DEEP EXCAVATION-DIAPHRAGM WALL by Dr. M. Muttharam, Associate Professor, CEG,Anna university, Chennai Ms. J. Jasmine Nisha, Research Scholar, CEG,Anna university, Chennai Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)

Deep Excavation - Diaphragm Wall - Dr.M.muttharam

  • Upload
    nsweta

  • View
    139

  • Download
    19

Embed Size (px)

Citation preview

  • DEEP EXCAVATION-DIAPHRAGM WALL

    by

    Dr. M. Muttharam, Associate Professor,CEG,Anna university, Chennai

    Ms. J. Jasmine Nisha, Research Scholar, CEG,Anna university, Chennai

    Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)

  • INTRODUCTION

    Due to rapid economic growth, numerous deep excavation

    projects for infra-structure and high-rise buildings were in

    progress

    Deep excavations are often carried out in congested areas

    to increase the underground usable spaces

    Excavation alters the stresses and disturbs the existing

    equilibrium and become unstable cut is deep and nearly

    vertical

    To improve the stability supported systems are used

    Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)

  • Diaphragm walls

    Temporary and permanent supporting

    system

    Reduced number of joints in the wall

    which ultimately improves the walls

    water tightness of walls

    Deflection of the wall is less can be

    used in congested areas

    Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)

  • DIAPHRAGM WALLS - APPLICATIONS

    Retaining structure and load bearing element for

    deep basements of buildings traffic under passes under ground mass transit stations cut and cover tunnels parking garages underground industrial facilities docks and water front installations water works

    Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)

  • ADVANTAGES

    Can be made in any soil and to any depth, regardless of the groundwater

    Fulfill simultaneously the task of sheeting, waterproofing and load bearing

    Every phase of operation can be mechanizedVery little noise on vibrationEven a confined space can be entirely usedMaterial of the wall may vary within wide

    limitsHas excellent properties as far as load

    bearing is concerned

    Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)

  • ADVANTAGES

    Its stiffness might be increased by buttresses to carry high moments.

    It is very suitable for tie-backsWork can be carried out freely in sections.

    No major surface gradings are required prior to the trenching

    It provides a simple and clear site as compared with the traditional foundation pit full of Braces

    Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)

  • DISADVANTAGES

    The surface quality of the diaphragm walls depends on the equipment used and the type of soil to be excavated

    In order to prevent pollution caused by the slurry at the site and its vicinity, special precautions must be taken.

    Any inspection during construction is only possible by indirect means

    Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)

  • DISADVANTAGES

    In the following cases it can be made only after preparatory work

    In open water In layers bearing artesian water In poorly compacted fillNear existing buildings, or if the existence

    of unknown sewers, cellars, caves, public utilities is suspected

    In a soil where a significant and rapid loss of the slurry is anticipated

    Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)

  • CONSTRUCTION SEQUENCE

    Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)

  • CONSTRUCTION SEQUENCE

    Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)

  • DIAPHRAGM WALL CONSTRUCTION

    Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)

  • STABILITY OF THE TRENCHo Technological requirements

    The guide wall must not move or be deformed

    There must be nor deformations or cave-ins in the trench

    The slurry level must not sink to such an extent or at such a rate as to endanger the technological procedure

    Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)

  • STABILITY OF THE TRENCH-CONT

    Stability requirements concerning the vicinity of the slot

    There must not occur any greater subsidence or damage of the surrounding buildings, structures or public utilities than the considered values

    Traffic in the vicinity must remain unhindered

    The safety of the workers, machinery and equipment must be protected

    Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)

  • FACTORS INFLUENCING THE STABILITY OF THE SLOT

    The forces stabilizing the trench The support of the guide wall and the

    slurry the internal strength of the soil

    The forces acting in opposition to cause failure of the slot Hydrostatic pressure Weight of the soil The surcharges and other forces or their

    combined effect

    Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)

  • FUNCTIONS OF THE GUIDE WALL FROM THETECHNOLOGICAL ASPECT ARE

    To ensure the guidance of the trenching tool

    To ensure the specified horizontal state of the diaphragm wall

    To serve as a baseline for staking outTo serve as a conduit for filling in the

    necessary slurry during excavation or for its removal during concreting

    Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)

  • ROLES OF THE GUIDE WALL AS FAR AS SLOTSTABILITY IS CONCERED ARE

    It protects the edge of the slot from being damaged by the trenching equipment

    It prevents the dangerous seepage of slurry into the upper soil layers of high porosity

    It supports the upper portion of the trench like a bracing on that part where the slurry pressure is insufficient to ensure the stability

    If required, it can be raised above the working surface to increase the slurry level

    It prevents the horizontal deformation of the upper soil strata by its rigidity and by activating some arching effect, reducing the vertical stresses in the surrounding soils

    Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)

  • Case study on Diaphragm wall

    Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)

  • STUDY AREA- NOIDA

    Plan area of site 24000m2Ground + 13 stories with a combined

    basement of 3 levelsAll floors (except basement floors) to be

    used as office spaceBasement floor 1 and 2 are to be used

    for double level car parkingBasement 3 is used for conventional

    single level parking

    Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)

  • SITE LAYOUT

    Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)

  • BOREHOLE LOCATION

    Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)

  • BOREHOLE PROFILEDepth

    (m) BH-1 BH 2 BH 3 BH 4 BH 5 BH 6 BH 7 BH 8 BH 9 BH 10 BH 11 BH 12 BH 13 BH 14 BH 15 BH 16 BH 17 BH 18 BH 19 BH 20 ABH 1 ABH 2 ABH 3

    00.5 4 5 6 4 4 12 4 6 4 91 7 6 4 6 4 6 9 7 8 9

    1.52 5 9 8 6 6 9 7 8 7 13 8 9 9

    2.5 7 8 6 7 7 10 8 12 11 133

    3.5 16 9 16 9 9 10 9 15 12 17 9 15 104 13 11 11 9 10 8 19 16 16 20

    4.55 12 10 11 8 14 9 11 8 9 17 14 13 15

    5.5 11 12 12 13 9 10 8 11 10 186

    6.5 11 13 12 13 15 11 15 13 13 15 17 28 177 13 17 10 20 14 13 11 14 12 14

    7.58 11 15 15 21 21 14 21 19 19 17 22 25 22

    8.5 16 26 16 24 16 15 17 19 16 209

    9.5 16 18 17 27 23 21 22 29 23 22 24 33 3310 17 28 22 29 21 15 16 20 19 20

    10.511 33 32 21 30 34 39 35 31 28 30 21 27 25

    11.5 20 33 31 42 32 20 20 25 20 2312

    12.5 25 30 2713

    13.514 36 44 46 33 48 39 33 40 33 37 30 35 32

    14.5 31 43 39 43 39 32 32 26 28 2615

    15.5 37 39 3616

    16.517 45 49 52 42 46 46 43 42 42 42

    17.5 38 46 43 46 34 42 37 36 41 3318

    18.5 42 44 4219

    19.5 50 49 4320 49 61 46 45 47 47 45

    20.5 50 48 43 50 37 42 4121

    21.5 31 48 4822

    22.523 61 43 52 58 48 51 54

    23.5 55 50 49 51 41 53 5224

    24.5 48 49 5325

    25.526 50 57 50 55 56 46 55

    26.5 56 52 53 53 50 42 4727

    27.5 58 49 4928

    28.529 61 62 58 67 61 57 61

    29.5 68 66 63 57 53 39 53

    Filled up Soil Silty sand Sand

    Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)

  • 02

    4

    6

    8

    10

    12

    14

    16

    18

    20

    22

    24

    26

    28

    30

    32

    0 10 20 30 40 50 60 70

    Average SPT 'N'

    Sand 'Average N Value - 14

    Silty sand 'Average N Value -8

    Sand 'Average N Value - 20

    Sand 'Average N Value - 32

    Sand 'Average N Value - 46

    Sand 'Average N Value - 52

    Sand 'Average N Value - 60

    Borehole Chart

    Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)

  • GENERALIZED SOIL PROFILE

    Layers (m)Layer

    Thickness (m)

    Soil Descriptio

    n

    Unit weight of soil

    (kN/m3)

    Saturated Unit

    weight of soil

    (kN/m3)

    SPT N

    Value

    Youngs Modulus (kN/m2)

    Poisson's ratio ()

    Friction Angle ()Top Bottom

    0 4 4 Silty Sand 15 16 8 22900 0.25 27

    4 8 4 Sand 16 17 14 35900 0.25 29

    8 11 3 Sand 18 19 20 47500 0.25 29

    11 17 6 Sand 19 20 32 64400 0.25 30

    17 22 5 Sand 19 20 46 78400 0.35 30

    22 28 6 Sand 19 20 52 80000 0.35 30

    >28 - Sand 20 21 60 85000 0.35 31

    Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)

  • GUIDE WALL LAYOUT

    Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)

  • GUIDE WALL DETAIL

    Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)

  • DIAPHRAGM WALL LAYOUT

    Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)

  • INSTRUMENTATION SCHEME FOR DIAPHRAGM WALL

    Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)

  • EXCAVATION SCHEME - 1 (800 MM THICK D-WALL)

    Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)

  • PLAXIS MODEL FOR 800 MM THICK D-WALL

    Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)

  • SHEAR FORCE FOR 800 MM THICK D-WALL

    Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)

  • BENDING MOMENT FOR 800 MM THICK D-WALL

    Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)

  • WALL DEFLECTION FOR 800 MM THICK D-WALL

    Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)

  • TOTAL DISPLACEMENTS FOR 800 MM THICK D-WALL

    Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)

  • PLAXIS OUTPUT FOR 800 MM THICK D-WALL

    SI.No Stage of Excavation Bending Moment (kNm/m) Shear Force (kN/m)Horizontal

    Deformation (mm)SF EF SF EF

    1 Excavation upto -2m from NGL 26.62 -14.72 21.34 -9.42 2

    2 Excavation upto -3.5m from NGL 60.65 -20.16 37.23 -10.38 4

    3 Installation of soil anchors @ -3 from NGL 99.68 -72.61 71.56 -69.86 3

    4 Excavation upto -6m from NGL 66.31 -86.72 53.46 -106.01 5

    5 Excavation upto -7.5m from NGL 46.4 -194.28 68.09 -127.62 7

    6 Installation of soil anchors @ -7 from NGL 59.09 -87.26 85.6 -104.11 7

    7 Excavation upto -10m from NGL 45.9 -218.72 90.28 -115.86 11

    8 Excavation upto -11.5m from NGL 106.3 396.49 154.02 -127.91 20

    9 Installation of soil anchors @ -11 from NGL 55.08 -340.58 153.41 -126.69 19

    10 Excavation upto -14.2m from NGL 93.18 -503.56 186.19 -142.89 40

    Design forces 106.3 -503.56 186.19 -142.89 40

    Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)

  • TYPICAL STAAD MODEL FOR 800 MM THICK D-WALL

    Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)

  • SCHEMATIC REPRESENTATION OF 800 MM THICK D-WALL WITHLOADS AND EARTH PRESSURE

    Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)

  • SHEAR FORCE FOR 800 MM THICK D-WALL

    Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)

  • BENDING MOMENT FOR 800 MM THICK D-WALL

    Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)

  • -25

    -23

    -21

    -19

    -17

    -15

    -13

    -11

    -9

    -7

    -5

    -3

    -1

    -600.000 -500.000 -400.000 -300.000 -200.000 -100.000 0.000 100.000 200.000 300.000D

    epth

    (m)

    Shear Force (kN/m) & Bending Moment (kN-m/m)

    Net Maximum Bending Moment and Shear Force from PLAXIS and STAAD for 800 mm thick D-wall

    Net Max. Shear force

    Net Min. Shear force

    Net Max. Bending moment

    Net Min. Bending moment

    Basement slab - 2 at -4.5m below EGL

    Basement slab - 3 at -9.0m below EGL

    Diaphragm Wall

    Raft slab at -12.7m below EGL

    Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)

  • EXCAVATION SCHEME - 2 (600 THICK D-WALL)

    Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)

  • PLAXIS MODEL FOR 600 MM THICK D-WALL

    Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)

  • SHEAR FORCE FOR 600 MM THICK D-WALL

    Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)

  • BENDING MOMENT FOR 600 MM THICK D-WALL

    Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)

  • WALL DEFLECTION FOR 600 MM THICK D-WALL

    Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)

  • TOTAL DISPLACEMENTS FOR 600 MM THICK D-WALL

    Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)

  • PLAXIS OUTPUT FOR 600 MM THICK D-WALL

    SI.No Stage of ExcavationBending Moment

    (kNm/m)Shear Force

    (kN/m)Horizontal

    Deformation (mm)SF EF SF EF

    1 Excavation upto -5.5m from NGL 29.04 -5.27 23.9 -7 5

    2 Excavation upto -7.5m from NGL 86.54 -9.57 44.77 -22.36 8

    3 Installation of soil anchors @ -7 from NGL 111.84 -16.9 84.04 -57.34 7

    4 Excavation upto -10m from NGL 56.89 -78.33 61.22 -104.82 12

    5 Excavation upto -11.5m from NGL 113.34 -164.38 109.13 -123.96 21

    6 Installation of soil anchors @ -11 from NGL 85.79 -100.1 109.79 -108.5 21

    7 Excavation upto -14.2m from NGL 73.85 -270 121.68 -124.5 55

    Design forces 113.34 -270 121.68 -124.5 55

    Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)

  • TYPICAL STAAD MODEL FOR 600 MM THICK D-WALL

    Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)

  • SCHEMATIC REPRESENTATION OF 600 MM THICK D-WALL WITHLOADS AND EARTH PRESSURE

    Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)

  • SHEAR FORCE FOR 600 MM THICK D-WALL

    Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)

  • BENDING MOMENT FOR 600 MM THICK D-WALL

    Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)

  • -22

    -20

    -18

    -16

    -14

    -12

    -10

    -8

    -6

    -4

    -2

    0-400 -300 -200 -100 0 100 200

    Dep

    th (m

    )

    Moment (kN-m/m) & Shear force (kN/m)

    Net Max. Bending moments and Shear force from PLAXIS and STAAD for 600 mm thick D-wall

    Net Max. Bending momentNet Min. Bending momentNet Max. Shear forceNet Min. Shear force

    Basement slab - 2 at -4.5m below EGL

    Basement slab - 3 at -9.0m below EGL

    Raft slab at -12.7m below EGL

    Diaphragm Wall

    Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)

  • GUIDE WALL - BORING

    Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)

  • GUIDE WALL REINFORCEMENT

    Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)

  • GUIDE WALL CONSTRUCTION

    Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)

  • REINFORCEMENT CAGE

    Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)

  • REINFORCEMENT CAGE CORNER PANEL

    Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)

  • LIFTING HOOK - REINFORCEMENT

    Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)

  • ANCHOR SLEEVE

    Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)

  • ANCHOR PLATE

    Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)

  • ANCHOR SLEEVE W.R.T. SPACING

    Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)

  • ANCHOR SLEEVE W.R.T. SPACING

    Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)

  • CRABBING FOR D-WALL & STOP END INSTALLATION

    Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)

  • KODEN TEST

    Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)

  • SONIC LOGGING INSTALLATION

    Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)

  • SONIC LOGGING INSTALLATION

    Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)

  • SONIC LOGGING & REINF. WITH STOP END

    Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)

  • DIAPHRAGM WALL WITH STOP END

    Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)

  • SONIC LOGGING TEST

    Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)

  • CONCLUSIONDiaphragm wall was used as support

    system for deep excavation and its performance is monitored by instrumentation, which reveals that diaphragm wall is one of the best solutions for supporting deep excavation.

    PLAXIS-2D and STAAD Pro software are effective tools for the analysis and design of diaphragm wall.