Diminished Drillpipe CapacityDiminished Drillpipe Capacity
Due to Slip CrushingDue to Slip Crushing
Drilling Engineering Association (DEA) A Research Operations Forum
7/29/2019 DEA-150-Slips
http://slidepdf.com/reader/full/dea-150-slips 2/28
What We KnowWhat We Know
z
Reaching (Exceeding?) Limits – Materials
– Equipment
7/29/2019 DEA-150-Slips
http://slidepdf.com/reader/full/dea-150-slips 3/28
W. ReinholdW. Reinhold
WH SpiriWH Spiri(World Oil, Oct. 1959)(World Oil, Oct. 1959)
7/29/2019 DEA-150-Slips
http://slidepdf.com/reader/full/dea-150-slips 4/28
Hydraulic SlipsHydraulic Slips
z
Hydraulic ControlledSlips
7/29/2019 DEA-150-Slips
http://slidepdf.com/reader/full/dea-150-slips 5/28
Conventional SlipsConventional Slips
z
Conventional Drop in3 Man Slips
z Modified to enhance
integrity at high loads
7/29/2019 DEA-150-Slips
http://slidepdf.com/reader/full/dea-150-slips 6/28
Strain Gage PlacementStrain Gage Placement
z
Strain Gages Placed atCritical Load/Stress
Points on Modified
Conventional Slips
7/29/2019 DEA-150-Slips
http://slidepdf.com/reader/full/dea-150-slips 7/28
Wedding CakeWedding Cake
z
ID Measuring Systemz 3 sensors at 120°
phase separation
7/29/2019 DEA-150-Slips
http://slidepdf.com/reader/full/dea-150-slips 8/28
1.6 MM Pound Load Frame1.6 MM Pound Load Frame
z
Sample Loaded inLoad Frame
7/29/2019 DEA-150-Slips
http://slidepdf.com/reader/full/dea-150-slips 9/28
ResultsResults
z
DimensionalLocations
z Strain Gage Locations
z Evaluate Shape andDiameters Before and
After Testing
7/29/2019 DEA-150-Slips
http://slidepdf.com/reader/full/dea-150-slips 10/28
ResultsResults
z
Slip Die Bite Marks atToe of Slips
7/29/2019 DEA-150-Slips
http://slidepdf.com/reader/full/dea-150-slips 11/28
Landing StringsLanding StringsOD ID PPF WALL
5 3.574 32.67 0.7135 3.500 34.01 0.750
5 1/2 4.000 38.01 0.750
5 7/8 4.375 41.05 0.7506 5/8 5.625 32.67 0.500
6 5/8 5.581 34.01 0.522
6 5/8 5.375 40.00 0.6256 5/8 5.345 40.90 0.640
6 5/8 5.125 47.05 0.750
6 5/8 4.999 50.46 0.813
6.906 5.000 60.59 0.953
7/29/2019 DEA-150-Slips
http://slidepdf.com/reader/full/dea-150-slips 12/28
New 6 5/8 DrillpipeNew 6 5/8 Drillpipe
z
Hexagonal IDz Mill Process
7/29/2019 DEA-150-Slips
http://slidepdf.com/reader/full/dea-150-slips 13/28
Neck down of ODNeck down of OD
z
OD Deformationz Midway up the toe of
the slips
7/29/2019 DEA-150-Slips
http://slidepdf.com/reader/full/dea-150-slips 14/28
NeckdownNeckdown of Drillpipeof Drillpipe
z
As Weight is HungOff Plastic
Deformation Occurs
7/29/2019 DEA-150-Slips
http://slidepdf.com/reader/full/dea-150-slips 15/28
Change in Internal Diameter by Load CycleChange in Internal Diameter by Load Cycle
-0.80%
-0.70%
-0.60%
-0.50%
-0.40%
-0.30%
-0.20%
-0.10%
0.00%
850 900 1000 1050 1100 1150 1250 1300 1350 1400
Load Cycle Maximum (kips)
% C
h a n g e i n I D
7/29/2019 DEA-150-Slips
http://slidepdf.com/reader/full/dea-150-slips 16/28
Cumulative Change in Internal Diameter Cumulative Change in Internal Diameter
-4.00%
-3.50%
-3.00%
-2.50%
-2.00%
-1.50%
-1.00%
-0.50%
0.00%
800 850 900 950 1000 1050 1100 1150 1200 1250 1300 1350 1400 1450Load (kips)
%
C h a n g e i n
I D
DRIFT
7/29/2019 DEA-150-Slips
http://slidepdf.com/reader/full/dea-150-slips 17/28
What We ThinkWhat We Think
z
This problem should not be ignoredz If the string needs to be held for a length of
time, plastic deformation will cause the
drillpipe to neckdown just below the slips
z The reduction in area will eventually
weaken the drillpipe causing the pipe to part just below the slips
7/29/2019 DEA-150-Slips
http://slidepdf.com/reader/full/dea-150-slips 18/28
What Needs to be DoneWhat Needs to be Done
z
Comprehensive Studies to Better Define – Material Degradation
– Material Limits
– Equipment Operating Limits
z Test validity of Spiri-Reinhold Equation
z
Possible solutions – Mitigate Risks
– Improve Cost Effectiveness
7/29/2019 DEA-150-Slips
http://slidepdf.com/reader/full/dea-150-slips 19/28
How?How?
z
Develop a study protocol that does not havethe objective of qualifying a product
z Strain Gage OD and ID of Drill Pipe
– ID Problematic
z Precise, Repetitive, and Accurate Placement
– Technically Difficult
7/29/2019 DEA-150-Slips
http://slidepdf.com/reader/full/dea-150-slips 20/28
Establish Control ValuesEstablish Control Values
z
Limit Scope – Limit variables
– Establish baseline values
z Determine generic damage to drill pipe
7/29/2019 DEA-150-Slips
http://slidepdf.com/reader/full/dea-150-slips 21/28
Limit Initial StudyLimit Initial Study
66--12 Months12 Months
z
1 pipe vendor – Before tool joint
z 10 foot lengths
– 5”
– 5 ½”
– 6 5/8”
7/29/2019 DEA-150-Slips
http://slidepdf.com/reader/full/dea-150-slips 22/28
z
2 Slip Styles – Narrow Column Inserts
– Wide Column Inserts
7/29/2019 DEA-150-Slips
http://slidepdf.com/reader/full/dea-150-slips 23/28
z
New Solid Bowl inside new bushing – Establish control values
– Split bowls more popular
z Less consistent
z More variance
7/29/2019 DEA-150-Slips
http://slidepdf.com/reader/full/dea-150-slips 24/28
Future EffortsFuture Efforts – – Phase IIPhase II
z
Determine correlation between laboratoryconditions vs rig conditions
7/29/2019 DEA-150-Slips
http://slidepdf.com/reader/full/dea-150-slips 25/28
Future EffortsFuture Efforts – – Phase IIIPhase III
z 1 Drill Pipe vs Split Bowl vs Bushing
– Split Bowl vs Bushing Condition Matrix
z New x New
z New x Mid API Spec
z New x Max API Spec
z Mid API Spec x New
z Max API Spec x New
z Mid API Spec x Mid API Spec
z Mid API Spec x Max API Spec
z Etc.
7/29/2019 DEA-150-Slips
http://slidepdf.com/reader/full/dea-150-slips 26/28
Future EffortsFuture Efforts – – Phase IVPhase IV
z
Establish Realistic Range – Coefficient of Friction
z Water Base Mud vs Oil Base Mud
– Insert Die and Slip Body – Slip Body and Bowl
z Define Critical Damage to Drill Pipe
– Inspection Criteria
z Effect of Instantaneous Loading
7/29/2019 DEA-150-Slips
http://slidepdf.com/reader/full/dea-150-slips 27/28
Projected CostProjected Cost – – Phase IPhase I
Lab and Engineering 100,000$Drill Pipe 20,000$
Slips and Bowls Rental 10,000$Bushing Rental 10,000$
TOTAL 140,000$
7/29/2019 DEA-150-Slips
http://slidepdf.com/reader/full/dea-150-slips 28/28