DD Excellence 2 pager.pptx

Embed Size (px)

Citation preview

  • 7/25/2019 DD Excellence 2 pager.pptx

    1/2

    page 1

    Dry-Docking Excellence using Six Sigmaapproach.

    Objectives

    Standardize the dry-dockingprocess in terms ofprocedures, job roles and

    responsibilities, team. educe unplanned and gro!th

    !ork. Standardize the dry-docking

    speci"cations #mpro$e reliability and

    maintenance managementstrategies.

    #mplement a detailed dry-

    docking tool and integrate!ith yards, suppliers andinternal stakeholders.

    Dry-dock project managementsystem upgrade.

    De"ne maintenanceprocedures in detail.

    Standardize the in$oicingprocess in agreement !ithyards. De"ne job speci"c

    prices as per pre$ious dataa$ailable.

    #mpro$e accuracy and on timeperformance.

    %reating a benchmark for dry-docking process and e$aluateyards

    &roader utilization of conditionassessment de$ices.

    %reate a system to sharelessons learned from past dry-dock projects.

    Approach

    #dentify best practices for (re-docking inspections andprepare a detailed job scope

    !hich should be carried outalong !ith pre-dockinginspections, such as )*+,

    *hermography etc. %arry out pre-study on the

    existing dry-docking processand identify the goodpractices and the a!s from

    *, yards, $endors and ser$ice

    companies (repare a list of standard jobsand procedures that must becarried out in a dry-dock toeliminate maintenance issueslater.

    %reate machinery speci"cinstructions for repairs andidentify standard proceduresfor the same.

    +anagement of $endors andser$ice engineers and ratingtheir ser$ice.

    Discussion !ith yard to accesstheir Standard operatingprocedures and identifyimpro$ements to suit +aerskreuirements.

    De$elopment of a dry-dockingsoft!are, !hich integrates!ith yards, and all internalstake holders. *his tool should

    Deliverables

    Detailed procedures for pre-docking inspections

    identifying jobs to be carriedout and $endors being used. %hecklist and standard

    procedures pertaining to jobsthat must be carried out indock.

    Detailed maintenanceprocedures and ser$iceengineers reuired for thesame.

    #dentifying the team, rolesand responsibilities mappingfor ship sta0 and shoresupport.

    Detailed dry-dockingsoft!are for record keeping,analysis and comparison andinformation management.

    De$elopment of (#2s andbenchmark studies.

    KPIs and Benchmark

    Estimated cost to /ctual%ost.

    Estimated duration to actualduration.

    3o of additional unplannedjobs.

    3o of incomplete jobs.

    3o of 3ear misses andaccidents

  • 7/25/2019 DD Excellence 2 pager.pptx

    2/2

    Time and Cost Efecienc

    Estimated %ost /ctual %ost

    4.445

    64.445

    74.445

    84.445

    94.445

    144.445

    164.445

    Dr!Dockin" Cost ComparisonEstimated 14-1:5 sa$ings indocking cost isthe targetrange.

    Better Dr!dockin" mana"ement Contin#o#sl improved

    speci$cations% Better pre!dockin" preparations% Improved relations &ith

    shipards%

    Bene$ts

    '( ) *+ ,illion -.Dsavin"s%

    &etter +anpo!er utilization. %ontributes to maintenance excellence project by

    lesser do!ntime of machinery. %ritical failures due to missed out !ork in dry-

    dock reduce.

    ;esser disputes !ith in$oices. &etter time management and accuracy in dock. &etter record keeping for analysis and

    comparison. *ransparency in the process and better

    information a$ailability for all stake holders.