EMC BW Endcap David Rodríguez Piñeiro David Rodríguez Piñeiro GSI Darmstadt GSI Darmstadt PANDA Collaboration Meeting PANDA Collaboration Meeting Turin Turin 15. 06. 2009 15. 06. 2009

David Rodríguez Piñeiro GSI Darmstadt PANDA Collaboration Meeting Turin 15. 06. 2009

  • Upload
    rufus

  • View
    43

  • Download
    0

Embed Size (px)

DESCRIPTION

David Rodríguez Piñeiro GSI Darmstadt PANDA Collaboration Meeting Turin 15. 06. 2009. EMC BW Endcap. Backward Endcap EMC. 1.– Extension of BW Endcap in Z Direction 2.– Support Structure 3.– Tracking Supplies 4. – ToF Supplies 5. – MVD Supplies 6. – Summary. Backward Endcap EMC. - PowerPoint PPT Presentation

Citation preview

Page 1: David Rodríguez Piñeiro GSI Darmstadt PANDA Collaboration Meeting Turin 15. 06. 2009

EMC BW Endcap

David Rodríguez PiñeiroDavid Rodríguez PiñeiroGSI DarmstadtGSI Darmstadt

PANDA Collaboration MeetingPANDA Collaboration MeetingTurinTurin

15. 06. 200915. 06. 2009

Page 2: David Rodríguez Piñeiro GSI Darmstadt PANDA Collaboration Meeting Turin 15. 06. 2009

15/06/200915/06/2009 David Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration MeetingDavid Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration Meeting 22

Backward Endcap EMCBackward Endcap EMC

1.– Extension of BW Endcap in Z Direction

2.– Support Structure

3.– Tracking Supplies

4. – ToF Supplies

5. – MVD Supplies

6. – Summary

Page 3: David Rodríguez Piñeiro GSI Darmstadt PANDA Collaboration Meeting Turin 15. 06. 2009

15/06/200915/06/2009 David Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration MeetingDavid Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration Meeting 33

Backward Endcap EMCBackward Endcap EMC

Extension of BW Endcap in Z Direction 1. – Extension of BW Endcap in Z Direction

2.– Support Structure

3.– Tracking Supplies

4. – ToF Supplies

5. – MVD Supplies

6. – Summary

It extends further backwards as compared to official drawings

Page 4: David Rodríguez Piñeiro GSI Darmstadt PANDA Collaboration Meeting Turin 15. 06. 2009

15/06/200915/06/2009 David Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration MeetingDavid Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration Meeting 44

Backward Endcap EMCBackward Endcap EMC

Support Structure (I)

DIN 1025-IPB360-1.0112

1. – Extension of BW Endcap in Z Direction

2.– Support Structure

3.– Tracking Supplies

4. – ToF Supplies

5. – MVD Supplies

6. – Summary

Page 5: David Rodríguez Piñeiro GSI Darmstadt PANDA Collaboration Meeting Turin 15. 06. 2009

15/06/200915/06/2009 David Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration MeetingDavid Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration Meeting 55

Backward Endcap EMCBackward Endcap EMC

Support Structure (II) 1. – Extension of BW Endcap in Z Direction

2.– Support Structure

3.– Tracking Supplies

4. – ToF Supplies

5. – MVD Supplies

6. – Summary

- Rails for placing

- Order installation/ desensitization

- Cylindrical space upstream

- Interaction with beam pipe

Rail

Page 6: David Rodríguez Piñeiro GSI Darmstadt PANDA Collaboration Meeting Turin 15. 06. 2009

15/06/200915/06/2009 David Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration MeetingDavid Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration Meeting 66

Backward Endcap EMCBackward Endcap EMC

Support Structure (III) 1. – Extension of BW Endcap in Z Direction

2.– Support Structure

3.– Tracking Supplies

4. – ToF Supplies

5. – MVD Supplies

6. – Summary

Too Tight

Placing the pump further

Page 7: David Rodríguez Piñeiro GSI Darmstadt PANDA Collaboration Meeting Turin 15. 06. 2009

15/06/200915/06/2009 David Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration MeetingDavid Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration Meeting 77

Backward Endcap EMCBackward Endcap EMC

Support Structure (IV.a)

Max Stress: 26,14 MPa

Steel: Safety factor = 10

1. – Extension of BW Endcap in Z Direction

2.– Support Structure

3.– Tracking Supplies

4. – ToF Supplies

5. – MVD Supplies

6. – Summary

Ansys Stress Analysis

1 Ton

Page 8: David Rodríguez Piñeiro GSI Darmstadt PANDA Collaboration Meeting Turin 15. 06. 2009

15/06/200915/06/2009 David Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration MeetingDavid Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration Meeting 88

Backward Endcap EMCBackward Endcap EMC

Support Structure (IV.b) 1. – Extension of BW Endcap in Z Direction

2.– Support Structure

3.– Tracking Supplies

4. – ToF Supplies

5. – MVD Supplies

6. – Summary

Vertical displacement 0,8 mm

Ansys Deformation Analysis

Page 9: David Rodríguez Piñeiro GSI Darmstadt PANDA Collaboration Meeting Turin 15. 06. 2009

15/06/200915/06/2009 David Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration MeetingDavid Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration Meeting 99

Backward Endcap EMCBackward Endcap EMC

Tracking Supplies (I) 1. – Extension of BW Endcap in Z Direction

2.– Support Structure

3.– Tracking Supplies

4. – ToF Supplies

5. – MVD Supplies

6. – Summary

Page 10: David Rodríguez Piñeiro GSI Darmstadt PANDA Collaboration Meeting Turin 15. 06. 2009

15/06/200915/06/2009 David Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration MeetingDavid Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration Meeting 1010

Backward Endcap EMCBackward Endcap EMC

Tracking Supplies (II)

Available area = = 4x1350 = =

5400 mm2

1. – Extension of BW Endcap in Z Direction

2.– Support Structure

3.– Tracking Supplies

4. – ToF Supplies

5. – MVD Supplies

6. – Summary

Held by 4 rollers in the common rail

Page 11: David Rodríguez Piñeiro GSI Darmstadt PANDA Collaboration Meeting Turin 15. 06. 2009

15/06/200915/06/2009 David Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration MeetingDavid Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration Meeting 1111

Backward Endcap EMCBackward Endcap EMC

Tracking Supplies (III.a)

3 mm Polyethylene

Max Stress: 4,29 MPa

Polyethylene: Safety factor > 5

1. – Extension of BW Endcap in Z Direction

2.– Support Structure

3.– Tracking Supplies

4. – ToF Supplies

5. – MVD Supplies

6. – Summary

Ansys Stress Analysis

Page 12: David Rodríguez Piñeiro GSI Darmstadt PANDA Collaboration Meeting Turin 15. 06. 2009

15/06/200915/06/2009 David Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration MeetingDavid Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration Meeting 1212

Backward Endcap EMCBackward Endcap EMC

Tracking Supplies (III.b)

Max deformation < 1 mm

1. – Extension of BW Endcap in Z Direction

2.– Support Structure

3.– Tracking Supplies

4. – ToF Supplies

5. – MVD Supplies

6. – Summary

Ansys Deformation Analysis

3 mm Polyethylene

Page 13: David Rodríguez Piñeiro GSI Darmstadt PANDA Collaboration Meeting Turin 15. 06. 2009

15/06/200915/06/2009 David Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration MeetingDavid Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration Meeting 1313

Backward Endcap EMCBackward Endcap EMC

Tracking Supplies (IV.a) 1. – Extension of BW Endcap in Z Direction

2.– Support Structure

3.– Tracking Supplies

4. – ToF Supplies

5. – MVD Supplies

6. – Summary

Ansys Stress Analysis

Max Stress: 66,04 MPa

Aluminium: Safety factor > 4

1 mm Aluminium

Page 14: David Rodríguez Piñeiro GSI Darmstadt PANDA Collaboration Meeting Turin 15. 06. 2009

15/06/200915/06/2009 David Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration MeetingDavid Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration Meeting 1414

Backward Endcap EMCBackward Endcap EMC

Tracking Supplies (IV.b)

Max deformation < 0,5 mm

1. – Extension of BW Endcap in Z Direction

2.– Support Structure

3.– Tracking Supplies

4. – ToF Supplies

5. – MVD Supplies

6. – Summary

Ansys Stress Analysis

1 mm Aluminium

Page 15: David Rodríguez Piñeiro GSI Darmstadt PANDA Collaboration Meeting Turin 15. 06. 2009

15/06/200915/06/2009 David Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration MeetingDavid Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration Meeting 1515

Backward Endcap EMCBackward Endcap EMC

ToF Supplies (I) 1. – Extension of BW Endcap in Z Direction

2.– Support Structure

3.– Tracking Supplies

4. – ToF Supplies

5. – MVD Supplies

6. – Summary

Gross Area > 16000 mm2

Space Reserved for ToF Supplies

Page 16: David Rodríguez Piñeiro GSI Darmstadt PANDA Collaboration Meeting Turin 15. 06. 2009

15/06/200915/06/2009 David Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration MeetingDavid Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration Meeting 1616

Backward Endcap EMCBackward Endcap EMC

ToF Supplies (II) 1. – Extension of BW Endcap in Z Direction

2.– Support Structure

3.– Tracking Supplies

4. – ToF Supplies

5. – MVD Supplies

6. – Summary

Integrate ToF supplies Support into DIRC and Tracking Support

Page 17: David Rodríguez Piñeiro GSI Darmstadt PANDA Collaboration Meeting Turin 15. 06. 2009

15/06/200915/06/2009 David Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration MeetingDavid Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration Meeting 1717

Backward Endcap EMCBackward Endcap EMC

ToF & Tracking Supplies 1. – Extension of BW Endcap in Z Direction

2.– Support Structure

3.– Tracking Supplies

4. – ToF Supplies

5. – MVD Supplies

6. – Summary

Posibility to switch the spaces for Tracking and ToF, depending on the needed area.

Page 18: David Rodríguez Piñeiro GSI Darmstadt PANDA Collaboration Meeting Turin 15. 06. 2009

15/06/200915/06/2009 David Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration MeetingDavid Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration Meeting 1818

Backward Endcap EMCBackward Endcap EMC

MVD Supplies (I) 1. – Extension of BW Endcap in Z Direction

2.– Support Structure

3.– Tracking Supplies

4. – ToF Supplies

5. – MVD Supplies

6. – Summary

New proposal: Rectangular Shape

Page 19: David Rodríguez Piñeiro GSI Darmstadt PANDA Collaboration Meeting Turin 15. 06. 2009

15/06/200915/06/2009 David Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration MeetingDavid Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration Meeting 1919

Backward Endcap EMCBackward Endcap EMC

MVD Supplies (II) 1. – Extension of BW Endcap in Z Direction

2.– Support Structure

3.– Tracking Supplies

4. – ToF Supplies

5. – MVD Supplies

6. – Summary

- Better use of the space

- Easier and safer insulation system

- 24 crystals gain!

- MVD Demand: 44000mm2

With this proposal:

Free Area around Beam Pipe for MVD Supplies ~ 50000 mm2

Page 20: David Rodríguez Piñeiro GSI Darmstadt PANDA Collaboration Meeting Turin 15. 06. 2009

15/06/200915/06/2009 David Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration MeetingDavid Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration Meeting 2020

Backward Endcap EMCBackward Endcap EMC

Summary 1. – Extension of BW Endcap in Z Direction

2.– Support Structure

3.– Tracking Supplies

4. – ToF Supplies

5. – MVD Supplies

6. – Summary

Extension of BW in Z Direction: at least 1000 mm

Supporting Structure: Advanced

Space for Tracking Supplies: Feasible

Space for ToF Supplies: To Be Determined

Space for MVD Supplies: Rectangular Solution

Page 21: David Rodríguez Piñeiro GSI Darmstadt PANDA Collaboration Meeting Turin 15. 06. 2009

15/06/200915/06/2009 David Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration MeetingDavid Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration Meeting 2121

Backward Endcap EMCBackward Endcap EMC

Thank you!