December 02, 2010
Columbus City Schools Schematic Design Progress
Alum Crest / Clearbrook 6-12 School
General Presentation Footer
CCS Alum Crest / Clearbrook 6-12 School
Community Presentation12-02-2010
December 02, 2010
Columbus City Schools Schematic Design Progress
Alum Crest / Clearbrook 6-12 School
Core Team Members
• Columbus City SchoolsMary Ey, Executive Director of Education Services/ResourcesSusan Fossmeyer, Regional Executive DirectorDoug Swartz, Project ManagerTeresa McGurr, Principal of Alum Crest High SchoolNancy Vallette, Assistant Principal of Alum Crest High SchoolGilda Taylor, Principal of Clearbrook Middle SchoolDon Cantrell, Assistant Principal of Clearbrook Middle School
• Ohio School Facilities Commission (OSFC) – Financial Partner
Rhonda Hagemeyer
• Smoot Elford Resource (SER) – Construction Manager
Bob Hurley, SuperintendentCorey Holben, Project Engineer
December 02, 2010
Columbus City Schools Schematic Design Progress
Alum Crest / Clearbrook 6-12 School
Core Team Members
• Design TeamDesignGroup - Architect
Keith DeVoeJocelyn Krosky
Kinzelman Kline Gossman – Landscape ArchitectMichael Pistiolas
Shelley Metz Baumann Hawk – Structural Engineer
EMH&T – Civil Engineer
Dynamix Engineering Ltd. – Mechanical, Electrical, Plumbing, Fire Protection, Technology
December 02, 2010
Columbus City Schools Schematic Design Progress
Alum Crest / Clearbrook 6-12 School
Schedule
• DesignJuly 2010 through August 2011
• BiddingAugust 2011 through November 2011
• ConstructionJanuary 2012 through June 2013
• Start of SchoolAugust 2013
December 02, 2010
Columbus City Schools Schematic Design Progress
Alum Crest / Clearbrook 6-12 School
What has Occurred So Far
• Geothermal Testing
• Archeological Study
• Environmental Studies – Phase I & II
• Geotechnical Servicesa. Soil borings start in December 2010.b. Geotechnical Company will be onsite for approximately a week with
their equipment.c. Soil samples help determine the bearing capacity of the soil for the
new building.d. All soil borings will be back-filled onsite by Geotech Company.
• Program of Requirementsa. Design team, CCS, and schools have reconciled the program for the
project.b. Basic massing studies of the building.c. Site Analysis.
December 02, 2010
Columbus City Schools Schematic Design Progress
Alum Crest / Clearbrook 6-12 School
Project Parameters
• New 6-12 School for 250 students.a. 100 Middle School Studentsb. 150 High School Students
• Room Types:a. Classrooms (Academic, Science, Computer, Wood Shop)b. Cafeteria and Kitchenc. Staged. Gymnasiume. Media Centerf. Vocal & Instrumental Roomsg. Art Roomsh. Administration Offices
• 72,549 gross square feet.
• $13.5 million construction budget.
December 02, 2010
Columbus City Schools Schematic Design Progress
Alum Crest / Clearbrook 6-12 School
Program Graphic
December 02, 2010
Columbus City Schools Schematic Design Progress
Alum Crest / Clearbrook 6-12 School
Project Site
December 02, 2010
Columbus City Schools Schematic Design Progress
Alum Crest / Clearbrook 6-12 School
Site Analysis
December 02, 2010
Columbus City Schools Schematic Design Progress
Alum Crest / Clearbrook 6-12 School
Building Massing Study 1
December 02, 2010
Columbus City Schools Schematic Design Progress
Alum Crest / Clearbrook 6-12 School
Building Massing Study 2
December 02, 2010
Columbus City Schools Schematic Design Progress
Alum Crest / Clearbrook 6-12 School
CCS Website
Alum Crest/Clearbrook Homepage• Follow the Progress of the new school.• Download presentations to community.
Go to:
www.columbus.k12.oh.usa. In the bottom left-hand corner of the screen, click on ‘New Facilities’.b. Under the heading ‘Learning Continues During Construction and
Renovation’ click ‘more’.c. Then, click on the heading ‘Alum Crest/Clearbrook 6-12’.
December 02, 2010
Columbus City Schools Schematic Design Progress
Alum Crest / Clearbrook 6-12 School
Next Steps
• Schematic Design Approval with CCS and SER: November 2010 – January 2011
• Review Schematic Design with Community:January 2011 – Meeting Date TBD
• Design Development with CCS:January - February 2011
• Review Design Development with Community:
March 2011 – Meeting Date TBD