Summary (1)

2

• Life was Pretty Good Until 2008• High levels of annual generation.

• Selling output for substantially more than the cost of generation.

• Making a lot of money.

• Then PSEG’s pre-tax earnings fell dramatically starting in 2009. Decline primarily driven by:

• Collapse of natural gas and energy market prices in 2008/09.

• Steep decline in plant generation due to increased competition from lower cost gas-fired units.

• Decline in capacity market prices.

• Flattening of the demand for power in NE due to slow economic recovery and energy efficiency.

©2014 Institute for Energy Economics & Financial Analysis

Summary (2)

3

• Same factors likely to drive future earnings.

• No credible reason to expect that pre-tax earnings will recover to anywhere near 2007/2008 levels.

• In fact, pre-tax earnings may disappear by end of this decade.

• Bridgeport Harbor Unit 3 does not appear to be financially viable over the long term.

• City of Bridgeport, State of Connecticut and grid operator ISO New England should begin to plan for when it retires.

©2014 Institute for Energy Economics & Financial Analysis

NE Wholesale Electric Prices Collapsed in 2009

4©2014 Institute for Energy Economics & Financial Analysis

$0.00

$10.00

$20.00

$30.00

$40.00

$50.00

$60.00

$70.00

$80.00

$90.00

2003 2004 2005 2006 2007 2008 2009 2010 2011 2012

$ pe

r MW

h

Steep Decline in Annual Bridgeport Harbor Unit 3 Generation

5©2014 Institute for Energy Economics & Financial Analysis

Pre-Tax Earnings from Bridgeport Harbor Unit 3 Plummeted after 2008

©2014 Institute for Energy Economics & Financial Analysis 6

Circumstances that Led to Steep Drop in Pre-Tax Earnings Unlikely to Go Away Anytime Soon

7

• Natural gas prices and energy market prices expected to remain relatively low except in peak winter months.

• Uncertainty about future capacity market prices.

• Little growth projected in demand for power plus increased competition from energy efficiency and renewables.

• Future Bridgeport Harbor generation likely to remain low.

• Potential for higher prices for CO2 emissions.

©2014 Institute for Energy Economics & Financial Analysis

©2014 Institute for Energy Economics & Financial Analysis

Example – New England Energy Market Price Forwards as of January 2014

8

2007

2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

2020

$0

$10

$20

$30

$40

$50

$60

$70

$80

$90

$100

On-Peak Prices Off-Peak Prices All Hours Prices

Do

llar

s p

er M

egaw

att

Ho

ur

©2014 Institute for Energy Economics & Financial Analysis

Example – Uncertainty in Future Bridgeport Harbor Generation

9

PSEG pre-tax earnings recovered somewhat beginning in 2013. However, based on currently expected future circumstances, there is no credible reason to expect that pre-tax earnings will again reach anywhere near the high levels achieved in 2007 and 2008.

Must remember that PSEG’s after-tax profits from the plant will be even lower because it has to pay taxes, interests and depreciation from these pre-tax earnings.

Conclusion No. 1

10©2014 Institute for Energy Economics & Financial Analysis

11

Projected Bridgeport Harbor Unit 3 Pre-Tax Earnings – “Optimistic” Scenario with Relatively High Energy

Market and Capacity Market Prices

©2014 Institute for Energy Economics & Financial Analysis

Conclusion No. 2

In fact, energy and capacity market prices could be lower than assumed in the “optimistic” scenario.

©2014 Institute for Energy Economics & Financial Analysis 12

Projected Pre-Tax Earnings – “Less Optimistic” Scenario with Lower Energy and Capacity Prices

©2014 Institute for Energy Economics & Financial Analysis 13

Conclusion No. 3

Plant does not appear to be financially viable over the long term (the end of this decade). The City of Bridgeport, State of Connecticut and grid operator ISO New England should begin to plan for future without Bridgeport Harbor Unit 3 coal plant.

©2014 Institute for Energy Economics & Financial Analysis 14

stop

For More Information

David Schlissel

617-489-4840

[email protected]