with Workshop and 4-Storey Research Building at Prince George's Park within National University of Singapore (Contract Cost: $39.39m)

Institutional CPG Consultants

Lian Soon Construction

Relocation, Restoration and Reinstatement of Tanjong Pagar Railway Station Platforms (Contract Cost: $33.58m)

Building (Others)

RDC Architects Shanghai Chong Kee Furniture &

Construction

CONTRACT COST (MORE THAN S$40M TO S$85M)

HDB Building Works at Bedok N4 N9 comprising 660 units and Contingency Works (Contract Cost: $61.70m)

Residential ADDP Architects

Welltech Construction

HDB Building Works at Ang Mo Kio N2 C31 comprising 590 units and Contingency Works (Contract Cost: $69.50m)

Residential Surbana Jurong Consultants

Welltech Construction

Page 60: DEMAND FOR CONSTRUCTION MATERIALS Steel Bars Granite …

Page 60/60

Project Description Development

Type Consultant Contractor

CONTRACT COST (MORE THAN S$40M TO S$85M)

Sturdee Residences: Erection of 2 Blocks of 30-Storey Condominium Development comprising 305 units with a Landscape Deck, Basement Carpark, a Swimming Pool and Communal Facilities at Sturdee Road

Residential Aga Architects China Construction

Realty Co

Phases 1 & 2 of the Erection of 81 units of Intermediate Terrace Houses, 14 units of Corner Terrace Houses, 2 units of Semi-Detached Houses and a Detached House at Nim Road/Ang Mo Kio Avenue 5

Residential W Architects TPS Construction

Ferra: Erection of a Block of 22-Storey Residential Apartment comprising 104 units with a Basement Carpark and Ancillary Facilities at Leonie Hill

Residential RSP Architects Planners & Engineers

Hexacon Construction

Additions and Alterations involving Data Processing Space on the 5th Storey, 2 Underground Fuel Storage Tanks on the First Storey and Extension of the 6th Storey with Mezzanine at Pioneer Walk

Industrial AWP RCS Engineering

CONTRACT COST (MORE THAN S$85M)

The Alps Residences: Erection of 2 Blocks of 10-Storey, a Block of 12-Storey, 2 Blocks of 13-Storey and 4 Blocks of 15-Storey Condominium Development comprising 626 units with a Swimming Pool, Ancillary Facilities, 2 Commercial Lots and 2 Levels of Basement Carpark at Tampines Street 86

Residential Aga Architects China Jingye Engineering Corporation

Limited (Singapore

Branch)

Construction of JTC Furniture Hub at Sungei Kadut (Contract Cost: $121m)

Industrial Not Available Straits Construction

Singapore

Evonik ME6: Engineering, Procurement and Construction of Evonik's 2nd Plant in Singapore for DL-Methionine Production next to the Existing DL-Methionine Complex at Banyan Avenue

Industrial Engineers 9000 Not Known

Additions and Alterations to the Existing Tanah Merah Station and Viaducts (Contract Cost: $325.00m)

Civil Engineering

Hassell Architecture (Singapore)

Lum Chang Building

Contractors

Building and Construction Authority _____________________________________________________________________________________________________________________________________________________________________________________________________

52 Jurong Gateway Road #11-01 Singapore 608550 Tel : 1800-3425 2222 Fax : 6325 4800 Email Address : [email protected] Web Site Address : http://www.bca.gov.sg

_______________________________________________________________________________________________________________________________________________________________________________ For enquiries on construction statistics, please contact Ms Siti Aloyah

@ email: [email protected]