December’ 2016
[ENVIRONMENTAL COMPLIANCE REPORT ]
Dedicated to Environment Clean & Green
Sawen
Consultancy
Services Pvt.
Ltd.
(An ISO 9001:2008 certified, NABL & QCI (NABET) Accreditated Company) 409 A, 417 A & B, Sahara Shopping Centre, Faizabad Road, Lucknow-16 7379444471-75 91-522-2341312; 522-2344559
Chak Ganjaria Township Zonal Development Plan (Chak
Ganjaria City), Sultanpur Road, Lucknow.
Project Proponent: Executive Engineer,
C.G.City, Lucknow Development Authority,
Pradhikaran Bhavan, Gomti Nagar, Lucknow
File No.: 2097 JD CA(S)
Environmental Clearance Vide Letter No.: 381/Parya/SEAC-III/2097/2014 JDCA (S) dated 27.05.2014 & Vide Minutes of SEIAA Meeting dated 14.09.2016 for 286th SEAC Meeting dated 03.08.2016. Total Plot Area : 326.92 Ha
R
Compliance Report – Chak Ganjaria Township Zonal Development Plan (Chak Ganjaria City), village Chak Kanjhera, Ahmamau & Mastemau, Sultanpur Road Dist.- Lucknow, U.P.
Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow Page | 2
GENERAL CONDITIONS WITH COMPLIANCE STATUS
1. No sewer discharge shall be made outside the project. Zero effluent discharge principle shall be followed.
100% sewer treatment at 19 MLD capacity Zonal STP has been proposed. At present the
individual STP's of educational & institutional land uses are under the development stage.
Compliance Report – Chak Ganjaria Township Zonal Development Plan (Chak Ganjaria City), village Chak Kanjhera, Ahmamau & Mastemau, Sultanpur Road Dist.- Lucknow, U.P.
Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow Page | 3
PROPOSED ZERO WASTE WATER DISCHARGE SCHEME DIAGRAM
Total Water
Requirement
(12.40 MLD)
Horticulture &
Landscaping
(0.448 MLD)
Domestic Water
Requirement
(7.304 MLD)
ETP Pre Treated Waste Water
(0.9 MLD)
Waste Water
NIL
Fresh Water
Requirement
(8.2037 MLD)
Tertiary Treated
Water Requirement
(3.981 MLD)
Post Treated Total Waste Water
(0.9 MLD)
Tertiary Treated Water
(8.32 MLD)
STP (MBR Technology + UV Disinfection)
(19.0 MLD)
Flushing*
(3.13 MLD)
Waste Water
(3.13 MLD)
Hospital Water
Requirement
(1.012 MLD)
Waste Water
(5.21 MLD)
Modern Milk
Processing Unit
(0.1 MLD)
Total Waste Water
(9.248 MLD)
Secondary Treated Water (4.339 MLD)
for Street Washing = 0.30 MLD @ 1.0 ltr/sq.m/day;
For Sewer Cleaning = 0.96 MLD @ 4.5 ltr/head/day
Roadside
Plantation
(0.403
MLD)
Compliance Report – Chak Ganjaria Township Zonal Development Plan (Chak Ganjaria City), village Chak Kanjhera, Ahmamau & Mastemau, Sultanpur Road Dist.- Lucknow, U.P.
Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow Page | 4
Figure 1: Location of Amul Banas Dairy at Chak Ganjaria, Sultanpur Road, Lucknow.
Figure 2: Amul Banas Diary plant & STP under Development Stage.
Compliance Report – Chak Ganjaria Township Zonal Development Plan (Chak Ganjaria City), village Chak Kanjhera, Ahmamau & Mastemau, Sultanpur Road Dist.- Lucknow, U.P.
Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow Page | 5
Figure 3 & 4: STP being developed under Construction Phase at Amul Banas Dairy Plant.
2. No wet lands shall be encroached. No encroachment of wetland has been done so far. And the same will be complied in future
as well.
Compliance Report – Chak Ganjaria Township Zonal Development Plan (Chak Ganjaria City), village Chak Kanjhera, Ahmamau & Mastemau, Sultanpur Road Dist.- Lucknow, U.P.
Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow Page | 6
Figure: 6: Natural Pond near Village Mastemau unenchroached.
Figure 5:Area Toposheet
Compliance Report – Chak Ganjaria Township Zonal Development Plan (Chak Ganjaria City), village Chak Kanjhera, Ahmamau & Mastemau, Sultanpur Road Dist.- Lucknow, U.P.
Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow Page | 7
3. The proponent shall construct pucca drains for storm water which will be fully covered within the project area. This drain exists already and is connected with river Gomti. It should be ensure that the storm water through drain should not pollute the river Gomti.
Is being complied. All drains proposed are being developed as covered drains. The natural
creek flowing along project boundary and merging to river Gomti is being protected by
converting it into RCC Channelized drains with cover on top.
This has been ensured that only storm network will be connected to Natural Drain
connecting to River Gomti.
Natural
Creek to
R. Gomti
Compliance Report – Chak Ganjaria Township Zonal Development Plan (Chak Ganjaria City), village Chak Kanjhera, Ahmamau & Mastemau, Sultanpur Road Dist.- Lucknow, U.P.
Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow Page | 8
Figure : Covered Drains
Compliance Report – Chak Ganjaria Township Zonal Development Plan (Chak Ganjaria City), village Chak Kanjhera, Ahmamau & Mastemau, Sultanpur Road Dist.- Lucknow, U.P.
Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow Page | 9
Figure 7&8: Channelization of Natural Creek is under progress.
4. Part of the storm water should be recycled through rain water harvesting pits and suitably used for various purposes.
The proposed township project site is located on cis-Gomti Lucknow- Sultanpur road and is
in proximity of river Gomti, 1000 m north. As per drilling results of Central as well as State
Government Deptts.,aquifers become fine to finer and clay-silts also progressively increase
towards the river. Published dynamic groundwater resource data (2004) of the district by
Central Ground Water Board, Ministry of water Resources , Govt. of India , Mohanlalganj
block has been put in safe category with stage of groundwater development as 75.7%. In
general the sub-surface is constituted by indiscriminate mixture of fine to medium sands
and clay- silts – kankar in varying proportions
In the proposed - Roof top storm water will be diverted to rain water harvesting pits. Rain
Water Harvesting Pits have been provisioned in various project land uses of C. G. Township
Zonal Development Plan as follows:
1. High Level Cancer Institute
Chak Ganjaria Farm- Rain Water Harvesting Pits = 14 Nos.
2. Indian Institute of Information Technology- Rain Water Harvesting Pits = 15
Nos
3. DR RML State Administration & Management Academy (ATI) = Rain Water
Harvesting Pits = 06 Nos
Compliance Report – Chak Ganjaria Township Zonal Development Plan (Chak Ganjaria City), village Chak Kanjhera, Ahmamau & Mastemau, Sultanpur Road Dist.- Lucknow, U.P.
Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow Page | 10
The rain water would recharge the acquifer in the area. and would also be retained in the
natural ponds of the area..
5. 5% of the total green is to be developed as water body for rain water harvesting purpose with a maximum depth of 3 meter as per provision in “Bhavan Nirman aivam vikas upnidhi 2008”. Rain water harvesting pits are suggested to be at site proposed for vermiculture.
Replied vide General Condition #4. In plot areas ≥ 100 sq.m ; rain water harvesting would be mandatory. In plot areas ≤ 300 sq.m; roof top rain water harvesting would be mandatory. On the Master Plan Level, 5% of the green park and open spaces shall be covered under rain water harvesting by LDA. In different >20 acres ≤ projects within Township, 5% of the green park and open spaces shall be covered under rain water harvesting by specific Project Proponents of different land uses. The Landscape Development Plan includes the following major components. The water water bodies will be developed along the Green Connector.
S. No. Landscape Area Area (Acre) Area
(Hectare)
Percentage (%)
1 Green Parks 80.42 32.55 9.96
2 Green Connector 41.25 16.69 5.11
3 Green Utility 0.62 0.25 0.08
122.29 49.49 15.15
6. The vermiculture activity may be relocated on one corner. The vermiculture activities have been relocated to one corner of utility.
Compliance Report – Chak Ganjaria Township Zonal Development Plan (Chak Ganjaria City), village Chak Kanjhera, Ahmamau & Mastemau, Sultanpur Road Dist.- Lucknow, U.P.
Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow Page | 11
7. The Lucknow Development Authority(Project Proponent) has committed to provide 15-18% of the total land under parks, open spaces and green area for which they will ask allottes of various uses to allocate 10% of their area under green belt development so that overall green land on zonal plan may be achieved.
As per approved & revised layout after Exclusion of Khasra No. 279 (ख) from
Chak Ganjaria Zonal Development Plan :
S.No. Land Use Area
(Acre) Area (Hectare)
Percentage (%)
1 Residential Area 90.71 36.71 11.23
2 Commercial Area 68.07 27.55 8.43
3 Mixed Use Area 140.15 56.72 17.35
4 IT City Area 100.0 40.47 12.38 5 IIIT Area 50.0 20.23 6.19
Vermiculture
Bed Identified
Location
Compliance Report – Chak Ganjaria Township Zonal Development Plan (Chak Ganjaria City), village Chak Kanjhera, Ahmamau & Mastemau, Sultanpur Road Dist.- Lucknow, U.P.
Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow Page | 12
6 Milk Processing Unit
Area 25.0 10.12 3.09
7 Medicity Area 100.0 40.47 12.38 8 Hospital Area 20.0 8.09 2.48 9 ATI Area 25.0 10.12 3.09 10 Road Area 66.62 26.96 8.25 11 Landscape Area 12 Green Utility 0.62 0.25 0.08
13 Green Parks 80.42 32.55 9.96
14 Green Connector 41.25 16.69 5.11
807.84 326.92 Hence the total landscape development area = 122.29 acre /49.49 hac/ or 15.15 %
Hence the overall green of 15% is being maintained on zonal plan.
8. This environment clearance is for proposed creation of infrastructure facilities and related services for chak Ganjaria Zonal Plan. Any other activity/ development as proposed under various land use category (like- Resdential, Commercial, IT City, mixed land use, IIT, Medicity and dairy relocation etc.) shall seek a separate clearance as required under EIA Notification 2006. However, Project Proponent shall ensure establishment of complete infrastructure for all facilities proposed in the project as per law.
The present proposal is for plotting & infrastrcuture development of zonal plan of Chak
Ganjaria City at Lucknow. The project comprises the following land uses:
Compliance Report – Chak Ganjaria Township Zonal Development Plan (Chak Ganjaria City), village Chak Kanjhera, Ahmamau & Mastemau, Sultanpur Road Dist.- Lucknow, U.P.
Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow Page | 13
All individual projects within the zonal plan are in process of obtaining their respective
environmnetal clearances.
Status as on Date:
Chak Ganjaria Zonal Plan Development Components
Status of Environmental Clearance (EC)
IIIT EC Granted
IT City EC Granted
Cancer Hospital EC Granted
Dairy Plant EC Granted
HCL Technology Hub EC Granted
ATI UPPCB -NOC Granted
The copies of granted environmental clearance of projects at Chak Ganjaria Township is
enclosed as Annexure A.
The project proponent will ensure the establishment of complete infrastructure for all
facilities proposed in the project as per law.
9. Provision shall be made for the housing of construction labour within the site with all necessary infrastructure and facilities such as fuel for cooking, mobile toilets, mobile STP, safe drinking water, medical health care, crèche etc. the housing may be in the form of temporary structures to be removed after completion of project.
Compliance Report – Chak Ganjaria Township Zonal Development Plan (Chak Ganjaria City), village Chak Kanjhera, Ahmamau & Mastemau, Sultanpur Road Dist.- Lucknow, U.P.
Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow Page | 14
The housing for construction laborers with the sanitation, cooking medical care facilities
etc. in the form of temporary structures is available at site during construction phase. Local
labours are hired and rest is being complied.
Figure 9: Temporary Labour Hutment
Figure 10: Fresh water Supply Source for Laboures
Compliance Report – Chak Ganjaria Township Zonal Development Plan (Chak Ganjaria City), village Chak Kanjhera, Ahmamau & Mastemau, Sultanpur Road Dist.- Lucknow, U.P.
Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow Page | 15
10. Top soil excavated during construction activities should be stored for horticulture/ landscape development within site.
During construction phase excavation is being carried out in order to provide foundation
and basement as per individual construction plans, the top soil is beinge preserved
separately for landscaping purpose only.
Compliance Report – Chak Ganjaria Township Zonal Development Plan (Chak Ganjaria City), village Chak Kanjhera, Ahmamau & Mastemau, Sultanpur Road Dist.- Lucknow, U.P.
Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow Page | 16
Figure 11: Storage of Construction Debris/ Muck at an isolated space at project boundary.
11. Disposal of muck during construction phase should not create any adverse effect on the neighboring communities and be disposed taking the necessary precautions for general safety and health aspects of people, only in approved sites with the approval of competent authority.
Is being complied. Figure 11 shows isolated space of debris/ muck of construction. The
authorized vendor segregates and picks the debris and disposes off to designated site/ end
users.
12. Proper measures should be adopted to control dust emission during construction phase.
Dust is getting generated in phase of construction. Water is being sprinkled and tarpaulin
cover is being provided over stored raw material to reduce dust emission.
Compliance Report – Chak Ganjaria Township Zonal Development Plan (Chak Ganjaria City), village Chak Kanjhera, Ahmamau & Mastemau, Sultanpur Road Dist.- Lucknow, U.P.
Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow Page | 17
Figure 12: The construction site after Water Sprinkling on emanated dust.
13. Soil and water samples of the site should be tested by proponent through MoEf/NABL recognized laboratory to ascertain that there is no threat to ground water quality by leaching of heavy metals and other toxic contaminants on a quarterly basis data should also be submitted.
Complied. All tests are carried out by M/s SAWEN Projects & laboratories Pvt. Ltd.,
Lucknow an NABL recognized laboratory, T-2091. The result are detailed in the
enclosure.
14. Construction spoils, including bituminous material and other hazardous materials, must not be allowed to contaminate watercourses and the dump sites for such material must be secured so that they should not leach into the ground water
Complied. No dump site is being maintained near water course of river watercourse of Gomti or the natural creek..
15. Any hazardous waste generated during construction and operation phase should be disposed off as per applicable rules and norms with necessary approvals from the state pollution control board.
Compliance Report – Chak Ganjaria Township Zonal Development Plan (Chak Ganjaria City), village Chak Kanjhera, Ahmamau & Mastemau, Sultanpur Road Dist.- Lucknow, U.P.
Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow Page | 18
At present construction waste is being generated . The used oil from DG sets is hazardous
in nature and is being disposed off by authorized vendor of Uttar Pradesh Pollution Control
Board.
Spent oil from D.G. sets is carefully stored in HDPE drums in isolated covered facility.
Suitable care is taken so that spills/leaks of used oil from storage could be avoided.
16. The diesel generator sets to be used during construction phase should be low sulphur diesel type and should conform to Environment Protection Rules prescribed for Air and Noise Emission Standards.
20 KVA x 01 No. DG set during construction phase is of light diesel oil and conforms to EP
rules prescribed for D. G. Sets emission standards.
The noise emission from DG set will meet the noise level as per CPCB guidelines and only
HSD of calorific 0.25 will be to run these DG sets. Vibratos pads &acoustic enclosures will
be used in DG set to minimize the vibration effect.
Figure 13: DG Set in enclosure and adequate stack height.
emissions: Values
PM 0.3 g/kw-h NOx 9.2 g/kw-h
Compliance Report – Chak Ganjaria Township Zonal Development Plan (Chak Ganjaria City), village Chak Kanjhera, Ahmamau & Mastemau, Sultanpur Road Dist.- Lucknow, U.P.
Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow Page | 19
emissions: Values
HC 1.3 g/kw-h CO 3.5 g/kw-h
17. The diesel required for operating DG sets shall be stored in underground tanks and if required, clearance from chief controller of explosives shall be taken.
The diesel required are being stored in drums and no underground storage is required as
the quantity is very and less and the purchase of diesel is being carried out as per demand
only.
Figure 14: Specifications of 20 KVA DG Set presently in use at site.
18. Vehicles hired for bringing construction material to the site should be in good condition and should have a pollution check certificate and should conform to applicable air and noise emission standards and should be operated only during non-peak hours. The material loaded or unloaded should be covered before transportation to avoid fugitive emissions etc.
Being complied. The construction materials is covered before transportation.
Compliance Report – Chak Ganjaria Township Zonal Development Plan (Chak Ganjaria City), village Chak Kanjhera, Ahmamau & Mastemau, Sultanpur Road Dist.- Lucknow, U.P.
Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow Page | 20
19. Ambient noise levels should conform to prescribed residential standards both during day and night. Adequate measures should be made to reduce ambient air and noise level during construction and operation phase, so as to conform to the norms stipulated by CPCB/SPCB. Ambient air and noise monitoring should be done by an accredited lab and data should also be submitted on six monthly bases to this authority and SPCB.
During Construction Phase activities like operation of DG sets, concreting and mixing,
foundation excavation etc will generate noise for which administrative as well as
engineering control will be implemented. To prevent any occupational hazard, ear muff/
earplug shall be given to the workers working around of operating plant and machinery
emitting high noise levels.
During Operation Phase all the DG set of the proposed project will be kept in Acoustic
Enclosure to reduce the noise from DG set and attached with stacks height as per C.P.C.B
norms to reduce the impacts on air quality around the project site. The noise emission
from DG set will meet the noise level as per CPCB guidelines and only HSD of calorific 0.25
will be used to run these DG sets. Vibratos pads &acoustic enclosures will be used in DG set
to minimize the vibration effect.
Designers of crushers made provisions for the installation of dust abatement, suppression
or collection equipment. To mitigate noise effects well-balanced, choke-fed crushers, dust
enclosed screens and dust collector fans with silencers were employed that kept noise
levels under control.
The landscape design shall comprise of earthen mounds that will act as noise buffer from
adjoining country roads and the hedges acting as windbreaks would produce considerable
noise attenuation in the entire scheme.
20. Thick green belt of adequate width and density shall be raised along the periphery of the plot so as to provide protection against particulates and noise. Native species of trees should be planted.
The overall Green Belt development of the township plan is as follows:
Green Utility 0.62 0.25 0.08 Green Parks 80.42 32.55 9.96 Green
Connector 41.25 16.69 5.11
Compliance Report – Chak Ganjaria Township Zonal Development Plan (Chak Ganjaria City), village Chak Kanjhera, Ahmamau & Mastemau, Sultanpur Road Dist.- Lucknow, U.P.
Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow Page | 21
S. No. Landscape Area Area (Acre) Area
(Hectare)
Percentage (%)
1 Green Parks 80.42 32.55 9.96
2 Green Connector 41.25 16.69 5.11
3 Green Utility 0.62 0.25 0.08
122.29 49.49 15.15
Landscape Other Than Zonal Green
4 Central Verge-Tree Plantation Area within 45 m wide zonal road
3.33 1.35 0.41
5 Central Verge-Tree Plantation Area within 30 m wide zonal road
1.66 0.67 0.21
6 Road Side Plantation along 45 m wide zonal road
4.47 1.80 0.55
7 Road Side Plantation along 30 m wide zonal road
3.89 1.57 0.48
13.35 5.39 1.65
Figure: The proposed Green Connector of
Northern & Southern Pockets of Chak
Ganjaria Township Plan.
Compliance Report – Chak Ganjaria Township Zonal Development Plan (Chak Ganjaria City), village Chak Kanjhera, Ahmamau & Mastemau, Sultanpur Road Dist.- Lucknow, U.P.
Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow Page | 22
Green Connector
Plantation started
Central Verge
Development
Under Process
Compliance Report – Chak Ganjaria Township Zonal Development Plan (Chak Ganjaria City), village Chak Kanjhera, Ahmamau & Mastemau, Sultanpur Road Dist.- Lucknow, U.P.
Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow Page | 23
The green belt design along with periphery of the plot shall achieve attenuation factor
conforming to day & night noise standards prescribed for residential purposes. The open
spaces shall be suitably landscaped & covered with vegetation of indigenous variety to
provide a clean, healthy and beautiful green environment for the people to live in and work
in.
Natural landscaping offers a way to reduce the use of chemical pesticides and fertilizers,
while introducing natural techniques that are safer for the long-term health of the
community.
Some native species planned to be planted are:
Pithecellobium dulce(jungle jalebi)
Green
Connector
Close View
Compliance Report – Chak Ganjaria Township Zonal Development Plan (Chak Ganjaria City), village Chak Kanjhera, Ahmamau & Mastemau, Sultanpur Road Dist.- Lucknow, U.P.
Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow Page | 24
Prosopis juliflora(Kikar)
Syzygium cumini (jamun)
Ficus microcarpa
Ficus religosa(peepal)
Bambusa
Ficus benjamina
Ficus nuda
Ficus panda
Plumeria alba (pigeon wood)
Bamboosa vulgaris (common Bamboo)
Thuja orientalis(morpankhi)
Gravellia robusta (silver ok)
Delonix regia(gulmohar)
Ticoma urgentia
Terminalia belerica (Baheda)
21. Fly ash should be used as building material in the construction as per the provisions of fly ash notification of September. 1999 as amended
Fly ash has been used as Building Material in the construction as per the provision of fly
ash notification of September, 1999 and amended as on August, 2003.
22. Ready mix concrete should be used for construction purposes.
Complied.
23. Rain water harvesting system from roof top run off and surface run off should be implemented. Before recharging the surface run off, pre treatment must be done to remove suspended matter , oil and grease. The depth of the bore for rainwater recharging should be kept in consultation with CGWB. No wastewater (such as sewage, effluent, backwash of treatment unit, floor washing wastewater etc) should be discharged into rain water harvesting structure in order to avoid groundwater contamination.
On the Master Plan Level, 5% of the green park and open spaces shall be covered under rain water harvesting by LDA. In different >20 acres ≤ projects within Township, 5% of the green park and open spaces shall be covered under rain water harvesting by specific Project Proponents. In plot areas ≥ 100 sq.m ; rain water harvesting would be mandatory. In plot areas ≤ 300 sq.m; roof top rain water harvesting would be mandatory. The permission from Central Ground Water Board in this regard has been obtained. The copy of the same is annexed as Annexure B.
In the proposed - Roof top storm water will be diverted to rain water harvesting pits. Rain
Water Harvesting Pits have been provisioned in various project land uses of C. G. Township
Zonal Development Plan as follows:
Compliance Report – Chak Ganjaria Township Zonal Development Plan (Chak Ganjaria City), village Chak Kanjhera, Ahmamau & Mastemau, Sultanpur Road Dist.- Lucknow, U.P.
Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow Page | 25
1. High Level Cancer Institute
Chak Ganjaria Farm- Rain Water Harvesting Pits = 14 Nos.
2. Indian Institute of Information Technology- Rain Water Harvesting Pits = 15
Nos
3. DR RML State Administration & Management Academy (ATI) = Rain Water
Harvesting Pits = 06 Nos
The rain water would recharge the acquifer in the area. and would also be retained in the
natural ponds of the area..
24. Traffic congestion near the entry and exit points from the roads adjoining the proposed project site must be avoided. Parking should be fully internalized and no public space should be utilized.
The Chak Ganjaria Township will be approached by Sultanpur Road - NH-56. The township
would have 45.0 m and 30.0 m zonal roads for direct approaches.
Compliance Report – Chak Ganjaria Township Zonal Development Plan (Chak Ganjaria City), village Chak Kanjhera, Ahmamau & Mastemau, Sultanpur Road Dist.- Lucknow, U.P.
Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow Page | 26
All parking would be fully internalized by respective projects.
Two Nos. Foot Over Bridges have been introduced to avoid traffic congestions in the
proposed plan in Pocket - 1 as well as Pocket -2.
Zonal Road Development Under Process-
Northern Part
Zonal Road Development Under Process- Southern Part
Compliance Report – Chak Ganjaria Township Zonal Development Plan (Chak Ganjaria City), village Chak Kanjhera, Ahmamau & Mastemau, Sultanpur Road Dist.- Lucknow, U.P.
Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow Page | 27
Also underpasses have been proposed near entry/ exit places to avoid traffic congestion a nd cycle tracks have alos been proposed to avoid congestion.
Estimated Parking requirement as per the LDA norms: Parking requirement as per the norms:
Residential (Group Housing) FAR Area : 1361265 Sq. Mtr. 1.5 ECS for above 151 sq.m. floor area 1361265/150 * 1.5= 13613 ECS Institutional : 1942492.5 Sq.Mtr. 2 ECS for 100 sq.m. floor area 1942492.5*2/100: 38850 ECS Public/ Commercial: 691440 2.0 ECS for 100 sq.m. floor area 691440 * 2/100=13829 ECS Hence total required parking facility: 13613+38850+13829 = 66292 ECS
FOB -1
FOB -2
Compliance Report – Chak Ganjaria Township Zonal Development Plan (Chak Ganjaria City), village Chak Kanjhera, Ahmamau & Mastemau, Sultanpur Road Dist.- Lucknow, U.P.
Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow Page | 28
Figure: Section of Green Connector and Over Bridge proposed on Highway.
Figure: Proposed Underpasses
Compliance Report – Chak Ganjaria Township Zonal Development Plan (Chak Ganjaria City), village Chak Kanjhera, Ahmamau & Mastemau, Sultanpur Road Dist.- Lucknow, U.P.
Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow Page | 29
Figure: Section of pedestrian cycle tracks
The project parking plan for this construction project would follow all the standards and
norms. To avoid any traffic congestion, incoming and outgoing gates would be different.
Traffic manager and all persons involved with these activities shall do traffic management.
25. Water demand during construction should be reduced by use of pre –mixed concrete, curing agents and other best practices preferred.
Complied. Water Demand During Construction is as follws:
High Priority Activity
Water Usage Areas Approximate Consumption (KLD)
Dust Suppression @ 0.25l /sq.m road
General site Roads, Wheel Washes 70
Cleaning Ready Mixed Concrete Wagons 10 Site-General Cleanings Specialist High Pressure Cleaning
Commissioning & Test
Building Plot/ Services 100
Lower Priority Activity Site Cabins/ Toilets, Catering, Washing (Personal) 35
Compliance Report – Chak Ganjaria Township Zonal Development Plan (Chak Ganjaria City), village Chak Kanjhera, Ahmamau & Mastemau, Sultanpur Road Dist.- Lucknow, U.P.
Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow Page | 30
Temporary Accomodations General site Activity Tool Washing, Rinsing 50 Ground Works No water due to s Ready Mix Concrete 0 Cleaning Cleaning Tools & Small Equipments, Plant &
Equipment, Paintbrush Washing 10
Total 275 KLD
26. Fixtures for showers, toilet flushing and drinking should be of low flow either by use of aerators or pressure reducing devices or sensor based control.
Will be complied.
27. Energy conservation building code to be strictly adopted in all aspects of building design and construction.
As per latest Energy Conservation Building Code, 20% of hot water requirement has to be
met through solar heating system. This will require terrace/ exposed areas. A solar hot
water system will be provided on the terrace.
At the C.G. City Project, it has been proposed that Solar lights in the streets and landscaping
area will be placed.
CCFLs are being used for entire common areas and corridors.
The provision of LED Lights in elevation and signage are being used.
Solar street lights are raised light sources which are powered by photovoltaic panels
generally mounted on the lighting structure. The photovoltaic panels charge a rechargeable
battery, which powers a fluorescent or LED lamp during the night.
The LED street light is an integrated light-emitting diode (LED) light fixture that is used for
street lighting.
In the operation phase, appropriate energy conservation measures and management plan
will be adopted in order to minimize the consumption of non-renewable fuel.
Energy efficient building material for wall, roof, roads and open areas will be used.
28. A first aid room to be provided in the project both during construction and operation phase. First aid ambulance is stationed on site.
Complied. First aid room is provided.
29. The environmental safeguards and monitoring schedule as contained in the EMP should be implemented in letter and spirit
Compliance Report – Chak Ganjaria Township Zonal Development Plan (Chak Ganjaria City), village Chak Kanjhera, Ahmamau & Mastemau, Sultanpur Road Dist.- Lucknow, U.P.
Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow Page | 31
The environmental safeguards during construction pjase as proposed in the EMP are as
follws with their present status:
ENVIRONMENTAL MANAGEMENT PLAN FOR CONSTRUCTION PHASE
S.NO. Impacts
During
Construction
Phase
Management Plan Monitoring Responsibi
lity
Status as on
December
2016
1 Soil Erosion Installation of soil
traps on lower
edges
Installation of traps
for stored loose
construction
materials such as
sand.
Installed soil
traps
Securing of
construction
materials
Project
Manager
Top soil is
being
preserved.
2 Construction
equipment
and
waste
The vehicle
maintenance area
shall be located in
such a manner to
avoid sources by
accidental spillage
of oil.
Unauthorized
dumping of waste
oil should be
prohibited.
Wastes shall be
disposed off at an
approved site.
Provide oil
receptors and
tanks for collection
of used oils
and spillages
should be quickly
cleaned
Observations
Records of
waste oils
Records of
sales
Project
Manager
All waste is
being
disposed off
at an
approved
site.
3 Water
Pollution
sufficient
sanitation facilities
Routine
maintenance
Project
Manager
Complied as
mentioned
Compliance Report – Chak Ganjaria Township Zonal Development Plan (Chak Ganjaria City), village Chak Kanjhera, Ahmamau & Mastemau, Sultanpur Road Dist.- Lucknow, U.P.
Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow Page | 32
S.NO. Impacts
During
Construction
Phase
Management Plan Monitoring Responsibi
lity
Status as on
December
2016
for workers- 02
Septic Tanks; sizes:
5 7.5 m x 2.65 m x
1.24 m and 1 Nos.
5m x 2m x 1.24m
for 30 KLD sewer
load
Regular
maintenance
checks on drainage
system
checks
of drainage
system and
reports.
Recommended
water quality
standards
maintained
in EIA
reports.
4 Air Dust Provision of dust
masks to workers
Use labour
intensive methods
Properly stack
construction
materials
Screen
construction area
Stop work during
strong winds
Dust masks
provided
More labour
employed than
machinery
Orderly stock
area
Project
Manager
Dust Mask to
Labouers is
being
provided.
5 Emissions Use of low sulphur
diesel
Use of mufflers on
heavy equipment
and vehicles
Reduction in use of
machinery to
necessary
requirement
Only. It shall be
ensured that both
gasoline and diesel
Low sulphur
diesel used
Mufflers
installed
Reduced
machinery use
Vehicle
contractor
Site
supervisor
In
compliance
Compliance Report – Chak Ganjaria Township Zonal Development Plan (Chak Ganjaria City), village Chak Kanjhera, Ahmamau & Mastemau, Sultanpur Road Dist.- Lucknow, U.P.
Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow Page | 33
S.NO. Impacts
During
Construction
Phase
Management Plan Monitoring Responsibi
lity
Status as on
December
2016
powered
construction
vehicles are
properly
maintained to
minimize smoke in
the exhaust
emissions.
6 Noise Operation during
daylight hours
only-08 hourly
Provision of ear
muffs to site
workers
Operation logs
Ear muffs
provision and
numbers
Project
manager
Site
supervisor
Dg Sets in
acoustic
enclosures;
7 Biodiversity
Bush
clearing
Minimal excavation
To keep bush
clearing debris
away from the
river
Revegetation of
bare areas
Planting
indigenous, exotic
trees, flowers and
grass
Excavated
areas
Revegetated
areas
Number of
trees planted
Site
Manager
Revegation
under
implementati
on.
8 Social
concerns &
hazrads
Erecting hazards
warning signs
Reduced speed of
delivery trucks
Provision of
Personal Protective
Equipment (PPE)
First aid kits
provided at easily
accessible points
Signage
erected at
road
turnings and
at the gate
PPE provided
and use
enforced
First aid kits
available
Project
manager
Labour
Contractor
First Aid Kits
and signages
provided.
Compliance Report – Chak Ganjaria Township Zonal Development Plan (Chak Ganjaria City), village Chak Kanjhera, Ahmamau & Mastemau, Sultanpur Road Dist.- Lucknow, U.P.
Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow Page | 34
S.NO. Impacts
During
Construction
Phase
Management Plan Monitoring Responsibi
lity
Status as on
December
2016
Proper storage of
hazardous
materials such as
painting
materials, petrol
and diesel, LPG, etc
Proper storage
facilities
provided and
monitored
9 Security Fencing off the
project site and
limiting movement
and attraction of
unwanted
characters.
Fence and
restricted
entry
Strict
monitoring on
movement
of personnel
and materials
to
and from site
Site
Manager
In
Compliance.
10 Mushrooming
of
slums
To employ 250 nos.
local workers from
the local
community who
have homes;
Ensure organized
sourcing of
supplies to avoid
hawking
P.M Proper and
adequate
nos. labour
hutments
with toilet
facilities
have been
developed as
shown in
figures
11 Construction
works: Safe
distance from
Highway
50 m distance shall
be maintained from
highways during
construction works
- P.M. Is complied.
30. The development authority will ensure to provide accommodation for unorganized sector as per guidelines issued by the government by providing 10% houses for LIG and 10% houses for EWS at subsidized rates under residential scheme.
Compliance Report – Chak Ganjaria Township Zonal Development Plan (Chak Ganjaria City), village Chak Kanjhera, Ahmamau & Mastemau, Sultanpur Road Dist.- Lucknow, U.P.
Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow Page | 35
LIG EWS is being built.
Figure : WS / LIG houses under development stage in Pocket -2. & Pocket 01.
31. It is suggested that the area is to be declared as polythene/plastic free zone.
Will be complied . Also CNG fuels would be strictly used in the twonship.
32. In case of STP, Hybrid treatment plant is to be provided.
19.0 MLD STP is being constructed based on SBR technology. The 30% of the civil work and
10% of Mechanical Work has been done so far and the expected commissioning of the plant
is September’2017
Figure: SBR based technology plant under progress at Amul project premises.
33. The authority will give undertaking as suggested and agreed upon that 30% of the street lights in the zonal development plan area will be provided with solar energy.
Annexed as ANNEXURE-I
Compliance Report – Chak Ganjaria Township Zonal Development Plan (Chak Ganjaria City), village Chak Kanjhera, Ahmamau & Mastemau, Sultanpur Road Dist.- Lucknow, U.P.
Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow Page | 36
34. An authorization from the State Pollution Control Board regarding the disposal of solid waste during the construction / operation phase shall be taken . marble / stone cutting shall not be carried out without the permission from the competent authority. Liquid waste if any during the construction project shall not be discharged in any stream or well and be recycled in the project itself. This clearance is for lay out plan development including development of basic facilities and not for any hospital/industry etc.
Reply: Authorization is under process. Rest compliances are being followed at site.
ANNEXURE-I
Compliance Report – Chak Ganjaria Township Zonal Development Plan (Chak Ganjaria City), village Chak Kanjhera, Ahmamau & Mastemau, Sultanpur Road Dist.- Lucknow, U.P.
Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow Page | 37
UNDERTAKING
We hereby undertake that The Lucknow Development Authority will ensure 30% of the
street lights in the zonal development plan area will be provided with solar energy.
For C.G.City Lucknow
Date:27.01.2017
Authorized Signatory
Compliance Report – Chak Ganjaria Township Zonal Development Plan (Chak Ganjaria City), village Chak Kanjhera, Ahmamau & Mastemau, Sultanpur Road Dist.- Lucknow, U.P.
Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow Page | 38
(I)Ambient Air Quality:
S.No Date of
sampling
Sample Code Location 24 Hourly Concentration(µg/m3)
PM (10) PM(2.5) SOx NOx
01. 11.11.2016 AQ/SPLPL-435 Site office 96.6 48.61 6.26 24.77
02. 11.11.2016 AQ/SPLPL-436 EWS LIG 96.11 49.44 7.01 26.79
03. 11.11.2016 AQ/SPLPL-437 Village
Madhanmau 94.99 42.55 6.46 26.55
04. 11.11.2016 AQ/SPLPL-438 Village
Shekhnapur Ghat 94.92 41.65 5.23 24.18
(II) Stack Monitoring:
S.No Date of
sampling
Sample Code Capacity of DG Set 24 Hourly Concentration(µg/m3)
SPM SOx NOx
01. 11.11.2016 EQ/SPLPL-434 125 KVA 33.51 0.11 21.86
(III) Ground Water Quality Test Results:
Date of Sampling: 11.11.2016
Laboratory Sample code & Location: BW/SPLPL-1554 at Madhanmau Village, Temple
Compliance Report – Chak Ganjaria Township Zonal Development Plan (Chak Ganjaria City), village Chak Kanjhera, Ahmamau & Mastemau, Sultanpur Road Dist.- Lucknow, U.P.
Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow Page | 39
BW/SPLPL-1555 on Sultanpur Road
BW/SPLPL-1556 at LIG EWS
BW/SPLPL-1557 at Sanskriti School
S. N.
PARAMETER TESTED
UNITS RESULT DESIRABLE LIMITS (IS 10500:2012)
MAXIMUM PERMISSIBLE LIMIT
TEST PROTOCOL
BW BW BW BW
1 Colour Hazen units
<5 <5 <5 <5 5.0 15.00
2120 B APHA 22nd Edition 2012
2 pH Value - 7.880 7.537 7.678 7.617 6.5-8.50
No Relaxation
4500-H+ B,APHA’ 2012
3 Electrical Conductivity
µs/cm 535.3 536.2 496.9 614.9 _ _ 2510 B.APHA’ 2012
4 Turbidity NTU 0.0 0.0 0.0 0.0 1.00 5.0 2130 B APHA ’ 2012
5 Total Dissolved
Solids
mg/L 386 386 358 443 500 2000
2540 D. APHA’ 2012
6 Total Hardness as
CaCO3
mg/L 296 304 308 308 200.0 600
2340 C. APHA’ 22nd Edition 2012
7 Ca++ mg/L 52.91 56.11 59.32 43.29 8 Mg++ mg/L 39.85 39.85 38.88 48.60 9 Alkalinity as
CaCO3
mg/L 360.0 340 380 400 200.0 600
2320B, APHA’ 2012
10 Chloride as Cl-
mg/L 9.99 11.99 7.99 15.99 250.0 1000
4500 –Cl- B, APHA’ 2012
11 Sulphate as SO4
mg/L 16.70 17.23 3.87 35.77 200.0 400
4500-SO42- E 2012
12 Iron as Fe mg/L 0.20 0.04 0.05 0.06 45.0
No Relaxation
IS 3025 (Part 34)
13 Nitrate as NO3
mg/L 0.09 5.32 0.13 3.63 0.3
No Relaxation
3500 Fe-B APHA’ 2012
14 Fluoride as F- mg/L 0.61 0.58 0.62 0.68 1.0 1.5 4500-F- APHA 2012
(IV) Surface Water Quality Test Result:
Compliance Report – Chak Ganjaria Township Zonal Development Plan (Chak Ganjaria City), village Chak Kanjhera, Ahmamau & Mastemau, Sultanpur Road Dist.- Lucknow, U.P.
Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow Page | 40
Date of Sampling: 11.11.2016
Laboratory Sample code: SW1- SW/SPLPL-1550: downstream, Indira Canal
SW2- SW/SPLPL-1551: upstream, Indira Canal
SW3- SW/SPLPL-1552: downstream, Gomti River
SW4- SW/SPLPL-1553: upstream, Gomti River
S. No.
PARAMETER TESTED
UNITS RESULT DESIRABLE LIMITS
MAXIMUM PERMISSIBLE LIMIT
TEST PROTOCOL
SW1 SW2 SW3 SW4 (IS 10500:2012)
01 Colour Hazen units
<5 <5 <5 <5 5.0 15.00 2120 B APHA 22nd Edition 2012
02 pH Value - 8.624 8.521 7.900 8.003 6.5-8.50 No Relaxation
4500-H+ B,APHA’ 2012
03 Electrical Conductivity
µs/cm 231.2 241.5 498.8 490.9 _ _ 2510 B.APHA’ 2012
04 Turbidity NTU 0.2 0.2 0.1 0.1 1.00 5.0 2130 B APHA ’ 2012
05 TSS mg/L 68 52 56 54 2540 D APHA 22ND Edition 2012
06 O & G mg/L - - - - 5210 B APHA 22nd Edition 2012
7 COD mg/L 60 60 80 80 5220 B APHA 22nd Edition 2012
8. BOD mg/L 17.5 17.5 20 20
Compliance Report – Chak Ganjaria Township Zonal Development Plan (Chak Ganjaria City), village Chak Kanjhera, Ahmamau & Mastemau, Sultanpur Road Dist.- Lucknow, U.P.
Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow Page | 41
(III) Soil Quality Test Result
Laboratory Sample Code: SQ1- SQ/SPLPL-341; Location= Garden Soil
SQ2- SQ/SPLPL-342; Location= EWS LIG Houses
SQ3- SQ/SPLPL-343; Location= Agriculture soil near Madhanmau
SQ4- SQ/SPLPL-344; Location= Near Site Office
Date of Receipt: 11.11.2016
S.No Parameter Result
SQ1 SQ2 SQ3 SQ4
1 pH 9.42 8.740 8.860 8.929
2 Electrical Conductivity 108.8 129 87.88 119.0
3 Total Organic Carbon % 0.21 1.24 0.11 0.15
4 Organic Matter % 0.36 2.14 0.19 0.26
5 Bulk Density (gm/cc) 1.66 1.5 1.66 1.66
6 Particle Density(gm/cc) 2.0 2.0 2.14 2.0
7 Phosphous as P2O5 (Kg/ha) 3.52 11.92 4.72 2.4
8 Sulphur (mg/kg) 0.039 0.009 0.11 0.083
9 Ca + Mg(Mequi./100gm) 8.2 15.0 5.0 6.6
10 Ca (Me/100 gm Soil) 7.2 7.5 4.0 5.5
11 Mg (Me/100 gm Soil) 1.0 7.5 1.0 1.1
12 Moisture (%) 3.89 5.286 4.265 6.006
(IV) Noise
Date Of Monitoring: 24.10.2016
Time: 11:00 AM to 11:00 PM
Noise Location Min
(dB)
Max
(dB)
NQ1 Main Entry Gate (near Vidhan
sabha marg)
88.5 94.1
NQ2 Visitor Area 58.9 72.6
NQ3 DG Set Area 62.3 73.4
NQ4 Back Side of the Lok Bhawan
(out of the boundary )
68.6 80.3
Compliance Report – Chak Ganjaria Township Zonal Development Plan (Chak Ganjaria City), village Chak Kanjhera, Ahmamau & Mastemau, Sultanpur Road Dist.- Lucknow, U.P.
Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow Page | 42