Local Development Framwork
Annual monitoring report 5
December 2009
Former Mid Bedfor dshire a rea
Centra
l Bedfordshire
Local Development Framework
Local Development Framework
Annual Monitoring Report 6
December 2010
Former Mid Bedfor dshire a rea
Centra
l Bedfordshire
Local Development Framework
1
1
Contents Page
Contents Page .................................................................................................................1
Section 1..........................................................................................................................4
Executive Summary .........................................................................................................5
1.0 Introduction ...........................................................................................................8
2.0 Background...........................................................................................................9
2.1 Location and General Character........................................................................9
2.2 Needs and issues facing the area .....................................................................9
3.0 Approach.............................................................................................................11
3.1 Linkages with Regional Monitoring Reports.....................................................11
3.2 Community Strategy ........................................................................................11
3.3 Consultation.....................................................................................................11
4.0 Monitoring Requirements ....................................................................................12
4.1 LDF Policies ....................................................................................................12
4.2 Saved Policies .................................................................................................12
4.3 Targets ............................................................................................................13
4.4 Indicators .........................................................................................................13
4.5 Relationship with the National Indicators.........................................................14
4.6 Policy Implementation......................................................................................16
4.7 Planning Obligations SPD ...............................................................................16
5.0 Local Development Scheme Implementation......................................................18
5.1 LDS First Review.............................................................................................18
5.2 LDS Second Review........................................................................................18
5.3 LDS Third Review – The Central Bedfordshire LDS........................................18
2
2
6.0 Progress In Relation to the Local Development Scheme ....................................22
7.0 Reasons for slippage in relation to the LDS ........................................................28
7.1 LDS 3rd Review................................................................................................28
7.2 Risk Management and Contingencies .............................................................28
7.3 Contingencies..................................................................................................29
8.0 Technical Reports ...............................................................................................30
Section 2........................................................................................................................31
9.0 Monitoring ...........................................................................................................32
10.0 Business Development and Town Centres .........................................................33
10.1 Contextual Indicators.......................................................................................33
10.2 Core Output Indicators.....................................................................................36
10.3 Local Indicators ...............................................................................................37
10.4 Significant Effects (Sustainability) Indicators ...................................................38
11.5 Indicator/Policy Analysis ..................................................................................38
11.0 Housing...............................................................................................................40
11.1 Contextual Indicators.......................................................................................40
11.2 Core Output Indicators.....................................................................................42
11.3 Local Indicators ...............................................................................................49
11.4 Indicator/Policy Analysis ..................................................................................50
12.0 Environmental Quality .........................................................................................52
12.1 Contextual Indicators.......................................................................................52
12.2 Core Output Indicators.....................................................................................52
12.3 Local Indicators ...............................................................................................55
12.4 Significant Effects (Sustainability) Indicators ...................................................56
12.5 Indicator/Policy Analysis ..................................................................................56
3
3
13.0 Other Relevant Local Indicators ..........................................................................57
13.1 Contextual Indicators.......................................................................................57
13.2 Local Indicators ...............................................................................................57
14.0 Other relevant significant effects indicators.........................................................61
15.0 Conclusions and future development of the LDF AMR .......................................62
Appendices ....................................................................................................................65
Appendix 1: List of Superseded Local Plan Policies ......................................................66
Appendix 2: List of Saved Local Plan Policies not Superseded .....................................69
Appendix 3: CSDM Policy Monitoring ............................................................................70
Strategic Objectives .................................................................................................103
Appendix 4:Status of B1-B8 Allocated Sites at 31/03/10 .............................................105
Appendix 5: Housing Trajectory...................................................................................106
Appendix 5a:15 year Housing Trajectory Data Table ...............................................106
Appendix 5b: Detailed delivery - site justification......................................................107
Appendix 5c: Trajectory Commentary ......................................................................109
Appendix 6: Housing Mix .............................................................................................110
Appendix 7: Status of Local Plan Housing Allocations at 31/03/10..............................111
Appendix 8: NI 186 – Per capita reduction in C02 emissions in the LA area ...............114
4
4
Section 1
5
5
Executive Summary
The Annual Monitoring Report (AMR) is submitted to the Secretary ofState by 31st December each year. This sixth report monitors theperiod 1st April 2009 to 31st March 2010 and is the second for CentralBedfordshire since the formation of a Unitary authority on 1st April2009. This report covers the former Mid Bedfordshire area, nowreferred to as Central Bedfordshire (North)
AMRs are required to contain information on the implementation ofthe Local Development Scheme (LDS) and the extent to whichpolicies in the Local Development Documents (LDD) are beingsuccessfully implemented.
This AMR also provides information on the performance of policiesand impacts on the environment in the context of the new planningsystem. It is required to monitor policies contained in the LDDs andwill be used to identify any key changes as a result of policyimplementation. It will also be used to provide feedback on whetherpolicy objectives are being achieved to enable appropriateadjustments and revisions to be made.
This report is in two sections. The first section provides an overview ofthe requirements in the legislation, how the Council is working tomake progress in meeting these requirements and progress towardsthe implementation of the Local Development Scheme. The secondsection provides information on a set of national Core Indicators, localindicators, contextual and significant effect indicators and savedpolicies.
Key Findings
Local Development Scheme
The Local Development Scheme Third Revision was formallysubmitted to the Government Office by 31st December 2008 and wasbrought into effect by virtue of Regulation 11(3) on the 16th January2009.
Progress towards the implementation of the Local DevelopmentScheme: The Core Strategy and Development Management Policies DPDwas successfully adopted in November 2009 in accordance with theLDS timetable. The Site Allocations DPD is on target in relation to the delivery ofthe key milestones outlined in the LDS. Gypsy & Traveller DPD is not on target in relation to the delivery ofthe key milestones outlined in the LDS .
6
6
Monitoring
This monitoring report is reporting on both Local Plan and CoreStrategy and Development Management DPD.
Local Plan policies were in effect during the monitoring period from 1st
April to 18th November 2009.
The Core Strategy and Development Management Policies DPD wasadopted 19th November 2009 and therefore these policies and thosesaved from the Local Plan have been monitored for the period 19th
November 2009 to 31st March 2010.
The main monitoring results are:
There has been a net addition of 8480sqm of B1-B8 employmentfloor space across the whole of Central Bedfordshire (North) over theperiod April 2009 to March 2010. This is compared to a loss of834sqm during 2008/2009.
90.96% of B1-B8 employment completions were on previouslydeveloped land (PDL)
There is still a sufficient amount of allocated B1-B8 employmentland that has yet to come forward for development. The majority ofthis allocated employment land, is concentrated in the A1 corridor atSandy and Biggleswade.
Housing provision required in Central Bedfordshire North is basedupon Regional Strategies and on the growth targets and plan periodas stated in the Adopted Core Strategy until 2026.
The Adopted Core Strategy delivery: 14,230 new homes between 2001 – 2021 3,720 new homes between 2021 – 2026 17,950 total new homes 2001 – 2026
The net annual number of housing completions at the 31st March2010 was 378 which is substantially lower than completions inprevious years. This fall in completions could be attributed to thecurrent economic situation.
The trajectory demonstrates that a sufficient number of sites areavailable, suitable and achievable so as to ensure a 5 year landsupply of housing. The total delivery during the 5 year period (April2011 – March 2016) is expected to be 4,421 dwellings.
7
7
5,984 dwellings have been completed since the beginning of 2001which leaves a residual of 8,246 to build by 2021. The annualrequirement implied by Plan targets is 712 dwellings. The manageddelivery target (residual) taking into account actual completions andexpected completions is 750 dwellings. This results in a 5 yearrequirement of 3,748.
The authority has an identified supply that meets 118% of thetarget or 5.9 years of land supply. There is an insufficient housingsupply after 2019 with a shortfall of 4,035 dwellings by 2026.
Contingencies are in place to meet the shortfall of 4,035.
68.35% of housing completions were on previously developed land.
The Council has endeavored to develop monitoring systems for allindicators and policies however in some cases the information is stillincomplete whilst monitoring mechanisms are being implemented orupdated. Progress as to their inclusion in next years AMR will behighlighted in the report.
8
8
1.0 Introduction
The Government’s Planning and Compulsory Purchase Act came intoforce in 2004. It requires every Local Authority to produce an AnnualMonitoring Report (AMR) as an integral part of the production andimplementation of the Local Development Framework (LDF).
Monitoring is crucial within the process to ensure the successfuldelivery of policies of the LDF.
The current Local Plan is being replaced by the Local DevelopmentFramework, which will comprise a number of documents collectivelyreferred to as Local Development Documents (LDDs). One of thesedocuments is a Local Development Scheme (LDS) which is a projectplan setting out the content and relevant timescales for the LDF.
AMRs are required to contain information on the implementation ofthe LDS and the extent to which policies in the LDDs are beingsuccessfully implemented. The monitoring and evaluation of progresstowards objectives and targets will form part of the feedbackmechanism to ensure the effective operation of policies or highlightany revisions that maybe required. The presence of clearmechanisms for implementation and monitoring forms one part of the“test of soundness” of the LDF.
The LDF AMR will be submitted to the Government Office for theEastern Region (GO-East) annually by 31st December and willmonitor the period 1st April to 31st March each year.
9
9
2.0 Background
2.1 Location and General Character
Since April 2009, Central Bedfordshire Council has provided publicservices as an all-purpose unitary authority. It delivers all the previousservices of the former Mid and South Bedfordshire District Councilsas well as those which were run by Bedfordshire County Council inthese areas. The Local Development Framework for the former MidBedfordshire area (Central Bedfordshire (North), remains in place.Further details are set out in the Central Bedfordshire LocalDevelopment Scheme (Third Revision). The LDF for the SouthBedfordshire area remains as a joint working arrangement with LutonBorough Council. Accordingly, the information in this document refersonly to the geographical area of the former Mid Bedfordshire District.
Geographically, Central Bedfordshire (North) covers approximately50,000 ha and contains a number of scattered market towns andvillages separated by extensive areas of open countryside. The areahas good north/south strategic transport links including the M1, A1and two mainline rail services into London. Much of the area containsa high quality natural environment, including a small part of theChilterns Area of Outstanding Natural Beauty and the Forest ofMarston Vale, one of 12 Community Forests throughout the UK.
2.2 Needs and issues facing the area
Central Bedfordshire (North) has a population of 134,800 andapproximately 55,840 households (Population Estimates andForecasts, 2009). It is one of the fastest growing Districts in Englandhaving undergone a 10% increase in population from 1991 to 2001,which was double the average for England. The population is forecastto increase by 5 % to around 138,000 by 2021. The increase inpopulation and development pressure in the area will need to becarefully managed to ensure that growth is well integrated withexisting development. Alongside the additional homes it is essentialthat adequate infrastructure is provided such as roads, water supplyand green space. Provision for new facilities will also have to becarefully planned and where deficits exist new facilities will need to beprovided. Providing more affordable homes as well as the provision ofaccommodation for the increasing elderly population are a bigchallenge especially in the smaller settlements. Whilst the ethnicminority population is low there is also a need to assess and providefor the accommodation needs of the gypsy and traveller communitywithin the area.
10
10
Central Bedfordshire (North) has a strong local economy with a higherthan average employment rate and only 0.9% unemploymentcompared to the regional rate of 1.8% (Unemployment QuarterlyBedfordshire County Council July 2007). The 2001 Census showedthat less than half of residents work within the area. There is a needto provide more jobs to try to reduce the level of out commuting andbalance the number of jobs with homes.
Transport issues are a concern for residents and the networkoperates at close to capacity in some areas. The high dependence onthe car causes problems for sustainability associated with greenhouse gas emissions as well as excluding those sectors of thepopulation without the use of a car from access to services. Thescattered pattern of development also raises difficulties in providingviable public transport.
In terms of the environment, it is important that the rural nature of thearea is preserved, the character enhanced and where appropriate theimpact of development mitigated. The attractive and accessiblelandscapes are a draw to those people living in large neighboringtowns such as Bedford and Luton. The growth of these areas will putincreasing pressure on the environment and there also a need toaddress the impact of climate change and the demand for additionalresources.
11
11
3.0 Approach
3.1 Linkages with Regional Monitoring Reports
There will no longer be linkages with Regional Monitoring Reports dueto the dissolving of regional bodies resulting from the Secretary ofState for Communities and Local Government revoking RegionalStrategies.
3.2 Community Strategy
The first Mid Bedfordshire Community Strategy was launched inDecember 2003. A refreshed version re-titled the Mid BedsSustainable Community Strategy 2008-2011, was approved by theCouncil in January 2008 alongside an action plan including specificmeasurements to monitor progress on implementation of the actions.This has subsequently been replaced by The Sustainable CommunityStrategy 2010-2031 – A prospectus for Central Bedfordshire. TheCouncil has taken steps to ensure that there is some commonality inthe targets and measures where appropriate to ensure that the LDFforms a spatial expression of some elements of the CommunityStrategy.
3.3 Consultation
This AMR has been prepared following consultation with Officers andMembers of the Council, but has not been subject to externalconsultation this year. Key officers within the Council were alsoconsulted and comments requested before submission of the finalreport in December 2010.
It is the Council's intention next year to review the process ofproducing the AMR with a view to including stakeholder involvement,to further develop the monitoring strategy for emerging LDD’s.
12
12
4.0 Monitoring Requirements
The Monitoring Framework in this document has been developedfrom Government Guidance ODPM Local Development FrameworkMonitoring: Good Practice Guide, referred to below. It requires theLocal Authority to:
Monitor a set of national core indicators and local and significanteffect indicators (see Section 2) The Core Output Indicators wereupdated in July 2008 (Regional Spatial Strategy and LocalDevelopment Framework Core Output Indicators – Update 2/2008DCLG) and this update is reflected in section 2 of this document.
Monitor the implementation of the LDS.
Monitor the effectiveness of new LDF policies as well as “saved”policies .
4.1 LDF Policies
The District has made significant progress on its LDF. The mostadvanced LDD is the Core Strategy and Development ManagementPolicies DPD. The document was formally submitted to the Secretaryof State within the first quarter of 2009, subjected to PublicExamination by the Planning Inspectorate in June and July 2009 andfollowing receipt of the Inspectors report, was adopted by the Councilon the 19th November 2009.
The Core Strategy and Development Management Policies DPDidentifies a set of overarching objectives for the LDF. Appendix 1 linksthese objectives with local, significant (sustainability) and coreindicators together with the key delivery agencies.
The Site Allocations DPD is progressing well with the adoption of thedocument and policies due April 2011.
4.2 Saved Policies
The DCLG Protocol issued in August 2006 states that if an authoritywishes to retain plan policies beyond the expiry of the three yearperiod (28 September 2007 for plans adopted before commencementof Section 38 of the Planning and Compulsory Purchase Act 2004 on28 September 2004; or three years from the date of adoption for otherplans) then it will need to seek the Secretary of State’s agreement toissue a direction to save them. In the case of the Mid BedfordshireLocal Plan, adopted in December 2005, this process had to be
13
13
achieved before December of 2008 to comply with this legislation. Tothis end, the Council submitted a schedule of all the policies itdetermined to ‘save’ to the Secretary of State in mid 2008. The formatand criteria of this schedule complied with the principles of the DCLGProtocol, by demonstrating that the policies to be saved reflected theprinciples of LDFs and were consistent with, without repeating currentnational policy.
This schedule was then ratified and the Secretary of State duly issueda direction to save the specified policies in September 2008.
The Bedfordshire and Luton Minerals and Waste Local Plan wasadopted in January 2005, and was automatically saved until January2008. The only Policies not saved are Policies W10 (concerningHousehold Waste Recycling Centres) and W15 (concerning Pre-landfill treatments for biodegradable waste). Monitoring for theMinerals and Waste Local Plan and production and development ofthe emerging Minerals and Waste LDF will continue to be done by theJoint Minerals and Waste Planning Team, which will be employed byCentral Bedfordshire but will work on behalf of Bedford Borough,Central Bedfordshire and Luton Borough.
The table in Appendix 1 sets out the saved policies from the adoptedLocal Plan that are superseded by the Core Strategy andDevelopment Management Policies DPD, and thus are no longer partof the development plan for Central Bedfordshire. The Local Planpolicies which remain in place are listed in Appendix 2.
The approach taken is also consistent with the Planning andCompulsory Purchase Act, Regulation 48, which requires the AMR tomonitor existing or saved policies.
4.3 Targets
Clear targets will ensure effective policy implementation, monitoringand review. The targets will be used to measure whether the LDF isperforming as required. Some targets already exist but further workneeds to be done to identify realistic targets for future policies, whichrelate to the indicators being developed. These will be reported infuture AMRs.
4.4 Indicators
The report is required to include a tiered framework approach toindicators reflecting the fact that different types of indicators arerequired as they have specific purposes. These indicators can beseen in the second section of this document and is split by corethemes and contains information on the following:
14
14
Contextual Indicators – A set of indicators, which together form ageneral portrait of Central Bedfordshire (North). They cover diversesubjects, often unrelated to planning policy, to give a broad idea of thesocial, economic and environmental background against which theplanning policies operate.
Output Indicators – These include both statutory Core OutputIndicators, set by central government, and Local Indicators, set by theCouncil through plan policies. These indicators provide an analysis ofthe way the Council’s adopted planning policies have performed.Core IndicatorsCore output indicators are designed as part of the monitoringframework to achieve a consistent and cost effective approach to datacollection. The core indicators were revised in July 2008 (RegionalSpatial Strategy and Local Development Framework Core OutputIndicators – Update 2/2008 DCLG). The update has rationalised theoverall set of indicators and made further definitional changes toclarify the indicators and ensure they are consistent with nationalpolicy guidance and other data collection processes (includingNational Indicators).
Significant Effect Indicators (Sustainability Indicators) – Theseindicators take a wider look at the effects that the Council’s adoptedplanning policies are having on Central Bedfordshire (North). Theyare based on the objectives set out in the Council’s SustainabilityAppraisal documents, and their purpose is to examine the indirecteffects that the policies may have.
4.5 Relationship with the National IndicatorsFrom 1st April 2008 a set of 198 National Indicators for localauthorities and local authority partnerships (National Indicators) wereintroduced and flow from the priorities identified in Public ServiceAgreements and Departmental Strategic Objectives announced inCSR07. These are the only set of indicators on which centralgovernment will performance manage local government working on itsown or in partnership with other bodies.
Of the set of 198 indicators there are a number on which spatialplanning has a powerful influence. The core output indicators withinAMRs provide a set of consistent and comparable definitions,developed with regional and local monitoring representatives, to helpplanning bodies monitor their own progress, and review their ownspatial strategies. Unlike with national indicators, AMRs are not usedby Government to performance manage local areas. Whereappropriate, targets from the National Indicators have been includedin this years AMR.
15
15
The only exception to this is the three indicators on net additionalhomes, affordable homes and deliverable housing sites, these are thesame as national indicators NI154, N155 and NI159.
16
16
4.6 Policy Implementation
Much work has already been done of relevance to delivery in thedevelopment of the Core Strategy and Development ManagementPolicies. This includes
Core Strategy and Development Management Policies MonitoringFramework. (Appendix 1)
The Delivery Strategy
The Infrastructure Audit Technical Report
The Planning Obligations Strategy Supplementary PlanningDocument referred to below; and
The engagement of key stakeholders through the LDF communityinvolvement process.
4.6.1 Delivery Strategy
The Council has prepared a Delivery Strategy to support the deliveryof the LDF. It provides an overview of action that is required, who isresponsible for delivery of infrastructure and a broad indication ofphasing, cost and funding. The Delivery Strategy will be a keyelement in delivering the Core Strategy and it is intended that futureAMR’s will include a separate section outlining progress on theprovision of infrastructure and measures on how to improve itseffectiveness. This will be informed by detailed policy monitoringincluding the results from the various indicators.
4.7 Planning Obligations SPD
The Planning Obligations Strategy Supplementary PlanningDocument (SPD) sets out proposals for an improved approach tonegotiating and securing planning obligations associated with newdevelopment in Central Bedfordshire North.
In November 2009, the Council adopted the revised PlanningObligations SPD to reflect the new policy framework set out in theAdopted Core Strategy and Development Management DevelopmentPlan Document. Other changes include updating the document toreflect the unitary status of the authority.
17
17
Quarterly reports are being finalised (30th June, 30th September, 31st
December and 31st March) to report the following:
money that has been received and available for spending.
money that has been spent.
money that has been transferred to other parties.
performance reports to show value of agreementssigned/payments. received/money spent and balance at end ofquarter.
breakdown of all payments received and expenditure.
receipt and expenditure against obligation type.
During the monitoring period:
£6,450,439.39 was secured through Section 106 agreementsexcluding Unilateral Undertakings through the Planning ObligationsSPD of which £0 was received.
£1,331,482.00 was secured through Unilateral Undertakingsexcluding Section 106 Agreements through the Planning ObligationsSPD of which £152,814.97 was received
Planning Obligations Expenditure 2009-2010
Date Amount Received by Obligation Address ApplicationNumber
08/06/09 £69,637.54 Marston ParishCouncil
Sport Bedford RoadRecreationGround
99/00609
09/06/09 £6,696.00 Tempsford ParishCouncil
Multi Playequipment
Church StreetPlay area
05/02005
18
18
5.0 Local Development Scheme Implementation
The Local Development Scheme (LDS) functions as a project plan forthe LDF and establishes which policy documents are to be preparedfor the Mid Bedfordshire Local Development Framework as well asproviding a timetable for their production and review. This sectionsets out progress to date, any issues, potential delays, problems andrevisions to our approach.
5.1 LDS First Review
The milestones and targets as set out in the Council’s LDS were metduring the monitoring period 05/06. However, in 2005 and early 2006,several issues arose, which if not taken into consideration, were likelyto have a significant impact on the delivery of key milestones. Theissues were broadly identified as risks in the original LDS. However,the implication of these risks in terms of timescales were not apparentat the time of adoption of the LDS.
In May 2006, the Executive considered a revision to the original LDSwhich sought to re profile some of the key milestones in response tochanging regional issues in the emerging East of England Plan andstaff changes. The amendments approved by the Executive formallycame into force in July 2006. The Council therefore submitted a firstreview of the LDS to Government that was approved in July 2006.
5.2 LDS Second Review
A number of issues arose after the first review that affected thedelivery of the key milestones set in the LDS. These include changesto the emerging East of England Plan, the experience of a number ofauthorities whose plans have been found “unsound”, the restructuringof the Development Plans team, the need for further publicconsultation on spatial options, and the findings of technical reportsindicating the need for further evidence.
The Council submitted the second review of the LDS to Governmentthat was approved in April 2007.
5.3 LDS Third Review – The Central Bedfordshire LDS
The Local Government Reorganisation and the ensuing move fromMid Bedfordshire District Council to the unitary authority of CentralBedfordshire from 1st April 2009 necessitated a further review of theLDS, as required by Statute. The new project plan must now takeaccount of Central Bedfordshire, although during the current review,the Luton and South Beds Growth Area will remain excluded. In
19
19
addition to this a number of issues have arisen which have affectedthe timetable as set out in the LDS (Second Revision)
The timetable for work on the Core Strategy and DevelopmentManagement Policies DPD was always a challenging one, and wasformulated with the expectation that the Government’s proposals for“streamlining” the LDF system would be published in April 2008.These proposals, in the form of a revised PPS12: Local SpatialPlanning and revised regulations were not published until thebeginning of June and it took some time to align the process for theMid Beds LDF.
In addition, there was continuing uncertainty over key regionalplanning issues – namely the proposed Eco-town in the Marston Valeand the possible expansion of Milton Keynes into Mid Bedfordshirethrough the South East Plan. Whilst the Eco-town issue became voidin this area following the publication of the Draft Planning PolicyStatement, a short delay in the timetable had allowed sufficient time torespond to the consultation on the Secretary of State’s proposedchanges to the South East Plan (the Government’s response to thePanel Report on the Examination in Public) which were published forconsultation on 17th July 2008.
This further revision was also considered necessary in order to defersubmission of the Site Allocations DPD until after adoption of the CoreStrategy. This was prudent in order to ensure that any changes to theCore Strategy that arose through the Examination process could beincorporated into the Site Allocations DPD before submission, sincechanges cannot be made after this point. This change meant a delayof around 6 months in the adoption of the Site Allocations DPD fromthe Second Revision.
The Local Development Scheme was formally submitted to theGovernment Office on 31st December 2008. The LDS Third Reviewtimetables are shown in Figure 1.
20
20
Figure 1: LDS (Third Revision) Development Plan Documents Timetable
Saved policies (Adopted Local Plan)
Gypsies & Travellers
Combined CS & DM Policies
Site Allocations
Pre Production (evidence gathering and front loading)
Consultation on Issues and Options
Preparation of Preferred Options Pre-Examination meeting Timescales subject to Planning Inspectorate
Consultation on Preferred Options Public Examination
Preparation of Draft Submission document Receipt of Inspectors Report
Draft Publication Adoption
DAF
2 0 1 0
J A S OMM
2 0 0 9
J A S OM J N D
2 0 0 8
J F M A M J A SJ
2 0 0 7
S O N DMJ MF
2011
J F M A M J J AA J AJ
Submission to Inspector
O N DSJ F NJ J
Summary of consultation responses
M AN DO
21
21
Figure2: Supplementary Planning Document Timetable
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J
Planning Obligations Strategy
District Design Guide
Biggleswade Town Centre Masterplan
Research
Preparation of Draft SPD
Public participation on Draft SPD
Consideration of representations and amendment of SPD
Adoption of SPD
N D JJ A S OJF MA J A
2005 2006 2007
FJ
2008
S O N DMM M J
20102009
F M AJ A M
22
22
6.0 Progress In Relation to the Local DevelopmentScheme
Progress on the Preparation of The Central Bedfordshire LDF (formerMid Bedfordshire) for the period April 2008-March 2009 against theLDS Second Review Timetable (May 2007) and Third Review(January 2009)
6.1 Statement of Community Involvement (SCI)
(Prepared in accordance with the LDS (First Review)
LocalDevelopmentDocument
Milestone Milestone Date Milestone Metor on target?
SCI Commencement ofthe preparationprocess of LDD
June 2004 Yes
Public consultation onthe Issues andOptions Paperregulation 25
Jan-Mar 2005 Yes
Public Participationon Preferred OptionsRegulation 26
July-Sept 2005 September2005
Submission of LDD October 2005 N/A Dealtwith bywrittensubmissions
Pre-examinationmeeting
Nov-Dec 2005 N/A Dealtwith bywrittensubmissions
Commencement ofthe Examination
Jan-Feb 2006 Adopted 22ndFebruary2006
Adoption of theDevelopment PlanDocument
June 2004 Yes
Status andProgress
The SCI has met all milestones and is now and Adopteddocument.
23
6.2 Development Plan Documents
LDS Third Review Timetable (January 2009)
LocalDevelopmentDocument
Milestone MilestoneDate
MilestoneMet or ontarget?
Core StrategyandDevelopmentManagementPolicies
Commencement ofthe preparationprocess of LDD
April 2005 Yes
Public consultation onthe Issues andOptions Paperregulation 25
No specificmilestone
Issues andOptionsPaperpublishedFebruary 06
Public Participationon Preferred OptionsRegulation 26
Aug-Sept2007
Consultationcompleted24th
September to5th November2007
Submission of LDD February2009
SubmittedFebruary 12th
2009
Pre-examinationmeeting
April 2009 8th April 2009
Commencement ofthe Examination
June-July2009
Yes, 23rd
June - 9th
July 2009
Adoption of theDevelopment PlanDocument
November-January 2010
Adopted 19th
November2009
Status andProgress
Adopted in line with LDS timescales
24
24
LocalDevelopmentDocument
Milestone MilestoneDate
MilestoneMet or ontarget?
Gypsies andTravellers
Commencement ofthe preparationprocess of LDD
November2005
Yes: SecondIssues andOptionsConsultationCompleted22nd Octoberto 3rd
December2007
Public Participationon Preferred Sites
Feb-March2008
Consultation17 November2008, 7January 2009
Public Participationon Preferred Sites(Second round)
Additionalstage not inLDS
26th April2010 to 7th
June 2010
Draft Submissionconsultation
May-June2009
December2010
Submission Sept-Oct2009
AnticipatedFeb 2011
Pre-examinationmeeting
Dec 2009
Commencement ofthe Examination
Feb 2010 AnticipatedSpring 2011
Adoption of theDevelopment PlanDocument
July-Sept2010
AnticipatedAutumn 2011
Status andProgress
The revocation of the Regional Spatial Strategy hasdelayed production of the Gypsy and Traveller DPD inrelation to the delivery of the key milestones set in thethird LDS .
25
LocalDevelopmentDocument
Milestone MilestoneDate
MilestoneMet or ontarget?
SiteAllocations
Commencement ofthe preparationprocess of LDD
September2006
CommencedSeptember2006
Public Participationon Draft Submission
Dec-Jan 2010 25th January2010 to 15th
March 2010
Submission of LDD March – April2010
May 2010
Pre-examinationmeeting
June 2010 13th August2010
Commencement ofthe Examination
August 2010 Commenced25th October2010
Adoption of theDevelopment PlanDocument
Jan-March2010
On target
Status andProgress
In line with LDS.
26
26
6.3 Supplementary Planning Documents (SPD)
LDS Third Review Timetable (January 2009)
LocalDevelopmentDocument
Milestone MilestoneDate
MilestoneMet or ontarget?
PlanningObligationsStrategy
Research Phase June 2005–June 2006
Completed
Preparation of draftSPD
June-Oct2006
This stagetook longerthananticipatedand resultedin a delay inpreparationby 3 months
Public Participationon Draft SPD
Oct-Dec 2006 This stagetook placebetween 6th
July 2007 –24th Augustdue to thedelay fromthe abovestage
Submission toGovernment Office ifrequired
Oct 2006 Not required
Consideration ofConsultationrepresentations andamendment of SPD
Jan-Apr 2007 StartedSeptember2007 –February2008
Adoption of the SPD June 2007 1st April 2008
Status andProgress
This SPD was adopted on 1st April 2008. A refresh hasbeen undertaken to align the SPD with the adoptedCore Strategy and Development ManagementPolicies. The 2009 SPD was adopted by the Councilon 19th November 2009.
27
LocalDevelopmentDocument
Milestone MilestoneDate
Milestone Metor on target?
District WideDesign Guide
Research Phase Jan-Mar 2008 Met
Preparation of draftSPD
Apr-June2008
Met
Public Participationon Draft SPD
Jul-Aug 2008 5th October –16thNovember2010
Consideration ofConsultationrepresentations andamendment of SPD
July-Sept2008
Nov/Dec2010
Adoption of the SPD Jan-Feb 2009 Jan 2010
Status andProgress
Adopted
LocalDevelopmentDocument
Milestone MilestoneDate
MilestoneMet or ontarget?
BiggleswadeTown CentreSPD
Research Phase Nov 2008-April 2009
CommencedNov 2008
Preparation of draftSPD
April 2009-Sept 2010
Currentlyunderway -Draftdocumentprepared –internalprocesses tobe conducted
Public Participationon Draft SPD
Oct-Dec 2009 Schedulerevised.Statutoryconsultationto begin midJan forperiod of 6weeks.
Consideration ofConsultationrepresentations andamendment of SPD
Dec 2009-March 2010
Schedulerevised.Feb to March2011
Adoption of the SPD May 2010 Adoptionlikely to takeplace in June2011
28
28
7.0 Reasons for slippage in relation to the LDS
7.1 LDS 3rd Review
The Third Revision was formally submitted to the Government Officeby 31st December 2008 and was brought into effect by virtue ofRegulation 11(3) on the 16th January 2009.
The Core Strategy and Development Management Policies DPDwas successfully adopted in November 2009 in accordance with theLDS timetable.
The Site Allocations DPD is on target in relation to the delivery ofthe key milestones outlined in the LDS.
Gypsy & Traveller DPD. The revocation of the Regional SpatialStrategy has delayed production of the Gypsy and Traveller DPD inrelation to the delivery of the key milestones set in the third LDS . Therevocation of the Regional Spatial Strategy has necessitated a reviewof the level of need and an additional site selection.
7.2 Risk Management and Contingencies
Government guidance requires local planning authorities, within theirLDSs to identify the risks involved with LDD SPD production and thecontingencies required to ensure the programme of documentproduction remains on schedule. The LDS Risk Management tableidentifies short medium and long-term risks and suggestscontingencies where possible.
Current Risks are identified as follows:
7.2.1 Core Strategy and DM Policies DPD
Now adopted
7.2.2 Site Allocations DPD
The Council is currently awaiting the Inspector's report on the PublicExamination into the DPD, expected to be received in January 2011.The main risks are: The delivery of the Inspector's Report being delayed or notpublished due to proposed changes to the development plan systemto be set out in the upcoming Decentralisation and Localism Bill. The recommendations made in the report, which are currentlyunknown. These recommendations are binding on the Council and will
29
need to taken on board in the final version of the DPD to be adopted.Therefore, Members will need to be informed of any required changesin order to approve the DPD for adoption purposes, in accordancewith the LDS timetable.
7.2.3 Gypsy and Traveller DPD
The Council published the Draft Submission document on 8December for an 8 week period. The responses made to both Issuesand Options and both Preferred Sites consultations have been usedto inform this current consultation. Risks associated with this include ahigh level of responses necessitating additional staff resources whichwill delay processing of the representations. There may also bepolitical intervention, given the high political profile of this matter,which could affect the timetable.
7.3 Contingencies
The Local Development Scheme 3rd Review sets out the currenttimetable that the Council is working to for the production of its LDF.Further risks have been identified that may have an impact on thetimetable. The contingencies identified include recruiting additionalstaff to cover processing representations for the two DPD’s. Howeverthis will be subject to budgetary constraints. In addition, post-LGRconsiderations are requiring the authority to make savings, includingthe consideration of freezing posts and making redundancies.
30
30
8.0 Technical Reports
The Technical Reports listed below all form part of the evidence basefor the Core Strategy and Development Management Policies DPD:
Affordable Housing Stage 1Affordable Housing Stage 2Bedfordshire and Luton Strategic Green Infrastructure PlanBedfordshire and Luton Gypsy & Traveller Accommodation NeedsAssessment 2006BedfordshireTravelling Showpeople Study 2007Employment Land Review Stage 1Employment Land Review – Non B and-B Employment UsesEmployment Land Review Sites StudyHousing Land Availability ReportInfrastructure AuditMid Bedfordshire Green Infrastructure PlanMid Bedfordshire Landscape Character Assessment ReportMilton Keynes Strategic Development Areas StudyOpen Space, Sports and Recreation Needs AssessmentSettlement Envelope ReviewSettlement Hierarchy Technical ReportState of the Environment ReportStrategic Flood Risk Assessment Stage 1Strategic Flood Risk Assessment Stage 2Sustainability Appraisal/Strategic Environmental AssessmentTransport Impact AssessmentTown Centres and Retailing: Stage 1Town Centres and Retailing Stage 2Urban Potential Study
31
Section 2
32
32
9.0 Monitoring
This monitoring report is structured by the key policy themes as setout in the CLG Regional Spatial Strategy and Local DevelopmentFramework, Core Output Indicators – Update 2/2008.
These key policy themes are:
Business Development and Town Centre Housing Environmental Quality Other Relevant Local Indicators Significant Effect Indicators
Mineral Production and Waste matters will not be covered within thisreport as is covered separately.
This monitoring report is reporting on Local Plan policies which werein effect during the monitoring period from 1st April to 18th November2009. Local indicators relating to Local Plan policies can be foundwithin the main report.
The Core Strategy and Development Management Policies DPD wasadopted 19th November 2009 and therefore these policies and thosesaved from the Local Plan will be included for the period 19th
November 2009 to 31st March 2010. Indicator monitoring results forCSDM policies can be found in Appendix 3.
33
10.0 Business Development and Town Centres
10.1 Contextual Indicators
Business Stock
Active Enterprises 2008
Central Bedfordshire North 6,100
Central Bedfordshire South 5,035
Central Bedfordshire 11,135
East 236,355
England 2,024,990
Source:ONS
Vat registrations/deregistrations
The total number of VAT registered businesses in the Central Bedfordshire(North) continues to slowly increase.
Year Registrations Deregistration Start of yearStock
2001 405 375 4870
2002 475 385 4900
2003 515 370 4990
2004 505 395 5130
2005 480 395 5240
2006 515 325 5325
2007 540 365 5515
2008 5690
Source: ONS Crown Copyright Reserved – Nomis Official Labour MarketStatistics - 19th November 2010
Economic Activity Rate
Jan 2006 – Dec 2006 80.5% Jan 2007 – Dec 2007 83.0% Jan 2008 – Dec 2008 85.1% Jan 2009 – Dec 2009 80.0% Apr 2009 – Mar 2010 80.8%
Source: ONS Crown Copyright Reserved – Nomis Official Labour MarketStatistics - 23rd November 2010
34
34
Total in Employment
Jan 2005 - Dec2005 67,100 Jan 2006 – Dec 2006 67,600 Jan 2007 – Dec 2007 73,000 Jan 2008 – Dec 2009 75,300 Jan 2009 – Dec 2009 67,600
Source: ONS Crown Copyright Reserved – Nomis Official Labour MarketStatistics
Total employee jobs
Year
CentralBedfordshire
(North)(employee jobs)
East(employee
jobs)
Great Britain(employee
jobs)
1995 34,035 2,012,300 22,728,869
1996 32,709 2,033,982 23,137,135
1997 35,167 2,133,264 23,747,609
1998 37,100 2,187,800 24,355,000
1999 36,300 2,149,700 24,827,400
2000 36,600 2,241,200 25,214,600
2001 38,300 2,266,100 25,490,300
2002 40,100 2,283,600 25,593,700
2003 38,800 2,304,700 25,710,600
2004 40,800 2,303,000 26,067,500
2005 43,200 2,360,700 26,496,600
2006 42,700 2,382,100 26,351,600
2007 42,700 2,377,600 26,599,200
2008 43,600 2,392,700 26,677,200
Source: ONS annual business inquiry employee analysis
35
Unemployment
DateClaimant
Count
CentralBedfordshire
(North) East
Dec 2001 801 1.0% 1.6%
Dec 2002 909 1.1% 1.6%
Dec 2003 863 1.0% 1.6%
Dec 2004 802 1.0% 1.5%
Dec 2005 745 0.95 1.7%
Dec 2006 852 1.0% 1.8%
Dec 2007 699 0.8% 1.5%
Dec 2008 1328 1.5% 2.3%
Dec 2009 2088 2.3% 3.2%
Oct 2010 1590 1.8% 2.8%
Source: ONS Crown Copyright Reserved – Nomis Official Labour MarketStatistics – 23rd November 2010
36
36
10.2 Core Output Indicators
BD1 Total amount of additional employment floorspace – by type (sqm)
BD1 B1a B1b B1c B2 B8 B1-B8Unknown
Total
MKSM Gross 0 0 0 139 0 0 139
Loss 0 0 0 0 0 0 0
Net 0 0 0 139 0 0 139
E of E Gross 2305 0 250 5143 0 1785 9483
Loss 0 0 600 450 0 92 1142
Net 2305 0 350 4693 0 1693 9041
Total Gross 2305 0 250 5282 0 1785 9622
Loss 0 0 600 450 0 92 1142
Net 2305 0 -350 4832 0 1693 8480
BD2 Total amount of employment floorspace previously developed land –by type (sqm)
BD2 B1a B1b B1c B2 B8 B1-B8Unknown
Total
MKSM Grosson PDL
0 0 0 0 0 139 139
% PDL 0 0 0 0 0 100
E of E Grosson PDL
2260 0 -600 5143 0 1631 8434
% PDL 98 0 58.33 100 0 96.33
Total Grosson PDL
2260 0 -600 5143 0 1770 8573
% PDL 98 0 -58.33 100 0 96.61 90.96
37
BD3 Employment land available – by type (ha)
BD3 B1a B1b B1c B2 B8 B1-B8Unknown
Total
MKSM Extant PlanningPermissions
0.08 4.78 0 0 0 0.76 5.62
Extant Allocations 0 0 0 0 0 3.0 3.0
Total 0.08 4.78 0 0 0 3.76 8.62
E of E Extant PlanningPermissions
1.536 0 1.311 -0.04
0.0225 104.682 107.51
Extant Allocations 1.126 1.14 0 0 0 6.008 8.274
Total 2.662 1.14 1.311 -0.04
0.0225 110.69 115.78
Total Extant PlanningPermissions
1.616 4.78 1.311 -0.04
0.0225 104.442 113.13
Extant Allocations 1.126 1.14 0 0 0 9.008 11.274
Total 2.742 5.92 1.311 -0.04
0.0225 114.42 124.4
BD4 Total amount of floorspace for ‘town centre uses’
There are no defined town centre boundaries under the Local Plan.Town centre boundaries have been addressed through the LDF CoreStrategy and Development Management Policies DPD. MonitoringMechanisms are currently being implemented to report this in nextyears AMR.
10.3 Local Indicators
The Council will safeguard the key employment sites listed below andthe proposed allocation sites listed in Table E2 (Policies EMP4(1) -EMP4(10) inc) and identified on the Proposals Map, for B1, B2 and B8employment use. Development or redevelopment of land onsafeguarded sites for uses other than those which fall within ClassesB,1 B2 and B8 of the Use Classes Order (1987) will not be permitted
Local Plan Policy; EMP1
Employment Allocation Progress
Local Plan Policy; EMP4
38
38
Appendix 5 shows the status of B1-B8 allocated sites at 31/03/10
10.4 Significant Effects (Sustainability) Indicators
11.5 Indicator/Policy Analysis
There has been a net addition of 8480sqm of B1-B8 employmentfloor space across the whole of Central Bedfordshire (North) over theperiod April 2009 to March 2010. This is compared to a loss of834sqm during 2008/2009. During 2008/2009 there were net lossesin B2 and B8 whereas during this monitoring period it can be seenthat there is a net increase in B2 employment floor space and no netincrease in B8 employment floor space.
The percentage of B1-B8 employment completions on previouslydeveloped land (PDL) has increased from 68.73% in 2008/2009 to90.96% in this monitoring period.
Information on allocated sites indicates that there is still a sufficientamount of allocated B1-B8 employment land that has yet to come
Residence of Workforce
(Source: Census 2001)
Only 47% of Central Bedfordshire (North) Residents work within thedistrict. The principal work destinations of out commuters are:
Hertfordshire 17.2% Bedford 8.9% London 6.6% Luton 6.2% Milton Keynes 5.1%
Of the 45,084 people who work in Central Bedfordshire (North): 66% live within the district 9.9% live in Bedford 5.2% live in Hertfordshire 4.1% live in Cambridgeshire 3.9% live in Milton Keynes
Significant Effects – Residence of Workforce
39
forward for development. The majority of this allocated employmentland, is concentrated in the A1 corridor at Sandy and Biggleswade.
40
40
11.0 Housing
11.1 Contextual Indicators
Population forecasts
CentralBedfordshire
North
CentralBedfordshire
South
CentralBedfordshire
East England
2009 134,800 118,100 252,900 5,766,600 51,809,700
2016 146,000 128,400 274,400 6,172,900 54,471,600
2021 149,100 142,900 292,100 6,469,900 56,432,500
2031 164,700 170,300 335,000 7,016,500 60,070,700
Source: Forecasts for East and England are 2008 based sub nationalpopulation projections from ONS. Forecasts Central Bedfordshire areas are2009 based population projections taken from Bedfordshire population model.
Population Density
CentralBedfordshire
North
CentralBedfordshire
South
CentralBedfordshire
East England
Size(km2)
503 213 716 19,109 130,279
2009(people
per km2)
268.0 554.5 353.2 301.8 397.7
Source: Population density calculated using 2001 Census area sizes
Housing Stock
Housing Stock: 55,840Source: Customer and Community Insight team, Central Bedfordshire Council
All Housing Stock: 50,067 Occupied Housing Stock: 48,600 Unoccupied Housing Stock: 1,467
Source: ONS, Census 2001
41
Housing Type (All housing stock)
Percentage of detached dwellings: 33% Percentage of semi-detached dwellings: 34% Percentage of terraced housing: 24% Percentage of flats/maisonettes: 8% Percentage of Temporary dwellings: 1% Source: ONS, 2001 Census, Figures taken to nearest %
Housing Tenure and Housing Stock (occupied housing stock only)
27% of owner occupied households (owned outright): 49% of owner occupied households (owns with a mortgage orloan): 6% of households rented from the Council: 8% of households in Housing Association/Registered SocialLandlords properties: 6% of households in private rented or letting agencyaccommodation: 4% of households rented from other:
Source: ONS, 2001 Census - Figures taken to nearest
Vacant Dwellings
1,694 Vacant Dwellings (Excluding Second Homes) Source: ONS
House Prices
Average House Price
Central Bedfordshire £176,300
East £177.300
England and Wales £166,100
Source: Land Registry June 2010
42
42
11.2 Core Output Indicators
The East of England Plan and the MKSM Sub-Regional Strategyprovide regional planning guidance for Central Bedfordshire North.This guidance sets out the housing provision required in CentralBedfordshire North over the period 2001-2021. The East of EnglandPlan (May 2008) highlights that 11,000 new homes are required in thedistrict over this period. In addition, the MKSM Sub- Regional Strategyhas recognised the Northern Marston Vale as being within arecognised growth area and requires that an additional 3,230 newhomes are built within this part of the district between 2001-2021.
On the 6th July 2010 Regional Strategies were revoked by theSecretary of State for Communities and Local Government and nolonger form part of the development plan for the purposes of s38 (6)of the Planning and Compulsory Purchase Act 2004. A successfulHigh Court challenge was made against the Government resulting inRegional Strategies being re-established. It is however theGovernments intention to abolish Regional Strategies in the LocalismBill. Housing provision required in Central Bedfordshire North isbased upon Regional Strategies and on the growth targets and planperiod as stated in the Adopted Core Strategy until 2026.
The monitoring period of 2009/10 pre dates the changes to theregional strategies, therefore they will still be mentioned in this report,
The Adopted Core Strategy delivery: 14,230 new homes between 2001 – 2021 3,720 new homes between 2021 – 2026 17,950 total new homes 2001 - 2026
H1 Plan Period and housing targets
Start ofPlan period
End of Planperiod
TotalHousingRequirement
Source of Plan Target
H1 2001 2021 3230 MKSM Sub-Regional Strategy
H1b 2001 2021 11000 East of England Plan
Total 14230
H2(a) Net additional dwellings in previous years
Figure 3a, b and c
H2(b) Net additional dwellings – for the reporting year
43
NI 154 Net additional homes provided
Figure 3a, b and c
H2(c) Net additional dwellings – in future years
NI 159 Supply of ready to develop housing sites
The Central Bedfordshire (North) housing trajectory sets out theCouncil’s estimated trajectory for future housing completions up to2026. The trajectory only consists of specific “committed” sites thatare available, are suitable and are achievable and therefore complywith the guidance in PPS3. The sites are either under construction,have planning permission but yet to start, sites awaiting completion ofSection 106 agreements, sites with outline permission or saved sitesallocated in the Local Plan. Projected housing delivery is largelybased on information received from developers on expectedcompletion rates and discussions with Development Management.
Target Post 2021 Target TotalPlan Start 01/04/2001 01/04/2021Plan End 31/03/2021 31/03/2026Number of Years 20 5 25Number of Yearsremaining in DP(c.)
11 5 16
(15 yeartrajectory +currentyear)
Dwelling Target(a)
14,230 3,720 17,950
Completions sinceplan start date (b)
5,984 0 5,984
Residual targetat end ofreporting year (a-b)/c
750
5 year supply4,421
n.b. total of 5 year supply in schedulespreadsheet 1 Apr 2011 to 31 Mar 2016 (thisdoes not include current year)
5 year target3,748
n.b. this is calcultated by taking the residualtarget taking into account completions todate and multiplying it by 5
NI 159 %achievable supply
118%
Years LandSupply
5.9
Figure 3a, b and cFigure 4: 15 year Housing Trajectory Graph
44
44
Appendix 5a: 15 year Housing Trajectory Data TableAppendix 5b: Detailed delivery - site justification for the trajectoryAppendix 5c: Trajectory Commentary
H2(d) Managed delivery target
Managed Delivery Targets are policy targets taking into account actual andplanned completions. The managed delivery target shows what ought to havebeen built in the year to achieve the strategic requirement.
Figure 4: 15 year Housing Trajectory Graph
The managed delivery target line on figure 4 stops at the end of the 5yr supply(2015/2016) as the line in future years becomes unrealistic.
45
Figure 3a: MKSM
Figure 3b: East of England
MKSM 01/02
02/03
03/04
04/05
05/06
06/07
07/08
08/09
09/10
10/11
11/12
12/13
13/14
14/15
15/16
16/17
17/18
18/19
19/20
20/21
21/22
22/23
23/24
24/25
25/26
H2a 55 38 125 41 70 6 12 15
H2b 3
H2c a) NetAdditions
57 179 179 384 369 346 290 240 50 50 160 160 160 160 160 150
b)Hectares
2 11 11 26 24 21 17 17 4 4 12 12 12 12 12 11
c) Target 162 162 162 162 162
H2d 260 281 292 306 295 283 270 265 274 386 721
East ofEngland
01/02
02/03
03/04
04/05
05/06
06/07
07/08
08/09
09/10
10/11
11/12
12/13
13/14
14/15
15/16
16/17
17/18
18/19
19/20
20/21
21/22
22/23
23/24
24/25
25/26
H2a 540 608 620 410 813 840 708 705
H2b 375
H2c a) NetAdditions
637 854 663 542 512 393 558 300 300 78 0 0 0 0 0 0
b)Hectares
22 22 25 23 27 25 33 24 24 6 0 0 0 0 0 0
c) Target 550 550 550 550 550
H2d 489 474 432 403 384 362 356 306 307 311 544
46
46
Figure 3c: Total
Total 01/02
02/03
03/04
04/05
05/06
06/07
07/08
08/09
09/10
10/11
11/12
12/13
13/14
14/15
15/16
16/17
17/18
18/19
19/20
20/21
21/22
22/23
23/24
24/25
25/26
H2a 595 646 745 451 883 846 720 720
H2b 378
H2c a) NetAdditions
694 1033 842 926 881 739 848 540 350 128 160 160 160 160 160 150
b)Hectares
24 33 36 49 51 46 50 41 28 10 12 12 12 12 12 11
c) Target 712 712 712 712
H2d 750 755 724 710 679 645 626 571 581 697 1265 965 1166 1502 2173 4185
47
Figure 4: 15 year Housing Trajectory
59
5
64
6
45
1
88
3 84
6
72
0
72
0
37
8
69
4
1,0
33
84
2
92
6 88
1
73
9
84
8
54
0
35
0
12
8
16
0
16
0
16
0
16
0
16
0
15
0
74
5
71
2
71
8
72
2
72
0
73
7
72
7
71
9
71
9
71
9
75
0
75
5 72
4
71
0 67
9 64
5
0
200
400
600
800
1,000
1,200
2001
/02
2002
/03
2003
/04
2004
/05
2005
/06
2006
/07
2007
/08
2008
/09
2009
/10
2010
/11
2011
/12
2012
/13
2013
/14
2014
/15
2015
/16
2016
/17
2017
/18
2018
/19
2019
/20
2020
/21
2021
/22
2022
/23
2023
/24
2024
/25
2025
/26
Dwellings Completed
Identified for completion (copied from Schedule)
Plan Target
Managed Delivery Target - Residual Target taking into account actual completions and expected supply
48
48
H3 New and converted dwellings – on previously developed land
H3 Total
MKSM Sub-Regional Strategy Gross 3
% Gross on PDL 75
East of England Plan Gross 267
% Gross on PDL 68.29
Total Gross 270
% Gross on PDL 68.35
H4 Net additional Pitches (Gypsy and Traveller)
H4 Permanent Transit Total
MKSM Sub-Regional Strategy 0 0 0
East of England Plan 0 0 0
Total 0 0 0
H5 Gross affordable housing completions
NI 155 Number of affordable homes delivered (gross)
H5 Socialrent
IntermediateShared
Ownership
SharedOwnership
Total
MKSM Sub-Regional Strategy 0 0 0 0
East of England Plan 44 31 9 84
Total 44 31 9 84
H6 Housing quality – Building for life assessments
This indicator is not currently reported and will be dealt with by DevelopmentManagement who are in the process of setting up procedures for monitoringthis indicator.
Affordable Housing
Local Plan Policy; H02
49
11.3 Local Indicators
Appendix 6
Local planning authorities in England are directed to ensure the best and mostefficient use of land when considering applications for new residentialdevelopment. PPS3 ‘Housing’ states that Local planning authorities may wishto set out a range of densities across their area, although 30 dwellings perhectare (net) should be used as a national indicative minimum to guidedecision making.
Net Density
Above 50 dwellings per hectare 11%
Less than 30 dwellings per hectare 16%
Between 30 and 50 dwellings per hectare 73%
Provision of varying housing, types and size.
Local Plan Policy; H04
The Council will expect the density of residential development on anysite within the District to respect the particular characteristics of the siteand its surroundings. In general, the Council would seek to encouragehigher density development where it would result in the effective andefficient use of land and contribute towards maximising opportunities forsustainable development, for example within or adjoining the towncentres and in locations well served by public transport.
Local Plan Policy; H05
50
50
The Council monitors the status of housing allocations HO8(1) – HO8(26A) ofthe Local Plan. Appendix 6.
11.4 Indicator/Policy Analysis
On the 6th July 2010 Regional Strategies were revoked by the Secretary ofState for Communities and Local Government and no longer form part of thedevelopment plan for the purposes of s38 (6) of the Planning and CompulsoryPurchase Act 2004. A successful High Court challenge was made against theGovernment resulting in Regional Strategies being re-established. It ishowever the Governments intention to abolish Regional Strategies in theLocalism Bill. Housing provision required in Central Bedfordshire North isbased upon Regional Strategies and on the growth targets and plan period asstated in the Adopted Core Strategy until 2026.
The net annual number of housing completions at the 31st March 2010 was378 which is substantially lower than completions in previous years. This fallin completions could be attributed to the current economic situation.
The trajectory demonstrates that a sufficient number of sites are available,suitable and achievable so as to ensure a 5 year land supply of housing. Thetotal delivery during the 5 year period (April 2011 – March 2016) is expectedto be 4,421 dwellings. 5,984 dwellings have been completed since thebeginning of 2001 which leaves a residual of 8,246 to build by 2021. Theannual requirement implied by MKSM and the East of England Plan is 712dwellings. The managed delivery target (residual) taking into account actualcompletions and expected completions is 750 dwellings. This results in a 5year requirement of 3,748. The authority has an identified supply that meets118% of the target or 5.9 years of land supply. There is an insufficienthousing supply after 2019 with a shortfall of 4,035 dwellings by 2026.
To meet the shortfall of 4,035 there are contingencies in place. The trajectorydoes not account for windfall development. Data from housing monitoringdemonstrates that since 2001 an average of 53% of the total housingdevelopment has been through windfall development. Allocated sites throughthe Site Allocations DPD once adopted will also add to the future supply ofhousing development.
This year’s trajectory differs from last years as it now goes up to 2026 tomatch the Adopted Core Strategy growth target.Developers have revised their estimates for when their developments are dueto be built by delaying the start date by a year or two.
Progress on Housing Allocations
Local Plan Policy; H08
51
Very large sites such as Wixams and Land East of Biggleswade are moreuncertain on start dates due to market conditions.
52
52
12.0 Environmental Quality
12.1 Contextual Indicators
Number of Sites of Special Scientific Interest (SSSIs): 14 (490.96 Ha)Excludes the part of Smithcombe, Sharpenhoe and Sundon Hills within CentralBedfordshire (North) which English Natureclass as Central Bedfordshire (South)
Number of County Wildlife Sites (CWS): 155Changes to CWS are summarized in the below table:
CWS Central GridRef
Change Date Area (ha)
Biggleswade AllotmentsMeadow TL205444 New Site 16/11/09 1.78
Watergate Meadow CWS SP981281 Deselected 16/11/09 -1.8
Number of Local Nature Reserves (LNR): 8 (154.89 Ha) Number of National Nature Reserves (NNR): 1 (8.08 Ha)
Number of Local Geological Sites (Previously Regionally ImportantGeological/Geomorphological Sites, RIGS): 10 (499.70 Ha) createdOctober 2007.
12.2 Core Output Indicators
E1 Number of planning permissions granted contrary to EnvironmentAgency advice on flooding and water quality grounds
NI 189 Flood and coastal erosion risk management
Reported by the Environment Agency
E2 Change in biodiversity importance
E2 (Ha) Loss Addition Total
MKSM Sub-RegionalStrategy
0 0 0
East of England Plan 1.8 1.78 -0.02
Total 1.8 1.78 -0.02
Data collection carried out covers the whole of the CentralBedfordshire area.
NI 197 Improved local biodiversity – active management of local sites
53
Sites in the Central Bedfordshire where positive conservationmanagement has been or is being implemented during the last fiveyears:
Revisedbaseline2007/08*
Originaltarget
Performance2008/09
Target2009/10
Performance2009/10
Target2010/11
33.1%87 out of263 sites
+20Sites
43.7%115 sites
+ afurther10 sites(44.5% -117sites)
54.75%144 sites
+ afurther10 sites(48.3%)
+27 sites.Targetexceeded
By March 2010 the target had been exceeded by 27 sites.
Procedures for calculating this indicator dictate that positiveconservation management must have occurred in the five yearsleading up to the reporting date.
It is proposed that targets remain as originally agreed. Final target forMarch 2011 would therefore be 48.3% or 127 of 263 sites
E3 Renewable energy generation
Within the monitoring period Central Bedfordshire (North) approvedapplications:
ApplicationNumber
Type Address Description Details
CB/09/05810/FULL Biomass Southill House,Southill Park,Southill,Biggleswade,SG18 9LL
Full: 'Alteration to oil tankstorage building andassociated works for theinstallation of a biomassboiler into the stable block,construction of brick builtraised planter in laundry yardand installation of oil tank(Revisions to approvedscheme MB/08/01937/FULLdated 08.12.2008)'
Granted07.12.09
CB/09/05811/LB Biomass Southill House,Southill Park,Southill,Biggleswade,SG18 9LL
Listed Building: 'Alteration tooil tank storage building andassociated works for theinstallation of a biomassboiler into the stable block,construction of brick builtraised planter in laundry yardand installation of oil tank
LBConsent07.12.09
54
54
(Revisions to approvedscheme MB/08/01937/FULLdated 08.12.2008)'
CB/09/06413/FULL Biomass 48B ShortmeadStreet,Biggleswade,SG18 0AP
Full: Installation of biomassboiler (retrospective)
Granted14.01.10
MB/09/00529/FULL Solar FulbrookSchool,WeathercockLane, WoburnSands, MiltonKeynes, MK178NP
Installation of a roof-mountedsolar photovoltaic (PV)system on top of the flat roofof the school, includingpanels and fixings
Granted28.05.09
CB/09/06373/NMA Solar SheffordBusiness Park,Clifton Road,Shefford
Revision to spread of unitswith solar energy. Approvedplanning application06/01451/OUT dated24/09/07.
Granted01.12.09
CB/09/06578/FULL Solar 1 HighlandsLodge,GravenhurstRoad, Campton,Shefford, SG175PQ
Full: Alteration of existingroof and photovoltaic solarpanels to front elevation
Granted05.01.10
CB/10/00289/FULL Solar 20 VictoriaClose,Wrestlingworth,Sandy, SG192EF
Full: Solar/photovoltaicpanels to rear and front roof,bin store to front of propertyand removal of chimneybreast
Granted29.03.10
CB/09/05810/FULL Biomass Southill House,Southill Park,Southill,Biggleswade,SG18 9LL
Full: 'Alteration to oil tankstorage building andassociated works for theinstallation of a biomassboiler into the stable block,construction of brick builtraised planter in laundry yardand installation of oil tank(Revisions to approvedscheme MB/08/01937/FULLdated 08.12.2008)'
Granted07.12.09
Awaiting clarification from DECC. Council's carbon footprint iscurrently being compiled.
Data comes from DECC with a two year lag. Most recent received inSeptember 2010 for 2008.Appendix 9
Level 1 reached.
NI 185 CO2 reduction from Local Authority operations
NI 186 Per capita reduction in CO2 emissions in the LA area
NI 188 Adapting to climate change
55
12.3 Local Indicators
One planning application was granted permission in a partial floodzone - 07/01383 parcel 7 Land South of Stotfold - a small part on thebottom edge of the site is in zones 2 and 3.
Developers must take full account of the impact of their proposals onsurface water drainage and infrastructure and incorporateappropriatecontrols as necessary. The Council will refuse proposals fordevelopmentthat would:(i) intensify the risk of flooding;(ii) be at an unacceptable risk of flooding;(iii) prejudice existing flood control and maintenance works; or(iv) adversely affect wildlife habitat in the floodplain.Planning applications may be required to include a levels survey oftheproposal site. Any compensatory works associated withdevelopment
Local Plan Policy; DPS17
Development likely to have an adverse impact upon the specialscientific interest of existing and proposed Sites of Special ScientificInterest, including National Nature Reserves, or upon the habitats whichsupport that Special Scientific Interest, will not be permitted unless thedevelopment can be subject to conditions and/or legal agreements thatwill prevent damaging impacts on wildlife habitats or important physicalfeatures, or if other material considerations are sufficient to overridenature conservation interests.
Local Plan Policy; NC2
Development proposals likely to have an adverse impact upon thenature conservation interest of a County Wildlife Site or Local NatureReserve will only be permitted where the need for the developmentclearly and demonstrably outweighs the nature conservation value ofthe site. If development is permitted that would damage features ofwildlife value, appropriate measures will be sought to mitigate theimpact and/or provide for appropriate replacement habitats or features.
Local Plan Policy; NC3
56
56
Local indicators NC2, NC3, EN2, EN3 and EN4 reported through coreindicators.
12.4 Significant Effects (Sustainability) Indicators
The percentage of new development incorporating water efficiencymeasures has not been monitored this year.
12.5 Indicator/Policy Analysis
There has been an addition of 1.06 hectares through the addition ofShillington Fields County Wildlife Site.
Further monitoring work will be conducted and reported in next yearsreport.
The Council will encourage schemes for the development of newelectricity generating capacity utilising renewable sources of energy.
Local Plan Policy; EN2
The Council will encourage the development of wind turbine generatorsas a source of renewable energy. The Council will need to be satisfiedthat development will not result in potential danger to the users ofnearby roads, railways or airfields, or have an unacceptable adverseimpact upon the character and appearance of the area or the amenitiesof neighbouring or nearby residential property.
Local Plan Policy; EN3
The Council will support proposals for the development of active solarsystems.
Local Plan Policy; EN4
57
13.0 Other Relevant Local Indicators
13.1 Contextual Indicators
Listed Buildings
Grade I 43 Grade II* 79 Grade II 1,284 Total 1,406
Conservation Areas
There are 39 conservation areas in Central Bedfordshire North
13.2 Local Indicators
PPS4 States that the AMR should be used to keep the followingmatters under review in order to inform consideration of the impact ofpolicies and planning obligations.
the network and hierarchy of centres (regional and local) the need for further development the vitality and viability of centres (at a local level)
No new sport and leisure facilities provided in this monitoring period No facilities permitted/built beyond settlement envelopes. Notreported in this monitoring period
To guide the provision of new sport and leisure facilities to appropriatelocations.
The number of new sport and leisure facilities provided. The number/type of facilities permitted/built beyondsettlement envelopes.
Local Plan Policy; SR2
The protection of existing recreational open space. The loss of any recreational open space and thecircumstances which may explain that loss
Local Plan Policy; SR4
58
58
No recreation open space was lost during the monitoring period.
New on site provision provided:Childrens Play:
- Maple Close/Oak Drive, Pulloxhill – LAP children’s play area andsurrounding OS (approx 0.025ha) - Goldfinch Drive, Sandy – LEAP children’s play area andsurrounding OS (approx 0.14ha)
£211,089.89 was secured via Section 106 agreements for open space New open space provided as a result of local initiative and localauthority grant funding.
Outdoor Sport:- Biggleswade: refurbishment of outdoor and indoor sportingfacilities funded by CBC grant and S106 monies.
Playbuilder Grant: Children’s Play :The following sites benefitted from new or additional play facilities fundedby the Government’s Playbuilder grant fund:
- Sandy: provision of new play facilities at Bedford Road recreationground- Marston Moretaine: provision of new play facilities at Manor Roadplay area.- Biggleswade: creation of new play area at Chambers Wayrecreation ground.- Flitwick: provision of new play facilities at Hatfield Crescent playarea, and at Hinksley Road play area.- Henlow: provision of new play facilities at Baulk Wood
The improvement of existing play areas and open spaces, astargeted by the Open Space Strategy.
To ensure new recreational open space is provided to keep pace withthe demands of new residential development.
New on-site provision (by Ha and type of facility) for:Children’s Play, Outdoor Sport and Informal use. Financial contributions agreed toward off-site provision ofthe same categories of open space. New open space provided as a result of local initiative andlocal authority grant funding. The improvement of existing play areas and open spaces,as targeted by the Open Space Strategy.
Local Plan Policy; SR5
59
Outdoor Sport:- Biggleswade: refurbishment of outdoor and indoor sporting facilitiesfunded by CBC grant and S106 monies.
Children’s Play/Sport:- Flitwick: part-funding of new skate park agreed, from CBC grant.
The following facilities were created or improved using S106contributions secured as targeted by the Open Space Strategy:
Arlesey: improvements to High Street recreation ground play andsporting facilities.
Biggleswade: improvements to the Fairfield recreation ground.
Lidlington: new sporting facility created at Hurst Grove recreationground.
Marston: improvements to the sport pavilion at Bedford Roadrecreation ground.
Sandy: new play and sporting facilities provided at Bedford Roadrecreation ground, and improvements to play facilities at SunderlandRoad recreation ground.
Tempsford: new play and sport facilities provided.
No extinguishment orders
4 diversion orders 40m of new public path provided as a result of development andnone stopped up. 1305m of new public paths provided as a result of country-sidemanagement projects and none stopped up.
The retention and enhancement of the public rights of way network The number of public rights of way extinguishment anddiversion orders agreed during the year The length of new public rights of way provided and lost as aresult of development during the year The length of new public rights of way provided and lost as aresult of country-side management projects during the year
Local Plan Policy; SR6
60
60
No listed building were demolished during the monitoring period 35 buildings are at risk. (Buildings at risk register updated 2008.)
There are currently no Conservation areas under or scheduled forreview during 2010/2011.
During 1st April 2009 to 18th November 2009 no new conservationareas approved
2 Tree preservation Orders (TPOs) were made between 1st April2009 and 18th November 2009
Maintain an up to date record of designated conservation areas. Number of conservation area reviews Conservation Area programme for 2010/2011
Local Plan Policy; CHE9
Control/restrict the demolition of Listed Buildings: Number of listed buildings demolished Number of buildings at risk
Local Plan Policy; SR6
The consideration of and allocation of Conservation Areas at specifiedlocations
New Conservation areas approved
Local Plan Policy; CHE10
Protection of District’s character. Number of Tree Preservation Orders (TPOs) served.
Local Plan Policy; DPS16
61
14.0 Other relevant significant effects indicators
12 travel plans were completed during 2009/2010
Indicator: The number of new Travel Plans completed in the District.Target: Increase travel to work/ school by means other than the privatecar.
Significant Effects – Travel Plans
62
62
15.0 Conclusions and future development of the LDFAMR
15.1 LDS Implementation
The LDS Third Revision was formally submitted to the GovernmentOffice by 31st December 2008 and was brought into effect by virtue ofRegulation 11(3) on the 16th January 2009.
Progress towards the implementation of the Local DevelopmentScheme:
The Core Strategy and Development Management Policies DPDwas successfully adopted in November 2009 in accordance with theLDS timetable.
The Site Allocations DPD is on target in relation to the delivery ofthe key milestones outlined in the LDS.
Gypsy & Traveller DPD is not on target in relation to the delivery ofthe key milestones outlined in the LDS.
15.2 Core Indicator Analysis
This AMR has been able to provide the information required forfourteen out of the sixteen revised national core indicators areas.
CoreIndicator
Monitored
BD1 Total amount of additional employment floorspace - by type Yes
BD2 Total amount of employment floorspace on previously developedland - by type Yes
BD3 Employment land available - by type Yes
BD4 Total amount of floorspace for 'town centre uses' No
H1 Plan period and housing targets Yes
H2(a) Net additional dwellings - in previous years Yes
H2(b) Net additional dwellings for the reporting year Yes
H2(c) Net additional dwellings - in future years Yes
H2(d) Managed delivery target Yes
H3 New and converted dwellings - on previously developed land Yes
H4 Net additional pitches (Gypsy and Traveller) Yes
H5 Gross affordable housing completions Yes
H6 Housing quality - Building for Life Assessments No
E1 Number of planning permissions granted contrary to EA advice onflooding and water quality grounds
Reported byEnvironment
Agency.
E2 Change in areas of biodiversity Yes
E3 Renewable energy generation Yes
63
Monitoring arrangements are being developed with partners in order to ensurethat the data is available for next years AMR.
15.3 Key Core Indicator findings
This monitoring report is reporting on both Local Plan and CoreStrategy and Development Management DPD.
Local Plan policies were in effect during the monitoring period from 1st
April to 18th November 2009.
The Core Strategy and Development Management Policies DPD wasadopted 19th November 2009 and therefore these policies and thosesaved from the Local Plan have been monitored for the period 19th
November 2009 to 31st March 2010.
The main monitoring results are:
There has been a net addition of 8480sqm of B1-B8 employmentfloor space across the whole of Central Bedfordshire (North) over theperiod April 2009 to March 2010. This is compared to a loss of834sqm during 2008/2009.
90.96% of B1-B8 employment completions were on previouslydeveloped land (PDL)
There is still a sufficient amount of allocated B1-B8 employmentland that has yet to come forward for development. The majority ofthis allocated employment land, is concentrated in the A1 corridor atSandy and Biggleswade.
Housing provision required in Central Bedfordshire North is basedupon Regional Strategies and on the growth targets and plan periodas stated in the Adopted Core Strategy until 2026.The Adopted Core Strategy delivery:
14,230 new homes between 2001 – 20213,720 new homes between 2021 – 202617,950 total new homes 2001 – 2026
The net annual number of housing completions at the 31st March2010 was 378 which is substantially lower than completions inprevious years. This fall in completions could be attributed to thecurrent economic situation.
The trajectory demonstrates that a sufficient number of sites areavailable, suitable and achievable so as to ensure a 5 year landsupply of housing. The total delivery during the 5 year period (April2011 – March 2016) is expected to be 4,421 dwellings.
64
64
5,984 dwellings have been completed since the beginning of 2001which leaves a residual of 8,246 to build by 2021. The annualrequirement implied by Plan targets is 712 dwellings. The manageddelivery target (residual) taking into account actual completions andexpected completions is 750 dwellings. This results in a 5 yearrequirement of 3,748.
The authority has an identified supply that meets 118% of thetarget or 5.9 years of land supply. There is an insufficient housingsupply after 2019 with a shortfall of 4,035 dwellings by 2026.
Contingencies are in place to meet the shortfall of 4,035.
68.35% of housing completions were on previously developed land.
The Council has endeavored to develop monitoring systems for allindicators and policies however in some cases the information is stillincomplete whilst monitoring mechanisms are being implemented orupdated. Progress as to their inclusion in next years AMR will behighlighted in the report.
65
Appendices
66
66
Appendix 1: List of Superseded Local Plan Policies
Certain policies of the Mid Bedfordshire Local Plan (adopted December 2005)were saved1 by the Secretary of State on 23rd September 2008 and continueto be part of the development plan until the Council indicates that they aresuperseded by policies in Development Plan Documents in the LocalDevelopment Framework.
The table below sets out the saved policies from the adopted Local Plan thatare superseded by this Core Strategy and Development Management PoliciesDPD, and thus are no longer part of the development plan for CentralBedfordshire.
Saved LocalPlan Policy
CoreStrategy/Development
Management Policy thatsupersedes Saved Local
Plan Policy
Description
LPS1A CS1 New Settlement at Elstow
LPS1 CS1 Selected Settlements
LPS2 CS1 Large Villages
LPS3 CS1 Small Villages
LPS4 DM4 Settlement Envelopes
CS1 CS16, DM14 Landscape
CS3 CS16, DM14 Areas of Great Landscape Value
CS5 CS16 Marston Vale Community Forest
CS7 CS17 Countryside Management Projects
CS10 CS11DM12
Farm Diversification
CS15 CS11, DM3, DM12 Re-use of Rural Buildings (commercial)
CS17 DM12 Agricultural PD Rights
CS18 DM3 Re-use of Rural Buildings (residential)
CS19 DM4 Development in the Countryside
CS22 DM4 Re-building of Dwellings in theCountryside
CS23 DM18 Horse Related Development (Domestic)
CS24 DM18 Horse Related Development(Commercial)
CS25 DM12 Retailing in the Countryside
CS26 CS12 Outdoor Markets
CS27 DM4 Garden Extensions
NC3 CS18 CWSs & LNRs
NC8 CS17, CS18 Protection of Undesignated Sites
GBT3 DM6 Infill Development in Green Belt
1 Under Schedule 8, paragraph 1(3) of the Planning and Compulsory Purchase Act2004
67
CHE8 CS15 Historic Parks & Gardens
CHE11 CS15, DM13 New Development in ConservationAreas
CHE13 CS15 Retention of Unlisted Buildings
A1 CS15 Ancient Monuments
A2 CS15 Site Evaluations
DPS5 DM3 Protection of Amenity
DPS6 DM3 Criteria for Extensions
DPS9 CS2, CS3 Open Space for New Dwellings
DPS10 CS3, CS4 Highways Provision for NewDevelopments
DPS11 CS17, DM3, DM14 Landscaping for New Developments
DPS12 DM3 Character of Village Ends
DPS16 CS16, DM14 Trees and Hedgerows
DPS17 DM2 Surface Water Drainage
DPS18 CS2 Sewerage Infrastructure
DPS19 CS2, DM9 Public Transport/ Cycling
DPS20 CS13, DM1 Energy Conservation
DPS20A DM3 Management of Development Waste
DPS23 CS14, DM3 Crime Prevention
DPS26 DM3 Temporary Buildings
DPS27 CS2, DM3 Public Art
EN2 CS13, DM1 Renewable Energy
EN3 CS13, DM1 Wind Turbines
EN4 CS13, DM1 Solar Energy
PHS3 CS13, DM3 Limiting Emissions
PHS5 DM3 Light Pollution
SR2 CS3 Sport & Leisure Facilities
SR5 CS3, DM17 Provision of Recreational Open Space
SR6 CS17 Rights of Way
SR8 CS17, DM16DM17
Sport & Leisure Facilities in theCountryside
HO2 CS7 Affordable Housing
HO3 CS8 Rural Exceptions Sites
HO4 DM10 Housing Mix
HO5 DM3 Housing Density
HO6 CS1, CS5 Location of New ResidentialDevelopment
HO9 DM10 Impaired Mobility Dwellings
EMP2A CS11, DM12 Rural Workshops
EMP3 DM3 Protection of Amenity
EMP6A CS11, DM12 Commercial Uses in the Countryside
EMP7 CS11 Small Scale Tourist Development
EMP9 CS11, DM11 Major Tourist Related Development
EMP10 DM11 Higher Education and ResearchFacilities
EMP11 DM3 Aviation Development
TCS2 CS12, DM7 Retail Development
TCS9 DM7 A3 Uses in town & village centres
68
68
TCS10 DM7 Residential Uses in Town Centres
TCS11 DM7 Office Uses in Town Centres
TCS12 DM7 Leisure and Cultural Facilities
TCS13 CS4 Off-Street Car Parking
TCS14 CS4 Town Centre Car Parking
TCS15 DM3 Shopfronts
TCS16 DM8 Village Shops & Local Retail Centres
TCS17 DM8 Last Public House
TP1A DM9 Travel Assessments
TP1 CS4 Access for Cyclists & Pedestrians
TP4 CS4 Biggleswade-Sandy Cyclepath
TP5 CS4 Public Transport Provision
TP6 CS4 East-West Rail Link
TP7 CS4 Env. Impact of Rail Freight
69
Appendix 2: List of Saved Local Plan Policies notSuperseded
The policies listed below have not been superseded by the Core Strategy andDevelopment Management Policies DPD, and continue to be part of thedevelopment plan.
CS21 Important Countryside Gaps
GBT5 Safeguarded or White Land
DPS15 Important Open Space
H08(1) Land East of Lidlington
H08(2) Land at Stewartby (Houghton Conquest Parish)
H08(2A) Land at High Street, Houghton Conquest
H08(3A) Land East of Bedford Road, Marston Moretaine
H08(4) Land for Elstow New Settlement
H08(5) Land Adjacent to Swaffield Close, Ampthill
H08(6A) Land at Tavistock Avenue, Ampthill
H08(8) Land East of Biggleswade
H08(10) Land South of Stotfold
H08(11) Land at Queen Street, Stotfold
H08(12) Fairfield Hospital, Stotfold
H08(13A) Land West of High Street, South of Cricketers Road, Arlesey
H08(14A) Land at Garfield Farm, Langford
H08(15A) Land to the East of the Dairy, Henlow
H08(19) Shefford Town Football Club
H08(22A) Land East of the Woodlands Estate, Greenfield
H08(25A) Land to the Rear of Braybrooks Drive, Potton
H08(26) College Farm, Silsoe
H08(26A) Home Farm, Cranfield
H010,H011
Travelling Showpeople
H012 Gypsies
EMP1 Land Supply and the Need for Further B1, B2 and B8 EmploymentLand
EMP4(1) Stratton Business Park, London Road, Biggleswade
EMP4(2) Land North of Sunderland Road, Sandy
EMP4(3) Land West of A1, Girtford Underpass, Sandy
EMP4(4) Land at Arlesey Brickworks, Arlesey
EMP4(6) Cranfield Technology Park
EMP4(10A) Land Adjoining 29 Clophill Road, Maulden
EMP12 Local Airfields and Airstrips
TCS4,TCS5
Biggleswade – Land at Bonds Lane
TCS7 Flitwick – Robsons Depot and Land off Steppingley Road
TCS8 Biggleswade – Land at London Road
70
70
Appendix 3: CSDM Policy Monitoring
The monitoring table below shows how the CSDM policies willl be monitored through relevant strategic objectives, targetsand indicators.
Policy StrategicObjective(Table 1 in
CSDM)
Outputindicator
type
Indicator Target MonitoringStatus
Council Vision Realising the area’s economic potential to be: globally connected, deliver sustainable growth, ensuring a green, prosperous and ambitious place.... for the benefit of all.
Council Priorities Creating safer communities Educating, protecting and providing opportunities for children and young people Managing growth effectively Supporting and caring for an ageing population Promoting healthier lifestyles.
Council Values Respect and Empowerment – we will treat people as individuals who matter to us Stewardship and Efficiency – we will make the best use of the resources available to us Results Focused – we will focus on the outcomes that make a difference to people’s lives; and Collaborative – we will work closely with our colleagues, partners and customers to deliver on these outcomes.
CS1:DevelopmentStrategy
1234
Refer to policies CS3,CS4, CS5, CS6,CS9,CS10, CS12
71
CS2: DeveloperContributions
Planning Obligations 36
Local
Local
Local
Local
Local
Local
CS2(i) money that hasbeen received andavailable for spending.
CS2(ii) money that hasbeen spent.
CS2(iii) money that hasbeen transferred to otherparties.
CS2(iv) performancereports to show value ofagreementssigned/payments.received/money spent andbalance at end of quarter.
CS2(v) breakdown of allpayments received andexpenditure.
CS2(vi) receipt andexpenditure againstobligation type.
Refer to mainreport for allPlanningObligationmonitoring
CS3:Healthy andSustainableCommunities
The Council will ensure thatappropriate infrastructure is providedfor existing and growing communitiesby:Safeguarding existing community,education, open space, recreation,
36
Local
Local
CS3(i) The number of newsport and leisure facilitiesprovided
CS3(ii) The number/type offacilities permitted/built
Refer to mainreport
Refer to mainreport
72
72
sports, play and health facilities.Supporting in principle, the upgradingof community, education, open space,recreation, sports, play and healthfacilities.Identifying appropriate sites for newfacilities to meet identified needs andshortfalls in accessible locations thatare well served by sustainable modesof transport. All new facilities shouldmeet the needs of the entirecommunity, particularly sociallyexcluded groups, facilitating multi-usefacilities where possible.Directing development, within thecontext of the development strategyand settlement hierarchy, to locationswhere developer contributions canfacilitate a solution or where additionaldevelopment could achieve a criticalmass to make a solution viable.Approving new development whichprovides new recreational and sportsfacilities and open space which meetsthe requirements of the PlanningObligations Strategy and the standardsset out in the Standards from the MidBedfordshire Open Space, Sports andRecreation Needs AssessmentTechnical Report 2008. Annex E inCSDM.
Local
Local
Local
beyond settlementenvelopes
CS3(iii) The loss of anyrecreational open spaceand the circumstanceswhich may explain thatloss.
CS3(iv) Monitoring ofStandards for OpenSpace:
CS3(v) Country Parks.Number of Green Flagawards.
Refer to mainreport
Currently notmonitored butwill beaddressedthrough theCentralBedfordshireROSS
None in thearea.
73
Policy CS4:LinkingCommunities –Accessibility andtransport
The Council will seek to facilitate thedelivery of strategic transportationschemes identified in the LocalTransport Plan and other strategies:road improvementsrail improvementsNational Cycle Network routes
The Council will seek to maximise thecapacity of the existing transportnetwork. Where such capacity isinsufficient, the provision of newtransport and travel infrastructure willbe sought as a priority. In the case ofnew development, such provision willbe sought in parallel or beforecommencement.
The Council will focus newdevelopment in locations, which due totheir convenient access to localfacilities and public transport, promotesustainable travel patterns.Development will be expected tocontribute towards new facilities andservices that support sustainable travelpatterns.
When allocating land for development,priority will be given to developmentschemes that:make best use of the existing public
37
Local
Local
Local
Significanteffects
CS4(i) Percentage of newresidential developmentwithin 30 minutes publictransport time of GP,hospital, primary andsecondary school,employment and a majorhealth centre New on siteprovision (by hectare andtype of facility) forchildren’s play space,outdoor sport and informaluse
CS4(ii) Kilometres of cycleroute completed in thedistrict
CS4(iii) Length of newpublic rights of wayprovided/lost as a result ofdevelopment or otherprojects
Number of new travelplans completed
To increasetravel towork/schoolby meansother thanprivate car
Monitoringmechanismsto beimplemented
Not Reported
Reported inmain report
Reported inmain report
74
74
transport services and provide clearopportunities for improving andsustaining the viability of thoseservices;ensure convenient access for walkingand cycling to local facilities andemployment, linking to and helping todeliver the Council’s Cycle andWalking Strategy and the GreenInfrastructure Plan;develop innovative and adaptableapproaches to public transport in ruralareas of the district; andmake appropriate parking provision, interms of both the number of spacesand their location, given the need toboth encourage sustainable travelpatterns and avoid creating congestioncaused by excessive on-street parking.
National NI 175 Access to servicesand facilities by publictransport, walking andcycling may also be usefulin monitoring accessibility.
Nodevelopmentsof 50+dwellings
Policy CS5:Providing Homes
The Council will make provision fornew housing sites sufficient to ensurethe delivery of at least 17,950 newhomes between 2001-2026. In additionto delivering the existing committedsites, new sites will be allocated toprovide for a minimum of 5000 newdwellings up to 2026. The distributionof this growth will be in line with thetable below. Specific sites for housingprovision will be established throughthe Site Allocations DPD and the
14
Core
Core
Core
Core
H1 Plan period andhousing targets
H2(a) Net additionaldwellings – in previousyears
H2(b) Net additionaldwellings –for the reportingyear
H2(c) Net additional
2001-202617,790 newhomes
Reported inmain report
Reported inmain report
Reported inmain report
Reported in
75
phasing of housing development willbe governed by Policy CS6.
Core
Core
Local
Local
Local
Local
dwellings – in future years
H3 New and converteddwellings – on previouslydeveloped land
H4 Net Additional Pitches(Gypsy and Traveller)
CS5(i) Dwelling density perhectare
CS5(ii)Completion ofdevelopment onallocations
CS5(iii) Percentage ofdevelopment bysettlement/area to bedelivered through the SiteAllocations DPD
G&T(i) The levels ofvacancy on permanent
60%development to be onpreviouslydevelopedland
main report
Reported inmain report
Reported inmain report
Reported inmain report
Awaitingadoption ofSAAppendix 7For saved LPallocations
Awaitingadoption ofSA
Monitoringmechanisms
76
76
Local
Local
Local
SignificantEffects
National
National
Gypsy and Traveller sites
G&T(ii) The levels ofvacancy on TravellingShowpeople sites
G&T(iii) The number ofillegal encampments andenforcement action carriedout
G&T(iv) The number ofapplications by Gypsiesand Travellers andTravelling Showpeopleapproved and refused.
Percentage of newdevelopment incorporatingwater efficiency measures
NI 154 Net additionalhomes provided
NI 159 Supply of ready todevelop housing sites
to beimplemented
Monitoringmechanismsto beimplemented
Monitoringmechanismsto beimplemented
Monitoringmechanismsto beimplemented
Monitoringmechanismsto beimplemented
Monitoredthrough H2(b)
Monitoredthrough H2(b)
Policy CS6:Delivery and
The Council will maintain a 5-yearhousing land supply in accordance
1 Core H2(d) Managed deliverytarget
Reported inmain report
77
Timing ofHousingProvision
with PPS3. The Annual MonitoringReport will be used to identify therequired rate of housing delivery forthe following 5-year period, based onthe remaining dwellings needed tomeet overall requirements. Tomaintain the 5-year supply, sitesidentified in the Site Allocations DPDwill be added in line with the priorityorder to be set out in the SiteAllocations DPD.
Policy CS7:AffordableHousing
New housing development for 4 ormore dwellings should provide anelement of affordable housing. Sites of4 dwellings should include oneaffordable dwelling. On all otherqualifying sites, 35% or more unitsshould be affordable.
The Council’s preference is fordevelopers to provide fully servicedland on site, at no cost to theaffordable housing provider. Use ofalternative mechanisms should be fullyjustified with evidence that this wouldnot prejudice the level of delivery ofaffordable homes. A mix of tenures willbe required, in accordance with figuresset out in a Supplementary PlanningDocument. Affordable housing shouldbe constructed and designed to the
8 Core H5 Gross affordablehousing completions
Newhousingdevelopment for 4 ormoredwellingsshouldprovide anelement ofaffordablehousing.Sites of 4dwellingsshouldinclude oneaffordabledwelling. Onall otherqualifyingsites, 35%
Reported inmain report.Monitoringmechanismsto beimplementedin relation tomonitoring theaffordablehousingtarget.
78
78
same standard as market housing andshould be fully integrated into thedevelopment. Within large housingdevelopments, the affordable housingwill be scattered through thedevelopment, or in small clusters.
Where a site has been divided andbrought forward in phases, the Councilwill consider the site as a whole for thepurposes of calculating the appropriatelevel of affordable housing provision.
In exceptional circumstances andwhere robustly justified, commutedsums may be considered to achieveoff-site provision of affordable housing.
Provision of fewer affordable homesmay exceptionally be considered onsites only if the applicant producesevidence to demonstrate that toprovide the full amount would makethe scheme unviable.
National NI 155 Number ofaffordable homes delivered(gross)
or moreunits shouldbeaffordable.
Monitoredthrough H5
Policy CS8:ExceptionsSchemes
The Council will support proposals for100% affordable housing designed tomeet local housing needs adjacent tothe defined Settlement Envelopesprovided that:the local need is demonstrated;the scheme is viable;
8 Local CS8(i) No of exceptionschemes approved.
Constructedbeyond thesettlementenvelopeand provide100%affordable
Monitoringmechanismsto beimplemented
79
the scheme will remain available inperpetuity to local people whodemonstrate a need for affordableaccommodation;the design and location of the schemerelates well to the built up area of thesettlement;the mix of size and tenure will relate tothe needs identified in that area.
housing.
Policy CS9:Providing Jobs
The Council will plan for a minimumtarget of 17,000 net additional jobs inthe district for the period 2001-2026.
In support of this target, approximately77 hectares of net additional B1-B8employment land will be identified forthe remainder of the period 2010-2026. Land will be allocated throughthe Site Allocations DPD which willidentify whether phasing is required.The AMR will inform when sites shouldbe released to ensure a sufficientrange, quantity and quality of land isavailable to cater for all employmentsectors or, identify where there is ademand that cannot be met byavailable sites.
19
Core
Core
Core
Local
Local
BD1 Total amount ofadditional employmentfloorspace – by type
BD2 Total amount ofemployment floorspace onpreviously developed land– by type
BD3 Employment landavailable – by type
CS9(i) Number of jobscreated – Annual BusinessIndex
CS9(ii) Amount ofemployment land lost toresidential development
17,000 newjobs
Ratio of jobsto homes1:1
Reported inmain report
Reported inmain report
Reported inmain report
Monitoringmechanismsto beimplemented
Policy CS10:Location of
The Council will safeguard for futureemployment use the Key Employment
49
Local CS10(i) Completion ofdevelopment on
Awaitingadoption of
80
80
Employment Sites Sites pending review by the SiteAllocations DPD.
Where sites are identified as ‘not fit forpurpose’ in the ELR but are insustainable locations, the Council willsupport mixed use schemes to helpimprove the balance of homes andjobs locally. Developments proposingsmall flexible units will be encouraged.However, where these sites are stilloccupied in part by existing users whowould be displaced by redevelopment,alternative employment land will needto be available in the locality to allowthem to relocate prior toredevelopment
There will be a flexible approach tosafeguarded sites which have beenunderperforming. The Council willsupport the employment generatingredevelopment of these sites allowingfor appropriate non B1 to B8 uses thatprovide for additional job creation.More efficient use and redevelopmentof these sites for employment will besupported and encouraged.
Sites will be allocated in sustainablelocations close to major transportroutes that will include a mix of type
Local
allocations
CS10(ii) Percentage ofdevelopment bysettlement/area to bedelivered through the SiteAllocations DPD
SA
Awaitingadoption ofSA
81
and scale of premises, allowing foremployment uses to fill anyacknowledged gaps in the employmentmarket or to meet demand for aparticular use.Support will be given to thegrowth/intensification of employmentuses at Cranfield University andTechnology Park, Shuttleworth Collegeand Millbrook Proving Ground. Thegrowth of these sites will be subject toDevelopment Management PolicyDM11.
The broad level of employmentprovision to be allocated at the mainsettlements and growth areas isoutlined below
Policy CS11:Rural Economyand Tourism
The Council will seek to support therural economy and promote tourismby:Safeguarding rural employment sitesin the district unless it can clearly bedemonstrated that they are unfit forpurpose and unable to be redevelopedfor employment use.Supporting diversification of the ruraleconomy and the conversion ofredundant properties to commercial,industrial, tourism and recreationaluses in the first instance.
9 Local
Local
Local
CS11(i) Number ofredundant buildingsoutside the settlementenvelope reused foremployment purposes.
CS11(ii) Number ofagricultural buildingsconverted to residentialuse.
CS11(iii) Number ofconversions to
Monitoringmechanismsto beimplemented
Monitoringmechanismsto beimplemented
Monitoringmechanisms
82
82
Providing for new small-scaleemployment allocations in the ruralarea where appropriate and there isdemand locally.Supporting diversification of redundanthorticultural or farm buildings insettlements or in the countryside foremployment purposes.Supporting proposals for tourist orleisure developments in settlements orin the countryside including new touristaccommodation which providesopportunities for rural diversificationand are well located to support localservices, businesses and other touristattractions.
Local
Local
employment use in ruralareas
CS11(iv) Number of ruralemployment sites lost toother uses
CS11(v) Number ofpermissions for touristrelated development
to beimplemented
Monitoringmechanismsto beimplemented
Monitoringmechanismsto beimplemented
Policy CS12:Town Centres andRetailing
The Council will support andencourage new retail and serviceprovision that provides for moresustainable communities.
In Major Service Centres, town centreboundaries will be established, withinwhich new retail and service provisionshould be focused. Development willbe assessed against the sequentialapproach in PPS6.In Minor Service Centres, additionalretail provision that meets the needs ofthat centre and that consolidates andenhances existing retail provision will
9 Core
Local
Local
BD4 Total amount offloorspace for ‘towncentres uses’
CS12(i) Additional retailprovision provided/lostwithin Minor ServiceCentres
CS12(ii) Number of localshops, facilities andservices provided/lost
Reported inmain report
Monitoringmechanismsto beimplemented
Monitoringmechanismsto beimplemented
83
be supported. Specific opportunitieswill be identified at Stotfold andArlesey to create new local shoppingfacilities.In Villages, important retail and othercommunity facilities will be retainedand additional local provisionsupported.
CS13: ClimateChange
35
Core
Core
National
National
National
National
E1 Number of planningpermissions grantedcontrary to EnvironmentAgency advice on floodingand water quality grounds
E3 Renewable energy
NI 189 Flood and coastalerosion risk management
185 CO2 reduction fromLocal Authority operations
NI 186 Per capita reductionin CO2 emissions in the LAarea
NI 188 Adapting to climatechange
Reported inmain report
Reported inmain report
Reported byEnvironmentAgency
Reported inmain report
Reported inmain report
Reported inmain report
Policy CS14: High The council will require development to 10
84
84
QualityDevelopment
be of the highest quality by:Respecting local context, the variedcharacter and the local distinctivenessof Mid Bedfordshire’s places, spacesand buildings in design and employs arange of urban design tools includingurban design frameworks, designbriefs and design codes to fulfil thisundertaking;Focusing on the quality of buildingsindividually and collectively to createan attractive, accessible, mixed usepublic realm;Ensuring it is accessible to all; andReducing the opportunities for crimeand anti-social behaviour andenhancing community safety
Policy CS15:Heritage
The Council will:Protect, conserve and enhance thedistrict’s heritage including its ListedBuildings, Scheduled AncientMonuments, Conservation Areas,Registered Parks and Gardens andarchaeology and their setting.Conserve and where appropriateenhance the quality and integrity of thelocal built and natural environment,including historic structures or opengreen spaces considered to be ofspecial local interest.Designate and keep under review
10 Local CS15(i) The number oflisted buildings removed oradded from/to the statutorylist or at risk
CS15(ii) The number andlocation of new andreviewed ConservationAreas
CS15(iii) Number ofapplications refused
Reducenumber ofbuildings atrisk
Review ofConservation Areas inline withServicePlan
Reported inmain report
None
Monitoringmechanisms
85
Conservation Areas in order to protector enhance their special architecturalor historic interest. This will includethe implementation of an on-goingprogramme of Conservation AreaCharacter Appraisals to include areview of their special interest andboundaries.Monitor and survey the condition ofListed Buildings and periodicallyreview and update a Register ofBuildings at Risk, providingappropriate grant assistance toencourage their essential sympatheticrepair.
because they do not meetone or more of the abovecriteria and numberallowed on appeal
to beimplemented
Policy CS16:Landscape andWoodland
The Council will:Protect, conserve and enhance theChilterns Area of Outstanding NaturalBeauty;Conserve and enhance the variedcountryside character and localdistinctiveness in accordance with thefindings of the Mid BedfordshireLandscape Character Assessment;Resist development where it will havean adverse effect on importantlandscape features or highly sensitivelandscapes;Require development to enhancelandscapes of lesser quality inaccordance with the Landscape
11 Local
Local
Local
(CS16 (i) Planningapplications within theAONB
(CS16 (ii) Creation of theForest of Marston Vale.
(CS16 (iii) Number of TreePreservation Orders(TPOs)
30%woodlandcover in theforest areasby 2030
Monitoringmechanismsto beimplemented
Monitoringmechanismsto beimplemented
2 TPOs made
86
86
Character Assessment;Continue to support the creation of theForest of Marston Vale recognising theneed to regenerate theenvironmentally damaged landscapethrough woodland creation to achievethe target of 30% woodland cover inthe Forest area by 2030;Conserve woodlands including ancientand semi-natural woodland,hedgerows and veteran trees; andPromote an increase in tree coveroutside of the Forest of Marston Vale,where it would not threaten othervaluable habitats.
Policy CS17:GreenInfrastructure
The Council will:Seek a net gain in green infrastructurethrough the protection andenhancement of assets and provisionof new green spaces as set out in theStrategic, Mid Bedfordshire and ParishGreen Infrastructure Plans.Take forward priority areas for theprovision of new green infrastructure inthe Forest of Marston Vale (includingthe Bedford and Milton KeynesWaterway), the Ivel Valley, theGreensand Ridge, the Flit Valley andthe Chilterns.Require new development tocontribute towards the delivery of new
11 Local
Local
Local
CS17(i) Green spaceswithin developmentenvelopes (hectares)lost/developed
CS17(ii) Net loss/gain ofaccessible greenspace
Refer to CS12 – PlanningObligation contributions
Net gain ingreeninfrastructure provision
Monitoringmechanismsto beimplemented
Monitoringmechanismsto beimplemented
87
green infrastructure and themanagement of a linked network ofnew and enhanced open spaces andcorridors.
Development that would fragment orprejudice the green infrastructurenetwork will not be permitted.
Policy CS18:Biodiversity andGeologicalConservation
The Council will:Support the designation, management,and protection of biodiversity andgeology including nationaldesignations (SSSI’s), locallyimportant County Wildlife Sites(CWS’s) and Regionally ImportantGeological and GeomorphologicalSites (RIGGS); as well as those localpriority habitats and species identifiedin the Local Biodiversity Action Plan.Support the maintenance andenhancement of habitats, identifyopportunities to create buffer zonesand restore and repair fragmented andisolated habitats to form biodiversitynetworks.
Development that would fragment orprejudice the biodiversity network willnot be permitted.
11 Core
Local
National
CS18(i) E2 Change inareas of biodiversityimportance
CS18(ii) Area of Sites ofSpecial Scientific Interestin favourable condition
NI197 Improved localbiodiversity – activemanagement of local sites
Reported inmain report
Reported inmain report
Reported inmain report
Policy DM1: The Council will consider favourably 3 See policy CS13
88
88
RenewableEnergy
proposals for renewable energyinstallations. Proposals should satisfythe following criteria:Have good accessibility to thetransport network;Not be harmful to residential amenity ,including noise and visual amenity;Be located and designed so as not tocompromise the landscape and scenicbeauty of the Chilterns AONB;In other areas identified through theLandscape Character Assessment ashaving high sensitivity, be located anddesigned so as to respect thecharacter of the landscape.
Proposals for all new development ofmore than 10 dwellings or 1,000square metres of non-residentialbuildings should contribute torenewable energy targets byincorporating on-site or near-siterenewable or low carbon technologyenergy generation. Developmentsshould achieve 10% or more of theirown energy requirements throughsuch sources, unless it can bedemonstrated that this would beimpracticable or unviable.
Policy DM2:Sustainable
All proposals for new developmentshould contribute towards sustainable
35
Local BREEAM Monitoringmechanisms
89
Construction ofNew Buildings
building principles. Where theminimum standards are not met,evidence will be required todemonstrate why this would not befeasible or viable.
Future new housing development willbe expected to comply with mandatorystandards in relation to the Code forSustainable Homes.Non-residential buildings shouldcomply with building regulations. TheCouncil will encourage and support thedesign and implementation of featuresthat will increase the environmentalcredentials of a building includinggreen roofs.Major developments anddevelopments which will have highwater consumption should incorporatemeasures to minimise their use of‘white’ water.The provision of Sustainable UrbanDrainage Systems for the disposal ofsurface water within and leading fromdevelopment sites will be expected.
to beimplemeted
Policy DM3: HighQualityDevelopment
All proposals for new development,including extensions will:be appropriate in scale and design totheir setting.contribute positively to creating a
3 Core H6 Housing quality –Building for LifeAssessments
Reported inmain report
90
90
sense of place and respect localdistinctiveness through design and useof materials.use land efficiently.use energy efficiently.respect the amenity of surroundingproperties.enhance community safety.comply with the current guidance onnoise, waste management, vibration,odour, water, light and airbornepollution.incorporate appropriate access andlinkages, including provision forpedestrians, cyclists and publictransport.provide adequate areas for parkingand servicing.provide hard and soft landscapingappropriate in scale and design to thedevelopment and its setting.incorporate public art in line with thethresholds determined by the PlanningObligations Strategy.ensure that public buildings areaccessible for all, and comply withcurrent guidance on accessibility toother buildingsrespect and complement the contextand setting of all historically sensitivesites particularly those that aredesignated.
91
Policy DM4:DevelopmentWithin andBeyondSettlementEnvelopes
Within Settlement Envelopes, theCouncil will support schemes forcommunity, education, health, sportsand recreation uses or mixedcommunity and other uses where aneed for such facilities is identifiedthrough the Infrastructure Audit or upto date evidence. Where no land isavailable within the settlement, a siteadjacent to the settlement may begranted planning permission. Suchdevelopment should make the bestuse of available land and lead to moresustainable communities.
Within the Settlement Envelopes ofboth Major and Minor Service Centres,the Council will approve housing,employment and other settlementrelated development commensuratewith the scale of the settlement, takingaccount of its role as a local servicecentre.
Within Settlement Envelopes in LargeVillages, small-scale housing andemployment uses, together with newretail and service facilities to serve thevillage and its catchment will bepermitted.
3 Local DM4(i) Percentage ofdevelopment in settlementenvelopes
Monitoringmechanismsto beimplemented
92
92
Within Settlement Envelopes in SmallVillages, development will be limited toinfill residential development andsmall-scale employment uses.
Beyond Settlement Envelopes, limitedextensions to gardens will be permittedprovided they do not harm thecharacter of the area. They must besuitably landscaped or screened fromthe surrounding countryside andbuildings may not be erected on theextended garden area.
Policy DM5:Important OpenSpace withinSettlementEnvelopes
The Council will protect designatedImportant Open Space withinSettlement Envelopes by refusingplanning permission where proposalswould result in the loss of ImportantOpen Space and this would have anunacceptable adverse impact on itsvalue either in visual or functionalterms.
Redevelopment or partialredevelopment of an Important OpenSpace will only be consideredfavourably:where proposals would result inenhanced provision in functional terms(both the facility itself and its location),where there are exceptional
11 Local
Local
DM5(i) Net loss/gain ofImportant Open Space
DM5(ii) number ofapplications resulting in aloss of Important OpenSpace
Monitoringmechanismsto beimplemented
Monitoringmechanismsto beimplemented
93
circumstances resulting in overallcommunity benefit;where there would be no adverseeffect on the visual quality of thesettlement
Policy DM6:Developmentwithin Green BeltInfill Boundaries
The Council will consider infilldevelopment acceptable in principlewithin the defined Green Belt InfillBoundaries. Particular attention will bepaid to assessing the quality ofdevelopment proposed and the likelyimpact on the character of thesettlement and its surroundings.
2 Local DM6 (i) Number/type ofpermissions/refusals in i)the greenbeltii) infill
Monitoringmechanismsto beimplemented
Policy DM7:Development inTown Centres
The Council will support andencourage additional convenience andcomparison retail provision and otheruses such as cultural, leisure andentertainment facilities inside thedesignated town centre boundaries inBiggleswade, Sandy, Ampthill andFlitwick. All new retail and servicedevelopment, including extensions to,or the redevelopment of existing edgeof centres and out of centres storesover 200 square metres, includingmezzanines, will be assessed againstthe criteria set out in PPS6.
The Council will seek to retain existingretail uses within town centre
6 Refer to CS12 – Coreindicator - BD4 Totalamount of floorspace for‘town centres uses’
94
94
boundaries. Permission will only begranted for changes of use away fromretail (A1) to A2, A3, A4 and A5 atground floor level if there is no realisticprospect of the property being utilisedfor retail purposes (evidence ofmarketing will be required) and theproposed use would enhance thevitality and viability of the town centre.
Proposals for residential developmentat ground floor level within towncentres will only be approved if it canbe demonstrated that there is no needfor the premises to be used for othertown centre related uses.
Policy DM8:Village Shops andPubs
Planning permission will not bepermitted for the change of use orredevelopment of shops or pubs invillages which would result in the lossof such facilities unless:
there are other facilities performing thesame function within easy walkingdistance of the village community, andthe applicant provides evidence thatthere is no prospect of the usecontinuing even if permission isrefused.
6 Refer to policy CS12
Policy DM9: The Council, when considering 7 Refer to policy CS4
95
Providing a rangeof transport
development proposals will:require planning applications for alldevelopments of 50 or more dwellingsor 1,000 square metres of commercialdevelopment to submit a TransportAssessment and Travel Plan. TravelPlans will be required to demonstratehow the development is accessible bya range of travel modes.;where a Travel Plan is in place, expectthe developer and/or user toimplement and monitor the plan to theCouncil’s satisfaction;require, as appropriate, financialcontributions towards sustainabletravel options including thedevelopment of the local cycle networkas set out in the cycle mapping project.
Policy DM10:Housing Mix
All new housing developments willprovide a mix of housing types,tenures and sizes, in order to meet theneeds of all sections of the localcommunity, promote sustainablecommunities and social cohesion. Thisincludes the provision of ‘lifetime’homes.
The main considerations indetermining the appropriate mix for thedevelopment will be:The most up to date district-wide and
8 Local DM10(i) Housing mix –Breakdown by type ofdwellings developed.
Appendix 6
96
96
local housing needs assessments,including evidence of need identifiedby the Strategic Housing MarketAssessment, population projectionsand census information;The existing housing mix of thelocality;The location and particular physicalcharacteristics of the site, including itsaccessibility to local services;Current housing market conditions.
Policy DM11:SignificantFacilities in theCountryside
Management plans, developmentbriefs or masterplans agreed by theCouncil will be required prior to thesignificant expansion orredevelopment of the facilities atCranfield University and TechnologyPark, Shuttleworth College, MillbrookProving Ground and RAF Henlow andDISC Chicksands.
All proposals for significantdevelopment at these facilities will beassessed in terms of their:Impact on the open countryside;Provision of sustainable transport;Justification;Scale, layout and design - which mustbe appropriate to the establishmentand its setting.
9 Local DM11(i) Managementplans, development briefsor masterplans approved.
Monitoringmechanismsto beimplemented
97
Planning applications that areconsidered acceptable against thesecriteria will be approved.
Further major facilities that may bedeveloped within the district with asimilar level of importance in terms ofemployment or research will beconsidered under this policy.
Policy DM12:Horticultural andRedundantAgricultural Sites
Proposals for commercial developmenton horticultural or redundantagricultural sites in the countryside willbe approved if they are consideredacceptable when considered in termsof their:
Scale, layout and design in relation totheir setting;Assimilation into the rural setting andimpact on the surrounding countrysidewhen assessed against the findings ofthe Landscape Character Assessment;Relationship with the road network andneighbouring rural settlements;Potential impact on existing local retailfacilities;Provision of suitable vehicular andpedestrian access arrangements;
Proposals for redevelopment willrequire evidence that an agricultural,
9 Refer to policy CS11
98
98
market gardening or horticulturalnursery use is not viable.
Proposals will be approved if they areconsidered acceptable against theabove criteria.
Policy DM13:Heritage inDevelopment
The Council will ensure that:
proposals for development relating toListed Buildings and registered Parksand Gardens will pay particularattention to the conservation of locallydistinctive features and uses;planning applications for developmentwithin Conservation Areas will beassessed against the ConservationArea appraisals and inappropriatedevelopment will be refused.
10 Refer to policy CS15
Policy DM14:Landscape andWoodland
The Council will ensure that:the highest level of protection will begiven to the landscape of the ChilternsAONB, where any development whichhas an adverse impact on thelandscape will be refused;planning applications are assessedagainst the impact the proposeddevelopment will have on thelandscape, whether positive ornegative. The Landscape CharacterAssessment will be used to determine
11 Refer to policy CS16
99
the sensitivity of the landscape and thelikely impact. Any proposals that havean unacceptable impact on thelandscape quality of the area will berefused.proposals for development that liewithin the Greensand Ridge or the FlitValley will be required to conserve orenhance the landscape. Any proposalsthat have an adverse impact on thelandscape in these areas will berejected unless there is a particularneed for, or benefit arising from theproposal that would override thisrequirement.proposals for development within theNorthern Marston Vale, the Forest ofMarston Vale, Ivel Valley, the urbanfringe around the major servicecentres and along the main roadcorridors will be required to providelandscape enhancement on oradjacent to the development site orcontribute towards landscapeenhancement in these areas.trees, woodland and hedgerows in thedistrict will be protected by requiringdevelopers to retain and protect suchfeatures in close proximity to buildingworks. Tree Preservations Orders willbe used to protect trees under threatfrom development. Any trees or
100
10
hedgerows lost will be expected to bereplaced.tree planting or contributions towardsplanting for the purposes of enhancingthe landscape will be sought from newdevelopments. Any planting for thepurposes of mitigating the carbonimpact of new development will besought in line with government advice.
Policy DM15:Biodiversity
The Council will ensure that:where planning applications areconsidered to have an impact onwildlife, whether habitats or species orwhere applications are close tonationally or locally designated sites orimportant species, advice will besought from relevant national and localorganisations and applicationsconsidered to be harmful to wildlife willbe refused.where any development is permittedwithin, adjacent to or in close proximityto designated sites or known locationsof identified species, the developer willbe expected to take steps to securethe protection of such animals andplants. In cases where newdevelopment is unavoidable and mayharm wildlife interests, mitigation isrequired.for developments where there is a
11 Refer to policy CS18
101
need to protect or enhancebiodiversity, developers will berequired to carry out such work and/ormake contributions to secure longerterm benefits for wildlife.the use of native and locallyappropriate species, including locallysourced plants and seeds and plantsof local provenance, in plantingschemes will be required whereappropriate.
Policy DM16:GreenInfrastructure
The Council will promote and protectgreen infrastructure by ensuring thatproposed residential and commercialdevelopment:will contribute to the provision,extension and maintenance of greeninfrastructure in accordance with therequirements outlined in the areaprofiles in Chapter 3 Spatial Strategy,and in accordance with themechanisms in the PlanningObligations Strategy.which adversely affects identifiedgreen infrastructure assets and/orprevents the implementation of greeninfrastructure projects will not bepermitted.
11 Refer to policy CS17 andCS2
Policy DM17:Accessible
The Council will require the following:For new housing developments,
3 Refer to policy CS2 andCS3
102
10
Greenspaces contributions for the provision,extension and maintenance ofaccessible green space, includinggreen space for sport and children’splayspace for the enjoyment ofresidents in accordance with theCouncil’s open space standards.For smaller scale housingdevelopment, where there is nopractical way of providing green spaceon the development site, off sitecontributions will be required.
Planning applications that containproposals that would adversely affectexisting accessible green space willnot be permitted.
Policy DM18:EquestrianDevelopment
Horse-related facilities and small scaleextensions to existing equestrianenterprises in the countryside will bepermitted subject to the followingcriteria:
The proposals should be closelyrelated to the bridleway network andshould not have an adverse impact onbridleways.New freestanding stables should bewell screened from the surroundingcountryside and should not interferewith the amenities of adjoining
11 Local DM18(i) Number ofpermissions for horserelated facilities
Monitoringmechanismsto beimplemented
103
residents.New buildings for indoor equestrianuse should be located adjacent toexisting buildings.Any proposals for equestriandevelopment including jumps,schooling areas and newbuildings/extensions will be consideredin the context of the LandscapeCharacter Assessment.Their design, scale, siting and use ofmaterials should respect the ruralsetting.
Proposals for larger scale private orcommercial enterprises (comprisingten horses or more) shoulddemonstrate the sustainable nature oftheir location by means of a trafficimpact assessment.
Strategic Objectives
1. To deliver the regional and sub regional spatial planning requirements of the East of England Plan and the Milton Keynes andSouth Midlands Sub Regional Strategy
2. To maintain the existing Green Belt
104
10
3. To plan for the highest quality sustainable development in the most sustainable location whilst ensuring that new development hasa positive impact on communities and is supported by necessary infrastructure
4. To identify a hierarchy of settlements and concentrate development in the larger settlements, while seeking opportunities to directgrowth to one or two key locations. In particular to:i. deliver planned growth in the identified Major Service Centres and consolidate and develop their roleii. deliver planned growth in the identified Minor Service Centres and allow development to serve the needs of their population andtheir rural catchment areasiii. limit development outside of the identified Major and Minor Service Centres
5. To make Mid Bedfordshire a more environmentally, economically and socially sustainable place that positively responds to thechallenges of climate change but is prepared for its effects
6. To support the role of towns and villages as locations for accessible services by the retention and enhancement of existingfacilities and the provision of appropriate new ones.
7. Taking account of the rural nature of Mid Bedfordshire, reduce the need to travel, promote more sustainable transport modes andmaximise capacity of the existing transport network and add additional capacity and new infrastructure where needed.
8. To provide the right mix of new high quality homes, including enough affordable homes to meet identified needs
9. To strengthen the local economy, providing new employment opportunities that help reduce the level of out-commuting
10. To ensure development respects and contributes to the district’s diverse local character.
11. To enhance and manage natural resources of the district in a sustainable and integrated way to bring about an increase inbiodiversity, a net gain in green infrastructure, and the retention and enhancement of landscape character
105
Appendix 4:Status of B1-B8 Allocated Sites at 31/03/10
Note: * Land allocated at Shefford Industrial Estate has been granted permission at appealfor residential development** Employment land at Robinson’s Depot, Flitwick is allocated for mixed use development.The amount of land to be redeveloped for B1 use has not been fully determined.
Site LocalPlanPolicy
Location Area ofAllocatedSite (ha)(gross)
AreaCompleted(ha)
Outstandingland withPlanningPermission(ha)
Land underconstruction(ha)
AllocatedLandwithoutPlanningPermission(ha)
Subject to aS106Agreement(ha)
Land atArleseyBrickworks,Arlesey
EMP4(4) E of E 2 0 0 0 2 0
Phase IVStrattonBusinessPark,Biggleswade
EMP4(1) E of E 20.2 2.98 0 0 17.22 0
Phase 1, 2 &3, StrattonBusinessPark,Biggleswade
EMP4(1) E of E 34.96 33.27 1.39 0 0.3 0
Land atRidgmontBrickworks,Brogborough(PrologisPark)
EMP4(5) E of E 34.17 34.17 0 0 0 0
CranfieldTechnologyPark,Cranfield
EMP4(6) E of E 35.18 14.25 1.14 0 19.79 0
Land West ofGirtfordBridge, Sandy
EMP4(3) E of E 16.51 13.04 0 0 3.47 0
Land North ofSunderlandRoad, Sandy
EMP4(2) E oF E 5.7 3.7 0 0 2 0
LandAdjoining 29Clophill Road,Maulden
EMP4(10A)
E of E 0.37 0 0.37 0 0 0
Land atBedfordRoad,MarstonMoretaine
HO8(3) MKSM 3 0 3 0 0 0
Land South ofStotfold
HO8(10) E of E 2.27 0 2.27 0 0 0
Total 154.36 101.41 8.17 0 44.78 0
*LandformingPhase III,SheffordIndustrialEstate,Shefford
EMP4(10)
E of E -0.85 -0.85 0 0 0 0
** RobinsonsDepot andLand offSteppingleyRoad,Flitwick
TCS7 E of E 1.72 0 0 0 Not Known 0
Appendix 5: Housing TrajectoryAppendix 5a:15 year Housing Trajectory Data Table
Yr 1 Yr 2 Yr 3 Yr 4 Yr 5 Yr 6 Yr 7 Yr 8 Yr 9 Yr 10 Yr 11 Yr 12 Yr 13 Yr 14 Yr 15
2001/02 2002/03 2003/04 2004/05 2005/06 2006/07 2007/08 2008/09 2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 2024/25 2025/26DwellingsCompleted 595 646 745 451 883 846 720 720 378Identified forcompletion (copiedfrom Schedule) 694 1,033 842 926 881 739 848 540 350 128 160 160 160 160 160 150CumulativeCompletions 595 1,241 1,986 2,437 3,320 4,166 4,886 5,606 5,984 6,678 7,711 8,553 9,479 10,360 11,099 11,947 12,487 12,837 12,965 13,125 13,285 13,445 13,605 13,765 13,915
Plan Target 712 712 712 712 712 712 712 712 712 712 712 712 712 712 712 712 712 712 712 712 744 744 744 744 744
Cumulative Target 712 1,423 2,135 2,846 3,558 4,269 4,981 5,692 6,404 7,115 7,827 8,538 9,250 9,961 10,673 11,384 12,096 12,807 13,519 14,230 14,974 15,718 16,462 17,206 17,950Monitor - No.dwellings above orbelow cumulativedevelopment plantarget -117 -182 -149 -409 -238 -103 -95 -86 -420 -437 -116 15 230 399 427 563 392 30 -554 -1,105 -1,689 -2,273 -2,857 -3,441 -4,035Managed DeliveryTarget - ResidualTarget taking intoaccount actualcompletions andexpected supply 712 718 722 720 737 727 719 719 719 750 755 724 710 679 645 626 571 581 697 1,265 965 1,166 1,502 2,173 4,185
Number of yearsleft in Plan(s) 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 5 4 3 2 1
As presented above it demonstrates performance against a Plan target 2001-2021 and a different post 2021 for the remainder of the 15 year trajectory
Appendix 5: Housing Trajectory Yr 1 Yr 2 Yr 3 Yr 4 Yr 5 Yr 6 Yr 7 Yr 8 Yr 9 Yr 10 Yr 11 Yr 12 Yr 13 Yr 14 Yr 15
Appendix 5b:Detailed delivery - site justification
Planningapplicationref/DPD policyref
Type ofpermission(Allocation,Outline,ReservedMatters,Full)
Parish/Ward Name and address of site SiteArea(Ha)
Greenfield/Brownfield/Mixed
Available Suitable Achievable Totalnumber ofdwellingsalready builton site
Total residualnumber ofdwellingsunderconstruction,permitted/allocated
Totalnumber ofdwellingson site
Number ofresidualwhich areexpected tobecompletedin 5 years
2010/11
current
year
2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 Total
Identified
Supply
Extant Planning Permissions on Allocated Sites
07/01338 Full Pulloxhill Woodlands Estate 1.38 Brownfield Status: Allocated site HO8(22A). Full
Planning Permission
Previous Use: Chicken processing works
This site has full planning permission and istherefore considered suitable fordevelopment.
Site under construction.
34 8 42 0 8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8
03/01205 Outline Biggleswade Land East of Biggleswade 98.64 Greenfield Status: Allocated site HO8(8) Outline
planning permission
Existing Use: Fields
This site was allocated in the adopted LocalPlan and has been granted outline planningpermission and is therefore consideredsuitable for development.
Information based on discussions withDevelopment Management.
0 1,228 1,228 250 0 0 0 0 100 150 300 300 300 78 0 0 0 0 0 0 1,228
07/02189 RM Biggleswade Site 2, Land off Potton Road 3.65 Greenfield Status: Allocated site HO8(8) Reserved
Matters planning permission
Previous Use: Fields
This site is part of the larger allocated siteHO8(8). It has reserved matters planningpermission is therefore suitable fordevelopment.
Proforma completed by David Wilson Homesand used as a basis for projected completionfigures.
0 95 95 38 57 36 2 0 0 0 0 0 0 0 0 0 0 0 0 0 95
05/01423 Outline Biggleswade Site 4, Land South of PottonRoad
8.6 Greenfield Status: Allocated site HO8(8) Outline
planning permission
Existing Use: Fields
This site was allocated in the adopted LocalPlan. It was also granted outline planningpermission subject to signing of a S106 istherefore suitable for development.
Information based on discussions withDevelopment Management.
0 373 373 290 0 50 50 50 70 70 83 0 0 0 0 0 0 0 0 0 373
05/01425 Outline Biggleswade Site 3, Land South of PottonRoad
7.16 Greenfield Status: Allocated site HO8(8) Outline
planning permission
Existing Use: Fields
This site was allocated in the adopted LocalPlan. It was also granted outline planningpermission subject to signing of a S106 istherefore suitable for development.
Information based on discussions withDevelopment Management.
0 182 182 182 0 50 50 82 0 0 0 0 0 0 0 0 0 0 0 0 182
09/00247 RM Biggleswade Phase 1, Land South ofPotton Road
1.307 Greenfield Status: Allocated site HO8(8) Outline
planning permission
Previous Use: Fields
This site is part of the larger allocated siteHO8(8). It has reserved matters planningpermission is therefore suitable fordevelopment.
Information based on visit and discussions withMartin Grant Homes
0 83 83 67 16 30 37 0 0 0 0 0 0 0 0 0 0 0 0 0 83
09/05286 RM Biggleswade Phase 1, Kings Reach 3.416 Greenfield Status: Allocated site HO8(8) Outline
planning permission
Previous Use: Fields
This site is part of the larger allocated siteHO8(8). It has reserved matters planningpermission is therefore suitable fordevelopment.
Information based on visit and discussions withTaylor Wimpey
0 139 139 119 20 35 35 49 0 0 0 0 0 0 0 0 0 0 0 0 139
02/00242 Outline Stotfold Land South of Stotfold 30.31 Greenfield Status: Allocated site HO8(10) Outline
planning permission all site. Full planningpermission for part of site.
Existing Use: Agricultural fields
This site was allocated in the adopted LocalPlan. It has outline planning permission istherefore suitable for development.
Information based discussions with TaylorWimpey
0 293 293 293 0 0 73 73 73 74 0 0 0 0 0 0 0 0 0 0 293
07/01546 RM Stotfold Parcel 1, Land South ofStotfold
1.54 Greenfield Status: Allocated site HO8(10) RM planning
permission.
Previous Use: Agricultural fields
This site is part of the larger allocated siteHO8(10). It has reserved matters planningpermission and is therefore consideredsuitable for development.
Site under construction.
47 7 54 0 7 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7
07/01383 RM Stotfold Parcel 7, Land South ofStotfold
1.68 Greenfield Status: Allocated site HO8(10) RM planning
permission.
Previous Use: Agricultural fields
This site is part of the larger allocated siteHO8(10). It has reserved matters planningpermission is therefore considered suitablefor development.
Site under construction.
71 6 77 0 6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6
08/01921 RM Stotfold Parcel part 3, 3B & 5B, LandSouth of Stotfold
1.578 Greenfield Status: Allocated site HO8(10) RM planning
permission.
Previous Use: Agricultural fields
This site is part of the larger allocated siteHO8(10). It has reserved matters planningpermission and is therefore consideredsuitable for development.
Site under construction.
0 50 50 36 14 36 0 0 0 0 0 0 0 0 0 0 0 0 0 0 50
08/02226 RM Stotfold Parcel 5A & 6, Land South ofStotfold
1.508 Greenfield Status: Allocated site HO8(10) RM planning
permission.
Previous Use: Agricultural fields
This site is part of the larger allocated siteHO8(10). It has reserved matters planningpermission and is therefore consideredsuitable for development.
Site under construction.
0 80 80 57 23 30 27 0 0 0 0 0 0 0 0 0 0 0 0 0 80
09/06615 RM Stotfold Parcel 2, Land South ofStotfold
1.992 Greenfield Status: Allocated site HO8(10) RM planning
permission.
Previous Use: Agricultural fields
This site is part of the larger allocated siteHO8(10). It has reserved matters planningpermission and is therefore consideredsuitable for development.
Site under construction.
0 96 96 76 20 36 40 0 0 0 0 0 0 0 0 0 0 0 0 0 96
08/02093 Full Shefford Shefford Town Football Club 1.505 Greenfield Status: Allocated site HO8(19) Full planning
permission.
Previous Use: Football Ground
This site has been granted full planningpermission and is therefore consideredsuitable for development.
Proforma completed by Lagan Homes andused as a basis of projected completionfigures.
0 59 59 56 3 36 20 0 0 0 0 0 0 0 0 0 0 0 0 0 59
Various Full/RM Stotfold Fairfield Park 73.23 Brownfield Status: Allocated site HO8(12) Full planning
permission
Previous Use: Curtilage around former
Fairfield Hospital
Whole site has planning permission and isnearly complete.
Whole site is nearly complete.
909 0 909 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
04/02047 RM Stotfold Fairfield Park 0.083 Brownfield Status: Allocated site HO8(12) RM planning
permission
Previous Use: Curtilage around former
Fairfield Hospital
This site is part of the larger allocated sitefor Fairfield and is therefore consideredsuitable for development.
Site under construction.
6 6 12 0 6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6
06/01252 Full Stotfold Fairfield Park - Site 2 0.68 Brownfield Status: Allocated site HO8(12) RM planning
permission
Previous Use: Curtilage around former
Fairfield Hospital
This site is part of the larger allocated sitefor Fairfield and is therefore consideredsuitable for development.
Site under construction.
7 16 23 0 16 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 16
06/01253 Full Stotfold Fairfield Park - Site 1 2.8 Brownfield Status: Allocated site HO8(12) RM planning
permission
Previous Use: Curtilage around former
Fairfield Hospital
This site is part of the larger allocated sitefor Fairfield and is therefore consideredsuitable for development.
Site under construction.
29 47 76 0 47 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 47
07/01320 Full Stotfold Fairfield Park - The Crescent 1.04 Brownfield Status: Allocated site HO8(12) RM planning
permission
Previous Use: Curtilage around former
Fairfield Hospital
This site is part of the larger allocated sitefor Fairfield and is therefore consideredsuitable for development.
Site under construction.
27 8 35 0 8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8
07/01497 RM Stotfold Fairfield Park - WillowherbWay etc…
0.86 Brownfield Status: Allocated site HO8(12) RM planning
permission
Previous Use: Curtilage around former
Fairfield Hospital
This site is part of the larger allocated sitefor Fairfield and is therefore consideredsuitable for development.
Site under construction.
34 14 48 0 14 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 14
Planningapplicationref/DPD policyref
Type ofpermission(Allocation,Outline,ReservedMatters,Full)
Parish/Ward Name and address of site SiteArea(Ha)
Greenfield/Brownfield/Mixed
Available Suitable Achievable Totalnumber ofdwellingsalready builton site
Total residualnumber ofdwellingsunderconstruction,permitted/allocated
Totalnumber ofdwellingson site
Number ofresidualwhich areexpected tobecompletedin 5 years
2010/11
current
year
2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 Total
Identified
Supply
09/00167 Full Stotfold Fairfeld Park - The Crescent 0.6 Brownfield Status: Allocated site HO8(12) RM planning
permission
Previous Use: Curtilage around former
Fairfield Hospital
This site is part of the larger allocated sitefor Fairfield and is therefore consideredsuitable for development.
Site under construction.
0 3 3 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3
09/05385 Full Stotfold Fairfield Park - FairfieldMews
0.74 Brownfield Status: Allocated site HO8(12) RM planning
permission
Previous Use: Curtilage around former
Fairfield Hospital
This site is part of the larger allocated sitefor Fairfield and is therefore consideredsuitable for development.
Site under construction.
0 6 6 0 6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6
07/00539 Full Silsoe Phase 1, Land at West EndRoad
0.674 Brownfield Status: Allocated site HO8(26) Full planning
permission.
Previous Use: Redundant farm buildings
and student residences
This site is part of the larger allocated sitefor College Farm, Silsoe and is thereforeconsidered suitable for development.
Site under construction.
20 8 28 0 8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8
07/01987 RM Silsoe Phase 2, Land at West EndRoad
3.98 Brownfield Status: Allocated site HO8(26) Full planning
permission.
Previous Use: Redundant farm buildings
and student residences
This site is part of the larger allocated sitefor College Farm, Silsoe and is thereforeconsidered suitable for development.
Proforma completed by Miller Homes and usedas a basis of projected completion figures.
0 104 104 99 5 40 36 23 0 0 0 0 0 0 0 0 0 0 0 0 104
05/00275 Outline Ampthill Land West of Ampthill 6.707 Greenfield Status: Allocated site HO8(6A) Outline
planning application. S106 signed
Existing Use: Fields
This site has been granted outline planningpermission and is therefore consideredsuitable for development.
Proforma completed by DLA Town Planningand used as a basis of projected completionfigures.
0 210 210 124 86 73 51 0 0 0 0 0 0 0 0 0 0 0 0 0 210
Planning app.
Registered
Full Ampthill Land off Swaffied Close 1.404 Greenfield Status: Allocated site HO8(5) Full planning
application.
Existing Use: Disused land
This allocated site has been registered forfull planning permission and is thereforesuitable for development.
Proforma completed by Bidwells and used as abasis of projected completion figures.
0 36 36 20 16 20 0 0 0 0 0 0 0 0 0 0 0 0 0 0 36
05/00885 Outline Cranfield Home Farm 16.81 Greenfield Status: Allocated site HO8(26A) Outline
planning permission
Existing Use: Farm land
This site has been granted outline planningpermission and is therefore consideredsuitable for development.
Information based on discussions withDevelopment Management.
0 371 371 221 0 0 30 41 70 80 150 0 0 0 0 0 0 0 0 0 371
97/01085 Outline HoughtonConquest
Land at Stewartby 5.45 Greenfield Status: Allocated site HO8(2). Outline
planning permission subject to S106agreement.
Existing Use: Open field
This site was allocated in the adopted LocalPlan. It also has a resolution to grantplanning permission subject to a Section106 agreement and was therefore inprinciple considered to be in line withexisting Development Plan policy. On thisbasis it is considered to be suitable fordevelopment.
Information based on discussions withDevelopment Management.
0 120 120 120 0 40 40 40 0 0 0 0 0 0 0 0 0 0 0 0 120
Extant Planning Permissions on Unallocated Sites08/01890 Full Ampthill Land on the North Side of
Church Street1.011 Greenfield Status: Full planning permission
Previous Use: grazing land and orchard
This site has been granted outline planningpermission and is therefore consideredsuitable for development.
Proforma completed by Dandara and used as abasis for projected completion figures.
0 38 38 31 7 31 0 0 0 0 0 0 0 0 0 0 0 0 0 0 38
06/00272 Outline Arlesey Crossway Park, PortlandIndustrial Estate
0.78 Brownfield Status: Outline planning permission
Previous Use: Industrial Estate
This site has been granted full planningpermission and is therefore consideredsuitable for development.
Proforma completed by Pegasus PlanningGroup and used as a basis for projectedcompletion figures. 0 43 43 37 6 37 0 0 0 0 0 0 0 0 0 0 0 0 0 0 43
09/00580 Full Sandy 58-64/66 High Street 0.29 Brownfield Status: Full planning permission
Previous Use: Industrial and commercial
This site has been granted full planningpermission and is therefore consideredsuitable for development.
Proforma completed by Aragon HousingAssociation and used as a basis for projectedcompletion figures. 0 19 19 0 19 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 19
Sites completed (0.41 - 1.0) 814 0
Sites completed >1ha 2,086 0
All small sites of less than 14 dwgs (RM & FULL) (see note 1) 2,038 585 2,623 451 134 112 113 113 113 0 0 0 0 0 0 0 0 0 0 0 585
Dwelling Losses -190
Total 5,984 7,931 11,205 4,421 694 1,033 842 926 881 739 848 540 350 128 160 160 160 160 160 150 7,931
2. Sites where the delivery rate cannot be estimated have not been included in the trajectory.
3. Wixams figures are based on assumed information with development taking 4 years to build each Village.
Produced by LDF North Team: September 2010
Notes:
1. At 31/03/10 there were 597 (net) dwellings with planning permission on sites of 14 dwellings or less. 134 of these were under construction so it has been assumed that they would be developed over the next 12 months. The remainder have been split over the next 4 years. On average, planning permission expires for 3 dwellings per year on small sites. Therefore 3 dwelling completions have been deducted from each year from
20011/2012 to 2014/2015.
109
Appendix 5c: Trajectory Commentary
The trajectory demonstrates that a sufficient number of sites are available,suitable and achievable so as to ensure a 5 year land supply of housing. Thetotal delivery during the 5 year period (April 2011 – March 2016) is expectedto be 4,421 dwellings. 5,984 dwellings have been completed since thebeginning of 2001 which leaves a residual of 8,246 to build by 2021. Theannual requirement implied by Plan targets is 712 dwellings. The manageddelivery target (residual) taking into account actual completions and expectedcompletions is 750 dwellings. This results in a 5 year requirement of 3,748.The authority has an identified supply that meets 118% of the target or 5.9years of land supply. There is an insufficient housing supply after 2019 with ashortfall of 4,035 dwellings by 2026.
To meet the shortfall of 4,035 there are contingencies in place. The trajectorydoes not account for windfall development. Data from housing monitoringdemonstrates that since 2001 an average of 53% of the total housingdevelopment has been through windfall development. Allocated sites throughthe Site Allocations DPD once adopted will also add to the future supply ofhousing development.
This year’s trajectory differs from last years as it now goes up to 2026 tomatch the Adopted Core Strategy growth target.Developers have revised their estimates for when their developments are dueto be built by delaying the start date by a year or two.Very large sites such as Wixams and Land East of Biggleswade are moreuncertain on start dates due to market conditions.
110
11
Appendix 6: Housing Mix
Year Comp Loss Net
1B
ed
Terr
2B
ed
Terr
3B
ed
Terr
4+
Bed
Terr
1B
ed
Sem
i
2B
ed
Sem
i
3B
ed
Sem
i
4+
Bed
Sem
i
1B
ed
Det
2B
ed
Det
3B
ed
Det
4+
Bed
Det
1B
ed
Fla
t
2B
ed
Fla
t
3B
ed
Fla
t
4B
ed
Fla
t
1B
ed
Bu
ng
alo
w
2B
ed
Bu
ng
alo
w
3B
ed
Bu
ng
alo
w
4B
ed
Bu
ng
alo
w
Un
kn
ow
n
Total
2002/03 656 10 646 0 24 93 7 0 9 61 29 0 19 60 282 18 54 0 0 not recorded 656
2003/04 756 11 745 9 71 125 28 0 32 110 12 5 6 54 210 62 32 0 0 not recorded 756
2004/05 481 30 451 3 34 73 15 1 25 41 18 2 10 56 157 7 39 0 0 not recorded 481
2005/06 903 20 883 1 50 161 34 0 36 123 42 1 7 74 215 63 89 0 0 2 5 0 0 903
2006/07 866 20 846 9 59 171 20 2 25 70 25 1 7 40 130 84 174 24 0 1 21 3 0 866
2007/08 754 35 719 0 54 92 12 6 31 99 23 3 13 52 150 39 171 8 0 0 0 0 1 754
2008/09 749 29 720 2 48 86 17 0 26 75 11 1 12 41 138 129 143 13 0 0 3 3 0 1 749
2009/10 395 17 378 0 40 50 11 3 18 38 23 0 13 34 69 37 42 1 0 2 11 0 2 1 395
TOTAL 5560 172 5388 24 380 851 144 12 202 617 183 13 87 411 1351 439 744 46 0 5 40 6 3 2 5560
111
Appendix 7: Status of Local Plan Housing Allocations at 31/03/10
Site Address PolicyHO8ref.
Site Area(ha.)
LocalPlan
Estimateof out-
turn
Localplanallocationsremaining
Basis of Assumption Current status ActualDwgs
permittedat
31/03/10
AffordableHousing
Requirement
Estimateof out-turn of
affordabledwellings
Actualaffordabl
edwellingssecured
at31/03/10
PlanningApplication
number
Land at Stewartby,Houghton Conquest
2 5.45 50 Bedford Borough Councildevelopment brief
Subject to S106 50 28% 14 24/97/1085
Land at High Street,Houghton Conquest
2A 1.03 24 Development to include villagegreen.
Site Under Construction 26 28% 7 06/00558
Land East of BedfordRoad, MarstonMoretaine
3A 31.08 380 Development brief adoptedNovember 2005
Current outline application 480 28% 134 06/00593
Elstow Depot,Houghton Conquest*
4 163.10 2250 Development brief adoptedSeptember 1999. Assumeddensity 30-50 dwgs per ha
Current OutlineApplication.
2250 25% 563 24/99/1694
Swaffield Close,Ampthill
5 1.70 50 50 Site topography dictates a lowdensity
No curent planningapplication.
28% 14 01/99/1747Refused
01/01/1228Withdrawn
Tavistock Avenue,Ampthill
6A 6.7 150 210 Development brief adoptedNovember 2005
Current Outline Application 28% 42 05/00275/OUT
Land East ofBiggleswade
8 98.64 2100 Development brief adopted June2003
Current Applications - notstarted
2100 28% 588 03/0120503/02006
05/01423/2405/01424/25
05/01477(duplicate of 03/02006)
Land South of Stotfold 10 30.31 650 Development brief adoptedFebruary 2003
Site Under Construction 650 28% 182 33 07/0154607/01383
Fairfield Hospital,Stotfold*
12 73.23 850 Fairfield Hospital DevelopmentBrief
Site Under Construction 853 28% 45 48/00/1151
Land East of TheDiary, Henlow
15A 1.42 30 30-60 dwellings per hectare acrossthe site
Site Under construction 38 28% 9 07/01248/RM
112
11
Shefford Town FC, IvelRoad, Shefford
19 1.50 40 30 dwellings to the ha across thesite.
Current Full Application -not started
40 Local Plan Inspectors recommend noaffordable housing
07/00889/OUT
Woodlands Estate,Greenfield
22A 1.38 20 30 dwellings to the ha across thesite
Site Under Construction 42 28% 11 05/01444
Braybrooks Drive,Potton
25A 0.89 20 28 dwellings per hectare acrossthe site
Site Under construction 21 Nil Nil 05/02056FULL
College Farm, Silsoe 26 2.8 90 32 dwellings per hectare acrossthe site
Site Under construction 90 20% 15 03/0114807/00539
Home Farm, Cranfield 26A 16.81 350 Development brief adoptedSeptember 2005
Current Outline Application 371 28% 104 05/00885OUT
Garfield Farm,Langford
14A 1.70 35 34 dwellings to the ha across thesite
SITE COMPLETE 58 28% 15 04/01542FULL04/01867FULL
Queen Street, Stotfold 11 3.30 70 30 dwellings to the ha across thesite
SITE COMPLETE 97 22% 23 03/01541FULL
Land East ofLidlington
1 2.00 60 30 dwellings to the ha across thesite
SITE COMPLETE 72 20% 14 05/01516 RM
Woburn Road,Marston Moretaine
3 6.80 100 SAM & A421 require 'stand-off' SITE COMPLETE 141 20% 30 29/02/054929/02/0445
Woburn Street,Ampthill
6 0.95 30 A flatted scheme is sought toreflect locality
SITE COMPLETE 30 Nil Nil 01/01/0718
Denel End, Flitwick 7 1.45 40 30 dwellings to the ha across thesite
SITE COMPLETE 50 20% 7 19/01/114719/00/1422
Hitchin Street,Biggleswade
9 4.80 140 30 dwellings to the ha across thesite
SITE COMPLETE 141 20% 30 07/99/183407/02/0748
House Lane, Arlesey 13 1.20 30 30 dwellings to the ha across thesite
SITE COMPLETE 63 20% 7 02/01/0110
Cricketers Road,Arlesey
13A 2.20 60 30 dwellings to the ha across thesite
SITE COMPLETE 73 22% 16 03/01331OUT05/01141RM
Church Street,Langford
14 0.90 25 30 dwellings to the ha across thesite
SITE COMPLETE 18 Nil Nil 27/99/0069
The Dairy, Henlow 15 2.40 70 Awkward shaped site partly in CA SITE COMPLETE 72 20% 12 23/99/1618
Broad Street, Clifton 16 1.20 35 30 dwellings to the ha across thesite
SITE COMPLETE 31 20% 6 10/99/172501/01099
Shefford Road/PedleyLane, Clifton
17A 1.70 35 30 dwellings to the ha across thesite
SITE COMPLETE 35 20% 8 04/00906
113
Land at Bedford Road,Henlow
18 6.40 150 30 dwellings to the ha across 2/3gross site.
SITE COMPLETE 136 20% 34 23/00/1991
Ampthill Road,Shefford
20 1.00 20 Significant screening requiredpartly in floodplain.
SITE COMPLETE 22 Nil Nil 42/98/0916
Ampthill Road,Maulden
21 1.60 45 30 dwellings to the ha across thesite.
SITE COMPLETE 46 20% 9 30/03/01985
Hall End, Maulden 22 1.10 20 30 dwellings to the ha across thesite.
SITE COMPLETE 25 Nil Nil 30/01/0897
High Street,Meppershall
23 2.60 75 30 dwellings to the ha across thesite.
SITE COMPLETE 66 20% 13 31/02/0057
Myers Road, Potton 24 2.50 70 30 dwellings to the ha across thesite.
SITE COMPLETE 70 20% 14 37/98/0045
Sandy Road, Potton 25 3.25 95 30 dwellings to the ha across thesite.
SITE COMPLETE 86 20% 20 37/01/0334
Total 485.09 8259 260 8343 1672 347
* Elstow is estimate only.
114
11
Appendix 8: NI 186 – Per capita reduction in C02emissions in the LA area
LARegionName
Year
Industr
yan
dC
om
merc
ial
Dom
estic
Road
Tra
nsport
Tota
l
Po
pu
lation
('0
00
s,m
id-y
ea
re
stim
ate
)
Per
Capita
Em
issio
ns
(t)
%per
cap
itare
ductio
nsin
ce
2005
Bedfordshire Bedford 2005342 347
282971
153.9 6.3
Bedfordshire Bedford 2006333 352
280965
154.7 6.2
Bedfordshire Bedford 2007322 343
285949
155.5 6.1
Bedfordshire Bedford 2008339 340
279958
157.1 6.1 3.2
Bedfordshire Central Bedfordshire(North)
2005262 302
289852
129.4 6.6
Bedfordshire Central Bedfordshire(North)
2006265 308
287859
131.2 6.6
Bedfordshire Central Bedfordshire(North)
2007263 303
292858
132.8 6.5
Bedfordshire Central Bedfordshire(North)
2008257 299
283839
134.2 6.2 6.1
Bedfordshire Central Bedfordshire(South)
2005227 279
172678
115.0 5.9
Bedfordshire Central Bedfordshire(South)
2006219 282
170671
115.7 5.8
Bedfordshire Central Bedfordshire(South)
2007216 277
172665
116.5 5.7
Bedfordshire Central Bedfordshire(South)
2008238 273
163674
117.5 5.7 3.4
Central Bedfordshire 2005489 580
4601,530
244.4 6.3
Central Bedfordshire 2006484 590
4571,530
246.9 6.2
Central Bedfordshire 2007479 580
4641,523
249.3 6.1
Central Bedfordshire 2008495 572
4461,513
251.7 6.0 4.0
BedfordshireTotal
Bedfordshire Total 2005831 927
7432,501
398.3 6.3
BedfordshireTotal
Bedfordshire Total 2006817 941
7372,495
401.6 6.2
BedfordshireTotal
Bedfordshire Total 2007800 923
7492,472
404.8 6.1
BedfordshireTotal
Bedfordshire Total 2008834 912
7242,470
408.9 6.0 4.8
Serving our communities
on the telephone...
0300 300 8000by email... [email protected]
on the web... www.centralbedfordshire.gov.uk
@
Alternatively, you can write to: Central Bedfordshire Council Priory House, Monks Walk, Chicksands, Shefford, Bedfordshire, SG17 5TQ.
CentralBedfordshirein contact
Find out more…Get in touch if you would like further copies, a large-print edition or more information about this publication
More information
Please recycle me!When you have finished, please put me in your recycling bin or bag