13
Delta-DOR WG: Report of the Spring 2010 Meeting Portsmouth, VA, USA May 7 th , 2010 Roberto Maddè ESA/ESOC, [email protected]

Delta-DOR WG: Report of the Spring 2010 Meeting Portsmouth, VA, USA May 7 th, 2010 Roberto Maddè ESA/ESOC, [email protected]

Embed Size (px)

Citation preview

Page 1: Delta-DOR WG: Report of the Spring 2010 Meeting Portsmouth, VA, USA May 7 th, 2010 Roberto Maddè ESA/ESOC, Roberto.Madde@esa.int

Delta-DOR WG:Report of the Spring 2010

Meeting

Portsmouth, VA, USAMay 7th , 2010

Roberto Maddè ESA/ESOC,[email protected]

Page 2: Delta-DOR WG: Report of the Spring 2010 Meeting Portsmouth, VA, USA May 7 th, 2010 Roberto Maddè ESA/ESOC, Roberto.Madde@esa.int

SEA Area WG REPORTSUMMARY TECHNICAL STATUS

Delta-DOR WG

Goal: Standardising cross-support for Delta-DOR

measurements

Working Status: Active

Summary progress / Major accomplishments:

Magenta Book: second Agency review started. The WG discussed further cosmetic changes and the possibility to modify/add pictures, to improve readability.

Draft Blue Book: draft was finalised and the WG resolved to CESG and CMC approval, for Agency review

Draft Green Book: draft reviewed and actions distributed for next version

Yellow Book: contents discussed

Progress since last meeting: Second Agency Review for MB, BB ready for Agency review

Problems and Issues: Time, meeting room allocations

Status: OK CAUTION PROBLEM

X

Page 3: Delta-DOR WG: Report of the Spring 2010 Meeting Portsmouth, VA, USA May 7 th, 2010 Roberto Maddè ESA/ESOC, Roberto.Madde@esa.int

Executive Summary Attendees:

Roberto Maddè, ESA/ESOC, chair James Border, NASA/JPL, member Hiroshi Takeuchi, Jaxa/ISAS, member Mattia Mercolino, ESA/ESOC, member

Major topics: Magenta Book (in Red 2 status): discussion on improvements, in view of 2nd Agency review Draft Blue Book, “Delta-DOR Raw Data Exchange Format”, resolution to go for Agency review Plan for coming Green Book “Delta-DOR technical characteristics and performance”

Significant decisions: Draft Blue Book, “Delta-DOR Raw Data Exchange Format”, resolution to go for Agency review Commitment on prototyping of NASA, JAXA, ESA Yellow book to be prepared, containing the results of the prototyping Short and long term plan agreed

Cross-area meetings With SM WG, inputs provided for the inclusion of DDOR service in SM Next cross-area meeting foreseen during 2010 Fall Meeting

New work: Prototyping for the Blue Book Yellow Book which will contain the results of prototyping Continuation on the Green Book

Future work/documents Blue Book titled “Delta-DOR Raw Data Exchange Format” Green Book titled “Delta-DOR technical characteristics and performance” Yellow Book in support to the Blue Book above

Page 4: Delta-DOR WG: Report of the Spring 2010 Meeting Portsmouth, VA, USA May 7 th, 2010 Roberto Maddè ESA/ESOC, Roberto.Madde@esa.int

Summary of Goals and Deliverables (1)

1. What do you expect to deliver and when

Short term schedule:

Magenta Book: When RIDS are in (after June 28th), process them Include some pictures anyway, to improve readability

Blue Book: Run first Agency review

Green Book: Complete missing chapters, review existing ones

Interaction with SMWG: Continuing discussion with SMWG, for inclusion of DDOR

service in the Cross-support Services

Page 5: Delta-DOR WG: Report of the Spring 2010 Meeting Portsmouth, VA, USA May 7 th, 2010 Roberto Maddè ESA/ESOC, Roberto.Madde@esa.int

Summary of Goals and Deliverables (2)Long term schedule:

Date Milestone

Fall 2010

Disposition of Second Round of Agency RIDs on the “Delta-DOR recommended practice for cross support” Magenta Book

Issue of “Delta-DOR recommended practice for cross support” Magenta Book

Internal review of the RIDS received for the Blue Book

December 2010Disposition of First Round of Agency RIDs on the “Delta-DOR Raw Data

Exchange Format” Blue Book

April 2011 Issue a final version of the Green Book

December 2011Prototyping of the raw data format (Blue Book) complete. Compile Yellow

Book

Date TBD

Continuing the process for the issue of the Blue Book, once the Yellow Book is ready, through 2nd Agency review

Revise Magenta Book based on inputs coming from SMWG, whenever such WG is advancing on the definition of SM for tracking services.

Page 6: Delta-DOR WG: Report of the Spring 2010 Meeting Portsmouth, VA, USA May 7 th, 2010 Roberto Maddè ESA/ESOC, Roberto.Madde@esa.int

Progress Achieved What do you expect to accomplish:

To publish the Magenta Book after the Second Round of Agencies’ review by Fall 2010

To have passed the First Round of Agency Review on the Blue Book by December 2010

To have a complete draft (for all sections) of the Green Book by Spring 2011

Page 7: Delta-DOR WG: Report of the Spring 2010 Meeting Portsmouth, VA, USA May 7 th, 2010 Roberto Maddè ESA/ESOC, Roberto.Madde@esa.int

Detailed progress on Magenta Book

The version recently published for 2nd Agencies’ review has been discussed

WG members were encouraged to advertise the review within their own Agencies

Few editorial changes were agreed and collected in an ad-hoc document; these will be inserted at the end of the review process

Figure 3-1 has been extensively discussed MM and JB to draft a new version of it, for WG discussion

The possibility to insert several figures in sect. 4 (one for each scenario) has been discussed JB to draft one figure, for WG discussion

The draft pictures will be provided within 1 month, and discussed via telecon

Page 8: Delta-DOR WG: Report of the Spring 2010 Meeting Portsmouth, VA, USA May 7 th, 2010 Roberto Maddè ESA/ESOC, Roberto.Madde@esa.int

Detailed progress on Blue Book The book was revised by the WG Version v3 is now ready for editorial review The WG resolves that document 506.1-W-0 can go to CESG

and CMC approval, for Agency review ESA stated that, according to current plans, their prototype will

be ready by mid 2011 NASA will develop plan and schedule for prototype JAXA stated that, according to current plans, their prototype will

be ready by mid 2011 Based on the above, testing and evaluation will be done during

the second half of 2011 This will allow collecting material for the related Yellow Book It is noted that the current CCSDS scheduling tool foresees

prototyping only after the 2nd Agency review, whereas the SEA Area Director reported that the prototyping before the 2nd review will be needed

Page 9: Delta-DOR WG: Report of the Spring 2010 Meeting Portsmouth, VA, USA May 7 th, 2010 Roberto Maddè ESA/ESOC, Roberto.Madde@esa.int

Detailed info on Yellow Book

Preliminary table of contents Two main chapters, one for Magenta Book, one for Blue

Book Magenta Book: chapters on testing of Operational and

Validation Scenarios Blue Book: testing of completeness of the information

content (i.e. the stated parameters are sufficient for obtaining the expected results) and on quality of results

Blue Book: testing the capability of each Agency to produce data in the specified format and to make use of such data

In both cases, test plans, test procedures and test reports will be produced

Page 10: Delta-DOR WG: Report of the Spring 2010 Meeting Portsmouth, VA, USA May 7 th, 2010 Roberto Maddè ESA/ESOC, Roberto.Madde@esa.int

Detailed progress on Green Book

Sections 1 to 5 were discussed during the meeting.

The WG agreed that an outline of the remaining sections shall be due before the next CCSDS Fall Meeting Outline for chapter 5 Action: MM and HT Outline for chapter 6 Action: MM Outline for chapter 7 Action: MM Outline for chapter 8 Action: HT

All sections shall be then completed, at least in a draft form, two months before the CCSDS Fall meeting 2011.

All WG members to review existing sections (1 to 5) It is noted that chapters 6 and 7 may move to the Yellow Book

Page 11: Delta-DOR WG: Report of the Spring 2010 Meeting Portsmouth, VA, USA May 7 th, 2010 Roberto Maddè ESA/ESOC, Roberto.Madde@esa.int

Open Issues / Areas of concern

What are the currently known open issues

Currently there are no open issues

Areas of concern

Time and resources could limit the progress on the Green Book during 2010

The prototyping of the Blue Book format will absorb most of the energies in the next year

Page 12: Delta-DOR WG: Report of the Spring 2010 Meeting Portsmouth, VA, USA May 7 th, 2010 Roberto Maddè ESA/ESOC, Roberto.Madde@esa.int

Risk Management Update

No risk has been highlighted Resources are always an issue

Page 13: Delta-DOR WG: Report of the Spring 2010 Meeting Portsmouth, VA, USA May 7 th, 2010 Roberto Maddè ESA/ESOC, Roberto.Madde@esa.int

Cross Area WG / BOF Issues Are there issues in your WG with other WGs?

Existing limitations in (interagency) data transfer infrastructure may reduce the applicability of the coming Magenta Book

Is there cross WG or cross area coordination needed? Service Management: SMWG will extend, in the future, their SM

procedures to tracking services; interaction with such WG is being put in place, to insure the proper level of coordination

Data Transfer RF & Mod WG (modification of 401 2.5.6B needed and agreed)

At what level and how would you like to proceed? Service management: embed the DDOR service in the SM

framework discussions with SMWG are on going, a more focalised concept of the required SR has been provided to SM WG

Data transfer: through the production of an ad-hoc Blue Book, then discuss with CSS-SM and CSS-CSTS whether to manage/formalize data transfer (but it should be just a question of protocols)

Modification of sect. 2.5.6B as required