1
DBB Project Steering Committee Meeting (Draft)
Date: July 27th 5:30 p.m. - 7:00 p.m./ PDT 7:30 p.m. - 9:00 p.m./ CDT 8:30 p.m. - 10:00 p.m./ EDT July 28th 9:30 a.m. - 11:00 a.m./ JST
Locations:Atsugi, Culver City, Park Ridge, San Jose (Connected by VC ), Austin (Connected by phone)
Attendees:PSG T. Saito, S. Nemoto, M. Kawano, S. Ioka, M. Imamura, M. Soga, T. Fukuda, K. Kamiyama, H.
Yoshinari, H. Kajita, K. Yamanouchi, K. Abe
PSAT. Ohnishi, P. Lude, S. Kanemura, Y. Iwasaki, G. Mirsky, D. Carroll
SCA S. Chennakeshu SPE
C. Cookson, G. Joblove, S. Stephens, P. Squyres, T. Beswick, D. Loughery, B. Masek, R. Kido, J. Houston,T. Yuhaku, M. Nakayama, K. Jinushi
2
Agenda for DBB Project Steering Committee Meeting
• Opening remarks - C. Cookson, T.Saito, S.Nemoto
• B2B Middleware Status Report - P. Ludé– V1.0 Feature Confirmation
• SPE PBB and Conductor update – Colorworks PBB Storage update - J. Houston– PBB-DAM Related Activities - B. Masek– MB-Conductor Deployment and Testing
• Action items - SPE, PSG
• Ellcami Update - K. Yamanouchi
• Wrap-up - PSG
3
Agenda for DBB Project Steering Committee Meeting
• Opening remarks - C. Cookson, T.Saito, S.Nemoto
• B2B Middleware Status Report - P. Ludé– V1.0 Feature Confirmation
• SPE PBB and Conductor update – Colorworks PBB Storage update - J. Houston– PBB-DAM Related Activities - B. Masek– MB-Conductor Deployment and Testing
• Action items - SPE, PSG
• Ellcami Update - K. Yamanouchi
• Wrap-up - PSG
7
Agenda for DBB Project Steering Committee Meeting
• Opening remarks - C. Cookson, T.Saito, S.Nemoto
• B2B Middleware Status Report - P. Ludé– V1.0 Feature Confirmation
• SPE PBB and Conductor update – Colorworks PBB Storage update - J. Houston– PBB-DAM Related Activities - B. Masek– MB-Conductor Deployment and Testing
• Action items - SPE, PSG
• Ellcami Update - K. Yamanouchi
• Wrap-up - PSG
8CONFIDENTIAL Ver 6
Software Development Status Report
Steering Committee Meeting
July 27, 2010
Pete LudéSolutions EngineeringPSA San Jose
9CONFIDENTIAL Ver 6
Topics
• Current Activities
• Development Status
• QA Plan
• SPE Support
• Summary and Questions
• Appendix A: Version 1.0 Scope Details
10CONFIDENTIAL Ver 6
SPE Deployment (in progress)
Release -September 30, 2010
Feb 1,2010 July 1,2010May. 1,2010April 1,2010March 1,2010
June 1,2010 Aug. 1,2010Sept.
1, 2010
Jan 1, 2010
NAB 2010
Core Software Development
User Interface Design and Development
Documentation Development
Test Procedures Development Quality Assurance + Software Bug
Fixes
Feedback Collection
Core Software Development
Current Activities - Project Plan
11CONFIDENTIAL Ver 6
Current Activities - August > September 2010
• Complete Conductor Software Development– July 31, 2010– Some UI elements of Production Asset Database – August 2010
• Quality Assurance– August 1 – Sept 30
• Release Preparation– Documentation, etc
• SPE Support– Colorworks– Post Media Center (PMC)
12CONFIDENTIAL Ver 6
Topics
• Current Activities
• Development Status
• QA Plan
• SPE Support
• Summary and Questions
• Appendix A: Version 1.0 Scope Details
13CONFIDENTIAL Ver 6
CATEGORY MoU ColorworksRequiremen
t
As of 2nd March MTG
CurrentStatus
“MUST” Be Supported 46 58 33 37
To Be Determined (more information needed) 1 0 17 13
Not Applicable (e.g. 3rd party no longer in business)
2 2 2 2
Deferred (Cannot implement until third party makes interface available)
0 11 17 17
Delayed (Candidate for future implementation) 0 0 9 9
TOTAL 49 71 78 78
From last Steering Committee
Version 1.0 Project Scope See Details in Appendix A
14CONFIDENTIAL Ver 6
REQUIREMENT PAGE MUST MAY TOTAL
Top Level Requirements P 5 10 10
Operation Environment P 9 6 6
Platform P 12 24 24
System P 14 93 93
Workflow p 19 25 25
Third Party Products/Services P 21 46 18 64
Web Services P 24 70 70
TOTALS 274 292
Summary of ALL MoU Requirements Version 1.11 Nov 8 2009
15CONFIDENTIAL Ver 6
What Is Implemented in Ver 1.0? (Device Support)
REQUIREMENT
DESCRIPTION MOU Req. MBC 1.0 DETAILS
FR-04-0002 Transcoding must included Rhozet Carbon Coder/Carbon ServerFR-04-0003 Transcoding must included Digital Rapids Transcode ManagerFR-04-0006 Transcoding must included AmberfinFR-04-0011 Ingest must included AJA Xena 2KFR-04-0012 Ingest must included Blackmagic Decklink HDFR-04-0020 File Transfer must included AsperaFR-04-0022 File Transfer must included SFTP (webmethods ActiveTransfer)FR-04-0023 Sound Editing/Sound Mixing must included Digidesign ProTools (AVID)FR-04-0025-01A Picture Edit (offline editing) included AVID file transfer onlyFR-04-0036 Color Grading/Digital Intermediate must included FilmLight Baselight 8/4/1FR-04-0040 DVD, Blu-ray Encode and Author must included Digital Rapids StreamZHDFR-04-0041 File based Ingest/Record must included Sony XDCAM/XDCAM EXFR-04-0042 VTR Ingest/Record must included Sony HDCAM SR/HDCAM, Sony
DVCAMFR-04-0043 Sony Telefile Import must included Sony HDCAM SRFR-04-0044 Watermarking must included Civolution FR-04-0045 Watermarking, Encryption, DRM must included Thomson NexGuardFR-04-0049 Media Asset Management must included SEL Asset DBFR-04-0054 Conform must included Baselight 1FR-04-0061 QC must included Tektronix Cerify
FR-04-0063File Management must included Imageworks 2012 system (as base
code)FR-04-0064 Metadata must included SPE Digital Slate (parse only)
16CONFIDENTIAL Ver 6
Bottom Line:
• Significant Majority of 274 requirements of MoU are met
• Not all third-party devices are supported– API’s not available / no web services I/F– Unavailability of units for testing– Time constraints required us to prioritize– We believe we are meeting key SPE requirements
• Not every service is included in Ver 1.0– However, we believe key requirements for Colorworks can be met
• This is complicated…– We need to review specific requirements against MoU goals– We need to reach speedy agreement on Phase 1 close-out plan
17CONFIDENTIAL Ver 6
Topics
• Current Activities
• Development Status
• QA Plan
• SPE Support
• Summary and Questions
• Appendix A: Version 1.0 Scope Details
21CONFIDENTIAL Ver 6
Topics
• Current Activities
• Development Status
• QA Plan
• SPE Support
• Summary and Questions
• Appendix A: Version 1.0 Scope Details
22CONFIDENTIAL Ver 6
SPE Status – Instance #2 for Post Media Center (PMC)
• Timing is later than we would have liked – Concurrent with Ver 1.0 QA cycle
• But… this install will be important for practical testing– Assess usability– Feedback for ver 1.1 (and future) roadmap
• Workflow scope appears to be generally good fit with current plan– Some features beyond current ver 1.0 scope– However, Sony may be able to accommodate via MoU reconciliation
24CONFIDENTIAL Ver 6
SPE Status – Post Media Center (PMC) Workflow
“Hot folders” not planned for ver 1.0, but
is supported in WebMethods.
25CONFIDENTIAL Ver 6
SPE Status – Post Media Center (PMC) Workflow
Avid UNITY not supported in Ver 1.0 – difficulties in
obtaining documentation & test unit
26CONFIDENTIAL Ver 6
SPE Status – Post Media Center (PMC) Workflow
FlipFactory not yet supported in ver 1.0
27CONFIDENTIAL Ver 6
SPE Status – Fulfilling MoU Requirements
• Two beta site installation (rather then 1, per MoU) – Colorworks– Post Media Center
• Will require support of SPE installation through Q3-Q4 2010– This is included in MoU– However, future work in 2011 part of optional future SI contract
• Goal: Collect feedback during Q3 2010– Establish consensus on priority list for any additional features
• Future Roadmap– New features determined to be needed for general market:
• CWS Planning to assign to future version release (ver 1.1, ver 1.2 etc)– New features considered unique to SPE requirements
• Offered as extra-cost option
28CONFIDENTIAL Ver 6
Next step: MoU Reconciliation
• Reach full agreement on Services and Wrappers provided (ver 1.0)– May be additional request by SPE to accommodate some “deferred” items
• Define “punch list” of any remaining items• Clarify final installation support requirements and schedule• Clarify scope of any requested System Integration Work• Service support implementation details under SLA
GOAL: Meeting by week of August 16
29CONFIDENTIAL Ver 6
Topics
• Current Activities
• Development Status
• QA Plan
• SPE Support
• Summary and Questions
• Appendix A: Version 1.0 Scope Details
30CONFIDENTIAL Ver 6
Summary
• Release of ver 1.0 on track for Sept 30– Risk: Prod Asset Management UI’s not fully complete at start of QA4 cycle– May be gap in supported services vs. Colorworks requests
• Let’s clarify priority requirements to find solution
• Support for two SPE beta sites ongoing– Colorworks & PMC– We expect these to provide valuable feedback!
• Need to reconcile MoU Requirements – top priority– Services and Devices supported– Maintenance Service/Support per SLA– Future release roadmap requests– Possible optional System Integration work
32CONFIDENTIAL Ver 6
Topics
• Current Activities
• Development Status
• QA Plan
• SPE Support
• Summary and Questions
• Appendix A: Version 1.0 Scope Details
33CONFIDENTIAL Ver 6
What Is Implemented? (Services) (1)
Requirement ID Function Description
FR-05-0001Transcode Services perform conversion of one media format to another, or one
resolution to anotherFR-05-0002
Watermark Services embed a unique visible watermark in a digital media file
FR-05-0003Transport Services perform data movement of large media file from one server to
anotherFR-05-0004
Repository (MAM) Services add new asset, search, retrieve or manage existing digital asset of a catalog or repository
FR-05-0005
Media Verification Services (QC) perform analysis or validate specific characteristics of the digital media file, normally as part of the quality assurance process
FR-05-0006Fingerprint Services perform forensic fingerprinting analysis of a digital media file
FR-05-0007
Physical Asset Management Services add new asset or manage existing physical asset(e.g., video or audio tapes) in the catalog or repository
FR-05-0008Resource Scheduler Services schedule new or manage current available resources
FR-05-0009Rename/renumber Services perform renaming of files in image sequences for specific
operations like DI
LEGEND: RED:NEW/MODIFED REQ., ITALIC - DEFERRED
34CONFIDENTIAL Ver 6
What Is Implemented? (Services) (2)
Requirement ID Function Description
FR-05-0010 Digital Rights Management (DRM) Services
manage media asset intellectual rights to helpprevent illegal copying or conversation to other format
FR-05-0011Editorial Services support editorial process, like auto ingest, ALE file generation,
etc.FR-05-0012
Hot Folder Services Monitor folders for new files and create event
FR-05-0013
Conform Services Retrieve files and sequences based on EDL or conform list
FR-05-0014
HSM Migration Services Manage hierarchal storage migration based on media aware rules
FR-05-0015Encryption Services Provide encryption or decryption of files
FR-05-0016
Versioning Services Provide version control of files and sequences, and track approved versions
FR-05-0017Metadata Services Manages metadata for files and sequences
LEGEND: RED:NEW/MODIFED REQ., ITALIC - DEFERRED
35CONFIDENTIAL Ver 6
What Is Implemented? (Services) (3)
Requirement ID Function DescriptionFR-06-0001
Sync Service Synchronize Video and Audio
A service that Synchronizes Video and Audio files within the backbone.
FR-06-0002Conform Service Pull files and handles
based on EDL A service that conforms files within the backbone
FR-06-0003Retrieve Service Retrieve Files A service that extracts the file from the repository.
FR-06-0004Monitoring Service Monitor Directories This program looks for files in source directories and calls the
ingest service.- INTEGRATION
FR-06-0005Ingestion Service Ingestion Process The Ingestion Service is used to facilitate adding content into
the system.
FR-06-0006Metadata Service Processes Metadata A service that extracts, translates, and processes source
metadata and stores it in the database.
FR-06-0007Notification Service Email Notifications A Service that sends out a notification message.
FR-06-0008
Proxy Service Manage Proxy Relations The Proxy Service manages the relationship of files to proxies (create relationship and retrieve relationship between files)
FR-06-0009Search Service Find assets in the
Backbone A service that submits a search query and retrieves results
LEGEND: RED:NEW/MODIFED REQ., ITALIC - DEFERRED
36CONFIDENTIAL Ver 6
What Is Implemented?(Services) (4) Requirement ID
Function Description
FR-06-0010Security Service Authorize Users The Security Service verifies / enforces user roles / privileges / access
within the Backbone.FR-06-0010-1
Transaction Logging Service Logs TransactionsThe Transaction Logging Service creates a record in the database for every transaction. This record shall be used for reporting and tracking purposes.
FR-06-0011Transcode Service Modify Asset Resolutions to
Optimize PerformanceA service that converts assets into higher/lower resolutions or other file formats depending on specifications.
FR-06-0012 Transfer Service (Client to Server) File Transfers HTTP or Aspera Client Transfers from local computers to Backbone
(uploads).FR-06-0013 Transfer Service (Server to
Client) File Transfers HTTP or Aspera Client Transfers from Backbone to local computers (downloads).
FR-06-0014 Transfer Service (Server to Server) File Transfers Backbone Transfers to or from FTP servers, Aspera Console servers,
network directories.FR-06-0015
Transcode Service Modify Asset Resolutions to Optimize Performance
A service that converts assets into higher/lower resolutions or other file formats depending on specifications.
FR-06-0016 Deliver Service (Ext Client to Server) File Transfers SFTP, HTTP or Aspera Client Transfers from external computers to
Backbone (uploads).FR-06-0017 Deliver Service (Server to Ext
Client) File Transfers SFTP, HTTP or Aspera Client Transfers from Backbone to external computers (downloads).
FR-06-0018Watermark Burn In Service File Transfers Add visible watermark or burn ins (copyright, time code, frames)
FR-06-0019Resource Utilization Service resource monitoring track resources used in processes
FR-06-0020Message Authentication Service Message Authentication Authenticate and create digital signatures and encryption (CA based)
LEGEND: RED:NEW/MODIFED REQ., ITALIC - DEFERRED
37CONFIDENTIAL Ver 6
What Is Implemented?(Services) (5)
Requirement ID Function Description
FR-06-0021Data Migration Service Automated file transfer
between storage tiersAutomated movement of data from higher performance storage to lower performance storage and vice versa
FR-06-0022Backup Service Automated backup and
restore Automated backup and restore system for disaster recovery.
FR-06-0023File Spoof Service (Virtual File System)
Create illusion of assets available in all supported formats
Takes request for existing asset in format it does not presently exist in, locate asset and transcoder and initiate transcoding, advise requestor it shall be available in x timeframe
FR-06-0024Encryption Service Encrypt content Encrypts content as directed.
FR-06-0025Deep Archive Service Prepare and store deep
archive formatDirects transcode engine, manages database, and supervises placement in deep archive
FR-06-0026Render Service Render content Render color grading, effects, etc from existing content or render frames
from 3D modelingFR-06-0027 Packaging &
Containerization Service
Packages or wraps content Packages or wraps content
FR-06-0028LUT Service Applies LUTs Applies 1D &3D LUTs plus gamma, logarithmic, and exponential curves for
direct viewing or to bake in proper corrections in dubsFR-06-0029
Service Automatic QC of operations Automatically QC ingests, transfers, etc.
FR-06-0030 Read from Physical Media Service Read Physical Media Retrieve from physical media including videotape, audiotape, optical media.
LEGEND: RED:NEW/MODIFED REQ., ITALIC - DEFERRED
38CONFIDENTIAL Ver 6
What Is Implemented? (Services) (6) Requirement ID Function Description
FR-06-0031Write to Physical Media Service Write Physical Media Record on physical media including videotape,
audiotape, optical media.FR-06-0032
Dynamic Service Provider Selection Service Dynamic resource allocation
Determine which provider of a service should be utilized per request, and forward request to that provider.
FR-06-0033Dirt & Scratch Removal Service Remove dirt and scratches
from pictures. Provide cleanup of ingested film.
FR-06-0034Service Gateway
Provide access to other departments or external vendors.
Gateway to connect with and provide programmatic interface to other departments or external vendors.
FR-06-0035Picture Editing Service Picture editing functions. Service that abstracts picture editing process.
FR-06-0036Color Grading Service Color grading functions. Service that abstracts color grading process.
FR-06-0037Visual Effects Service Visual effects functions. Service that abstracts VFX process.
FR-06-0038Sound Editing Service Sound editing functions. Service that abstracts sound editing process.
FR-06-0039
Sound Mixing Service Sound mixing functions. Service that abstracts sound mixing process.
FR-06-0040Metadata Version Control Service
Maintain metadata version control.
Ensures that metadata versions are retained and naming conventions automatically supported.
LEGEND: RED:NEW/MODIFED REQ., ITALIC - DEFERRED
39CONFIDENTIAL Ver 6
What Is Implemented? (Services) (7)
Requirement ID Function Description
FR-06-0041
Metadata Latest Version Service Ensure operator has latest version of metadata.
Compares local version to latest network version and provides automatic or semi-automatic transfer and replacement of any outdated metadata.
FR-06-0042
Essence Version Control Service Maintain essence version control.
Ensures that essence versions are retained and naming conventions automatically supported.
FR-06-0043
Essence Latest Version Service Ensure operator has latest version of essence.
Compares local version to latest network version and provides automatic or semi-automatic transfer and replacement of any outdated essence.
FR-06-0044Rename & Renumber Filename Service
Maintain naming and numbering conventions.
Automatic (or semi-automatic) renaming or renumbering of filenames to adhere to predetermined naming conventions.
FR-06-0045
Essence Latest Version Service Ensure operator has latest version of essence.
Compares local version to latest network version and provides automatic or semi-automatic transfer and replacement of any outdated essence.
LEGEND: RED:NEW/MODIFED REQ., ITALIC - DEFERRED
40
Agenda for DBB Project Steering Committee Meeting
• Opening remarks - C. Cookson, T.Saito, S.Nemoto
• B2B Middleware Status Report - P. Ludé– V1.0 Feature Confirmation
• SPE PBB and Conductor update – Colorworks PBB Storage update - J. Houston– PBB-DAM Related Activities - B. Masek– MB-Conductor Deployment and Testing
• Action items - SPE, PSG
• Ellcami Update - K. Yamanouchi
• Wrap-up - PSG
42
Colorworks PBB Storage Update
• Resource Management tools– Ability to monitor storage utilization– TSM/Tape Library Monitoring tools– Render Queue
• Smurfs client interface prototype– Asset browser– Asset retrieval request submission and monitoring
43
Colorworks PBB Storage Update
SMURFS Asset Browser/Extraction UISMURFS Asset Browser/Extraction UI MBC UIMBC UI
TapeTape
ServicesServices
Calypso Media Backbone Conductor
TranscodersTranscoders
Colorworks Development and proposed MBC Integration
Resource ManagementResource Management
MonitoringMonitoring SchedulingScheduling
DiskDisk Render Farm
Render Farm
44
Colorworks PBB Storage Update
Storage Summary Graph
At-a-glance situation report
• Backbone disk• Backbone tape library• Mouse over any section for further
details
45
Colorworks PBB Storage Update
Per-project Storage Report
• Ability to sort by any field• Searchable
46
Colorworks PBB Storage Update
Per-volume Storage Report
• Ability to sort by any field• Searchable
47
Colorworks PBB Storage Update
Storage Time Series
Shows a breakdown of storage for one or more projects, over time
48
Colorworks PBB Storage Update
Storage Project Details
• Provides a condensed but complete storage situation report for a project.
• Shows a breakdown of storage for a given project, over multiple storage pools, and over time
• Also shows total occupancy for the project
49
Colorworks PBB Storage Update
TSM Tape Drives
• Instant status of TSM-controlled tape drives• Pass-through interface between Calypso and TSM
52
Colorworks PBB Storage Update
SMURFS Component
Asset Browser
• Searchable listing• Asset detail with all collected
metadata and thumbnails
53
Colorworks PBB Storage Update
SMURFS Component - Asset Retrieval System
• Request submission, validation, and submission to render queue• Designed to handle multi-stage requests (with approval at each stage)• Request browser provides summarized update on the status of a request
54
PBB-DAM Related Activities (Part 1)
• Objectives– Clarify PBB-DAM Requirements across all SPE Production Groups– Provide base documentation to allow architects to select proper PBB-DAM
solution
• Requirements Gathering and Analysis– Effort spanned over 10 weeks– Interviewed 15 Technical Stakeholders (Post Prod Facilities, Colorworks,
VFX, TV, Distribution Backbone)– Identified over 40 asset groups along with their metadata requirements– Developed detailed Functional Specifications– Provides basis to validate potential PBB-DAM solution
55
PBB-DAM Related Activities (Part 2)
• PBB DAM Planning– Architecture/ design team to review findings– Evaluate best PBB-DAM candidates (3rd party, internal, Conductor DAM?)– Currently evaluating DAMs for “MIB-3” and “Spiderman-4”– Collaborate w/ PSA Conductor team to establish best practices for 3 rd party
DAM integration into Conductor
56
Potential PBB-DAM, PBB Storage and Conductor Integrations
1. Interface DAM w/ PBB Storage.
2. Integrate PBB Storage w/ Conductor Media Bus.
3. Integrate PBB DAM w/ Conductor.
SONY WORKFLOW SOLUTIONS
webMethods SOA PLATFORM
SONY WEB SERVICE INTERFACE
webMethods BPM ORCHESTRATION
SONY GUI
SONY WEB SERVICE WRAPPERS
THIRD PARTY SERVICES
SONY UNIQUE SERVICES
web
Method
s ESB
Oracle 11g D
AT
AB
AS
E
SONY MEDIA BUS
Customer STORAGE & NETWORK(e.g. SPE PBB Storage)
PB
B - D
AM
Sony Media Backbone Conductor Platform
3
21
1
2
3
57
MB-Conductor Deployment and Testing (part 1)
• Objectives– Test how to implement Conductor workflows– Evaluate how productions will benefit from Conductor workflow automation– Provide feedback to PSA on initial Conductor learning– Evaluate flexibility, adaptability and usability of toolset by production operators
• Deployments of NAB version near complete– Colorworks
• Oracle and WebMethods systems have been set up• Awaiting work-around to optimize Conductor to Colorworks interface
daemon– Post Media Center (PMC)
• Support and training– Access to WebMethods Sys Admin and WebMethods developer to accelerate
effort– Depending upon outcome and needs, will possibly train more operators
• Upcoming Conductor related activities– Colorworks: Tape archiving/Tape library handling, File movement, Ellcami
integration– PMC: Editorial to Sound orchestrated workflow
58
MB-Conductor Deployment and Testing (part 2)
• PMC Background– Part of SPE Post Production Facilities.– Combines Picture Editorial and Video Transfer Services.
• PMC Conductor Pilot Workflow– Transferring, transcoding and marking Avid files from Editorial to Sound Stages.
• Workflow Benefits– PMC will be able to automate and track key transcode, mark, transfer and notify workflows.– Learning will assess capabilities of Conductor; will share findings with PSA.– Stepping stone towards more complex PBB workflows (Colorworks and others).
59
Agenda for DBB Project Steering Committee Meeting
• Opening remarks - C. Cookson, T.Saito, S.Nemoto
• B2B Middleware Status Report - P. Ludé– V1.0 Feature Confirmation
• SPE PBB and Conductor update – Colorworks PBB Storage update - J. Houston– PBB-DAM Related Activities - B. Masek– MB-Conductor Deployment and Testing
• Action items - SPE, PSG
• Ellcami Update - K. Yamanouchi
• Wrap-up - PSG
60
Action Items from SPE
• Review ‘services and wrappers’ list and re-assess prioritization of roadmap of supported devices and functions to ensure Colorworks can leverage greater value out of Conductor.
• Re-visit findings from PBB – Conductor pilot workflows.– Evaluate what worked, investigate areas for improvement.– Assess expanded use of Conductor throughout other productions
workflows.
• Re-visit MB-Conductor DAM capabilities for potential use w/in SPE.
• Plan to re-adjust MoU and SLA based on latest licensing, support and feature prioritizations.
62
Agenda for DBB Project Steering Committee Meeting
• Opening remarks - C. Cookson, T.Saito, S.Nemoto
• B2B Middleware Status Report - P. Ludé– V1.0 Feature Confirmation
• SPE PBB and Conductor update – Colorworks PBB Storage update - J. Houston– PBB-DAM Related Activities - B. Masek– MB-Conductor Deployment and Testing
• Action items - SPE, PSG
• Ellcami Update - K. Yamanouchi
• Wrap-up - PSG
1. Ingest Station for Phil Squyres (TV Production) Target release date of commercial version : Sep. 27
Focused on ingest function only, no file base transcode function We will upgrade Phil’s system to the latest version during the week of Jul. 26
Requests from Phil on Jun. 25 Ingest from SRW to DPX & XDCAM 50 + ASC CDL Tested in Atsugi already
Live ingest function is still under development but with no firm release date yet
2. Transcode Station for Jim Houston (Colorworks) Target release date of Transcode Station is still to be determined
Because of the growing complexity found during beta tests
Nonetheless, DPX – SLIC functionality that Jim is testing will be stable
3. 2K- 4K DEEP upconverter requested by Chris Cookson As promised, we will install the prototype of DEEP during the week of Jul. 26 64
Other questions Status of SLIC
Already implemented in Transcode Station that Jim has been testing
For SPE only
Support of SStP (HDCAM-SR CODEC) Considering both software codec and hardware codec (we will as well consider 4K, DBL Debayer when it comes time to) Release date: TBD
65
66
Agenda for DBB Project Steering Committee Meeting
• Opening remarks - C. Cookson, T.Saito, S.Nemoto
• B2B Middleware Status Report - P. Ludé– V1.0 Feature Confirmation
• SPE PBB and Conductor update – Colorworks PBB Storage update - J. Houston– PBB-DAM Related Activities - B. Masek– MB-Conductor Deployment and Testing
• Action items - SPE, PSG
• Ellcami Update - K. Yamanouchi
• Wrap-up - PSG