December 17, 2009

Sunflower Project Monthly Conversion Meeting – December

Page 2: December 17, 2009 Sunflower Project Monthly Conversion Meeting – December

2

StatisticsAs of 12/15/09

CustomersAR

Pending Items

Purchasing Contracts

Projects Assets

# Files Expected 3 1 1 5 72

# Files Received 2 0 1 4 59

# Files Processed 2 0 1 2 27

Mock Conversion Testing

Page 3: December 17, 2009 Sunflower Project Monthly Conversion Meeting – December

3

• Feedback is currently being provided to agencies from the Mock 1 conversion.

• This feedback consists of items that must be corrected in your agency’s conversion file before the Mock 2 conversion file is submitted to the Sunflower Project on 1/18/10.

• If your file passes Mock 1 testing with no errors and there are no changes to your data before Mock 2, the Sunflower Project can use the same file for Mock 2. If this is the case for your agency, please email [email protected] to let us know that you would like us to use your Mock 1 file for Mock 2.

Mock Conversion Testing

Page 4: December 17, 2009 Sunflower Project Monthly Conversion Meeting – December

4

I haven’t received feedback yet on my Mock #1 file. Why?

• Assets: Files containing data that exceeds the maximum field length are causing the program to error.

• Projects: Large files are causing the program to error.

• The Sunflower Project is working through these issues in order to provide you with feedback on your file as soon as possible.

What will the feedback look like?

1. Log/Error Files2. Feedback Form

Mock Conversion Testing

Page 5: December 17, 2009 Sunflower Project Monthly Conversion Meeting – December

5

Log/Error Files

• Text file, best if opened with a text editor (e.g., UltraEdit Text Editor)

• Contains # of transactions that processed, # that errored

• Lists error messages

• For the Asset Conversion: Refer to CNV009 Error Messages Job Aid for assistance with resolving errors. This will be posted on the secure SMART website.

Mock Conversion Testing

Page 6: December 17, 2009 Sunflower Project Monthly Conversion Meeting – December

6

CNV009 Asset Conversion Error Messages Job Aid

Mock Conversion Testing

Page 7: December 17, 2009 Sunflower Project Monthly Conversion Meeting – December

7

Feedback Form

Mock Conversion Testing

Page 8: December 17, 2009 Sunflower Project Monthly Conversion Meeting – December

8

• Each mock conversion file should be the complete set of data that you plan to convert.

• All active data that needs to be converted, as of the time when the file is due, should be included.

• This should include any additions/changes to the data since the last time that a file was submitted.

• All corrections requested by the project should be made prior to the next submission.

• Agencies should strive for minimizing changes to data closer to the deployment, wherever possible.

Mock Conversion Testing

Page 9: December 17, 2009 Sunflower Project Monthly Conversion Meeting – December

9

• The following checklist will be posted on the secure SMART website.• Please complete the checklist and submit with each asset conversion

file in the future (Mock 2, Mock 3, Dry Run, Deployment/Go-Live).

Asset Conversion FileSubmission Checklist

Page 10: December 17, 2009 Sunflower Project Monthly Conversion Meeting – December

10

Data entered does not exceed maximum field length according to the file layout/data entry template.

Data is entered into all required fields. Interface ID Interface Line Number Description Asset Subtype Serial ID (for IT hardware assets) In Service Date Quantity Cost Business Unit Location

Date fields are entered as MM/DD/YYYY. Cost field does not contain a dollar sign.

Asset Conversion FileSubmission Checklist

Page 11: December 17, 2009 Sunflower Project Monthly Conversion Meeting – December

11

Valid values are entered into all fields requiring it. Asset Subtype (Required field) Business Unit (Required field) Department ID Fund Code Program Code Service Location Budget Unit Agency Use Location (Required field) Area ID Employee ID Condition Code

For split-funded assets the only data that is different between the lines is Quantity, Cost, and chartfield values.

File contains all assets that your agency plans to convert to SMART.

There is no extraneous data at the bottom of the file.

Asset Conversion FileSubmission Checklist

Page 12: December 17, 2009 Sunflower Project Monthly Conversion Meeting – December

12

Asset Conversion FileField Length Validation Tool

• Intended to provide agencies with a mechanism for validating the length of field values entered into the SMART Asset Data Entry template before the file is submitted to the Sunflower Project.

• Will be posted on secure SMART website.

• Directions are also posted.

Page 13: December 17, 2009 Sunflower Project Monthly Conversion Meeting – December

13

I received feedback that a fund used in my conversion file is invalid. This fund was previously in my agency’s chart of accounts and was the fund used to purchase the asset a long time ago; however, it is not longer part of my chart of accounts. What should I send for the fund in my conversion file?

• The Sunflower Project’s General Ledger and Asset Management Teams have evaluated this scenario. Historical funds will not be added to the SMART chart of accounts for the purpose of data conversion. If a fund is not established as a valid value, it cannot be sent in the Fund field of your assets conversion file. Since it is important to retain the historical fund for reference purpose, you should include this information in the Long Description field of your conversion file.

General Conversion UpdatesAssets (CNV009)

Page 14: December 17, 2009 Sunflower Project Monthly Conversion Meeting – December

14

Agency Task 266: Interfund Contact(s)

• This task is designed for agencies to define their Agency Interfund Customer/Vendor Contacts.

• Task Due Date: December 23, 2009

General Conversion UpdatesAccounts Payable/Accounts Receivable

Page 15: December 17, 2009 Sunflower Project Monthly Conversion Meeting – December

15

Task Due DateAgency cleans up data and sends complete files to the Sunflower Project for Mock Conversion #2 (Task ID 25)

01/18/10

Agency cleans up data and sends complete files to the Sunflower Project for Mock Conversion #3 (Task ID 224)

03/05/10

Agency cleans up data and sends complete files to the Sunflower Project for the Dry Run (Task ID 225)

04/30/10

Future Milestones

Page 16: December 17, 2009 Sunflower Project Monthly Conversion Meeting – December

16

Conversion Support

•Email [email protected] with questions. Include ‘Conversion’ in the Subject line of all emails.

• Schedule Office Hours with the SMART Conversion Team. Email [email protected] to schedule an appointment.

•Attend Monthly Conversion Meetings.

• Visit secure SMART website to obtain conversion materials: http://www.da.ks.gov/smart/

Click on Technical Resources tab at top of page. Don’t have access? Email [email protected].

• Refer to Q&A’s from this meeting on the SMART website. Click on ‘Questions & Answers’ on the home page

January’s Conversion MeetingWednesday, January 27

9:00 – 10:00 LSOB Auditorium