Dry-Docking Excellence using Six Sigmaapproach.
Objectives
Standardize the dry-dockingprocess in terms ofprocedures, job roles and
responsibilities, team. educe unplanned and gro!th
!ork. Standardize the dry-docking
speci"cations #mpro$e reliability and
maintenance managementstrategies.
#mplement a detailed dry-
docking tool and integrate!ith yards, suppliers andinternal stakeholders.
Dry-dock project managementsystem upgrade.
De"ne maintenanceprocedures in detail.
Standardize the in$oicingprocess in agreement !ithyards. De"ne job speci"c
prices as per pre$ious dataa$ailable.
#mpro$e accuracy and on timeperformance.
%reating a benchmark for dry-docking process and e$aluateyards
&roader utilization of conditionassessment de$ices.
%reate a system to sharelessons learned from past dry-dock projects.
Approach
#dentify best practices for (re-docking inspections andprepare a detailed job scope
!hich should be carried outalong !ith pre-dockinginspections, such as )*+,
*hermography etc. %arry out pre-study on the
existing dry-docking processand identify the goodpractices and the a!s from
*, yards, $endors and ser$ice
companies (repare a list of standard jobsand procedures that must becarried out in a dry-dock toeliminate maintenance issueslater.
%reate machinery speci"cinstructions for repairs andidentify standard proceduresfor the same.
+anagement of $endors andser$ice engineers and ratingtheir ser$ice.
Discussion !ith yard to accesstheir Standard operatingprocedures and identifyimpro$ements to suit +aerskreuirements.
De$elopment of a dry-dockingsoft!are, !hich integrates!ith yards, and all internalstake holders. *his tool should
Deliverables
Detailed procedures for pre-docking inspections
identifying jobs to be carriedout and $endors being used. %hecklist and standard
procedures pertaining to jobsthat must be carried out indock.
Detailed maintenanceprocedures and ser$iceengineers reuired for thesame.
#dentifying the team, rolesand responsibilities mappingfor ship sta0 and shoresupport.
Detailed dry-dockingsoft!are for record keeping,analysis and comparison andinformation management.
De$elopment of (#2s andbenchmark studies.
KPIs and Benchmark
Estimated cost to /ctual%ost.
Estimated duration to actualduration.
3o of additional unplannedjobs.
3o of incomplete jobs.
3o of 3ear misses andaccidents
7/25/2019 DD Excellence 2 pager.pptx
2/2
Time and Cost Efecienc
Estimated %ost /ctual %ost
4.445
64.445
74.445
84.445
94.445
144.445
164.445
Dr!Dockin" Cost ComparisonEstimated 14-1:5 sa$ings indocking cost isthe targetrange.
Better Dr!dockin" mana"ement Contin#o#sl improved
speci$cations% Better pre!dockin" preparations% Improved relations &ith
shipards%
Bene$ts
'( ) *+ ,illion -.Dsavin"s%
&etter +anpo!er utilization. %ontributes to maintenance excellence project by
lesser do!ntime of machinery. %ritical failures due to missed out !ork in dry-
dock reduce.
;esser disputes !ith in$oices. &etter time management and accuracy in dock. &etter record keeping for analysis and
comparison. *ransparency in the process and better
information a$ailability for all stake holders.