September 16, 2015 Regular Board Meeting Del Mar Union School District Facilities Master Plan

Del Mar Union School District...Modernization: Modernization is necessary to ensure facilities continue to meet all building and safety codes, and specifically includes repair, upgrade

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Del Mar Union School District...Modernization: Modernization is necessary to ensure facilities continue to meet all building and safety codes, and specifically includes repair, upgrade

September 16, 2015 Regular Board Meeting

Del Mar Union School DistrictFacilities Master Plan

Page 2: Del Mar Union School District...Modernization: Modernization is necessary to ensure facilities continue to meet all building and safety codes, and specifically includes repair, upgrade

• Deferred Maintenance

• Community Facility Districts

• Facility Master Plan• Development

• Scope of Work

• Summary of Construction Costs

• Improvement Priorities

• Multi-Year Projection

• Election Results

• Timeline

• Conclusion

Presentation

Page 3: Del Mar Union School District...Modernization: Modernization is necessary to ensure facilities continue to meet all building and safety codes, and specifically includes repair, upgrade

Deferred Maintenance

Page 4: Del Mar Union School District...Modernization: Modernization is necessary to ensure facilities continue to meet all building and safety codes, and specifically includes repair, upgrade

• Pursuant to GASB 54 Fund Balance Reporting and GovernmentalFund Type Definitions, the Governing Board adopted byResolution No. 2011-21 to commit the fund balance for deferredmaintenance

• Funds for Deferred Maintenance has been eliminated and rolledinto the base grant under the Local Control Funding Formula(LCFF)

• The Local Control and Accountability Plan (LCAP) requires thatschool facilities be maintained in good repair

• Districts are required to continue to properly maintain facilitiesand manage deferred maintenance needs

Fund 14 - Deferred Maintenance

Page 5: Del Mar Union School District...Modernization: Modernization is necessary to ensure facilities continue to meet all building and safety codes, and specifically includes repair, upgrade

Fiscal Year:Year 1

2014-2015Year 2

2015-2016Year 3

2016-2017Year 4

2017-2018Year 5

2018-2019

Beginning Fund Balance 530,222.80 483,795.05 352,348.05 (272,525.95) (1,117,399.95)

Revenue:

LCFF Deferred Maintenance Transfer 135,126.00 135,126.00 135,126.00 135,126.00 135,126.00

Interest 1,156.31 1,000.00 - - -

Total Revenue 136,282.31 136,126.00 135,126.00 135,126.00 135,126.00

Expenditures:

Painting 29,505.00 35,550.00 45,000.00 150,000.00 75,000.00

Slurry Seal 56,422.50 96,523.00 35,000.00 30,000.00 25,000,00

Ball Walls 25,950.00 - - - -

Flooring 39,832.56 135,500.00 480,000.00 500,000.00 450,000.00

Roofing - - - 50,000.00 250,000.00

Shade Structures - - - 250,000.00 150,000.00

Electrical - - 200,000.00 - -

Sewer Replacement 31,000.00

Total Expenditures 182,710.06 267,573.00 760,000.00 980,000.00 950,000.00

Ending Fund Balance 483,795.05 352,348.05 (272,525.95) (1,117,399.95) (1,932,273.95)

Fund 14 Deferred MaintenanceFor Routine Upkeep of Schools

Page 6: Del Mar Union School District...Modernization: Modernization is necessary to ensure facilities continue to meet all building and safety codes, and specifically includes repair, upgrade

Community Facility Districts

Page 7: Del Mar Union School District...Modernization: Modernization is necessary to ensure facilities continue to meet all building and safety codes, and specifically includes repair, upgrade

Community Facilities Districts Nos. 95-1 & 99-1

Page 8: Del Mar Union School District...Modernization: Modernization is necessary to ensure facilities continue to meet all building and safety codes, and specifically includes repair, upgrade

• In July 1999 the Del Mar CFD 95-1 issued $12,660,000 ofCertificates of Participation (COPs); proceeds from the sale wereused to finance the acquisition and construction of the TorreyHills School.

• In June 2007 the Del Mar CFD 95-1 issued $19,955,000 Series2007 Special Tax Bonds, proceeds from the bonds were usedprimarily to finance the acquisition and construction of OceanAir School and prepay the COPs.

• Future funding from CFD 95-1 may be used for school siteimprovements at Ocean Air School and Torrey Hills School and issubject to Bond Counsel approval.

Community Facility District No. 95-1

Page 9: Del Mar Union School District...Modernization: Modernization is necessary to ensure facilities continue to meet all building and safety codes, and specifically includes repair, upgrade

• In October 2003 the Del Mar CFD 99-1 issued $10,620,000 inLease Revenue Bonds; proceeds from the sale were used tofinance the acquisition and construction of the Sycamore RidgeSchool.

• In June 2012 the Del Mar CFD 99-1 refinanced the 2003 Bondsunder the Series 2012 Special Tax Refunding Bonds in theamount of $9,920,000

• Future funding from CFD 99-1 may be used for school siteimprovements at Sycamore Ridge School and is subject to BondCounsel approval.

Community Facility District No. 99-1

Page 10: Del Mar Union School District...Modernization: Modernization is necessary to ensure facilities continue to meet all building and safety codes, and specifically includes repair, upgrade

Community Facilities Districts North City West School Facilities Financing Authority

Page 11: Del Mar Union School District...Modernization: Modernization is necessary to ensure facilities continue to meet all building and safety codes, and specifically includes repair, upgrade

Facility Master Plan

Page 12: Del Mar Union School District...Modernization: Modernization is necessary to ensure facilities continue to meet all building and safety codes, and specifically includes repair, upgrade

• Strategic Plan• Core Strategy #4 Facility Optimization

• We will develop a plan to maximize functional use of facilities

• 2013-2014 Top Priority Action• Finalize long term Facility Master Plan

• 2014 Facility Master Plan• Developed through stakeholder engagement

• Identifies a vision; it is not a design but a plan for future improvement

• Should be revisited and updated so it reflects the changing needs of the district

Facility Master Plan

Page 13: Del Mar Union School District...Modernization: Modernization is necessary to ensure facilities continue to meet all building and safety codes, and specifically includes repair, upgrade

the outreach committeeinput from 60+ stakeholders including:

community membersparents

district staffschool site principals

teachers + site representatives

60+core

participants

Community Outreach /

250+outreach

Del Mar

Community

• (5) Outreach Meetings

• (8) Data Committee Meetings

• (2) School Site Committee Meetings

• (1) Public Town Hall

• (3) Board Presentations

• (2) Parent Focus Group Meeting

• West Side Facility Meeting

• Local Press Articles

• Website Postings

• Online Survey

• Future “Planning Board Meetings”

20+meetings

13

Page 14: Del Mar Union School District...Modernization: Modernization is necessary to ensure facilities continue to meet all building and safety codes, and specifically includes repair, upgrade

• Town Hall November 6, 2013

Flyer posted on district website

Articles in Carmel Valley News & Del Mar Times

PTA Meetings, Superintendent letter to the Community, e-blast invitation to parents and all call telephone invitation to district families

• Town Hall December 3, 2013

Sycamore Ridge

Ashley Falls

Torrey Hills

• Board Meeting November 20, 2013

Review of Community Input

• Special Board Workshop February 12, 2014

FMP Presentation and Discussion

• Torrey Hills Community Planning Board Meeting March 18, 2014

Early Childhood Development Center at Torrey Hills

• Board Meeting March 26, 2014

Projected Enrollment vs. School Capacity

Direction to conduct feasibility study at ECDC at Torrey Hills

• Board Meeting August 27, 2014

ECDC scope of work, design, cost estimate and schedule

• Community Information Meeting September 8, 2014

Enrollment/ Capacity

ECDC Feasibility Study

• Outreach Meeting 1 September 18, 2013

Process Overview

Educational Visioning

Integration of Technology

Professional Learning

• Outreach Meeting 2 October 1, 2013

Educational Themes

Site Assessments

Program Opportunities

• Outreach Meeting 3 October 29, 2013

School Site Utilization

Facility Optimization

Options to Address Capacity and Program Needs

Early Childhood Development Center

Funding Approaches

• Outreach Meeting 4 December 17, 2013

Master Plan Review

Prioritization

ECDC Proposal at Torrey Hills

• Outreach Meeting 5 January 8, 2014

Funding Alternatives

Stakeholder & Community Collaboration

Page 15: Del Mar Union School District...Modernization: Modernization is necessary to ensure facilities continue to meet all building and safety codes, and specifically includes repair, upgrade

• Ashley Falls• Principal Coffee February 10, 2014• State of the District Staff Meeting June 2, 2014

• Carmel Del Mar• Principal Coffee January 23, 2014• Principal Coffee September 10, 2014• State of the District Staff Meeting June 5, 2014

• Del Mar Heights• Principal Coffee March 19, 2014• State of the District Staff Meeting May 21, 2014

• Del Mar Hills• Principal Coffee March 13, 2014• State of the District Staff Meeting June 2, 2014

• Ocean Air• Principal Coffee February 6, 2014• State of the District Staff Meeting June 3, 2014

School Site Specific Outreach and Collaboration

• Sage Canyon• Principal Coffee March 4, 2014• State of the District Staff Meeting May 27, 2014

• Sycamore Ridge• Principal Coffee February 27, 2014• State of the District Staff Meeting May 20, 2014

• Torrey Hills• Principal Coffee March 7, 2014• State of the District Staff Meeting June 10, 2014• Principal Coffee September 5, 2014• Principal Coffee September 11, 2014

• PTA Presidents’ Advisory Council Meetings:October 8, 2013 February 11, 2014 November 12, 2013 April 15, 2014December 10, 2014 May 13, 2014January 14, 2014

Page 16: Del Mar Union School District...Modernization: Modernization is necessary to ensure facilities continue to meet all building and safety codes, and specifically includes repair, upgrade

Staff attended:• Pacific Center for Workforce Innovation: Idea Jam – November 2014• Future Ready Summit – June 2015• 4 Classroom Learning Environment (CLE) Tour – Laguna Beach School District – June 2015

Governing Board of Trustees Special Meetings:• Governing Board of Trustees Workshop: Setting the Stage for Optimal Learning Meeting – March 2015• Governing Board of Trustees Tour of Carmel Del Mar School – September 2015

Community Meetings:• Community Information Meeting at Del Mar Hills Academy – September 2014 (regarding DMUSD Capacity and Programs - feasibility study

and anticipated growth)• (8) Coffees with the Superintendent (each school)

Staff Meetings:• (5) Cabinet Meetings• (10) Leadership/Principals’ Meetings• (2) Planning meetings for Community Information Meeting • (12) Facilities Master Plan Meetings• (22) Modern Learning Studios / Innovation Centers Meetings• (14) STEAM+ Meetings• (5) STEAM+ Meetings with the Del Mar Schools Education Foundation• (4) PTA Presidents’ Advisory Committee Meetings

Ongoing Facility Master Plan Meetings

Page 17: Del Mar Union School District...Modernization: Modernization is necessary to ensure facilities continue to meet all building and safety codes, and specifically includes repair, upgrade

1. Modernization: Modernization is necessary to ensure facilities continue to meet all building and safety codes, and specifically includes repair, upgrade and replacement of outdated essential building components such as lighting, casework, ADA requirements, finishes, as well as electrical and mechanical systems.

2. Technology Infrastructure: Technology infrastructure upgrades are necessary to increase campus connectivity (WiFi and bandwidth) to support the educational program.

3. Collaboration Space (Classroom Adjustments): To effectively teach California Standards, collaboration space is needed to allow for an extension of the classroom that provides a flexible learning environment for students, faculty, and parents.

4. Flexible Furnishings: Flexible furnishings such as tables, desks, chairs and shelving allow multiple classroom configurations to support 21st Century learning.

Facility Master PlanScope of Work Categories

Page 18: Del Mar Union School District...Modernization: Modernization is necessary to ensure facilities continue to meet all building and safety codes, and specifically includes repair, upgrade

5. Innovation Center (Including Technology): The Innovation Center is the library for 21st Century learning. To be successful in teaching 21st Century skills, it is necessary that we provide a content-creation space with multiple zones, allowing for acoustical separation when necessary.

6. MUR Upgrades (Sink and AV): To maximize each school community’s use of their MUR, we need to upgrade the Audio Visual systems at each site, and add a sink to the existing buildings.

7. Front Office Improvements: Minor reconfigurations to the front office lobby are necessary to transform the space to a welcome center with a student-scaled environment and a waiting area for parents and visitors.

8. Science/Technology/Art/Engineering/Music/PE (STEAM+): The STEAM+ approach to learning removes the traditional barriers separating disciplines and allows students the opportunity to apply the skills and knowledge they have learned or are in the process of learning to real-world, relevant applications. To fully implement such a dynamic program, it is necessary to have facilities that allow a variety of configurations and space for this learning.

Facility Master PlanScope of Work Categories

Page 19: Del Mar Union School District...Modernization: Modernization is necessary to ensure facilities continue to meet all building and safety codes, and specifically includes repair, upgrade

9. Professional Learning Center: Professional learning is essential for teachers and staff in the implementation of California Standards. Similar to student classrooms, the Professional Learning Center will be a space dedicated to faculty to collaborate and learn new technologies, and also to share teaching strategies.

10. Parent Workroom: Individual school sites report that between 40 and 100 parents volunteer per week. In order to allow parents meaningful participation in the educational program, it is necessary to have a work space dedicated to parent use.

11. Reconfigure Administration: The reconfiguration of the administrative offices is an extension of the Modernization category.

12. Portable Classrooms to Permanent: As relocatable classroom buildings age and near the end of their life cycles, these buildings must be replaced with new, permanent construction to meet the needs of the District as reflected in forecasted increases in student enrollment.

13. Security: The intent of this category is to address the need to ensure safety of people on campus through improvements to parent/bus drop-off, parking, pedestrian circulation, and campus fencing.

14. Covered Dining: Keep students safe from heat and sun skin damage.

Facility Master PlanScope of Work Categories

Page 20: Del Mar Union School District...Modernization: Modernization is necessary to ensure facilities continue to meet all building and safety codes, and specifically includes repair, upgrade

15. Covered Play: Keep students safe from heat and sun skin damage.

16. Replace Wood Chips with Rubber: Replacing wood chips with rubber will keep students safe by providing a cleaner and softer play surface.

17. Parking Lot/Drop-off: Provide enough parking to accommodate individual school needs. Improve ingress and egress routes to increase the safety of students around moving vehicles and to minimize wait time in school traffic lanes.

18. Outdoor Learning Opportunities: Outdoor learning spaces extend the classroom and encourage the creative and critical thinking necessary for 21st Century learning.

19. Child Development Center Buildings: The Ashley Falls Child Development Center is currently housed in relocatable classrooms. These buildings are aging and nearing the end of their life cycles, and need to be replaced with new permanent construction to meet the needs of the District as reflected in forecasted increases in student enrollment.

Facility Master PlanScope of Work Categories

Page 21: Del Mar Union School District...Modernization: Modernization is necessary to ensure facilities continue to meet all building and safety codes, and specifically includes repair, upgrade

Summary of Construction Costs

* Item #8 STEAM+ construction cost includes portable classrooms to permanent at Carmel Del Mar, Del Mar Heights and Del Mar Hills

ItemAshley

FallsCarmel Del Mar

Del Mar Heights

Del Mar Hills

Ocean Air

Sage Canyon

Sycamore Ridge

Torrey Hills

Total Construction Cost (2014$)

1 - Modernization $5,433,000 $11,314,000 $9,588,000 $11,041,000 $423,000 $4,587,000 $602,000 $4,733,000 $47,721,000

2 - Technology Infrastructure $1,690,000 $1,810,000 $1,690,000 $1,580,000 $2,170,000 $2,080,000 $1,720,000 $2,050,000 $14,790,000

3 - Collaboration Space $346,000 - - - - $566,000 - - $912,000

4 - Flexible Furnishings $620,000 $441,000 $498,000 $418,000 $738,000 $639,000 $725,000 $620,000 $4,699,000

5 - Innovation Center (Including Technology) $672,000 $806,000 $1,112,000 $1,008,000 $1,094,000 $850,000 $706,000 $1,066,000 $7,314,000

6 - MUR Upgrades (Sink and AV) $31,000 $31,000 $31,000 $31,000 $31,000 $31,000 $31,000 $31,000 $248,000

7 - Front Office Improvements - - - - $281,000 $220,000 $207,000 $260,000 $968,000

8 -* STEAM+ (portables to permanent) - $5,136,000 $2,643,000 $2,450,000 - - - - $10,229,000

9 - Professional Learning Center $215,000 $276,000 $276,000 $276,000 $259,000 $215,000 $215,000 $215,000 $1,947,000

10 - Parent Workroom - $173,000 $173,000 $131,000 - $115,000 $215,000 $215,000 $1,022,000

11 - Reconfigure Administration - $888,000 $770,000 $1,421,000 - - - - $3,079,000

12 - *Portable Classrooms to Permanent - - $5,659,000 - - $4,497,000 - - $10,156,000

13 - Security $417,000 $297,000 $335,000 $316,000 $649,000 $431,000 $488,000 $472,000 $3,405,000

14 - Covered Dining $523,000 $436,000 $382,000 $1,418,000 $327,000 $382,000 - $174,000 $3,642,000

15 - Covered Play $698,000 $523,000 $523,000 $1,046,000 $785,000 $785,000 $785,000 $785,000 $5,930,000

16 - Replace Wood Chips with Rubber $58,000 $115,000 $173,000 $230,000 $173,000 $115,000 - $173,000 $1,037,000

17 - Parking Lot/Bus Drop-off - $644,000 - $828,000 - - - $1,564,000 $3,036,000

18 - Outdoor Learning Opportunities - $26,000 $66,000 $53,000 - $121,000 - $48,000 $314,000

19 - Child Development Center Buildings $4,896,000 - - - - - - $7,489,000 $12,385,000

Total Construction Cost $15,599,000 $22,916,000 $23,919,000 $22,247,000 $6,930,000 $15,634,000 $5,694,000 $19,895,000 $132,834,000

Page 22: Del Mar Union School District...Modernization: Modernization is necessary to ensure facilities continue to meet all building and safety codes, and specifically includes repair, upgrade

Category Ranking Cost Total

Modernization 1 $47,721,000 $47,721,000

Technology Infrastructure 2 $14,790,000 $62,511,000

Portable Classrooms to Permanent 3 $10,156,000 $72,667,000

STEAM+ (portable classrooms to permanent) 4 $10,229,000 $82,896,000

Innovation Center 5 $7,314,000 $90,210,000

Covered Dining 6 $3,642,000 $93,852,000

MUR Upgrades 7 (A) $248,000 $94,100,000

Parking and/or Drop Off 7 (B) $3,036,000 $97,136,000

Safety & Security 8 (A) $3,405,000 $100,541,000

Flexible Furnishings 8 (B) $4,699,000 $105,240,000

Covered Play 9 $5,930,000 $111,170,000

Outdoor Learning Opportunities 10 $314,000 $111,484,000

Front Office Improvements 11 $968,000 $112,452,000

Collaboration Space 12 $912,000 $113,364,000

Professional Learning Center 13 (A) $1,947,000 $115,311,000

Parent Workroom 13 (B) $1,022,000 $116,333,000

Reconfigure Administration 13 (C) $3,079,000 $119,412,000

Replace Woodchips with Rubber 13 (D) $1,037,000 $120,449,000

Cumulative Estimated Cost by Prioritization of Improvement

Page 23: Del Mar Union School District...Modernization: Modernization is necessary to ensure facilities continue to meet all building and safety codes, and specifically includes repair, upgrade

Construction Costs Multi-Year Projection

ItemTotal

Construction Cost

2014-2015 Actual

Expenditures

2015-2016

Budgeted

Expenditures

2016-2017

Projected Budget

2017-2018

Projected Budget

2018-2019

Projected BudgetUnfunded FMP

1 - Modernization * 53,332,000.00 1,080,798.00 2,002,356.00 781,474.00 150,000.00 150,000.00 49,167,372.00

2 - Technology Infrastructure 14,790,000.00 206,401.00 100,000.00 150,000.00 150,000.00 150,000.00 14,033,599.00

3 - Collaboration Space (Classroom Adjustments) * - - - - - - -

4 - Flexible Furnishings * - - - - - - -

5 - Innovation Center (Including Technology) 7,314,000.00 - - - - - 7,314,000.00

6 - MUR Upgrades (Sink & AV) 248,000.00 - - - - - 248,000.00

7 - Front Office Improvements 968,000.00 - - - - - 968,000.00

8 - STEAM+ (portable classrooms to permanent) 10,229,000.00 - - - - - 10,229,000.00

9 - Professional Learning Center 1,947,000.00 - - - - - 1,947,000.00

10 - Parent Workroom 1,022,000.00 - - - - - 1,022,000.00

11 - Reconfigure Administration 3,079,000.00 - - - - - 3,079,000.00

12 - Portable Classrooms to Permanent 10,156,000.00 - - - - - 10,156,000.00

13 - Security 3,405,000.00 137,685.00 66,973.00 - - - 3,200,342.00

14 - Covered Dining 3,642,000.00 - - - - - 3,642,000.00

15 - Covered Play 5,930,000.00 130,511.00 - - - - 5,799,489.00

16 - Replace Wood Chips with Rubber 1,037,000.00 - - - - - 1,037,000.00

17 - Parking Lot/Bus Drop-off 3,036,000.00 - - - - - 3,036,000.00

18 - Outdoor Learning Opportunities 314,000.00 57,694.00 - - - - 256,306.00

19 - Child Development Center Buildings 12,385,000.00 453,874.00 1,006,308.00 - - - 10,924,818.00

Total Construction Cost $ 132,834,000.00 $ 2,066,963.00 $ 3,175,637.00 $ 931,474.00 $ 300,000.00 $ 300,000.00 $ 126,059,926.00

Multi-Year Projection

* #3 Collaboration Space and #4 Flexible Furnishings combined with #1 Modernization

Page 24: Del Mar Union School District...Modernization: Modernization is necessary to ensure facilities continue to meet all building and safety codes, and specifically includes repair, upgrade

Election Results

Page 25: Del Mar Union School District...Modernization: Modernization is necessary to ensure facilities continue to meet all building and safety codes, and specifically includes repair, upgrade

55% GO Bond ElectionSchool District

Amount(in millions)

Percentageof the Yes Vote

* Dehesa Elementary School District $5.5 58.4%

* Encinitas Union Elementary School District $44.2 61.6%

* Julian Union High School District $2.1 60.4%

* San Marcos Unified School District $287.0 63.4%

November 2, 2010 Election

Parcel Tax Election-2/3 voteSchool District Amount /Time

Percentage of the Yes Vote

San Diego Unified School District $98/Parcel -5 years 50.8%

South Bay Union Elementary School DistrictNot to exceed

$96/Parcel – 4 years 59.7%

* = measure was successful

Page 26: Del Mar Union School District...Modernization: Modernization is necessary to ensure facilities continue to meet all building and safety codes, and specifically includes repair, upgrade

55% GO Bond ElectionSchool District

Amount(in millions)

Percentageof the Yes Vote

* Cajon Valley Union Elementary School District $88.4 58.2%

* Dehesa Elementary School District $3.0 55.9%

Mountain Empire Unified School District $30.8 45.4%

Ramona Unified School District $66.0 50.6%

* South Bay Union Elementary School District $26.0 75.9%

* San Diego Unified School District $2,800.0 61.8%

* San Dieguito Union High School District $449.0 55.5%

Del Mar Union Elementary School District $76.8 54.3%

November 6, 2012 Election

* = measure was successful

School Facilities Improvement DistrictAmount

(in millions)Percentage

of the Yes Vote

* Chula Vista Elementary School District $90.0 68.8%

Page 27: Del Mar Union School District...Modernization: Modernization is necessary to ensure facilities continue to meet all building and safety codes, and specifically includes repair, upgrade

55% GO Bond ElectionSchool District

Amount(in millions)

Percentageof the Yes Vote

Cajon Valley Union Elementary School District $20.0 49.1%

* Escondido Union Elementary School District $182.1 57.0%

* Lakeside Union Elementary School District $31.0 58.6%

* Lemon Grove Elementary School District $10.0 71.9%

* National Elementary School District $26.1 78.6%

Ramona Unified School District $40.0 53.3%

Vallecitos Elementary School District $2.0 53.5%

November 4, 2014 Election

* = measure was successful

55% GO Bond ElectionSchool District

Amount(in millions)

Percentageof the Yes Vote

Coronado Unified School District $29.0 42.0%

June 3, 2014 Election

Page 28: Del Mar Union School District...Modernization: Modernization is necessary to ensure facilities continue to meet all building and safety codes, and specifically includes repair, upgrade

Timeline

Page 29: Del Mar Union School District...Modernization: Modernization is necessary to ensure facilities continue to meet all building and safety codes, and specifically includes repair, upgrade

Date Event

November 2015 Assembling the Team-Financial Advisor, Bond Counsel, Campaign Consultant

January 2016 Commence Public Information and Education Outreach

February 2016 Conduct Bond Measure Feasibility Survey

March 2016 Present Survey Results and Findings to the Board

April 2016 Develop Project List and Ballot Measure

May 12, 2016Estimated Deadline to Submit Package to the San Diego County Taxpayers Association for Endorsement

June 2016 Board Meeting to Consider Declaring Intention to Form SFID

July 2016Board Meeting to Consider Ordering the Formation of SFID and Calling Bond Election

August 12, 2016 Estimated Deadline to Submit Paperwork to County Registrar of Voters

November 8, 2016 Election Day

Estimated Election TimelineNovember 2016

Page 30: Del Mar Union School District...Modernization: Modernization is necessary to ensure facilities continue to meet all building and safety codes, and specifically includes repair, upgrade

• Parcel Tax• Requires two-thirds voter approval• Flat amount per parcel

• General Obligation Bond• Prop 46

• Simple majority board approval• Two-thirds voter approval• No statutory tax rate limit

• Prop 39• Super majority board approval• 55% voter approval• Tax rate limited to $30 per $100k for assessed value

• School Improvement District (SFID)• Operates like a Prop 39 GO Bond• Carves out a specified area where only those voters within the SFID would vote and be assessed taxes• Projects funded by SFID must be located within its boundaries

• Reserves over the 15% minimum fund balance and 3% reserve for economic uncertainties

Options for Funding the Unfunded Portion of the Facility Master Plan

Page 31: Del Mar Union School District...Modernization: Modernization is necessary to ensure facilities continue to meet all building and safety codes, and specifically includes repair, upgrade

• Relocatable classroom buildings continue to age and are near the endof their life cycle

• Routine Maintenance of School Sites is not part of the Facility MasterPlan

• Fund 14 Deferred Maintenance reserve balance will be exhausted by2016-2017 with an annual $135,000 funds transfer available fordeferred maintenance projects

• There is no funding from the State for Facilities

Conclusion