EPA Davis-Bacon Training0

Davis-Bacon Federal Wage Determinations

January 26, 2012 | U.S. EPA Region 10 Presented by: Miguel A. Flores

Page 2: Davis-Bacon Federal Wage Determinations · • The 10 day rule and the 90 day rule – AK specific projects; timing of bid vs. receipt of SRF funding • Overview of EPA expectations

EPA Davis-Bacon Training1

• Wage Determination Basics– What is a Wage Determination?– Construction categories (schedules); use of multiple categories– How to look up a current federal Wage Determination– How to look up an old federal Wage Determination– Verifying Communities have used a ‘Prevailing Wage’

• The 10 day rule and the 90 day rule– AK specific projects; timing of bid vs. receipt of SRF funding

• Overview of EPA expectations for D-B compliance• Questions

Topics to be covered

Page 3: Davis-Bacon Federal Wage Determinations · • The 10 day rule and the 90 day rule – AK specific projects; timing of bid vs. receipt of SRF funding • Overview of EPA expectations

EPA Davis-Bacon Training2

What is a Wage Determination?Wage Determination number

Date WD is effective

Date WD was replaced

Modifications

•Included in bid docs and contract•Effective the day project goes out to bid*

*subject to 10 day/90 day rule

Page 4: Davis-Bacon Federal Wage Determinations · • The 10 day rule and the 90 day rule – AK specific projects; timing of bid vs. receipt of SRF funding • Overview of EPA expectations

EPA Davis-Bacon Training3

Using wdol.gov

Page 5: Davis-Bacon Federal Wage Determinations · • The 10 day rule and the 90 day rule – AK specific projects; timing of bid vs. receipt of SRF funding • Overview of EPA expectations

EPA Davis-Bacon Training4

How to look up a current Wage Determination

link to DOL All Agency Memo 130 and 131

Selecting the Construction ‘Category’ (also known as ‘General Schedule’)

Page 6: Davis-Bacon Federal Wage Determinations · • The 10 day rule and the 90 day rule – AK specific projects; timing of bid vs. receipt of SRF funding • Overview of EPA expectations

EPA Davis-Bacon Training5

How to look up a current Wage Determination

Page 7: Davis-Bacon Federal Wage Determinations · • The 10 day rule and the 90 day rule – AK specific projects; timing of bid vs. receipt of SRF funding • Overview of EPA expectations

EPA Davis-Bacon Training6

How to look up a current Wage Determination

Page 8: Davis-Bacon Federal Wage Determinations · • The 10 day rule and the 90 day rule – AK specific projects; timing of bid vs. receipt of SRF funding • Overview of EPA expectations

EPA Davis-Bacon Training7

How to look up an old Wage Determination

Page 9: Davis-Bacon Federal Wage Determinations · • The 10 day rule and the 90 day rule – AK specific projects; timing of bid vs. receipt of SRF funding • Overview of EPA expectations

EPA Davis-Bacon Training8

How to look up an old Wage Determination

(Enter DBA WD numbers in the following format: two-letter abbreviation for the state, and the number of the WD. For example, DBA WD "VA030003" is entered "VA3"; DBA WD "MD030150" is entered "MD150")

Page 10: Davis-Bacon Federal Wage Determinations · • The 10 day rule and the 90 day rule – AK specific projects; timing of bid vs. receipt of SRF funding • Overview of EPA expectations

EPA Davis-Bacon Training9

How to look up an old Wage Determination

Pop Quiz:If this project went out to bid on 7/05/11 and the bidding close date was 8/05/11, was the right WD used?

WD effective dates: 7/1/11 – 8/11/11

Page 11: Davis-Bacon Federal Wage Determinations · • The 10 day rule and the 90 day rule – AK specific projects; timing of bid vs. receipt of SRF funding • Overview of EPA expectations

EPA Davis-Bacon Training10

10 day rule and 90 day rule

Project out to bid

Close of bid period

May 1 May 31 June 1

Bids are ‘opened’

Aug. 30May 21

90 days to sign contract

Any changes to WD up until 10 days before close of bid will need to be incorporated into bid docs/ contract

If contract is not signed within 90 days of bid open, the most recent modification to the WD prior to contract signing would become effective

Page 12: Davis-Bacon Federal Wage Determinations · • The 10 day rule and the 90 day rule – AK specific projects; timing of bid vs. receipt of SRF funding • Overview of EPA expectations

EPA Davis-Bacon Training11

Documentation of Prevailing Wage Verification

Federal exceeds StateState

exceeds Federal

Page 13: Davis-Bacon Federal Wage Determinations · • The 10 day rule and the 90 day rule – AK specific projects; timing of bid vs. receipt of SRF funding • Overview of EPA expectations

EPA Davis-Bacon Training12

Overview of EPA Expectations for D-B Compliance• State must specify in loan agreement that city must comply

with Davis-Bacon.• State must ensure that community has inserted the EPA

Davis-Bacon contract language (from the Grant condition) into the bid documents and the contract.

• State must ensure that community has included federal Davis-Bacon Wage Determinations in bid documents and contract AND that correct Wage Determinations are used.

• State must ensure that community has hung Davis-Bacon poster on site.

• State must ensure that community has conducted (AND documented) laborer interviews.

• Community must notify state that weekly certified payrolls are being submitted.

• State must ensure a prevailing wage has been paid.