20
ASX Announcement 31 January 2018 BERMUDA TRINITY HALL 43 CEDAR AVENUE HAMILTON HM12 AUSTRALIA SUITE 5, 56 KINGS PARK ROAD WEST PERTH, WA AUSTRALIA 6005 TEL: +61 8 6555 1879 TREK METALS LIMITED ARBN: 124 462 826 MAIL: PO Box 1796, West Perth WA 6872 Australia EMAIL: [email protected] www.trekmetals.com.au December 2017 Quarterly Operations Report 1. Key Points Kroussou Project TKM enters into a binding term sheet with Battery Minerals Limited (ASX: BAT) subsequent to the quarter end to acquire the Kroussou Project 100% for a consideration of US$400,000 in a combination of cash and securities. Initial results from a programme of ground based geophysics, including IP and NSAMT (Induced Polarisation and Natural Source Audio Magneto Tellurics) to target near surface open‐pit orebodies returns several large anomalies. Anomalies within the Dikaki Channel highlight the potential for extensions to known mineralisation. Inversion modelling suggests significant targets from near surface to approximately 100m below surface. Arunta Lithium ‐ Cobalt Project Project includes six exploration licences and one exploration licence application with historical rock chips up to 1,500ppm Li 2 O, 0.12% Co. Project includes historical reports of lithium, cobalt, tin, tungsten, copper, tantalum and niobium anomalism and/or mineralisation Reconnaissance field work indicates large volumes of granite with pegmatites and copper mineralisation at surface. Historical exploration review to evaluate numerous opportunities within the extensive ground package is ongoing. Lawn Hill Project Meeting with Traditional Owners anticipated during the June Quarter. Historical exploration review and initial target development work is ongoing. Aeon Metals’ Walford Creek Deposit, along strike, has grown its resource to 15.7Mt @ 1.24% Copper and 0.15% Cobalt.

December 2017 Quarterly Operations Reporttrekmetals.com.au/wp-content/uploads/2018/04/20180131-TKM... · TRINITY HALL 43 CEDAR AVENUE ... across much of the Project area is very similar

Embed Size (px)

Citation preview

ASX Announcement   31 January 2018 

 

BERMUDA  TRINITY HALL 43 CEDAR AVENUE HAMILTON HM12  

 

AUSTRALIA SUITE 5, 56 KINGS PARK ROAD 

WEST PERTH, WA AUSTRALIA 6005 

TEL: +61 8 6555 1879  

 

TREK METALS LIMITED  ARBN: 124 462 826 

MAIL: PO Box 1796, West Perth WA 6872 Australia 

EMAIL:  [email protected]  www.trekmetals.com.au 

December 2017 Quarterly Operations Report  

1. Key Points Kroussou Project 

TKM  enters  into  a  binding  term  sheet  with  Battery  Minerals  Limited  (ASX:  BAT) subsequent to the quarter end to acquire the Kroussou Project 100% for a consideration of US$400,000 in a combination of cash and securities. 

Initial  results  from a programme of ground based geophysics,  including  IP and NSAMT (Induced Polarisation and Natural Source Audio Magneto Tellurics) to target near surface open‐pit orebodies returns several large anomalies. 

Anomalies  within  the  Dikaki  Channel  highlight  the  potential  for  extensions  to  known mineralisation. 

Inversion modelling suggests significant targets from near surface to approximately 100m below surface. 

Arunta Lithium ‐ Cobalt Project 

Project  includes  six  exploration  licences  and  one  exploration  licence  application  with historical rock chips up to 1,500ppm Li2O, 0.12% Co. 

Project includes historical reports of lithium, cobalt, tin, tungsten, copper, tantalum and niobium anomalism and/or mineralisation 

Reconnaissance field work indicates large volumes of granite with pegmatites and copper mineralisation at surface. 

Historical exploration review to evaluate numerous opportunities within  the extensive ground package is ongoing. 

Lawn Hill Project 

Meeting with Traditional Owners anticipated during the June Quarter.  

Historical exploration review and initial target development work is ongoing. 

Aeon Metals’ Walford Creek Deposit, along strike, has grown its resource to 15.7Mt @ 1.24% Copper and 0.15% Cobalt.

 

BERMUDA  TRINITY HALL 43 CEDAR AVENUE HAMILTON HM12  

 

AUSTRALIA SUITE 5, 56 KINGS PARK ROAD 

WEST PERTH, WA AUSTRALIA 6005 

TEL: +61 8 6555 1879  

 

2. Kroussou Project 2.1 100% Acquisition Subsequent to the quarter end, Trek was delighted to advise that a binding term sheet had been signed to acquire 100% of  the Kroussou Zinc‐Lead Project  in Gabon  from Battery Minerals Limited  (ASX:BAT) (refer to ASX announcement – 11 January 2018).  

Trek  will  pay  Battery  Minerals  Limited  US$400,000  in  a  mix  of  cash  and  securities  plus  a  deferred 

consideration of shares and options,  totalling US$2.5 million subject  to a mineral  resource of 250,000 

tonnes of combined zinc‐lead metal being estimated on the Kroussou Project. Trek will also grant BAT a 

2.5% NSR on the project, subject to a 1% buyback by TKM with the payment of US$1.5million in cash.  

Deal Terms 

Key points of the Term Sheet include: 

TKM (or it’s nominee) will acquire 100% of the issued capital of BAT subsidiary, Select Exploration 

(Select Exploration), which holds a 100% interest in the Kroussou Project. 

The consideration for the acquisition of the Kroussou Project is: 

o a cash payment of US$200,000 to BAT; and o the issue of US$200,000 of TKM shares based on a 5‐day VWAP prior to the date of issue and 

subject to a minimum floor price of $0.025 (Consideration Shares) and one free attaching option (term of 3 years, $0.10 exercise price) for every two Consideration Shares issued. 

The Consideration Shares will be subject to a 12‐month voluntary escrow period. 

Deferred  consideration  upon  an  Indicated  Resource  (as  defined  in  JORC  2012)  of  more  than 

250,000 tonnes of combined Zn/Pb metal being declared in relation to the Kroussou Project and 

subject to shareholder approval, of US$2,500,000 of TKM shares based on a 5‐day VWAP prior to 

the date of issue and subject to a minimum floor price of $0.025 (Deferred Consideration Shares) 

and one free attaching option (term of 3 years, exercise price of 150% of the 5‐day VWAP prior to 

the date of  issue) for every two Deferred Consideration Shares issued (Deferred Consideration 

Options) (together, the Deferred Consideration). 

TKM will grant BAT a 2.5% net smelter royalty on gross sales revenue (NSR) with TKM having an 

option to buy back 1% of the NSR for US$1,500,000. 

An existing 0.75% net smelter royalty payable in relation to the Kroussou Project to a third party 

(Existing Royalty) which can be bought back for US$250,000, will be novated from BAT to TKM as 

part of the acquisition. 

If TKM abandons the Kroussou Project, BAT has the option to acquire the project for fair value. If 

TKM sells the Kroussou Project, the third‐party purchaser must undertake to provide BAT with an 

equivalent Deferred Consideration or TKM may agree to pay BAT the Deferred Consideration.   

Conditions precedent to completion of the acquisition include a satisfactory 30‐day due diligence 

period for TKM, novation of the Existing Royalty from BAT to TKM and other conditions precedent 

which  are  considered  standard  for  a  transaction  of  this  nature  including  no material  adverse 

change to BAT or TKM, representations and warranties of BAT being true and correct and BAT 

complying with its obligations under the Term Sheet. TKM may terminate the Term Sheet if any 

conditions precedent are not satisfied or waived by 31 March 2018 and BAT may terminate if a 

material adverse change occurs in relation to TKM.  

The Term Sheet also contains representations and warranties from the parties that are considered 

standard for this type of transaction. 

 

BERMUDA  TRINITY HALL 43 CEDAR AVENUE HAMILTON HM12  

 

AUSTRALIA SUITE 5, 56 KINGS PARK ROAD 

WEST PERTH, WA AUSTRALIA 6005 

TEL: +61 8 6555 1879  

 

 

A formal share sale agreement and royalty deed in respect of the Term Sheet is expected to be executed 

by the parties by the end of Q1 2018.  

 

2.2 Surface Geophysics During the quarter, the Company announced that it had commenced a ground geophysical programme at its Kroussou Zn‐Pb Project JV (refer to ASX announcement – 16 October 2017).  

This programme, consisting of both  IP and NSAMT methods  (Induced Polarisation and Natural  Source Audio Magneto Tellurics), aimed to assist drill targeting in combination with the recently identified soil anomalies within the Project area. 

Initial lines indicated significant anomalies potentially related to mineralisation being present within the Dikaki Channel. Both IP and NSAMT methods highlighted these anomalies that appear related to known 

mineralisation.  Inversion modelling  orientation  lines  across  some  of  the  known mineralisation  at Dikaki  has  indicated  that  a  substantial  semi‐continuous  conductive  body  persists  from  surface (associated with known mineralisation) to approximately 100m below surface (Figures 2 and 3) (refer to ASX announcement – 03 November 2017).  

2.3 Future Work The geophysical programme has now recommenced following a period of heavy rain that halted activity. It is anticipated that the programme will be completed during Q1 2018 with drilling to follow thereafter. 

3. Arunta Project 3.1 Project Acquisition Trek announced the 100% acquisition, during the quarter, of Elm Resources Pty Ltd which owns seven applications (six now granted) in the Northern Territory that are highly prospective for Lithium and Cobalt 

(Figure 4) (refer to ASX announcement – 15 November 2017).  

This acquisition provides Trek with significant exposure to strategic commodities for the mobile energy / battery market and is an adjunct to its strategy of the discovery of zinc and lead deposits both in Australia (Lawn Hill Project) and via its interest in the Kroussou Zinc‐Lead Project JV in Gabon. 

Trek sees this commodity mix as presenting opportunities in both base load energy storage (lead and zinc) 

and mobile energy storage (lithium and cobalt) as the renewables sector expands globally.  

The key technical aspects of the Arunta Lithium – Cobalt Project are as follows: 

7 ELA’s (6 now granted) for a total of 5,274 km2 

Approximately 200km NW of Alice Springs adjacent to the Tanami Road with a major unsealed 

link road to the Stuart Highway traversing the eastern part (Napperby) of the project area 

Wangala Suite Granites mapped across the Napperby area – highly lithium fertile rocks 

Historic rock chips up to 0.12% Cobalt in Lander Bed meta‐sediments 

Southwark Granite in the western part of the project area (Mt Singleton) contains pegmatites and 

greisen phases with elevated tungsten – highly lithium fertile rocks 

Abundant pegmatites mapped in both regions of the project 

Exploration possible year‐round with access along pastoral and exploration tracks  

Potential exists also for tin, tungsten, copper, gold, tantalum and niobium mineralisation  

 

BERMUDA  TRINITY HALL 43 CEDAR AVENUE HAMILTON HM12  

 

AUSTRALIA SUITE 5, 56 KINGS PARK ROAD 

WEST PERTH, WA AUSTRALIA 6005 

TEL: +61 8 6555 1879  

 

A  reconnaissance  field  trip was  undertaken  late  last  year  and  confirmed  the  presence  of widespread 

granites  mapped  as  Wangala  Suite  which  are  considered  highly  prospective  sources  for  lithium 

mineralisation  in  the  Northern  Territory.  Outcropping  copper mineralisation was  also  present  at  one 

location visited during the excursion (Figures 5 and 6). 

Consideration  

Trek secured the outright purchase of the Arunta Li‐Co Project for a consideration of $300,000 comprising 

an  issue  of  8,571,429  Trek  shares  at  $0.035  per  Trek  share.  Fifty  percent  of  the  shares  issued  as 

consideration will be escrowed for 6 months. There are no other material conditions of the agreement. 

3.2 Future Work Compilation of historical data will be ongoing with a more complete understanding of the potential of the 

tenements to continue to emerge  in  the coming months with commensurate ground works beginning 

during 2018.  

4. Lawn Hill Project 4.1 Historic Exploration Trek is continuing to evaluate the historic data available for the Lawn Hill Project (Figure 7). The geology 

across much of the Project area is very similar to that which hosts the Walford Creek Project (see Aeon 

Minerals ASX: AML), across  the border  in Queensland approximately 30km to  the east. The Fish River 

Fault, associated intimately with the Walford Creek mineralisation, traverses TKM’s Lawn Hill Project area.  

A compilation of available historic  stream sediment data,  collected  in  the 1980’s across  the  Lawn Hill 

Project area, indicates the potential for copper, cobalt, zinc and lead mineralisation across the tenement 

application areas (refer to ASX announcement – 21 August 2017). 

The Lawn Hill Project  is  located  immediately across the border  (approx. 35km west and directly along 

strike) on the Northern Territory side, from the emerging Walford Creek Copper‐Cobalt‐Zinc‐Lead Project 

owned by Aeon Metals Limited. Aeon Metals suggests that the Walford Creek Project contains Australia’s 

largest and most advanced sulphide cobalt resource.  

The  rocks  hosting  the Walford  Creek  Project,  the  Lawn  Hill  Platform,  extend  across  the  border  from 

Queensland into the Northern Territory. An obvious and abrupt absence of copper‐cobalt, zinc and lead 

occurrences within  the  Lawn  Hill  Platform  rocks  on  the  Northern  Territory  side  of  the  border  is  not 

necessarily due to an absence of mineralisation but rather a lack of exploration.  

ESSO conducted limited surface exploration between 1979 ‐ 1981 which included:  

•  stream sediment sampling  

•  rock chip sampling  

•  gravity survey  

•  drilling of two stratigraphic diamond drillholes 

4.2 Tenement Applications  The process of negotiating access arrangements to allow for the grant of the Lawn Hill Project tenure is 

ongoing. A meeting with Traditional Owners is now due to be held in Q1 2018.  

 

BERMUDA  TRINITY HALL 43 CEDAR AVENUE HAMILTON HM12  

 

AUSTRALIA SUITE 5, 56 KINGS PARK ROAD 

WEST PERTH, WA AUSTRALIA 6005 

TEL: +61 8 6555 1879  

 

Several  new  tenement  applications  were  lodged  during  the  quarter  to  bolster  the  Lawn  Hill  Project 

package. For details of this see the ASX announcement from 27 November 2018 (Figure 8).   

5. Kangaluwi Copper Project 5.1 Court Case  The Company is awaiting written judgement by the Judge of the Lusaka High Court on the appeal lodged 

by organisations associated with the conservation movement in Zambia on 17 January 2014 against the 

decision  of  the  Minister  of  Lands,  Natural  Resources  and  Environment  Protection  to  approve  the 

Company's 100% owned Kangaluwi Copper Project. The stay of execution remains in place pending the 

outcome of the appeal against the Minister’s decision. 

TKM is currently evaluating its options with respect to the divestment of this Project. 

6. Corporate 6.1 Fund Raising & General Meeting Given the very strong market interest in the key strategic commodities for the mobile energy / battery 

market and the prospectivity of the Arunta Li‐Co Project, Trek received commitments during the quarter 

from new and existing sophisticated and professional investors for 67,741,935 new shares to raise $2.1 

million  (before costs) at $0.031 per Trek share  through Lead Manager PAC Partners  (Placement). The 

Placement  included a 1:2 free attaching unlisted option exercisable at $0.06 before 2 November 2021 

(Placement Options) and 4,000,000 Broker Options on the same terms. 

Proceeds from the Placement were to fund: 

Initial assessment of the Arunta Lithium‐Cobalt Project in Northern Territory 

Continuing advancement of exploration activities at  the Kroussou Zinc‐Lead Project  in 

Gabon 

Support ongoing exploration activities on the company’s other base metals project in the 

Northern Territory, the Lawnhill Zinc‐Copper‐Cobalt Project 

General working capital, including evaluation of new project opportunities 

The securities were issued in two tranches, the first utilising its capacity under Listing Rules 7.1 and 7.1A of 58,997,562 fully paid ordinary shares issued in November 2017. The remaining 8,744,373 shares, the Placement Options and the Broker Options received shareholder approval at a General Meeting which was held on 4 December 2017 and were issued following that meeting. 

The Company also received at that General Meeting approval for the issue of 8,571,429 new fully paid 

ordinary  shares  for  the purchase of  the Arunta  Li‐Co Project  and  for  the  issue of  21 million unlisted options exercisable at $0.06 before 2 November 2021 to directors.  

The Company also completed  in October 2017 the  issue of 4 million new fully paid ordinary shares at $0.025  per  share  to  sophisticated  and  professional  investors  to  finalise  the  $2 million  capital  raising 

approved by shareholders at the Annual General Meeting of Shareholders in August 2017. 

 

   

 

BERMUDA  TRINITY HALL 43 CEDAR AVENUE HAMILTON HM12  

 

AUSTRALIA SUITE 5, 56 KINGS PARK ROAD 

WEST PERTH, WA AUSTRALIA 6005 

TEL: +61 8 6555 1879  

 

7. Tenements  

Tenement  Holder  Last 

Qtr Interest 

Current 

Qtr Interest 

EPM26707 (appl.) 

(Queensland) 

Trek Metals Limited100%  100% 

EPM26708 (appl.) 

(Queensland) 

Trek Metals Limited 100%  100% 

G4‐569 

(Gabon) 

Select Explorations Gabon SA 

(Wholly owned subsidiary of 

Battery Minerals Limited) 

0% 

(Option agreement 

to enter into JV to 

earn up to 70%) 

0% 

G4‐588  Select Explorations Gabon SA 

(Wholly owned subsidiary of 

Battery Minerals Limited) 

0% 

(Option agreement 

to enter into JV to 

earn up to 70%) 

0% 

EL31564 

(Northern Territory) 

ELM Resources Pty Ltd 

(100% owned subsidiary) 100%  100% 

EL31565 

(Northern Territory) 

ELM Resources Pty Ltd 

(100% owned subsidiary) 100%  100% 

EL31566 

(Northern Territory) 

ELM Resources Pty Ltd 

(100% owned subsidiary) 100%  100% 

EL31567 

(Northern Territory) 

ELM Resources Pty Ltd 

(100% owned subsidiary) 100%  100% 

EL31598

(Northern Territory) 

ELM Resources Pty Ltd

(100% owned subsidiary) 100%  100% 

EL31599

(Northern Territory) 

ELM Resources Pty Ltd

(100% owned subsidiary) 100%  100% 

 

 

BERMUDA  TRINITY HALL 43 CEDAR AVENUE HAMILTON HM12  

 

AUSTRALIA SUITE 5, 56 KINGS PARK ROAD 

WEST PERTH, WA AUSTRALIA 6005 

TEL: +61 8 6555 1879  

 

EL31728 (appl.) 

(Northern Territory) 

ELM Resources Pty Ltd

(100% owned subsidiary) 100%  100% 

EL31260 (appl.) 

(Northern Territory) 

TM Resources Pty Ltd

(100% owned subsidiary) 100%  100% 

EL31261 (appl.) 

(Northern Territory) 

TM Resources Pty Ltd 

(100% owned subsidiary) 100%  100% 

EL31751 (appl.) 

(Northern Territory) 

TM Resources Pty Ltd 

(100% owned subsidiary) 100%  100% 

EL31752 (appl.) 

(Northern Territory) 

TM Resources Pty Ltd 

(100% owned subsidiary) 100%  100% 

EL31753 (appl.) 

(Northern Territory) 

TM Resources Pty Ltd 

(100% owned subsidiary) 100%  100% 

15547‐HQ‐LML 

(Zambia) 

Mwembeshi Resources  

(100% owned subsidiary) 100%  100% 

13170‐HQ‐LPL 

(Zambia) 

Cheowa Resources 

(Incorporated JV‐ 51% 

Glencore 49% TKM) 

49%  49% 

13171‐HQ‐LPL 

(Zambia) 

Cheowa Resources 

(Incorporated JV‐ 51% 

Glencore 49% TKM) 

49%  49% 

8573‐HQ‐LPL 

(Zambia) 

Cheowa Resources 

(Incorporated JV‐ 51% 

Glencore 49% TKM) 

49%  49% 

 COMPETENT PERSONS STATEMENT 

The information in this report that relates to exploration results is based on information compiled by Mr 

Bradley Drabsch, Member of the Australian Institute of Geoscientists (“AIG”) and Managing Director of 

Trek Metals Limited. Mr Drabsch has sufficient experience which is relevant to the style of mineralisation 

and  type  of  deposit  under  consideration  and  to  the  activity  that  is  being  undertaken  to  qualify  as  a 

competent person as defined in the JORC Code 2012. Mr Drabsch consents to the inclusion in the report of 

the matters based on the information in the form and context in which it appears. 

 

 

Figure 1: Kroussou Project Location Plan 

 

Figure 2: Geophysical image (metal factor – chargeability/resistivity) over part of the Dikaki Channel. The anomalies may represent down dip and along strike 

extensions to the known mineralization (for details of intersections, refer ASX Announcement 11 May 2017 

 

Figure 3: DDIP Inversion Model along section line 640300mN indicating a chargeable body that approximately coincides with known mineralization at surface and a 

much larger anomalous region deeper down 

 

Figure 4: The Arunta Project tenements on regional 1VD Aeromagnetics 

 

 

 

                       

 

Figure 5: Wangala Suite Granites                                           Figure 6: Rocks from a copper occurrence  

                  on EL31598 (671,850mE 7,568,900mN Z52) 

 

 

Figure 7: Lawn Hill Project tenement applications in the Northern Territory and Queensland (excluding the newest applications – see below figure) 

 Figure 8: Witwatersrand Gold targets within existing and new tenement applications in the Northern Territory and Queensland 

Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report 

+ See chapter 19 for defined terms. 01/09/2016  Appendix 5B  Page 1

Rule 5.5 

Appendix 5B 

Mining exploration entity and oil and gas exploration entity quarterly report 

Name of entity 

TREK METALS LIMITED 

ARBN    Quarter ended (“current quarter”) 

124 462 826    31 DECEMBER 2017 

 

Consolidated statement of cash flows* 

* Trek Metals Limited has changed its presentation currency to USD.

Current quarter $US’000 

Year to date 

(9 months) $US’000 

1.  Cash flows from operating activities 

1.1  Receipts from customers 

1.2  Payments for 

(181) (643)  (a) exploration & evaluation 

  (b) development  ‐ ‐

  (c) production  ‐ ‐

  (d) staff costs  (80) (189)

  (e) administration and corporate costs  (68) (200)

1.3  Dividends received (see note 3)  ‐ ‐

1.4  Interest received  4 6

1.5  Interest and other costs of finance paid  ‐ ‐

1.6  Income taxes paid  ‐ ‐

1.7  Research and development refunds  ‐ ‐

1.8  Other (Refund of unclaimed GST 2015/2016) 

‐ 122

1.9  Net cash from / (used in) operating activities  (325) (904)

 

2.  Cash flows from investing activities 

‐ ‐

2.1  Payments to acquire: 

  (a) property, plant and equipment 

  (b) tenements (see item 10)  ‐ ‐

Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report 

+ See chapter 19 for defined terms. Appendix 5B  Page 2  01/09/2016 

Consolidated statement of cash flows* 

* Trek Metals Limited has changed its presentation currency to USD.

Current quarter $US’000 

Year to date 

(9 months) $US’000 

  (c) investments  ‐ (240)

  (d) other non‐current assets  ‐ ‐

2.2  Proceeds from the disposal of: 

‐ ‐  (a) property, plant and equipment 

  (b) tenements (see item 10)  ‐ ‐

  (c) investments  ‐ ‐

  (d) other non‐current assets  ‐ ‐

2.3  Cash flows from loans to other entities   ‐ ‐

2.4  Dividends received (see note 3)  ‐ ‐

2.5  Other (provide details if material)  ‐ ‐

2.6  Net cash from / (used in) investing activities  ‐ (240)

 

3.  Cash flows from financing activities 

1,662 3,1743.1  Proceeds from issues of shares 

3.2  Proceeds from issue of convertible notes 

3.3  Proceeds from exercise of share options 

3.4  Transaction costs related to issues of shares, convertible notes or options  (74) (185)

3.5  Proceeds from borrowings 

3.6  Repayment of borrowings 

3.7  Transaction costs related to loans and borrowings 

3.8  Dividends paid 

3.9  Other (provide details if material) 

3.10  Net cash from / (used in) financing activities  1,588 2,989

 

Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report 

+ See chapter 19 for defined terms. 01/09/2016  Appendix 5B  Page 3

Consolidated statement of cash flows* 

* Trek Metals Limited has changed its presentation currency to USD.

Current quarter $US’000 

Year to date 

(9 months) $US’000 

4.  Net increase / (decrease) in cash and cash equivalents for the period 

4.1  Cash and cash equivalents at beginning of period *  1,014 447

4.2  Net cash from / (used in) operating activities (item 1.9 above)  (325) (904)

4.3  Net cash from / (used in) investing activities (item 2.6 above)  ‐ (240)

4.4  Net cash from / (used in) financing activities (item 3.10 above)  1,588 2,989

4.5  Effect of movement in exchange rates on cash held *  47 32

4.6  Cash and cash equivalents at end of period 

*Cash at 1 April 2017 amended to reconcile to Half year report 

2,324 2,324

 

5.  Reconciliation of cash and cash equivalents at the end of the quarter (as shown in the consolidated statement of cash flows) to the related items in the accounts 

Current quarter $US’000 

Previous quarter $US’000 

5.1  Bank balances  2,308 998

5.2  Call deposits  16 16

5.3  Bank overdrafts  ‐ ‐

5.4  Other (provide details)  ‐ ‐

5.5  Cash and cash equivalents at end of quarter (should equal item 4.6 above)  2,324 1,014

 

Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report 

+ See chapter 19 for defined terms. Appendix 5B  Page 4  01/09/2016 

6.  Payments to directors of the entity and their associates  Current quarter $US'000 

6.1  Aggregate amount of payments to these parties included in item 1.2  51

6.2  Aggregate amount of cash flow from loans to these parties included in item 2.3  ‐

6.3  Include below any explanation necessary to understand the transactions included in items 6.1 and 6.2 

Payment of Director fees 

 

 

 

7.  Payments to related entities of the entity and their associates 

Current quarter $US'000 

7.1  Aggregate amount of payments to these parties included in item 1.2  ‐

7.2  Aggregate amount of cash flow from loans to these parties included in item 2.3  ‐

7.3  Include below any explanation necessary to understand the transactions included in items 7.1 and 7.2 

‐ 

 

 

 

8.  Financing facilities available  Add notes as necessary for an understanding of the position 

Total facility amount at quarter end 

$US’000  

Amount drawn at quarter end $US’000 

8.1  Loan facilities     

8.2  Credit standby arrangements     

8.3  Other (please specify)     

8.4  Include below a description of each facility above, including the lender, interest rate and whether it is secured or unsecured. If any additional facilities have been entered into or are proposed to be entered into after quarter end, include details of those facilities as well. 

 

 

 

 

Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report 

+ See chapter 19 for defined terms. 01/09/2016  Appendix 5B  Page 5

9.  Estimated cash outflows for next quarter  $US’000 

9.1  Exploration and evaluation  362 

9.2  Development  ‐ 

9.3  Production  ‐ 

9.4  Staff costs  61 

9.5  Administration and corporate costs  67 

9.6  Other (provide details if material) 

‐ capital raising costs  ‐ 

9.7  Total estimated cash outflows  490 

 

10.  Changes in tenements (items 2.1(b) and 2.2(b) above) 

Tenement reference and location 

Nature of interest  Interest at beginning of quarter 

Interest at end of quarter 

10.1  Interests in mining tenements and petroleum tenements lapsed, relinquished or reduced 

 

 

     

10.2  Interests in mining tenements and petroleum tenements acquired or increased 

EL31564‐NT 

EL31565‐NT 

EL31566‐NT 

EL31567‐NT 

EL31598‐NT 

EL31599‐NT 

Located in Northern Territory; granted during quarter 

0%  100% 

    EL31753 

EL31752 

EL31751 

EL31728 

 (appl.) NT 

Tenements under application in Northern Territory 

0%  100% 

    EPM26707 

EPM26708 

 (appl.) QLD 

Tenements under application in Queensland 

0%  100% 

 

Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report 

+ See chapter 19 for defined terms. Appendix 5B  Page 6  01/09/2016 

Compliance statement 

1  This statement has been prepared in accordance with accounting standards and policies which comply with Listing Rule 19.11A. 

2  This statement gives a true and fair view of the matters disclosed. 

   

     

Sign here:   ............................................................    Date: 31 January 2018 Company Secretary 

 

Print name:   Nerida Schmidt 

 

Notes 

1.  The quarterly report provides a basis for informing the market how the entity’s activities have been financed for the past quarter and the effect on its cash position. An entity that wishes to disclose additional information is encouraged to do so, in a note or notes included in or attached to this report. 

2.  If this quarterly report has been prepared in accordance with Australian Accounting Standards, the definitions in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash Flows apply to this report. If this quarterly report has been prepared  in  accordance with  other  accounting  standards  agreed  by  ASX  pursuant  to  Listing Rule 19.11A, the corresponding equivalent standards apply to this report. 

3.  Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities, depending on the accounting policy of the entity.