DEAD LOAD CALCULATION FOR T-GIRDER DECK

Embed Size (px)

Citation preview

  • 7/30/2019 DEAD LOAD CALCULATION FOR T-GIRDER DECK

    1/3

    DEAD LOAD CALCULATION FOR RCC T-GIRDER DECK :

    Note : Al l f igures in red coloured font are to be treated as input data. Al l dimensions are in m etres.

    Load from Superstructure : Depth of Super Structure = 2.7

    No. of longitudinal girders = 4

    2.65 2.65 2.65

    0.200

    150 2.075

    300

    0.325

    150 150

    TYPICAL CROSS SECTION OF T-BEAM DECK 0.625

    Cross Sectional Area :-(Intermediate Section )

    i) Intermediate Slab (2.65-0.325)*3*0.25 1.744 m2

    ii) Cantilever Slab 0.5*(0.2+0.33)*(2.075-0.325/2)*2 1.014 m2

    iii) 300 X 150 haunch (0.5*0.3*0.15)*6 0.135 m2

    iv) Web (2.7-0.4)*0.325*4 2.990 m2

    v) Bottom Bulb (0.625*0.25+0.5*(0.325+0.625)*0.15)*4 0.910 m2

    Total SUM(1.74375:0.91) 6.792 m2

    EFFCT OF END THICKENING OF GIRDER

    0.90 0.90

    280 300

    3.24t/m

    Load intensity at B in addition to 325th

    (0.625-0.325)*2.125*2.4*4 6.12 t/m

  • 7/30/2019 DEAD LOAD CALCULATION FOR T-GIRDER DECK

    2/3

    250

    150

    300

    2.

    125

    1900

    150

    250

    DEAD LOAD INTERMEDIATE DIAPHRAGM Thickness of Diaphragm = 0.325 m

    Thickness of diaphragm 0.325m

    Cross Sectional area in elevation (2.65-0.325)*(2.7-250*0.001-250*0.001)-0.15*0.3-0.15*0.15 5.048 m2

    Total Load of each diaphragm 5.0475*0.325*2.4*3 11.81 T

    (Intermediate)

    DEAD LOAD OF END DIAPHRAGM

    Cross sectional area in elevation (2.65-0.625)*(2.7-250*0.001-250*0.001)-0.15*0.075 4.444 m2

    Total load of end diaphragm(2 nos thus) (4.44375*0.325*2.4*3*)2 20.797 T

    D.L. Running meter 6.79*2.4 16.30 t/m

    (Ref P-6)

    S.I.D.L.

    I)Wearing coat =0.2t/m2 =0.2x11.1 2.22

    ii)Crash barrier =1.0x2 2.00

    Total 4.22

    S.I.D.L reaction 4.22*(26.71-2*0.02)*0.5 56.3 T

    10.4 T 11.81 T 10.4 T

    6.12 t/m

    16.30 t/m

    0.02 0.28 26.15

    26.71

    A

    RA = 16.3*(26.71-0.02*2)*0.5+6.12*0.9+0.5*6.12*0.9+10.4+11.81*0.5 241.9 T

  • 7/30/2019 DEAD LOAD CALCULATION FOR T-GIRDER DECK

    3/3

    Total dead load reaction 241.93+56.27 298.20 T

    For design of substructure increasing by 5% 1.05*298.2 313.11 T

    Say= 314 T

    Total Dead Load on Pier due to Super structure 628 T