28
DCS5098 COMPUTING PROJECT BRIEFING Trimester 58 12 November 2014 (Wed) 8.00 p.m. – 10.00 p.m. MBMX 2001 (CLCR 2001)

DCS5098 COMPUTING PROJECT BRIEFING Trimester 58 12 November 2014 (Wed) 8.00 p.m. – 10.00 p.m. MBMX 2001 (CLCR 2001)

Embed Size (px)

Citation preview

Page 1: DCS5098 COMPUTING PROJECT BRIEFING Trimester 58 12 November 2014 (Wed) 8.00 p.m. – 10.00 p.m. MBMX 2001 (CLCR 2001)

DCS5098 COMPUTING PROJECTBRIEFINGTrimester 5812 November 2014 (Wed)8.00 p.m. – 10.00 p.m. MBMX 2001 (CLCR 2001)

Page 2: DCS5098 COMPUTING PROJECT BRIEFING Trimester 58 12 November 2014 (Wed) 8.00 p.m. – 10.00 p.m. MBMX 2001 (CLCR 2001)

Overview

• Computing Project (DCS5098) also known as Final Year Project (FYP) which is an important course in your programme.

o It is a C-List subject (min C grade to PASS). o It is divided into Interim (Part 1) and Final (Part 2) in

TWO trimesters.

• There are two categories: • Web-based or standalone project.• Multimedia project.

FYP Briefing Tri 58 2

Page 3: DCS5098 COMPUTING PROJECT BRIEFING Trimester 58 12 November 2014 (Wed) 8.00 p.m. – 10.00 p.m. MBMX 2001 (CLCR 2001)

Pre-requisite

• When you register the subject (Trimester 60), the Total Credit Hours including all subjects that you had PASSED must be minimum of 50 Hours.o Calculation of credit hours:

NOT inclusive of “F”, “D”, “D+”, “C-” grade subjects. NOT inclusive of the withdrawn or barred subjects. NOT inclusive of MPU subjects:

• Academic Writing/ Bahasa Kebangsaan• Fundamental of Islamic Leadership in Malaysia• Family Society in Malaysia• Co-Cu

FYP Briefing Tri 58 3

Page 4: DCS5098 COMPUTING PROJECT BRIEFING Trimester 58 12 November 2014 (Wed) 8.00 p.m. – 10.00 p.m. MBMX 2001 (CLCR 2001)

Recommended subjects

• Highly recommended to have knowledge or have taken these subjects:

Web programming (IWP) Desktop programming (Visual Basic) Database (Database Systems) Multimedia tools (Intro. to Multimedia)

FYP Briefing Tri 58 4

Page 5: DCS5098 COMPUTING PROJECT BRIEFING Trimester 58 12 November 2014 (Wed) 8.00 p.m. – 10.00 p.m. MBMX 2001 (CLCR 2001)

TimelineTRIMESTER TASK DURATION/DEADLINE

Tri 2 (2014/2015)

Confirm group members, titles and Supervisor (SV) Week 5

Start FYP Part 1 (Interim) Week 6 - 12

SV checks report/prototype Week 12

SV confirms and submits list for presentation End of Week 12

Interim Presentation Week 14 (26-30 Jan)

Tri 3 (2014/2015) Industrial Training

Tri 1 (2015/2016)

Register FYP Week 1 - 2

Continue FYP Part 2 (Final) Week 1 - 12

Demo project to SV Week 11/12

SV confirms and submits list for presentation Week 12

Final presentation Week 14FYP Briefing Tri 58 5

Page 6: DCS5098 COMPUTING PROJECT BRIEFING Trimester 58 12 November 2014 (Wed) 8.00 p.m. – 10.00 p.m. MBMX 2001 (CLCR 2001)

Project Minimum Requirements

• Minimum requirements are the indicator for the supervisor (SV), panels and students to determine whether:

o Your project is eligible to be presented in the Final presentation and;

o Your project is eligible to be graded as Pass.

• You are RESPONSIBLE to make sure that your project fulfills the minimum requirements.

FYP Briefing Tri 58 6

Page 7: DCS5098 COMPUTING PROJECT BRIEFING Trimester 58 12 November 2014 (Wed) 8.00 p.m. – 10.00 p.m. MBMX 2001 (CLCR 2001)

Web based and Standalone

• Minimum of THREE tables in the database.• Minimum of TWO types of users.

FEATURES/USER E.g.: Customer E.g.: Staff

Basic

1. Login 1. Login

2. Register 2. Add item ( e.g.: product, movie, room, staff, subject, etc)

3. Edit & View profile -

Core

4) Add the important data/info for one of the core features. Example:

• Add to cart• Add booking (can book, reserve,

etc)• Add order (can order, request,

can apply leave, etc)

3. View the important info from one of the core features. Example:• View the transaction• View order list• View reservation/booking

Project Minimum Requirements

FYP Briefing Tri 58 7

Page 8: DCS5098 COMPUTING PROJECT BRIEFING Trimester 58 12 November 2014 (Wed) 8.00 p.m. – 10.00 p.m. MBMX 2001 (CLCR 2001)

Web based and Standalone

• Requirements for Interim Presentation:

o MUST have TEN prototype design/pages (NOT including front page, feedback, contact us page)

FIVE designs of user/customer module• E.g.: Registration, Login, Booking/Ordering form, View menu, etc.

FIVE designs of admin module• E.g.: Add product, View booking, edit booking status, etc.

o This prototype should be in HTML format and preferably connected to each other.

Project Minimum Requirements

FYP Briefing Tri 58 8

Page 9: DCS5098 COMPUTING PROJECT BRIEFING Trimester 58 12 November 2014 (Wed) 8.00 p.m. – 10.00 p.m. MBMX 2001 (CLCR 2001)

Web based and Standalone• Web Development

o Software bundles: e.g.: XAMPP, LAMP, WAMP, EasyPhp, etc.

o Server-side: E.g.: ASP, PHP, JSP and etc.o Client-side: E.g.: HTML, JavaScript, CSS, jQuery, Ajax and

etc.o Adobe Dreamweaver

Can be used as HTML editor only

• Standalone Applicationo E.g.: Visual Basic, Java, C, C++o E.g.: (software) MS VB, JDK, Borland,

• Databaseo E.g.: MS Access, MySQL (software: phpMyAdmin)

Project Minimum Requirements

FYP Briefing Tri 58 9

Page 10: DCS5098 COMPUTING PROJECT BRIEFING Trimester 58 12 November 2014 (Wed) 8.00 p.m. – 10.00 p.m. MBMX 2001 (CLCR 2001)

Web based and Standalone

• NOT ALLOWED to use any code generator, application or framework that have user interface for user management and access levelo Eg: ASPMaker, PHPMaker, Joomla, TangoCMS,

WordPress and etc.

• NOT ALLOWED to use any free Web templates. • NOT ALLOWED to use:

o Adobe Dreamweaver Use behaviours for validate forms. Use code (PHP/ASP) extensions for database related

functions.

Project Minimum Requirements

FYP Briefing Tri 58 10

Page 11: DCS5098 COMPUTING PROJECT BRIEFING Trimester 58 12 November 2014 (Wed) 8.00 p.m. – 10.00 p.m. MBMX 2001 (CLCR 2001)

Multimedia Project

• Must have at least ONE PRIMARY module and THREE SECONDARY modules excluding Splash screen, Homepage & Contact Us/Credit page.o Primary module must have MINIMUM 15 scenes.o Secondary module must have MINIMUM 5 scenes.

• Must have a theme or unique identityo Standardized layout design/screen design

Project Minimum Requirements

FYP Briefing Tri 58 11

Page 12: DCS5098 COMPUTING PROJECT BRIEFING Trimester 58 12 November 2014 (Wed) 8.00 p.m. – 10.00 p.m. MBMX 2001 (CLCR 2001)

Multimedia Project

• Must have the combination of PRIMARY media elements, e.g. animation and minimum THREE secondary media elements.o Primary media: Animationo Secondary media: Text, graphics, audio/ sound

• Must have at least TWO INTERACTIVITY between user and application.o Gallery: images can be enlarged, zoom in and zoom out.

• Must include simple Action Scripting.• Must publish as application format (.exe).• Should bring all the raw materials during presentation (.fla

format).

Project Minimum Requirements

FYP Briefing Tri 58 12

Page 13: DCS5098 COMPUTING PROJECT BRIEFING Trimester 58 12 November 2014 (Wed) 8.00 p.m. – 10.00 p.m. MBMX 2001 (CLCR 2001)

Multimedia Project

Other important notes:• Multimedia elements (Graphics, Animations, Videos) need to

be created / edited using Flash, Photoshop, Illustrator, Adobe Premiere/Adobe After Effects or any other permitted tools o You CANNOT directly download from the website (copyright

issues)

• For animation, you CANNOT use .gif format.• Audio can be edited/recorded using Sony Sound Forge, MP3

Cutter, or any other permitted tools.• Video can be edited using Adobe Premiere/Adobe After

Effects.• Originality : 70% of the multimedia elements are fresh,

original and inventive.

Project Minimum Requirements

FYP Briefing Tri 58 13

Page 14: DCS5098 COMPUTING PROJECT BRIEFING Trimester 58 12 November 2014 (Wed) 8.00 p.m. – 10.00 p.m. MBMX 2001 (CLCR 2001)

Multimedia Project

Requirements for Interim Presentation:

• Must have prototype design of splash screen, homepage and ALL topics/titles/categories.o Must present the screenshots of each interface either by:

Design in Photoshop for each screen OR Design prototype of interface for each screen in Flash.

• These screenshots should be included in the PowerPoint slides.

Project Minimum Requirements

FYP Briefing Tri 58 14

Page 15: DCS5098 COMPUTING PROJECT BRIEFING Trimester 58 12 November 2014 (Wed) 8.00 p.m. – 10.00 p.m. MBMX 2001 (CLCR 2001)

Multimedia Project

• Storyboard o The template is available at the FYP website.o Storyboard can be hand drawn or digitally created using

the computer BUT must follow the storyboard template given in the FYP website.

Project Minimum Requirements

FYP Briefing Tri 58 15

Page 16: DCS5098 COMPUTING PROJECT BRIEFING Trimester 58 12 November 2014 (Wed) 8.00 p.m. – 10.00 p.m. MBMX 2001 (CLCR 2001)

Multimedia Project

• Main development platform:o Adobe Flash

• Picture/Image editing software:o Adobe Photoshop / Illustratoro Paint

• Other editing tools:o Adobe After Effect (video)o Adobe Premiere (video)o MP3 Cutter (Sound)o Sony Sound Forge, Audacity (Sound)o Crazy talk (for creating avatar only)

Project Minimum Requirements

FYP Briefing Tri 58 16

Page 17: DCS5098 COMPUTING PROJECT BRIEFING Trimester 58 12 November 2014 (Wed) 8.00 p.m. – 10.00 p.m. MBMX 2001 (CLCR 2001)

Multimedia Project

• CANNOT use software that could generate the application (multimedia elements) automatically.o E.g.: Swift software, Rapid Gallery Creator

• DO NOT use any programming language to create the core of the multimedia applicationo E.g.: HTML scripts, Java, VB

Project Minimum Requirements

FYP Briefing Tri 58 17

Page 18: DCS5098 COMPUTING PROJECT BRIEFING Trimester 58 12 November 2014 (Wed) 8.00 p.m. – 10.00 p.m. MBMX 2001 (CLCR 2001)

Rules and Warnings• Each member must be involved in ALL aspects of the Project.

• It is COMPULSORY to meet/ consult Supervisor on Project progress. This should be done on a weekly basis until the date of your presentation.o Show the progress of the project AND demonstrate the

prototype/final product.o Allowed to present only if satisfy the minimum

requirements but NO guarantees to PASS.

• If Fail FYP and need to Repeat (*T&C apply) – maximum grade is C.

FYP Briefing Tri 58 18

Page 19: DCS5098 COMPUTING PROJECT BRIEFING Trimester 58 12 November 2014 (Wed) 8.00 p.m. – 10.00 p.m. MBMX 2001 (CLCR 2001)

Rules and Warnings• DO BACKUP FREQUENTLY– upload, keep in your email, etc.

Any excuses such as hard disk crash, laptop was stolen, accidentally format hard disk --- NOT ACCEPTABLE!

• You are NOT ALLOWED to change topic, change supervisor, join another group in Trimester 1, 2015/ 2016.

• CANNOT combine Industrial Training & FYP (Part 2) in one trimester.o This is based on Industrial Training’s rules.

• (NEW) MUST REGISTER FYP – Tri 1 2015/2016 (Final Part 2)o If not, your name will be removed from the group.

FYP Briefing Tri 58 19

Page 20: DCS5098 COMPUTING PROJECT BRIEFING Trimester 58 12 November 2014 (Wed) 8.00 p.m. – 10.00 p.m. MBMX 2001 (CLCR 2001)

Grading and Assessment• FYP carries a total of 100 marks.

• Each member of the group will be graded individually.

Interim (30%)

Prototype : 10%

Presentation : 10%

Report : 10%

Final (70%)

General effort : 10%

Presentation : 10%

Report : 10%

System : 40%

FYP Briefing Tri 58 20

Page 21: DCS5098 COMPUTING PROJECT BRIEFING Trimester 58 12 November 2014 (Wed) 8.00 p.m. – 10.00 p.m. MBMX 2001 (CLCR 2001)

What to do? – 1st Step

• Form a group of MAXIMUM of THREE students.

• Minimum number of students per group is TWO (Not advisable).

• No individual projects is allowed.

• Please choose the right person as your members. o Find members who can and will contribute in the overall project.

FYP Briefing Tri 58 21

Page 22: DCS5098 COMPUTING PROJECT BRIEFING Trimester 58 12 November 2014 (Wed) 8.00 p.m. – 10.00 p.m. MBMX 2001 (CLCR 2001)

What to do? – 2nd Step

• Choose a title and get an IT lecturer to be your supervisor.

• The list of titles will be available at the CDP FYP website.

• Each SV will supervise between 3 and 4 groups only.

• Do not be too ambitious when choosing project titles.

• Choose a topic that you can do. o Ask the SV what is the project about to get a better understanding

of what is required.

• The SVs will also paste the titles on their door.

FYP Briefing Tri 58 22

Page 23: DCS5098 COMPUTING PROJECT BRIEFING Trimester 58 12 November 2014 (Wed) 8.00 p.m. – 10.00 p.m. MBMX 2001 (CLCR 2001)

What to do? – 3rd Step

• Once you get a topic, start doing research on the project.

• Search similar project online to get an idea of the project. This is done to get ideas, not to COPY.

• Start designing and developing the project.

• Start work early.

• Meet your SV on a weekly basis. o Set a time (maybe an hour) to discuss project issues with your SV.

FYP Briefing Tri 58 23

Page 24: DCS5098 COMPUTING PROJECT BRIEFING Trimester 58 12 November 2014 (Wed) 8.00 p.m. – 10.00 p.m. MBMX 2001 (CLCR 2001)

FYP Briefing Tri 58

• It is also known as partnership in industrial linked final year project (FYP).

• Your FYP will be jointly supervised by industry supervisor and CDP supervisor.

o Industry supervisor will identify potential projects.o CDP supervisor to identify students for such projects.

• Students and industry supervisor to sign an agreement, if needed.

Industrial Linked FYP

24

Page 25: DCS5098 COMPUTING PROJECT BRIEFING Trimester 58 12 November 2014 (Wed) 8.00 p.m. – 10.00 p.m. MBMX 2001 (CLCR 2001)

FYP Briefing Tri 58

• Industry / company supervisor:

o To monitor the progress of FYP students in Interim AND/OR Final stage.

o To evaluate the FYP upon the accomplishment of project development.

• Students are reminded that your project must fulfill the minimum requirements.

o Industry supervisor’s roles and responsibilities are to provide comments, suggestions and guidance.

Industrial Linked FYP

25

Page 26: DCS5098 COMPUTING PROJECT BRIEFING Trimester 58 12 November 2014 (Wed) 8.00 p.m. – 10.00 p.m. MBMX 2001 (CLCR 2001)

Downloads• http://cdp.mmu.edu.my/FYP/index.html

o Briefing slides (READ again)o FYP Guidelines (IMPORTANT)o Interim Report templateo Final Report templateo Report cover pageo Meeting Minutes template, etc.

FYP Briefing Tri 58 26

Page 27: DCS5098 COMPUTING PROJECT BRIEFING Trimester 58 12 November 2014 (Wed) 8.00 p.m. – 10.00 p.m. MBMX 2001 (CLCR 2001)

Contact• If you need to clarify things related to FYP, you can

meet Ms Lim Liyen:

o Office location: FSER 3001o Office contact number: 06-252 3218o Email: [email protected]

FYP Briefing Tri 58 27

Page 28: DCS5098 COMPUTING PROJECT BRIEFING Trimester 58 12 November 2014 (Wed) 8.00 p.m. – 10.00 p.m. MBMX 2001 (CLCR 2001)

Thank You

Q&A

FYP Briefing Tri 58 28