7/26/2019 Dc Cabling Info Acquisition Matrix
1/29
Cabling Solutions
Data Centre Cabling
Information AcquisitionMatrix
Version 1.2 / Nexans Cabling Solutions 2012
7/26/2019 Dc Cabling Info Acquisition Matrix
2/29
23 October 2012 Doc. N: DC matrix V1_2.doc
Nexans Cabling Solutions 2012 Page 2/29
Table of contentData Centre Cabling ......................................................................................................... 1
I. Introduction ............................................................................................................ 3
II.
Standards ............................................................................................................... 4
III. Distribution ............................................................................................................. 6
A.
Distribution scheme ................................................................................................ 6
1. End of server row switching (Man) ...................................................................... 62.
Top of server rack switching (Man) ..................................................................... 6
3. Centralised server row switching (Man) .............................................................. 74. Dual end of row switching (Man) ......................................................................... 75. Computer Edge Switching (Man) ........................................................................ 76. Edge to Edge Corporate switching (Man) ........................................................... 87.
Edge to Edge Collocation switching (Man) .......................................................... 8
B.
Availability (Sup) According to EN 50600-1 ......................................................... 9
C. Data centre layout .................................................................................................10
1. Data centre rack layout (Man) ............................................................................102. Layout and number of server racks (Man) .........................................................113. Layout and number of storage racks (Man) .......................................................134.
Layout and number of network racks (Man) .......................................................15
5. Distribution area (patching frame) (Man) ............................................................17
IV. Components ..........................................................................................................19
A. Copper cabling specification ..................................................................................19
B.
Fibre cabling specification .....................................................................................20
1. OM3 ..................................................................................................................202. OM4 ..................................................................................................................213.
OS2 ...................................................................................................................21
V. Added value ..........................................................................................................22
A. LANsense .............................................................................................................22
1. Area to monitor ..................................................................................................222. Hardware required .............................................................................................223. Software required ..............................................................................................22
B.
EMAC ...................................................................................................................23
C. Pre-term ................................................................................................................24
D. MPO ......................................................................................................................25
1.
OM3 specifications (MPO) .................................................................................26
2. OM4 specifications (MPO) .................................................................................263. OS2 specifications (MPO) ..................................................................................26
E. Bend insensitive fibres Slimflex LC Patch cords .................................................27
F. Secure Lock LC fibre products ..............................................................................27
G. High Density Data Centre Cabinet (HDDC) ...........................................................28
H.
Data collection sheet .............................................................................................29
7/26/2019 Dc Cabling Info Acquisition Matrix
3/29
23 October 2012 Doc. N: DC matrix V1_2.doc
Nexans Cabling Solutions 2012 Page 3/29
I. Introduction
This document is intended to capture data that is required by the Project DesignDepartment to create a cabling design study for Data Centre projects. The work flowschematic is used to cover all aspects affecting cabling and simplify the decision makingprocess.
Mandatory information listed below is marked in parenthesis (Man).
Supplementary information which would enable a better understanding of customerrequirements and assist in providing a value added design proposal is marked (Sup).
7/26/2019 Dc Cabling Info Acquisition Matrix
4/29
23 October 2012 Doc. N: DC matrix V1_2.doc
Nexans Cabling Solutions 2012 Page 4/29
II. Standards
The Data Centre cabling shall comply with
ISO/IEC 24764:2010: Information technology - Generic cabling systems for Data Centresor
EN50173-5:2011: Information technology - Generic cabling systems - Part 5: Data centres
Those standards are making reference to the general building cabling standards
ISO/IEC 11801:2011or
EN 50173-1:2011 + EN50173-2:2011 (Design)
EN50174-1:2011 + EN50174-2:2011 + EN50174-2-3:2003 (Installation)
The cabling architecture in a Data Centre is divided into different subsystems as it is forthe cabling architecture of a building but the names of those sub-parts (as defined in theDC standards) are different.
In order to select the applicable cabling standard and infrastructure design, the followingshould be taken into account
Current and future bandwidth requirements
LAN & SAN convergence
Scalability and migration to higher speeds
Resiliency and redundancy
Flexibility for equipment placement, reconfiguration due to equipment failure andany-to-any connectivity
Expansion; new equipment and/or cabling additions
Intelligent Cabling Management System (LANsense) as recommended byEN50174-1
7/26/2019 Dc Cabling Info Acquisition Matrix
5/29
23 October 2012 Doc. N: DC matrix V1_2.doc
Nexans Cabling Solutions 2012 Page 5/29
Data Centre Infrastructure Standards EN 50600 Series (In development)
This standard specifies general concepts for data centre facilities and infrastructures. It
defines the common aspects of data centres, specifies a classification system, basedupon the key criteria of "availability", "security" and "energy-efficiency" over the plannedlifetime of the data centre, for the provision of effective facilities and infrastructure anddescribes the general design principles for data centres.
Information technology - Data centre facilities and infrastructures
EN 50600-1:201X - Part 1: General concepts
Status: Approved Will be officially published in 2013
Sub-parts
EN 50600-2-1 - Part 2-1: Build ing construct ion
EN 50600-2-2 - Part 2-2: Power distr ibution
EN 50600-2-3 - Part 2-3: Environmental control
EN 50600-2-4 - Part 2-3: Telecommunications cabling Infrastructure
EN 50600-2-5 - Part 2-3: Security Systems
EN 50600-2-6 - Part 2-3: Management and operational information
Status: Currently in development
7/26/2019 Dc Cabling Info Acquisition Matrix
6/29
23 October 2012 Doc. N: DC matrix V1_2.doc
Nexans Cabling Solutions 2012 Page 6/29
III. Distribution
A. Dis tribut ion scheme
In order to understand the needs of the Data Centre it is imperative to know how all thepieces will interconnect with each other. Based on this information the matrix of theinterconnections can be made.
The complexity of this matrix will depend on the size and resilience of the network.
1. End of server row switching (Man)
2. Top of server rack switching (Man)
7/26/2019 Dc Cabling Info Acquisition Matrix
7/29
23 October 2012 Doc. N: DC matrix V1_2.doc
Nexans Cabling Solutions 2012 Page 7/29
3. Centralised server row switching (Man)
4. Dual end of row switching (Man)
5. Computer Edge Switching (Man)
7/26/2019 Dc Cabling Info Acquisition Matrix
8/29
23 October 2012 Doc. N: DC matrix V1_2.doc
Nexans Cabling Solutions 2012 Page 8/29
6. Edge to Edge Corporate switching (Man)
7. Edge to Edge Collocation switching (Man)
7/26/2019 Dc Cabling Info Acquisition Matrix
9/29
23 October 2012 Doc. N: DC matrix V1_2.doc
Nexans Cabling Solutions 2012 Page 9/29
B. Availability (Sup) According to EN 50600-1
The acceptable level of availability of the DC is to be determined.
Downtime cost analysis (EN 31010) Risk of loss of services analysis (EN 31010) Implement redundancy to reduce the high and critical risks
Classes of availability for telecommunication cabling
Class 1: Single path using direct connectiono Shall be the exception Limited scalabilityo Not recommended
Class 2: Single path using fixed infrastructureo Flexible and scalable designo Central Patching / Cross-connect requiredo Minimum recommended Class
Class 3: Multi-path using fixed infrastructureo Flexible and scalable designo Shall be future-proof (Performance > fasted application)o Pre-terminated cabling recommended (Security & availability)
Class 4: Multi-path using fixed infrastructure with diverse pathways
o Flexible and scalable designo Shall be future-proof (Performance > fasted application)o Pre-terminated cabling recommended (Security & availability)o Redundant cabling diversely routed
Will the cabling and the network of your Data centre offer redundancy to reduce the risk ofcostly and critical downtime?
If so, please indicate the redundant links onto the layout
Example of dual pathways layout (Also see next page)
7/26/2019 Dc Cabling Info Acquisition Matrix
10/29
23 October 2012 Doc. N: DC matrix V1_2.doc
Nexans Cabling Solutions 2012 Page 10/29
C. Data centre layout
1. Data centre rack layout (Man)
The following diagram is a typical representation of a data centre rack layout showingserver, network, storage and cabling racks, which will vary from customer to customer. Inorder to provide an assessment for the design, bill of materials and costs, an indication ofthe position and number of racks for each type is required. The detail of this information islisted further on in points B, C, D & E.
Cable trays layout
Cable tray configuration
Trays located above the racks or under the raised floor?
Distance from tray to cabinet
7/26/2019 Dc Cabling Info Acquisition Matrix
11/29
23 October 2012 Doc. N: DC matrix V1_2.doc
Nexans Cabling Solutions 2012 Page 11/29
2. Layout and number of server racks (Man)
Information required:
1) Number of server racks per row2) Number of rows3) Location of server racks in the computer room floor4) Height (U) of server racks5) Width and depth of the server racks6) Number of copper connections per rack7) Number of fibre Channel connections per rack8) Class of copper cabling if specified9) Grade of fibre cable and connectivity if specified
7/26/2019 Dc Cabling Info Acquisition Matrix
12/29
23 October 2012 Doc. N: DC matrix V1_2.doc
Nexans Cabling Solutions 2012 Page 12/29
Example of Server Rack configuration
7/26/2019 Dc Cabling Info Acquisition Matrix
13/29
23 October 2012 Doc. N: DC matrix V1_2.doc
Nexans Cabling Solutions 2012 Page 13/29
3. Layout and number of storage racks (Man)
Information required:
1) Number of storage racks per row for SAN fabric switches2) Number of storage rows for SAN fabric switches3) Location of Storage racks in the computer room floor4) Height (U numbers) of storage racks5) Width and depth of the storage racks6) Number of copper connections per rack7) Number of Fibre Channel connections per rack8) Class of copper cabling if specified9) Grade of fibre cable and connectivity if specified
Note: The demarcation point for infrastructure connectivity tends to be at the SAN fabricswitch. Connectivity from the switch to the SAN device is usually treated separately andby the IT department so this may not be included.
7/26/2019 Dc Cabling Info Acquisition Matrix
14/29
23 October 2012 Doc. N: DC matrix V1_2.doc
Nexans Cabling Solutions 2012 Page 14/29
Example of Storage Rack configuration
7/26/2019 Dc Cabling Info Acquisition Matrix
15/29
23 October 2012 Doc. N: DC matrix V1_2.doc
Nexans Cabling Solutions 2012 Page 15/29
4. Layout and number of network racks (Man)
Information required:
1) Number of network racks per row (note; maybe positioned at end of serverrows)
2) Number of rows of network racks3) Location of Network racks in the computer room floor4) Height (U) of network racks5) Width and depth of the network racks6) Switch model and part number7) Number and location of switches8) Number of Ethernet connections to copper patching frame per rack9) Number of fibre uplinks to patching frame per rack10) Class of copper cabling if already specified11) Grade of fibre cable and connectivity if already specified
7/26/2019 Dc Cabling Info Acquisition Matrix
16/29
23 October 2012 Doc. N: DC matrix V1_2.doc
Nexans Cabling Solutions 2012 Page 16/29
Example of Network Rack configuration
7/26/2019 Dc Cabling Info Acquisition Matrix
17/29
23 October 2012 Doc. N: DC matrix V1_2.doc
Nexans Cabling Solutions 2012 Page 17/29
5. Distr ibution area (patching frame) (Man)
Note: The following data can be calculated by Nexans if all data requested in the formerchapters are provided.
Information required:
1) Number of copper cabling racks per distribution frame2) Number of fibre Channel connections per distribution frame3) Number of distribution frames
4) Location of the distribution frames in the computer room floor5) Height (U numbers) of the distribution frames6) Width and depth of the distribution frame7) Number of copper cables to each rack (should correspond with combined
number in each server and network rack)8) Number of fibre connections to each rack (should correspond with combined
number in each server and network rack)9) Class of copper cabling if specified10) Grade of fibre cable and connectivity if specified
7/26/2019 Dc Cabling Info Acquisition Matrix
18/29
23 October 2012 Doc. N: DC matrix V1_2.doc
Nexans Cabling Solutions 2012 Page 18/29
Example of Patching Rack configuration
7/26/2019 Dc Cabling Info Acquisition Matrix
19/29
23 October 2012 Doc. N: DC matrix V1_2.doc
Nexans Cabling Solutions 2012 Page 19/29
IV. Components
A. Copper cabling specification
Server, switch and storage virtualisation are the main drivers for higher speeds. ModernData Centres need to support a minimum of 10G Ethernet now with the potential tosupport 40G within the next 3 5 years. LANmark 6A therefore is the minimum coppercabling spec that should be considered. High availability server farms will require futureproofing beyond 10G and therefore LANmark 7A should also be considered.
7/26/2019 Dc Cabling Info Acquisition Matrix
20/29
23 October 2012 Doc. N: DC matrix V1_2.doc
Nexans Cabling Solutions 2012 Page 20/29
B. Fibre cabling specification
1. OM3
Field Terminated fibres (Splicing or Direct Termination)
Appl ications(not exhaustive)
2connections
3connections
4connections
5connections
6connections
1GBase-SX 880 780 700 620 520
1GBase-LX 550 550 530 460 370
10GBase-SR 330 290 270 240 210
10GBase-LX4 300 290 270 250 23010GBase-LRM 220 - - - -
1GBit FC - serial (PI-4 100-M5E-SN-I) 1160 960 840 700 540
2GBit FC - serial (PI-4 200-M5E-SN-I) 660 540 440 340 200
4GBit FC(PI-5 400-M5E-SN-I) 380 300 250 190 90
8GBit FC (PI-5 800-M5E-SN-I) 180 150 125 100 35
10GBit FC - serial (10GFC 1200-M5E-SN-I) 350 290 270 240 210
16GBit FC (PI-5 800-M5E-SN-I) 120 100 75 40 NA
Pre-Terminated SC/LC Assemblies
Appl ications(not exhaustive)
2connections
3connections
4connections
5connections
6connections
1GBase-SX 920 840 820 760 720
1GBase-LX 550 550 550 550 530
10GBase-SR 350 320 300 290 270
10GBase-LX4 320 310 300 290 280
10GBase-LRM 220 - - - -1GBit FC - serial (PI-4 100-M5E-SN-I) 1240 1080 1020 940 860
2GBit FC - serial (PI-4 200-M5E-SN-I) 720 620 580 520 460
4GBit FC(PI-5 400-M5E-SN-I) 400 350 330 300 260
8GBit FC (PI-5 800-M5E-SN-I) 180 180 160 135 125
10GBit FC - serial (10GFC 1200-M5E-SN-I) 350 320 300 290 270
16GBit FC (PI-5 800-M5E-SN-I) 120 120 105 85 75
7/26/2019 Dc Cabling Info Acquisition Matrix
21/29
23 October 2012 Doc. N: DC matrix V1_2.doc
Nexans Cabling Solutions 2012 Page 21/29
2. OM4
Field Terminated fibres (Splicing or Direct Termination)
Appl ications(not exhaustive)
2connections
3connections
4connections
5connections
6connections
1GBase-SX 900 800 720 640 520
1GBase-LX 550 550 530 460 370
10GBase-SR 550 460 420 380 330
10GBase-LX4 300 290 270 250 230
10GBase-LRM 220 - - - -
1GBit FC - serial (PI-4 100-M5E-SN-I) 1220 1000 860 720 560
2GBit FC - serial (PI-4 200-M5E-SN-I) 720 580 480 360 220
4GBit FC(PI-5 400-M5E-SN-I) 410 340 280 200 100
8GBit FC (PI-5 800-M5E-SN-I) 220 190 160 110 160
10GBit FC - serial (10GFC 1200-M5E-SN-I) 550 460 420 380 330
16GBit FC (PI-5 800-M5E-SN-I) 150 125 100 50 NA
Pre-Terminated SC/LC Assemblies
Appl ications(not exhaustive)
2connectors
3connectors
4connectors
5connectors
6connectors
1GBase-SX 940 880 840 800 740
1GBase-LX 550 550 550 550 530
10GBase-SR 550 490 470 450 430
10GBase-LX4 320 310 300 290 280
10GBase-LRM 220 - - - -
1GBit FC - serial (PI-4 100-M5E-SN-I) 1300 1140 1060 980 880
2GBit FC - serial (PI-4 200-M5E-SN-I) 780 680 620 560 500
4GBit FC(PI-5 400-M5E-SN-I) 440 390 360 330 290
8GBit FC (PI-5 800-M5E-SN-I) 220 220 200 175 160
10GBit FC - serial (10GFC 1200-M5E-SN-I) 550 490 470 450 430
16GBit FC (PI-5 800-M5E-SN-I) 150 150 130 110 100
3. OS2
Field Terminated fib res (Splicing, Direct Termination or Pre-Terminated) with one splice every 2 kmbetween 2 connections if required
Appl ications
(not exhaustive)
2
connections
3
connections
4
connections
5
connections
6
connections
100 Base-FX 2.000 - - - -
1Gbase LX 5.000 4.900 4.500 4.000 3.500
10Gbase LR 10.000 9.000 7.500 6.000 4.500
10Gbase LW 10.000 9.000 7.500 6.000 4.500
10Gbase LX4 10.000 8.500 6.750 5.250 3.500
4GBit-FC (PI-5 400-SM-LC-L) 10.000 10.000 7.500 6.000 4.000
8GBit-FC(PI-5 800-SM-LC-L) 10.000 10.000 7.500 6.000 4.000
10GBase-FC(1200-SM-LL-L) 10.000 9.000 7.500 6.000 4.500
10GBase-FC (1200-SM-LC4-L) 10.000 8.500 6.750 5.250 3.500
16Gbit-FC(PI-5 1600-SM-LC-L) 10.000 10.000 7.500 6.000 4.000
40Gbase-LR4 10.000 10.000 9.000 7.000 5.000100Gbase-LR4 10.000 10.000 8.000 6.000 4.000
7/26/2019 Dc Cabling Info Acquisition Matrix
22/29
23 October 2012 Doc. N: DC matrix V1_2.doc
Nexans Cabling Solutions 2012 Page 22/29
V. Added value
According to the latest EN-50174 standard it is recommended to foresee an automated
system to control Moves, Adds and Changes (MAC) in your data centre. LANsense issuch a system which provides real time mapping of the cabling infrastructure. Otherfeatures are also available which includes EMAC (Environmental Monitoring & AccessControl). In order to implement LANsense additional information is required.
A. LANsense
LANsense is Nexanss Intelligent Infrastructure Management (IIM) solution. It is aninternet enabled hardware and software package which can automatically discover andmonitor network connectivity in real-time, to ensure network connections are secure andthat connectivity documentation is always 100% accurate. LANsense is vendorindependent and can be retro-fitted to existing systems.
Benefits:
Increased Security Cost effective change control and management Reduced downtime Asset Management Remote site monitoring the ability to integrate EMAC
1. Area to monitor
We need to know all the patching zones that need to be configured with LANsense, this
can be done by marking them in the matrix list. Those areas can mainly include theDistribution area (patching frame) and the end of server rows.Note: If a top of server rack switching scheme is selected the monitoring of the server toswitch connections is not useful because the LANsense system will automatically detect ifswitch ports are connected to each port of the server.
2. Hardware required
Analysers the LANsense analysers are permanently connected to every (copper andfibre) intelligent patch panels to detect the port connectivity and feed the output to thesoftware database.
Patch Panels and Cords LANsense intelligent patch panels and cords incorporatesensor circuits (based on 9thwire technology) to detect the insertion or removal of cords.
3. Software required
LANsense Software The LANsense software is a control and reporting tool.
Two platforms of software are available:
LANsense Enterprise Edition: a fully featured package which can becustomised according to the individual client requirements
LANsense Data Centre Edition: a fully featured, customised package withspecific tools designed to meet the operational needs of Data Centre managers
7/26/2019 Dc Cabling Info Acquisition Matrix
23/29
23 October 2012 Doc. N: DC matrix V1_2.doc
Nexans Cabling Solutions 2012 Page 23/29
B. EMAC
EMAC is a set of tools managed by the ICMS of the cabling, for example Nexans
LANsense Enterprise software, or used as a Stand-alone system. In this case, the
management is performed through the built in web management interface.
This set of tools shall be used for the following:
Monitoring and control of power in server and switch racks
Measurement of temperature and humidity inside server and switch
racks
Detection of open and closed rack doors
Controlling rack door access
Controlling door access to computer roomsRack door keypads to enhance security (Optional)
Retro-fit solution for existing dumb power strips.
Water detection
7/26/2019 Dc Cabling Info Acquisition Matrix
24/29
23 October 2012 Doc. N: DC matrix V1_2.doc
Nexans Cabling Solutions 2012 Page 24/29
C. Pre-term
LANmark-6A Pre-Term Multipair Cat 6A RJ45 Jack-Jack
LANmark Pre-Term Bundles
Pre-Terminated Fibre Assemblies
7/26/2019 Dc Cabling Info Acquisition Matrix
25/29
23 October 2012 Doc. N: DC matrix V1_2.doc
Nexans Cabling Solutions 2012 Page 25/29
D. MPO
7/26/2019 Dc Cabling Info Acquisition Matrix
26/29
23 October 2012 Doc. N: DC matrix V1_2.doc
Nexans Cabling Solutions 2012 Page 26/29
1. OM3 specifications (MPO)
Low Loss MPO Connectivity
Appl ications(not exhaustive)
2 MPOmodules
4 MPOmodules
6 MPOmodules
8 MPOmodules
1GBase-SX 880 680 440 140
1GBase-LX 520 350 - -
10GBase-SR 330 260 190 80
10GBase-LX4 300 220 - -
1GBit FC - serial (PI-4 100-M5E-SN-I) 1140 780 460 120
2GBit FC - serial (PI-4 200-M5E-SN-I) 660 400 - -
4GBit FC(PI-5 400-M5E-SN-I) 370 230 - -
8GBit FC (PI-5 800-M5E-SN-I) 170 125 - -
10GBit FC - serial (10GFC 1200-M5E-SN-I) 330 260 190 80
16GBit FC (PI-5 800-M5E-SN-I) 110 75 - -
40GBase-SR4 130 100 - -
100GBase-SR10 130 100 - -
2. OM4 specifications (MPO)
Low Loss MPO Connectivity
Appl ications(not exhaustive)
2 MPOmodules
4 MPOmodules
6 MPOmodules
8 MPOmodules
1GBase-SX 900 700 460 140
1GBase-LX 520 350 - -
10GBase-SR 520 400 290 110
10GBase-LX4 300 220 - -
1GBit FC - serial (PI-4 100-M5E-SN-I) 1200 800 480 120
2GBit FC - serial (PI-4 200-M5E-SN-I) 700 440 140 -
4GBit FC(PI-5 400-M5E-SN-I) 400 250 20 -
8GBit FC (PI-5 800-M5E-SN-I) 210 160 - -10GBit FC - serial (10GFC 1200-M5E-SN-I) 520 400 290 110
16GBit FC (PI-5 800-M5E-SN-I) 140 100 - -
40GBase-SR4 150 120 - -
100GBase-SR10 150 120 - -
3. OS2 specifications (MPO)
MPO Connectiv ity
Appl ications(not exhaustive)
2 MPOmodules
4 MPOmodules
6 MPOmodules
1GBase-LX 5.000 1.000 -
10Gbase LR 9.000 4.000 -
4GBit-FC (PI-5 400-SM-LC-L) 10.000 6.000 -
8GBit-FC(PI-5 800-SM-LC-L) 10.000 6.000 -
16Gbit-FC(PI-5 1600-SM-LC-L) 10.000 6.000 -
40Gbase-LR4 10.000 7.000 3.000100Gbase-LR4 10.000 6.500 2.000
7/26/2019 Dc Cabling Info Acquisition Matrix
27/29
23 October 2012 Doc. N: DC matrix V1_2.doc
Nexans Cabling Solutions 2012 Page 27/29
E. Bend insensit ive fibres Slimflex LC Patch cords
For use in cabinets and workplaces Bend radius reduced to 7.5 mm GIGAliteFLEX bend insensitive fibre Round patch cord with uniboot design LC connectors OM3, OM4 or OS2
F. Secure Lock LC fibre products
LC Patch cords
OS2 and OM3 Variants Eight boot colours 1, 2, 3 & 5m Lengths Secure locking system
LC Keys Secure LC keys to unlock Secure LC cords and plugs Eight standard colours to match cords and plugs "Magic" purple administrator key unlocks all colours
LC Locking plugs
Secure LC plugs lock ports to prevent connection Eight colours available Matching keys to unlock
7/26/2019 Dc Cabling Info Acquisition Matrix
28/29
23 October 2012 Doc. N: DC matrix V1_2.doc
Nexans Cabling Solutions 2012 Page 28/29
G. High Density Data Centre Cabinet (HDDC)
7/26/2019 Dc Cabling Info Acquisition Matrix
29/29
H. Data collection sheet
The following is a screen shot of the data collection sheet.This XL sheet has to be filled out to provide the Project Design Department with the dataneeded to create the Data Centre design and associated Bill of Materials.
-------------------
Edition 17.11.2012Copyright Nexans 2012
All data subject to changewithout prior notice.