Page 1: DDSP STAINLESS STEELSP STAINLESS STEEL CEILING · 2016-04-27 · 2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart. 3. Fix the main T-bar

DSP STAINLESS STEELDSP STAINLESS STEEL

CEILING

Standard Ceiling Perforated Ceiling LED Ceiling

Page 2: DDSP STAINLESS STEELSP STAINLESS STEEL CEILING · 2016-04-27 · 2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart. 3. Fix the main T-bar

CEILINGCEILINGSTANDARD

Standard Ceiling Perforated Ceiling LED Ceiling

Page 3: DDSP STAINLESS STEELSP STAINLESS STEEL CEILING · 2016-04-27 · 2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart. 3. Fix the main T-bar

LINEUPSTANDARD CEILING

LLLIIINNEEUUPPPLLLIIINNEEUUPPLINEUPLINEUP

Available Color

FinishDouble Type

Clip-bar Type

M-bar System Clip-bar Systemunit: mm

No. CD3600S

Size 300 x 600

Weight 575 (g)

Construction Method M-bar System

unit: mm

No. CD3600L

Size 300 x 600

Weight 530 (g)

Construction Method M-bar System

unit: mm

No. CCD3600S

Size 300 x 600

Weight 510 (g)

Construction Method

Clip-bar System

Open-hole Type

Ti-GoldSilver Ti-Bronze Ti-Black

Hard Bead blastBA

INOXTA Ceiling

Page 4: DDSP STAINLESS STEELSP STAINLESS STEEL CEILING · 2016-04-27 · 2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart. 3. Fix the main T-bar

LINEUPSTANDARD CEILING

LLLIIINNEEUUPPPLLLIIINNEEUUPPLINEUPLINEUP

Available Color

Embossed Pattern

unit: mm

Surface VERNOX (Ultra-thin stainless steel)

Surface material thickness 0.06 ~ 0.09

Back material / Thickness ZAM / 0.45

Product size 590 x 590 / 590 x 890 / (H): 10

Weight 1,580 (g)

Construction Method T-bar SystemTi-GoldSilver Ti-Bronze Ti-Black

Brush

Cube

Linen

Fan

Mesh

Snow Flower

Micro Chess

Shine Delta

VERNOX Ceiling

Page 5: DDSP STAINLESS STEELSP STAINLESS STEEL CEILING · 2016-04-27 · 2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart. 3. Fix the main T-bar

LINEUPSTANDARD CEILING

LLLIIINNEEUUPPPLLLIIINNEEUUPPLINEUPLINEUP

Standard type Drawing (590x590)

Page 6: DDSP STAINLESS STEELSP STAINLESS STEEL CEILING · 2016-04-27 · 2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart. 3. Fix the main T-bar

LINEUPSTANDARD CEILING

LLLIIINNEEUUPPPLLLIIINNEEUUPPLINEUPLINEUP

Available Color

Embossed Pattern

unit: mm

Surface VERNOX (Ultra-thin stainless steel)

Surface material thickness 0.06 ~ 0.09

Back material / Thickness ZAM / 0.45

Product size(Model: DSP VG 14) 440 (Installation Size)

460 (Product Size)

Walls

Length: max. 10m

Weight 2,400 (g) per 1 m

Construction Method T-bar System

Ti-GoldSilver Ti-Bronze Ti-Black

Brush

Cube

Linen

Fan

Mesh

Snow Flower

Micro Chess

Shine Delta

The product size will be different after installation, because it requires overlapping parts at the edge.

VERGATE Ceiling

Page 7: DDSP STAINLESS STEELSP STAINLESS STEEL CEILING · 2016-04-27 · 2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart. 3. Fix the main T-bar

LINEUPSTANDARD CEILING

LLLIIINNEEUUPPPLLLIIINNEEUUPPLINEUPLINEUP

VERGATE Ceiling Detail Size

unit: mm

Depth (H) Material thickness (T) Intervals (P) Width (L) Length (B)

14 0.4 40 475 On Demand

Page 8: DDSP STAINLESS STEELSP STAINLESS STEEL CEILING · 2016-04-27 · 2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart. 3. Fix the main T-bar

IMAGESTANDARD CEILING

IIIMMMAAGGEEEIIIMMMAAGGEEEIMAGEIMAGE

INOXTA Ceiling

Page 9: DDSP STAINLESS STEELSP STAINLESS STEEL CEILING · 2016-04-27 · 2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart. 3. Fix the main T-bar

IMAGESTANDARD CEILING

IIIMMMAAGGEEEIIIMMMAAGGEEEIMAGEIMAGE

VERNOX Ceiling

Page 10: DDSP STAINLESS STEELSP STAINLESS STEEL CEILING · 2016-04-27 · 2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart. 3. Fix the main T-bar

IMAGESTANDARD CEILING

IIIMMMAAGGEEEIIIMMMAAGGEEEIMAGEIMAGE

VERGATE Ceiling

Page 11: DDSP STAINLESS STEELSP STAINLESS STEEL CEILING · 2016-04-27 · 2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart. 3. Fix the main T-bar

Standard Ceiling Perforated Ceiling LED Ceiling

CEILINGCEILINGPERFORATED

Page 12: DDSP STAINLESS STEELSP STAINLESS STEEL CEILING · 2016-04-27 · 2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart. 3. Fix the main T-bar

LINEUPPERFORATED CEILING

LLLIIINNEEUUPPPLLLIIINNEEUUPPLINEUPLINEUP

Available Color

FinishDouble Type

Clip-bar Type

M-bar System Clip-bar System

Open-hole Type

Ti-GoldSilver Ti-Bronze Ti-Black

Hard Bead blastBA

Perforated INOXTA Ceiling (Optional)SOUNDTEX

unit: mm

No. CD3600P

Size 300 x 600ø7.5 Hole

Weight 565 (g)

Construction Method M-bar System

unit: mm

No. CD3600PL

Size 300 x 600ø7.5 Hole

Weight 520 (g)

Construction Method M-bar System

unit: mm

No. CCD3600P

Size 300 x 600ø7.5 Hole

Weight 470 (g)

Construction Method

Clip-bar System

Page 13: DDSP STAINLESS STEELSP STAINLESS STEEL CEILING · 2016-04-27 · 2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart. 3. Fix the main T-bar

LINEUPPERFORATED CEILING

LLLIIINNEEUUPPPLLLIIINNEEUUPPLINEUPLINEUP

Available Color

Embossed Pattern

Ti-GoldSilver Ti-Bronze Ti-Black

Brush

Cube

Linen

Fan

Mesh

Snow Flower

Micro Chess

Shine Delta

(Optional)SOUNDTEX

Perforated VERNOX Ceiling

unit: mm

Surface VERNOX (Ultra-thin stainless steel)

Surface material thickness 0.06 ~ 0.09

Back material / Thickness ZAM / 0.45

Product size 590 x 590 / 590 x 890 / (H): 10 / 3.5ø

Weight 1,270 (g)

Construction Method T-bar System

Page 14: DDSP STAINLESS STEELSP STAINLESS STEEL CEILING · 2016-04-27 · 2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart. 3. Fix the main T-bar

LINEUPPERFORATED CEILING

LLLIIINNEEUUPPPLLLIIINNEEUUPPLINEUPLINEUP

ø3.5 x 21% OPEN Perforated Quantity: 7,224

Perforated type Drawing (590x590)

Page 15: DDSP STAINLESS STEELSP STAINLESS STEEL CEILING · 2016-04-27 · 2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart. 3. Fix the main T-bar

LINEUPPERFORATED CEILING

LLLIIINNEEUUPPPLLLIIINNEEUUPPLINEUPLINEUP

Available Color

Embossed Pattern

Ti-GoldSilver Ti-Bronze Ti-Black

Brush

Cube

Linen

Fan

Mesh

Snow Flower

Micro Chess

Shine Delta

The product size will be different after installation, because it requires overlapping parts at the edge.

(Optional)SOUNDTEX

Perforated VERGATE Ceiling

unit: mm

Surface VERNOX (Ultra-thin stainless steel)

Surface material thickness 0.06 ~ 0.09

Back material / Thickness ZAM / 0.45

Product size(Model: DSP VG 14) 440 (Installation Size)

460 (Product Size)

WallsLength:

max. 10mHole: 3.5ø

Weight 2,310 (g) per 1 m

Construction Method T-bar System

Page 16: DDSP STAINLESS STEELSP STAINLESS STEEL CEILING · 2016-04-27 · 2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart. 3. Fix the main T-bar

IMAGEPERFORATED CEILING

IIIMMMAAGGEEEIIIMMMAAGGEEEIMAGEIMAGE

Perforated INOXTA Ceiling

Page 17: DDSP STAINLESS STEELSP STAINLESS STEEL CEILING · 2016-04-27 · 2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart. 3. Fix the main T-bar

IMAGEPERFORATED CEILING

IIIMMMAAGGEEEIIIMMMAAGGEEEIMAGEIMAGE

Perforated VERNOX Ceiling

Page 18: DDSP STAINLESS STEELSP STAINLESS STEEL CEILING · 2016-04-27 · 2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart. 3. Fix the main T-bar

IMAGEPERFORATED CEILING

IIIMMMAAGGEEEIIIMMMAAGGEEEIMAGEIMAGE

Perforated VERGATE Ceiling

Page 19: DDSP STAINLESS STEELSP STAINLESS STEEL CEILING · 2016-04-27 · 2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart. 3. Fix the main T-bar

Specifi cation : American Society for Testing Materials(ASTM) C423-90 and ASTME95-93

Material : Acoustic Ceiling Made with Aluminum SheetHole Size : 7.5 mmCavity : 15.748”(400mm)NRC : 0.75

* NRC (Noise Reduction Coeffi cient)

Soundtex made in Germany has a high performance of Sound absorbing.

American Standard1.0

0.8

0.6

0.4

0.2

0.0125

Frequency [Hz]

So

und

ab

sorp

tion

[alp

ha s

]

250 500 1000 2000 4000

[Hz] 125 250 500 1000 2000 4000

alpha s 0.97 0.80 0.64 0.73 0.79 0.83

About Soundtex (Perforated Type Only)

SOUNDTEX

Soun

d ab

sorp

tion

[alp

ha s]

Frequency [Hz]

Page 20: DDSP STAINLESS STEELSP STAINLESS STEEL CEILING · 2016-04-27 · 2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart. 3. Fix the main T-bar

CEILINGCEILINGLED

Standard Ceiling Perforated Ceiling LED Ceiling

Page 21: DDSP STAINLESS STEELSP STAINLESS STEEL CEILING · 2016-04-27 · 2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart. 3. Fix the main T-bar

LINEUPLED CEILING

LLLIIINNEEUUPPPLLLIIINNEEUUPPLINEUPLINEUP

LED LightDouble Type

Specifi cation

LED Light Color

unit: mm

Input Output Electric Power Consumption

220 V / 60 Hz DC 36 V White / 22~25 WWarm White / 22~25 W

Clip-bar Type

White Warm White

LED INOXTA Ceiling

unit: mm

No. LCD3600S

Size 300 x 600

Weight 1155 (g)

Construction Method M-bar System

unit: mm

No. LCCD3600S

Size 300 x 600

Weight 1090 (g)

Construction Method

Clip-bar System

LED 84 holes(ø5).

LED 84 holes(ø5).

Page 22: DDSP STAINLESS STEELSP STAINLESS STEEL CEILING · 2016-04-27 · 2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart. 3. Fix the main T-bar

LINEUPLED CEILING

LLLIIINNEEUUPPPLLLIIINNEEUUPPLINEUPLINEUP

LED Detail

Available Color

Finish

M-bar System Clip-bar System

Ti-GoldSilver Ti-Bronze Ti-Black

Hard Bead blastBA

Page 23: DDSP STAINLESS STEELSP STAINLESS STEEL CEILING · 2016-04-27 · 2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart. 3. Fix the main T-bar

LINEUPLED CEILING

LLLIIINNEEUUPPPLLLIIINNEEUUPPLINEUPLINEUP

LED Light

Specifi cation

LED Light Color

unit: mm

Input Output Electric Power Consumption

220 V / 60 Hz DC 36 V White / 44~50 WWarm White / 44~50 W

White Warm White

LED VERNOX Ceiling

unit: mm

Surface VERNOX (Ultra-thin stainless steel)

Surface material thickness 0.06 ~ 0.09

Back material / Thickness ZAM / 0.45

Product size 590 x 590 / 590 x 890 / (H): 10

Weight 1,850 (g)

Construction Method T-bar System

Page 24: DDSP STAINLESS STEELSP STAINLESS STEEL CEILING · 2016-04-27 · 2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart. 3. Fix the main T-bar

LINEUPLED CEILING

LLLIIINNEEUUPPPLLLIIINNEEUUPPLINEUPLINEUP

Available Color

Embossed Pattern

Ti-GoldSilver Ti-Bronze Ti-Black

Brush

Cube

Linen

Fan

Mesh

Snow Flower

Micro Chess

Shine Delta

LED Detail

Page 25: DDSP STAINLESS STEELSP STAINLESS STEEL CEILING · 2016-04-27 · 2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart. 3. Fix the main T-bar

IMAGELED CEILING

IIIMMMAAGGEEEIIIMMMAAGGEEEIMAGEIMAGE

LED INOXTA Ceiling

Page 26: DDSP STAINLESS STEELSP STAINLESS STEEL CEILING · 2016-04-27 · 2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart. 3. Fix the main T-bar

IMAGELED CEILING

IIIMMMAAGGEEEIIIMMMAAGGEEEIMAGEIMAGE

LED VERNOX Ceiling

Page 27: DDSP STAINLESS STEELSP STAINLESS STEEL CEILING · 2016-04-27 · 2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart. 3. Fix the main T-bar

Why LED?

High Efficiency

Long LED Life span

Eco Friendly

Environment Friendly

Economic

" Conversion rate of electric energy to light."

“ The numbers are in and they’re better than we thought.“

" Contain no mercury, 90% of material recyclable."

" Less Maintenance and Save Electricity."

"Emit less heat""Attract less insects""No UV or harmful electro wave"

90% 40%

LED FlorescentLight

LED FluorescentLight

8,000 h

50,000 h

LED

Lamp

2 years 4 years 6 years

More than 10 years

8 years

Replace Lamp

No UV Less Heat

UV

Page 28: DDSP STAINLESS STEELSP STAINLESS STEEL CEILING · 2016-04-27 · 2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart. 3. Fix the main T-bar

LED Lamp's economy

DSP LED Ceiling light saves approximately $23 per year.

Using 12hrs per day, electricity bill $0.1/kwh. Assuming fluorescent light needs replacement 2 times per year, but DSP LED Ceiling light replacement is not necessary.

Depending on product price and using condition, upper content may have difference.

DSP LED Ceiling light saves approximately $270 for 10 years.

Providing high-reliability product under strict quality control system can be used more than 10 years without replacement so it can save the cost.

DSP LED Lamp

50,000hrs

Annual maintenance costs (Unit: $) Comparison of the amount for 10 years (Unit: $)

Fluorescent light(36W)

DSP LED Lamp(100 W)

$9

$32

Electricity bill

$23

72%

Fluorescent light(36W)

DSP LED Lamp(100 W)

Total cost in 2-10 years

Total first year cost

61%$270

$396

$44

$89$81

Page 29: DDSP STAINLESS STEELSP STAINLESS STEEL CEILING · 2016-04-27 · 2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart. 3. Fix the main T-bar

DSP CEILINGDSP CEILING

INSTALLATION

M-bar System-

-

-

Clip-bar System

T-bar System(VERNOX)

T-bar System(VERGATE)

Page 30: DDSP STAINLESS STEELSP STAINLESS STEEL CEILING · 2016-04-27 · 2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart. 3. Fix the main T-bar

INSTALLATIONIIINNNSSSTTTAAALLLLAATTTIIIOOONNNIIINNNSSSTTTAAALLLLAATTTIIIOOONNNNSTALLATIONNSTALLATIONM-BAR

Hanger Bolt ø9(Interval 900-1200)

Hanger H100

Carrying Channel

STS Ceiling

M-bar

Page 31: DDSP STAINLESS STEELSP STAINLESS STEEL CEILING · 2016-04-27 · 2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart. 3. Fix the main T-bar

INSTALLATIONIIINNNSSSTTTAAALLLLAATTTIIIOOONNNIIINNNSSSTTTAAALLLLAATTTIIIOOONNNNSTALLATIONNSTALLATIONM-BAR

Construction drawings

1. After the actual measurement, assemble a stud bolt and a ceiling hanger then fi x with a strong anchor. Then, fi x a carrying channel using hanger pins or bolts.

2. Install an M-bar with a carrying channel placed vertically and spaced at 30 cm apart.

3. Fix the M-bar and carrying channel using an M-bar clip.

4. After M-bar is installed, fi x the DSP Ceiling to the M-bar using the screw from the baseline.

Page 32: DDSP STAINLESS STEELSP STAINLESS STEEL CEILING · 2016-04-27 · 2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart. 3. Fix the main T-bar

INSTALLATIONIIINNNSSSTTTAAALLLLAATTTIIIOOONNNIIINNNSSSTTTAAALLLLAATTTIIIOOONNNINSTALLATIONINSTALLATIONCLIP-BAR

Hanger bolt ø9(Interval 900-1200)

Hanger H100

Carrying Channel

Clip-bar

STS Ceiling

Page 33: DDSP STAINLESS STEELSP STAINLESS STEEL CEILING · 2016-04-27 · 2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart. 3. Fix the main T-bar

INSTALLATIONIIINNNSSSTTTAAALLLLAATTTIIIOOONNNIIINNNSSSTTTAAALLLLAATTTIIIOOONNNINSTALLATIONINSTALLATIONCLIP-BAR

Construction drawings

1. After the actual measurement, assemble a stud bolt and a ceiling hanger then fi x with a strong anchor. Then, fi x a carrying channel using hanger pins or bolts.

2. Install a Clip-bar with a carrying channel placed vertically and spaced at 30 cm apart.

3. Fix the Clip-bar and a carrying channel using a Clip-bar clip.

4. After Clip-bar is installed, fi x the DSP Ceiling to the Clip-Bar furrow on the embossed area of the baseline.

Page 34: DDSP STAINLESS STEELSP STAINLESS STEEL CEILING · 2016-04-27 · 2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart. 3. Fix the main T-bar

INSTALLATIONIIINNNSSSTTTAAALLLLAATTTIIIOOONNNIIINNNSSSTTTAAALLLLAATTTIIIOOONNNINSTALLATIONNINSTALLATIONNT-BAR_VERNOX

Hanger bolt ø9(Interval 900-1200)

Hanger H100

Carrying Channel

VERNOX Ceiling

T-BAR

Page 35: DDSP STAINLESS STEELSP STAINLESS STEEL CEILING · 2016-04-27 · 2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart. 3. Fix the main T-bar

INSTALLATIONIIINNNSSSTTTAAALLLLAATTTIIIOOONNNIIINNNSSSTTTAAALLLLAATTTIIIOOONNNINSTALLATIONNINSTALLATIONNT-BAR_VERNOX

Construction drawings

1. After the actual measurement, assemble a stud bolt and a ceiling hanger then fi x with a strong anchor.

2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart.

3. Fix the main T-bar and a carrying channel using a C/T clip.

4. Install a main T-bar with a cross T-bar placed vertically and spaced at 60 cm apart.

5. After all T-bar is installed, place DSP Ceiling on T-bar wings to complete the installation.

Page 36: DDSP STAINLESS STEELSP STAINLESS STEEL CEILING · 2016-04-27 · 2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart. 3. Fix the main T-bar

INSTALLATIONIIINNNSSSTTTAAALLLLAATTTIIIOOONNNIIINNNSSSTTTAAALLLLAATTTIIIOOONNNINSTALLATIONNINSTALLATIONNT-BAR_VERGATE

Hanger bolt ø9(Interval 900-1200)

Hanger H100

VERGATE Ceiling

Carrying Channel

T-BAR

Page 37: DDSP STAINLESS STEELSP STAINLESS STEEL CEILING · 2016-04-27 · 2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart. 3. Fix the main T-bar

INSTALLATIONIIINNNSSSTTTAAALLLLAATTTIIIOOONNNIIINNNSSSTTTAAALLLLAATTTIIIOOONNNINSTALLATIONNINSTALLATIONNT-BAR_VERGATE

Construction drawings

1. After the actual measurement, assemble a stud bolt and a ceiling hanger then fi x with a strong anchor.

2. Install a main T-bar with a carrying channel placed vertically and spaced at 60 cm apart.

3. Fix the main T-bar and a carrying channel using a C/T clip.

4. Install a main T-bar with a cross T-bar placed vertically and spaced at 60 cm apart.

5. After all T-bar is installed, place DSP Ceiling on T-bar wings to complete the installation.