10
C IncA irflg000fl coverage end sdjnct bends. Weed snd ccl leshnub eodgrorrrrdcourereun. Check for end rnmoro dead coed porN. Donern. brsnulrec end plants. Chock for and epic, r.odsliem damsge CIenk for rienils. rrrderda. incoct, fiargio. Asic. sod &__ for noesnonoOnrrd ,=rnucno I AGREE TO COMPLY WITH THE REQUIREMENTS OF THE WATER EFFICIENT LANDSCAPE ORDINANCE AND SUBMIT A COMPLETE LANDSCAPE DOCUMENTATION PACKAGE APPLICANT I AGREE TO COMPLY WITH THE REQUIREMENTS OF THE PRESCRIPTIVE COMPLIANCE OPTION OF THE MWELO APPLICANT AN IRRIGATION AUDIT REPORT SHALL BE COMPLETED AT THE TIME OF FINAL INSPECTION AT THE TIME OF FINAL INSPECTION, THE PERMIT APPLICANT MUST PROVIDE THE OWNER OF THE PROPERTY WITH A CERTIFICATE OF COMPLETION, CERTIFICATE OF INSTALLATION, IRRIGATION SCHEDULE AND A SCHEDULE OF LANDSCAPE AND IRRIGATION MAINTENANCE. I HAVE COMPLIED /MTII THE CRITERIA OF THE ORDINANCE AND APPLIED THEM FOR THE EFFICIENT USE OF WATER IN THE LANDSCAPE DESIGN PLANS A DIAGRAM OF THE IRRIGATION PLAN SHOWING HYDROZONES SHALL BE KEPT EtITH THE IRRIGATION CONTROLLER FOR SUBSEQUENT MANAGEMENT PURPOSES A CERTIFICATE OF COMPLETION SHALL BE FILLED OUT AND CERTIFIED BY EITHER THE SIGNER OF THE LANDSCAPE PLANS, THE SIGNER OF THE LANDSCAPE PLANS, THE SIGNER OF THE IRRIGATION PLANS OR THE UCENSED LANDSCAPE CONTRACTOR FOR THE PROJECT FOR PROJECTS THAT INCLUDE LANDSCAPE WORK, THE LANDSCAPE CERTIFICATION, FORM GRN 12 SHALL BE COMPLETED PRIOR TO FINAL INSPECTION APPROVAL LOCKS SHALL BE INSTALLED ON ALL PUBLICLY ACCESSIBLE EXTERIOR FAUCETS AND HOSE BIBS FOR SITES WITH OVER 500 SQUARE FEET OF LANDSCAPE AREA, WASTE PIPING SHALL BE ARRANGED TO PERMIT DISCHARGE FROM THE CLOTHES WASHER, BATHTUB, SHOWERS, AND BATHROOM/RESTROOMS WASH BASINS TO BE USED FOR A FUTURE GRAY WATER IRRIGATION SYSTEM AUTOMATIC LANDSCAPE IRRIGATORS SHALL BE INSTALLED IN SUCH A WAY THAT IT DOESENT SPRAY ON THE BUILDING Inspect Ones for girdlino by Morn ground corers orinsnrgoorsod replsee PROGRESS DRAWING 7 TERRENO DOMINGUEZ CARSON, CALIFORNIA SHEET iNDEX Ii iNDEX SHEET Li IRRIGATION L2 PLANTING L3 IRRIGATION DETAILS L4 PLANTING DETAILS L5 IRRIGATION SPECIFICATIONS-On. L6 IRRIGATION SPECIFICATIONW L7 PLANTING SPECIFICATIONS L8 PLANTING SPECIFICATIONS L9 PLANTING SPECIFICATIONS or DC -Er<i CAL ICLL FREE DcE2272BGR U AT EAST TWO DAYS BEFORE YOU DIG UNDERGROUND DENUDE ALERT Of SOUTHERN CALIFORNIA / 0 Cl) MAINTENANCE SCHEDULE ADO TO IRRIGATION CONTROLLERCABINET WeoUy Bionnotldy Monthly Qnonrdy Dionoually Annually Verify ST irrigctr en controller is functioning proporlt Edgocoserstid Fenrlror cossoosl color sod Nodding plsnls Check mulch siorrege sitd Conduct genoral inspmrion rep/coo coil, owner I d N Pouro snd grin ntimhn scd Praise rod trim lent gtorctng overgrnen grondog end deciduous ems torityolloyCrbotot.Ognn Cehinci And C/con Org DoNna And Roplsce INner, AcNueeet,rv Check Winno And Repso As Needed And C/reeL Clock Aiid Reset If Nccc C hock en s ret hs sins arirtund trees end shrub, sod mplsoe Trim hodges end topists S ubmrt to oottot n record if nsrro omfi. sod chomiocls need hoigutirsi &Iogrch- tooth SE curntmllm if functioning profottr sod nd1unrsng suhedrdo Ar sosrorci csrighintr sod orIon conditions nnhioh may effect the sinonni of maser neohod Iomaintaroplnntheeldt. sdj U St CS no conrcrv litters sod sitsirsers vinselly check for loden, broken filling clone sod Dech Moss I-cur - (miming Gmaod Penilioo tree,. shrub,, sod Corers gtomtd emmcor —000onoests mo;so,swsor Nts era, tiouc seer ccc estunnnnieosemrn Vrroullt Inspect Cum1orsermtsl’orl.esks. Pressure SPonge. SerUeorons (N (NIcer Danrago Affecting The Oçmranon n/A Cieclennont RepsirAn Needed Rooroto coot rot oat cnn. irolstioo rsleen end quick coupler m s/u en s is icc Ily itmrpect fot looks. eetikmeot. onto connections od pmsaumnentuogs Rcpsrr or sdjoct 55 oecdsd Mainline sod steeds rocallt ronfoot Em INks or sonlerocor of iteooh LANDSCAPE INDEX SHEET SHEET NO. I’. SCALE: PER PLAN

DC L9 L8 L7 L6 Li Ii U - ci.carson.ca.us

  • Upload
    others

  • View
    9

  • Download
    0

Embed Size (px)

Citation preview

Page 1: DC L9 L8 L7 L6 Li Ii U - ci.carson.ca.us

CIncA

irflg000flcoverage

endsdjnct

bends.

Weed

sndccl

leshnubeodgrorrrrdcourereun.

Check

forend

rnmoro

deadcoed

porN.

Donern.brsnulrec

endplants.

Chock

forand

epic,r.odsliem

damsge

CIenk

forrienils.

rrrderda.incoct,

fiargio. Asic

.sod

—&

__

for

noesn

onoO

nrrd

,=

rnu

cno

IAG

RE

ET

OC

OM

PLY

WIT

HT

HE

RE

QU

IRE

ME

NT

SO

FT

HE

WA

TE

RE

FF

ICIE

NT

LA

ND

SC

AP

EO

RD

INA

NC

EA

ND

SUB

MIT

AC

OM

PL

ET

EL

AN

DS

CA

PE

DO

CU

ME

NT

AT

ION

PAC

KA

GE

AP

PL

ICA

NT

IAG

RE

ET

OC

OM

PLY

WIT

HT

HE

RE

QU

IRE

ME

NT

SO

FT

HE

PR

ES

CR

IPT

IVE

CO

MP

LIA

NC

EO

PT

ION

OF

TH

EM

WE

LO

AP

PL

ICA

NT

AN

IRR

IGA

TIO

NA

UD

ITR

EP

OR

TSH

AL

LB

EC

OM

PL

ET

ED

AT

TH

ET

IME

OF

FINA

LIN

SP

EC

TIO

N

AT

TH

ET

IME

OF

FINA

LIN

SP

EC

TIO

N,

TH

EP

ER

MIT

AP

PL

ICA

NT

MU

STP

RO

VID

ET

HE

OW

NE

RO

FT

HE

PR

OP

ER

TY

WIT

HA

CE

RT

IFIC

AT

EO

FC

OM

PL

ET

ION

,C

ER

TIF

ICA

TE

OF

INST

AL

LA

TIO

N,

IRR

IGA

TIO

NS

CH

ED

UL

EA

ND

AS

CH

ED

UL

EO

FL

AN

DS

CA

PE

AN

DIR

RIG

AT

ION

MA

INT

EN

AN

CE

.

IHA

VE

CO

MP

LIE

D/M

TII

TH

EC

RIT

ER

IAO

FT

HE

OR

DIN

AN

CE

AN

DA

PP

LIE

DT

HE

MF

OR

TH

EE

FF

ICIE

NT

US

EO

FW

AT

ER

INT

HE

LA

ND

SC

AP

ED

ES

IGN

PLA

NS

AD

IAG

RA

MO

FT

HE

IRR

IGA

TIO

NPL

AN

SH

OW

ING

HY

DR

OZ

ON

ES

SHA

LL

BE

KE

PT

EtIT

HT

HE

IRR

IGA

TIO

NC

ON

TR

OL

LE

RFO

RS

UB

SE

QU

EN

TM

AN

AG

EM

EN

TP

UR

PO

SE

S

AC

ER

TIF

ICA

TE

OF

CO

MP

LE

TIO

NSH

AL

LB

EFIL

LE

DO

UT

AN

DC

ER

TIF

IED

BY

EIT

HE

RT

HE

SIG

NE

RO

FT

HE

LA

ND

SC

AP

EPL

AN

S,T

HE

SIG

NE

RO

FT

HE

LA

ND

SC

AP

EPL

AN

S,T

HE

SIG

NE

RO

FT

HE

IRR

IGA

TIO

NPL

AN

SO

RT

HE

UC

EN

SE

DL

AN

DS

CA

PE

CO

NT

RA

CT

OR

FO

RT

HE

PR

OJE

CT

FO

RP

RO

JEC

TS

TH

AT

INC

LU

DE

LA

ND

SC

AP

EW

OR

K,

TH

EL

AN

DS

CA

PE

CE

RT

IFICA

TIO

N,

FOR

MG

RN

12SH

AL

LB

EC

OM

PL

ET

ED

PR

IOR

TO

FINA

LIN

SP

EC

TIO

NA

PP

RO

VA

LL

OC

KS

SHA

LL

BE

INST

AL

LE

DO

NA

LLPU

BLIC

LYA

CC

ESSIB

LE

EX

TE

RIO

RFA

UC

ET

SA

ND

HO

SEB

IBS

FOR

SITE

SW

ITHO

VE

R500

SQ

UA

RE

FE

ET

OF

LA

ND

SC

AP

EA

RE

A,

WA

ST

EP

IPIN

GSH

AL

LB

EA

RR

AN

GE

DT

OPE

RM

ITD

ISC

HA

RG

EFR

OM

TH

EC

LO

TH

ES

WA

SH

ER

,B

AT

HT

UB

,S

HO

WE

RS

,A

ND

BA

TH

RO

OM

/RE

ST

RO

OM

SW

ASH

BA

SINS

TO

BE

US

ED

FO

RA

FU

TU

RE

GR

AY

WA

TE

RIR

RIG

AT

ION

SYST

EM

AU

TO

MA

TIC

LA

ND

SC

AP

EIR

RIG

AT

OR

SSH

AL

LB

EIN

STA

LL

ED

INS

UC

HA

WA

YT

HA

TIT

DO

ES

EN

TS

PR

AY

ON

TH

EB

UIL

DIN

G

InspectO

nesfor

girdlinoby

Morn

groundcorers

orin

snrg

oorso

dreplsee

PR

OG

RE

SS

DR

AW

ING

7

TE

RR

EN

OD

OM

ING

UE

ZC

AR

SO

N,

CA

LIF

OR

NIA

SH

EE

TiN

DE

XIi

iND

EX

SH

EE

TL

iIR

RIG

AT

ION

L2

PL

AN

TIN

GL

3IR

RIG

AT

ION

DE

TA

ILS

L4

PL

AN

TIN

GD

ET

AIL

SL

5IR

RIG

AT

ION

SPEC

IFICA

TIO

NS-O

n.L

6IR

RIG

AT

ION

SP

EC

IFIC

AT

ION

WL

7P

LA

NT

ING

SP

EC

IFIC

AT

ION

SL

8P

LA

NT

ING

SP

EC

IFIC

AT

ION

SL

9P

LA

NT

ING

SP

EC

IFIC

AT

ION

Sor

DC

-Er<

iCA

LIC

LL

FREE

DcE

2272B

GR

UA

TE

AST

TWO

DA

YS

BE

FO

RE

YO

UD

IG

UNDERGROUNDDENUDE

ALERTO

fSOUTHERN

CALIFORNIA

/

0Cl)

MA

INT

EN

AN

CE

SCH

ED

UL

EA

DO

TOIR

RIG

AT

ION

CO

NT

RO

LL

ER

CA

BIN

ET

WeoU

yB

ionnotldyM

onthlyQ

no

nrd

yD

ionouallyA

nnually

Verify

STirrigctren

controlleris

functioningproporlt

Ed

goco

sers

tid

Fenrlrorcossoosl

colorsod

Nodding

plsnls

Check

mulch

siorreg

esitd

Conduct

genoralinspm

rionrep/coo

coil,ow

ner

IdN

Pourosnd

grinntim

hnscd

Praiserod

trimlent

gtorctngovergrnen

grondogend

deciduousem

s

torityolloyCrbotot.O

gnnC

ehinciA

ndC

/conO

rgD

oNna

And

Roplsce

INner,

AcN

ueeet,rv

Check

Winno

And

Repso

As

Needed

And

C/reeL

Clock

Aiid

Reset

IfN

ccc

Chock

ensrethssins

arirtundtrees

endshrub,

sodm

plsoe

Trim

hodgesend

topists

Subm

rtto

oottotn

recordif

nsrroom

fi.sod

chomiocls

need

hoigutirsi&

Iogrch-tooth

SEcurntm

llmif

functioningprofottr

sodnd1unrsng

suhedrdoA

rsosrorci

csrighintrsod

orIonconditions

nnhiohm

ayeffect

thesinonni

ofm

aserneohod

Iomaintaroplnntheeldt.

sdjU

StCS

noconrcrv

litterssod

sitsirsersvinselly

checkfor

loden,broken

fillingclone

sodD

ech

Moss

I-cur-

(mim

ingG

maod

Peniliootree,.

shrub,,sod

Corers

gtomtd

emmcor

—0

00

on

oests

mo

;so

,sw

so

rN

ts

era,tio

uc

seerccc

estun

nn

nieo

semrn

Vrroullt

InspectC

um

1o

rsermtsl’o

rl.esks.

PressureS

Ponge.

SerUeorons

(N(N

IcerD

anrag

oA

ffecting

The

Oçm

ranonn/A

Cieclennont

RepsirA

nN

eeded

Rooroto

cootrotoatcnn.

irolstioorsleen

endquick

couplerms/u

ens

isiccIlyitm

rpectfot

looks.eetikm

eot.onto

connectionsod

pmsaum

nentuogsR

cpsrror

sdjoct55

oecdsd

Mainline

sodsteeds

rocallt

ronfootEm

INks

orsonlerocor

ofiteooh

LA

ND

SC

AP

EIN

DE

XS

HE

ET

SHE

ET

NO

.

I’.SC

AL

E:

PER

PLAN

Page 2: DC L9 L8 L7 L6 Li Ii U - ci.carson.ca.us

Iy

7s

/7

I/

/

I’

Il/I/1’

//

><>

;I

>z

zoCo

IH

HH

IH

HH

iiiii

11Eiii

IIfl/I

fl;I

fl:I

Iii1

r

I/

IRR

IGA

TIO

NL

EG

EN

D

//

SYM

IIOE

MA

NTlE

MO

DE

l,I

DE

SCR

IPTIO

N

—In-on,)

TotolC

r,nlrol2

SE

/ononli

mountol

outonn,IiuPT

oonHoIk

MooS

IC-I2E

Xonuoll

wI,oro

rhoonor

ondio

lrdhr

ounorC

oordirn,toto/h

olouthoim,10

provi1nI2SV

AC

pooorrX

on

lrollo

r

—1010,1

CI,rnut,

Login

W,rnlnoo

Wruthor

uoro,r,g050m

mIrotull

IJnoholnnlol,CE

.1(X)-

Woo/un

2B

olos,Top

ofR

ooront)olnido

Woll

CO

NT

RA

ClO

BM

DX

rPR

OV

IDE

AL

LC

OM

PON

EN

ES,I’R

OG

XA

MM

INO

AN

I)D

AT

ATN

PUT

bR

IMM

ED

IAT

EIt

BA

SED

SCITED

UL

INS

BY

1HE

IRR

IGA

TIO

NC

ON

tRO

lLER

PRO

VID

EM

AN

IJEA

CE

UR

ER

DO

CU

ME

NtA

tION

,cER

rIFIcA

Y1

0N

EttA

rrIIls[A

SR

EIN

CO

MPL

ET

ED

AF

lER

TItIS

ISD

ON

E[E

MIN

JRA

RY

MA

NIJM

,PI/O

GR

AM

TOU

NG

ISA

LL

OW

ED

FOR

AM

AN

tMU

M3

MO

NT

hE

STA

DL

tSIIME

NT

PER

IOI)

I”W

utorM

otor

to/n

o1)21-V

I-I(2’R

lPro

rmo

lrjmB

ouk

floso

Prosonlor&

Boll

Volvos

-L

ooolcd0

Shrubto

o,

0m

ono,

—N

t/no1131

Li-rizodG

amnV

oIr-r

—1101001

lWhnnoo

IMooorC

onIroJVoInn

R.nnh,rd

Pt))

S000uPlus/n

In-han1-loon/u

Roootu

Control

Volso.Saood

Notol

•R

on/bird33

DX

C3(4•

QoinI

Couplno

Vu/u

IIYD

RO

ZO

NE

ChA

RT

...48811(1))

DL

W

17/IR

LW

11WR

lW

IlIumI)

EW7

20W3(00

B1W

1)12W

I/HB

LW

(‘97

/z,II

z#711

I‘/4

I”!1

-?’

III

/‘o4Iii/

//,,‘ I

hii!

/

/“

/

///1

/1/1111

/./i

i/I/

//O

llI

/7L

//‘/

Thy!//74;cv

LI

//I

//‘I

h1/

/II

/1

n

(

,

0’

--

c/i/I

\ ________

//1

--

//1

‘1

/-

III

DR

IPIR

RIG

AT

ION

SYM

BO

LM

AN

tlEM

OD

EL

ID

ESC

RIPT

ION

I8t,b

dP

60Snnio.

l’luntiolruhnoElortho

Rom

otu(001001

No/tin.

Don

Fitlor007

gpnt354’

FiltorI

I7S

22gptn

=l’b

dlo

r‘j

22005fIrm

1.1-2’Filtor

Noofana

IrRVO

7SSm

/ruInlino

353’Prrovraoo

RooIotasr

Lat,.

Flats,101/on

PR=

JI)21.4

41)5P

M)

IlighPloav

In/jamPR

14S(1-1

700G

PMI

€>—

Nom

otimT

IAD

VM

umudL

mnothrd/ngV

uhothVuB

ufloo

4N

otofonA

oNoouaun

354A

anNonuann

Rn/nE

V.1-n

RoIaoEV

ol.0Launto

othag/sun1sth1

inssntnm

rngordlcuuofathom

/osasnam

pIousA

dduddam

iorolor

n-lintso

/um

tmollaplo

highto

ot

non.aoith

gamin

daltornronn0

6’

Ca,nlronaor

ItooII1,01011

oIlN

ntotnstP

nsdon/pon

Monufunturoo

SImo’Oafto,mtas noN

olointC

onlocaIn/s

pltono1)81-638-2336

a,shso

lonom

I,nmooaoona

IRR

iGA

TIO

NP

IPE

&V

AL

VE

LE

GE

ND

,L

-

,L

II

‘IIYD

RO

ZO

NE

IIW=

111011W

AlE

RU

SCEl

AN

TS

MW

MO

DE

RA

TE

WA

TE

RU

SCI’L

AN

FSL

W=

LO

WW

AT

ER

lISPP

EA

l/IS

lRktG

A11O

NhalL

11101)M

ho/R

CR

OSI’R

AY

S=SI’R/oY

R”R

lYtO

RIIN

TIIB

BL

ER

DoS/Il’

00011hR

Ehasovntc’n,

isdesignol

100150010

toil/utnanh,toanoE

7h(81

I’SIasfprounuro

TImn

on

lroo

tor

0,001voniry

thutnaioimuan

prn

nsm

o00,01(11

Owm

intolnsm

0000ltasnprior

toinshallotiran

mlnrigutiam

nsyotona

CosntoctI,ndooo1or

arc/janetifm

ananaoaopm

nsomd

oo

not0/lO

t(714/680-0417

Moxam

otnSvstom

Flsssv’iPSlotiasn

IX =2200

Gl’M

I

I

——

——

—holodolo

4/PV

CP0m

oM

on/I/anop

mar1-1(2’

ondC

lnsn315

(or2’

undIorgm

-Sioo

Na,mnl

Schodsotn4(1

I’VE

PipatsarLolorul

In/co.(0

ho3/4’

&L

orgot‘O

PTD

roptnnguhian

“iPIY

hoc.dor(aalwro

tour.)’

8mB

G1’M

=3/4’

PVC

81012U

PMI’

I’VE

I21o

22G

PM

11/3’

PVC

22toa31)GPM

=I

I)2’PV

C

I

II

I

Wom

nlCoon

Pro.uumC

uloadation,PO

C221)0

GI’M

-SiStoliasn

IS

I’Mntor

280I.)

2’

flucktloma

IXovorlor

12101

600’of

1.1(2’M

o//too822

[‘Control

Volvo

2W31(8’

arfintorsl11am

I28

TO

TA

LPSI

LO

SS2721)

23%FIT

TIN

G655

PSIRcqum

rcd(/5

Hood

400

II

——

—&

-hodulo4/P

VC

PipoR

lorvo.

Sor

1/oIlhr

lot,sioos

lorgorIluan

paponoosi,ing

——

——

—T

ool/insC

VD

raplinnIS’

nninorm

puoirgm

d1%

’M

ono11-Ito

Spocing(fl/N

o/fin

USA

.T

oho

flu/od4’nrin

-6’m

ox,0

/poo

rI-Too

Boo-O

S,

InlolProusom

o.3S

pri)

Rosacul

posingto

inslnllants

loloralarrm

n/ninns

(Only

ifnondod)P

olo/honotch

noisling.

Califo

rnIa

Water

Efftntent

Lan

decap

oW

ork

ohen

Rononne

foepotnorspontmn

)6T5

50iPrnjoul

TypoN

nn’Res

iywaone#rPO

Oling

Plarl

000

WR

eFoO

tnr)PF)

tOT

AL

PSIR

EQ

IJIRE

D5

‘(SC7405

IngarsnrW

rRatmnr

ETAF

Mrth//’

Efflo)nrny(PFIIE)

lIE)’

I

/IR

RIG

AT

ION

LE

GE

ND

SYM

BO

LM

AN

UI-

MO

DE

L0

(RA

DIU

S-BO

DY

)

[lanrorP

IU-I2-R

-V.l

0

/

Landanego

ETAF

0E

slanraledT

rIalA

rea(Sq.

FL)A

rnoW

andU

SeIE1W

UI°

nIItJN

TFR

MSI3N

-SoH-PR

OS4I&

RI-I’R

SIS

DE

SCR

IPTIO

NPSI

GI°M

BA

DPrnniW

RoIn

STR

EA

MB

IJBI3L

ER

StI58

2’

Prop-opRoator

31)I

0Ito

0(r2

ETAF

Cain

alation

s

Regajar

Landscape

Sreas

[5(iaIE

r/FaoBaea

6576T

otal/tea

16935A

oenageE

TA

F0

39

Aneroge

EtA

Ffor

Rognlar

Landonape

ArnaC

no

ot

be0,55

orbelow

forreA

dentielanoan,

and0,45011.10w

fornon

-redo

n6o

I

AUL

asotsoapeA

reasT

otalE

TA

Fa

Nea

6576T

nt/aA

rea76935

Aoerage

fiT/F

030

SHE

ET

NO

.

LI

Page 3: DC L9 L8 L7 L6 Li Ii U - ci.carson.ca.us

z0tn•I

II

II

tI

J

NLUD(Dz000zLULUHlAN

DS

CA

PE

PLA

NT

ING

SHE

ET

NO

.

L2

/

•I

II

.

// I/I

c]

,/

*:I,i’

ft//

/

/

‘I,

II

//

/

//

r_\

(x

)—

I

00

PL

AN

TL

EG

EN

D

SYM

BO

LB

OT

AN

ICA

LN

AM

EC

OM

MO

NN

AM

ESIZE

QU

AN

TIT

YW

AT

ER

USE

POIX

)CA

RI’IJS

GR

AC

ILIO

RY

EW

PINE

BO

UG

AIN

VIL

LE

AR

ASPB

ER

RY

ICE

BE

RB

ER

ISO

IIUN

BE

RG

II

EX

IRI

INC

FICU

SI’IJER

LA

LU>0-J

z0U)

tOR

EM

AIN

BO

UG

AIN

VIC

ILA

BE

RSF

RA

Y

RO

SMA

RIN

US

TU

SCA

NB

LU

E

5G

AL

5G

AL

CR

EE

PING

Of,

6413

PIIYL

LA

NG

DIFL

OR

A

SG

AL

UP

RIG

hTR

OSE

MA

RY

LO

W

tow

120

WE

STR

ING

IAM

UN

DI

IG

AL

KIIR

M’IA

low

MU

lCH

P36

0C

EC

hOS

1.0WC

OA

STR

OSE

MA

RY

LO

W

A12

0C

5G

AL

LO

W

BO

UL

DE

R2.3

GR

AN

ITE

BO

UL

DE

RS

LO

CA

LL

YSO

//AC

ED

S•lA

YE

RSIIR

ED

OL

DB

AR

KM

UL

LII

‘a2

3D

CL

OW

/

I—hd

Page 4: DC L9 L8 L7 L6 Li Ii U - ci.carson.ca.us

‘tA

j5

Mlv

1C

ON

TEOT

WIR

E

LO

SERD

IW

ill!-

Silo

Sh

IV!

RIQ

TIIR

JI)—

ITN

I)tRPA

VI

MT

NT

ON

!Y

(SEt

IRR

IGA

TIO

NP

lAN

S)

LILA

NRA

CKET!

NO

TE

IA

llp

Oslie

pip

ing

10ho

soakedin

lreeclsav2

Bus40e

&llO

Iilflfl0(0

Inle

rsaIs

LI.Tic

aloose

20loop

me

long

31clrin

ge

of

diroslionglealerlivin

3TEU

flIloall

mops

oilerall

enw

oonole

luncboon

made

4Sen

irngaliOll

np

oelfl0

00

0n

sfor

backfilland

compaclion

lequllemenIs

TR

EN

CH

ING

Or

bU

Nt)

V/Il

VI. B

OX

SINISII

OR

/ID!

QC

IIRA

ND

FDO

NIII)

(WI

PmpIe

Cap

&N

elll’nTahT

50

15

(1

nrlee$llIOI

onR

.lsinn

oI

IN_iC

rM

om

i

QU

ICK

LO

UP

LtR

VA

LV

Ej_

_T

n1

aT

I2

Vo

ln

co

er_

id

PVC

SCIll

OU

tI

RI

RISI

R

PVC

ID6”

3/lT

RU

FD

RD

EK

hr

Sfl

II

PVC

SLIIT01(11

FESE

NSO

RM

OU

NT

PERP1

AN

NO

MO

RE

_—

IT

h’N

(AnTI

FRO

MCT

MO

I)TTLEL

TWIREN

SIE

CIF

IFI)

TNI

ElI-N

OT

CO

NT

EO

LI

ER

-SEE

MA

NITE

MA

NU

Al

2M

mE

OR

MO

TJN

1TN

GIN

SER

UC

TT

OSS

L_J

2”M

is

I2TIVA

CIS)W

FRW

IRE

INC

ON

DI;TT

II)C

ON

DU

ITC

ON

IRTTLV

ALV

E—

—I

(WA

)TO

NS

-U

SING

014

VC

ON

DIO

LW

IRE

tEN

TS

T

5190

WA

LL

-MO

UN

TC

ON

TR

OL

LE

RW

ITII

ETSE

NSO

R

If

XTS1150

[lUll

DIN

O(Ill

hEA

DE

R

SIIRU

ISSPR

AY

NO

/TE

E

rP

\IE

SCIIFD

TTLFI))

RISE

R

/O

NISII

(TRAD

E

•A

VD

RN

LR

Tao

Nole

PV

CSC

IIEDITI

PO

TRTSI

R

Inslalt

head

sir

UPV

CSE

IIEI)I]I

F3)’TEE

OR

ITobove

gradein

the

Interio

rof

plan

tsng

bed

sin

stallh

eads

60

abovegrade

nextto

build

Ings

and

head

ersPV

CL

AT

ER

Al

SHR

UB

SPRA

YB

UB

BL

ER

LA[FERA

lIT

S)

HN

ISIIG

RA

DE

NA

I1VE

RACK

EITI

2”M

INU

S

/rM

AT

NI

1SFD

RS

I)EV

E

CLEA

NITSC

KI-II

IS

AS

ST

RA

flA

NT

)C

OM

PAC

TTO

90%

_—11A

RD

SCA

PTN

G

ITAC

KEII

IT

SON

GS)

ipo

i:SS

I;o]:

IA

LIE

n/ILL

INE

W/

SIF

IVE

—PRLSSLTRY

STTPI’IV

LINE

W/SL

EE

VE

IIW

IRP

SIE

EV

E

SCK

EIII,

NO

TE

S:

I-leanS

mean

l1m

denseodjensol

Od

inpersons

supplylion,

sonpor

2-All

sterns,lobs

scfr40

pscend

lobeh

lbed

ixn

etenn

fdn

lionlo

bssls

sv

inbornthis

disOem

boWsuhon

stem/n0

nnbeimdw

oyosod

usonmnnid

no0%esys

n/Isoblonelod

bybe1,m

on.3- S

lsonsbflbeoobanbeIbeyond

bnduoeposo

potenso

nstndbyhopsoror

4-lfslnevs,embobs

nestsI

shEendan,m

onsOon

shellIn

sod,sodpm

s)dosr/ned

nssnhsIredo

of

shem

ing

olgonendhosE

1)

SLE

EV

ING

DE

TA

IL

U.

MA

tF

AD

AP

ITS

LtO

AIN

LINE

fRO

MhW

lEo

BA

CK

FL

OW

PRE

VE

NT

ER

DE

VIC

E

Irs

2”C

ON

CR

ET

E]

PV

CSM

ITNI

TNT—

“/

DIR

EST

BlO

CK

PVC

SCIOEI3U

I1:411

ElI

Nole:

InStall6

ftoinnearest

adjacenipaved

area

QU

ICK

CO

UPL

ING

VA

LV

E

3R-IN

CII

LIN

EA

RlE

NG

IIII

CO

ILE

DW

AT

ER

PRO

OF

IR

AIN

511

II)[A

G

LOW

FLO

W?

RA

INB

IRD

V-EP-R

7SV

AL

VE

(INC

LU

!)IN

XA

CZ

-R75-PR

EKI

POE

SER

EG

TIL

AT

ING

FILT

FR

(INX

AC

2

IUN

ION

PVC

SCII

40M

AL

EA

DA

PTE

R

®U

VR

AD

LST

IDN

RE

SISEA

NT

PS

CS

CII1S

PIP

E)I

0F21

P11,1511G

RA

DE

I[OP

OI

MIIE

CII

PVC

SCIIA

IEEL

(lOP

2/

©PV

ClA

TE

RA

LPIPE

)IO

F2/

:4”

101

2”

slopo[B

eEani

heetn

iel

Ml

*N

olA

llPlants

inPols/C

onlainersShall

Be

uallyIrrigated

Using

JardinierSub-Irrigation

SY5.

)C

ON

TA

INE

RIR

RIG

AT

ION

(TY

P)w>0-J0z0U

)

ID”

SILL-I50511

-

BR

ICK

SITTIIREET

3/36RA

9011505w

IL

RE

MO

flEC

OT

OT

VA

LV

EW

IlDT

TL

1RII:IE

RA

ND

AU

..PR

V

DR

JPEIN

ESE

AR

IC

ON

NE

CT

ION

MA

LI:

AD

SE

TIR

SE

AN

])PEO

TME

till

[mhlnes

TEE

-

-

Tm

hlooELI

AIR/V

ACTTTIM

RL

[TFF

V/Il

RE-/‘

I(P1

EM

RE

DIC

)D

RIP

IINCA

tFA

CE

TII

111611‘GREET

SEC1)1

tAIL

S

LIN

EFL

IISIIING

VA

lVE

Pt

lIMB

ED

-(0

OR

II’LIN

ESEE

DE

TA

IL1’

MA

NITA

ILIN

EELITRTIIN

GV

AlV

EPLITM

EET)TO

11)0106

P)

MA

NU

AL

LIN

EFL

USH

ING

VA

LV

E(Q

)D

RIP

LIN

EISL

AN

DL

AY

OU

T

UR

ICK

SUPR

)RT

A-C

PEAbIL

TE

RSEE

IE

GE

NI)

(OC

AC

OR

NE

R)

GR

AV

El

SLIER’O

NIR

RIG

AT

ION

EL,SN‘—

ID”SE

EE

EN

IPS!!PO

R1Y

PETLO

WV

Ol

TiME

CO

NT

RO

LSY

SEL

Mw

mi

3/3”FIL

TE

RA

NT)

)/4I’R

I:SSTJRE

FT/UI

AIO

RSEE

IRR

ICTA

TION

EE

GL

ND

POR

MO

DE

LN

UM

I1ERA

M)

DESC

RTPTIO

N

LO

W-V

OL

UM

EC

ON

TR

OL

ZO

NE

AS

SE

MB

LY

IRR

IGA

TIO

ND

ET

AIL

S

SHE

ET

NO

.

L3

PR

OG

RE

SS

DR

AW

ING

SCA

LE

:

NTS

Page 5: DC L9 L8 L7 L6 Li Ii U - ci.carson.ca.us

WO

OD

INST

AL

LA

TIO

N

NO

TE

DR

ILL

1/KPIL

OT

HO

LEB

EFO

RE

MO

UN

TIN

GEY

EB

OL

T

TO6”

—W

HER

EC

ON

DIT

ION

SPE

RM

ITPL

AC

EL

INE

AR

RO

OT

BA

RR

IER

4”TO

6’A

WA

YFR

OM

AN

YH

AR

DSC

APE

—LIN

EAR

POL

YE

TH

YL

EN

ER

OO

TB

AR

RIE

RN

AT

IVE

MA

TfR

IAL

“-24”

TA

LL

FOR

ISG

AL

&24”

BO

XO

RG

RA

VE

LB

AC

KFIL

L-36”

TA

LL

FOR

36”B

OX

OR

LA

RG

ER

a

w>0-J0z0Cl)

Co

0x

x,

A

1G

1Io

n

B

12”

2G

.llox

C

7”

D

18

SG

1Io,,

4”

8”

24”

4”

7G

lIon

12”

26”

4”

15G

tflon

16”

36”

6”

18”

18”B

ox

6”

42”

48”

24”B

ox

18”

48”

6”

22”

48”

6”48”

30”B

ox

36”B

ox

42”B

ox

48”B

ox

54”B

ox

60”B

ox

72”B

ox

54”

66”

78”

90”

102”

108”

120”

27”

32”

32”

36”

36”

42”

42”

12”

12”

12”

12”

12”

12”

12”

48”

48”

60”

60”

60”

72”

72”

PRE

VA

ILIN

GW

IND

TH

RO

UG

HST

AK

ES

PRU

NE

TR

EE

HE

AD

OU

TTO

RE

DU

CE

WE

IGH

TPE

RD

IRE

CT

ION

OF

TH

EL

AN

DSC

APE

AR

CH

ITE

CT

DO

NO

TR

EM

OV

EM

OU

NT

PER

SIDE

GR

OW

TH

MA

NU

FAC

TU

RE

RS

AL

ON

GT

RU

NK

SPEC

IFICA

TIO

NS

CIN

CH

STA

BIL

ITY

FOR

TR

UN

KA

ND

PRE

VEN

TTR

UN

KA

ND

TR

EE

IL

OV

ER

BR

AN

CH

ES

FRO

MR

UB

BIN

GO

NST

AK

ES

“CIN

CH

TIE

”AS

I—

ST

AK

ES

SH

AL

LB

EM

A’SU

FB

YV

ITST

RA

IGIIT

GR

AIN

ED

LO

DG

ETO

(OR

APPR

OV

ED

POLE

PINE

TR

EA

TE

DW

ITH

EQ

UA

L)

NA

ILTO

CO

PPER

NA

PHT

HA

NA

TE

TR

EE

STA

KE

W/I”

FRE

EO

FK

NO

TS

CH

EC

KS

GA

LR

OO

FING

1SPL

ITS

DISFIG

UR

EM

EN

TS

NA

ILA

ND

PL

AC

ED

AM

INIM

UM

OF

4”FR

OM

RO

OT

BA

LL

INST

AK

ES

61

PL

AN

TP

IT

IPL

AN

TPIT

SEE

DE

TA

ILS

r—T

YPIC

AL

PLA

NT

ING

/)SPE

CIFIC

AT

ION

S)12”M

IN,>

,/\

s\‘K

\’‘‘

TR

EE

PLA

NT

ING

IN<

<PA

VE

ME

NT

-RO

OT

RA

LL

\/‘%

‘,‘

CR

OW

NSIIA

LL

BE

I”A

BO

VE

FINISH

ED

SUR

FAC

E

®T

RE

EP

LA

NT

ING

A.B

.CS

ndDrefertoD

eLoiIs”B

”,”G”aodH

”bxIrns

®P

LA

NT

ING

PITL

EG

EN

D

TR

EE

PLA

NT

ING

INL

AW

NR

OO

TR

AL

LC

RO

WN

SHA

LL

BE

I”A

BO

VE

TU

RF

TH

RF

ED

GE

SSH

AL

LB

E6’

AW

AY

FRO

MSID

EO

FT

RU

NK

/O

136SF(33

B(C

AR

TIL

’Ix

SKI

RU

NK

CL

EA

NL

Y13(3T

t33MO

F3,1

ESSO

TH

ER

WISE

oV

IAK

I(I’CH

Ofl

OT

ED

—T

RIM

AER

IAL

RO

OT

S(IF

>-

AN

Y)

TOS

MM

ET

RIC

AL

SHA

PE‘0

--

zz

ND

UP

TOFIN

ISHG

RA

DE

1ULC

HO

RT

OPSO

ILIN

ISA

RE

A)

-R

MF,

-

1310533G

RA

IN

8T

WO

PO

PL

PB

UB

BL

ER

S4”

PER

FOR

A“.“

3,—-

SEEIR

RIG

AT

ION

PLAN

SCH

ED

UL

EC

‘3,

3s

DR

AIN

P1w

i-ni)

--

-30”

Mi-S

FILT

FAB

RIC

‘\

WA

SH

ED

RIV

ER

SA

ND

SOC

KTH

GR

EE

N‘,(,

SLO

PEB

OT

EO

MO

FPIT

AST

ICD

RA

INT

OW

AR

DS

SUM

P2”)

MIN

GTE

CA

PO

NT

OP

24”12”

RO

OT

BA

LL

MIN

V”G

RA

VE

L

FAN

PAL

M

/0

RA

SF

OF

B3IE

AR

TIE

AF

SKIN

UN

KC

LE

AN

LY

5-

/U

NS

SO

TH

ER

WISE

IMA

ER

IAL

RO

OT

S(IF

2A

NY

)TO

SYM

ME

TR

ICA

LSH

APE

Z3-

5\D

UP

TO

FI”S

ISH

GR

.AD

EL

LC

HO

RT

OPSO

ILI’S

SA

REA

)

U

1”3I’,IS

IICR

AD

C

\,.‘

TW

OPO

PU

PB

UB

BL

ER

S4”

PER

FOL

AT

“/

-s

SEEIR

RIG

AT

ION

PLAN

SCH

ED

UL

E40

C“‘

-‘

DR

AIN

PIP‘1131

,“

30”M

IN

FILTEA

BR

ICW

ASH

ED

RIV

ERSA

NG

SOC

KA

NV

CC

AP-

SLO

PEB

OT

TO

MO

FPIT

FOR

AC

UA

TIO

NT

OW

AR

DS

SUM

P2%

MIN

OF

STA

ND

ING

24”2”

000TB

AL

LM

INI’,”

GR

AV

EL

FE

AT

HE

RP

AL

M

LIN

EA

RR

OO

TB

AR

RIE

R‘‘

HA

RD

SCA

PE

\\

Rfl

III

U’’

><]R

OO

TB

AL

LM

AX

‘‘

/‘,\

>/‘

PR

EP

AR

ED

SO

ILM

IX

VE

RT

ICA

LR

IBS

]TY

P%

\\,5/,/,/f

BA

CK

FILL

MA

TE

RIA

L

RE

QU

IRE

DaO

’0

CM

AX

HA

RD

SCA

PE

TH

ER

OO

TB

AR

RIE

RM

UST

BE

MTN

MIN

LIN

EA

RR

OO

TB

AR

RIE

RS

INST

AL

LE

DW

ITH

RO

OT

GU

IDIN

GR

IBS

SHA

LL

BE

INST

AL

LE

DFA

CIN

GT

OW

AR

DT

HE

RO

OT

BA

LL

ON

AL

LT

RE

ES

SVITH

INFIV

EFE

ET

OF

CU

RB

S.N

EW

OR

,M

AX

GR

AS

,SID

EW

AL

KS.

WA

LL

S.E

XIST

ING

TR

EE

—5

SPEC

IFIED

ON

PLAN

,—FO

OT

ING

S,PA

VIN

GO

RA

NY

HA

RD

SCA

PE

3/4”A

RB

OR

TIE

-G

RE

EN

POL

YPR

OPY

LE

NE

CL

OT

HST

RA

PT

RE

EG

UY

BY

DE

EP

RO

OT

OR

APPR

OV

ED

EQ

UA

L

2”X

4”X

36”R

ED

VO

OD

DE

AD

MA

NPL

AC

ED

AT

A45D

EG

AN

GL

EA

ND

BU

RIE

D4”

BE

LO

WFIN

ISHE

DG

RA

DE

MU

LT

IPL

ET

RU

NK

GU

YIN

G

MO

UN

DE

DB

ASIN

SHA

LL

BE

4”A

BO

VE

RO

OT

BA

LL

CR

OW

N

NE

WPR

EPA

RE

D—

SOIL

MIXL

INE

AR

RO

OT

BA

RR

IER

PL

AN

TIN

G

RO

OT

BA

LL

CR

OW

NSH

AL

LB

E2”

AB

OV

EB

AC

KFIL

LS

EU

LE

ME

NT

BA

CK

FILL

MIX

ED

WIT

HFE

RT

ILIZ

ER

(SEE

PLA

NT

ING

SPEC

IFICA

TIO

NS)

RO

OT

BA

LL

SHA

LL

SITD

IRE

CT

LY

UPO

NU

ND

ISTU

RB

ED

SOIL

PED

EST

AL

IPITB

AC

KFIL

LA

RE

A

RO

OT

BA

LL

RO

OT

RA

LL

SHA

LL

SIT

UN

DIS

TUR

BED

SOIL

PED

EST

AL

©L

EA

DA

NC

HO

R

GR

EE

NV

INY

L/‘P

LA

NT

TIE

TY

PIC

AL

SH

RU

BP

LA

NT

ING

RO

OT

BA

LL

CR

OW

NS

hAL

LB

E2”

AB

OV

EB

AC

KFIL

LSE

TT

LE

ME

NT

BA

CK

FILL

MIX

ED

WIT

HFE

RT

ILIZ

ER

(SEE

PLA

NT

ING

SPEC

IFICA

TIO

NS)

RO

OT

BA

LL

SHA

LL

SITD

IRE

CT

LY

UPO

NU

ND

ISTU

RB

ED

SOIL

PED

EST

AL

2PIE

CE

SO

FFIL

TE

RFA

BR

IC

MA

SON

RY

INST

AL

LA

TIO

N

FINISH

GR

AD

E(I’

BE

LO

WT

OP

OF

CU

RB

FOR

TU

RF

AN

D2

BE

LO

WT

OP

OF

CU

RB

FOR

PLA

NT

ING

AR

EA

)PL

AN

TIN

GA

REA

TIEL

OC

AT

ION

SHA

LL

STA

BIL

IZE

STA

KE

DV

INE

MA

TE

RIA

LR

EM

OV

AL

PLA

NT

FRO

MST

AK

EB

EFO

RE

INST

AL

LA

TIO

N.

#725-0123/K

IDZ

INC

\PL

AT

ED

SCR

EW

EY

E=

AV

AIL

AB

LE

TH

RO

UG

HK

NO

XIN

DU

STR

IAL

SUPPL

IES

OR

EQ

UA

L

TIE

LO

CA

TIO

NSH

AL

LST

AB

ILIZ

EST

AK

ED

VIN

EM

AT

ER

IAL

RE

MO

VA

LPL

AN

TFR

OM

STA

KE

BE

FOR

EIN

STA

LL

AT

ION

ESPA

LIE

RA

UA

C)IM

EN

T

SEC

TIO

N(SEE

PLA

NT

PITD

ET

AIL

FOR

TY

PICA

LPL

AN

TIN

GSPE

CIFIC

AT

ION

S3

12”D

IAM

ET

ER

GR

AV

EL

SUM

PSH

AL

LB

ER

EQ

UIR

ED

FOR

TR

EE

PLA

NT

ING

INH

EA

VY

SOIL

S(SEE

DE

TA

IL“A

”FO

RD

IME

NSIO

NS.)

©H

EA

VY

SO

ILP

LA

NT

ING

6”C

ON

CR

ET

EM

OW

ST

R1P

VIN

EA

TtA

CH

ME

NT

0”z

p

EDE

SP

AL

IER

AN

DV

INE

PL

AN

TIN

G

PL

AN

TIN

GD

ET

AIL

S

SHE

ET

NO

.

L4PR

OG

RE

SSD

RA

WIN

G

SC

AL

E:

NT

S

Page 6: DC L9 L8 L7 L6 Li Ii U - ci.carson.ca.us

IRR

IGA

TIO

NSY

STE

MSPE

CIFIC

AT

ION

S

Note:

The

generaland

specificconditions

ofthese

specificationsare

anintegral

partof the

landscapeconstruction

documents

andm

ustbe

complied

with.

I.G

EN

ER

AL

A.

SCO

PEO

FW

OR

KProvide

alllabor,

materials,

eqttipment,

andservices

necessaryto

furnishand

installIrrigation

Systemas

shown

onthe

drawings

anddescribed

herein.

B.Q

UA

LIT

YA

SSUR

AN

CE

AN

DR

EQ

UIR

EM

EN

TS

I.Perm

itsand

FeesT

heC

ontractorshall

obtainand

payfor

anyand

allperm

itsand

allinspections

asrequired.

2.M

anufacturer’sD

irectionsM

anufacturer’sdirections

anddetailed

drawings

shallbe

followed

inall

casesw

herethe

manufacturers

ofm

aterialsand

articlesused

inthis

contractfurnish

directionscovering

pointsnot

shown

inthe

drawings

andspecifications.

3.O

rdinancesand

Regulations

All

local,m

unicipaland

statelaw

s,and

rulesand

regulationsgoverning

orrelating

toany

portionof

thisw

orkare

herebyincorporated

intoand

made

apart

ofthese

specificationsand

theirprovisions

shallbe

carriedoutby

theC

ontractor.A

nythingcontained

inthese

specificationsshall

notbe

construedto

conflictw

ithany

oftheabove

ntlesand

regulationsofthe

same.

How

ever,w

henthese

specificationsand

drawings

callfor

ordescribe

materials,

workm

anship,or

constructionof

abetter

quality,higher

standard,or

largersize

thanis

requiredby

theabove

rulesand

regulations,the

conditionsofthese

specificationsand

drawings

shalltake

precedence.

4.E

xplanationof

Draw

ingsC

ontractoris

responsiblefor

alloffsets,

fittings,sleeves,

fixtures,and

appurtenantdevices

etc.,w

hichm

aybe

requiredfor

properoperation

andconstruction

ofthesystem

.C

ontractorw

illcarefully

investigatethe

structuraland

finishedconditions

affectingall

ofthew

orkand

planthe

work

accordingly,fitm

ishingsuch

fittings.etc.,as

may

berequired

tom

eetsuch

conditions.D

rawings

aregenerally

diagramm

aticand

indicativeofthe

work

tobe

installed.T

hew

orkshall

beinstalled

insuch

am

anneras

toavoid

conflictsbetw

eenirrigation

systems,

otherutilities

planting,and

architecturalfeatures.

The

contractorshall

notw

illfullyinstall

theirrigation

systemas

shown

onthe

drawings

when

itisobvious

inthe

fieldthat

unknown

obstructions,grade

differencesor

discrepanciesin

areadim

ensionsexist

thatm

ightnot

havebeen

consideredin

engineeringSuch

obstructionsor

differencesshould

bebrought

tothe

attentionof

theO

wner’s

authorizedrepresentative.

Inthe

eventthis

notificationis

notperform

ed,the

Contractor

shallassum

eftill

responsibilityfor

anyrevision

necessaryat

noadditional

costto

theO

wner.

CSU

BM

ITT

AL

SI.

Material

List

Furnishthe

articles, equipment,

materials

orprocesses

specifiedby

name

inthe

drawings

andspecifications.

No

substitutionw

illbe

allowed

without

priorw

rittenapproval

bythe

Architect.

Substituteequipm

entor

materials

installedor

furnishedw

ithoutprior

approvalof the

architectm

aybe

rejectedand

theC

ontractorrequired

torem

ovesuch

materials

fromthe

andreplace

themw

ithapproved

materials

siteat

hisow

nexpense.

Approval

ofany

item,

alternateor

substituteindicates

onlythat

theproduct

orproducts

apparentlym

eetthe

requirements

ofthe

drawings

andspecifications

onthe

basisof

theinform

ationor

samples

submitted.

2.R

ecordD

rawings

aT

hecontractor

shallprepare

Record

Draw

ingsor

As-B

uiltplans

showing

thefinal

constructionfield

conditionirrigation

systemb.

The

Record

Draw

ings!A

s-Built

plansshall

beaccurate,

legible,and

toa

measurable

scale,i.e.;

1“=20’,1!8”

=I‘-0”

orother

standardscale.

These

drawings

areto

beprepared

onm

ylaror

otherreproductive

material

c.O

nthe

Record

Draw

ings!A

s-Builts

thecontractor

shalldim

ensionfrom

two

permanent

pointsof

referencepoints

ofreference,

buildingcorners,

sidewalk,

orroad

intersections:etc.,

thelocations

ofthefollow

ingitem

s:(I)

Connection

toexisting

water

lines.(2)

Connection

toexisting

electricalpow

er.(3)

Gate

valves.(4)

Routing

ofsprinkler

pressurelines

(dimension

max

100’along

routing)(5)

Sprinklercontrol

valves.(6)

Routing

ofcontrolw

iring.(7)

Quick

couplingvalves.

(8)O

therrelated

equipmentas

directedby

theA

rchitect.d.

On

orbefore

thedate

ofthe

finalinspection,

theC

ontractorshall

deliverthe

correctedand

completed

Record

Draw

ings!A

s-Builts

tothe

Ow

ner.D

eliveryoftheses

drawings

will

notrelieve

theC

ontractorof

theresponsibility

offurnishingrequired

information

thatmay

beom

ittedfrom

theprints.

3.C

ontrollerC

hartsa

Record

drawings

shallbe

approvedby

theA

rchitectbefore

controllercharts

areprepared.

b.Provide

onecontroller

chartfor

eachcontroller

supplied.c.

The

chartshall

showthe

areacontrolled

bythe

automatic

controllerand

shallbe

them

aximum

sizew

hichthe

controllerdoor

will

allow.

d.T

hechart

isto

bea

reduceddraw

ingofthe

actualA

s-Built

system.

How

ever,in

theevent

thecontroller

sequenceis

notlegible

when

thedraw

ingis

reduced,the

information

shallbe

enlargedto

asize

thatw

illbe

readablew

henreduced.

e.The

circuitsshow

non

thechart

shallbe

color-codedand

adifferent

colorshall

beused

toindicate

thearea

ofcoveragefor

eachcontroller

stationf.

When

completed

andapproved,

thechart

shallbe

hermetically

sealedbetw

eentw

opieces

ofplastic,

eachpiece

beinga

minim

um10

mils

thick.g.

These

chartsshall

becom

pletedand

approvedprior

tofinal

inspectionofthe

irrigationsystem

.

4.O

peratingand

Maintenance

Manuals

Prepareand

deliveroperation

andm

aintenancem

anualsas

specifiedin

Division

Iand

asfollow

s:a.

Catalog

andparts

sheetson

everym

aterialand

alleqtupm

entinstalled

underthis

Contract.

b.G

uaranteestatem

ent.c.

Com

pleteoperating

andm

aintenanceinstructions

onall

major

equipment.

d.In

additionto

theabove

mentioned

maintenance

manuals,

providethe

Ow

ner’sm

aintenancepersorm

elw

ithinstructions

form

ajorequipm

entand

showevidence

inw

ritingto

theA

rchitectat

theconclusion

ofthe

projectthat

thisservice

hasbeen

rendered.

5.E

quipment

tobe

Fumished

Supplyas

apartofthis

Contract

thefollow

ingtools.

a.T

wo

setsof

anyspecial

toolsrequired

forrem

oving,disassem

blingand

adjustingeach

typeof

sprinklerand

valvesupplied

onthis

project.b.

Tw

ofive-foot

valvekeys

foroperation

ofgate

valves.c.

Tw

okeys

foreach

automatic

controller.d.

One

quickcoupler

keyand

matching

hosesw

ivelsper

fotirquick

couplingvalves

installed.e.

Tw

osets

ofoperation

manuals

forautom

aticcontrollers

andvalves.

f.A

nyother

equipment

deemed

necessaryby

theM

anufacturer’sinstructions

tothe

properoperation

ofthe

irrigationsystem

.

The

above-mentioned

eqtupment

shallbe

turnedover

tothe

Ow

nerat

theconclusion

oftheproject.

Before

finalinspection

canoccur,

evidencethat

Ow

nerhas

receivedm

aterialm

ustbe

shown

tothe

Architect.

D.PR

OD

UC

TD

EL

IVE

RY

,ST

OR

AG

EA

ND

HA

ND

LIN

GH

andlingof

PVC

Pipeand

Fittings:T

heC

ontractoris

cautionedto

exercisecare

inhandling,

loadingunloading,

andstoring

PVC

pipeand

fittings.D

onot

subjectPV

Cpipe

toundue

bendingor

concentratedexternal

loadat

anypoint.

Any

sectionof

pipethat

hasbeen

dentedor

damaged

will

bediscarded

and,if

installed,shall

bereplaced

with

newpiping.

E.G

UA

RA

NT

EE

The

guaranteefor

thesprinkler

irrigationshall

bem

adein

accordancew

iththe

formshow

nbelow

.A

copyofthe

guaranteeform

shallbe

includedin

theoperations

andm

aintenancem

anual.T

heguarantee

formshall

bere-typed

ontothe

Contractor’s

letterheadand

containthe

following

information:

GU

AR

AN

TE

EFO

RSPR

INK

LE

RIR

RIG

AT

ION

SYST

EM

We

herebyguarantee

thatthe

sprinklerirrigation

systemw

ehave

furnishedand

installedis

freefrom

defectsin

materials

andw

orkmanship,and

thew

orkhas

beencom

pletedin

accordancew

iththe

drawings

andspecifications,

ordinaryw

earand

tearand

unusualabuse

orneglect

excepted.W

eagree

torepair

orreplace

anddefects

inm

aterialor

workm

anshipw

hichm

aydevelop

duringthe

periodofone

yearfrom

dateof

acceptanceand

alsoto

repairor

replaceany

damage

resultingfrom

therepairing

orreplacing

ofsuch

defectsatno

additionalcost

tothe

Ow

ner.W

eshall

make

suchrepairs

orreplacem

entsw

ithinreasonable

time,

asdeterm

inedby

theO

wner,

afterreceipt

ofw

rittennotice.

Inthe

eventof

ourfailure

tom

akesuch

repairsor

replacements

within

areasonable

time

afterreceipt

ofw

ritten

notic

efro

mthe

Ow

ner,w

eauthorize

theO

wner

toproceed

tohave

saidrepairs

orreplacem

entsm

adeat

ourexpense

andw

ew

illpay

thecosts

andcharges

thereforupon

demand.

PR

OJE

CT

:____________________________

LO

CA

TIO

N:_

______________________

SIG

NE

D:

__

__

__

__

__

__

__

__

__

__

__

__

_

Contractor

_________________________________

AD

DR

ES

S:_

_________________________

PH

ON

E:_

___________________________

DA

TE

OF

AC

CE

PTA

NC

E:

A.

MA

TE

RIA

LS

I.G

eneral:U

seonly

newm

aterialsofbrands

andtypes

notedon

drawings,

specifiedherein,

orapproved

equals.

2.PV

CPressure

Main

Line

Pipeand

Fittingsa

Pressurem

ainline

pipingfor

allsizes

shallbe

PVC

Class

3I5

for2”

andlarger,

schedule40

forI-I!2”

andsm

aller.b.

Pipeshall

bem

adefrom

NSF

approvedtype

I,G

radeI

PVC

compound

conforming

toA

STM

resinspecification

1785.A

llpipe

shallm

eetrequirem

entsas

setforth

inFederal

SpecificationsPS-2

1-70.(Solvent-w

eldpipe).

c.PV

Csolvent-w

eldfittings

shallbe

Schedule40,

1-2,lI-I

NSF

approvedconform

ingto

AST

Mtest

procedureD

2466.U.

Solventcem

entand

primer

forPV

Csolvent-w

eldpipe

andfittings

shallbe

oftype

andinstallation

methods

prescribedby

them

anufacturer.e.

All

PVC

pipeshall

bearthe

following

markings:

(1)M

anufacturer’snam

e.(2)

Nom

inalpipe

size.(3)

Scheduleor

Class.

(4)Pressure

ratingin

PSI.(5)

NSF

(National

Sanitationfoundation)

approval.f.

All

fittingsshall

bearthe

manufacturer’s

name

ortradem

arkm

aterialdesignation,

size,applicable

I,P.S.schedule

andN

SFseal

ofapproval.

3.PV

CN

on-PressureL

ateralL

inePiping

a.N

on-pressureburied

lateralline

pipingshall

bePV

Cschedule

40w

ithsolvent

weld

joints.b.

Pipeshall

bem

adefrom

NSF

approved,Type

IG

radeII

PVC

compound

conforming

toA

STM

resinspecification

01784.A

llpipe

shallm

eetrequirem

entsset

forthin

FederalSpecification

PS-22-70,w

ithan

appropriatestandard

dimension

ratio.c.

Except

asnoted

insection

lI-A2,

a&

b,all

requirements

fornon-pressure

lateralline

pipeand

fittingsshall

bethe

same

asfor

solvent-weld

pressurem

ainline

pipeand

fittingsas

setforth

insection

II-A-2

ofthesespecifications.

4.U

VR

IPVC

Pipeon

Grade

a.A

llpipe

ongrade

shallbe

schedule40

UV

RI

PVC

pipe.b.

All

pipeand

fillingsshall

beara

permanent

identifiablelabel

of“B

rownline

UV

R!

PVC

.T

hepiping

andinstallation

shallbe

inaccordance

with

therequirem

entsofthe

latestedition

ofthe

InternationalA

ssociationof

Plumbing

andM

echanicalO

fficials(IA

PMO

)Standard

IS-s.c.

All

lateralpiping

shallbe

installedon

thesurface

andanchored

at10’

O.C

.by

a#3

rebarw

itha

“J”hooked

radiusdriven

24”into

solidground.

d.H

orizontalpiping

stakesshall

bew

ithin12”

ofthesprinkler

riser.e.

Each

piperiser

servinga

sprinklerhead

shallbe

anchoredby

ariser

stabilizerassem

blyconstructed

ofa#4

rebardriven

24”into

solidground

andfastened

tothe

riserby

two

(2)galvanized

orstainless

steelbands.

f.A

llrisers

andfittings

usedon

UV

RIPV

Cpipe

shallbe

IFSschedule

40or

80as

manufactured

byB

rownline

PipeC

.o.”.

5.B

rassPipe

andFittings

a.W

hereindicated

onthe

drawings,

usered

brassscrew

edpipe

conforming

toFederal

Specification#W

W-P-35

I.b.

Fittingsshall

bered

brassconform

ingto

FederalSpecification

#WW

-P-460.

6G

ateV

alvesa.

Gate

valves3”

andsm

allershall

be125

lb.SW

Pbronze

gatevalve

with

screw-in

bonnet,non-rising

stemand

solidw

edgedisc.

b.G

atevalves

3”sm

allershall

bethreaded

endsand

shallbe

equippedw

itha

bronzehandw

heel.c.

Gate

valve3”

andsm

allershall

besim

ilarto

thosem

anufacturesby

Nibco

orapproved

equal.d.

All

gatevalves

shallbe

installedper

installationdetail.

7.Q

uickC

ouplingV

alvesa

Quick

couplingvalves

shallhave

abrass

two-piece

bodydesigned

forw

orkingpressure

of150

PS

I.

8.B

ackflowPrevention

Units

a.B

ackflowprevention

unitsshall

beofsize

andtype

indicatedon

theirrigation

drawings.

Installbackflow

preventionunits

inaccordance

with

irrigationconstructions

details,and

localprevailing

codes.b.

Wye

Strainersat

backflowprevention

unitsshall

havea

bronzedscrew

edbody

with

60m

eshm

odelscreen

andshall

beW

atts#777

orapproved

equal.

9.C

heckV

alvesA

nti-drainvalves

shallbe

ofheavy-duty

virginPV

Cconstruction

with

F.l.P.thread

inletandoutlet.

Internalparts

shallbe

stainlesssteel

andneoprene.

Anti-drain

valvesshall

befield

adjustableagain

drawout

from5

to40

feet ofhead.

The

anti-drainvalve

shallbe

similar

tothe

Valcon

AD

Vor

approvedequal.

PRO

GR

ESS

DR

AW

ING

IIPR

OD

UC

TS

•I

I•III

z0Si

>Si

wI0I.

liii

2

>(9L

iz,—

‘0

Co

SCA

LE

:

NIA

Page 7: DC L9 L8 L7 L6 Li Ii U - ci.carson.ca.us

10.C

ontrolW

iringa.

Connections

between

theautom

aticcontrollers

andthe

electriccontrol

valvesshall

bem

adew

ithdirect

burialcopper

wire

AW

G-U

F.600

voltPilot

wires

shallbe

adifferent

colorw

irefrom

eachautom

aticcontroller.

Com

mon

wires

shallbe

white

with

adifferent

colorstripe

foreach

automatic

controller.Install

inaccordance

with

valvem

anufacturer’sspecifications

andtvire

chart.In

nocase

shallw

iresize

beless

than#14.

b.W

inngshall

occupythe

same

trenchand

shallbe

installedalong

thesam

eroute

aspressure

supplyor

laterallines

wherever

possible.c.

Where

more

thanone

(1)w

ireis

placedin

atrench, w

iringshall

betaped

togetherat

intervalsof

ten(10)

feet.d.

An

expansioncurl

shallbe

providedw

ithinthree

(3)feetof

eachw

ireconnection.

Expansion

curlshall

beof

sufficientlength

sothat

incase

of repair,the

valvebonnet

may

bebrought to

thesurface

without

disconnectionof

thecontrol

wires.

Control

wires

shallbe

laidloosely

intrench

without

stressor

stretchingof

controlw

ireconductors.

e.A

llsplices

shallbe

made

with

Scotch-Lok

#3576C

onnectorSealing

Packs,R

ainbirdsnap-rite

connector,or

approvedequal.

Use

onesplice

perconnector

sealingpack

11.A

utomatic

Controllers

a.A

utomatic

controllersand

climate

sensorsand

flowsensors

shallbe

ofsize

andtype

shown

onthe

Plans.b.

Finallocation

of automatic

controllersshall

beapproved

bythe

Ow

ner’sauthorized

representative.c.

Unless

otherwise

notedon

theplans,

the120

voltelectrical

power

tothe

automatic

controllerlocation

tobe

furnishedby

others.T

hecoordination

with

Electrical

Contractor

andfinal

electricalhook-up

shallbe

theresponsibility

ofthe

irrigationcontractor.

d.T

hecontractor

isresponsible

forproperly

programm

ingthe

controllerinconjunction

with

specifiedsensors.

Coordinate

with

them

anufacturerfor

anyneeded

assistance.

12.E

lectricC

ontrolV

alvesa.

All

electriccontrol

valvesshall

havea

manual

flowadjustm

ent.b.

Provideand

installone

controlvalve

boxfor

eachelectric

controlvalve.

13.C

ontrolV

alveB

oxesa.

Use

9by

24inch

roundbox

forall

galevalves,

Brooks

#9or

approvedequal.

b.U

se9-1/2

by16

byI

I-inchrectangular

boxfor

allelectrical

controlvalves,

Carson

Industries1419-12B

orapproved

equal.

14.Sprinkler

Heads

a.A

llsprinkler

headsshall

beof the

same

size,type,

anddeliver

thesam

erate

ofprecipitation

with

thediam

eter(O

rradius)

ofthrow.

pressure,and

dischargeas

shown

onthe

plansand’or

specifiedon

thesespecial

provisions.b.

Sprayheads

shallhave

ascrew

adjustment.

c.R

iserunits

shallbe

fabricatedin

accordancew

iththe

details.d.

Riser

nipplesfor

allsprinkler

headsshall

bethe

same

sizeas

theriser

openingin

thesprinkler

head.

III.E

XE

CU

TIO

N

A.

INSPE

CT

ION

I.Site

Conditions

a.A

llscaled

dimensions

areapproxim

ate.T

hecontractor

shallcheck

andverify

allsize

dimensions

andreceive

Architect’s

approvalprior

toproceeding

with

work

underthis

Sectionb.

Exercise

extreme

carein

excavatingand

working

nearutilities.

Contractor

shallbe

responsiblefor

damages

toutilities

which

arecaused

byhis

operationor

neglect.C

heckexisting

utilitiesdraw

ingsfor

existingutility

locations.c.

Coordinate

installationof

sprinklerirrigation

materials,

includingpipe,

sothere

shallbe

nointerference

with

utilitiesor

otherconstruction

ordifficulty

inplanting

trees,shrubs,

orgroundcovers.

B.PR

EPA

RA

TIO

NI,

PhysicalL

ayouta.

Priorto

installation,the

Contractor

shallstake

outall

pressuresupply

lines,routing

andlocation

ofsprinkler

heads.b.

All

layoutshall

beapproved

byA

rchitectprior

totrenching.

2.W

aterSupply

a.Sprinkler

irrigationsystem

shallbe

connectedto

water

supplypoints

ofconnections

asindicated

onthe

drawings.

3.E

lectricalSupply

a.E

lectricalconnections

forautom

aticcontroller

shallbe

made

toelectrical

pointsof connections

asindicated

onthe

drawings.

b.C

ontractoris

responsiblefor

minor

changescaused

byactual

siteconditions.

C.

INST

AL

LA

TIO

NI.

Trenching

a,D

igtrenches

straightand

supportpipe

continuouslyon

sandor

nativebedding

atbottom

oftrench.

Rem

oveall

stonesor

sharpobjects

fromtrench.

Lay

pipeto

aneven

grade.T

renchingexcavation

shallfollotv

layoutindicated

ondraw

ingsand

asnoted.

b.Provide

fora

minim

umof

eighteen(18”)

inchescover

forall

pressuresupply

lines.c.

Providefor

am

inimum

coverof(12”)

inchesfor

allnon-pressure

lines.U.

Providefor

minim

umcover

ofeighteen(18”)

inchesfor

allcontrol

wiring.

2.B

ackfillinga.

The

trenchesshall

notbe

backfilleduntil

allrequired

testsare

performed.

Trenches

shallbe

carefullybackfilled

with

theexcavated

material

approvedby

theSoils

Engineer

forbackfilling

consistingofearth,

loam,

sandyclay,

sand,or

otherapproved

materials,

freefrom

largeclods

ofearth

orstones.

Backfill

shallbe

compacted

inlandscape

areasto

adry

densityequal

toadjacent

undisturbedsoil

inplanting

areas.B

ackfillw

illconform

toadjacent

gradesw

ithoutdips,

sunken,areas,

humps

orother

surfaceirregularities.

b.N

oforeign

mailer

largerthan

one-half(l/2)inch

insize

will

beperm

ittedin

theinitial

backfill.c.

Floodingoftrenches

will

beperm

ittedonly

with

theapproval

ofthe

SoilsE

ngineerand

Architect.

U.lfsettlem

entoccurs

andsubsequent

adjustments

inpipe,

valvessprinkler

heads,law

nor

planting,or

otherconstruction

arenecessary,the

Contractor

shallm

akeall

requiredadjustm

entsw

ithoutcost

tothe

Ow

ner.

3.T

renchingand

Backfill

Under

Pavinga.

Trenches

locatedunder

areasof

paving,asphaltic

concreteshall

bebackfilled

with

sand(slay

ersix

inchesbelow

thepipe

andthree

inchesabove

thepipe)

andcom

pactedin

layersto

90%left

flushw

iththe

adjoininggrade.

The

sprinklerirrigation

Contractor

shallset

inplace,

capand

pressuretest

altpiping

underpaving

priorto

thepaving

work.

b.G

enerally,piping

underexisting

walks

isdone

byjacking,

boringor

hydraulicdriving,

butw

hereany

cuttingor

breakingof

sidewalks

andor

concreteis

necessary,it

shallbe

doneand

replacedby

theC

ontractoras

partof the

Contract

cost.Perm

issionto

cutor

breaksidesvalks

andor

concreteshall

beobtained

fromthe

PropertyO

wner.

c.Provide

foram

inimum

coverof tsventy-four

inchesbetw

eenthe

topofthe

pipeand

thebottom

oftheaggregate

basefor

allpressure

andnon-pressure

pipinginstalled

underasphaltic

concretepaving.

4.A

ssemblies

a.R

outingof

sprinklerirrigation

linesas

indicateon

thedraw

ingis

diagramm

atic.Install

linesand

variousassem

bliesto

confirmw

iththe

detailsshow

non

drawings.

b.Install

nom

ultipleassem

blieson

plasticlines.

Provideeach

assembly

with

itsow

noutlet.

c.Install

allassem

bliesspecified

hereinin

accordancew

ithrespective

detail.In

absenceofdetail

drawings

orspecifications

pertainingto

specificitem

srequired

tocom

pletew

ork,perform

,such

work

inaccordance

with

beststandard

practicew

ithprior

approvalofA

rchitectU.

PVC

pipeand

fittingsshall

bethoroughly

cleanedof

dirt,dust,

andm

oisturebefore

installation.Installation

andsolvent-w

eldingm

ethodsshall

beas

recomm

endedby

thepipe

andfittings

manufacture.

e.O

nPV

Cto

metal

connections,the

Contractor

shallw

orkthe

metal

connectionsfirst.

Teflon

tapeor

approvedequal

shallbe

usedon

allthreaded

PVC

toPV

C,

andon

allthreaded

PVC

tom

etaljoints.

Light

svrenchpressure

isall

thatis

required.W

herethreaded

PVC

connectionsare

requireduse

threadedPV

Cadapters

intow

hichthe

pipem

aybe

welded.

5.L

ineC

learancea.

All

linesshall

havea

minim

umclearance

ofsix

inchesfrom

eachother.

Parallellines

shallnot

beinstalled

directlyover

oneanother.

No

othertrades

areallow

edin

same

trenchw

ithirrigation

pipe

6.A

utomatic

Controller

&Install

controllerin

avandal-proof

enclosure.b.

Installas

perm

anufacturer’sinstructions.

Rem

otecontrol

valvesshall

beconnected

tocontroller

innum

ericalsequences

shown

onthe

drawing.

c.A

utomatic

controllersshall

beof

sizeand

typeshow

non

theplans.

U.Final

locationof

automatic

controllersshall

beapproved

bythe

Ow

ner’sauthorized

representative.e.

Unless

otherwise

notedon

theplans,

the120

voltelectrical

power

tothe

automatic

controllerlocation

tobe

furnishedby

othersT

hefinal

electricalhook-up

shallbe

theresponsibility

ofthe

irrigationcontractor.

f.R

emote

Control

Valves

Installw

hereshow

non

drawings

anddetails.

When

groupedtogether,

allowat

leasttw

elveinches

between

valves.Install

eachrem

otecontrol

valvein

aseparate

valvebox

7.flushing

ofSystem

a.A

fterall

newsprinkler

pipelines

andrisers

arein

placeand

connected,all

necessarydiversion

work

hasbeen

completed

andprior

toinstallation

ofsprinkler

headsthe

controlvalves

shallbe

openedand

afull

headof w

aterused

toflush

outthesystem

.b.

Sprinklerheads

shallbe

installedonly

afterflushing

ofthesystem

hasbeen

accomplished

tothe

complete

satisfactionof

theA

rchitect

8.Sprinkler

Heads

&Install

thesprinkler

headsas

designatedon

thedraw

ings.Sprinkler

headsto

beinstalled

inthis

work

shallbe

equivalentin

allrespects

tothose

itemized.

b.Spacing

ofheads

shallnot

exceedthe

maxim

umindicated

onthe

drawings.

Inno

caseshall

thespacing

exceedthe

maxim

umrecom

mended

bythe

manufacturer.

D.

TE

MPO

RA

RY

RE

PAIR

Sa.

The

Ow

nerreserves

theright

tom

aketem

porary’repairs

asnecessary’

tokeep

thesprinkler

systemequipm

entin

operatingcondition

The

exerciseof

thisright

bythe

builder-Developer

shallnot

relievethe

Contractor

ofhis

responsibilitiesunder

theterm

softhe

guaranteeas

hereinspecified.

E.FIE

LD

QU

AL

ITY

CO

NT

RO

L

I.A

djustment

oftheSystem

a.T

heC

ontractorshall

flushand

adjustheads

foroptim

umperform

anceand

toprevent

oversprayonto

walks,

roadways,

walls

fences,w

indows,

andbuildings

asm

uchas

possible.b.

Ifit

isdeterm

inedthat

adjustments

inthe

irrigationequipm

entw

illprovide

properand

more

adequatecoverage,

theC

ontractorshall

make

suchadjustm

entsprior

toplanting.

Adjustm

entsm

ayalso

includechanges

innozzle

sizesand

degreesof

areas

required.C

.L

owering

raisedsprinkler

headsby

theC

ontractorshall

beaccom

plishedw

ithinten

daysafter

notificationby

Ow

ner.U. A

ltsprinkler

headsshall

beset

perpendicularto

finishedgrades

unlessotherw

isedesignated

onthe

plans.

2.T

estingof

IrrigationSystem

a.T

heC

ontractorshall

requestthe

presenceof

theA

rchitectin

writing

atleast 48

hoursin

advanceof

testing.b.

Test

allpressure

linesunder

hydrostaticpressure

of150

poundsper

squareinch

andprove

watertight.

NO

TE

:T

estingof

pressurem

ainlines

shalloccur

priorto

installationof

electriccontrol

valves.c.

All

pipingunder

pavedareas

shaltbe

testedunder

hydrostaticpressure

of150

poundsper

squareinch

andproved

watertight

priorto

paving.U.

Sustainpressure

inm

ainlinesfor

notless

than4

hours.If

teaksdevelop,

replacejointsand

repeattest

untilentire

systemis

provensvater-tight.

e.A

llhydrostatic

testsshall

bem

adeonly

inthe

presenceof

theA

rchitectand

City

Landscape

Inspectoror

otherduly

authorizedrepresentative

oftheO

wner.

No

pipeshall

bebackfilled

untilit

hasbeen

inspected,tested

andapproved

inw

ritingand

shallbe

re-testedafter

backfilloperations

arecom

ptete.f.

Furnishednecessary

forcepum

pand

allother

testequipm

ent.g.

When

thesprinkler

irrigationsystem

iscom

pleted,perform

acoverage

testin

thepresence

oftheA

rchitectto

determine

ifthew

atercoverage

forplanting

areasis

complete

andadequate.

furnishall

materials

andperform

allw

orkrequired

tocorrect

anyinadequacies

ofcoverage

dueto

deviationsfrom

plansor

where

thesystem

hasbeen

willfully

installedas

indicatedon

thedraw

ingsw

henitis

obviouslyinadequate

without

bringingthis

tothe

attentionofthe

Architect.

This

testshall

beaccom

plishedbefore

an’groundcover

isplanted.

h.U

poncom

pletionof

eachphase

ofsvork,

theentire

systemshall

betested

andadjusted

tom

eetsite

requirements.

F.M

AIN

TE

NA

NC

E

I.T

heentire

sprinklerirrigation

systemshall

beunder

fullautom

aticoperation

fora

periodof

sevendays

priorto

anyplanting.

2.T

heA

rchitectreserves

theright

tow

aiveor

shortenthe

operationperiod.

G.

CL

EA

N-U

P

Clean-U

pshall

bem

adeas

eachportion

ofw

orkprogresses.

Refuse

andexcess

dirtshall

berem

ovedfrom

thesite,

allw

alksand

pavingshall

bebroom

edor

washed

down,

andany

damage

sustainedto

thesite

orthe

work

ofothersshall

berepaired

toits

originalcondition.

H.

FINA

LO

BSE

RV

AT

ION

PRIO

RT

OA

CC

EPT

AN

CE

I.T

heC

ontractorshall

operateeach

systemin

itsentirety

forthe

Architect

attim

eof

finalobservation.

Any

items

deemed

notacceptable

bythe

Observer

shallbe

reworked

tothe

complete

satisfactionof

theA

rchitect.2.

The

Contractor

shallshow

evidenceto

theA

rchitectthat

theO

svnerhas

receivedall

accessories,charts,

recorddraw

ings,and

equipment

asrequired

beforefinal

observationcan

occur.

I.O

BSE

RV

AT

ION

SCH

ED

UL

E

1.C

ontractorshall

beresponsible

fornotifying

theA

rchitectin

Advance

forthe

following

observationsaccording

tothe

time

indicated:a.

Pre-JobC

onference-

7days

b.Pressure

supplyline

installationand

testing-4

daysc.

Autom

aticC

ontrollerinstallation

-4days

d.C

ontrolw

ireinstallation

-4days

e.L

ateralline

andsprinkler

installation-4

daysf.

Coverage

test-4

daysg.

Finalobservation

-7

days

2,W

heninspections

havebeen

conductedby

otherthan

theA

rchitect,show

evidenceof

when

andby

whom

theseinspections

were

made.

3.N

oobservation

shallcom

mence

svithoutA

s-Built

drasvings.In

theevent

theC

ontractorcalls

foran

observationw

ithoutA

s-Built

drawings,

without

completing

previouslynoted

corrections,or

without

preparingthe

systemfor

observations,he

shallbe

responsiblefor

reimbursing

theA

rchitectat

thehourly

ratein

effectat

thetim

ethe

observation,portal

to

____________________________________

portalplus

transportationcost.

Subsequentinspections

will

notbe

performed

untilthis

chargeis

paid.PR

OG

RE

SSD

RA

WIN

G

I‘I

z001—

—J

c-)<

C’)

IRR

IGA

11ON

SP

EC

IFIC

AT

ION

S

SHE

ET

NO

.

L6

SCA

LE

:

NIA

Page 8: DC L9 L8 L7 L6 Li Ii U - ci.carson.ca.us

LA

ND

SC

AP

EP

LA

NT

ING

SP

EC

IFIC

AT

ION

S

Note

The

generaland

specificconditions

ofthese

specificationsare

anintegral

pactorthe

landscapeconstruction

documents

nodm

osthe

complied

ssith

IG

EN

ER

AL

ASC

OPE

OF

WO

RK

Fomish

alllabor!

materials.

eqoipnmnl.

andsen

icesnecessan

topros

ideall

landscapeplanting

asshoon

onthe

dmisings

andspecified

WQ

UA

LIT

YA

SSUR

AN

CE

ISource

Qualtis

Control

aSabm

itdocum

entationthat

allplant

material

hasbeen

orderedto

leastS

icdass

poorin

stanof

oork

nnderthis

SectionA

rrangeprocedure

forinspection

ofplant

material

ssilhA

rchitectat

lime

ofsobm

issionPlants

shallhe

subjectIa

inspectionand

approvalof

Architect

atplace

ofgroivilt

spandclii

enfor

conformity

Inspecifications

Sochapproval

shallnot

impair

thenolst

ofinspection

andrejection

daringprogress

ofthe

mesh

Subm

itisrilton

requestfor

inspectionof

plantm

aterialof

plantsto

beinspected

atthis

time

if,in

hisjadgm

ent,a

ssffrcientqnanlils

ofplants

Isnot

asaslaMe

forinspection

The

Landscape

Architect

andO

svnerhate

conlraclaalhagreed

tonotifa

theL

andscapeC

ontractorthat

hessiIl

beresponsihle

forSnanciat

reimbursem

entIn

theL

andscapeA

rchitectfor

Additional

andnnanlicipated

lime

andm

aterialsrequired

toorganize,

re-design,re-inspector

Indo

svhateveeis

requiredIn

guidea

substandardinstallation

orone

ohichis

notoithin

snbstantialconform

ancelath

ePlans

andSpecifications

backloan

acceptableinstallation

Saidreim

hursemeni

isillIn

theform

ofa

chargelath

eC

ontractorfrom

theG

oner

CS

UB

MIT

fAL

SC

ertificateof

Inspectionof

plantm

aterialhi

Staleor

FederalA

allrariiy

DPR

OD

UC

TD

EL

IVE

RY

.ST

OR

AG

EA

ND

HA

ND

LIN

GI.

Deltven

aD

eliserfertilizer

tosite

inoriginal.

nnopenedcontainers

bearingm

anufacturer’sgaarm

leedchem

icalanahsis,

name.

trademark

andconfonnance

InStale

Lasvb

Deliser

plantsw

ithlegible

identificationlabels

IL

aboltrees,

evergreens,bandies

ofcenialnees

ofIsLe

shrubsor

groandcaverplants.2.

Stalecorrect

plantnam

eand

sizeindicated

onplant

list3

Use

durable.naterpreof

labelsrsiih

svaler-resislaatink

svhichrsili

remain

legiblefor

01least

611days

Protectm

aterialdoting

dehsnn’to

preseat

damage

Iaroatball

ordesiccation

ofeaves

The

contractorshall

nolif;the

Landscape

inspectorfour

dossin

adsancedelivers

ofoil

plantm

aterialsand

shallsubm

itan

itemized

listof

plantsin

eachdelis

en’2

PruningA

lno

lime

shallthe

treeor

plantm

aterialsbe

pruned.E

imm

edor

lappedpnnr

todetiscn

.and

alieratsanof

theirshape

shallbe

conductedonly

ssitlsthe

approsalof

theL

andscapeA

rchitect.3

Rig

htaf

InspectionT

heL

andscapeA

rchitectresers

esthe

rightto

approveor

rejeclm

anylim

enpen

delisewor

duringthe

work

anyor

allplant

material

regardingsize.

sarietsor

condition.4

SailsT

estT

oocopies

ofsoils

testsperform

edby

anapprosed

agranomic

soilstesting

labaratan’shall

besubm

ittedoith

plansA

llsail

samples

shallbe

takenin

thefield

bya

qualifiedsoils

tecbescsanand

submitted

ssilhplans

totesting

lobeunless

priorapprasol

foraltem

aliseprecedares

isgum

bythe

CityE

ngineerT

estsshall

inctedea

fertilityand

sniiabitiisanalysis

rsithorilten

recomm

endationsC

ontractorshall

comply

ssithrecom

mendations

givenfar

soilam

endments,

plantm

ateoalseleclians

andirogalion

equipment.

5Storage

aStare

plantm

oteoalin

shadeand

protectfrom

sseother,M

aintainand

protectplant

material

netlo

be

plantedss’ilhtn

fourhours

6H

andlingD

onol

dropplant

matenal

b.D

onot

pickupcontainer

plantm

aterialby’

stems

ortrunks

EJO

BC

ON

DIT

ION

SI.

PlantingPerform

aclnalplanting

onlysshen

o’ealherand

soilconditions

aresuitable

inaccordance

ssithlocally

acceptedpractice

2,Scheduling

Installtrees,

shrubsand

linerslack

ptanim

aterialbefore

hydraulicseeded

taintm

eanm

einstalled

FSA

MPL

ES

AN

DT

ES

TS

IT

heL

andscapeA

rchitectresenes

theright

tolake

andanalyze

samples

ofm

aterialsfor

conformity

tospecifications

atany

time.

Contractor

shallfurnish

samples

openrequest

byL

andscapeA

rchitectR

ejectedm

aterialsshall

beim

mediately

mm

osed

fromthe

siteand

premises

atC

nntmcio?s

expenseC

ostof

teslingof

malenals

notm

eetingspecifications

shallbe

paidN

Contractor

2A

gncallnralSuitabihio

ofthesoil

shallbe

determined

bya

credentialedsoil

sciencetaboralosy.

The

Laberolon’

shallprepare

an’rillen

reperton

thesoil

testingnbich

shallsnclnde

adetailed

descriptionof

lestresults

alongoith

recomm

endationsfor

backfilland

surfacesoil

amendm

entsT

hecontractor

shallbe

eespeesiblefor

thetesting

andfor

fatteningthe

recomm

endationsofthe

agrenamic

soilsreport.

3.A

griculloratsuitabihils

analysisof

soila

Most

sncladepH

meaanrem

enlis

theSaturation

Extract,

Electrical

Conducliritv

ofthe

sotneolionextract

andSodium

Adsorption

Ratio

ofthe

saturationextract.

The

apprasedprecedm

esm

ethe

fohinningpH

Methed2t

Saturation

Extraci

Method

2Sodium

Adsorpuon

Ratio

Methed

2itb

Methods

oftheU

nitedStoles

SalinityL

aboratanan

publishedin

theA

gricuhinralH

andbeokN

umber

6(1entitled

“Diagnosis

andIm

prnsemnel

ofSaline

andA

lkaliSoils”

bT

hefollooteg

sutnentsand

elements

msst

bedeterm

inedoith

anA

merican

Societyof

Agronam

sor

SoilScience

SocietyofA

menca

approred

extracliunm

ethedInterpretation

datam

uobe

gssenciting

cancentrolionsw

hichare

consideredlobe

Inn,m

ediumand

highheron,

calcium,

copper,iron.

ruagnesinm,

manganese,

molybdenum

,phesphann,

pelansiues,sedium

,sulfur,

andzInc

(I)T

heappros

edm

etlsedsm

eIhase

citedby

theC

ouncilon

SoilT

estingand

PlantA

nalysisand

thosem

ethodscorrenlb’

publishedby

SoilScience

Societs’of

Am

ericom

anuals.C

omm

snscotiunsin

SailScience

andPlant

Analysis.

SoilScience

andSoil

ScienceSociety

ofA

merica

Jenmal.

Appeased

methods

forphosphorus

me

Bray

Pt.B

rayP2,

Olsen

P.D

TPA

,am

esonsumacetate,

andam

monium

hscaehesotwD

TPA

Appras

edesetheds

forheron

amhal

u’aterextract

andam

monium

bicarhonale-DT

PA

extractT

hesaluration

exlracsm

ostbe

analyzedfor

calcium,

magnesium

,sodium

,heron,

chloride,phespharus.

nitrateand

sulfate.d

The

fallontog

iracem

etalsm

ustbe

meannm

dby’

theD

TPA

exlractalum

inum.

arsonic,cadm

ium,

chromium

,cobalt,

lead,lithium

,nickel,

selenium,

sitscc.

strontium,

tinand

sanadiume,

The

presenceof

calcinmcarbonate

antherm

agnesiumcarbonate

must

bedeleenrisedf.

SailT

exturelgravel.

sand,silt

andctayl

most

bedeterm

inedD

elemsine

orgonicm

oltercontent

bythe

rueannremenl

oforganic

carbonT

hequalsq’

ofthe

organicm

attershall

bedeterm

inedby

measuring

organiccarbon

andtotal

nitrogen.g

Interpretationof

nslnliosaldeficiencies

orexcesses

andpetential

losicitiesm

astbe

givenh.

Determ

inethe

foltassingby

methods

appeasedby

theA

merican

Secielyof

Agronom

yan

publishedIn

theM

ethodsof

SoilA

nalysis.m

ethodsof

theU

nitedSlates

SalinityL

oboraton’an

publishedis

theA

gricailuralH

andbookN

umber

tillentitled

“Diagnosis

andIm

peos’eraenlof

Salineand

Alkali

Soils.“

andhulk

densityof

clodsby

them

ethodpobhshod

inSoil

Science.sot

155,325-339

(1993)E

xchangeableA

esmanium

cationB

aneSaturation

Cation

Eschange

Capacity

Waler

InfiltrationR

ate-

Method

34bof

Agricullural

Handbonk

Num

berfat

IIf

requiredfor

mare

complete

soilcharacterization,

determine

thefolloning

bym

ethodsapproved

bythe

Am

encanSeciely’

ofA

gronomy

anpsblished

isthe

Methods

ofSail

Analysis,

methods

ofthe

United

StalesSalinity

Labutatan’

anpublished

inIhe

Agricohinral

handbookN

umber

69entitled

“Diagnosis

andlesptnsem

entof

Salineand

Alkali

Soils,”

andbalk

densityof

clodsby

liem

ethodpublished

InSoil

Scieoce,sal

153,325-3311)19931

Carbonates

Meanm

ement

SoilB

ulkD

ensityIC

ompacliont

3E

leruenoddolnrm

inaoonsto

mode

accordingto

methods

appeasedby

theE

PAur

bythe

Am

ooconSociety

ofA

gronomy

aO

ptional-

Grosslh

Test

forT

oxicC

onstituentsand’ur

PourPhysical

PropertiesI.

Gron

adicet

planispecies

anda

ruanocotspecies

o’ithand

oithousactuated

charcoalM

easureyield

andpem

enlof

germination

forall

Irealments

Repert

conclanionsm

dfindings

GG

UA

RA

NT

EE

AN

DR

EPL

AC

EM

EN

TS

IG

umanlec

All

plantm

aterialtaslalled

underthe

Contract

shallbe

gnaranlecdagainst

anyand

allpoor,

inodequateor

inferiorm

atenalsond’or

isneluesanship

fora

penodof

oneyear

(trees)or

6m

onthslshrubs)

aflerdate

ofacceplance

byG

oner.M

yplanI

fnondIn

hedead

artspear

conditiondue

tofaulty

materials

orssnekm

amhip,

andeterm

inedby

theL

andscapeA

rchilecl,shall

bereplaced

byshe

Conlrm

terat

hisnspense

2.R

eplacement

Any

materials

foundlobe

dead,m

issingor

Inpoor

ionduring

theestablishm

entpenod

shallhe

replacedim

issedialelyT

heL

andscapeA

rchilect,or

htsStercansailants.

shallbe

thesolejudge

anlath

econdslion

ofm

aterialM

aterialto

bereplaced

oilhsnthe

guaranteeperiod

shallbe

replacedby’

theconiractar

ss’ilhinIll

daysof

nrillznnotification

bythe

Goner

II.PR

OD

UC

T

A.

GE

NE

RA

LT

hefohlass’tsg

organicsoil

amendm

entsand

fertilizerare

tobe

med

forbid

pricebants

onlySpecific

amendm

enlsand

fertilizerspecifications

ssillbe

made

aftergrading

operationsm

ecam

pleleand

soilsam

plesm

etested

by’O

wner

All

materials

shallbe

ofslsndm

d.apprased

andfirsl-geode

qualityand

shallbe

inpsm

econdition

nheninstalled

andaccepted.

Any’com

mercially’

processedor

packagedm

aterialshall

bedelisered

toIhe

sitein

theoriginal,

aneponedcontainer

beanngthe

manufacturer’s

gnmanleed

analysis.C

ontractorshall

supplyL

andscapeA

rchitectouth

asantple

ofall

suppliedm

aterialsaccom

paniedby

analyticaldata

froman

approvedlaboraton’

sourceilluslealing

compliance

urbearing

them

anufacturersguaranteed

analysis

BSPE

CIFIC

ISuitable

Impen,

Borroo

Topsoil

orR

eclalsasodsoil

a.G

esscrol-

Topsoil

shallbe

frmof

rants,clods,

sInes

largerthan

I-inchin

thegreatest

dimension,

pocketsof

canrsesand,

nexinanneeds,

slicks.lum

ber,brm

hand

oIlierIstler

IIshall

nethe

infestednith

nemotodes

orother

undesirablethseane-caaning

organisms

sachan

insectsand

plunlpethogees

IllT

opsoilshall

befnoble

andhave

suflicienlsleuclure

inorder

togive

goodhealth

andaeration

Inthe

soil.

h.firuslasioss

himuts

-soulshall

boasandy

loam.

loam,

nrclay

loamT

hedefinition

ofsail

textureshall

bethe

USD

Aciansificalins

scheme

Grasel

over¼

-inchin

duameler

shallbe

lessthan

211%by

ss’eighI.c.

I’crisucohthst’Rutsc-

Hydraulic

canduiclusit’rale

shallbe

nolless

thanone

inchper

hournor

more

Ihan29

inchesper

hournhen

lestedIn

accordancen

ub

theU

SDA

Handbook

Num

berfat,

method

34bor

etherappras

edm

ethodsii

Fertility

-T

herange

ofthe

essenhialelem

enodconcentration

insoil

shallbean

fallosssA

mm

onunmB

tcmbonatw

DT

PA

Exlracluon

pastsper

million

bmg’kilagram

)dn’

sseightbasis

phosphorus2

-49

potassium411-2211

iran2-3

5m

anganese113-6

zincfig

-flcopper

91

-5boson

02

-hm

agnesium5

a-159

sodiumfl-lest

sulfur2y

-yuoum

olybdenumItt

-2

Soilm

ayneed

tobe

amended

andconditioned

tooptim

ieeplanI

grnnth.T

heabose

listedfertihuly

isfur

soilselection

Concentration

ofnnlrienls

forfinal

acceplanceA

mm

oniumB

icarbonate/DT

PA

Extraction

portsper

million

(mg/kilogram

dn’ss’eicht

basis

phosphorus19

-49

potassium1119

-2211iron

24-35m

anganese11

6-6

zincI-fl

copper03

-5boron

02

-Im

agnesium59-1

59

sodunm0-1

99

sulfur25

-59

9m

alybdenom

9I

-2

.4Adueu’

-The

sailpH

rangenieasnrod

InIlse

sataeolunextract

(Method

210.U

SDA

Haitdbook

Nsm

betgull

shellb

eg9

7.9f

Sesheun’-

The

sahuniss’rm

gem

easaredin

thesalam

hn

oxtroct(M

ethod3

aU

SDA

Handbook

Num

berfat)

shallbe

115-2.5

dS!m.

g.C

hloride-

The

maxurusm

concentrationof

solublechloride

inthe

salnralianexlract

(Method

3a

USD

AH

andbookN

umber

69)shall

be159

mgi

(partsper

million)

h.fiuurasr

-The

maxim

umcuncentralion

nfsoluble

boronin

thesoluralion

extract(M

ethod3a.

USD

AH

andbookN

umber

69)shall

beI

mgi

(pansper

million)

iSodison

Adsorption

Rustic(SA

P)-

The

maxim

umSA

Rshall

be3

measured

perM

ethod2flb.

USD

AH

andbookN

nmber

fatj

,4huntssssuns-

Available

alumtnum

nseasurednulh

theA

mm

oniamB

icarhonot&D

TPA

Exlraction

shallbe

lessthan

3pans

perm

illionk

SoulOrgum

c.kfatter

Cansessm-

Sufficientsoulor

anicm

uutarshall

bepresecl

IaIm

partgood

physicalsoil

propertiesbut

notbe

excessuse

Iaraese

toxicityor

causeescessise

redactionin

theblam

eof

soildoe

todecom

positionof

organicm

olterT

hedesirable

rmge

ss3%In

5%.

The

cmbon

nitrogenratio

shouldbo

uhonu19

Ahigh

cashesnilrugen

rottocan

inducolethe

presenceofby’drncacbom

ornon-hum

ifledorganic

molter

Cok’sosssf’orhoeusm

Cuunrcns-

Freecalcium

carbonate(lim

estone)shall

nolbe

presenlfor

acid-losingplants.

m.

ffcssuy’Mcuu/s

-T

hem

aximum

permissible

elemental

cnncenlralinnIn

Ihesoul

shallnot

exceedthe

follaoingconcentrulions

Am

moosum

Bicacbonole/D

TPA

Extraction

pmts

perm

illion(m

g/kihngcom)

dn’sveight

basis

arsenicI

cadmium

Ichrom

ium19

cobalt2

lead311

mercun

Inickelselenium

3sslser

115vanadium

3

It)Ifthe

soilpH

usbetnenn

hand7,

them

aximum

permissible

elemenlal

concenlraltonshall

bereduced

511%If

thesoul

pHis

lessthan

till,the

masim

umperm

issibleelem

entalcancenlroluon

shallbe

reduced75%

No

mare

thanthree

metals

shallhe

presentat

5119’sor

mare

oftheabove

values.(2)

Physosoxuccsnotusiueou,berbscsdcs.

ksslrsucurbsusraetc

—G

erminulton

andgrow

thof

manacuts

anddicoB

shallnnl

berestsicted

more

than19%

compared

Inthe

referencesoil

Total

petralnnmhydsacsrhons

shallnot

exceed59

mg/kg

dn’soil

measnred

perthe

modified

EPA

Method

No

gfiiy.T

otalarom

aticsolotule

organichydeocm

bons(beozene,

Intuene,xw

leneand

ethylbeneene)shall

501exceed

95

mg/kg

dry’soul

mm

auredper

EPA

Methods

No,

911211

2Sail

Condilianees

andFertilizers

aSoil

cosdilionerssilh

fertilizerincluded

shallconsisl

oforganic

malerials

comprised

ofdecom

posedanim

aland

negnuoblem

otherand

composted

tosapgort

bartnnalcultures

Soilconditions

shallbe

“Groo-P

osserPlus”

orapprus

edequal,

andshall

conformlath

efollon’iog

analysis

(I)Particle

Size631/2

‘¼through

1119Screen

pH4

.51

04

.7121

Organic

Content

Hum

an—511%

,H

nmic

Acids-IS

(Nab

PaulIn.

animal

orhum

ann’asle

isnol

acceplobteS

eethedefinition

ofllam

asin

9VesIem

FertilizerH

andbooLFifth

Edition)

(3)C

hemical

Mals

sus-

Am

monuc

Nitrogen

lfll’s

(dsrisedfrom

amm

ansumphosphote)

-O

rganicN

ilragen4191¼

(derisedfrees

compost,

meat

meal

andarea)

-T

oedN

itrogen5.155%

,-

Available

phosphnncA

cid3

1111%Iderised

fromcam

peskm

ealm

eatand

dsamm

oounmphosphale)-Soluble

PotashI

1111%(derived

fromcom

pesland

mnnale

ofPotash)

—Iron

I911%

(derisedfrom

Ironsolfale)

-Z

inc9.IIS°As

(derivedfrom

zincsolfate)

-M

anganese(195%

(derivedfrom

mailganese

snlfole((4)

SoilPenelrant

Alkyl

Naphihalene

-SodiumSW

fonulo2911%

(5)M

atenalsshall

bem

ixedtharaughls’

andbagged

in511

orfill

lbbags.

bO

rganicSail

Am

endmenls

shallbe

derivedfrom

Redusood,

Firor

Cedar

nandbark.

grmrotsr

innature.

stabilizedssilh

nitrogenand

havingthe

following

properties.(I)

ParticleSize

minim

um995

passiag4

mesh

screen(6.35

MM

slandardsieve),

minunsum

fill%passing

Sm

eshscreen

(2.33M

hlstandm

dsieve)

(2)N

ulrogenC

ontenv95%

basedon

dry’neight

farredn’oed

sandanl,fl,75/,,

baseden

dryneughl

forfir

sassdust.I

996based

ondry’

netghl

forfir

orpine.

(3)Salinity.

Sainratian

evlraclcondscttvily

shallnot

exceed3

5sollim

hos’centim

eterat

25degrees

centigrade(41

Drganic

Conteel

Munum

uns916¼

neighlc

Minerals

(I)Sash

Sulfur(S

)as

requiredfrom

soilreport

(2)Ferm

usSnlfate

asm

esallic211%

asreqaired

fromsail

roped(3)

Agncailnrol

Gx’psum

(CaS

G42H

pG).

asrequired

fromsoil

report(4)

Lim

e(C

aO)

asrequired

fromsoil

reportd.

Rzdn’ood

Shasings

shallbe

teechedPro-Plant

Com

mercial

Fertilizershall

benilrogen-fartified

andhave

uniformin

composition,

free-finning

suitablefor

applicationnith

approvedequipm

entand

delisered

tothe

projectsiteia

umopesied.

nrig

inut

containeror

package.each

bearingthe

manufsciam

r’sslasem

entofgum

anteedanalysis

audshuhl

containthe

mialm

amsuallable

percentageby

oesghtof

planIfood

asspecified

sttheapprosed

agronomic

soulsreport

PlanlingT

ablets(I)

stuuv-releasetype,

conlalningthe

fallousungpercentages

ofnutrienls

byss’eighl

211%nitrogen,

111%phosphoric

sri/k5%

polash(2)21

gramlablels

asm

anufaclneedby

Agriform

orapproved

equal.applued

peem

anufacturer’sinstruclians

(3)Subsurface

Rand

Bam

erR

ealbarrier

incorporatedunto

sIredtree

planlingfoe

thepurpose

oflong-lerm

rootcontrol

shallbe

prefabricated,m

anufacluredof

highim

pact.pelyelhy

lenean

manufactaned

byD

eepR

ootC

orporationor

approvedequal

ncuLn:

Nm

a2Cm2wasletI4C

Orl

mjj‘I

w>0

t>

z‘-I

0<

os

CoPL

AN

TIN

GS

PE

CIF

ICA

TIO

NS

SHE

ET

NO

,

L7

Page 9: DC L9 L8 L7 L6 Li Ii U - ci.carson.ca.us

4Plant

Matenal

aPlants

shallbern

accordancestith

theC

aliforniaState

Departm

entof

Agncnltace’s

regalalianfor

norsen’inspections.

mles

andratings

All

plantsshall

basea

nomsal

habitof

growth

andshall

besoand.

healthy.sinoroos

andfree

ofinsect

infestations,plant

diseases.sonscalds.

freshabrasions

ofthe

barke’crsstve

abrasionsor

otherobjectionable

disfinnrensrnrsT

reelnasks

shallbe

slurdsand

well

“hardened”off

MI

plantsshall

basenosm

allyssoll

doseloped

branchcisterns

andvtgoroan

andftberom

roots’stem

sisInch

arenot

roesor

pol-hoandIn

theoseni

ofdisagreem

entas

Incondition

ofrant

oxstem

,the

rootconthtions

nfthe

plantsfam

ishedhi

theC

ontractorin

cantaineesstill

hedeterm

inedby

removal

ofearth

fromthe

rootsof

notless

thanrsso

plants.or

more

thantsso

pmcent

ofthe

totalsom

berof

plantsof

speciesor

sariotyW

lserecontainer-grow

splants

arefrom

severalsources.

theroots

ofnot

lessthan

too

plantshe

inspectedIn

casethe

sample

plantsinspected

arefoand

lobedefective,

theL

andscapeA

rchitectis

thesolejodgo

asto

accepiahititiA

nyplants

renderedansallable

forplanting

bocame

ofthis

sospectsoointl

heconsidered

assam

plesand

writ

bepros

dodat

theexpense

ofthe

Contractor

bT

hesize

oftheplants

stallcorrespend

o’iththat

normath

oxpectedfor

speciesand

satietyof com

mercially

asaitablo

nurserystock

oras

specifiedin

thnSpecial

Conditions.

drarvingsor

detailsT

hem

inimom

acceptablesize

ofall

plants.m

emored

beforepraning

sviththe

branchesin

normal

position,shall

confo

rms

iththe

meanurem

ents,if

any,specified

ontho

dmss’ings

inshe

listof

plantslo

be

famished

Plantslarger

insize

thanspecified

may

beosod

isiththe

approsalof

theL

andscapeA

rchitect,If

them

eof

largorplant

isapprosod.

theball

ofearth

orsproad

ofroots

foreach

plantsill

beincreased

pro

pertio

ratetc.

All

Plantsnot

inthe

requirements

horeinspecified

shallbe

considereddefective

andsach

plants,ss’helhorin

placeor

not,shall

herom

osed

fromthe

siteof

svorkand

replacedssith

nessplants

atthe

Contractor’s

expenseT

heplants

shaltbe

ofthe

species.variets’.

sizeand

conditionspecified

hereinor

asshoon

onthe

drawings.

Under

nocondttiens

sillthere

hiany

substitutionof

plants,escepi

with

theexpressed

consentof

theL

andscapeA

rchitectand

City

Landscape

Inspectord.

At

notim

eshall

treesor

plantm

aterialbe

praned.trim

med

ortopped

pnorto

delivers’,and

anyalteration

oftheir

shapeshall

beconducted

onlyw

iththe

approsaland

whes

inthe

presenceof

theL

andscapeA

rchiloctand

asnoted

onthe

PlantingSpecifications

e,Plant

material

shaltbe

treeto

botanicaland

comm

onnam

eand

vanetaas

specifiedIn

“AC

hecklistof

Wand’

Om

amestal

Plantsis

California,”

Manual

32pabtished

bythe

Uoiseestff

ofC

alifomia

Schoolof

Agncattare

(l9h3)5

Narsew

-Grow

nand

Collected

Stocka.

Groan

andzrclim

aticconditions

similar

tothose

inlocality

ofproject.

Conlm

oer-grossnstock

insigoram

.healthy

condition.no

roothoand

plantor

plantsw

ithrant

sssiemhardm

edoff

c.Sobstilate

plantm

aterialsilt

notbe

permitted

anlessspeciftcalti

approsedis

writing

by’the

Architect.

Tree

StakingM

ateriala.

Stakesfor

Tree

Sapparl

(I)Pall

length,todge

pole.pine

stakes,treated

with

coppernaphthanute

(2)M

inimum

nomioal

size2”

indiam

eters12’

longand

pointedal

oneend

(adjustedlength

tofit

tree)b.

Hose

andW

ireT

ies(I)

Galsanized

sinew

ithcinch

tie.W

iseshalt

bezinc-coated

iron,lfi-gaage

minim

amand

solidcore

(21M

Igm

’sare

lobeflagged.

Ninety

percentiiire

lengthis

tobe

carered

White

PVC

1/4nab

diameter

iabecesenng

shallbe

med.

7B

arkC

hipsB

ackchips

sballbe

regular.groand,

redwood

orSr

hark.consissng

of1/2”

to374”

(acornsu

etchips.

Priorto

delisenlath

esite,

theC

ontractorshalt

sabmis

samples

lathe

Ciw

Landscape

Inspectorfor

approsalE

rosionC

annotM

attingE

rosioncontrol

matting

shallbe

ofopen

seale,

famished

torolled

stripsas

follows:

IIshalt

beapproxim

ately225

feettang

with

assidth

of48

inchesp

bs

orm

inmone

inchand

anapproxim

ateone

(1)inch

sqearem

esh.Fabric

shallasem

ge4

peandsper

linearfans

The

erosioncontrol

mailing

shaltbe

manafaciom

dfrom

looselytw

istedjate

yamo

atsaw

ingin

thicknessby’

morn

thanone-half its

normal

diameter.

eqoalin

qaalit

in“L

udlowSoil

Saser

#45”or

approvedeqaal.

Staplesfor

ermian

contralshall

beIt

gaugesteel

slimbent

isaU

shapesix

inchesm

inimam

lengthand

oneinch

wide

Wetting

Agent

Isbe

95%alky

IPolyedw

learglco

lether

sachan

“Com

mercial

Water

Is”or

approsed

eqoal.9.

SeedAlt

seedm

edfor

lastsplanting

orerosion

controlplantiog

orfor

anyother

reasonsspecified

inthe

plansshalt

belabeled

andfom

ishedis

sealed,standard

cootaloeww

ithdaptirate

signedcopies

ofa

statement

fromthe

sendor,certifying

thateach

consalnerofseed

delisored

isfalt

-labeledis

arcmdancn

with

theC

aliforniaSlate

Agricaltare

Code.

Seedw

hichhas

become

wet

moldy

orotherw

isedansaged

intransit

orstorage

wilt

notbe

acceptedIS

SodSadshall

befalls

mature.

welt-nsalntatoed,

ofthe

grasssanely

specified,free

ofalt

othergrasses

orneeds

andshalt

beesents

catw

itha

coalrational

sndcoiling

machian

toa

thicknessof

1-1,2inches

All

material

shaltbe

fromthe

same

growing

groandand

dehis’rredfresh

tothejob

siteIf.

afterim

tallaiion,any

arms

ofsod

theor

became

brown,

theseareas

areto

bereplaced

with

sodim

medsaloly

Replacem

entsod

isin

match

original

ItH

dram

alchin

ga

Wood

Cellulose

Mulch

shalthe

calm.

nalaral,w

oodcrtlalose

fiberN

utmal

wood

coltalosefiber

shalthe

processedin

sacha

manner

thatri

will

containno

growth

orgernrraarion-m

hibiengfactors

andshalt

hedyed

greento

facilitatem

atenngof

naaterialsII

shallbe

manafactured

insaab

nm

annerthat

afiereach

additionand

agitationin

slamtanks

with

fertilizer,seed

water

andother

approred

eddisises.the

fibersin

them

arenalstill

become

aniformly

smpended

Informa

hamogenanm

stem’

andthaI

when

bydraalicalty

sprayedan

theground

cosCr

impregnated

uniformly

with

seed.w

hichafler

application,w

iltallow

’the

ahoorpeonof

moisture

andw

iltallow

’rainfall

topercolate

tothe

andething

soilh.

Fertilizershalt

consistof

organicm

aterialscom

prisedof

decompesed

animal

andvegetable

maIler

andcam

pestedto

supportbacterial

cutimes

Fertilizershall

be“G

m-Pow

er”er

approvedequal

SoilB

inderT

ermT

ackIII

orapprated

equald

Ham

eclanlH

L-flll

Ham

ecianior

apprared

eqoal12,

Equipm

entH

ythaalic

equipment

usedfor

theapplication

efslurry’

shallbase

abuilt-in

agitalionsyslem

with

anoperating

capacihsuffrciert

toagitate,

saspeadand

homogeneously

mis

aboveslurry’

Dislnborion

linesshalt

belarge

enoughto

preventsloppage

andto

provideeren

distnihationof

thestan’s’

uien

ihegroand

Inorder

Iafacilitale

properro

terage.she

pamp

must

becapable

ofexerting

apto

1511psi

atthe

nozzleT

heslarw

tanksshalt

havea

minim

umcapacity

of1,5191

gallonsand

shaltho

moanled

ena

travelinganit

which

wilt

placethe

slum’

lankand

spraynozzles

within

sufficientprexim

ityto

iheareas

tobe

seededso

asto

provideuniform

distributionsssthaui

wanle

13W

eedA

balement

ProgramT

heherbicide

“Round-U

p”or

apprei’odeqoal

shallhom

edfor

slope!planting

areasSee

Seclions111-0-2

and111-0-7

forguidelines

forproper

applrcationprocedures

14.M

iscellaneomM

aterialsa

sand-washed

rivensan

der

equalb

pestem

ergentw

eedkilter:

“Roand-U

p”tree

woand

paint-as-approved

IIIE

XE

CU

TIO

N

AIN

SPEC

TIO

NV

erifyihat

finalgrades

havebeen

eslablishedprior

10begioning

plantingoperations

Inspecitrees,

shrubs,and

material

forinjury’

andm

artinfestation,

andinspect

treesand

shmbs

forim

properpruning

Do

eelbegin

plantingtrees

ontitdeficiencies

arecorrected

orplants

replaced.

BPR

EPA

RA

TIO

NSlake

outlecesiens

forplanss

andauitiae

ofplanting

bedson

groandD

onot

beginesges

alienuntil

planttocaliens

andplant

bedsare

acceptableto

Arehitoci

The

irrigationsyslem

shallhare

beeeinstalled

andappros

edprier

tosoil

preparation

C.

INST

AL

LA

TIO

N

IE

srasatienof

Plantinga

Shape(I)V

erticalsides

andflat

bottom(2)

Plantpits

lobesquare

farhex

material,

circularfor

cannedm

atenalSize

Ml

treesshall

hasa

plantedpits

dugto

icethe

diameter

andso

thedepth

efshe

rootball

BarkS

lIarnand

thereothalt

with

preparedbackfill

mis

Refer

toplanting

Details

farspecific

method

2Prepam

rianof

PlantingA

reasa

Afier

apprasimale

finishedgrades

harebeen

established,soil

shallhr

conthtionedand

fertilizedin

ihefollow

ingm

annerN

itrogen-stabilizedorganic

amendm

entand

amm

antamphosphate

shallas

thefollow

ingrates,

beanifenah

spreadand

cultivatedthom

eughtaby

nteaesof

mechanical

litterinto

lop6”

ofsail

(I)N

itrogen-StabilszedO

rganicA

mendm

ent4

cu.yards/loO

tssq.

ft.(2)

Arnm

oniamP

hasphate6-211-21)

15lbs

71.000sq.

fs.(31

ISalbs

Agriculture

Gspsum

I1.01)0

sqft

bA

llsail

areashall

hecom

pactedand

settledby’

applirationof

hoaryirrigation

toa

minim

umdepth

ofIn

elicinches.

Al

lime

ofptantrng.

shetop

baainches

ofturf

arms

tobesodded

orseededshall

hefree

ofsiones,

stumps

anotherdelelerious

maiter

I”in

diameter

enlargerIn

groandcoren

areas,the

top1sto

inchesshall

befree

ofstones.

slunrpsor

utherdetetenom

matter

2-(inthdiam

eteror

largerA

llplanting

arms

shallbe

freefm

mall

ssire,plasler

ensim

ilarobjects

3Final

Grades

aA

flerthe

forrgoisgspecified

deepw

’utenng.m

inimum

modrficalions

tograde

oatsbe

requiredto

establishthe

finalgrade.

These

arms

shallnot

bew

orkedanlil

them

oisturecontent

hasbeen

reducedlea

posnlishere

aorkrngit

will

sosdestroy

soilslnsgtare

bFinish

gradingshall

insureproper

drainageof

thesIte

c.A

llareas

shallbe

gradedso

thaithe

floatgrades

wilt

beI”

below’

ad1aceslpaved

arms,

sidewalks,

salvmboxes,

headers,cteanouts.

drains.m

anholes,n

cin

turfarm

s.and

2”below

ingroandcas

esareas

Surfacedrasnage

shallbe

away

fromall

brnldrngfeandalions

e.E

tiednatealt

eransonscaes

Plantingareas

receissog

sadshall

smlatn

afinish

gradeof

adepth

thussnstalled

sodshall

beflm

hrssth

finishsurfaces

(walks,

posedareas.

etc).g.

All

plantingareas

shalthate

afinish

gradeconform

ingbe

approsedplans

andspecifications

afterfull

srlttemenl

hasoceooed

4D

ispeseof

anaccepiabteor

onanedexcess

soiloff

siteand

premises.

DPL

AN

TIN

GIN

STA

LL

AT

ION

IG

eneeda

Actual

planoegshall

beperform

eddanng

thme

periodsw

henw

eatherand

soilconditions

aresaitsble

andin

accordancew

ithlacalh

accepiodpracltce,

asapprored

by’the

Landscape

Arctsooct

hO

salyan

mossy

plantsas

ranbe

plannedand

watered

onthai

same

das’shall

bedistributed

ina

plantingarea

Inesrrem

eheaL

planlsshall

bew

ateredim

enediasetyafter

plantingc

Canlainers

shallbe

openedand

plantsshall

berem

esedin

suche

manner

thatshe

ballof

earthsuooondsng

iherants

isnut

broken,and

thorshall

heplanted

andw

ateredan

hereinspecified

smm

ediatebafire

remos

alfrom

thecantalners

Conialnees

shaltnot

beopened

prierto

placingthe

planssin

theplanting

area2

Weed

Conlrol

After

soilpreparation

andesiahlishm

entof

finalgrades

prierle

aniplanliog.

theC

onlractorshall

irrigatethorooghly

fora

periodof

lime,

lisato

threew

eeksor

untilIhe

word

seedshave

geonineled.W

henshere

issufficient

weed

reedgerednatson,

theC

onlructonshall

applya

posbem

ergenlcontact

weed

killeraccording

lathe

directionsof

lhnm

anufaclurerT

heC

ontractorshall

thenw

allan

additionaltw

ow

eeksto

allowthe

wend

killerso

thssipote.then

planIas

indicatedis

theplans

andspecifications

Contractor

shallm

emar’e

anyresidual

foliageand/or

roots.3

Layout

ofM

ajorPlantings.

Loraooas

farplants

andoullines

ofareas

lobepbanied

shallbe

marked

onthe

groandby

sheconlnacbor

beforeany

planbpils

aredog.

All

sorblocutions

shallbe

approredby

bhelandscape

Architect

Ifanundergreand

constructionor

utititsline

isenraanirnnd

inshe

escas’asiosof

plantingareas.

otherlocations

may

beselected

bythe

landscapeA

rchitect4

Planlingof

Trees

andShrubs

aE

srasaltonfur

plansingshall

includeshe

sirippingand

stackingof

allacceptable

topsailencoonterad

within

theareas

Inbe

escavuledfor

trenches,tree

holes,plants

pitsand

plansingbeds,

bC

anR

emoral

(I(C

utcans

onIw

osides

svtlhan

uccepsublecan

cotter(2)

Do

salinjure

rantball

(3)D

osal

catcans

with

espade

erase(4(

Carefully

remove

planisw

ithoutinjury

ordam

ageso

rantball.

(5)A

fterrem

evingplank

superficiallycm

edge-rantsssith

kaifnon

threesides,

cB

oxR

emosal

(I)R

emove

beltomof

plantboxes

beforeplanting

(2(rem

ovesides

ofbox

rvilhautdam

ageto

ranthaltoften

pasibiosingplant

andpartially

backfillingA

llexcesated

halesshall

hosesenical

sidesw

ithraaghrned

surfacesand

shaltbe

ofasize

thatis

atleant

two

times

thew

idthand

oneand

Ihedepth

ofthe

originalplant

container.T

heholes

shallbe,

inall

cases.large

enough10

permit

handlingand

planling.w

ibhoutinjury’

orbreakage

toshe

rootson

noelball.

Refer

soStandard

PlantingD

etails.E

xcusatari

holesfor

slopeplanlings

shallbe

dugtw

otim

esoriginal

plansrontainer

width,

prosding

aperenanenl

Cinch

bermareand

planspis

Prolectall

areasfrom

excessivecom

pactionw

hentrucking

plantsor

otherrnalertal

bethe

plansiogsite

gC

enterplans

inpis

oninench

hFace

plantsw

ithfullest

gmesssh

intopras

ailingw

indSee

planspbem

band

holdogidls

inpesioan

anlibsoil

hasbeen

sampod

firstlyareand

ballor

molt

Container

planbsshall

behockfitled

with

-h

pans

byrolum

eon-site

topsail-2

pansby

salamo

organicusneodm

zni-

6-20-2tifertilizer

anyas

perchart

bdosvI

gallonI

handful5

gallon2

handfuls15

gallon3

handfulsIS”

box4

handfals24”

hasS

handfuls30”

box0

handfuls36”

box7

handfuls42”

box5

handfuls45”

box9

handfulsho”

boxtO

handfulsI

handfulapproxim

atelyequals

4-tiaances(

iA

llplants

which

seoledeeper

thanspecified

uboi’eshall

beraised

sothe

correctlevel

After

theplanI

hasboen

placed.addiiioral

backfillshalt

beadded

bathehole

torover

appraximaIel

one-halfof

theheight

ofthe

roothalt

At

thisslage.

water

shaltbe

addedto

thelop

ofshe

partly-filledhole

bethoroughly

sabacatethe

ransball

andadjacens

sailE

xcessm

itgenerated

fromshe

planongholes

may

bedism

butedon

thesite

andam

endedan

specifiedin

generalsail

preparationk.

Hand

placeplants

sthichore

incontainers

bessthan

onegallon

insize

I.Hand

backfilland

hamp

tamp,

leasinga

rlighbdepression

acoandbases

ofplants.

m,

Plantingtablets

shallbe

setw

itheach

planson

thetap

ofhe

rantball

while

theplants

aresoil

istheir

coobalneesso

therequired

namber

ofiahleis

10hom

edin

eachhale

canbe

easilysreified

s.‘hoer

thew

aterhas

campteieh

drained,planting

tabletsshall

beplaced

antndtcabrd

percontainer

sizebelow

Igallon

Itablet

5gallon

2bablets

ISgallon

3tablets

IS”box

4sahlets

24”box

5tablets

31ffbox

6tablets

36”box

7tablets

42”box

Stablets

48”box

9tablets

tilt”has

10iableis

NWI

oWat

es

W1—PL

AN

TIN

GS

PE

CIF

ICA

TIO

NS

‘II....

5-m20m5as260

Ijø’0

t

wan0

<(9U

)

PRO

GR

ESS

DR

AW

ING

m,,

“,““,‘5w”

,,,w

n5

”””n

’”

“r””’r

men

,m

alls

SHE

ET

NO

.

L8

ncAL

r:

NIA

Page 10: DC L9 L8 L7 L6 Li Ii U - ci.carson.ca.us

oT

herem

ainderni

thehale

shallhe

barkfllledp

After

backfllling.an

earthenbasin

shallhe

cnnstmcted

arnnndeach

plantE

achbasin

shallhe

ofa

depthsnfficicnt

inheld

atleast

two

inchesnfw

alerB

asinsshaD

heo

fasize

satiablefar

theindividual

planslan

ecase

shallshe

basinfare

fsfleee-eallonplant

heless

thanfear

feetin

disaseser.far

afiee-gollon

plansless

thanthree

feesin

diameter

andfern

one-gallonplans

lassthan

lessthan

ion

feesin

diaoseieoT

hebasses

shallbe

constructedof

nmended

backfillm

alenalsq

Panningshall

belim

itedto

them

ieimem

necessatxin

remos

em

jarednips

andbranches

andin

compansaso

farless

efroots

dnnngtransplanting,

busnes

erieexceed

eec-thirdof

thehm

nchsegesreciere

Upan

nppros-nlef

theL

andscapeA

rchitect,pruning

my

netbe

donebefore

deltvewnf

plantbet

eatbefore

plantshave

beeninspected

andappros

edC

atsever

314”in

diameter

shallbe

patetedsvslh

Ireeseal

rStaking

andG

nyieg(I)

Slakingof

alltrees

shallceeform

soslim

essakieg

andtree

flayingdetails(2)

Tree

stakesshall

bessraighs-grained.

ledgepale

pineStakes

shallbe

freefrom

keels,checks,

splitsas

disfigoremeete

Gas

asindicated

imm

ediniehafter

planting,using

threegus

sper

ieee,guys

placedas

Inflee

eqaslsappari

intree

themany

directionInstall

asvam

ingflag

aeeach

gusProtect

baskof

treebs’

connectingslice

with

“Csech-T

ic”A

nchorgas-

litressvidt

“deadmee”

busiedat

least2

feetbelosv

Seishgrade.

Tighten

gellieesIon

flosstansies,

Installndditioeal

gass

shouldtam

gruseibbe

saclilhai

threegay

sviresdo

notgive

seqsiredequal

sappeiafrom

alldirections

Vine

PlanttngV

inesshall

haveco

edslake

sappnrtrem

osodntthaut

damage

Inplans

andthe

s-toetrained

apesshe

adjacentpests

andcalls

asdirected

be’the

plan

arL

andscapeA

rchitectV

inesshall

beheldto

pastsand

overheadsby

plasticgreen

ribbon(“heasy

daly”)and

es-nbalsa,

aolaw

ls,as

directedby

theL

andscapeA

rchitectar

detailsI

Where

strealtrees

occarw

ithintree

svellsas

areadjacent

seesabstantial

amonot

afpar

omens,

aseb-sarface

planterbox

l”Deep-R

oot”as

approvedeqeal)

shallbe

med

flexshall

beinstalled

perD

esails,a.

Location

farsiseei

treesadjacent

toany

Iighlstandards

oretslity

equipment

shallbe

adjustedto

maintain

asuitable

clearance,as

approvedby

theC

ityL

andscapeA

schilecl,5

Plantingof

Ground

Cosess

aG

roandcover

plantsshall

begrow

nin

flatsar

peaspots

ortaken

asceilings,

asindicated

anthe

plansFlat

grown

plants(roosed

castings)shall

remain

inthese

flatsaelil

transplantingT

heflat’s

sailshall

cantonsafficiens

moislure

thatitsvill

notfall

spanc-hen

lifitngthe

plantsIfplants

frompeal

peisare

used,the

palsshall

beprotected

alall

times

priorto

plantingto

preseel

onnecessandix

ingof

therant

ballC

ranedeaser

shallbe

plantedte

straightross-sander

eatsspaced.

unlessothensise

noted,at

intersale

calledcalled

octin

thedraw

ingsT

hangelasspacing

shallbe

asedanless

oshenvisenoted

inthe

drawings

Each

cantedplant

shallho

plansedw

iihits

groportienateam

ountof

finssoil

nasapeat

pot,in

am

annerthat

will

snuorem

inimum

disimbance

ofthe

rootso

slam,

hutin

nocase

shallthis

dopshbe

lessthan

two

nodesT

onsoid

dn’iagoat.

plantingsshall

beim

mediately

spankleredafter

plantingunsil

iheentire

areais

soakedto

shefull

depthof

eachhole.

anlessuthens

isoontcd

onshe

drawings

dC

areshall

hoexercised

atall

limes

topraiaci

theplants

afterplanong

Any

damage

soplants

byiram

piagor

otheropem

sionsof

sheC

ootrnrlorshall

berepaired

imm

ediatetsCs

Flanisegof

Law

na,

Law

nisall

beplanted

byhand

seeding,hidusseeding,

and/orsodthag

asindicated

onthe

plansb.

After

pcoparaeonnf

soilin

accordaocesvtih

1hzsecnon

anG

radtngand

SoilPreparation.”

theareas

tobe

planiedin

lawn

shallbe

rolled,raked

andflow

ed10

finishgrade

beany

acceptablem

ethod,w

ith1hz

finishgm

deha

an’acceptable

method.

with

thefinish

gradebeing

smoath

andeven,

freeof

rocksand

clodsand

seasonablyw

ell-firmed,

Priorso

planuag.the

surfaceof

theam

ashall

besufficieeilo

looseand

friableto

receivethe

sendsof

sot

Pre-Fenliz,aiionJm

iprior

Sothe

plantingof

iarf,eseelo

broadcasiappsopnate

feoilizoras

specifiedin

theappros

adsoils

repeatd

Method

(IISeed

Asatisfacton’

method

ofsow

ingshall

beem

plosed,

usingan

approsed.m

echanical,pew

-er-drawn

driller-sender,m

echanicalhand-seeder

orother

spprosodcqsipm

entT

heraie

ofapplication

ofseed

will

bespecified

onthe

plansand

andia

ihespecificotioos

The

seedshall

becoiered

bym

eansof

aw

iredrag.

spikn-ioothed.banoss

celupackeror

etherapprosed

desice

Seededareas

shallinsm

ediaielybe

compacted

be-m

eansof

acalupacker,

ralleser

etherapproved

eqalpmeat

weighing

fig10911

peandsper

linensfans

ofrallw

Finalrolling

shallbe

ulaght

anglesio

slopesto

presenterosion

wheres

erpossible

mesal

siaplmfi pied

farthese

usedused

anerosion

controlm

ailing,if

noemsaw

(2)Sod

Soilpreparasian,

finishgrading

andfnoslieaiioe

shallbe

asspenfied

forseeded

lawns.

excepithat

thesob-sail

finishgrade

shallbe

iwo

inchesbelow

-final

gradeIa

alloo’for

thethickness

ofsod

Lassod

down

inan

edirccnon

only,w

ithclose

filedjoints.

The

endsof

eachstrip

shallbe

siaggoredso

eliminate

ceesesom

JoiningSingle

sodon

steepslopes

with

metal

sinplesis

picalfor

thoseused

anerosion

controlm

ailing,if

neemuan

eW

atenogIm

metharety

followsag

planitngas

lopdressing,

ifapplied.

app1’alight

fine,m

liispans

Iaanchor

theseed

and/ordressing

Iato

iheseth,

forming

apsoieesis

erm

stIa

preventw

inderosion

andds3

iagof

theseed

The

lawn

mom

shallhr

kepsm

oissanul

fall’gnessiaased.

Falle’germ

inasedlaw

nareas

shallbe

allowed

indn

snificientlyto

permit

rollingw

sshapproxim

atelotrio

hundredto

threehundred

peaodssntes-w

’eightedroller

tosatisfacsoels

compass

thesoil

aroandshe

grassroots

andprovide

afirm

.sm

ooshm

owing

surface

7H

sdsmeeded

Applieaiioe

Proceduresand

Eqaipnseas

aW

eedC

eesrolU

ponthe

compleltan

oftheirrigaiian

sestem

andand

afterall

existingw

eedsand

groseghhave

hems

remos

adfrom

thecem

meecial

fefllhiees121.11-0)

peracre

asper

plmling

areatapp1’

2ililpeonds

ofa

mauafactares’s

inslwcsinus

Waler

allareas

forsim

mdark

andanlil

weed

seedshai

agerm

iontedC

easew

aleringfor

threedays

Spsasthe

non-sehecIsveherbicide

“Roand-up”

toeradicate

thegem

enaledw

eedsT

rmslacason

orepprovod

equalperiod

ihosldbe

7-IIIdays

Allais

herbicideto

killall

is-endsR

akeor

beeoffall

deadaey-ds

loo

deplbof

1/4inch

belowthe

surfaceofth

esoil

lfpeseneialw

eedsor

grassesdill

emits,

re-waler

foeslim

esdm

lyfor

fans-seenconsecutive

dn1s,

untilthe

newgrossih

appearsR

e-applya

noa-selecdscherbicide

Rem

ovew

eedsafler

herbicidehas

hadsofficient

time

tokill

bE

qoipmeni

Hydrnnlic

equipmeni

uiedfor

theapplscauon

ofthe

feoilseayreed

andsIerra

ofprepared

wood

palpshall

beof

the“Super

l-Iydro-Seedes”type

This

eqoipmenl

shallhave

abaits-ia

agilntioesostem

andoperating

capacus-sufficienl

toagitate,

suspendand

homogeneously

mix

asham

.contained

eelleis

11505411%

offibre

mulch

plusa

combined

talalof

#7fertilizer

solidsfur

eachloll

gallonsof

stalerT

heslern

dishebolionlines

shallbe

largeenongli

10presenI

slappegenod

shallbe

equippedw

itha

setofh’

draulicspray

nozzlesw

hichw

illpros

idea

conlinuoasnen-flocteating

discharge‘D

ieilen

ytank

shallbase

am

inimum

capacii

ofI,Sflf

gallostsand

shallbe

moanted

ena

ueasehingaail,

eshherself-propelled

ordraw

nby

aseparate

unit

which

will

placeIhe

slopelank

spraxnozzles

within

seffciansproxim

ityIa

Iheareas

lobe

seededc

PreparationT

heslope

praparelionshall

sakeploce

asthe

siteof

wnrk

Begin

byadding

waler

tothe

tankw

henthe

engineis

athalf

throisleW

henthe

waler

levelhas

ranchedthe

hseighlof

theagitator

shaft.good

m-circalation

shallbe

essablishedand

Ihaseed

shallbe

added,F

ertilizershall

thanbe

added,follow

edho-

wood

pulpm

ulch,T

hew

andpulp

malch

shallonly

beadded

tothe

mislaco

aflerIhe

seedand

when

thelank

isal

leastone-third

filledsvtth

sealer,T

heengine

throlileshall

beopened

sofell

speedw

henthe

lankis

half-filledw

ishw

alerA

llshe

wood

palpm

olchshall

beadded

byIhe

lime

shetank

iitie-a-thirds

inibree-foufibs

fallSprayieg

shallcom

mence

imm

ediatelyw

henthe

tankis

felld

Application

The

operatorshall

spraythe

slopesw

itha

uniform,

yssibleraai

byusing

thegreen

colorof

thew

andpulp

asa

gaidelisa

slam’

shallho

appliedsea

sweeping

motion

inan

archedstream

soas

tofull

likerain,

allowing

ihew

eedSham

tobm

ldon

eachother

ansIa

goodcoal

isashier-ed

sadthe

maierial

isspread

atthe

reqeiredrate

peracre

The

Lim

itA

llslan

-m

ixhoroo-hich

barnoh

beenapplied

Iaihe

slopesw

ithinfear

boomefler

mixing

will

berejected

andrem

osedfram

sheprojerl

atIhe

Coniracles’s

expensef

PraseelionSpecial

careshould

beexercised

hothe

Centrecior

sopres

ennegany

ofshe

clansto

besprayed

insideany

resrno

irbasic

orid

adrainage

ditchesand

channelsw

hichm

mim

pedethe

theeflaw

ofrain

orirrigasioa

sealerA

nyslum

spilledsolo

resirictedareas

shallbe

cleanedup

atthe

Coetracm

ofsexpense

10the

salisfachionof

theG

oneror

CisxA

llareas

desigaahedfor

hodroseedseg

shallbe

ihoroughhew

alered5O

510

heho

droseedingT

heC

nniracinrshall

nolaany

discrepanco-for

rompleie

synlercovem

geand

cormci

The

Coniranur

shallas

Ibislim

eease

raindand

weather

cenditionsand

submil

aw

aleangprogram

10the

Landscape

Archileel

feeappm

ral

Friarso

be’droscedingg,

Reseeding

MI

barespots

shallbe

reseededw

idtieIll

dcciin

thesalisfnetioa

ofthe

Ow

-nwm

d-orL

andscapeA

arhssecsb

Watering

(I)A

balanced,fall-cos-esage

ssaleringprogram

shallbe

meinloned

10enlace

propergerm

inalioeantil

theacceplauce

ofcork

(21Plants

which

caneolbe

watered

ethcienihw

ilhIhe

evislingw

aleres-siam

shallbe

walerod

bym

eansofa

base5

Fertslizauon(Tech)

Apply

reeomm

eodedfenuli-inane

program45

des’snflw

thefim

lm

owing

Continue

asen’

90-1211days

Mainienance

andIrrigation

Mainlenance

shallbathe

sespensibilooof

sheL

audseapeC

antsaciorfo

reperiod

affany-fiso

daysIs

ishis

responsibilityto

providesuthcient

water

Moissere

must

bem

aintainedon

thesoil

oncethe

slum’

mulch

hasbree

appliedand

atoned

toSal

forone

dayT

heslopes

canihen

heiw

igalod,Threa

oredo

sdirrigation

reqairements

ingallons

perm

ieate,deralion

oflim

eor

camber

ofgallons

inbe

appliedso

theho

droseededslopes

This

oiIlvon’

fromdes-

Inday

dependingan

therate

ofgronsth

andchim

ariccandsiions

meouniered

The

soilearfaca

shallbe

kepim

oissas

alllim

es,pam

icalarlydaring

theseeding

gormiaalioe

period.Failore

topreside

adeqeasem

oissaraw

illsm

allin

desiccanonof

shenew

eeedltngs,in

lurem

akingit

neemsasy

foran

addosonalopplscalioe

ofseed.

fefislizerand

malch

kSoil

lessC

entmclor

shallrake

coilsam

plesthom

theseapproved

lacolionsA

gncallaadsm

iakiloylest

shallbe

made

ofshe

soilsam

plesT

essshall

inclode,bat

nolIsm

isedto

Ph.E

CE

.SA

R.N

FL

BO

RO

Nand

half-saiurnsinnlest

Copies

ofthe

smelts

shallbe

sentIa

theL

andscapeA

rchitectfor

seniaw

Hydroseeded

mIx

issebjecs

sochange

uponrosters

ofa

usihanalysis

Erosion

Conical

aflam

ieecontrol

inslallationw

illho

reqairedin

locationsspecificalls

delineatedon

thedraw

ingsores

nocesiasydue

tofield

conditionsSarface

ofshe

slopesshall

beunifonely

emooth

andesen,

waib

alldebris

andracks

rakedout

The

coilshall

besofficseally

moist

soperm

itthe

firmlaying

oferosion

canleolm

attingand

topresent

slooghingof

topsoilc-T

heerosion

controlm

alsiegshall

behod

ss’iththe

directionof

flow-

ofsecfnce

drainageand

inaccordance

with

them

anufaciures’sdim

ctioesT

hem

ailingshall

becal

topros

ideas

tsuallypleasing

sloped-

The

matting

shallha

stapledin

placeand

firmly

embedded

bym

eamof

lampiag

orrolling

asappros

adbc

theL

andscapeA

rchilectso

insorethat

them

ailingis

incontact

with

Ihesoil

andthai

noesosioe

cantake

placenader

them

aIling

aPlaniing

oflecf,groand

roseN,

uhmbs

and/ossines

mw

berequired

iearea

proseeiedho

erosioncoesrol

mailing

ccspecified

inshe

plansor

ccbecom

esssecm

ian’

9N

asivoPlans

Areas

aA

eoplaniieg

areasdm

ignaiedas

nalanalplansiag

thaiam

domed

afi’danngany

phaseof

thedes

elopmenl

mm

ibe

re-establishedw

ithan

oppresedplanfing

peerto

acceptanceoftho

leadb

Com

plyoith

Coo’Z

aniagand

Suhdisnon

Ordinance

cN

aleealvegetation

aseasare

eeh1ociho

seniow

andapprosal

bythe

Loatheope

Architect,

FireM

arshalland

City

Landscape

Archiloci

Appropriaie

foalm

anagemoni

programs

shallbe

addressedas

apan

ofiheconim

rlsdacam

entsfor

axecaliondaring

sitedoselopm

enhB

udgetingfor

oe-goingfoci

esanagemeal

prograrmihoald

alsobe

addressedas

apan

ofth

am

aintenanceprogram

s

fiC

LE

AN

-UP

After

allplanling

operationshava

beencom

pletedrem

ovenil

trash,excess

soil,am

ple’plant

conlainemand

rubbishfrom

sheproperlo

All

scars,ruts

omoiher

marks

inthe

groandcaused

bethis

ssorkshalt

herepaired

andthe

groendheft

ina

neatsad

orderlycondition

hhroughoot therile

Clean-up

Contractor

shallpick-up

alltrash

smelting

thomthis

work

noloss

freqeeathyihan

eachFrides

beforeleasing

thesite,

oncen

steakand/or

them

levorkieg

dayofeach

week,

All

trashshall

ham

emos

adcom

pletelyfrom

thecite,

lisaC

oniraclorshalt

heavethe

sitearea

broom-clean

andehall

wash

down

altpaved

areasw

iihinthe

Contract

arealeaving

theprem

isesin

nclean

cendotonT

heC

ontractorshall

nwm

gefor

ofl’sitedispesal

ofsom

ptassoil

andshall,

uponm

qoms,

famish

IheC

ityor

Counts

‘sauthorized

represeelalivew

iththe

disposalssle

Osyner’s

written

consent

F,IN

SPEC

TIO

NS

Norm

alprogress

inspectionsshall

bereqoesled

bythe

Cenim

aclorfrom

theL

andscapeA

rchilechat

leasI4

dess

inadvance

ofan

anticipatedsnspeclioa

tespecoonsare

requiredas

foltows

Iopec

thecom

pletionof

finegrading

2upon

thecom

plenonof

soilconditioning

3prior

inapplicaltoo

ofpost-em

ergentw

eedkillers

4pre

orpass-delis

eiyof

altplant

malarial

5,apon

thecom

plasonof

major

planttayoes

atthe

tree-stakingexam

pleprtor

sosodding

LA

ND

SCA

PEM

AIN

TE

NA

NC

E

IG

EN

ER

AL

RE

QU

IRE

ME

NT

S

aScope

ofW

orkW

orkspecified

inthis

Sectionfam

ishall

labor,m

aterial,equipm

aniand

senices

meqaired

tom

ainionshe

landscapea

analiractiso

rondilionas

specifiedharem

fora

periodof

nineio(fist)

daysafter

finalacceptance

byO

wner

bQ

ealitsA

ssacanceT

heC

ontractor’srepsesonialsse

shallho

experiencedin

landscapingm

ainimasce

andshall

basescram

adan

odernlionin

omom

ensalM

aintenancePeriod

The

Coatracios

shallroatiauom

lym

ainlonalt

areasinsets

adin

thisC

ontractdaring

theprogrm

sof

thew

orkand

them

ainlomance

perioduntil

finalaccoptauco

ofthe

o-orkby

sheow

nerIm

properm

aintenanceor

possiblepeer

conditionof

anyplanting

asihe

lerminasion

ofthe

schadeledm

aintenanceperiod

may

raosepostponem

entof

thefinal

completiae

daleof

iheC

oniractM

ainimanca

shallbe

continuedby

theC

ontractoruntil

work

isacceptable

Maiesm

anceperiod

shalleat

slatsuntil

altelem

entsof

ronssmcsiun,

planungand

irrigationfor

theentire

prajeelare

inaccordance

wish

Plansand

Specifications-T

heC

oesruciorshall

raqeestan

inspectianto

beginthe

maintenance

periodafter

allplansing

andrehaled

ssorkhas

beancem

pletedin

accordancew

ilhthe

Coniraci

dacomeets

Aprim

ereqaim

mm

sis

thasall

lawn

areasshalt

shosvan

aim,

healihystrand

ofgrass

seedlingsor

sod,either

ofw

hichshall

havehem

mow

etw

iceIf

suchcriteria

ism

etso

thesatisfaction

ufibe

Landscape

Architect.

ofield

nooficasionw

iltbe

issuedto

thoC

ontmoior

10establish

theetfeclive

begineingdale

ofthe

mainim

anceperiod.

My

dayw

heeshe

Contractor

failsto

adequatelym

oeto

nplantings.

replaceansalsable

plantsor

dow

eedcontrol

orother

work,

asdeterm

inednecessan’

by-the

Landscape

Architect,

will

antho

credisedas

am

aintenanceperiod

working

daysT

hem

ainnrnancoperiod

with

beexsendod

ifthe

pros550cc

reqaisedthe

planeand

specifleahionsarc

netfitted

0E

ME

RG

EN

CY

NU

MB

ER

S

(I)T

heC

oelmaciorshall

prosideand

montain

arurronl

liesof

emeigenus

salophonenam

bemfor

24-hoarem

ergeonresponse

121T

heC

ontraciosshalt

snissalerem

edialadlion

ssstlunIw

oboom

fromthe

time

ofnoufic

atio

n

EF

RO

ThC

11ON

OF

EX

ISTIN

GFA

CIL

ITIE

SA

ND

STR

UC

TU

RE

S

The

Consracsor

shallexorcise

danram

inpralerling

fmm

damage

allexisling

facilities.sirucieres

andusihilies

bethobese

andbelow

’sam

focene

theC

oy/O

wnar’s

psspeooA

m-

damage

inC

iw’s/

Discos’s

propefisdeem

edlo

be

caosedN

-the

Conisactas’s

responsibility’to

serifyand

locateany

andesgroandsystem

s(i

e,utiley

line)T

hisdons

aolrelease

theC

oniraclorfsom

theresponsibility’

oftaking

reasonablepraeaooons

ohenw

orkingin

theseareas

Any

domoge

orproblem

sshalt

berepenad

imm

ediatelylath

eCisy’/

Ow

ner’sm

eprmaalalss

a

FPR

OJE

CT

INSPE

CT

ION

SU

ponm

eqeeslthe

Censracios

orhis

ropsosenlalisessitl

stalkthe

projectssith

theCisy’/

Ossnor’s

represeolalivafom

thepacposo

ufdeterm

iningcom

pliancew

iththe

specificanonsPR

OG

RE

SSD

RA

WIN

G

OCA

LE:

NIA

0-

as0m>inasas5-0

II

oU

<as

oCo

NWI

—as<

00

og

Qo

Wus

WI—

JunSO

ME’

Ten

ures

cAm

,0006,10

SHE

ET

NO

.

L9