1
D D D D D D D D D D D D D D D D D D D D D D D D D D D D DD D & ( 75 5 63 7 12 39 20 74 70 200 41 21 50 601 49 63 27 5 16 4 28 22 62 4 19 13 40 25 60 520 28 502 519 18 47 72 41 38 500 19 17 62 41 520 201 42 1 502 41 62 32 5 45 62 14 60 6 47 501 63 63 512 71 63 63 28 22 26 62 40 62 60 14 63 62 62 513 62 73 38 602 62 63 40 201 520 63 48 63 8 31 7 9 44 10 48 46 70 511 43 38 32 30 28 34 62 36 45 29 35 602 30 70 14 6 63 12 23 33 47 37 519 11 70 5 48 28 37 71 28 63 501 28 73 30 520 35 33 30 33 519 37 47 33 7 48 36 501 520 62 519 73 38 519 63 46 519 Project No. 21016.1 Approved: EGL Date: 10/29/12 Figure Setbacks City of Raleigh Public Works Dept. Eagle Resources, P.A. P.O. Box 11189 Southport, NC 28461 919.345.1013 www.eagleresources.com Setback limits for all NWRRTP active fields, including those proposed for the re-application of biosolids. The area of proposed re-application fields after applying all setbacks is 354.4 acres. Note 1: The external compliance boundary has been updated to reflect the current property ownership by CORPUD. Note 2: National Wetlands Inventory database (http://www.fws.gov/wetlands/Wetlands-Mapper.html) was used for wetlands and for the wetland buffer other than the constructed wetlands. EXPLANATION Wetlands 100 ft Buffer External Compliance Boundary Proposed Biosolids Re-Application Areas Active Field, No Proposed Re-Application & ( Water Well Water Well 100 ft Buffer Property Lines (Wake Co. GIS) Property Line 50-ft Buffer Drain Stream Drain 25 ft Buffer Stream 100 ft Buffer Neuse River Neuse River 100-ft buffer Ponds Pond 100 ft buffer D Outcrop Rock Outcrop 25-ft buffer Constructed Wetlands Constructed Wetlands 25 ft Buffer Wetlands (National Wetlands Inventory) Wetlands 100 ft Buffer Habitable Residences Habitable Residence 400 ft buffer 100 Year Floodplain Limit Neuse Greenway Topography - 2 Ft Contour Interval . 0 1,000 2,000 3,000 4,000 500 Feet

DDDDD...D D D DD DD D DD D D D D DD D DD D DD D D DD DD D &(75 5 63 7 12 39 20 74 70 200 41 21 50 201 601 49 63 27 5 16 4 28 22 62 4 503 19 13 503 40 25 60 520 28 502 519 18 47 72

  • Upload
    others

  • View
    24

  • Download
    0

Embed Size (px)

Citation preview

Page 1: DDDDD...D D D DD DD D DD D D D D DD D DD D DD D D DD DD D &(75 5 63 7 12 39 20 74 70 200 41 21 50 201 601 49 63 27 5 16 4 28 22 62 4 503 19 13 503 40 25 60 520 28 502 519 18 47 72

DD

D DDDDD

DD

DD

DDDD

D

DD

D

DDD

D

DDDD

DDD

&(

75

5

63

7

12

39

20

74

70

200

41

21

50

201

601

49

63

27

5 16

4

28

22

62

4

503

19

13

503

40

25

60

520

28

502

519

18

47

72

41

38

500

19

17

62

41

520

201

201

42

1

502

41

62

32

5

45

62

14

60

6

47

501

63

63

512

71

63

63

28

22

26

62

40

62

60

14

6362

62

513

62

73

38

602

62

63

40

201

520

63

48

63

8

31

7

9

44

10

4846

70511

43

38

32

30

28

34

62

36

45

29

35

602

30

70

14

6

63

12 23

33

47

37

519

11

70

5

48

28

37

71

28

63

501

28

73

30

520

35

33

30

33

519

37

47

33

7

48

36

501

520

62

519

73

38

519

63

46

519

Project No.21016.1

Approved: EGL

Date: 10/29/12

Figure

Setbacks

City ofRaleighPublicWorksDept.

Eagle Resources, P.A.P.O. Box 11189Southport, NC 28461919.345.1013www.eagleresources.com

Setback limits for all NWRRTP active fields, including those proposed for the re-application of biosolids. The area of proposed re-application fields after applying all setbacks is 354.4 acres. Note 1: The external compliance boundary has been updated to reflect the current property ownership by CORPUD.Note 2: National Wetlands Inventory database(http://www.fws.gov/wetlands/Wetlands-Mapper.html) was used for wetlands andfor the wetland buffer other than the constructed wetlands.

EXPLANATIONWetlands 100 ft BufferExternal Compliance Boundary

Proposed Biosolids Re-Application AreasActive Field, No Proposed Re-Application

&( Water WellWater Well 100 ft BufferProperty Lines (Wake Co. GIS)Property Line 50-ft Buffer

DrainStreamDrain 25 ft BufferStream 100 ft BufferNeuse RiverNeuse River 100-ft bufferPondsPond 100 ft buffer

D Outcrop

Rock Outcrop 25-ft bufferConstructed WetlandsConstructed Wetlands 25 ft BufferWetlands (National Wetlands Inventory)Wetlands 100 ft Buffer

Habitable ResidencesHabitable Residence 400 ft buffer100 Year Floodplain LimitNeuse GreenwayTopography - 2 Ft Contour Interval

.

0 1,000 2,000 3,000 4,000500Feet