No None Required None Required Type of Employee No. Rate/hr Total Cost €17.21 €0.00 €16.69 €0.00 €15.66 €0.00 €15.14 €0.00 €13.77 €0.00 €5.73 €0.00 €8.61 €0.00 €12.91 €0.00 €15.49 €0.00 €0.00 Name No. Cost per Unit (Exl. VAT) % Adj. Total Cost €0.00 Name No. Cost per Unit (Exl. VAT) % Adj. Total Cost €0.00 €0.00 No No No Contractor Contractor's Personell Ommission in Contract Is the delay event the fault of: Please Provide a Brief Desciption of the claim Adjustment to Contract Sum Required None Required 1 Enter the Information in the Indicated Field, Do not Proceed with this Section Given that no Similar Works Exist in the BOQ, this Delay will Require a Complete Recalculation of Cost. Please enter the Information required below for Labour, Material, Plant and Design Costs as Shown. All other values are automatically calculated as per the current Construction Industry Registered Employment Please select a value for the hourly rate of the Craftsmen on this project. (Craftsmen rate automatically set to min. of €17.21) None Required Re-Caluculated Cost of Activity Please enter the required details in relation to materials required for pallned works. All figures to be entered exlcuding VAT. Percentage adj. as stated to in Schedule Part 2D must not be greater than 100%. Please enter the required details in relation to plant required for pallned works. All figures to be entered exlcuding VAT. Percentage adj. as stated to in Schedule Part 2D must not be greater than 100%. Enter the Information in the Indicated Field, Do not Proceed with this Section Please Enter the ID Number from the BOQ for the Activity to Replicate Here: Please Enter the Proprtional Amount of These Wokrs required in comparasion to the Amount Already Listed in the BOQ. E.g. If the Delay Requires 10 Days of an Activity which is Listed as Taking 20 then enter 0.5 below (20/10 = 0.5). Please Enter the Proprtional Amount of These Wokrs required in comparasion to the Amount Already Listed in the BOQ. E.g. If the Delay Requires 10 Days of an Activity which is Listed as Taking 20 then enter 0.5 below (20/10 = 0.5). Please Enter the Corelation Factor Between these Works and Those Required. E.g. if the Works required Here will cost 50% more than that Listed in the BOQ the Enter 1.5 Below (If Left Blank = 1). 1 Re-Caluculated Cost of Activity Adjustment to Contract Sum Required Do the Additional Works Required Currently Exist within the Original BOQ? Please Continue the Documentation of this Delay Event as indicated Below: Cost of Labour Craftsmen Total Recalculated Cost of Section of Works Total Adjustment to Contract Sum Required Cost of Materials Cost of Plant None Required Technical Operative Skilled Operative Semi-Skilled Operative Basic Operative 1st Year Apprentice 2nd Year Apprentice 3rd Year Apprentice 4th Year Apprentice Total Cost of Plant Cost of Design Works Total Cost of Materials Total Cost of Labour Has an event occurred within this section of the project which requires a delay/extension of time to be allowed for? Delay Event 1 0 0 -3 Adustment to Period Allowed Adjsutments to the Contract Sum There are Three Accpetable to Calculate the Adjustment to Contract Sum Required for this Delay. Please Select One of these from the Dropdown Below. Rule 1 Rule 2 Rule 3 D ≤ T1 T1 < D D > (T1 + 2T2) E=0 E=(D-T1)/2 E=D-T1-T2 0 0 3 Current Time for Completion: Calculation of Adjustments Required to Schedule No Need to Proceed With Documentation Programme Contingency Calculations Delay Extension First Threshold (T1 ) Second Threshold (T2) No Further Action Required Please Enter the ID Number from the BOQ for the Activity to Replicate Here: Enter the Information in the Indicated Field, Do not Proceed with this Section Name of Event in Question: Please Enter Item's Code Above Extension of Time Required: Adjustment to Contarct Sum Required: Please Enter the Unque Code for the Item in Question: Current Cost for Completion: Please Enter Item's Code Above Please Enter Item's Code Above Adjusted Time for Completion: Adjsuted Cost for Completion: Please Enter Item's Code Above Please Enter Item's Code Above

Delay & Extension of Time

Embed Size (px)

Citation preview

Page 1: Delay & Extension of Time

No

None

Required

None

Required

Type of Employee No. Rate/hr Total Cost

€17.21 €0.00

€16.69 €0.00

€15.66 €0.00

€15.14 €0.00

€13.77 €0.00

€5.73 €0.00

€8.61 €0.00

€12.91 €0.00

€15.49 €0.00

€0.00

Name No.

Cost per

Unit (Exl.

VAT) % Adj. Total Cost

€0.00

Name No.

Cost per

Unit (Exl.

VAT) % Adj. Total Cost

€0.00

€0.00

No

No

No

Contractor

Contractor's Personell

Ommission in Contract

Is the delay event the fault of:

Please Provide a Brief Desciption of the claim

Adjustment to Contract Sum Required

None Required

1

Enter the Information in the Indicated Field, Do not Proceed

with this Section

Given that no Similar Works Exist in the BOQ, this Delay will

Require a Complete Recalculation of Cost. Please enter the

Information required below for Labour, Material, Plant and

Design Costs as Shown.

All other values are automatically calculated as per the

current Construction Industry Registered Employment

Please select a value for the hourly rate of the

Craftsmen on this project.

(Craftsmen rate automatically set to min. of €17.21)

None Required

Re-Caluculated Cost of Activity

Please enter the required details in relation to materials

required for pallned works. All figures to be entered

exlcuding VAT. Percentage adj. as stated to in Schedule Part

2D must not be greater than 100%.

Please enter the required details in relation to plant required

for pallned works. All figures to be entered exlcuding VAT.

Percentage adj. as stated to in Schedule Part 2D must not be

greater than 100%.

Enter the Information in the Indicated Field,

Do not Proceed with this Section

Please Enter the ID Number from the BOQ

for the Activity to Replicate Here:

Please Enter the Proprtional Amount of These

Wokrs required in comparasion to the Amount

Already Listed in the BOQ. E.g. If the Delay

Requires 10 Days of an Activity which is Listed

as Taking 20 then enter 0.5 below (20/10 =

0.5).

Please Enter the Proprtional Amount of

These Wokrs required in comparasion to the

Amount Already Listed in the BOQ. E.g. If the

Delay Requires 10 Days of an Activity which

is Listed as Taking 20 then enter 0.5 below

(20/10 = 0.5).

Please Enter the Corelation Factor Between

these Works and Those Required. E.g. if the

Works required Here will cost 50% more

than that Listed in the BOQ the Enter 1.5

Below (If Left Blank = 1).

1

Re-Caluculated Cost of Activity

Adjustment to Contract Sum Required

Do the Additional Works Required Currently Exist within the Original BOQ?

Please Continue the Documentation of this Delay Event as indicated Below:

Cost of Labour

Craftsmen

Total Recalculated Cost of Section of Works

Total Adjustment to Contract Sum Required

Cost of Materials

Cost of Plant

None

Required

Technical Operative

Skilled Operative

Semi-Skilled Operative

Basic Operative

1st Year Apprentice

2nd Year Apprentice

3rd Year Apprentice

4th Year Apprentice

Total Cost of Plant

Cost of Design Works

Total Cost of Materials

Total Cost of Labour

Has an event occurred within this section of the project which

requires a delay/extension of time to be allowed for?

Delay Event 1

0

0

-3

Adustment to Period Allowed

Adjsutments to the Contract Sum

There are Three Accpetable to Calculate the Adjustment to Contract Sum Required for this Delay. Please Select One of these from the Dropdown Below.

Rule 1

Rule 2

Rule 3

D ≤ T1

T1 < D

D > (T1 + 2T2)

E=0

E=(D-T1)/2

E=D-T1-T2

0

0

3

Current Time for Completion:

Calculation of Adjustments Required to Schedule

No Need to Proceed With Documentation

Programme Contingency Calculations

Delay

Extension

First Threshold (T1 )

Second Threshold (T2)

No Further Action Required

Please Enter the ID Number from the BOQ for

the Activity to Replicate Here:

Enter the Information in the Indicated Field,

Do not Proceed with this Section

Name of Event in Question: Please Enter Item's Code Above

Extension of Time Required:

Adjustment to Contarct Sum Required:

Please Enter the Unque Code for the Item in Question:

Current Cost for Completion:

Please Enter Item's Code Above

Please Enter Item's Code Above

Adjusted Time for Completion:

Adjsuted Cost for Completion:

Please Enter Item's Code Above

Please Enter Item's Code Above

Page 2: Delay & Extension of Time

No

None

Required

None

Required

Type of Employee No. Rate/hr Total Cost

€17.21 €0.00

€16.69 €0.00

€15.66 €0.00

€15.14 €0.00

€13.77 €0.00

€5.73 €0.00

€8.61 €0.00

€12.91 €0.00

€15.49 €0.00

€0.00

Name No.

Cost per

Unit (Exl.

VAT) % Adj. Total Cost

€0.00

Name No.

Cost per

Unit (Exl.

VAT) % Adj. Total Cost

€0.00

€0.00

Please enter Item's Code Above

Adjusted Time for Completion: Please enter Item's Code Above

Adjsuted Cost for Completion: Please enter Item's Code Above

Is the delay event the fault of:

Contractor No

Contractor's Personell No

Ommission in Contract No

No Further Action Required

No Need to Proceed With Documentation

Please Provide a Brief Desciption of the claim

Calculation of Adjustments Required to Schedule

Adustment to Period Allowed

Programme Contingency Calculations

Delay

Please Enter the Unque Code for the Item in Question:

Name of Event in Question: Please enter Item's Code Above

Extension of Time Required:

Adjustment to Contarct Sum Required:

Current Time for Completion: Please enter Item's Code Above

Current Cost for Completion:

Extension 0

First Threshold (T1 )

Second Threshold (T2)

Rule 1 D ≤ T1 E=0 0

Adjsutments to the Contract Sum

There are Three Accpetable to Calculate the Adjustment to Contract Sum Required for this Delay. Please Select One of these from the Dropdown

Below.

Do the Additional Works Required Currently Exist within the Original BOQ?

Please Continue the Documentation of this Delay Event as indicated Below:

Enter the Information in the Indicated Field,

Do not Proceed with this Section

Enter the Information in the Indicated Field,

Do not Proceed with this Section

Enter the Information in the Indicated Field, Do not

Proceed with this Section

Rule 2 T1 < D E=(D-T1)/2 0

Rule 3 D > (T1 + 2T2) E=D-T1-T2 0

1 1

Re-Caluculated Cost of Activity

Please Enter the Corelation Factor Between

these Works and Those Required. E.g. if the

Works required Here will cost 50% more

than that Listed in the BOQ the Enter 1.5

Below (If Left Blank = 1).

Craftsmen

Technical Operative

Adjustment to Contract Sum Required Skilled Operative

None RequiredSemi-Skilled

Operative

Basic Operative

1st Year Apprentice

Given that no Similar Works Exist in the BOQ, this Delay

will Require a Complete Recalculation of Cost. Please

enter the Information required below for Labour,

Material, Plant and Design Costs as Shown.

Please Enter the ID Number from the BOQ

for the Activity to Replicate Here:

Please Enter the ID Number from the BOQ

for the Activity to Replicate Here:

Please Enter the Proprtional Amount of

These Wokrs required in comparasion to the

Amount Already Listed in the BOQ. E.g. If the

Delay Requires 10 Days of an Activity which

is Listed as Taking 20 then enter 0.5 below

(20/10 = 0.5).

Please Enter the Proprtional Amount of

These Wokrs required in comparasion to the

Amount Already Listed in the BOQ. E.g. If the

Delay Requires 10 Days of an Activity which

is Listed as Taking 20 then enter 0.5 below

(20/10 = 0.5).

Cost of Labour

Please select a value for the hourly rate of

the Craftsmen on this project.

All other values are automatically calculated as per the

current Construction Industry Registered Employment

(Craftsmen rate automatically set to min. of €17.21)

Cost of Materials

Total Cost of Materials

Please enter the required details in relation to plant

required for pallned works. All figures to be entered

exlcuding VAT. Percentage adj. as stated to in Schedule

Part 2D must not be greater than 100%.

Cost of Plant

Total Cost of Plant

Cost of Design Works

Total Recalculated Cost of Section of Works

Total Adjustment to Contract Sum Required

None

Required

1 2nd Year Apprentice

Re-Caluculated Cost of Activity 3rd Year Apprentice

4th Year Apprentice

Adjustment to Contract Sum Required Total Cost of Labour

None RequiredPlease enter the required details in relation to materials

required for pallned works. All figures to be entered

exlcuding VAT. Percentage adj. as stated to in Schedule

Part 2D must not be greater than 100%.

Has an event occurred within this section of the project which

requires a delay/extension of time to be allowed for?

Delay Event 2

Page 3: Delay & Extension of Time

No

None

Required

None

Required

Type of Employee No. Rate/hr Total Cost

€17.21 €0.00

€16.69 €0.00

€15.66 €0.00

€15.14 €0.00

€13.77 €0.00

€5.73 €0.00

€8.61 €0.00

€12.91 €0.00

€15.49 €0.00

€0.00

Name No.

Cost per

Unit (Exl.

VAT) % Adj. Total Cost

€0.00

Name No.

Cost per

Unit (Exl.

VAT) % Adj. Total Cost

€0.00

€0.00

No Further Action Required

No Need to Proceed With Documentation

Please Provide a Brief Desciption of the claim

Calculation of Adjustments Required to Schedule

Adustment to Period Allowed

Please Enter the Unque Code for the Item in Question:

Name of Event in Question: Please enter Item's Code Above

Extension of Time Required:

Adjustment to Contarct Sum Required:

Current Time for Completion: Please enter Item's Code Above

Current Cost for Completion: Please enter Item's Code Above

Adjusted Time for Completion: Please enter Item's Code Above

Adjsuted Cost for Completion: Please enter Item's Code Above

Is the delay event the fault of:

Contractor No

Contractor's Personell No

Ommission in Contract No

0

Adjsutments to the Contract Sum

There are Three Accpetable to Calculate the Adjustment to Contract Sum Required for this Delay. Please Select One of these from the Dropdown

Below.

Do the Additional Works Required Currently Exist within the Original BOQ?

Rule 1 D ≤ T1 E=0 0

Rule 2 T1 < D E=(D-T1)/2 0

Programme Contingency Calculations

Delay

Extension 0

First Threshold (T1 )

Second Threshold (T2)

Please Enter the Proprtional Amount of

These Wokrs required in comparasion to the

Amount Already Listed in the BOQ. E.g. If the

Delay Requires 10 Days of an Activity which

is Listed as Taking 20 then enter 0.5 below

(20/10 = 0.5).

Please Enter the Proprtional Amount of

These Wokrs required in comparasion to the

Amount Already Listed in the BOQ. E.g. If the

Delay Requires 10 Days of an Activity which

is Listed as Taking 20 then enter 0.5 below

(20/10 = 0.5).

Cost of Labour

Please select a value for the hourly rate of

the Craftsmen on this project.

All other values are automatically calculated as per the

current Construction Industry Registered Employment

(Craftsmen rate automatically set to min. of €17.21)

1 1

Re-Caluculated Cost of Activity

Please Enter the Corelation Factor Between

these Works and Those Required. E.g. if the

Works required Here will cost 50% more

than that Listed in the BOQ the Enter 1.5

Below (If Left Blank = 1).

Craftsmen

Technical Operative

Adjustment to Contract Sum Required Skilled Operative

None RequiredSemi-Skilled

Operative

Basic Operative

1st Year Apprentice

Total Cost of Materials

Please enter the required details in relation to plant

required for pallned works. All figures to be entered

exlcuding VAT. Percentage adj. as stated to in Schedule

Part 2D must not be greater than 100%.

Cost of Plant

Total Cost of Plant

Cost of Design Works

Total Recalculated Cost of Section of Works

Total Adjustment to Contract Sum Required

None

Required

1 2nd Year Apprentice

Re-Caluculated Cost of Activity 3rd Year Apprentice

4th Year Apprentice

Adjustment to Contract Sum Required Total Cost of Labour

None RequiredPlease enter the required details in relation to materials

required for pallned works. All figures to be entered

exlcuding VAT. Percentage adj. as stated to in Schedule

Part 2D must not be greater than 100%.

Cost of Materials

Please Continue the Documentation of this Delay Event as indicated Below:

Enter the Information in the Indicated Field,

Do not Proceed with this Section

Enter the Information in the Indicated Field,

Do not Proceed with this Section

Enter the Information in the Indicated Field, Do not

Proceed with this Section

Given that no Similar Works Exist in the BOQ, this Delay

will Require a Complete Recalculation of Cost. Please

enter the Information required below for Labour,

Material, Plant and Design Costs as Shown.

Please Enter the ID Number from the BOQ

for the Activity to Replicate Here:

Please Enter the ID Number from the BOQ

for the Activity to Replicate Here:

Rule 3 D > (T1 + 2T2) E=D-T1-T2

Has an event occurred within this section of the project which

requires a delay/extension of time to be allowed for?

Delay Event 3

Page 4: Delay & Extension of Time

No

None

Required

None

Required

Type of Employee No. Rate/hr Total Cost

€17.21 €0.00

€16.69 €0.00

€15.66 €0.00

€15.14 €0.00

€13.77 €0.00

€5.73 €0.00

€8.61 €0.00

€12.91 €0.00

€15.49 €0.00

€0.00

Name No.

Cost per

Unit (Exl.

VAT) % Adj. Total Cost

€0.00

Name No.

Cost per

Unit (Exl.

VAT) % Adj. Total Cost

€0.00

€0.00

Current Time for Completion: Please enter Item's Code Above

Current Cost for Completion: Please enter Item's Code Above

Adjusted Time for Completion: Please enter Item's Code Above

Adjsuted Cost for Completion: Please enter Item's Code Above

Is the delay event the fault of:

Contractor No

Contractor's Personell No

Ommission in Contract No

Please Enter the Unque Code for the Item in Question:

Name of Event in Question: Please enter Item's Code Above

Extension of Time Required:

Adjustment to Contarct Sum Required:

Programme Contingency Calculations

Delay

Extension 0

First Threshold (T1 )

Second Threshold (T2)

No Further Action Required

No Need to Proceed With Documentation

Please Provide a Brief Desciption of the claim

Calculation of Adjustments Required to Schedule

Adustment to Period Allowed

Rule 3 D > (T1 + 2T2) E=D-T1-T2 0

Adjsutments to the Contract Sum

There are Three Accpetable to Calculate the Adjustment to Contract Sum Required for this Delay. Please Select One of these from the Dropdown

Below.

Do the Additional Works Required Currently Exist within the Original BOQ?

Rule 1 D ≤ T1 E=0 0

Rule 2 T1 < D E=(D-T1)/2 0

All other values are automatically calculated as per the

current Construction Industry Registered Employment

(Craftsmen rate automatically set to min. of €17.21)

1 1

Re-Caluculated Cost of Activity

Please Enter the Corelation Factor Between

these Works and Those Required. E.g. if the

Works required Here will cost 50% more

than that Listed in the BOQ the Enter 1.5

Below (If Left Blank = 1).

Craftsmen

Technical Operative

Adjustment to Contract Sum Required Skilled Operative

None RequiredSemi-Skilled

Operative

Basic Operative

1st Year Apprentice

Please Continue the Documentation of this Delay Event as indicated Below:

Enter the Information in the Indicated Field,

Do not Proceed with this Section

Enter the Information in the Indicated Field,

Do not Proceed with this Section

Enter the Information in the Indicated Field, Do not

Proceed with this Section

Given that no Similar Works Exist in the BOQ, this Delay

will Require a Complete Recalculation of Cost. Please

enter the Information required below for Labour,

Material, Plant and Design Costs as Shown.

Please Enter the ID Number from the BOQ

for the Activity to Replicate Here:

Please Enter the ID Number from the BOQ

for the Activity to Replicate Here:

Has an event occurred within this section of the project which

requires a delay/extension of time to be allowed for?

Cost of Materials

Total Cost of Materials

Please enter the required details in relation to plant

required for pallned works. All figures to be entered

exlcuding VAT. Percentage adj. as stated to in Schedule

Part 2D must not be greater than 100%.

Cost of Plant

Total Cost of Plant

Cost of Design Works

Total Recalculated Cost of Section of Works

Total Adjustment to Contract Sum Required

None

Required

1 2nd Year Apprentice

Re-Caluculated Cost of Activity 3rd Year Apprentice

4th Year Apprentice

Adjustment to Contract Sum Required Total Cost of Labour

None RequiredPlease enter the required details in relation to materials

required for pallned works. All figures to be entered

exlcuding VAT. Percentage adj. as stated to in Schedule

Part 2D must not be greater than 100%.

Please Enter the Proprtional Amount of

These Wokrs required in comparasion to the

Amount Already Listed in the BOQ. E.g. If the

Delay Requires 10 Days of an Activity which

is Listed as Taking 20 then enter 0.5 below

(20/10 = 0.5).

Please Enter the Proprtional Amount of

These Wokrs required in comparasion to the

Amount Already Listed in the BOQ. E.g. If the

Delay Requires 10 Days of an Activity which

is Listed as Taking 20 then enter 0.5 below

(20/10 = 0.5).

Cost of Labour

Please select a value for the hourly rate of

the Craftsmen on this project.

Delay Event 4

Page 5: Delay & Extension of Time

No

None

Required

None

Required

Type of Employee No. Rate/hr Total Cost

€17.21 €0.00

€16.69 €0.00

€15.66 €0.00

€15.14 €0.00

€13.77 €0.00

€5.73 €0.00

€8.61 €0.00

€12.91 €0.00

€15.49 €0.00

€0.00

Name No.

Cost per

Unit (Exl.

VAT) % Adj. Total Cost

€0.00

Name No.

Cost per

Unit (Exl.

VAT) % Adj. Total Cost

€0.00

€0.00

No

Current Time for Completion: Please enter Item's Code Above

Current Cost for Completion: Please enter Item's Code Above

Adjusted Time for Completion: Please enter Item's Code Above

Adjsuted Cost for Completion: Please enter Item's Code Above

Is the delay event the fault of:

Has an event occurred within this section of the project which

requires a delay/extension of time to be allowed for?

Please Enter the Unque Code for the Item in Question:

Name of Event in Question: Please enter Item's Code Above

No Further Action Required

No Need to Proceed With Documentation

Please Provide a Brief Desciption of the claim

Calculation of Adjustments Required to Schedule

Adustment to Period Allowed

Extension of Time Required:

Adjustment to Contarct Sum Required:

Rule 1 D ≤ T1 E=0 0

Rule 2 T1 < D E=(D-T1)/2 0

Programme Contingency Calculations

Delay

Extension 0

First Threshold (T1 )

Second Threshold (T2)

Contractor No

Contractor's Personell No

Ommission in Contract

Please Continue the Documentation of this Delay Event as indicated Below:

Enter the Information in the Indicated Field,

Do not Proceed with this Section

Enter the Information in the Indicated Field,

Do not Proceed with this Section

Enter the Information in the Indicated Field, Do not

Proceed with this Section

Given that no Similar Works Exist in the BOQ, this Delay

will Require a Complete Recalculation of Cost. Please

enter the Information required below for Labour,

Material, Plant and Design Costs as Shown.

Please Enter the ID Number from the BOQ

for the Activity to Replicate Here:

Please Enter the ID Number from the BOQ

for the Activity to Replicate Here:

Rule 3 D > (T1 + 2T2) E=D-T1-T2 0

Adjsutments to the Contract Sum

There are Three Accpetable to Calculate the Adjustment to Contract Sum Required for this Delay. Please Select One of these from the Dropdown

Below.

Do the Additional Works Required Currently Exist within the Original BOQ?

Please Enter the Proprtional Amount of

These Wokrs required in comparasion to the

Amount Already Listed in the BOQ. E.g. If the

Delay Requires 10 Days of an Activity which

is Listed as Taking 20 then enter 0.5 below

(20/10 = 0.5).

Please Enter the Proprtional Amount of

These Wokrs required in comparasion to the

Amount Already Listed in the BOQ. E.g. If the

Delay Requires 10 Days of an Activity which

is Listed as Taking 20 then enter 0.5 below

(20/10 = 0.5).

Cost of Labour

Please select a value for the hourly rate of

the Craftsmen on this project.

All other values are automatically calculated as per the

current Construction Industry Registered Employment

(Craftsmen rate automatically set to min. of €17.21)

1 1

Re-Caluculated Cost of Activity

Please Enter the Corelation Factor Between

these Works and Those Required. E.g. if the

Works required Here will cost 50% more

than that Listed in the BOQ the Enter 1.5

Below (If Left Blank = 1).

Craftsmen

Technical Operative

Adjustment to Contract Sum Required Skilled Operative

None RequiredSemi-Skilled

Operative

Basic Operative

1st Year Apprentice

Cost of Materials

Total Cost of Materials

Please enter the required details in relation to plant

required for pallned works. All figures to be entered

exlcuding VAT. Percentage adj. as stated to in Schedule

Part 2D must not be greater than 100%.

Cost of Plant

Total Cost of Plant

Cost of Design Works

Total Recalculated Cost of Section of Works

Total Adjustment to Contract Sum Required

None

Required

1 2nd Year Apprentice

Re-Caluculated Cost of Activity 3rd Year Apprentice

4th Year Apprentice

Adjustment to Contract Sum Required Total Cost of Labour

None RequiredPlease enter the required details in relation to materials

required for pallned works. All figures to be entered

exlcuding VAT. Percentage adj. as stated to in Schedule

Part 2D must not be greater than 100%.

Delay Event 5

Page 6: Delay & Extension of Time

No

None

Required

None

Required

Type of Employee No. Rate/hr Total Cost

€17.21 €0.00

€16.69 €0.00

€15.66 €0.00

€15.14 €0.00

€13.77 €0.00

€5.73 €0.00

€8.61 €0.00

€12.91 €0.00

€15.49 €0.00

€0.00

Name No.

Cost per

Unit (Exl.

VAT) % Adj. Total Cost

€0.00

Name No.

Cost per

Unit (Exl.

VAT) % Adj. Total Cost

€0.00

€0.00

No

Has an event occurred within this section of the project which

requires a delay/extension of time to be allowed for?

Please Enter the Unque Code for the Item in Question:

Name of Event in Question: Please enter Item's Code Above

Extension of Time Required:

Adjustment to Contarct Sum Required:

Current Time for Completion: Please enter Item's Code Above

Current Cost for Completion: Please enter Item's Code Above

Adjusted Time for Completion: Please enter Item's Code Above

Adjsuted Cost for Completion: Please enter Item's Code Above

Is the delay event the fault of:

Contractor No

Contractor's Personell No

Ommission in Contract

Delay

Extension 0

First Threshold (T1 )

Second Threshold (T2)

No Further Action Required

No Need to Proceed With Documentation

Please Provide a Brief Desciption of the claim

Calculation of Adjustments Required to Schedule

Adustment to Period Allowed

Programme Contingency Calculations

Adjsutments to the Contract Sum

There are Three Accpetable to Calculate the Adjustment to Contract Sum Required for this Delay. Please Select One of these from the Dropdown

Below.

Do the Additional Works Required Currently Exist within the Original BOQ?

Please Continue the Documentation of this Delay Event as indicated Below:

Enter the Information in the Indicated Field,

Do not Proceed with this Section

Enter the Information in the Indicated Field,

Do not Proceed with this Section

Enter the Information in the Indicated Field, Do not

Proceed with this Section

Rule 1 D ≤ T1 E=0 0

Rule 2 T1 < D E=(D-T1)/2 0

Rule 3 D > (T1 + 2T2) E=D-T1-T2 0

1 1

Re-Caluculated Cost of Activity

Please Enter the Corelation Factor Between

these Works and Those Required. E.g. if the

Works required Here will cost 50% more

than that Listed in the BOQ the Enter 1.5

Below (If Left Blank = 1).

Craftsmen

Technical Operative

Adjustment to Contract Sum Required Skilled Operative

None RequiredSemi-Skilled

Operative

Basic Operative

1st Year Apprentice

Given that no Similar Works Exist in the BOQ, this Delay

will Require a Complete Recalculation of Cost. Please

enter the Information required below for Labour,

Material, Plant and Design Costs as Shown.

Please Enter the ID Number from the BOQ

for the Activity to Replicate Here:

Please Enter the ID Number from the BOQ

for the Activity to Replicate Here:

Please Enter the Proprtional Amount of

These Wokrs required in comparasion to the

Amount Already Listed in the BOQ. E.g. If the

Delay Requires 10 Days of an Activity which

is Listed as Taking 20 then enter 0.5 below

(20/10 = 0.5).

Please Enter the Proprtional Amount of

These Wokrs required in comparasion to the

Amount Already Listed in the BOQ. E.g. If the

Delay Requires 10 Days of an Activity which

is Listed as Taking 20 then enter 0.5 below

(20/10 = 0.5).

Cost of Labour

Please select a value for the hourly rate of

the Craftsmen on this project.

All other values are automatically calculated as per the

current Construction Industry Registered Employment

(Craftsmen rate automatically set to min. of €17.21)

Cost of Materials

Total Cost of Materials

Please enter the required details in relation to plant

required for pallned works. All figures to be entered

exlcuding VAT. Percentage adj. as stated to in Schedule

Part 2D must not be greater than 100%.

Cost of Plant

Total Cost of Plant

Cost of Design Works

Total Recalculated Cost of Section of Works

Total Adjustment to Contract Sum Required

None

Required

1 2nd Year Apprentice

Re-Caluculated Cost of Activity 3rd Year Apprentice

4th Year Apprentice

Adjustment to Contract Sum Required Total Cost of Labour

None RequiredPlease enter the required details in relation to materials

required for pallned works. All figures to be entered

exlcuding VAT. Percentage adj. as stated to in Schedule

Part 2D must not be greater than 100%.

Delay Event 6

Page 7: Delay & Extension of Time

No

None

Required

None

Required

Type of Employee No. Rate/hr Total Cost

€17.21 €0.00

€16.69 €0.00

€15.66 €0.00

€15.14 €0.00

€13.77 €0.00

€5.73 €0.00

€8.61 €0.00

€12.91 €0.00

€15.49 €0.00

€0.00

Name No.

Cost per

Unit (Exl.

VAT) % Adj. Total Cost

€0.00

Name No.

Cost per

Unit (Exl.

VAT) % Adj. Total Cost

€0.00

€0.00

Current Time for Completion: Please enter Item's Code Above

Current Cost for Completion: Please enter Item's Code Above

Adjusted Time for Completion: Please enter Item's Code Above

Adjsuted Cost for Completion: Please enter Item's Code Above

Is the delay event the fault of:

Contractor No

Contractor's Personell No

Ommission in Contract

Has an event occurred within this section of the project which

requires a delay/extension of time to be allowed for?

Please Enter the Unque Code for the Item in Question:

Name of Event in Question: Please enter Item's Code Above

Extension of Time Required:

Adjustment to Contarct Sum Required:

Delay

Extension 0

First Threshold (T1 )

Second Threshold (T2)

No Further Action Required

No Need to Proceed With Documentation

Please Provide a Brief Desciption of the claim

Calculation of Adjustments Required to Schedule

Adustment to Period Allowed

Programme Contingency Calculations

No

Adjsutments to the Contract Sum

There are Three Accpetable to Calculate the Adjustment to Contract Sum Required for this Delay. Please Select One of these from the Dropdown

Below.

Do the Additional Works Required Currently Exist within the Original BOQ?

Please Continue the Documentation of this Delay Event as indicated Below:

Enter the Information in the Indicated Field,

Do not Proceed with this Section

Enter the Information in the Indicated Field,

Do not Proceed with this Section

Enter the Information in the Indicated Field, Do not

Proceed with this Section

Rule 1 D ≤ T1 E=0 0

Rule 2 T1 < D E=(D-T1)/2 0

Rule 3 D > (T1 + 2T2) E=D-T1-T2 0

1 1

Re-Caluculated Cost of Activity

Please Enter the Corelation Factor Between

these Works and Those Required. E.g. if the

Works required Here will cost 50% more

than that Listed in the BOQ the Enter 1.5

Below (If Left Blank = 1).

Craftsmen

Technical Operative

Adjustment to Contract Sum Required Skilled Operative

None RequiredSemi-Skilled

Operative

Basic Operative

1st Year Apprentice

Given that no Similar Works Exist in the BOQ, this Delay

will Require a Complete Recalculation of Cost. Please

enter the Information required below for Labour,

Material, Plant and Design Costs as Shown.

Please Enter the ID Number from the BOQ

for the Activity to Replicate Here:

Please Enter the ID Number from the BOQ

for the Activity to Replicate Here:

Please Enter the Proprtional Amount of

These Wokrs required in comparasion to the

Amount Already Listed in the BOQ. E.g. If the

Delay Requires 10 Days of an Activity which

is Listed as Taking 20 then enter 0.5 below

(20/10 = 0.5).

Please Enter the Proprtional Amount of

These Wokrs required in comparasion to the

Amount Already Listed in the BOQ. E.g. If the

Delay Requires 10 Days of an Activity which

is Listed as Taking 20 then enter 0.5 below

(20/10 = 0.5).

Cost of Labour

Please select a value for the hourly rate of

the Craftsmen on this project.

All other values are automatically calculated as per the

current Construction Industry Registered Employment

(Craftsmen rate automatically set to min. of €17.21)

Cost of Materials

Total Cost of Materials

Please enter the required details in relation to plant

required for pallned works. All figures to be entered

exlcuding VAT. Percentage adj. as stated to in Schedule

Part 2D must not be greater than 100%.

Cost of Plant

Total Cost of Plant

Cost of Design Works

Total Recalculated Cost of Section of Works

Total Adjustment to Contract Sum Required

None

Required

1 2nd Year Apprentice

Re-Caluculated Cost of Activity 3rd Year Apprentice

4th Year Apprentice

Adjustment to Contract Sum Required Total Cost of Labour

None RequiredPlease enter the required details in relation to materials

required for pallned works. All figures to be entered

exlcuding VAT. Percentage adj. as stated to in Schedule

Part 2D must not be greater than 100%.

Delay Event 7

Page 8: Delay & Extension of Time

No

None

Required

None

Required

Type of Employee No. Rate/hr Total Cost

€17.21 €0.00

€16.69 €0.00

€15.66 €0.00

€15.14 €0.00

€13.77 €0.00

€5.73 €0.00

€8.61 €0.00

€12.91 €0.00

€15.49 €0.00

€0.00

Name No.

Cost per

Unit (Exl.

VAT) % Adj. Total Cost

€0.00

Name No.

Cost per

Unit (Exl.

VAT) % Adj. Total Cost

€0.00

€0.00

Current Time for Completion:

Current Cost for Completion:

Adjusted Time for Completion:

Adjsuted Cost for Completion:

Is the delay event the fault of:

Contractor

Contractor's Personell

Ommission in Contract

Has an event occurred within this section of the project which

requires a delay/extension of time to be allowed for?

Please Enter the Unque Code for the Item in Question:

Name of Event in Question: Please enter Item's Code Above

Extension of Time Required:

Adjustment to Contarct Sum Required:

Please enter Item's Code Above

Please enter Item's Code Above

Please enter Item's Code Above

Please enter Item's Code Above

No

No

No

Delay

Extension 0

First Threshold (T1 )

Second Threshold (T2)

No Further Action Required

No Need to Proceed With Documentation

Please Provide a Brief Desciption of the claim

Calculation of Adjustments Required to Schedule

Adustment to Period Allowed

Programme Contingency Calculations

Adjsutments to the Contract Sum

There are Three Accpetable to Calculate the Adjustment to Contract Sum Required for this Delay. Please Select One of these from the Dropdown

Below.

Do the Additional Works Required Currently Exist within the Original BOQ?

Please Continue the Documentation of this Delay Event as indicated Below:

Enter the Information in the Indicated Field,

Do not Proceed with this Section

Enter the Information in the Indicated Field,

Do not Proceed with this Section

Enter the Information in the Indicated Field, Do not

Proceed with this Section

Rule 1 D ≤ T1 E=0 0

Rule 2 T1 < D E=(D-T1)/2 0

Rule 3 D > (T1 + 2T2) E=D-T1-T2 0

1 1

Re-Caluculated Cost of Activity

Please Enter the Corelation Factor Between

these Works and Those Required. E.g. if the

Works required Here will cost 50% more

than that Listed in the BOQ the Enter 1.5

Below (If Left Blank = 1).

Craftsmen

Technical Operative

Adjustment to Contract Sum Required Skilled Operative

None RequiredSemi-Skilled

Operative

Basic Operative

1st Year Apprentice

Given that no Similar Works Exist in the BOQ, this Delay

will Require a Complete Recalculation of Cost. Please

enter the Information required below for Labour,

Material, Plant and Design Costs as Shown.

Please Enter the ID Number from the BOQ

for the Activity to Replicate Here:

Please Enter the ID Number from the BOQ

for the Activity to Replicate Here:

Please Enter the Proprtional Amount of

These Wokrs required in comparasion to the

Amount Already Listed in the BOQ. E.g. If the

Delay Requires 10 Days of an Activity which

is Listed as Taking 20 then enter 0.5 below

(20/10 = 0.5).

Please Enter the Proprtional Amount of

These Wokrs required in comparasion to the

Amount Already Listed in the BOQ. E.g. If the

Delay Requires 10 Days of an Activity which

is Listed as Taking 20 then enter 0.5 below

(20/10 = 0.5).

Cost of Labour

Please select a value for the hourly rate of

the Craftsmen on this project.

All other values are automatically calculated as per the

current Construction Industry Registered Employment

(Craftsmen rate automatically set to min. of €17.21)

Cost of Materials

Total Cost of Materials

Please enter the required details in relation to plant

required for pallned works. All figures to be entered

exlcuding VAT. Percentage adj. as stated to in Schedule

Part 2D must not be greater than 100%.

Cost of Plant

Total Cost of Plant

Cost of Design Works

Total Recalculated Cost of Section of Works

Total Adjustment to Contract Sum Required

None

Required

1 2nd Year Apprentice

Re-Caluculated Cost of Activity 3rd Year Apprentice

4th Year Apprentice

Adjustment to Contract Sum Required Total Cost of Labour

None RequiredPlease enter the required details in relation to materials

required for pallned works. All figures to be entered

exlcuding VAT. Percentage adj. as stated to in Schedule

Part 2D must not be greater than 100%.

Delay Event 8

Page 9: Delay & Extension of Time

No

None

Required

None

Required

Type of Employee No. Rate/hr Total Cost

€17.21 €0.00

€16.69 €0.00

€15.66 €0.00

€15.14 €0.00

€13.77 €0.00

€5.73 €0.00

€8.61 €0.00

€12.91 €0.00

€15.49 €0.00

€0.00

Name No.

Cost per

Unit (Exl.

VAT) % Adj. Total Cost

€0.00

Name No.

Cost per

Unit (Exl.

VAT) % Adj. Total Cost

€0.00

€0.00

No

Has an event occurred within this section of the project which

requires a delay/extension of time to be allowed for?

Please Enter the Unque Code for the Item in Question:

Name of Event in Question: Please enter Item's Code Above

Extension of Time Required:

Adjustment to Contarct Sum Required:

Current Time for Completion: Please enter Item's Code Above

Current Cost for Completion: Please enter Item's Code Above

Adjusted Time for Completion: Please enter Item's Code Above

Adjsuted Cost for Completion: Please enter Item's Code Above

Is the delay event the fault of:

Contractor No

Contractor's Personell No

Ommission in Contract

Delay

Extension 0

First Threshold (T1 )

Second Threshold (T2)

No Further Action Required

No Need to Proceed With Documentation

Please Provide a Brief Desciption of the claim

Calculation of Adjustments Required to Schedule

Adustment to Period Allowed

Programme Contingency Calculations

Adjsutments to the Contract Sum

There are Three Accpetable to Calculate the Adjustment to Contract Sum Required for this Delay. Please Select One of these from the Dropdown

Below.

Do the Additional Works Required Currently Exist within the Original BOQ?

Please Continue the Documentation of this Delay Event as indicated Below:

Enter the Information in the Indicated Field,

Do not Proceed with this Section

Enter the Information in the Indicated Field,

Do not Proceed with this Section

Enter the Information in the Indicated Field, Do not

Proceed with this Section

Rule 1 D ≤ T1 E=0 0

Rule 2 T1 < D E=(D-T1)/2 0

Rule 3 D > (T1 + 2T2) E=D-T1-T2 0

1 1

Re-Caluculated Cost of Activity

Please Enter the Corelation Factor Between

these Works and Those Required. E.g. if the

Works required Here will cost 50% more

than that Listed in the BOQ the Enter 1.5

Below (If Left Blank = 1).

Craftsmen

Technical Operative

Adjustment to Contract Sum Required Skilled Operative

None RequiredSemi-Skilled

Operative

Basic Operative

1st Year Apprentice

Given that no Similar Works Exist in the BOQ, this Delay

will Require a Complete Recalculation of Cost. Please

enter the Information required below for Labour,

Material, Plant and Design Costs as Shown.

Please Enter the ID Number from the BOQ

for the Activity to Replicate Here:

Please Enter the ID Number from the BOQ

for the Activity to Replicate Here:

Please Enter the Proprtional Amount of

These Wokrs required in comparasion to the

Amount Already Listed in the BOQ. E.g. If the

Delay Requires 10 Days of an Activity which

is Listed as Taking 20 then enter 0.5 below

(20/10 = 0.5).

Please Enter the Proprtional Amount of

These Wokrs required in comparasion to the

Amount Already Listed in the BOQ. E.g. If the

Delay Requires 10 Days of an Activity which

is Listed as Taking 20 then enter 0.5 below

(20/10 = 0.5).

Cost of Labour

Please select a value for the hourly rate of

the Craftsmen on this project.

All other values are automatically calculated as per the

current Construction Industry Registered Employment

(Craftsmen rate automatically set to min. of €17.21)

Cost of Materials

Total Cost of Materials

Please enter the required details in relation to plant

required for pallned works. All figures to be entered

exlcuding VAT. Percentage adj. as stated to in Schedule

Part 2D must not be greater than 100%.

Cost of Plant

Total Cost of Plant

Cost of Design Works

Total Recalculated Cost of Section of Works

Total Adjustment to Contract Sum Required

None

Required

1 2nd Year Apprentice

Re-Caluculated Cost of Activity 3rd Year Apprentice

4th Year Apprentice

Adjustment to Contract Sum Required Total Cost of Labour

None RequiredPlease enter the required details in relation to materials

required for pallned works. All figures to be entered

exlcuding VAT. Percentage adj. as stated to in Schedule

Part 2D must not be greater than 100%.

Delay Event 9

Page 10: Delay & Extension of Time

No

None

Required

None

Required

Type of Employee No. Rate/hr Total Cost

€17.21 €0.00

€16.69 €0.00

€15.66 €0.00

€15.14 €0.00

€13.77 €0.00

€5.73 €0.00

€8.61 €0.00

€12.91 €0.00

€15.49 €0.00

€0.00

Name No.

Cost per

Unit (Exl.

VAT) % Adj. Total Cost

€0.00

Name No.

Cost per

Unit (Exl.

VAT) % Adj. Total Cost

€0.00

€0.00

Current Time for Completion: Please enter Item's Code Above

Current Cost for Completion: Please enter Item's Code Above

Adjusted Time for Completion: Please enter Item's Code Above

Adjsuted Cost for Completion: Please enter Item's Code Above

Is the delay event the fault of:

Contractor No

Contractor's Personell No

Ommission in Contract No

Has an event occurred within this section of the project which

requires a delay/extension of time to be allowed for?

Please Enter the Unque Code for the Item in Question:

Name of Event in Question: Please enter Item's Code Above

Extension of Time Required:

Adjustment to Contarct Sum Required:

Delay

Extension 0

First Threshold (T1 )

Second Threshold (T2)

No Further Action Required

No Need to Proceed With Documentation

Please Provide a Brief Desciption of the claim

Calculation of Adjustments Required to Schedule

Adustment to Period Allowed

Programme Contingency Calculations

Adjsutments to the Contract Sum

There are Three Accpetable to Calculate the Adjustment to Contract Sum Required for this Delay. Please Select One of these from the Dropdown

Below.

Do the Additional Works Required Currently Exist within the Original BOQ?

Please Continue the Documentation of this Delay Event as indicated Below:

Enter the Information in the Indicated Field,

Do not Proceed with this Section

Enter the Information in the Indicated Field,

Do not Proceed with this Section

Enter the Information in the Indicated Field, Do not

Proceed with this Section

Rule 1 D ≤ T1 E=0 0

Rule 2 T1 < D E=(D-T1)/2 0

Rule 3 D > (T1 + 2T2) E=D-T1-T2 0

Re-Caluculated Cost of Activity

Please Enter the Corelation Factor Between

these Works and Those Required. E.g. if the

Works required Here will cost 50% more

than that Listed in the BOQ the Enter 1.5

Below (If Left Blank = 1).

Craftsmen

Technical Operative

Adjustment to Contract Sum Required Skilled Operative

None RequiredSemi-Skilled

Operative

Basic Operative

1st Year Apprentice

Given that no Similar Works Exist in the BOQ, this Delay

will Require a Complete Recalculation of Cost. Please

enter the Information required below for Labour,

Material, Plant and Design Costs as Shown.

Please Enter the ID Number from the BOQ

for the Activity to Replicate Here:

Please Enter the ID Number from the BOQ

for the Activity to Replicate Here:

Please Enter the Proprtional Amount of

These Wokrs required in comparasion to the

Amount Already Listed in the BOQ. E.g. If the

Delay Requires 10 Days of an Activity which

is Listed as Taking 20 then enter 0.5 below

(20/10 = 0.5).

Please Enter the Proprtional Amount of

These Wokrs required in comparasion to the

Amount Already Listed in the BOQ. E.g. If the

Delay Requires 10 Days of an Activity which

is Listed as Taking 20 then enter 0.5 below

(20/10 = 0.5).

Cost of Labour

Please select a value for the hourly rate of

the Craftsmen on this project.

All other values are automatically calculated as per the

current Construction Industry Registered Employment

(Craftsmen rate automatically set to min. of €17.21)

Delay Event 10

Cost of Materials

Total Cost of Materials

Please enter the required details in relation to plant

required for pallned works. All figures to be entered

exlcuding VAT. Percentage adj. as stated to in Schedule

Part 2D must not be greater than 100%.

Cost of Plant

Total Cost of Plant

Cost of Design Works

Total Recalculated Cost of Section of Works

Total Adjustment to Contract Sum Required

None

Required

1 2nd Year Apprentice

Re-Caluculated Cost of Activity 3rd Year Apprentice

4th Year Apprentice

Adjustment to Contract Sum Required Total Cost of Labour

None RequiredPlease enter the required details in relation to materials

required for pallned works. All figures to be entered

exlcuding VAT. Percentage adj. as stated to in Schedule

Part 2D must not be greater than 100%.

1 1