December 2013 Monthly Update North Dakota Pipeline Authority Justin J. Kringstad December 13, 2013 - Bismarck, ND

December 2013 Monthly Update - ND Pipeline Authority

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

December 2013 Monthly Update North Dakota Pipeline Authority

Justin J. Kringstad December 13, 2013 - Bismarck, ND

US Williston Basin Oil Production - 2013

2

2 JJ Kringstad - North Dakota Pipeline Authority 2

October 2013

Estimated Williston Basin Oil Transportation

3

3 JJ Kringstad - North Dakota Pipeline Authority 3

Estimated Williston Basin Oil Transportation

4

4 JJ Kringstad - North Dakota Pipeline Authority 4

Estimated ND Rail Export Volumes

5 JJ Kringstad - North Dakota Pipeline Authority 5

Cushing $96.36

Brent $108.06 WTI + $11.70

Crude Oil Prices – Dec. 13, 2013

6 JJ Kringstad - North Dakota Pipeline Authority

Simple Terms Orange – Challenges on existing infrastructure Blue – Lack of pipelines

GREEN – % of gas captured and sold Orange – % flared from wells with at least one mcf sold. Blue – % flared from zero sales wells

August 2013 Data – Non-Confidential Wells

Statewide

Solving the Flaring Challenge

7 JJ Kringstad - North Dakota Pipeline Authority

Capturing the 12% Faster Well Connections

8 8 JJ Kringstad - North Dakota Pipeline Authority

9

ND Gas Gathering Statistics

9 JJ Kringstad - North Dakota Pipeline Authority

Justin J. Kringstad, Director North Dakota Pipeline Authority

600 E. Boulevard Ave. Dept. 405 Bismarck, ND 58505-0840

Phone: (701)220-6227

Fax: (701)328-2820 E-mail: [email protected]

Websites:

www.pipeline.nd.gov www.northdakotapipelines.com

10 JJ Kringstad - North Dakota Pipeline Authority

Contact Information

10

SUPPORTING DOCUMENTS

Oil Loading Rail Facilities

13