50
Attached is the Equipment Assignment Report (4-12 Report) for the December 14, 2008 bus shakeup. This report summarizes the maximum number of in-service buses assigned to the bus divisions, spare buses, non-service buses, and division storage capacities. Vehicle requirements outlined in this report reflect schedule changes made by the Service Performance Analysis Department. This report also lists seasonal services for Santa Anita Race Track and Santa Anita Off-track wagering for Hollywood Park. In addition, this report addresses: Two (2) new hybrid-electric buses deployed to Division 6 One (1) additional Express bus put in service at Division 18 Five (5) additional TMC diesel buses removed from service In addition, the fifty (50) TMC diesel buses remaining at Division 6 will be replaced by fifty (50) new composite buses; furthermore, four (4) of the fifty (50) new composite buses are expected to be in service as of December 14, 2008. The transition between the TMC diesel buses and the new composite buses will occur on a rolling basis throughout the shake-up period upon receiving the new buses. The peak service pullout for December 2008 is 2,083 buses and total assigned with spares is 2,460. The contract services buses of 181 bring the total active fleet assigned to 2,641. Date December 4, 2008 To Distribution From Matthew Dake Subject Equipment Assignment Report (4-12 Report)

December 2008 Equipment Assignment Report (4 …libraryarchives.metro.net › DPGTL › 4_12_Reports › 4-12 Report...Attached is the Equipment Assignment Report (4-12 Report) for

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: December 2008 Equipment Assignment Report (4 …libraryarchives.metro.net › DPGTL › 4_12_Reports › 4-12 Report...Attached is the Equipment Assignment Report (4-12 Report) for

Attached is the Equipment Assignment Report (4-12 Report) for the December 14, 2008 bus shakeup. This report summarizes the maximum number of in-service buses assigned to the bus divisions, spare buses, non-service buses, and division storage capacities. Vehicle requirements outlined in this report reflect schedule changes made by the Service Performance Analysis Department. This report also lists seasonal services for Santa Anita Race Track and Santa Anita Off-track wagering for Hollywood Park. In addition, this report addresses:

• Two (2) new hybrid-electric buses deployed to Division 6 • One (1) additional Express bus put in service at Division 18 • Five (5) additional TMC diesel buses removed from service

In addition, the fifty (50) TMC diesel buses remaining at Division 6 will be replaced by fifty (50) new composite buses; furthermore, four (4) of the fifty (50) new composite buses are expected to be in service as of December 14, 2008. The transition between the TMC diesel buses and the new composite buses will occur on a rolling basis throughout the shake-up period upon receiving the new buses. The peak service pullout for December 2008 is 2,083 buses and total assigned with spares is 2,460. The contract services buses of 181 bring the total active fleet assigned to 2,641.

Date December 4, 2008

To Distribution

From Matthew Dake

Subject Equipment Assignment Report (4-12 Report)

Page 2: December 2008 Equipment Assignment Report (4 …libraryarchives.metro.net › DPGTL › 4_12_Reports › 4-12 Report...Attached is the Equipment Assignment Report (4-12 Report) for

I. Equipment Assignment Summary

Daily Bus Requirements 3Division Equipment Assignment - Total 4Division Equipment Assignment for Scheduled Service (Peak) 5Special Events Equipment Requirements 6

II. Division Line Assignment Report

Weekday 7Saturday 19Sunday 31

III. Appendix

Line Assignments Sorted by Division 44Line Assignments Sorted by Line Number 45Lines Assigned Out of More Than One Division 46Rapid Lines 47Division Capacities 48Fleet Definitions 49Equipment Series Designation Summary 50

EQUIPMENT ASSIGNMENT (4-12) REPORT

December 14, 2008

TABLE OF CONTENTS

LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY

Page 3: December 2008 Equipment Assignment Report (4 …libraryarchives.metro.net › DPGTL › 4_12_Reports › 4-12 Report...Attached is the Equipment Assignment Report (4-12 Report) for

LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY

ALT FUEL DIESEL TOTAL

1 SCHEDULED SERVICE

TOTAL SCHEDULED PEAK SERVICE 2025 58 2083

2 SPARES

PEAK SCHEDULED 366 11 377

3 TOTAL DIVISION ASSIGNMENTS

TOTAL SCHEDULED PEAK SERVICES & SPARES 2391 69 2460

4 CONTRACT & LEASED SERVICES 24 157 181

5 TOTAL ACTIVE FLEET ASSIGNED 2415 226 2641

6 INACTIVE FLEET

PENDING EVALUATION FOR SALE 7 123 130TRAINING BUSES 26 3 29NOT YET ASSIGNED 0 0 0CONTINGENCY 0 0 0APPROVED FOR SALE 0 0 0

TOTAL INACTIVE 33 126 159

*******************************************************************************TOTAL FLEET** 2448 352 2800

December 14, 2008

DAILY BUS REQUIREMENTS

DAILY ONLY

Page 3 of 50

Page 4: December 2008 Equipment Assignment Report (4 …libraryarchives.metro.net › DPGTL › 4_12_Reports › 4-12 Report...Attached is the Equipment Assignment Report (4-12 Report) for

Page 4 of 50

LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITYDIVISION EQUIPMENT ASSIGNMENT - TOTAL

12/14/2008

DIVISION 1200 1245 1900 2000 3000 4200 4400 4500 4600 5000 5300 6300 6700 7000 7300 7500 7600 7980 8000 8100 9200 9400 9500 *9800 *9900 *11000 Total1 10 129 34 26 26 18 2432 74 2 55 15 60 2063 10 99 36 13 24 22 2045 142 45 34 2216 46 15 2 4 677 79 21 42 46 15 6 8 31 2488 97 46 7 18 32 2009 41 40 18 160 259

10 6 85 40 5 14 60 33 5 24815 81 16 17 34 15 61 13 25 25 28718 17 170 8 12 15 5 50 277

SUB-TOTAL 52 15 2 178 72 221 220 288 99 184 214 75 347 8 96 4 198 92 95 2460169 3 1 20 5 196 86 223 222 298 100 180 215 75 347 20 98 200 94 17 2569169 -52 3 1 5 5 18 14 2 2 10 1 -4 1 12 2 2 2 -78 109

CONTRACT/LEASED 1 24 63 26 67 181TOTAL ACTIVE FLEET 53 15 2 178 72 221 220 288 99 208 214 75 347 8 96 198 92 95 63 26 67 2641

PENDING EVALUATION D12 17 98 3 3 2 1 6 130TRAINING BUSES D278 2 1 12 2 2 4 2 3 1 29

NOT YET ASSIGNED D311CONTINGENCY

APPROVED FOR SALETOTAL NON-ACTIVE 17 100 3 3 1 2 12 2 3 4 2 3 1 6 159

GRAND TOTAL 17 153 3 3 16 2 2 190 72 223 223 288 99 208 218 75 349 8 99 198 93 95 69 26 67 2800

* 9800 = ELDORADO BUSES* 9900 = ELD/THMS/GIL/BB BUSES* 11000 = ORION BUSES

Page 5: December 2008 Equipment Assignment Report (4 …libraryarchives.metro.net › DPGTL › 4_12_Reports › 4-12 Report...Attached is the Equipment Assignment Report (4-12 Report) for

5 of 50

DIVISION EQUIPMENT ASSIGNMENT FOR SCHEDULED SERVICE (PEAK), INCLUDING SPECIAL SERVICES PROJECTED THROUGH JUNE 2009.

Effective:

DAILY EXCEPT SATURDAY & SUNDAY

DIV NO AM BASE PM OWLPEAK REQ.

1200 1245 1900 2000 3000 4200 4400 4500 4600 5000 5300 6300 6700 7000 7300 7500 7600 7980 8000 8100 9200 9400 9500 *9800 *9900 *11000SUB

TOTALTotal Spares

Required%

DIV. TOTAL

1* 203 104 206 6 206 9 109 29 22 22 15 206 37 18.0% 243

2 175 88 175 5 175 63 2 47 13 50 175 31 17.7% 206

3* 159 117 173 7 173 9 84 30 11 20 19 173 31 17.9% 204

5* 175 90 185 4 185 121 38 26 185 36 19.5% 221

6 56 3 56 0 56 39 13 1 3 56 11 19.6% 67

7* 195 124 210 10 210 67 18 36 39 13 5 6 26 210 38 18.1% 248

8* 169 74 170 2 170 83 39 6 15 27 170 30 17.6% 200

9 201 135 220 4 220 35 34 15 136 220 39 17.7% 259

10* 186 120 210 15 210 5 74 34 4 12 51 26 4 210 38 18.1% 248

15* 234 130 242 4 242 69 14 15 29 13 51 11 21 19 242 45 18.6% 287

18* 229 135 236 5 236 14 147 7 9 12 4 43 236 41 17.4% 277

Total 1982 1120 2083 62 2083 44 13 1 152 62 188 186 250 84 157 182 63 293 6 80 3 167 71 81 2,083 377 18.1% 2,460

* PEAK ADJUSTMENT AND FLEET REQUIREMENT ADJUSTED FOR RAPID REGULAR SERVICE (see DAILY for Actual)

SCHEDULE

December 14, 2008

Page 6: December 2008 Equipment Assignment Report (4 …libraryarchives.metro.net › DPGTL › 4_12_Reports › 4-12 Report...Attached is the Equipment Assignment Report (4-12 Report) for

LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY

12/14/2008 Division Equipment Assignment - Special Events Equipment Requirements

Weekly Seasonal Assignments

Div. No. AM Base PM OWL Notes

1

2

3

5

6

7

8

9

10

15

18

Div. No.1 *** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD 2 *** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD 3 *** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD 56 *** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD 78 *** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD 9 *** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD 10 *** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD 15 *** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD 18 *** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD

*** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD

Notes

*** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD

Page 6 of 50

Page 7: December 2008 Equipment Assignment Report (4 …libraryarchives.metro.net › DPGTL › 4_12_Reports › 4-12 Report...Attached is the Equipment Assignment Report (4-12 Report) for

DIVISION LINE ASSIGNMENT REPORT

December 14, 2008

WEEKDAY

Page 8: December 2008 Equipment Assignment Report (4 …libraryarchives.metro.net › DPGTL › 4_12_Reports › 4-12 Report...Attached is the Equipment Assignment Report (4-12 Report) for

LINE ASSIGNMENT OF BUSESDAILY EXCEPT SATURDAY AND SUNDAY

DIVISION 1-1 -1

SUPPLEMENT TO REPORT 4-12 10 98 34 26 168

LINE NO. AM BASE PM OWL 1200 4600 5000 5300 7000 7300 7500 7600 7980 8000 9400 9500 Total

18 35 18 32 1 24 8 3226 0 0 0 1 045 28 15 25 2 2 22 3 2753 17 7 19 3 14 2 1960 25 11 28 2 4 24 2862 12 7 10 11 1166 7 1 5 7 7265 5 3 5 5 5460 12 12 20 15 15

0

SUBTOTAL 141 74 144 6 9 84 29 22 144SPARE 28 95 25 1 15 5 4 25TOTAL 169 169 169 10 99 34 26 169

OPERATING SPARES AS % OF SCH. 17.4%

DIVISION 1 SEASONAL SERVICE

1 1DIVISION 1 RAPID SERVICE 31 26 18 75

LINE NO. AM BASE PM OWL 1200 4600 5000 5300 7000 7300 7500 7600 7980 8000 9400 9500 Total

705 14 8 16 15 15753 10 6 10 10 10745 23 7 21 22 22760 15 9 15 15 15

SUBTOTAL 62 30 62 25 22 15 62SPARE 12 44 12 5 4 3 12TOTAL 74 74 74 30 26 18 74

OPERATING SPARES AS % OF SCH. 19.4%

DIVISION 1 COMBINED REGULAR AND RAPID SERVICE

AM BASE PM OWL 1200 4600 5000 5300 7000 7300 7500 7600 7980 8000 9400 9500 Total

SUBTOTAL 203 104 206 6 9 109 29 22 22 15 206SPARE 40 139 37 1 20 5 4 4 3 37TOTAL 243 243 243 10 129 34 26 26 18 243

OPERATING SPARES AS % OF SCH. 18.0%

& - Santa Anita Race Track from 9-29-04 through 10-31-04

EQUIPMENTSCHEDULE

*** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD

EQUIPMENT

EQUIPMENTSCHEDULE

COMBINED SCHEDULE

12/4/2008 Page 8 of 50

Page 9: December 2008 Equipment Assignment Report (4 …libraryarchives.metro.net › DPGTL › 4_12_Reports › 4-12 Report...Attached is the Equipment Assignment Report (4-12 Report) for

LINE ASSIGNMENT OF BUSESDAILY EXCEPT SATURDAY AND SUNDAY

DIVISION 21 -1

SUPPLEMENT TO REPORT 4-12 74 2 1 54 15 60 206

LINE NO. AM BASE PM OWL 1200 4500 4600 5000 5300 6300 7000 7300 7500 7600 9400 9500 Total

26 45 21 45 34 11 4555 30 11 23 2 11 15 2660 0 0 0 2 2 266 44 14 38 13 23 2 2 40102 5 3 5 5 5105 13 12 16 1 16 16120 4 3 4 1 2 3121 5 4 6 1 5 6124 3 2 3 2 2127 1 1 1 0200 15 9 21 3 5 6 5 19611 6 4 6 5 5612 4 4 7 6 6

00

SUBTOTAL 175 88 175 5 63 2 47 13 50 175SPARE 31 118 31 11 8 2 10 31TOTAL 206 206 206 74 2 55 15 60 206

OPERATING SPARES AS % OF SCH. 17.7%

EQUIPMENTSCHEDULE

12/4/2008 Page 9 of 50

Page 10: December 2008 Equipment Assignment Report (4 …libraryarchives.metro.net › DPGTL › 4_12_Reports › 4-12 Report...Attached is the Equipment Assignment Report (4-12 Report) for

LINE ASSIGNMENT OF BUSESDAILY EXCEPT SATURDAY AND SUNDAY

DIVISION 3

SUPPLEMENT TO REPORT 4-12 10 99 36 145

LINE NO. AM BASE PM OWL 1200 6300 6700 7000 7300 7500 7600 8000 8100 9200 9400 9500 Total

81 28 20 30 30 3083 13 10 15 2 15 1584 17 12 16 1 16 16175 4 1 2 2180 11 11 11 2 1 10 11201 3 3 3 3 3206 12 8 20 6 14 20251 13 11 13 2 13 13252 5 4 6 5 5485 6 4 6 6 6685 2 2 2 2 2

SUBTOTAL 114 85 123 7 9 84 30 123SPARE 31 60 22 1 15 6 22TOTAL 145 145 145 10 99 36 145

OPERATING SPARES AS % OF SCH. 17.9%

DIVISION 3 SEASONAL SERVICE

DIVISION 3 RAPID SERVICE 13 24 22 59

LINE NO. AM BASE PM OWL 1200 6300 6700 7000 7300 7500 7600 8000 9200 9400 9500 Total

728 16 9 19 19 19751 10 8 11 11 11780 19 15 20 20 20

0

SUBTOTAL 45 32 50 11 20 19 50SPARE 14 27 9 2 4 3 9TOTAL 59 59 59 13 24 22 59

OPERATING SPARES AS % OF SCH. 18.0%

DIVISION 3 COMBINED REGULAR AND RAPID SERVICE

AM BASE PM OWL 1200 6300 6700 7000 7300 7500 7600 8000 9200 9400 9500 Total

SUBTOTAL 159 117 173 7 9 84 30 11 20 19 173SPARE 45 87 31 1 15 6 2 4 3 31TOTAL 204 204 204 10 99 36 13 24 22 204

OPERATING SPARES AS % OF SCH. 17.9%

& Santa Anita Race Track from 9-26-07 through 11-04-07 and 12-26-07 through 4-22-08

EQUIPMENT

*** MAXIMUM SEASONAL ASSIGNMENTS INCLUDED IN SUBTOTALS

SCHEDULE

EQUIPMENT

EQUIPMENTSCHEDULE

COMBINED SCHEDULE

12/4/2008 Page 10 of 50

Page 11: December 2008 Equipment Assignment Report (4 …libraryarchives.metro.net › DPGTL › 4_12_Reports › 4-12 Report...Attached is the Equipment Assignment Report (4-12 Report) for

LINE ASSIGNMENT OF BUSESDAILY EXCEPT SATURDAY AND SUNDAY

DIVISION 5

SUPPLEMENT TO REPORT 4-12 142 34 176

LINE NO. AM BASE PM OWL 1200 4600 5000 5300 6300 6700 7980 8000 8100 9200 9400 9500 Total

108 32 14 31 31 31110 18 12 22 22 22115 18 5 14 14 2 16204 21 14 24 4 24 24206 5 2 5 5 5207 20 11 23 23 23209 5 3 3 4 4212 17 5 21 18 18305 4 3 4 4 4

00

SUBTOTAL 140 69 147 4 121 26 147SPARE 36 107 29 21 8 29TOTAL 176 176 176 142 34 176

OPERATING SPARES AS % OF SCH. 19.7%

DIVISION 5 SEASONAL SERVICE

DIVISION 5 RAPID SERVICE 45 45

LINE NO. AM BASE PM OWL 1200 4600 5000 5300 6300 6700 7980 8000 9200 9400 9500 Total

754 21 11 24 24 24757 14 10 14 14 14

00

SUBTOTAL 35 21 38 38 38SPARE 10 24 7 7 7TOTAL 45 45 45 45 45

OPERATING SPARES AS % OF SCH. 18.4%

DIVISION 5 COMBINED REGULAR AND RAPID SERVICE

AM BASE PM OWL 1200 4600 5000 5300 6300 6700 7980 8000 9200 9400 9500 Total

SUBTOTAL 175 90 185 4 121 38 26 185SPARE 46 131 36 21 7 8 36TOTAL 221 221 221 142 45 34 221

OPERATING SPARES AS % OF SCH. 19.5%

EQUIPMENT

EQUIPMENTSCHEDULE

COMBINED SCHEDULE

EQUIPMENTSCHEDULE

*** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD

12/4/2008 Page 11 of 50

Page 12: December 2008 Equipment Assignment Report (4 …libraryarchives.metro.net › DPGTL › 4_12_Reports › 4-12 Report...Attached is the Equipment Assignment Report (4-12 Report) for

LINE ASSIGNMENT OF BUSESDAILY EXCEPT SATURDAY AND SUNDAY

DIVISION 615 4 -2 -4 13

SUPPLEMENT TO REPORT 4-12 61 19 80

LINE NO. AM BASE PM OWL 1200 1245 1900 2000 2300 3000 4200 4400 7980 8100 9200 9500 Total

2 11 13 11 1 12 -120 4 2 6 5 5 -128 2 7 6 6 -130 4 1 3 3 -133 19 1 19 3 13 16 -335 3 4 3 3 -1217 3 2 2 2 -1534 10 4 9 9 -1

000000

SUBTOTAL 56 3 56 39 13 1 3 56SPARE 11 64 11 7 2 1 1 11TOTAL 67 67 67 46 15 2 4 67

OPERATING SPARES AS % OF SCH. 19.6%

DIVISION 6 SEASONAL SERVICE

EQUIPMENTSCHEDULE

*** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD

12/4/2008 Page 12 of 50

Page 13: December 2008 Equipment Assignment Report (4 …libraryarchives.metro.net › DPGTL › 4_12_Reports › 4-12 Report...Attached is the Equipment Assignment Report (4-12 Report) for

LINE ASSIGNMENT OF BUSESDAILY EXCEPT SATURDAY AND SUNDAY

DIVISION 7-8 -8

SUPPLEMENT TO REPORT 4-12 79 21 29 46 15 2 192

LINE NO. AM BASE PM OWL 1245 4600 5000 5300 6300 7000 7300 7500 7600 7980 9200 9400 Total

2 32 18 26 10 9 8 2 29 -310 25 13 26 1 24 1 25 -114 22 13 25 2 17 7 24 -116 32 18 31 3 4 20 3 30 -220 3 2 2 -128 10 9 16 9 7 1630 2 0 -235 8 7 9 9 938 6 3 5 3 3 6217 9 9 15 2 10 5 15220 2 2 2 2 2305 4 3 4 4 4534 10 8 11 8 8 -3

00

SUBTOTAL 160 103 170 10 67 18 25 39 13 2 6 170SPARE 40 97 30 12 3 4 7 2 2 30TOTAL 200 200 200 79 21 29 46 15 2 8 200

OPERATING SPARES AS % OF SCH. 17.6%

DIVISION 7 SEASONAL SERVICE

DIVISION 7 RAPID SERVICE 13 4 31 48

LINE NO. AM BASE PM OWL 1245 4600 5000 5300 6300 7000 7300 7500 7600 7980 9200 9400 Total

704 22 15 26 26 26714 13 6 14 11 3 14

0

0

SUBTOTAL 35 21 40 11 3 26 40SPARE 13 27 8 2 1 5 8TOTAL 48 48 48 13 4 31 48

OPERATING SPARES AS % OF SCH. 20.0%

DIVISION 7 COMBINED REGULAR AND RAPID SERVICE

AM BASE PM OWL 1245 4600 5000 5300 6300 7000 7300 7500 7600 7980 9200 9400 Total

SUBTOTAL 195 124 210 10 67 18 36 39 13 5 6 26 210SPARE 53 124 38 12 3 6 7 2 1 2 5 38TOTAL 248 248 248 79 21 42 46 15 6 8 31 248

OPERATING SPARES AS % OF SCH. 18.1%

EQUIPMENT

EQUIPMENTSCHEDULE

COMBINED SCHEDULE

EQUIPMENTSCHEDULE

*** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD

Page 13 of 50

Page 14: December 2008 Equipment Assignment Report (4 …libraryarchives.metro.net › DPGTL › 4_12_Reports › 4-12 Report...Attached is the Equipment Assignment Report (4-12 Report) for

LINE ASSIGNMENT OF BUSESDAILY EXCEPT SATURDAY AND SUNDAY

DIVISION 8-1 -1

SUPPLEMENT TO REPORT 4-12 96 46 142

LINE NO. AM BASE PM OWL 1200 4500 4600 7500 7600 7980 8000 8100 9200 9400 9500 Total

150 20 12 20 2 11 9 20152 23 8 24 23 23 -1154 3 3 3 3 3158 8 2 6 7 7 -1161 8 3 6 7 7 -1163 6 4 6 6 6164 7 5 12 12 12165 6 1 8 8 8166 14 5 13 6 7 13 -1168 2 2 2 2169 6 5 7 6 6 -1236 1 1 2 2 2243 8 3 6 2 5 7 -1245 8 2 7 6 6 -2645 1 0 -1

00

SUBTOTAL 121 54 122 2 83 39 122SPARE 22 89 21 14 7 21TOTAL 143 143 143 97 46 143

OPERATING SPARES AS % OF SCH. 17.2%

DIVISION 8 SEASONAL SERVICE

1 1DIVISION 18 RAPID SERVICE 8 18 26

LINE NO. AM BASE PM OWL 1200 4500 4600 7500 7600 7980 8000 9200 9400 9500 Total

741 6 3 6 6 6750 15 5 15 15 15

0

0

SUBTOTAL 21 8 21 6 15 21SPARE 4 17 4 1 3 4TOTAL 25 25 25 7 18 25

OPERATING SPARES AS % OF SCH. 19.0%32

DIVISION 8 METRO LINER 32 32

LINE NO. AM BASE PM OWL 1200 4500 4600 7500 7600 7980 8000 9200 9400 9500 Total

901 27 12 27 27 27

SUBTOTAL 27 12 27 27 27SPARE 5 20 5 5 5TOTAL 32 32 32 32 32

OPERATING SPARES AS % OF SCH. 18.5%

DIVISION 8 COMBINED REGULAR AND RAPID SERVICE

AM BASE PM OWL 1200 4500 4600 7500 7600 7980 8000 8100 9200 9400 9500 Total

SUBTOTAL 169 74 170 2 83 39 6 15 27 170SPARE 31 126 30 14 7 1 3 5 30TOTAL 200 200 200 97 46 7 18 32 200

OPERATING SPARES AS % OF SCH. 17.6%

EQUIPMENT

SCHEDULE EQUIPMENT

SCHEDULE

*** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD

EQUIPMENT

EQUIPMENTSCHEDULE

COMBINED SCHEDULE

12/4/2008 Page 14 of 50

Page 15: December 2008 Equipment Assignment Report (4 …libraryarchives.metro.net › DPGTL › 4_12_Reports › 4-12 Report...Attached is the Equipment Assignment Report (4-12 Report) for

LINE ASSIGNMENT OF BUSESDAILY EXCEPT SATURDAY AND SUNDAY

DIVISION 9

SUPPLEMENT TO REPORT 4-12 20 40 18 139 217

LINE NO. AM BASE PM OWL 1200 1245 1900 2000 7000 7300 7500 7600 7980 8000 8100 9500 Total

70 19 15 18 2 6 12 1876 17 12 22 2 16 4 2 2278 22 13 24 1 4 19 24176 3 2 3 3 3180 4 4 6 6 6258 6 4 6 6 6260 18 13 20 20 20267 8 8 9 9 9268 6 3 7 7 7287 6 4 8 8 8484 16 10 19 19 19485 3 2 3 3 3487 11 4 11 2 9 11490 17 6 16 10 6 16620 3 3 3 3 3665 3 1 3 3 3687 7 5 7 7 7

0

0

SUBTOTAL 169 109 185 4 17 34 15 119 185SPARE 48 108 32 3 6 3 20 32TOTAL 217 217 217 20 40 18 139 217

OPERATING SPARES AS % OF SCH. 17.3%

DIVISION 9 SEASONAL SERVICE

DIVISION 9 RAPID SERVICE 21 21 42

LINE NO. AM BASE PM OWL 1200 1245 1900 2000 7000 7300 7500 7600 7980 8000 9500 Total

762 14 10 17 17 17770 18 16 18 18 18

0

0

SUBTOTAL 32 26 35 18 17 35SPARE 10 16 7 3 4 7TOTAL 42 42 42 21 21 42

OPERATING SPARES AS % OF SCH. 20.0%

DIVISION 9 COMBINED REGULAR AND RAPID SERVICE

AM BASE PM OWL 1200 1245 1900 2000 7000 7300 7500 7600 7980 8000 9500 Total

SUBTOTAL 201 135 220 4 35 34 15 136 220SPARE 58 124 39 6 6 3 24 39TOTAL 259 259 259 41 40 18 160 259

OPERATING SPARES AS % OF SCH. 17.7%

& - Santa Anita Race Track from 9-26-07 through 11-04-07 and 12-26-07 through 4-22-08.

EQUIPMENTSCHEDULE

*** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD

EQUIPMENT

EQUIPMENTSCHEDULE

COMBINED SCHEDULE

12/4/2008 Page 15 of 50

Page 16: December 2008 Equipment Assignment Report (4 …libraryarchives.metro.net › DPGTL › 4_12_Reports › 4-12 Report...Attached is the Equipment Assignment Report (4-12 Report) for

LINE ASSIGNMENT OF BUSESDAILY EXCEPT SATURDAY AND SUNDAY

DIVISION 10-6 -6

SUPPLEMENT TO REPORT 4-12 85 8 5 9 33 5 145

LINE NO. AM BASE PM OWL 1200 1245 5300 6300 6700 7000 7300 7600 7980 9200 9400 9500 Total

2 10 8 11 7 4 114 26 17 30 7 26 4 3016 5 5 12 7 5 1220 21 15 20 2 2 18 2030 22 15 26 16 2 8 2633 23 18 29 6 3 26 29

00

SUBTOTAL 107 78 128 15 5 74 7 4 8 26 4 128SPARE 44 73 23 1 11 1 1 1 7 1 23TOTAL 151 151 151 6 85 8 5 9 33 5 151

OPERATING SPARES AS % OF SCH. 18.0%

DIVISION 10 SEASONAL SERVICE

1 -1DIVISION 10 RAPID SERVICE 33 4 60 97

LINE NO. AM BASE PM OWL 1200 1245 5300 6300 6700 7000 7300 7600 7980 9200 9400 9500 Total

720 49 36 51 51 51730 11 6 12 12 12920 19 19 15 4 19

0

SUBTOTAL 79 42 82 27 4 51 82SPARE 18 55 15 5 1 9 15TOTAL 97 97 97 32 5 60 97

OPERATING SPARES AS % OF SCH. 18.3%

DIVISION 10 COMBINED REGULAR AND RAPID SERVICE

AM BASE PM OWL 1200 1245 5300 6300 6700 7000 7300 7600 7980 9200 9400 9500 Total

SUBTOTAL 186 120 210 15 5 74 34 4 12 51 26 4 210SPARE 62 128 38 1 11 6 1 2 9 7 1 38TOTAL 248 248 248 6 85 40 5 14 60 33 5 248

OPERATING SPARES AS % OF SCH. 18.1%

EQUIPMENTSCHEDULE

*** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD

EQUIPMENT

EQUIPMENTSCHEDULE

COMBINED SCHEDULE

12/4/2008 Page 16 of 50

Page 17: December 2008 Equipment Assignment Report (4 …libraryarchives.metro.net › DPGTL › 4_12_Reports › 4-12 Report...Attached is the Equipment Assignment Report (4-12 Report) for

LINE ASSIGNMENT OF BUSESDAILY EXCEPT SATURDAY AND SUNDAY

DIVISION 15

SUPPLEMENT TO REPORT 4-12 81 16 15 28 15 32 25 212

LINE NO. AM BASE PM OWL 1245 1900 4500 4600 5300 7000 7300 7500 7600 8000 9200 9400 Total

90 17 8 14 14 14 -392 7 7 15 2 13 13 -294 25 9 17 17 5 22 -3152 4 1 5 4 4 -1154 1 0 0 1 1156 6 4 6 2 5 5 -1158 1 1 1 1 1163 11 8 15 12 12 -3164 10 5 7 7 7 -3165 20 9 11 14 3 17 -3166 7 3 8 8 8169 1 0 0 1 1183 7 4 6 4 1 5 -2222 4 3 5 2 3 5224 10 5 11 11 11230 10 7 14 8 4 12 -2233 16 12 19 19 19234 7 5 13 9 2 11 -2236 5 4 7 5 5 -2290 2 2 2 2 2292 5 3 3 4 4 -1

0

SUBTOTAL 176 100 179 4 69 14 13 24 13 27 19 179SPARE 36 112 33 12 2 2 4 2 5 6 33TOTAL 212 212 212 81 16 15 28 15 32 25 212

OPERATING SPARES AS % OF SCH. 18.4%

DIVISION 15 SEASONAL SERVICE

DIVISION 15 RAPID SERVICE 2 6 29 13 25 75

LINE NO. AM BASE PM OWL 1245 1900 4500 4600 5300 7000 7300 7500 7600 8000 9200 9400 Total

724 9 5 9 2 2 5 9734 8 4 10 5 5 10750 6 2 6 6 6761 20 11 21 21 21794 15 8 17 17 17

SUBTOTAL 58 30 63 2 5 24 11 21 63SPARE 17 45 12 1 5 2 4 12TOTAL 75 75 75 2 6 29 13 25 75

OPERATING SPARES AS % OF SCH. 19.0%

DIVISION 15 COMBINED REGULAR AND RAPID SERVICE

AM BASE PM OWL 1245 1900 4500 4600 5300 7000 7300 7500 7600 8000 9200 9400 Total

SUBTOTAL 234 130 242 4 69 14 15 29 13 51 11 21 19 242SPARE 53 157 45 12 2 2 5 2 10 2 4 6 45TOTAL 287 287 287 81 16 17 34 15 61 13 25 25 287

OPERATING SPARES AS % OF SCH. 18.6%

EQUIPMENT

EQUIPMENTSCHEDULE

COMBINED SCHEDULE

EQUIPMENTSCHEDULE

*** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD

12/4/2008 Page 17 of 50

Page 18: December 2008 Equipment Assignment Report (4 …libraryarchives.metro.net › DPGTL › 4_12_Reports › 4-12 Report...Attached is the Equipment Assignment Report (4-12 Report) for

LINE ASSIGNMENT OF BUSESDAILY EXCEPT SATURDAY AND SUNDAY

DIVISION 18-2 1 1

SUPPLEMENT TO REPORT 4-12 11 170 6 1 12 1 201

LINE NO. AM BASE PM OWL 1200 1245 5300 6300 7000 7300 7500 7600 7980 8000 8100 9200 9500 Total

40 28 16 26 2 25 1 2642 12 7 10 1 9 10111 21 17 24 1 22 22115 7 6 7 7 7117 12 11 14 13 13126 2 1 2 2202 4 4 4 4207 5 5 9 2 7 7210 17 13 22 20 20211 5 0 3 4 4212 8 7 8 8 8439 6 3 6 6 6442 2 2 2444 13 4 9 12 12445 4 3 4 4 4446 12 6 13 9 4 13550 10 5 12 7 5 12

000000

SUBTOTAL 168 103 172 5 9 147 7 9 172SPARE 33 98 29 2 23 1 3 29TOTAL 201 201 201 11 170 8 12 201

OPERATING SPARES AS % OF SCH. 16.9%

DIVISION 18 SEASONAL SERVICE

DIVISION 18 RAPID SERVICE 15 5 50 70

LINE NO. AM BASE PM OWL 1200 1245 5300 6300 7000 7300 7500 7600 7980 8000 9200 9500 Total

710 15 8 16 4 12 16711 10 7 12 12 12715 12 7 12 11 11740 19 10 19 20 20

SUBTOTAL 56 32 59 12 4 43 59SPARE 14 38 11 3 1 7 11TOTAL 70 70 70 15 5 50 70

OPERATING SPARES AS % OF SCH. 18.6%6

DIVISION 18 EXPRESS SERVICE 6 6

LINE NO. AM BASE PM OWL 1200 1245 5300 6300 7000 7300 7500 7600 7980 8000 9200 9500 Total

450X 5 0 5 5 5

SUBTOTAL 5 0 5 5 5SPARE 1 6 1 1 1TOTAL 6 6 6 6 6

OPERATING SPARES AS % OF SCH. 20.0%

DIVISION 18 COMBINED REGULAR AND RAPID SERVICE

AM BASE PM OWL 1200 1245 5300 6300 7000 7300 7500 7600 7980 8000 9200 9500 Total

SUBTOTAL 229 135 236 5 14 147 7 9 12 4 43 236SPARE 48 142 41 3 23 1 3 3 1 7 41TOTAL 277 277 277 17 170 8 12 15 5 50 277

OPERATING SPARES AS % OF SCH. 17.4%

EQUIPMENT

EQUIPMENTSCHEDULE

COMBINED SCHEDULE

EQUIPMENT

SCHEDULE EQUIPMENT

SCHEDULE

*** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD

12/4/2008 Page 18 of 50

Page 19: December 2008 Equipment Assignment Report (4 …libraryarchives.metro.net › DPGTL › 4_12_Reports › 4-12 Report...Attached is the Equipment Assignment Report (4-12 Report) for

DIVISION LINE ASSIGNMENT REPORT

December 14, 2008

SATURDAY

Page 20: December 2008 Equipment Assignment Report (4 …libraryarchives.metro.net › DPGTL › 4_12_Reports › 4-12 Report...Attached is the Equipment Assignment Report (4-12 Report) for

LINE ASSIGNMENT OF BUSESSATURDAY SCHEDULE

DIVISION 112 23 14 24 295

SUPPLEMENT TO REPORT 4-12 12 23 14 24 295

LINE NO. AM BASE PM OWL 1245 1900 2000 7500 7600 7980 8000 8100 9200 9400 9500 Total

18 15 19 24 1 026 1 045 15 19 20 2 053 10 14 14 060 14 20 22 2 062 4 4 4 066 1 1 1 0265 3 3 3 0460 10 11 11 0

0

SUBTOTAL 72 91 99 6SPARE 45 26 18TOTAL 117 117 117

OPERATING SPARES AS % OF SCH. #DIV/0!

DIVISION 1 SEASONAL SERVICE

DIVISION 1 RAPID SERVICE

LINE NO. AM BASE PM OWL 1245 1900 2000 7500 7600 7980 8000 9200 9400 9500 Total

705 0 0 0753 0 0 0745 10 8 8760 7 9 9

SUBTOTAL 17 17 17SPARE 3 3 3TOTAL 20 20 20

OPERATING SPARES AS % OF SCH. #DIV/0!DIVISION 1 COMBINED REGULAR AND RAPID SERVICE

AM BASE PM OWL 1245 1900 2000 7500 7600 7980 8000 9200 9400 9500 Total

SUBTOTAL 89 108 116 6SPARE 48 29 21TOTAL 137 137 137

OPERATING SPARES AS % OF SCH. #DIV/0!

& - Santa Anita Race Track from 9-29-04 through 10-31-04

EQUIPMENT

EQUIPMENTSCHEDULE

COMBINED SCHEDULE

EQUIPMENTSCHEDULE

*** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD

12/4/2008 Page 20 of 50

Page 21: December 2008 Equipment Assignment Report (4 …libraryarchives.metro.net › DPGTL › 4_12_Reports › 4-12 Report...Attached is the Equipment Assignment Report (4-12 Report) for

LINE ASSIGNMENT OF BUSESSATURDAY SCHEDULE

DIVISION 212 23 14 24 295

SUPPLEMENT TO REPORT 4-12 12 23 14 24 295

LINE NO. AM BASE PM OWL 1200 1245 1900 2000 7500 7600 7980 8000 8100 9200 9400 9500 Total

26 26 30 29 055 10 12 11 2 060 2 2 2 2 066 21 21 24 0102 3 3 3 0105 12 15 15 1 0120 3 3 3 0121 4 4 4 0124 0 0 0 0127 0 0 0 0200 10 11 12 0611 4 4 4 0612 4 4 4 0

00

SUBTOTAL 99 109 111 5SPARE 33 23 21TOTAL 132 132 132

OPERATING SPARES AS % OF SCH. #DIV/0!

DIVISION 2 SEASONAL SERVICE

DIVISION 2 SEASONAL SERVICE

LINE NO. AM BASE PM OWL 1200 1245 1900 2000 7500 7600 7980 8000 9200 9400 9500 Total

0

TOTAL = (Total Already Calculated Above)

DIVISION 2 RAPID SERVICE 44

LINE NO. AM BASE PM OWL 1200 1245 1900 2000 7500 7600 7980 8000 9200 9400 9500 Total

00

00

SUBTOTALSPARETOTAL

OPERATING SPARES AS % OF SCH. #DIV/0!

DIVISION 2 OTHER SERVICE 3

LINE NO. AM BASE PM OWL 1200 1245 1900 2000 7500 7600 7980 8000 9200 9400 9500 Total

SUBTOTALSPARETOTAL

OPERATING SPARES AS % OF SCH. #DIV/0!

DIVISION 2 COMBINED REGULAR AND RAPID SERVICE

AM BASE PM OWL 1200 1245 1900 2000 7500 7600 7980 8000 9200 9400 9500 Total

SUBTOTAL 99 109 111 5SPARE 33 23 21TOTAL 132 132 132

OPERATING SPARES AS % OF SCH. #DIV/0!

EQUIPMENT

*** MAXIMUM SEASONAL ASSIGNMENTS INCLUDED IN SUBTOTALS

SCHEDULE EQUIPMENT

SCHEDULE

*** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD

EQUIPMENT

EQUIPMENT

EQUIPMENT

SCHEDULE

SCHEDULE

COMBINED SCHEDULE

12/4/2008 Page 21 of 50

Page 22: December 2008 Equipment Assignment Report (4 …libraryarchives.metro.net › DPGTL › 4_12_Reports › 4-12 Report...Attached is the Equipment Assignment Report (4-12 Report) for

LINE ASSIGNMENT OF BUSESSATURDAY SCHEDULE

DIVISION 312 10 14 -2 -25 231

SUPPLEMENT TO REPORT 4-12 12 23 14 24 295

LINE NO. AM BASE PM OWL 1200 1245 1900 2000 7500 7600 7980 8000 8100 9200 9400 9500 Total

81 17 18 1883 7 9 9 284 11 12 12 1175 --- --- --- ---180 9 10 11 2201 2 2 2206 5 5 5251 9 9 9 2252 3 3 3485 5 5 5685 --- --- --- ---

SUBTOTAL 68 73 74 7SPARE 20 15 14TOTAL 88 88 88

OPERATING SPARES AS % OF SCH. #DIV/0!

DIVISION 3 SEASONAL SERVICE

LINE NO. AM BASE PM OWL 1200 1245 1900 2000 7500 7600 7980 8000 9200 9400 9500 Total

79X * 0 0 0 0 0TOTAL = (Total Already Calculated Above) 0 0 0 0

DIVISION 3 RAPID SERVICE 44

LINE NO. AM BASE PM OWL 1200 1245 1900 2000 7500 7600 7980 8000 9200 9400 9500 Total

728 --- --- --- --- 21 21751 5 6 6 11 11780 9 11 11 22 22

0

SUBTOTAL 14 17 17 11 22 21 54SPARE 6 3 3 2 4 4 10TOTAL 20 20 20 13 26 25 64

OPERATING SPARES AS % OF SCH. 18.5%

DIVISION 3 COMBINED REGULAR AND RAPID SERVICE

AM BASE PM OWL 1200 1245 1900 2000 7500 7600 7980 8000 9200 9400 9500 Total

SUBTOTAL 82 90 91 7 11 22 21 54SPARE 26 18 17 2 4 4 10TOTAL 108 108 108 13 26 25 64

OPERATING SPARES AS % OF SCH. 18.5%

EQUIPMENT

EQUIPMENT

EQUIPMENT

SCHEDULE

SCHEDULE

COMBINED SCHEDULE

EQUIPMENT

*** MAXIMUM SEASONAL ASSIGNMENTS INCLUDED IN SUBTOTALS

SCHEDULE

12/4/2008 Page 22 of 50

Page 23: December 2008 Equipment Assignment Report (4 …libraryarchives.metro.net › DPGTL › 4_12_Reports › 4-12 Report...Attached is the Equipment Assignment Report (4-12 Report) for

LINE ASSIGNMENT OF BUSESSATURDAY SCHEDULE

DIVISION 512 23 14 24 77

SUPPLEMENT TO REPORT 4-12 12 23 14 24 295

LINE NO. AM BASE PM OWL 1200 1245 1900 2000 7500 7600 7980 8000 8100 9200 9400 9500 Total

108 11 13 14 30110 9 9 9 25115 7 9 10 2 19204 9 11 13 4 24 24206 3 3 3 17207 15 15 17 15209 2212 7 9 9 13305 2 2 2 0

00000000000000

SUBTOTAL 63 71 77 4 26 145SPARE 28 20 14 5 27TOTAL 91 91 91 31 172

OPERATING SPARES AS % OF SCH. 18.6%

DIVISION 5 SEASONAL SERVICE

DIVISION 5 RAPID SERVICE 44

LINE NO. AM BASE PM OWL 1200 1245 1900 2000 7500 7600 7980 8000 9200 9400 9500 Total

754 11 12 12 24 24757 7 7 7 14 14

0

0

SUBTOTAL 18 19 19 38 38SPARE 5 4 4 8 8TOTAL 23 23 23 46 46

OPERATING SPARES AS % OF SCH. 21.1%

DIVISION 5 COMBINED REGULAR AND RAPID SERVICE

AM BASE PM OWL 1200 1245 1900 2000 7500 7600 7980 8000 9200 9400 9500 Total

SUBTOTAL 81 90 96 4 38 26 183SPARE 33 24 18 8 5 35TOTAL 114 114 114 46 31 218

OPERATING SPARES AS % OF SCH. 19.1%

EQUIPMENTSCHEDULE

*** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD

EQUIPMENT

EQUIPMENTSCHEDULE

COMBINED SCHEDULE

12/4/2008 Page 23 of 50

Page 24: December 2008 Equipment Assignment Report (4 …libraryarchives.metro.net › DPGTL › 4_12_Reports › 4-12 Report...Attached is the Equipment Assignment Report (4-12 Report) for

LINE ASSIGNMENT OF BUSESSATURDAY SCHEDULE

DIVISION 612 23 14 24 214

SUPPLEMENT TO REPORT 4-12 12 23 14 24 295

LINE NO. AM BASE PM OWL 1200 1245 1900 2000 7500 7600 7980 8000 8100 9200 9400 9500 Total

2 --- --- --- --- 4 1 2220 --- --- --- --- 11 1128 22 2230 --- --- --- --- 13 1333 --- --- --- --- 035 0217 0534 0

000000

SUBTOTAL 50 1 68SPARE 10 13TOTAL 60 1 81

OPERATING SPARES AS % OF SCH. 19.1%

DIVISION 6 SEASONAL SERVICE

* Hollywood Bowl (Seasonal service operated only 06-XX-04 through 09-XX-04)** Hollywood Bowl Extra Service (Seasonal service operated only 06-XX-04 through 09-XX-04)++ BDOF LINE

EQUIPMENTSCHEDULE

*** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD

12/4/2008 Page 24 of 50

Page 25: December 2008 Equipment Assignment Report (4 …libraryarchives.metro.net › DPGTL › 4_12_Reports › 4-12 Report...Attached is the Equipment Assignment Report (4-12 Report) for

LINE ASSIGNMENT OF BUSESSATURDAY SCHEDULE

DIVISION 7-3 18 -1 24 53

SUPPLEMENT TO REPORT 4-12 12 23 14 24 295

LINE NO. AM BASE PM OWL 1245 1900 2000 7500 7600 7980 8000 8100 9200 9400 9500 Total

2 10 11 10 5 1 6 2110 13 15 16 1 1314 17 17 16 2 2 3116 13 14 16 2320 3 828 13 14 16 030 2 1135 4 6 8 738 3 3 4 6 16217 9 13 14 2 2220 2 2 2 3305 2 2 2 2 10534 6 6 6 5 5

00

SUBTOTAL 92 103 110 10 13 1 13 150SPARE 38 27 20 2 2 27TOTAL 130 130 130 15 1 15 177

OPERATING SPARES AS % OF SCH. 18.0%

DIVISION 7 SEASONAL SERVICE

DIVISION 7 RAPID SERVICE 44

LINE NO. AM BASE PM OWL 1245 1900 2000 7500 7600 7980 8000 9200 9400 9500 Total

704 13 13 14 25 25714 0 3 7

0 220

SUBTOTAL 13 13 14 3 25 54SPARE 4 4 3 1 5 11TOTAL 17 17 17 4 30 65

OPERATING SPARES AS % OF SCH. 20.4%

DIVISION 7 COMBINED REGULAR AND RAPID SERVICE

AM BASE PM OWL 1245 1900 2000 7500 7600 7980 8000 9200 9400 9500 Total

SUBTOTAL 105 116 124 10 13 4 13 25 204SPARE 42 31 23 2 1 2 5 38TOTAL 147 147 147 15 5 15 30 242

OPERATING SPARES AS % OF SCH. 18.6%

EQUIPMENTSCHEDULE

*** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD

EQUIPMENT

EQUIPMENTSCHEDULE

COMBINED SCHEDULE

12/4/2008 Page 25 of 50

Page 26: December 2008 Equipment Assignment Report (4 …libraryarchives.metro.net › DPGTL › 4_12_Reports › 4-12 Report...Attached is the Equipment Assignment Report (4-12 Report) for

LINE ASSIGNMENT OF BUSESDAILY EXCEPT SATURDAY AND SUNDAY

DIVISION 812 13 14 5 88

SUPPLEMENT TO REPORT 4-12 12 23 14 24 295

LINE NO. AM BASE PM OWL 1200 1245 1900 2000 7500 7600 7980 8000 8100 9200 9400 9500 Total

150 11 11 12 2 23152 5 5 5 18154 --- --- --- --- 3158 1 1 1 4161 3 3 4 10163 5 4 4 8164 3 4 4 0165 4 4 5 21166 6 6 6 7168 --- --- --- --- 2169 --- --- --- --- 6236 2 2 2 3243 3 3 3 6245 3 3 3 12645 --- --- --- --- 0

00

SUBTOTAL 46 46 49 2 123SPARE 12 12 9 23TOTAL 58 58 58 146

OPERATING SPARES AS % OF SCH. 18.7%

DIVISION 8 SEASONAL SERVICE

DIVISION 18 RAPID SERVICE 44

LINE NO. AM BASE PM OWL 1200 1245 1900 2000 7500 7600 7980 8000 9200 9400 9500 Total

741 --- --- --- --- 8 8750 12 8 9 16 16

0

SUBTOTAL 12 8 9 8 16 24SPARE 2 6 5 2 3 5TOTAL 14 14 14 10 19 29

OPERATING SPARES AS % OF SCH. 20.8%

DIVISION 8 METRO LINER 3

LINE NO. AM BASE PM OWL 1200 1245 1900 2000 7500 7600 7980 8000 9200 9400 9500 Total

901 11 11 12 27 27

SUBTOTAL 11 11 12 27 27SPARE 3 3 2 5 5TOTAL 14 14 14 32 32

OPERATING SPARES AS % OF SCH. 18.5%

DIVISION 8 COMBINED REGULAR AND RAPID SERVICE

AM BASE PM OWL 1200 1245 1900 2000 7500 7600 7980 8000 9200 9400 9500 Total

SUBTOTAL 69 65 70 2 8 16 27 174SPARE 17 21 16 2 3 5 33TOTAL 86 86 86 10 19 32 207

OPERATING SPARES AS % OF SCH. 19.0%

EQUIPMENT

EQUIPMENTSCHEDULE

COMBINED SCHEDULE

EQUIPMENT

SCHEDULE EQUIPMENT

SCHEDULE

*** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD

12/4/2008 Page 26 of 50

Page 27: December 2008 Equipment Assignment Report (4 …libraryarchives.metro.net › DPGTL › 4_12_Reports › 4-12 Report...Attached is the Equipment Assignment Report (4-12 Report) for

LINE ASSIGNMENT OF BUSESSATURDAY SCHEDULE

DIVISION 9-6 -124 14 24 58

SUPPLEMENT TO REPORT 4-12 12 23 14 24 295

LINE NO. AM BASE PM OWL 1200 1245 1900 2000 7500 7600 7980 8000 8100 9200 9400 9500 Total

70 14 14 14 2 10 1476 12 12 12 2 2 15 2178 12 13 13 18176 --- --- --- --- 3180 4 5 5 2258 --- --- --- --- 7 7260 12 13 13 3 5267 4 4 4 27 27268 3 3 3 7 7287 --- --- --- --- 12 12484 11 11 13 5485 --- --- --- --- 18 19487 4 4 4 5 5490 3 3 3 3620 --- --- --- --- 3 12665 1 1 1 4687 4 4 4 12 12

50

0

SUBTOTAL 84 87 89 4 15 110 185SPARE 21 18 16 3 21 36TOTAL 105 105 105 18 131 221

OPERATING SPARES AS % OF SCH. 19.5%

DIVISION 9 SEASONAL SERVICE

LINE NO. AM BASE PM OWL 1200 1245 1900 2000 7500 7600 7980 8000 9200 9400 9500 Total

79X 0 4 40

TOTAL = (Total Already Calculated Above) 0 4 4

DIVISION 9 RAPID SERVICE 44

LINE NO. AM BASE PM OWL 1200 1245 1900 2000 7500 7600 7980 8000 9200 9400 9500 Total

762 9 9 9 13 13770 11 11 11 0

00

SUBTOTAL 20 20 20 13 13SPARE 4 4 4 3 3TOTAL 24 24 24 16 16

OPERATING SPARES AS % OF SCH. 23.1%

DIVISION 9 COMBINED REGULAR AND RAPID SERVICE

AM BASE PM OWL 1200 1245 1900 2000 7500 7600 7980 8000 9200 9400 9500 Total

SUBTOTAL 104 107 109 4 15 123 198SPARE 25 22 20 3 24 39TOTAL 129 129 129 18 147 237

OPERATING SPARES AS % OF SCH. 19.7%

EQUIPMENT

EQUIPMENT

EQUIPMENT

SCHEDULE

SCHEDULE

COMBINED SCHEDULE

EQUIPMENT

*** MAXIMUM SEASONAL ASSIGNMENTS INCLUDED IN SUBTOTALS

SCHEDULE

12/4/2008 Page 27 of 50

Page 28: December 2008 Equipment Assignment Report (4 …libraryarchives.metro.net › DPGTL › 4_12_Reports › 4-12 Report...Attached is the Equipment Assignment Report (4-12 Report) for

LINE ASSIGNMENT OF BUSESSATURDAY SCHEDULE

DIVISION 1012 14 9 24 -8 61

SUPPLEMENT TO REPORT 4-12 12 23 14 24 295

LINE NO. AM BASE PM OWL 1200 1245 1900 2000 7500 7600 7980 8000 8100 9200 9400 9500 Total

2 7 8 10 314 17 19 22 7 32 4 3616 4 5 9 1820 15 16 16 2 5 530 15 19 23 1133 21 24 26 6 29

3 3 8000

SUBTOTAL 79 91 106 15 8 3 32 4 138SPARE 47 35 20 1 2 6 1 28TOTAL 126 126 126 9 5 38 5 166

OPERATING SPARES AS % OF SCH. 20.3%

DIVISION 10 SEASONAL SERVICE

DIVISION 10 RAPID SERVICE 44

LINE NO. AM BASE PM OWL 1200 1245 1900 2000 7500 7600 7980 8000 9200 9400 9500 Total

720 27 32 32 3 3730 0 0 0 54 54920 0 0

SUBTOTAL 27 32 32 54 3 57SPARE 11 6 6 11 11TOTAL 38 38 38 65 3 68

OPERATING SPARES AS % OF SCH. 19.3%

DIVISION 10 COMBINED REGULAR AND RAPID SERVICE

AM BASE PM OWL 1200 1245 1900 2000 7500 7600 7980 8000 9200 9400 9500 Total

SUBTOTAL 106 123 138 15 8 3 54 32 7 195SPARE 58 41 26 1 2 11 6 1 39TOTAL 164 164 164 9 5 65 38 8 234

OPERATING SPARES AS % OF SCH. 20.0%

EQUIPMENT

EQUIPMENTSCHEDULE

COMBINED SCHEDULE

EQUIPMENTSCHEDULE

*** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD

12/4/2008 Page 28 of 50

Page 29: December 2008 Equipment Assignment Report (4 …libraryarchives.metro.net › DPGTL › 4_12_Reports › 4-12 Report...Attached is the Equipment Assignment Report (4-12 Report) for

LINE ASSIGNMENT OF BUSESSATURDAY SCHEDULE

DIVISION 15-3 -25 14 15 6

SUPPLEMENT TO REPORT 4-12 12 23 14 24 295

LINE NO. AM BASE PM OWL 1200 1245 1900 2000 7500 7600 7980 8000 8100 9200 9400 9500 Total

90 8 9 9 1692 6 7 8 2 1494 16 17 16 8 33152 3 4 4 3 12154 --- --- --- --- 1156 4 4 4 2 7 7158 1 1 1 --- 1163 7 7 7 10164 5 5 5 8165 2 2 2 14166 2 2 3 11169 0 0 0 1183 2 2 2 --- 5222 2 2 2 6 16224 8 9 9 4 13230 4 4 5 18 18233 9 11 10 9 2 11234 6 6 6 5236 --- --- --- --- 3 3290 --- --- --- --- 5 5292 3 3 3 0

0

SUBTOTAL 88 95 96 4 13 34 18 204SPARE 26 19 18 2 6 4 38TOTAL 114 114 114 15 40 22 242

OPERATING SPARES AS % OF SCH. 18.6%

DIVISION 15 SEASONAL SERVICE

DIVISION 15 RAPID SERVICE 44

LINE NO. AM BASE PM OWL 1200 1245 1900 2000 7500 7600 7980 8000 9200 9400 9500 Total

724 --- --- --- --- 7 11734 --- --- --- --- 7 7750 --- --- --- --- 21 21761 9 10 10794 --- --- --- --- 0

SUBTOTAL 9 10 10 7 7 21 39SPARE 3 2 2 1 2 4 8TOTAL 12 12 12 8 9 25 47

OPERATING SPARES AS % OF SCH. 20.5%

DIVISION 15 COMBINED REGULAR AND RAPID SERVICE

AM BASE PM OWL 1200 1245 1900 2000 7500 7600 7980 8000 9200 9400 9500 Total

SUBTOTAL 97 105 106 4 13 41 7 21 18 243SPARE 29 21 20 2 7 2 4 4 46TOTAL 126 126 126 15 48 9 25 22 289

OPERATING SPARES AS % OF SCH. 18.9%

EQUIPMENTSCHEDULE

*** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD

EQUIPMENT

EQUIPMENTSCHEDULE

COMBINED SCHEDULE

12/4/2008 Page 29 of 50

Page 30: December 2008 Equipment Assignment Report (4 …libraryarchives.metro.net › DPGTL › 4_12_Reports › 4-12 Report...Attached is the Equipment Assignment Report (4-12 Report) for

LINE ASSIGNMENT OF BUSESSATURDAY SCHEDULE

DIVISION 1814 10 -24

SUPPLEMENT TO REPORT 4-12 12 23 14 24 295

LINE NO. AM BASE PM OWL 1200 1245 1900 2000 7500 7600 7980 8000 8100 9200 9400 9500 Total

40 13 22 19 2 2 2042 7 8 9 3 3111 10 16 16 1 1 5 13115 3 5 4 22117 9 12 16 11126 14202 4207 2 3210 11 14 18 2211 3212 1 1 3 15439 3 3 3 20442 3444 4 4 4 2 11445 3 4 2 3 3446 4 4 7 6 6550 5 5 7 3

1 143

143 3

01 2

SUBTOTAL 73 98 108 5 10 17 192SPARE 55 30 20 2 3 37TOTAL 128 128 128 128 12 20 229

OPERATING SPARES AS % OF SCH. 19.3%

DIVISION 18 SEASONAL SERVICE

DIVISION 18 RAPID SERVICE 44

LINE NO. AM BASE PM OWL 1200 1245 1900 2000 7500 7600 7980 8000 9200 9400 9500 Total

710 7 8 8 15711 6 7 7 12 12715 20 20740 13 14 14

2 4

SUBTOTAL 26 29 29 2 12 20 51SPARE 9 6 6 1 2 4 10TOTAL 35 35 35 3 14 24 61

OPERATING SPARES AS % OF SCH. 19.6%

DIVISION 18 EXPRESS SERVICE 3

LINE NO. AM BASE PM OWL 1200 1245 1900 2000 7500 7600 7980 8000 9200 9400 9500 Total

450X 4

SUBTOTAL 4SPARE 1TOTAL 5

OPERATING SPARES AS % OF SCH. 25.0%

DIVISION 18 COMBINED REGULAR AND RAPID SERVICE

AM BASE PM OWL 1200 1245 1900 2000 7500 7600 7980 8000 9200 9400 9500 Total

SUBTOTAL 99 127 137 5 10 19 12 20 247SPARE 64 36 26 2 4 2 4 48TOTAL 163 163 163 12 23 14 24 295

OPERATING SPARES AS % OF SCH. 19.4%

EQUIPMENT

SCHEDULE EQUIPMENT

SCHEDULE

*** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD

EQUIPMENT

EQUIPMENTSCHEDULE

COMBINED SCHEDULE

12/4/2008 Page 30 of 50

Page 31: December 2008 Equipment Assignment Report (4 …libraryarchives.metro.net › DPGTL › 4_12_Reports › 4-12 Report...Attached is the Equipment Assignment Report (4-12 Report) for

DIVISION LINE ASSIGNMENT REPORT

December 14, 2008

SUNDAY

Page 32: December 2008 Equipment Assignment Report (4 …libraryarchives.metro.net › DPGTL › 4_12_Reports › 4-12 Report...Attached is the Equipment Assignment Report (4-12 Report) for

LINE ASSIGNMENT OF BUSESSUNDAY SCHEDULE

DIVISION 124 295

SUPPLEMENT TO REPORT 4-12 24 295

LINE NO. AM BASE PM OWL 1200 1245 1900 2000 2300 3000 4100 8000 8100 9200 9400 9500 Total

18 12 15 15 1 026 1 045 10 13 15 2 053 7 9 10 060 10 13 14 2 062 4 4 4 066 1 1 1 0265 3 3 3 0460 7 8 10 0

0 0 0

SUBTOTAL 54 66 72 6SPARE 31 19 13TOTAL 85 85 85

OPERATING SPARES AS % OF SCH. #DIV/0!

DIVISION 1 SEASONAL SERVICE

DIVISION 1 RAPID SERVICE

LINE NO. AM BASE PM OWL 1200 1245 1900 2000 2300 3000 8000 9200 9400 9500 Total

705 0 0 0753 0 0 0745 7 7 7760 6 6 7

SUBTOTAL 13 13 14SPARE 4 4 3TOTAL 17 17 17

OPERATING SPARES AS % OF SCH. #DIV/0!DIVISION 1 COMBINED REGULAR AND RAPID SERVICE

AM BASE PM OWL 1200 1245 1900 2000 2300 3000 8000 9200 9400 9500 Total

SUBTOTAL 67 79 86 6SPARE 35 23 16TOTAL 102 102 102

OPERATING SPARES AS % OF SCH. #DIV/0!

EQUIPMENTSCHEDULE

*** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD

EQUIPMENT

EQUIPMENTSCHEDULE

COMBINED SCHEDULE

12/4/2008 Page 32 of 50

Page 33: December 2008 Equipment Assignment Report (4 …libraryarchives.metro.net › DPGTL › 4_12_Reports › 4-12 Report...Attached is the Equipment Assignment Report (4-12 Report) for

LINE ASSIGNMENT OF BUSESSUNDAY SCHEDULE

DIVISION 224 295

SUPPLEMENT TO REPORT 4-12 24 295

LINE NO. AM BASE PM OWL 1200 1245 1900 2000 2300 3000 4100 8000 8100 9200 9400 9500 Total

26 14 19 20 055 7 9 9 2 060 0 0 0 2 066 10 13 14 0102 3 3 3 0105 8 11 10 1 0120 3 3 3 0121 4 4 4 0124 0 0 0 0127 0 0 0 0200 7 10 10 0611 4 4 4 0612 4 4 4 0

0

0

SUBTOTAL 64 80 81 5SPARE 32 16 15TOTAL 96 96 96

OPERATING SPARES AS % OF SCH. #DIV/0!

DIVISION 2 SEASONAL SERVICE

EQUIPMENTSCHEDULE

*** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD

12/4/2008 Page 33 of 50

Page 34: December 2008 Equipment Assignment Report (4 …libraryarchives.metro.net › DPGTL › 4_12_Reports › 4-12 Report...Attached is the Equipment Assignment Report (4-12 Report) for

LINE ASSIGNMENT OF BUSESSUNDAY SCHEDULE

DIVISION 3-2 -25 231

SUPPLEMENT TO REPORT 4-12 24 295

LINE NO. AM BASE PM OWL 1200 1245 1900 2000 2300 3000 4100 8000 8100 9200 9400 9500 Total

81 11 16 1683 6 7 7 284 9 13 14 1175 --- --- --- ---180 6 9 9 2201 2 2 2206 5 5 5251 8 10 10 2252 3 3 3485 5 5 5685 --- --- --- ---

SUBTOTAL 55 70 71 7SPARE 29 14 13TOTAL 84 84 84

OPERATING SPARES AS % OF SCH. #DIV/0!

DIVISION 3 SEASONAL SERVICE

LINE NO. AM BASE PM OWL 1200 1245 1900 2000 2300 3000 8000 9200 9400 9500 Total

79X * 0 0 0 0 0TOTAL = (Total Already Calculated Above) 0 0 0 0

DIVISION 3 RAPID SERVICE

LINE NO. AM BASE PM OWL 1200 1245 1900 2000 2300 3000 8000 9200 9400 9500 Total

728 --- --- --- --- 21 21751 --- --- --- --- 11780 9 10 10 22 22

0

SUBTOTAL 9 10 10 22 21 54SPARE 3 2 2 4 4 10TOTAL 12 12 12 26 25 64

OPERATING SPARES AS % OF SCH. 18.5%

DIVISION 3 COMBINED REGULAR AND RAPID SERVICE

AM BASE PM OWL 1200 1245 1900 2000 2300 3000 8000 9200 9400 9500 Total

SUBTOTAL 64 80 81 7 22 21 54SPARE 32 16 15 4 4 10TOTAL 96 96 96 26 25 64

OPERATING SPARES AS % OF SCH. 18.5%

EQUIPMENT

*** MAXIMUM SEASONAL ASSIGNMENTS INCLUDED IN SUBTOTALS

SCHEDULE

EQUIPMENT

EQUIPMENT

EQUIPMENT

SCHEDULE

SCHEDULE

COMBINED SCHEDULE

12/4/2008 Page 34 of 50

Page 35: December 2008 Equipment Assignment Report (4 …libraryarchives.metro.net › DPGTL › 4_12_Reports › 4-12 Report...Attached is the Equipment Assignment Report (4-12 Report) for

LINE ASSIGNMENT OF BUSESSUNDAY SCHEDULE

DIVISION 524 77

SUPPLEMENT TO REPORT 4-12 24 295

LINE NO. AM BASE PM OWL 1200 1245 1900 2000 2300 3000 4100 8000 8100 9200 9400 9500 Total

108 9 10 11 30110 5 6 6 25115 5 7 7 2 19204 9 11 11 4 24 24206 3 3 3 17207 9 11 13 15209 --- 2212 5 5 5 13305 2 2 2 0

00

SUBTOTAL 47 55 58 4 26 145SPARE 22 14 11 5 27TOTAL 69 69 69 31 172

OPERATING SPARES AS % OF SCH. 18.6%

DIVISION 5 SEASONAL SERVICE

DIVISION 5 RAPID SERVICE

LINE NO. AM BASE PM OWL 1200 1245 1900 2000 2300 3000 8000 9200 9400 9500 Total

754 8 9 9 24 24757 7 7 7 14 14

00

SUBTOTAL 15 16 16 38 38SPARE 4 3 3 8 8TOTAL 19 19 19 46 46

OPERATING SPARES AS % OF SCH. 21.1%

DIVISION 5 OTHER SERVICE

LINE NO. AM BASE PM OWL 1200 1245 1900 2000 2300 3000 8000 9200 9400 9500 Total

SUBTOTALSPARETOTAL

OPERATING SPARES AS % OF SCH. #DIV/0!

DIVISION 5 COMBINED REGULAR AND RAPID SERVICE

AM BASE PM OWL 1200 1245 1900 2000 2300 3000 8000 9200 9400 9500 Total

SUBTOTAL 62 71 74 4 38 26 183SPARE 26 17 14 8 5 35TOTAL 88 88 88 46 31 218

OPERATING SPARES AS % OF SCH. 19.1%

EQUIPMENT

EQUIPMENTSCHEDULE

COMBINED SCHEDULE

EQUIPMENT

SCHEDULE EQUIPMENT

SCHEDULE

*** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD

12/4/2008 Page 35 of 50

Page 36: December 2008 Equipment Assignment Report (4 …libraryarchives.metro.net › DPGTL › 4_12_Reports › 4-12 Report...Attached is the Equipment Assignment Report (4-12 Report) for

LINE ASSIGNMENT OF BUSESSUNDAY SCHEDULE

DIVISION 624 214

SUPPLEMENT TO REPORT 4-12 24 295

LINE NO. AM BASE PM OWL 1200 1245 1900 2000 2300 3000 4100 8000 8100 9200 9400 9500 Total

2 --- --- --- --- 4 1 17 2220 --- --- --- --- 11 1128 22 2230 --- --- --- --- 13 1333 --- --- --- --- 035 0217 0534 0

000000

SUBTOTAL 50 1 17 68SPARE 10 3 13TOTAL 60 1 20 81

OPERATING SPARES AS % OF SCH. 19.1%

DIVISION 6 SEASONAL SERVICE

EQUIPMENTSCHEDULE

*** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD

12/4/2008 Page 36 of 50

Page 37: December 2008 Equipment Assignment Report (4 …libraryarchives.metro.net › DPGTL › 4_12_Reports › 4-12 Report...Attached is the Equipment Assignment Report (4-12 Report) for

LINE ASSIGNMENT OF BUSESSUNDAY SCHEDULE

DIVISION 724 -1649

SUPPLEMENT TO REPORT 4-12 24 295

LINE NO. AM BASE PM OWL 1200 1245 1900 2000 2300 3000 4100 8000 8100 9200 9400 9500 Total

2 6 8 9 2110 7 10 10 1 1314 14 14 14 2 3116 7 8 7 2320 3 828 9 13 13 030 2 1135 4 6 7 738 3 3 3 16217 7 11 11 2 2220 3305 2 2 2 10534 3 3 5 5

00

SUBTOTAL 62 78 81 10 150SPARE 34 18 15 27TOTAL 96 96 96 177

OPERATING SPARES AS % OF SCH. 18.0%

DIVISION 7 SEASONAL SERVICE

DIVISION 7 RAPID SERVICE

LINE NO. AM BASE PM OWL 1200 1245 1900 2000 2300 3000 8000 9200 9400 9500 Total

704 8 12 13 0 0 704 0 0 0 25 25714 0 0 0 714 0 0 0 7

0 0 0 0 0 0 0 220

SUBTOTAL 8 12 13 1418 25 1472SPARE 8 4 3 284 5 295TOTAL 16 16 16 1702 30 1767

OPERATING SPARES AS % OF SCH. 20.0%

DIVISION 7 COMBINED REGULAR AND RAPID SERVICE

AM BASE PM OWL 1200 1245 1900 2000 2300 3000 8000 9200 9400 9500 Total

SUBTOTAL 70 90 94 10 1418 25 1622SPARE 42 22 18 284 5 322TOTAL 112 112 112 1702 30 1944

OPERATING SPARES AS % OF SCH. 19.9%

EQUIPMENT

EQUIPMENTSCHEDULE

COMBINED SCHEDULE

EQUIPMENTSCHEDULE

*** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD

12/4/2008 Page 37 of 50

Page 38: December 2008 Equipment Assignment Report (4 …libraryarchives.metro.net › DPGTL › 4_12_Reports › 4-12 Report...Attached is the Equipment Assignment Report (4-12 Report) for

LINE ASSIGNMENT OF BUSESSUNDAY SCHEDULE

DIVISION 85 88

SUPPLEMENT TO REPORT 4-12 24 295

LINE NO. AM BASE PM OWL 1200 1245 1900 2000 2300 3000 4100 8000 8100 9200 9400 9500 Total

150 10 10 14 2 23152 6 6 7 18154 --- --- --- --- 3158 2 2 2 4161 2 3 3 10163 8164 5 5 7 0165 4 4 4 21166 3 3 3 7168 --- --- --- --- 2169 --- --- --- --- 6236 2 2 2 3243 --- --- --- --- 6245 --- --- --- --- 12645 --- --- --- --- 0

00

SUBTOTAL 34 35 42 2 123SPARE 16 15 8 23TOTAL 50 50 50 146

OPERATING SPARES AS % OF SCH. 18.7%

DIVISION 8 SEASONAL SERVICE

DIVISION 18 RAPID SERVICE

LINE NO. AM BASE PM OWL 1200 1245 1900 2000 2300 3000 8000 9200 9400 9500 Total

741 --- --- --- --- 8750 7 6 7 16 16

00

SUBTOTAL 7 6 7 16 24SPARE 1 2 1 3 5TOTAL 8 8 8 19 29

OPERATING SPARES AS % OF SCH. 20.8%

DIVISION 8 METRO LINER

LINE NO. AM BASE PM OWL 1200 1245 1900 2000 2300 3000 8000 9200 9400 9500 Total

901 11 11 12 27 27

SUBTOTAL 11 11 12 27 27SPARE 3 3 2 5 5TOTAL 14 14 14 32 32

OPERATING SPARES AS % OF SCH. 18.5%

DIVISION 8 COMBINED REGULAR AND RAPID SERVICE

AM BASE PM OWL 1200 1245 1900 2000 2300 3000 8000 9200 9400 9500 Total

SUBTOTAL 52 52 61 2 16 27 174SPARE 20 20 11 3 5 33TOTAL 72 72 72 19 32 207

OPERATING SPARES AS % OF SCH. 19.0%

EQUIPMENT

SCHEDULE EQUIPMENT

SCHEDULE

*** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD

EQUIPMENT

EQUIPMENTSCHEDULE

COMBINED SCHEDULE

12/4/2008 Page 38 of 50

Page 39: December 2008 Equipment Assignment Report (4 …libraryarchives.metro.net › DPGTL › 4_12_Reports › 4-12 Report...Attached is the Equipment Assignment Report (4-12 Report) for

LINE ASSIGNMENT OF BUSESSUNDAY SCHEDULE

DIVISION 924 58

SUPPLEMENT TO REPORT 4-12 24 295

LINE NO. AM BASE PM OWL 1200 1245 1900 2000 2300 3000 4100 8000 8100 9200 9400 9500 Total

70 15 16 16 2 1476 9 11 11 2 2178 10 12 12 18176 --- --- --- --- 3180 4 5 5 2258 --- --- --- --- 7260 11 15 15 5267 4 4 4 27268 3 3 3 7287 --- --- --- --- 12484 7 7 10 5485 --- --- --- --- 19487 4 4 4 5490 3 3 3 3620 --- --- --- --- 12665 1 1 1 4687 4 4 4 12

50

0

SUBTOTAL 75 85 88 4 185SPARE 29 19 16 36TOTAL 104 104 104 221

OPERATING SPARES AS % OF SCH. 19.5%

DIVISION 9 SEASONAL SERVICE

LINE NO. AM BASE PM OWL 1200 1245 1900 2000 2300 3000 8000 9200 9400 9500 Total

79X 0 40

TOTAL = (Total Already Calculated Above) 0 4

DIVISION 9 RAPID SERVICE

LINE NO. AM BASE PM OWL 1200 1245 1900 2000 2300 3000 8000 9200 9400 9500 Total

762 --- --- --- --- 13770 --- --- --- --- 0

00

SUBTOTAL 13SPARE 3TOTAL 16

OPERATING SPARES AS % OF SCH. 23.1%

DIVISION 9 COMBINED REGULAR AND RAPID SERVICE

AM BASE PM OWL 1200 1245 1900 2000 2300 3000 8000 9200 9400 9500 Total

SUBTOTAL 75 85 88 4 198SPARE 29 19 16 39TOTAL 104 104 104 237

OPERATING SPARES AS % OF SCH. 19.7%

EQUIPMENT

*** MAXIMUM SEASONAL ASSIGNMENTS INCLUDED IN SUBTOTALS

SCHEDULE

EQUIPMENT

EQUIPMENT

EQUIPMENT

SCHEDULE

SCHEDULE

COMBINED SCHEDULE

12/4/2008 Page 39 of 50

Page 40: December 2008 Equipment Assignment Report (4 …libraryarchives.metro.net › DPGTL › 4_12_Reports › 4-12 Report...Attached is the Equipment Assignment Report (4-12 Report) for

LINE ASSIGNMENT OF BUSESSUNDAY SCHEDULE

DIVISION 1024 -8 61

SUPPLEMENT TO REPORT 4-12 24 295

LINE NO. AM BASE PM OWL 1200 1245 1900 2000 2300 3000 4100 8000 8100 9200 9400 9500 Total

2 5 7 7 314 11 14 17 7 32 4 3616 5 7 7 1820 15 16 15 2 530 12 20 20 1133 16 22 24 6 29

8000

SUBTOTAL 64 86 90 15 32 4 138SPARE 43 21 17 6 1 28TOTAL 107 107 107 38 5 166

OPERATING SPARES AS % OF SCH. 20.3%

DIVISION 10 SEASONAL SERVICE

DIVISION 10 RAPID SERVICE

LINE NO. AM BASE PM OWL 1200 1245 1900 2000 2300 3000 8000 9200 9400 9500 Total

720 22 26 27 3 3730 0 0 0 54 54920 --- --- --- ---

00

SUBTOTAL 22 26 27 54 3 57SPARE 10 6 5 11 11TOTAL 32 32 32 65 3 68

OPERATING SPARES AS % OF SCH. 19.3%

DIVISION 10 COMBINED REGULAR AND RAPID SERVICE

AM BASE PM OWL 1200 1245 1900 2000 2300 3000 8000 9200 9400 9500 Total

SUBTOTAL 86 112 117 15 54 32 7 195SPARE 53 27 22 11 6 1 39TOTAL 139 139 139 65 38 8 234

OPERATING SPARES AS % OF SCH. 20.0%

EQUIPMENTSCHEDULE

*** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD

EQUIPMENT

EQUIPMENTSCHEDULE

COMBINED SCHEDULE

12/4/2008 Page 40 of 50

Page 41: December 2008 Equipment Assignment Report (4 …libraryarchives.metro.net › DPGTL › 4_12_Reports › 4-12 Report...Attached is the Equipment Assignment Report (4-12 Report) for

LINE ASSIGNMENT OF BUSESSUNDAY SCHEDULE

DIVISION 1515 6

SUPPLEMENT TO REPORT 4-12 24 295

LINE NO. AM BASE PM OWL 1200 1245 1900 2000 2300 3000 4100 8000 8100 9200 9400 9500 Total

90 4 7 7 1692 6 8 8 2 1494 11 16 16 33152 1 1 1 12154 --- --- --- --- 1156 4 4 4 2 7158 1 1 1 --- 1163 7 8 8 10164 1 1 1 8165 2 2 2 14166 1 2 2 11169 0 0 0 1183 2 2 2 --- 5222 3 3 3 16224 4 5 5 13230 3 4 4 18 18233 9 9 9 11234 6 6 6 5236 --- --- --- --- 3290 --- --- --- --- 5292 3 3 3 0

0

SUBTOTAL 68 82 82 4 18 204SPARE 29 15 15 4 38TOTAL 97 97 97 22 242

OPERATING SPARES AS % OF SCH. 18.6%

DIVISION 15 SEASONAL SERVICE

DIVISION 15 RAPID SERVICE

LINE NO. AM BASE PM OWL 1200 1245 1900 2000 2300 3000 8000 9200 9400 9500 Total

724 --- --- --- --- 11734 --- --- --- --- 7 7750 --- --- --- --- 21 21761 6 8 8794 --- --- --- --- 0

SUBTOTAL 6 8 8 7 21 39SPARE 4 2 2 2 4 8TOTAL 10 10 10 9 25 47

OPERATING SPARES AS % OF SCH. 20.5%

DIVISION 15 COMBINED REGULAR AND RAPID SERVICE

AM BASE PM OWL 1200 1245 1900 2000 2300 3000 8000 9200 9400 9500 Total

SUBTOTAL 74 90 90 4 7 21 18 243SPARE 33 17 17 2 4 4 46TOTAL 107 107 107 9 25 22 289

OPERATING SPARES AS % OF SCH. 18.9%

EQUIPMENT

EQUIPMENTSCHEDULE

COMBINED SCHEDULE

EQUIPMENTSCHEDULE

*** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD

12/4/2008 Page 41 of 50

Page 42: December 2008 Equipment Assignment Report (4 …libraryarchives.metro.net › DPGTL › 4_12_Reports › 4-12 Report...Attached is the Equipment Assignment Report (4-12 Report) for

LINE ASSIGNMENT OF BUSESSUNDAY SCHEDULE

DIVISION 1810 -24

SUPPLEMENT TO REPORT 4-12 24 295

LINE NO. AM BASE PM OWL 1200 1245 1900 2000 2300 3000 4100 8000 8100 9200 9400 9500 Total

40 13 18 22 2 2042 3 3 4 3111 9 12 13 1 13115 2 3 3 22117 7 10 15 11126 14202 4207 2 3210 12 15 17 2211 3212 1 1 1 15439 3 3 3 20442 3444 4 4 4 11445 3 4 2 3446 4 4 7 6550 5 5 7 3

143

14302

SUBTOTAL 66 82 98 5 192SPARE 50 34 18 37TOTAL 116 116 116 116 229

OPERATING SPARES AS % OF SCH. 19.3%

DIVISION 18 SEASONAL SERVICE

DIVISION 18 RAPID SERVICE

LINE NO. AM BASE PM OWL 1200 1245 1900 2000 2300 3000 8000 9200 9400 9500 Total

710 15711 4 6 6 12 12715 20 20740

4

SUBTOTAL 4 6 6 12 20 51SPARE 3 1 1 2 4 10TOTAL 7 7 7 14 24 61

OPERATING SPARES AS % OF SCH. 19.6%

DIVISION 18 EXPRESS SERVICE

LINE NO. AM BASE PM OWL 1200 1245 1900 2000 2300 3000 8000 9200 9400 9500 Total

450X 0 0 0 0 4

SUBTOTAL 4SPARE 1TOTAL 5

OPERATING SPARES AS % OF SCH. 25.0%

DIVISION 18 COMBINED REGULAR AND RAPID SERVICE

AM BASE PM OWL 1200 1245 1900 2000 2300 3000 8000 9200 9400 9500 Total

SUBTOTAL 70 88 104 5 12 20 247SPARE 53 35 19 2 4 48TOTAL 123 123 123 14 24 295

OPERATING SPARES AS % OF SCH. 19.4%

EQUIPMENT

EQUIPMENTSCHEDULE

COMBINED SCHEDULE

EQUIPMENT

SCHEDULE EQUIPMENT

SCHEDULE

*** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD

12/4/2008 Page 42 of 50

Page 43: December 2008 Equipment Assignment Report (4 …libraryarchives.metro.net › DPGTL › 4_12_Reports › 4-12 Report...Attached is the Equipment Assignment Report (4-12 Report) for

APPENDIX

Page 44: December 2008 Equipment Assignment Report (4 …libraryarchives.metro.net › DPGTL › 4_12_Reports › 4-12 Report...Attached is the Equipment Assignment Report (4-12 Report) for

Page 44 of 50

LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY

LINE ASSIGNMENTS SORTED BY DIVISION

DIV LINE DIV LINE DIV LINE DIV LINE DIV LINE

1 18 5 108 8 164 15 90 18 445

1 26 5 110 8 165 15 92 18 450X

1 45 5 115 8 166 15 94 18 446

1 53 5 204 8 168 15 152 18 550

1 60 5 206 8 169 15 154 18 710

1 62 5 207 8 236 15 156 18 711

1 66 5 209 8 243 15 158 18 715

1 265 5 212 8 245 15 163 18 740

1 460 5 305 8 645 15 164

1 705 5 754 8 741 15 165

1 745 5 757 8 750 15 166

1 753 6 2 8 901 15 169

1 760 6 20 9 70 15 183

2 26 6 28 9 76 15 222

2 55 6 30 9 78 15 224

2 60 6 33 9 176 15 230

2 66 6 35 9 180 15 233

2 102 6 217 9 258 15 234

2 105 6 534 9 260 15 236

2 120 7 02 9 267 15 290

2 121 7 10 9 268 15 292

2 124 7 14 9 287 15 724

2 127 7 16 9 484 15 734

2 200 7 20 9 485 15 750

2 611 7 28 9 487 15 761

2 612 7 30 9 490 15 794

3 81 7 35 9 620 18 40

3 83 7 38 9 665 18 42

3 84 7 217 9 687 18 111

3 175 7 220 9 762 18 115

3 180 7 305 9 770 18 117

3 201 7 534 10 2 18 126

3 206 7 704 10 4 18 202

3 251 7 714 10 16 18 207

3 252 8 150 10 20 18 210

3 485 8 152 10 30 18 211

3 685 8 154 10 33 18 212

3 728 8 158 10 720 18 439

3 751 8 161 10 730 18 4423 780 8 163 10 920 18 444

Page 45: December 2008 Equipment Assignment Report (4 …libraryarchives.metro.net › DPGTL › 4_12_Reports › 4-12 Report...Attached is the Equipment Assignment Report (4-12 Report) for

Page 45 of 50

LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY

LINE ASSIGNMENTS SORTED BY LINE NUMBER

LINE DIV LINE DIV LINE DIV LINE DIV LINE DIV

2 6 90 15 183 15 444 18 761 15

2 7 92 15 200 2 445 18 762 9

2 10 94 15 201 3 446 18 770 9

4 10 102 2 202 18 460 1 780 3

10 7 105 2 204 5 484 9 794 15

14 7 108 5 206 3 485 3 901 8

16 7 110 5 206 5 485 9 920 10

16 10 111 18 207 5 487 9 450X 18

18 1 115 5 207 18 490 9

20 6 115 18 209 5 534 6

20 7 117 18 210 18 534 7

20 10 120 2 211 18 550 18

26 1 121 2 212 5 611 2

26 2 124 2 212 18 612 2

28 6 126 18 217 6 620 9

28 7 127 2 217 7 645 8

30 6 150 8 220 7 665 9

30 7 152 8 222 15 685 3

30 10 152 15 224 15 687 9

33 6 154 8 230 15 704 7

33 10 154 15 233 15 705 1

35 6 156 15 234 15 710 18

35 7 158 8 236 8 711 18

38 7 158 15 236 15 714 7

40 18 161 8 243 8 715 18

42 18 163 8 245 8 720 10

45 1 163 15 251 3 724 15

53 1 164 8 252 3 728 3

55 2 164 15 258 9 730 10

60 1 165 8 260 9 734 15

60 2 165 15 265 1 740 18

62 1 166 8 267 9 741 8

66 1 166 15 268 9 745 1

66 2 168 8 287 9 750 8

70 9 169 8 290 15 750 15

76 9 169 15 292 15 751 3

78 9 175 3 305 5 753 1

81 3 176 9 305 7 754 5

83 3 180 3 439 18 757 584 3 180 9 442 18 760 1

Page 46: December 2008 Equipment Assignment Report (4 …libraryarchives.metro.net › DPGTL › 4_12_Reports › 4-12 Report...Attached is the Equipment Assignment Report (4-12 Report) for

Page 46 of 50

LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITYBUS LINES ASSIGNED OUT OF MORE THAN ONE DIVISION

LINE

2 6 7 1016 7 1020 6 7 1026 1 228 6 730 6 7 1033 6 1035 6 760 1 266 1 2

115 5 18152 8 15154 8 15158 8 15163 8 15164 8 15165 8 15166 8 15169 8 15180 3 9206 3 5207 5 18212 5 18217 6 7236 8 15305 5 7485 3 9534 6 7750 8 15

DIVISION

Page 47: December 2008 Equipment Assignment Report (4 …libraryarchives.metro.net › DPGTL › 4_12_Reports › 4-12 Report...Attached is the Equipment Assignment Report (4-12 Report) for

Page 47 of 50

LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITYRAPID LINES

LINE

704 7705 1710 18711 18714 7715 18720 10724 15728 3730 10734 15740 18741 8745 1750 8 15751 3753 1754 5757 5760 1761 15762 9770 9780 3794 15920 10

DIVISION

Page 48: December 2008 Equipment Assignment Report (4 …libraryarchives.metro.net › DPGTL › 4_12_Reports › 4-12 Report...Attached is the Equipment Assignment Report (4-12 Report) for

Page 48 of 50

LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY

DIVISION NUMBER1 - 2052 - 1953 - 2205 - 2226 - 797 - 2488 - 2299 - 235

10 - 25915 - 26218 - 280

TOTAL 2434

* DIVISION 12 NOT INCLUDED IN TOTAL

(From the Equipment Update Report, FINAL, December 14, 2008)

MAXIMUM OPERATING (STORAGE) CAPACITY

Page 49: December 2008 Equipment Assignment Report (4 …libraryarchives.metro.net › DPGTL › 4_12_Reports › 4-12 Report...Attached is the Equipment Assignment Report (4-12 Report) for

Page 49 of 50

LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY

I. Active Fleet

A. Peak Fleet

1.

2. Active OtherSeasonal unscheduled service.

II. Inactive Fleet

A.

B.

C. Buses Approved for sale.

That portion of the revenue fleet regularly engaged in providing transportation service.

Scheduled Service/Peak Service

FLEET DEFINITIONS

Contingency Fleet - Revenue vehicles not regularly engaged in providing public transportation but available in the event of an unforeseen shortage of active fleet vehicles. (NOTE: Must meet Federal Transportation Administration eligibility requirements)

The number of buses required to support the peak service requirement for all operating service, including regularly scheduled, temporary and seasonal scheduled service.

Buses proposed for sale and awaiting approval.

Page 50: December 2008 Equipment Assignment Report (4 …libraryarchives.metro.net › DPGTL › 4_12_Reports › 4-12 Report...Attached is the Equipment Assignment Report (4-12 Report) for

Page 50 of 50

LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITYEQUIPMENT DESIGNATION SUMMARY12/14/2008

FLEET DESIGNATOR NUMBER (TYPE) MAKE TYPE

NO.OF SEATS ACCESSIBLE SERVICE SERVICE TYPE FUEL TYPE

12 TMC ADB -STANDARD 43 REAR DOOR LOCAL AS DESIGNATED DIESEL

19 TMC ADB -STANDARD 43 FRONT DOOR LOCAL AS DESIGNATED DIESEL

20 TMC ADB -STANDARD 43 REAR DOOR LOCAL AS DESIGNATED DIESEL

30 NEW FLYER ADB - LOW-FLOOR 40 FRONT DOOR LOCAL AS DESIGNATED DIESEL

42 NABI ADB - HYBRID 42 FRONT DOOR LOCAL AS DESIGNATED 42' HYBRID GAS

44 GMC ADB -INTERMEDIATE 36 REAR DOOR LOCAL AS DESIGNATED (35') DIESEL

45 NEOPLAN USA ADB -STANDARD 43 FRONT DOOR LOCAL AS DESIGNATED CNG

46 NEOPLAN USA ADB -STANDARD 43 FRONT DOOR LOCAL AS DESIGNATED CNG

50 NEW FLYER ADB -STANDARD 43 FRONT DOOR LOCAL AS DESIGNATED CNG

53 NEW FLYER ADB - LOW-FLOOR 40 FRONT DOOR LOCAL AS DESIGNATED CNG

63 NEOPLAN USA ADB -STANDARD 43 FRONT DOOR LOCAL AS DESIGNATED CNG

67 NEOPLAN USA ADB -STANDARD 43 FRONT DOOR LOCAL AS DESIGNATED CNG

70 NABI ADB - LOW-FLOOR 40 FRONT DOOR LOCAL AS DESIGNATED CNG

73 NABI ADB - LOW-FLOOR 40 FRONT DOOR LOCAL AS DESIGNATED CNG

75 NABI ADB - LOW-FLOOR 40 FRONT DOOR LOCAL AS DESIGNATED CNG

76 NABI ADB - LOW-FLOOR 40 FRONT DOOR LOCAL AS DESIGNATED CNG

79 NABI ADB - COMPOSITE 40 FRONT DOOR LOCAL AS DESIGNATED CNG

80 NABI ADB - COMPOSITE 46 FRONT DOOR LOCAL AS DESIGNATED 45' CNG

92 NABI ADB - ARTIC 57 FRONT DOOR LOCAL AS DESIGNATED 60' CNG

94 NABI ADB - ARTIC 57 FRONT DOOR LOCAL AS DESIGNATED 60' CNG

95 NABI ADB - ARTIC 57 FRONT DOOR LOCAL AS DESIGNATED 60' CNG