10
From: David Gorman To: "[email protected]" Cc: "[email protected]" ; "[email protected]" ; "[email protected]" Subject: NOI - Monument Small Engine Storage - water quality sand filter basin Date: Tuesday, October 15, 2019 2:40:00 PM Attachments: 61092 NJD-NOI package.pdf John, We are providing the attached NOI package for a non-jurisdictional storm detention/water quality pond in northern El Paso County. If there is anything else needed for this notification, please let me know. Thank you. Dave David R. Gorman, P.E. M.V.E., Inc. 1903 Lelaray St, Ste 200 Colorado Springs, CO 80909 Ph 719.635.5736

David Gorman - Microsoft€¦ · david r. gorman, p.e. m.v.e., inc. 1903 lelaray st, ste 200 colorado springs, co 80909 ph 719.635.5736. exist 12" cmp rr tie retaining wall rr tie

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

  • From: David GormanTo: "[email protected]"Cc: "[email protected]"; "[email protected]"; "[email protected]"Subject: NOI - Monument Small Engine Storage - water quality sand filter basinDate: Tuesday, October 15, 2019 2:40:00 PMAttachments: 61092 NJD-NOI package.pdf

    John, We are providing the attached NOI package for a non-jurisdictional storm detention/water qualitypond in northern El Paso County.  If there is anything else needed for this notification, please let meknow.  Thank you. Dave David R. Gorman, P.E.M.V.E., Inc.1903 Lelaray St, Ste 200Colorado Springs, CO 80909Ph 719.635.5736 

    mailto:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]
  • EXIS

    T 12

    " CM

    P

    RR TIE RETAINING WALL

    RR T

    IE R

    ETA

    ININ

    G W

    ALL

    6955

    6965

    6965

    6965

    RR TIE RETAINING WALL

    RR TIE RETAINING WALL

    6955

    6965

    6955

    6965

    EXISTING

    RESIDENCE

    6960

    6945

    6960

    6970

    6970

    6970

    6970

    6960

    6970

    6960

    76 GA

    TE

    SAND FILTER BASIN

    74.0 INV75.6 CRESTEMERGENCY

    SPILLWAY72

    74

    EX 6' OPAQUEWOOD FENCE

    EX 6' OPAQUEWOOD FENCE

    EX LEACH FIELD

    GARAGE D

    TO REMAIN

    STORAGE SHE

    D C

    TO BE REMOVE

    D

    SHOP B

    TO BE REMOVE

    D

    GARAGE A

    TO BEREMO

    VED

    EXISTING

    RESIDENCE

    EXISTING

    SHED

    EXLANDSCAPEAREA

    EX L

    AN

    DSC

    APE

    ARE

    A

    EX SEPTIC TANK PERMITNO. 0024327

    EX WELLPERMITNO.284289

    N 7

    0°03

    '47"

    W

    40

    0.08

    '

    N 16°32'53" E 510.12'

    S 01°54'38" E 632.84'

    TOWN OF MONUMENT

    EL PASO COUNTY

    TOW

    N O

    F M

    ON

    UMEN

    T

    20' ACCESS ESMT(REC# 207086150)

    20' ACCESS

    ESMT

    (REC# 2070

    86149)

    (711

    5100

    009)

    (7115100033)

    Mt. Herman RV StorageSubdivision

    (Rec No. 215713570)

    Not Platted

    Not

    Pla

    tted

    Not

    Pla

    tted

    El P

    aso

    Cou

    nty

    GARAGE

    EASEMEN

    T

    (REC# 20

    7086147)

    EX 6' OPAQUEWOOD FENCE

    N 8

    8°05

    '39"

    E

    209

    .80'

    (210

    ')

    RV PARKINGRECYCLED ASPHALT

    SURFACE

    EX GRAVEL

    DRIVE

    EX 6' OPAQUEWOOD FENCE

    (711

    5100

    032)

    (7115106002)

    FF=6974.4'

    PROPOSED 6'WOOD FENCE

    EXISTING RV PARKINGRECYCLED ASPHALT

    SURFACE

    PRO

    POSE

    D 6

    'W

    OO

    D F

    ENC

    ELA

    ND

    SCA

    PEA

    REA

    PROPOSED

    SHOP

    5,000 SF.

    EXIS

    TING

    GA

    TE

    LAN

    DSC

    APE

    ARE

    A

    57 5859 60

    61

    61 6059

    15' WIDEOVERFLOWSPILLWAY

    WQ POND DP 2BTM=58.5, TOP=60.0

    PIPE OUT=55.85'

    32 LF 12" HDPE (ADS N12 ORAPPROVED ALTERNATE) @ 3.0%

    12" HDPE FESINV = 54.90

    1.7%

    SWALE A - NO RIPRAP(SEE DETAIL)

    SWALE C(SEE DETAIL)

    4% 545352

    Entry

    51

    50

    5049.5

    80 LF 8" HDPE (ADS N12 ORAPPROVED ALTERNATE) w/

    FES @ 1.9%

    8" HDPE FESINV = 70.5

    8" HDPE FESINV = 69.0

    SWALE A(SEE DETAIL)

    SWALE B(SEE DETAIL)

    74.0

    73.6

    73.074.0

    74.3

    74.3

    73

    71

    75

    74

    73

    72

    71

    70

    66

    65

    PROPOSED 6'WOOD FENCE

    PROPOSED 6'WOOD FENCE

    PROPOSED RV PARKINGRECYCLED ASPHALT

    SURFACE TW=74.0FG/FW=71.0

    TW=73.5FG/FW=71.0TW=73.5

    FG/FW=71.0

    TW=73.5FG/FW=71.0

    8" 45° BENDINV = 69.9

    74.4

    74.4

    74.4

    74.4

    SPREADINGDEPRESSION(SEE DETAIL)

    BEGINSWALE B

    0

    1" = 30' 1:360

    6030105

    MAP NOTES1. THE EXISTING TOPOGRAPHY SHOWN ON THIS PLAN WAS PREPARED BY MVE, INC.

    2. ALL EXISTING UNDERGROUND UTILITIES SHOWN ON THIS MAP ARE FROM UTILITY MAIN RECORD MAPS AND UTILITY SERVICE LOCATION MAPSOBTAINED FROM COLORADO SPRINGS UTILITIES. THE LOCATION OF UTILITIES AS SHOWN ARE APPROXIMATE. ALL UTILITIES MAY NOT BE SHOWNOR MAY NOT HAVE BEEN LOCATED. BELOW GROUND UTILITY LOCATIONS WERE NOT PERFORMED.

    BENCHMARK

    EN

    GIN

    EE

    RS

    SU

    RV

    EY

    OR

    SM

    VE

    , IN

    C.

    MV

    E, I

    NC

    .

    ,

    ..

    EN

    GIN

    EE

    RS

    SU

    RV

    EY

    OR

    S

    CHECKED BY _____

    DESIGNED BY

    ___________________

    CHECKED BY _____ ___________________

    REVISIONS

    OF

    AS-BUILTS BY

    MVE DRAWING

    MVE PROJECT

    DRAWN BY

    SHEET

    61092

    Monument SmallEngine Storage

    -GEC-GP

    C1.3GRADING PLAN

    3 5OCTOBER 11, 2019

    1. PCD FILE NO. PPR-18-013 GEC PLANS APPROVED. 08/23/18

    2. SITE CHANGES 09/27/19

    3. EPC RESUBMITTAL 10/11/19

    WQ POND DP2LOCATION:

    13S 510,730 m E4,327,375 m N

    Z:\6

    1092

    \_Sh

    eet D

    wgs

    \610

    92-G

    EC-G

    P.d

    wg,

    10/

    14/2

    019

    9:14

    :01

    AM

    , TJC

    AD

    D

    AutoCAD SHX Text

    5"

    AutoCAD SHX Text

    7"

    AutoCAD SHX Text

    9"

    AutoCAD SHX Text

    6"

    AutoCAD SHX Text

    1-800-922-1987

    AutoCAD SHX Text

    BEFORE

    AutoCAD SHX Text

    DIG...

    AutoCAD SHX Text

    YOU

    AutoCAD SHX Text

    CALL

    AutoCAD SHX Text

    1-800-922-1987

    AutoCAD SHX Text

    R

    AutoCAD SHX Text

    LOCATORS

    AutoCAD SHX Text

    AND WASTEWATER

    AutoCAD SHX Text

    ELECTRIC, WATER

    AutoCAD SHX Text

    AND MARKING GAS,

    AutoCAD SHX Text

    FOR LOCATING

    AutoCAD SHX Text

    O

    AutoCAD SHX Text

    L

    AutoCAD SHX Text

    L

    AutoCAD SHX Text

    F

    AutoCAD SHX Text

    B

    AutoCAD SHX Text

    E

    AutoCAD SHX Text

    O

    AutoCAD SHX Text

    R

    AutoCAD SHX Text

    E

    AutoCAD SHX Text

    L

    AutoCAD SHX Text

    U

    AutoCAD SHX Text

    Y

    AutoCAD SHX Text

    O

    AutoCAD SHX Text

    A

    AutoCAD SHX Text

    C

    AutoCAD SHX Text

    R

    AutoCAD SHX Text

    D

    AutoCAD SHX Text

    G

    AutoCAD SHX Text

    I

    AutoCAD SHX Text

    O

    AutoCAD SHX Text

    D

    AutoCAD SHX Text

    A

    AutoCAD SHX Text

    R

    AutoCAD SHX Text

    O

    AutoCAD SHX Text

    C

    AutoCAD SHX Text

    F

    AutoCAD SHX Text

    O

    AutoCAD SHX Text

    CALL UTILITY

    AutoCAD SHX Text

    BEFORE YOU DIG,

    AutoCAD SHX Text

    48 HOURS

    AutoCAD SHX Text

    E

    AutoCAD SHX Text

    C

    AutoCAD SHX Text

    T

    AutoCAD SHX Text

    Y

    AutoCAD SHX Text

    T

    AutoCAD SHX Text

    I

    AutoCAD SHX Text

    L

    AutoCAD SHX Text

    I

    AutoCAD SHX Text

    T

    AutoCAD SHX Text

    U

    AutoCAD SHX Text

    O

    AutoCAD SHX Text

    N

    AutoCAD SHX Text

    T

    AutoCAD SHX Text

    A

    AutoCAD SHX Text

    C

    AutoCAD SHX Text

    I

    AutoCAD SHX Text

    F

    AutoCAD SHX Text

    I

    AutoCAD SHX Text

    N

    AutoCAD SHX Text

    O

    AutoCAD SHX Text

    I

    AutoCAD SHX Text

    E

    AutoCAD SHX Text

    T

    AutoCAD SHX Text

    N

  • 0

    1" = 50' 1:600

    100502010

    MAP NOTES1. THE EXISTING TOPOGRAPHY SHOWN ON THIS PLAN WAS PREPARED BY MVE, INC.

    2. ALL EXISTING UNDERGROUND UTILITIES SHOWN ON THIS MAP ARE FROM UTILITY MAIN RECORD MAPS AND UTILITY SERVICE LOCATION MAPSOBTAINED FROM COLORADO SPRINGS UTILITIES. THE LOCATION OF UTILITIES AS SHOWN ARE APPROXIMATE. ALL UTILITIES MAY NOT BE SHOWNOR MAY NOT HAVE BEEN LOCATED. BELOW GROUND UTILITY LOCATIONS WERE NOT PERFORMED.

    FLOODPLAIN STATEMENTNO PORTION OF THE SUBJECT PROPERTY IS LOCATED WITHIN FEMA DESIGNATED 100 YR FLOODPLAIN AS INDICATED ON THE FLOOD INSURANCERATE MAPS (FIRM) FOR EL PASO COUNTY, COLORADO AND INCORPORATED AREAS - MAP NUMBERS 08041C0260 F & 08041C0276 F, EFFECTIVEMARCH 17, 1997.

    PCD FILE NO.

    VICINITY MAP

    RIPRAP AT DRAIN PIPE ENDSNTS

    1.5'

    W.S.

    BTM / INV IN

    BTM SANDGEOTEXTILELINER

    1'-11" (MIN) CLASS C FILTERMATERIAL PER TABLE SF-1

    4" DIA. SLOTTED PVCDRAIN PIPE PER TABLESF-2. SLOPE 0.5% MIN.

    TYPICAL SWQC BASIN DETAILSCALE: NTS

    FILTER SURFACE TOBE LEVEL

    SLOPE BOTTOM 0.5%TOWARD INLET

    SFB BASE ELEV

    PON

    D D

    EPTH

    ,PE

    R TA

    BLE

    SF-3

    12" PVC TEEINV OUT WQCV ELEV(SEE POND TABLE DATA)

    CLEANOUT w/ 2 - 45° BENDS& WATERTIGHT CAP(SEE PLAN FOR LOCATIONS)

    CAP 12" TEE & DRILL FOR 4"UNDERDRAIN PIPE W/ORIFACE. (SEE PONDTABLE DATA)

    SECTION 'A'SCALE: 1" = 4'

    1'-6

    "M

    IN4"

    1" M

    IN

    1" B

    EDD

    ING

    2% (TYP)

    FILTER MATERIALIN-FLOW FROM STREETSFB BASE ELEV

    SEE RIPRAP AT CURBOPENING DETAIL

    A

    A

    TABLE SF-1 (CLASS C FILTER MATERIAL)

    SEIVE SIZE % PASSING

    3/4" 100NO 4 60-100NO 50 10-30NO 100 0-10NO 200 0-3

    TABLE SF-2 (SLOTTED PIPE DIMENSIONS)

    PIPE Ø SLOT SLOT SLOT OPEN AREALENGTH WIDTH CENTERS (PER SF)

    4" 1-1/16" 0.032" 0.413" 1.90 SQ. IN.

    4:1

    SPILLWAY(WIDTH PER

    PLAN)

    12"FREEBOARD

    4:1

    SPILLWAY DETAILSCALE: NTS

    4"(MIN)

    COVER w/TOPSOIL.

    14"

    TYPE 'L' OR 'VL' RIPRAP,INTERMIXED WITH 35%NATIVE SOIL, BY WEIGHT.

    SAND FILTER WATER QUALITY POND DATA TABLE

    SANDFILTER

    BASE AREA(SQUARE

    FEET)

    SANDFILTER

    VOLUME(FT3)

    SANDFILTERBASEELEV

    PONDDEPTH

    (FT)

    EMERGENCYOVERFLOWELEVATION

    PIPE INVERT ELEVATIONSOUTLETORIFICE

    DIAMETER(IN)

    TOP OFWQCV PIPE

    ELEV (FT)

    INV OUTWQCV ELEV

    (FT)HIGH END LOW ENDDP 2 1,322 2,134 58.5 1.50 60.0 56.67 56.35 1-1/16" 59.76 56.35

    TOP OF WQCV PIPE(SEE POND TABLE DATA)

    3:1MAX.

    3:1MAX

    .

    1'-0

    " M

    IN.

    6'-0"

    TYPICAL SWALE ASCALE 1" = 2.0'

    3'-0" 3'-0"

    LANDSCAPE FABRICTENCATE MIRIFI 180N ORAPPROVED ALTERNATE

    12" DOMED ADS/NYLOPLASTDUCTILE IRON FRAME & GRATE ORAPPROVED ALTERNATE

    3:1TYP.

    TYPICAL SWALE BSCALE 1" = 4.0'

    35 - 50

    50 - 70

    70 - 100

    2 - 10

    BY WEIGHT% SMALLER

    d = 2d = 6

    d = 9

    d = 12

    10

    50

    70

    100

    DIM.(INCHES)INTER.ROCK

    TYPE VL

    RIP-RAP GRADATION TABLE

    d = 3d = 9

    d = 12

    d = 15

    10

    50

    70

    100

    DIM.(INCHES)INTER.ROCK

    TYPE L

    3:1MAX.

    3:1MAX

    .

    1'-6

    " M

    IN.

    11'-0"

    TYPICAL SWALE CSCALE: NTS'

    4'-6" 2'-0" 4'-6"

    3:1MAX.

    3:1MAX

    .

    1'-6

    " M

    IN.

    9'-0"

    4'-6" 4'-6"

    SPREADING DEPRESSIONSCALE 1" = 4.0'

    6"

    9'-0"

    3'-0" 6'-0"

    ENSURE DOWNHILL(WEST) EDGE ISLEVEL. EL=50.0'

    TYPE 'VL' RIPRAP,12" THICK

    TYPE 'VL' RIPRAP,12" THICK

    TYPE 'VL' RIPRAP,12" THICK

    LEGEND

    FF = 5986.00

    PROPERTY LINE

    EASEMENT LINE

    LOT LINE

    BUILDING SETBACK LINE

    ADJACENT PROPERTY LINE

    EXISTING

    INDEX CONTOUR

    INTERMEDIATE CONTOUR

    CONCRETE AREA

    ASPHALT AREA

    BUILDING/BUILDING OVERHANG

    RETAINING WALL - SOLID/ROCK

    CHAIN LINK FENCE

    BARBED WIRE FENCE

    PROPOSED

    INDEX CONTOUR

    INTERMEDIATE CONTOUR

    CONCRETE AREA

    ASPHALT AREA

    BUILDING/BUILDING OVERHANG

    RETAINING WALL - SOLIDROCK

    TOP OF WALL/GRADE AT BOTTOMOF WALL

    SPOT ELEVATIONFL = FLOWLINETSW = TOP OF SIDEWALK

    FINISHED FLOOR ELEVATION

    SANITARY SEWER SERVICE LINE

    OVERHEAD ELECTRIC LINE

    UTILITY POLE/GUY WIRE

    STORM DRAIN PIPE/ FLARED END SECTION (FES)

    STORM DRAIN PIPE/ FLAREDEND SECTION (FES)

    RIPRAP

    86.0 TW83.0 FG

    84.96TSW

    5985

    84

    5985

    84

    TREES (EVERGREEN /DECIDUOUS)

    TREES (EVERGREEN /DECIDUOUS)

    GRADING NOTES:1. UNDERGROUND FACILITIES, STRUCTURES AND UTILITIES HAVE BEEN DRAWN FROM AVAILABLE RECORDS ANO/OR SURFACE EVIDENCE. THE

    LOCATION OF ALL UTILITIES MAY NOT BE SHOWN OR MAY NOT HAVE BEEN LOCATED. BELOW GROUND LOCATIONS HAVE NOT BEEN PERFORMED.THEREFORE, THE RELATIONSHIP BETWEEN PROPOSED WORK AND EXISTING FACILITIES, STRUCTURES AND UTILITIES MUST BE CONSIDEREDAPPROXIMATE. ALL UTILITIES SHALL BE LOCATED PRIOR TO ANY EARTH WORK OR DIGGING (1-800-922-1987 OR 811). THE CONTRACTOR SHALL BEFULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MAY BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE ANDPRESERVE ANY AND ALL UTILITIES.

    2. CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING ALL SUBSURFACE UTILITY OWNERS PRIOR TO BEGINNING WORK TO DETERMINELOCATION OF UTILITY FACILITIES.

    3. EXISTING CONDITIONS SHALL BE VERIFIED BY THE GENERAL CONTRACTOR. DISCREPANCIES ARE TO BE REPORTED TO THE ENGINEER PRIOR TOCONSTRUCTION.

    4. M.V.E., INC. OR THE ENGINEER ASSUMES NO RESPONSIBILITY OR LIABILITY FOR USE OF THIS GRADING PLAN FOR ANY OTHER PURPOSE THAN OVERLOT GRADING OPERATIONS.

    5. ALL WEEDS, TRASH, DEBRIS, RUBBLE, BROKEN ASPHALT, ORGANIC MATERIAL (EXCLUDING TOPSOIL) AND REFUSE, OR ANY OTHER MATERIAL WHICHWOULD NOT BE DELETERIOUS AS FILL MATERIAL OR INCAPABLE OF SUPPORTING THE BUILDING, VEHICULAR AND/OR OVERBURDEN LOADS TO BEIMPOSED SHALL BE CLEARED, GRUBBED OR EXCAVATED AS THE CASE MAY DICTATE PRIOR TO GRADING AND SHALL BE REMOVED FROM SITE ANDDISPOSED OF LEGALLY.

    6. PROPOSED CONTOURS SHOWN ARE FINISH GRADES AND READ TO TOP OF PAVEMENT AND FINISH SOIL GRADE.

    7. THE CONTRACTOR SHALL BE RESPONSIBLE TO PROTECT GRADED AREAS FROM, AND AS NECESSARY RESTORE TO GRADE, ANY RUTS, WASHES OROTHER CHANGES FROM THE DESIGN ELEVATIONS SHOWN HEREON, UNTIL GRADING WORK IS ACCEPTED BY THE OWNER OR OWNER'SREPRESENTATIVE.

    8. THE CONTRACTOR SHALL ENDEAVOR NOT TO DISTURB ANY OFFSITE AREAS. THE CONTRACTOR SHALL RESTORE TO THE ORIGINAL CONDITION,ADJACENT (OFF-SITE) PROPERTY DISTURBED BY HIS OPERATIONS.

    9. THE GENERAL CONTRACTOR SHALL STRIP TOPSOIL FROM CONSTRUCTION AREAS AND STOCKPILE TOPSOIL AT AREA SHOWN ON THIS PLAN. PLACETOPSOIL WITH APPROPRIATE EROSION CONTROL AND IN A MANNER SO AS TO NOT CONFLICT WITH OTHER TRADES AND CONSTRUCTIONPROCESS.

    10. ALL GRADING SHALL BE DONE TO INSURE POSITIVE DRAINAGE AWAY FROM FOUNDATIONS AND STRUCTURES.

    11. FINISHED GRADE OF ALL PERVIOUS EARTH SURFACES THAT CONTACT FOUNDATION WALLS SHALL BE A MINIMUM OF 6" BELOW ANY UNTREATEDWOOD MATERIAL OR IN ACCORDANCE WITH APPLICABLE CODES AND THE RECOMMENDATIONS OF THE OWNER'S GEOTECHNICALENGINEERING REPORT OR DESIGN.

    12. PERVIOUS EARTH SURFACES SHALL SLOPE AWAY FROM ALL FOUNDATION WALLS AT A MINIMUM RATE OF 6" IN 10 FEET (5%) FOR THE FIRST 10 FEETADJACENT TO THE FOUNDATION OR IN ACCORDANCE WITH APPLICABLE CODES AND THE RECOMMENDATIONS OF THE OWNER'SGEOTECHNICAL ENGINEERING REPORT OR DESIGN.

    13. CONCRETE OR OTHER IMPERVIOUS SURFACES THAT CONTACT FOUNDATION WALLS SHALL SLOPE AWAY FROM ALL FOUNDATION WALLS AT AMINIMUM RATE OF 1/4" PER FOOT (2.00%) OR IN ACCORDANCE WITH APPLICABLE CODES AND THE RECOMMENDATIONS OF THE OWNER'SGEOTECHNICAL ENGINEERING REPORT OR DESIGN.

    14. ANY FILL MATERIAL REQUIRED TO BRING GRADES UP TO PROPOSED ELEVATIONS SHALL BE PROVIDED BY THE CONTRACTOR.

    15. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DISTRIBUTING TOPSOIL THROUGHOUT THE LAWN AND PLANTING AREAS ACCORDING TOAPPROVED LANDSCAPE PLANS, BY OTHERS.

    16. THE NATURE OF WORK PROPOSED BY THIS PLAN IS GRADING AND THE EXTENT OF SAID PROPOSED GRADING IS SHOWN BY THE EXISTING ANDPROPOSED CONTOURS HEREON.

    17. CONTRACTOR SHALL USE MECHANICAL METHODS TO GO FROM THE EXISTING TO PROPOSED CONTOURS IN ACCORDANCE WITH THIS GRADINGPLAN. QUALITY CONTROL OF SOILS AND GRADING OPERATION WILL BE AS DIRECTED BY OWNERS GEOTECHNICAL ENGINEER.

    18. CONTRACTOR IN THE PERFORMANCE OF HIS GRADING WORK SHALL, AT ALL TIMES, WHETHER OR NOT SPECIFICALLY DIRECTED BY OWNER ORENGINEER, STRICTLY OBSERVE SAFETY PROVISIONS OF ALL FEDERAL, STATE AND MUNICIPAL LAWS AND BUILDING AND CONSTRUCTION CODESRELATING TO PUBLIC SAFETY. CONTRACTOR SHALL CONTINUOUSLY CONDUCT HIS GRADING OPERATIONS WORK IN A MANNER THAT SUCH WORKWILL NOT BECOME A HAZARD TO LIFE AND LIMB, ENDANGER PROPERTY OR ADVERSELY AFFECT THE SAFETY, USE OR STABILITY OF THE PUBLIC WAY,DRAINAGE CHANNEL OR OTHER PROPERTY SHOWN ON THIS GRADING PLAN. GRADING OPERATIONS WORK COMPLETED IN ACCORDANCE WITHTHIS GRADING PLAN WILL NOT BECOME A HAZARD TO LIFE AND LIMB, ENDANGER PROPERTY OR ADVERSELY AFFECT THE SAFETY, USE OR STABILITYOF THE PUBLIC WAY, DRAINAGE CHANNEL, OR OTHER PROPERTY SHOWN ON THIS GRADING PLAN.

    19. WHENEVER OWNER, ENGINEER OR CITY SAFETY DIRECTOR OR HIS DESIGNATED REPRESENTATIVE BECOMES AWARE OF CONTRACTORS FAILURE TOCOMPLY WITH APPLICABLE SAFETY REGULATIONS, THE OWNER, ENGINEER OR CITY SAFETY DIRECTOR OR HIS DESIGNATED REPRESENTATIVE WILLINFORM THE CONTRACTOR WHO SHALL TAKE IMMEDIATE STEPS TO REMEDY THE NONCOMPLIANCE.

    20. CONTRACTOR SHALL PROVIDE APPROPRIATE EROSION CONTROL MEASURES DURING EARTHWORK OPERATIONS TO CONTROL EROSION ANDSEDIMENT TRANSFER TO ADJACENT PROPERTIES. EROSION CONTROL MEASURES ARE NOT LIMITED TO THOSE NOTED ON THE EROSION CONTROLPLAN.

    A. ALL DISTURBED AREAS SHALL BE REVEGETATED OR OTHERWISE LANDSCAPED AFTER CONSTRUCTION IN ACCORDANCE WITH THEREVEGETATION GUIDELINES CONTAINED IN THE STANDARD EROSION CONTROL NOTES ON THIS PLAN AND IN ACCORDANCE WITH THEAPPROVED LANDSCAPE PLAN FOR THIS PROJECT. THE APPROVED LANDSCAPE PLAN DEPICTS SOD AND SEEDING AREAS WITH SPECIFIEDTYPES AND AMOUNTS.

    B. NETTING WILL BE PLACED ON CONSTRUCTED SLOPES GREATER THAN 3:1. SLOPE VALUES ARE ARE SHOWN ON THE PLAN. NETTING SHALL BEGREENFIX AMERICA WS072 OR EQUAL AGRICULTURAL STRAW BLANKET WITH PHOTODEGRADABLE NETTING ON BOTH SIDES. NETTING SHALLBE INSTALLED ACCORDING TO MANUFACTURER'S SPECIFICATIONS.

    C. STRAW BALES WILL BE PLACED AT TOP OF NEWLY CONSTRUCTED SLOPES OF 3:1 OR GREATER AT SELECTED LOCATIONS AS REQUIRED.

    D. PLACE SILT FENCE AS SHOWN ON THE EROSION CONTROL PLAN AND AS MAY BE REQUIRED TO PREVENT SEDIMENT MOVEMENT TO ADJACENTPROPERTY. STRAW BALES OR EROSION CONTROL LOGS MAY BE SUBSTITUTED WITH APPROVAL OF THE ENGINEER.

    22. ALL WORK IN THE PUBLIC RIGHT-OF-WAY SHALL BE PERFORMED ACCORDING TO THE EL PASO COUNTY STANDARD SPECIFICATIONS, LATESTREVISION.

    STANDARD EL PASO COUNTY GRADING & EROSION CONTROL PLAN NOTES1. STORMWATER DISCHARGES FROM CONSTRUCTION SITES SHALL NOT CAUSE OR THREATEN TO CAUSE POLLUTION, CONTAMINATION, OR DEGRADATION OF STATE WATERS. ALL WORK AND EARTHDISTURBANCE SHALL BE DONE IN A MANNER THAT MINIMIZES POLLUTION OF ANY ON-SITE OR OFF-SITE WATERS, INCLUDING WETLANDS.

    2. NOTWITHSTANDING ANYTHING DEPICTED IN THESE PLANS IN WORDS OR GRAPHIC REPRESENTATION, ALL DESIGN AND CONSTRUCTION RELATED TO ROADS, STORM DRAINAGE AND EROSIONCONTROL SHALL CONFORM TO THE STANDARDS AND REQUIREMENTS OF THE MOST RECENT VERSION OF THE RELEVANT ADOPTED EL PASO COUNTY STANDARDS, INCLUDING THE LANDDEVELOPMENT CODE, THE ENGINEERING CRITERIA MANUAL, THE DRAINAGE CRITERIA MANUAL, AND THE DRAINAGE CRITERIA MANUAL VOLUME 2. ANY DEVIATIONS FROM REGULATIONS ANDSTANDARDS MUST BE REQUESTED, AND APPROVED, IN WRITING.

    3. A SEPARATE STORMWATER MANAGEMENT PLAN (SMWP) FOR THIS PROJECT SHALL BE COMPLETED AND AN EROSION AND STORMWATER QUALITY CONTROL PERMIT (ESQCP) ISSUED PRIOR TOCOMMENCING CONSTRUCTION. MANAGEMENT OF THE SWMP DURING CONSTRUCTION IS THE RESPONSIBILITY OF THE DESIGNATED QUALIFIED STORMWATER MANAGER OR CERTIFIED EROSIONCONTROL INSPECTOR. THE SWMP SHALL BE LOCATED ON SITE AT ALL TIMES DURING CONSTRUCTION AND SHALL BE KEPT UP TO DATE WITH WORK PROGRESS AND CHANGES IN THE FIELD.

    4. ONCE THE ESQCP IS APPROVED AND A “NOTICE TO PROCEED” HAS BEEN ISSUED, THE CONTRACTOR MAY INSTALL THE INITIAL STAGE EROSION AND SEDIMENT CONTROL MEASURES ASINDICATED ON THE APPROVED GEC. A PRECONSTRUCTION MEETING BETWEEN THE CONTRACTOR, ENGINEER, AND EL PASO COUNTY WILL BE HELD PRIOR TO ANY CONSTRUCTION. IT IS THERESPONSIBILITY OF THE APPLICANT TO COORDINATE THE MEETING TIME AND PLACE WITH COUNTY STAFF.

    5. CONTROL MEASURES MUST BE INSTALLED PRIOR TO COMMENCEMENT OF ACTIVITIES THAT COULD CONTRIBUTE POLLUTANTS TO STORMWATER. CONTROL MEASURES FOR ALL SLOPES,CHANNELS, DITCHES, AND DISTURBED LAND AREAS SHALL BE INSTALLED IMMEDIATELY UPON COMPLETION OF THE DISTURBANCE.

    6. ALL TEMPORARY SEDIMENT AND EROSION CONTROL MEASURES SHALL BE MAINTAINED AND REMAIN IN EFFECTIVE OPERATING CONDITION UNTIL PERMANENT SOIL EROSION CONTROLMEASURES ARE IMPLEMENTED AND FINAL STABILIZATION IS ESTABLISHED. ALL PERSONS ENGAGED IN LAND DISTURBANCE ACTIVITIES SHALL ASSESS THE ADEQUACY OF CONTROL MEASURES AT THESITE AND IDENTIFY IF CHANGES TO THOSE CONTROL MEASURES ARE NEEDED TO ENSURE THE CONTINUED EFFECTIVE PERFORMANCE OF THE CONTROL MEASURES. ALL CHANGES TO TEMPORARYSEDIMENT AND EROSION CONTROL MEASURES MUST BE INCORPORATED INTO THE STORMWATER MANAGEMENT PLAN.

    7. TEMPORARY STABILIZATION SHALL BE IMPLEMENTED ON DISTURBED AREAS AND STOCKPILES WHERE GROUND DISTURBING CONSTRUCTION ACTIVITY HAS PERMANENTLY CEASED ORTEMPORARILY CEASED FOR LONGER THAN 14 DAYS.

    8. FINAL STABILIZATION MUST BE IMPLEMENTED AT ALL APPLICABLE CONSTRUCTION SITES. FINAL STABILIZATION IS ACHIEVED WHEN ALL GROUND DISTURBING ACTIVITIES ARE COMPLETE AND ALLDISTURBED AREAS EITHER HAVE A UNIFORM VEGETATIVE COVER WITH INDIVIDUAL PLANT DENSITY OF 70 PERCENT OF PRE-DISTURBANCE LEVELS ESTABLISHED OR EQUIVALENT PERMANENTALTERNATIVE STABILIZATION METHOD IS IMPLEMENTED. ALL TEMPORARY SEDIMENT AND EROSION CONTROL MEASURES SHALL BE REMOVED UPON FINAL STABILIZATION AND BEFORE PERMITCLOSURE.

    9. ALL PERMANENT STORMWATER MANAGEMENT FACILITIES SHALL BE INSTALLED AS DESIGNED IN THE APPROVED PLANS. ANY PROPOSED CHANGES THAT EFFECT THE DESIGN OR FUNCTION OFPERMANENT STORMWATER MANAGEMENT STRUCTURES MUST BE APPROVED BY THE ECM ADMINISTRATOR PRIOR TO IMPLEMENTATION.

    10. EARTH DISTURBANCES SHALL BE CONDUCTED IN SUCH A MANNER SO AS TO EFFECTIVELY MINIMIZE ACCELERATED SOIL EROSION AND RESULTING SEDIMENTATION. ALL DISTURBANCES SHALL BEDESIGNED, CONSTRUCTED, AND COMPLETED SO THAT THE EXPOSED AREA OF ANY DISTURBED LAND SHALL BE LIMITED TO THE SHORTEST PRACTICAL PERIOD OF TIME. PRE-EXISTING VEGETATIONSHALL BE PROTECTED AND MAINTAINED WITHIN 50 HORIZONTAL FEET OF A WATERS OF THE STATE UNLESS SHOWN TO BE INFEASIBLE AND SPECIFICALLY REQUESTED AND APPROVED.

    11. COMPACTION OF SOIL MUST BE PREVENTED IN AREAS DESIGNATED FOR INFILTRATION CONTROL MEASURES OR WHERE FINAL STABILIZATION WILL BE ACHIEVED BY VEGETATIVE COVER. AREASDESIGNATED FOR INFILTRATION CONTROL MEASURES SHALL ALSO BE PROTECTED FROM SEDIMENTATION DURING CONSTRUCTION UNTIL FINAL STABILIZATION IS ACHIEVED. IF COMPACTIONPREVENTION IS NOT FEASIBLE DUE TO SITE CONSTRAINTS, ALL AREAS DESIGNATED FOR INFILTRATION AND VEGETATION CONTROLMEASURES MUST BE LOOSENED PRIOR TO INSTALLATION OF THE CONTROL MEASURE(S).

    12. ANY TEMPORARY OR PERMANENT FACILITY DESIGNED AND CONSTRUCTED FOR THE CONVEYANCE OF STORMWATER AROUND, THROUGH, OR FROM THE EARTH DISTURBANCE AREA SHALL BEA STABILIZED CONVEYANCE DESIGNED TO MINIMIZE EROSION AND THE DISCHARGE OF SEDIMENT OFF SITE.

    13. CONCRETE WASH WATER SHALL BE CONTAINED AND DISPOSED OF IN ACCORDANCE WITH THE SWMP. NO WASH WATER SHALL BE DISCHARGED TO OR ALLOWED TO ENTER STATE WATERS,INCLUDING ANY SURFACE OR SUBSURFACE STORM DRAINAGE SYSTEM OR FACILITIES. CONCRETE WASHOUTS SHALL NOT BE LOCATED IN AN AREA WHERE SHALLOW GROUNDWATER MAY BEPRESENT, OR WITHIN 50 FEET OF A SURFACE WATER BODY, CREEK OR STREAM.

    14. DURING DEWATERING OPERATIONS OF UNCONTAMINATED GROUND WATER MAY BE DISCHARGED ON SITE, BUT SHALL NOT LEAVE THE SITE IN THE FORM OF SURFACE RUNOFF UNLESS ANAPPROVED STATE DEWATERING PERMIT IS IN PLACE.

    15. EROSION CONTROL BLANKETING OR OTHER PROTECTIVE COVERING SHALL BE USED ON SLOPES STEEPER THAN 3:1.

    16. CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL OF ALL WASTES FROM THE CONSTRUCTION SITE FOR DISPOSAL IN ACCORDANCE WITH LOCAL AND STATE REGULATORYREQUIREMENTS. NO CONSTRUCTION DEBRIS, TREE SLASH, BUILDING MATERIAL WASTES OR UNUSED BUILDING MATERIALS SHALL BE BURIED, DUMPED, OR DISCHARGED AT THE SITE.

    17. WASTE MATERIALS SHALL NOT BE TEMPORARILY PLACED OR STORED IN THE STREET, ALLEY, OR OTHER PUBLIC WAY, UNLESS IN ACCORDANCE WITH AN APPROVED TRAFFIC CONTROL PLAN.CONTROL MEASURES MAY BE REQUIRED BY EL PASO COUNTY ENGINEERING IF DEEMED NECESSARY, BASED ON SPECIFIC CONDITIONS AND CIRCUMSTANCES.

    18. TRACKING OF SOILS AND CONSTRUCTION DEBRIS OFF-SITE SHALL BE MINIMIZED. MATERIALS TRACKED OFF-SITE SHALL BE CLEANED UP AND PROPERLY DISPOSED OF IMMEDIATELY.

    19. THE OWNER/DEVELOPER SHALL BE RESPONSIBLE FOR THE REMOVAL OF ALL CONSTRUCTION DEBRIS, DIRT, TRASH, ROCK, SEDIMENT, SOIL, AND SAND THAT MAY ACCUMULATE IN ROADS,STORM DRAINS AND OTHER DRAINAGE CONVEYANCE SYSTEMS AND STORMWATER APPURTENANCES AS A RESULT OF SITE DEVELOPMENT.

    20. THE QUANTITY OF MATERIALS STORED ON THE PROJECT SITE SHALL BE LIMITED, AS MUCH AS PRACTICAL, TO THAT QUANTITY REQUIRED TO PERFORM THE WORK IN AN ORDERLY SEQUENCE. ALLMATERIALS STORED ON-SITE SHALL BE STORED IN A NEAT, ORDERLY MANNER, IN THEIR ORIGINAL CONTAINERS, WITH ORIGINAL MANUFACTURER’S LABELS.

    21. NO CHEMICAL(S) HAVING THE POTENTIAL TO BE RELEASED IN STORMWATER ARE TO BE STORED OR USED ONSITE UNLESS PERMISSION FOR THE USE OF SUCH CHEMICAL(S) IS GRANTED INWRITING BY THE ECM ADMINISTRATOR. IN GRANTING APPROVAL FOR THE USE OF SUCH CHEMICAL(S), SPECIAL CONDITIONS AND MONITORING MAY BE REQUIRED.

    22. BULK STORAGE OF ALLOWED PETROLEUM PRODUCTS OR OTHER ALLOWED LIQUID CHEMICALS IN EXCESS OF 55 GALLONS SHALL REQUIRE ADEQUATE SECONDARY CONTAINMENT PROTECTIONTO CONTAIN ALL SPILLS ONSITE AND TO PREVENT ANY SPILLED MATERIALS FROM ENTERING STATE WATERS, ANY SURFACE OR SUBSURFACE STORM DRAINAGE SYSTEM OR OTHER FACILITIES.

    23. NO PERSON SHALL CAUSE THE IMPEDIMENT OF STORMWATER FLOW IN THE CURB AND GUTTER OR DITCH EXCEPT WITH APPROVED SEDIMENT CONTROL MEASURES.

    24. OWNER/DEVELOPER AND THEIR AGENTS SHALL COMPLY WITH THE “COLORADO WATER QUALITY CONTROL ACT” (TITLE 25, ARTICLE 8, CRS), AND THE “CLEAN WATER ACT” (33 USC 1344), INADDITION TO THE REQUIREMENTS OF THE LAND DEVELOPMENT CODE, DCM VOLUME II AND THE ECM APPENDIX I. ALL APPROPRIATE PERMITS MUST BE OBTAINED BY THE CONTRACTOR PRIOR TOCONSTRUCTION (1041, NPDES, FLOODPLAIN, 404, FUGITIVE DUST, ETC.). IN THE EVENT OF CONFLICTS BETWEEN THESE REQUIREMENTS AND OTHER LAWS, RULES, OR REGULATIONS OF OTHERFEDERAL, STATE, LOCAL, OR COUNTY AGENCIES, THE MOST RESTRICTIVE LAWS, RULES, OR REGULATIONS SHALL APPLY.

    25. ALL CONSTRUCTION TRAFFIC MUST ENTER/EXIT THE SITE ONLY AT APPROVED CONSTRUCTION ACCESS POINTS.

    26. PRIOR TO CONSTRUCTION THE PERMITTEE SHALL VERIFY THE LOCATION OF EXISTING UTILITIES.

    27. A WATER SOURCE SHALL BE AVAILABLE ON SITE DURING EARTHWORK OPERATIONS AND SHALL BE UTILIZED AS REQUIRED TO MINIMIZE DUST FROM EARTHWORK EQUIPMENT AND WIND.

    28. THE SOILS REPORT FOR THIS SITE HAS BEEN PREPARED BY ____________________________________ AND SHALL BE CONSIDERED A PART OF THESE PLANS.

    29. AT LEAST TEN (10) DAYS PRIOR TO THE ANTICIPATED START OF CONSTRUCTION, FOR PROJECTS THAT WILL DISTURB ONE (1) ACRE OR MORE, THE OWNER OR OPERATOR OF CONSTRUCTIONACTIVITY SHALL SUBMIT A PERMIT APPLICATION FOR STORMWATER DISCHARGE TO THE COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT, WATER QUALITY DIVISION. THEAPPLICATION CONTAINS CERTIFICATION OF COMPLETION OF A STORMWATER MANAGEMENT PLAN (SWMP), OF WHICH THIS GRADING AND EROSION CONTROL PLAN MAY BE A PART. FORINFORMATION OR APPLICATION MATERIALS CONTACT:

    COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENTWATER QUALITY CONTROL DIVISIONWQCD – PERMITS4300 CHERRY CREEK DRIVE SOUTHDENVER, CO 80246-1530ATTN: PERMITS UNIT

    BENCHMARK

    EN

    GIN

    EE

    RS

    SU

    RV

    EY

    OR

    SM

    VE

    , IN

    C.

    MV

    E, I

    NC

    .

    ,

    ..

    EN

    GIN

    EE

    RS

    SU

    RV

    EY

    OR

    S

    CHECKED BY _____

    DESIGNED BY

    ___________________

    CHECKED BY _____ ___________________

    REVISIONS

    OF

    AS-BUILTS BY

    MVE DRAWING

    MVE PROJECT

    DRAWN BY

    SHEET

    61092

    Monument SmallEngine Storage

    -GEC-ND

    C1.2NOTES & DETAILS

    2 5OCTOBER 11, 2019

    1. PCD FILE NO. PPR-18-013 GEC PLANS APPROVED. 08/23/18

    2. SITE CHANGES 09/27/19

    3. EPC RESUBMITTAL 10/11/19

    Z:\6

    1092

    \_Sh

    eet D

    wgs

    \610

    92-G

    EC-N

    D.d

    wg,

    10/

    14/2

    019

    9:14

    :08

    AM

    , TJC

    AD

    D

    AutoCAD SHX Text

    1-800-922-1987

    AutoCAD SHX Text

    BEFORE

    AutoCAD SHX Text

    DIG...

    AutoCAD SHX Text

    YOU

    AutoCAD SHX Text

    CALL

    AutoCAD SHX Text

    1-800-922-1987

    AutoCAD SHX Text

    R

    AutoCAD SHX Text

    LOCATORS

    AutoCAD SHX Text

    AND WASTEWATER

    AutoCAD SHX Text

    ELECTRIC, WATER

    AutoCAD SHX Text

    AND MARKING GAS,

    AutoCAD SHX Text

    FOR LOCATING

    AutoCAD SHX Text

    O

    AutoCAD SHX Text

    L

    AutoCAD SHX Text

    L

    AutoCAD SHX Text

    F

    AutoCAD SHX Text

    B

    AutoCAD SHX Text

    E

    AutoCAD SHX Text

    O

    AutoCAD SHX Text

    R

    AutoCAD SHX Text

    E

    AutoCAD SHX Text

    L

    AutoCAD SHX Text

    U

    AutoCAD SHX Text

    Y

    AutoCAD SHX Text

    O

    AutoCAD SHX Text

    A

    AutoCAD SHX Text

    C

    AutoCAD SHX Text

    R

    AutoCAD SHX Text

    D

    AutoCAD SHX Text

    G

    AutoCAD SHX Text

    I

    AutoCAD SHX Text

    O

    AutoCAD SHX Text

    D

    AutoCAD SHX Text

    A

    AutoCAD SHX Text

    R

    AutoCAD SHX Text

    O

    AutoCAD SHX Text

    C

    AutoCAD SHX Text

    F

    AutoCAD SHX Text

    O

    AutoCAD SHX Text

    CALL UTILITY

    AutoCAD SHX Text

    BEFORE YOU DIG,

    AutoCAD SHX Text

    48 HOURS

    AutoCAD SHX Text

    E

    AutoCAD SHX Text

    C

    AutoCAD SHX Text

    T

    AutoCAD SHX Text

    Y

    AutoCAD SHX Text

    T

    AutoCAD SHX Text

    I

    AutoCAD SHX Text

    L

    AutoCAD SHX Text

    I

    AutoCAD SHX Text

    T

    AutoCAD SHX Text

    U

    AutoCAD SHX Text

    O

    AutoCAD SHX Text

    N

    AutoCAD SHX Text

    T

    AutoCAD SHX Text

    A

    AutoCAD SHX Text

    C

    AutoCAD SHX Text

    I

    AutoCAD SHX Text

    F

    AutoCAD SHX Text

    I

    AutoCAD SHX Text

    N

    AutoCAD SHX Text

    O

    AutoCAD SHX Text

    I

    AutoCAD SHX Text

    E

    AutoCAD SHX Text

    T

    AutoCAD SHX Text

    N

    AutoCAD SHX Text

    2ND STREET

    AutoCAD SHX Text

    3RD STREET

    AutoCAD SHX Text

    4TH STREET

    AutoCAD SHX Text

    5TH STREET

    AutoCAD SHX Text

    WASHINGTON

    AutoCAD SHX Text

    MITCHELL AVE.

    AutoCAD SHX Text

    MONUMENT LAKE ROAD

    AutoCAD SHX Text

    FORMER COLO.SPGS.-DENVER ROAD

    AutoCAD SHX Text

    COLORADO

    AutoCAD SHX Text

    HIGHWAY 105

    AutoCAD SHX Text

    D&RG RAIL ROAD

    AutoCAD SHX Text

    SITE

    AutoCAD SHX Text

    NTS

    AutoCAD SHX Text

    CULVERT

    AutoCAD SHX Text

    PIPE

    AutoCAD SHX Text

    PIPE

    AutoCAD SHX Text

    CULVERT

    AutoCAD SHX Text

    TYPE L RIPRAP

    AutoCAD SHX Text

    FLARED END SECTION

    AutoCAD SHX Text

    MIRIFI FW 700 OR EQUAL

    AutoCAD SHX Text

    FLOW

    AutoCAD SHX Text

    FILTER FABRIC

    AutoCAD SHX Text

    FLOW

    AutoCAD SHX Text

    9"

  • 37'

    5'

    1.50

    '

    WQCV PIPERIM=59.76'

    EMERGENCYSPILLWAY=60.00'POND BTM

    EL=58.5'

    27'

    MONUMENT SMALL ENGINE STORAGESAND FILTER BASIN POND SECTION

    SCALE = 1"=10'

  • Stormwater Facility Name:

    Facility Location & Jurisdiction:

    User Input: Watershed Characteristics User Defined User Defined User Defined User DefinedWatershed Slope = 0.020 ft/ft Stage [ft] Area [ft^2] Stage [ft] Discharge [cfs]

    Watershed Length = 561 ft 0.00 1,322 0.00 0.00Watershed Area = 2.96 acres 0.25 1,453 0.25 0.05

    Watershed Imperviousness = 63.3% percent 0.50 1,619 0.50 0.05Percentage Hydrologic Soil Group A = 0.0% percent 0.75 1,763 0.75 0.05Percentage Hydrologic Soil Group B = 100.0% percent 1.00 1,912 1.00 0.05

    Percentage Hydrologic Soil Groups C/D = 0.0% percent 1.25 2,065 1.25 0.061.50 2,335 1.50 0.93

    User Input 17 1.75 2,538 1.75 1.352.00 2,750 2.00 1.642.25 2,972 2.25 7.74   2.50 3,203 2.50 19.30

    WQCV Treatment Method = 12.00 hours

    After completing and printing this worksheet to a pdf, go to:https://maperture.digitaldataservices.com/gvh/?viewer=cswdifcreate a new stormwater facility, and attach the pdf of this worksheet to that record.

    Routed Hydrograph ResultsDesign Storm Return Period = WQCV 2 Year 5 Year 10 Year 50 Year 100 Year

    One‐Hour Rainfall Depth = 0.60 1.19 1.50 1.75 2.25 2.52 inCalculated Runoff Volume = 0.049 0.168 0.226 0.291 0.441 0.523 acre‐ft

    OPTIONAL Override Runoff Volume = acre‐ftInflow Hydrograph Volume = 0.049 0.168 0.225 0.291 0.440 0.522 acre‐ft

    Time to Drain 97% of Inflow Volume = 13.4 13.0 12.6 12.1 11.2 10.6 hoursTime to Drain 99% of Inflow Volume = 15.4 15.2 14.6 14.3 13.6 13.3 hours

    Maximum Ponding Depth = 1.08 1.81 2.04 2.09 2.21 2.28 ftMaximum Ponded Area = 0.05 0.06 0.06 0.06 0.07 0.07 acres

    Maximum Volume Stored = 0.041 0.079 0.093 0.096 0.104 0.108 acre‐ft

    Location for 1‐hr Rainfall Depths (use dropdown):

    Workbook Protected Worksheet Protected

    Stormwater Detention and Infiltration Design Data Sheet

    Monument Small Engine Storage ‐ Sand Filter Basin

    137 N. Monument Lake Road, El Paso County, Colorado

    61092 SDI_Design_Data_v1.08.xlsm, Design Data 10/14/2019, 11:00 AM

  • WQCV_Trigger = 1RunOnce= 1

    CountA= 1Draintime Coeff= 0.8

    0 1 2 3#N/A#N/A0 1 2 3

    #N/A#N/A

    Check Data Set 1 Check Data Set 1

    Area

    Discharge

    Stormwater Detention and Infiltration Design Data Sheet

    0

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    0.1 1 10

    FLOW

     [cfs]

    TIME [hr]

    100YR IN

    100YR OUT

    50YR IN

    50YR OUT

    10YR IN

    10YR OUT

    5YR IN

    5YR OUT

    2YR IN

    2YR OUT

    WQCV IN

    WQCV OUT

    0

    0.5

    1

    1.5

    2

    2.5

    0.1 1 10 100

    POND

    ING DE

    PTH [ft

    ]

    DRAIN TIME [hr]

    100YR

    50YR

    10YR

    5YR

    2YR

    WQCV

    61092 SDI_Design_Data_v1.08.xlsm, Design Data 10/14/2019, 11:00 AM

    61092 ds_impound_form-s

    61092 Hazard Classification Statement

    61092 Pond Plan & Planned Structure Location Map

    61092 Pond Section

    Sheets and Views

    Model

    61092 SDI_Design_Data_v1.08

  • EXIS

    T 12

    " CM

    P

    RR TIE RETAINING WALL

    RR T

    IE R

    ETA

    ININ

    G W

    ALL

    6955

    6965

    6965

    6965

    RR TIE RETAINING WALL

    RR TIE RETAINING WALL

    6955

    6965

    6955

    6965

    EXISTING

    RESIDENCE

    6960

    6945

    6960

    6970

    6970

    6970

    6970

    6960

    6970

    6960

    76 GA

    TE

    SAND FILTER BASIN

    74.0 INV75.6 CRESTEMERGENCY

    SPILLWAY72

    74

    EX 6' OPAQUEWOOD FENCE

    EX 6' OPAQUEWOOD FENCE

    EX LEACH FIELD

    GARAGE D

    TO REMAIN

    STORAGE SHE

    D C

    TO BE REMOVE

    D

    SHOP B

    TO BE REMOVE

    D

    GARAGE A

    TO BEREMO

    VED

    EXISTING

    RESIDENCE

    EXISTING

    SHED

    EXLANDSCAPEAREA

    EX L

    AN

    DSC

    APE

    ARE

    A

    EX SEPTIC TANK PERMITNO. 0024327

    EX WELLPERMITNO.284289

    N 7

    0°03

    '47"

    W

    40

    0.08

    '

    N 16°32'53" E 510.12'

    S 01°54'38" E 632.84'

    TOWN OF MONUMENT

    EL PASO COUNTY

    TOW

    N O

    F M

    ON

    UMEN

    T

    20' ACCESS ESMT(REC# 207086150)

    20' ACCESS

    ESMT

    (REC# 2070

    86149)

    (711

    5100

    009)

    (7115100033)

    Mt. Herman RV StorageSubdivision

    (Rec No. 215713570)

    Not Platted

    Not

    Pla

    tted

    Not

    Pla

    tted

    El P

    aso

    Cou

    nty

    GARAGE

    EASEMEN

    T

    (REC# 20

    7086147)

    EX 6' OPAQUEWOOD FENCE

    N 8

    8°05

    '39"

    E

    209

    .80'

    (210

    ')

    RV PARKINGRECYCLED ASPHALT

    SURFACE

    EX GRAVEL

    DRIVE

    EX 6' OPAQUEWOOD FENCE

    (711

    5100

    032)

    (7115106002)

    FF=6974.4'

    PROPOSED 6'WOOD FENCE

    EXISTING RV PARKINGRECYCLED ASPHALT

    SURFACE

    PRO

    POSE

    D 6

    'W

    OO

    D F

    ENC

    ELA

    ND

    SCA

    PEA

    REA

    PROPOSED

    SHOP

    5,000 SF.

    EXIS

    TING

    GA

    TE

    LAN

    DSC

    APE

    ARE

    A

    57 5859 60

    61

    61 6059

    15' WIDEOVERFLOWSPILLWAY

    WQ POND DP 2BTM=58.5, TOP=60.0

    PIPE OUT=55.85'

    32 LF 12" HDPE (ADS N12 ORAPPROVED ALTERNATE) @ 3.0%

    12" HDPE FESINV = 54.90

    1.7%

    SWALE A - NO RIPRAP(SEE DETAIL)

    SWALE C(SEE DETAIL)

    4% 545352

    Entry

    51

    50

    5049.5

    80 LF 8" HDPE (ADS N12 ORAPPROVED ALTERNATE) w/

    FES @ 1.9%

    8" HDPE FESINV = 70.5

    8" HDPE FESINV = 69.0

    SWALE A(SEE DETAIL)

    SWALE B(SEE DETAIL)

    74.0

    73.6

    73.074.0

    74.3

    74.3

    73

    71

    75

    74

    73

    72

    71

    70

    66

    65

    PROPOSED 6'WOOD FENCE

    PROPOSED 6'WOOD FENCE

    PROPOSED RV PARKINGRECYCLED ASPHALT

    SURFACE TW=74.0FG/FW=71.0

    TW=73.5FG/FW=71.0TW=73.5

    FG/FW=71.0

    TW=73.5FG/FW=71.0

    8" 45° BENDINV = 69.9

    74.4

    74.4

    74.4

    74.4

    SPREADINGDEPRESSION(SEE DETAIL)

    BEGINSWALE B

    0

    1" = 30' 1:360

    6030105

    MAP NOTES1. THE EXISTING TOPOGRAPHY SHOWN ON THIS PLAN WAS PREPARED BY MVE, INC.

    2. ALL EXISTING UNDERGROUND UTILITIES SHOWN ON THIS MAP ARE FROM UTILITY MAIN RECORD MAPS AND UTILITY SERVICE LOCATION MAPSOBTAINED FROM COLORADO SPRINGS UTILITIES. THE LOCATION OF UTILITIES AS SHOWN ARE APPROXIMATE. ALL UTILITIES MAY NOT BE SHOWNOR MAY NOT HAVE BEEN LOCATED. BELOW GROUND UTILITY LOCATIONS WERE NOT PERFORMED.

    BENCHMARK

    EN

    GIN

    EE

    RS

    SU

    RV

    EY

    OR

    SM

    VE

    , IN

    C.

    MV

    E, I

    NC

    .

    ,

    ..

    EN

    GIN

    EE

    RS

    SU

    RV

    EY

    OR

    S

    CHECKED BY _____

    DESIGNED BY

    ___________________

    CHECKED BY _____ ___________________

    REVISIONS

    OF

    AS-BUILTS BY

    MVE DRAWING

    MVE PROJECT

    DRAWN BY

    SHEET

    61092

    Monument SmallEngine Storage

    -GEC-GP

    C1.3GRADING PLAN

    3 5OCTOBER 11, 2019

    1. PCD FILE NO. PPR-18-013 GEC PLANS APPROVED. 08/23/18

    2. SITE CHANGES 09/27/19

    3. EPC RESUBMITTAL 10/11/19

    WQ POND DP2LOCATION:

    13S 510,730 m E4,327,375 m N

    Z:\6

    1092

    \_Sh

    eet D

    wgs

    \610

    92-G

    EC-G

    P.d

    wg,

    10/

    14/2

    019

    9:14

    :01

    AM

    , TJC

    AD

    D

    AutoCAD SHX Text5"

    AutoCAD SHX Text7"

    AutoCAD SHX Text9"

    AutoCAD SHX Text6"

    AutoCAD SHX Text1-800-922-1987

    AutoCAD SHX TextBEFORE

    AutoCAD SHX TextDIG...

    AutoCAD SHX TextYOU

    AutoCAD SHX TextCALL

    AutoCAD SHX Text1-800-922-1987

    AutoCAD SHX TextR

    AutoCAD SHX TextLOCATORS

    AutoCAD SHX TextAND WASTEWATER

    AutoCAD SHX TextELECTRIC, WATER

    AutoCAD SHX TextAND MARKING GAS,

    AutoCAD SHX TextFOR LOCATING

    AutoCAD SHX TextO

    AutoCAD SHX TextL

    AutoCAD SHX TextL

    AutoCAD SHX TextF

    AutoCAD SHX TextB

    AutoCAD SHX TextE

    AutoCAD SHX TextO

    AutoCAD SHX TextR

    AutoCAD SHX TextE

    AutoCAD SHX TextL

    AutoCAD SHX TextU

    AutoCAD SHX TextY

    AutoCAD SHX TextO

    AutoCAD SHX TextA

    AutoCAD SHX TextC

    AutoCAD SHX TextR

    AutoCAD SHX TextD

    AutoCAD SHX TextG

    AutoCAD SHX TextI

    AutoCAD SHX TextO

    AutoCAD SHX TextD

    AutoCAD SHX TextA

    AutoCAD SHX TextR

    AutoCAD SHX TextO

    AutoCAD SHX TextC

    AutoCAD SHX TextF

    AutoCAD SHX TextO

    AutoCAD SHX TextCALL UTILITY

    AutoCAD SHX TextBEFORE YOU DIG,

    AutoCAD SHX Text48 HOURS

    AutoCAD SHX TextE

    AutoCAD SHX TextC

    AutoCAD SHX TextT

    AutoCAD SHX TextY

    AutoCAD SHX TextT

    AutoCAD SHX TextI

    AutoCAD SHX TextL

    AutoCAD SHX TextI

    AutoCAD SHX TextT

    AutoCAD SHX TextU

    AutoCAD SHX TextO

    AutoCAD SHX TextN

    AutoCAD SHX TextT

    AutoCAD SHX TextA

    AutoCAD SHX TextC

    AutoCAD SHX TextI

    AutoCAD SHX TextF

    AutoCAD SHX TextI

    AutoCAD SHX TextN

    AutoCAD SHX TextO

    AutoCAD SHX TextI

    AutoCAD SHX TextE

    AutoCAD SHX TextT

    AutoCAD SHX TextN

  • 0

    1" = 50' 1:600

    100502010

    MAP NOTES1. THE EXISTING TOPOGRAPHY SHOWN ON THIS PLAN WAS PREPARED BY MVE, INC.

    2. ALL EXISTING UNDERGROUND UTILITIES SHOWN ON THIS MAP ARE FROM UTILITY MAIN RECORD MAPS AND UTILITY SERVICE LOCATION MAPSOBTAINED FROM COLORADO SPRINGS UTILITIES. THE LOCATION OF UTILITIES AS SHOWN ARE APPROXIMATE. ALL UTILITIES MAY NOT BE SHOWNOR MAY NOT HAVE BEEN LOCATED. BELOW GROUND UTILITY LOCATIONS WERE NOT PERFORMED.

    FLOODPLAIN STATEMENTNO PORTION OF THE SUBJECT PROPERTY IS LOCATED WITHIN FEMA DESIGNATED 100 YR FLOODPLAIN AS INDICATED ON THE FLOOD INSURANCERATE MAPS (FIRM) FOR EL PASO COUNTY, COLORADO AND INCORPORATED AREAS - MAP NUMBERS 08041C0260 F & 08041C0276 F, EFFECTIVEMARCH 17, 1997.

    PCD FILE NO.

    VICINITY MAP

    RIPRAP AT DRAIN PIPE ENDSNTS

    1.5'

    W.S.

    BTM / INV IN

    BTM SANDGEOTEXTILELINER

    1'-11" (MIN) CLASS C FILTERMATERIAL PER TABLE SF-1

    4" DIA. SLOTTED PVCDRAIN PIPE PER TABLESF-2. SLOPE 0.5% MIN.

    TYPICAL SWQC BASIN DETAILSCALE: NTS

    FILTER SURFACE TOBE LEVEL

    SLOPE BOTTOM 0.5%TOWARD INLET

    SFB BASE ELEV

    PON

    D D

    EPTH

    ,PE

    R TA

    BLE

    SF-3

    12" PVC TEEINV OUT WQCV ELEV(SEE POND TABLE DATA)

    CLEANOUT w/ 2 - 45° BENDS& WATERTIGHT CAP(SEE PLAN FOR LOCATIONS)

    CAP 12" TEE & DRILL FOR 4"UNDERDRAIN PIPE W/ORIFACE. (SEE PONDTABLE DATA)

    SECTION 'A'SCALE: 1" = 4'

    1'-6

    "M

    IN4"

    1" M

    IN

    1" B

    EDD

    ING

    2% (TYP)

    FILTER MATERIALIN-FLOW FROM STREETSFB BASE ELEV

    SEE RIPRAP AT CURBOPENING DETAIL

    A

    A

    TABLE SF-1 (CLASS C FILTER MATERIAL)

    SEIVE SIZE % PASSING

    3/4" 100NO 4 60-100NO 50 10-30NO 100 0-10NO 200 0-3

    TABLE SF-2 (SLOTTED PIPE DIMENSIONS)

    PIPE Ø SLOT SLOT SLOT OPEN AREALENGTH WIDTH CENTERS (PER SF)

    4" 1-1/16" 0.032" 0.413" 1.90 SQ. IN.

    4:1

    SPILLWAY(WIDTH PER

    PLAN)

    12"FREEBOARD

    4:1

    SPILLWAY DETAILSCALE: NTS

    4"(MIN)

    COVER w/TOPSOIL.

    14"

    TYPE 'L' OR 'VL' RIPRAP,INTERMIXED WITH 35%NATIVE SOIL, BY WEIGHT.

    SAND FILTER WATER QUALITY POND DATA TABLE

    SANDFILTER

    BASE AREA(SQUARE

    FEET)

    SANDFILTER

    VOLUME(FT3)

    SANDFILTERBASEELEV

    PONDDEPTH

    (FT)

    EMERGENCYOVERFLOWELEVATION

    PIPE INVERT ELEVATIONSOUTLETORIFICE

    DIAMETER(IN)

    TOP OFWQCV PIPE

    ELEV (FT)

    INV OUTWQCV ELEV

    (FT)HIGH END LOW ENDDP 2 1,322 2,134 58.5 1.50 60.0 56.67 56.35 1-1/16" 59.76 56.35

    TOP OF WQCV PIPE(SEE POND TABLE DATA)

    3:1MAX.

    3:1MAX

    .

    1'-0

    " M

    IN.

    6'-0"

    TYPICAL SWALE ASCALE 1" = 2.0'

    3'-0" 3'-0"

    LANDSCAPE FABRICTENCATE MIRIFI 180N ORAPPROVED ALTERNATE

    12" DOMED ADS/NYLOPLASTDUCTILE IRON FRAME & GRATE ORAPPROVED ALTERNATE

    3:1TYP.

    TYPICAL SWALE BSCALE 1" = 4.0'

    35 - 50

    50 - 70

    70 - 100

    2 - 10

    BY WEIGHT% SMALLER

    d = 2d = 6

    d = 9

    d = 12

    10

    50

    70

    100

    DIM.(INCHES)INTER.ROCK

    TYPE VL

    RIP-RAP GRADATION TABLE

    d = 3d = 9

    d = 12

    d = 15

    10

    50

    70

    100

    DIM.(INCHES)INTER.ROCK

    TYPE L

    3:1MAX.

    3:1MAX

    .

    1'-6

    " M

    IN.

    11'-0"

    TYPICAL SWALE CSCALE: NTS'

    4'-6" 2'-0" 4'-6"

    3:1MAX.

    3:1MAX

    .

    1'-6

    " M

    IN.

    9'-0"

    4'-6" 4'-6"

    SPREADING DEPRESSIONSCALE 1" = 4.0'

    6"

    9'-0"

    3'-0" 6'-0"

    ENSURE DOWNHILL(WEST) EDGE ISLEVEL. EL=50.0'

    TYPE 'VL' RIPRAP,12" THICK

    TYPE 'VL' RIPRAP,12" THICK

    TYPE 'VL' RIPRAP,12" THICK

    LEGEND

    FF = 5986.00

    PROPERTY LINE

    EASEMENT LINE

    LOT LINE

    BUILDING SETBACK LINE

    ADJACENT PROPERTY LINE

    EXISTING

    INDEX CONTOUR

    INTERMEDIATE CONTOUR

    CONCRETE AREA

    ASPHALT AREA

    BUILDING/BUILDING OVERHANG

    RETAINING WALL - SOLID/ROCK

    CHAIN LINK FENCE

    BARBED WIRE FENCE

    PROPOSED

    INDEX CONTOUR

    INTERMEDIATE CONTOUR

    CONCRETE AREA

    ASPHALT AREA

    BUILDING/BUILDING OVERHANG

    RETAINING WALL - SOLIDROCK

    TOP OF WALL/GRADE AT BOTTOMOF WALL

    SPOT ELEVATIONFL = FLOWLINETSW = TOP OF SIDEWALK

    FINISHED FLOOR ELEVATION

    SANITARY SEWER SERVICE LINE

    OVERHEAD ELECTRIC LINE

    UTILITY POLE/GUY WIRE

    STORM DRAIN PIPE/ FLARED END SECTION (FES)

    STORM DRAIN PIPE/ FLAREDEND SECTION (FES)

    RIPRAP

    86.0 TW83.0 FG

    84.96TSW

    5985

    84

    5985

    84

    TREES (EVERGREEN /DECIDUOUS)

    TREES (EVERGREEN /DECIDUOUS)

    GRADING NOTES:1. UNDERGROUND FACILITIES, STRUCTURES AND UTILITIES HAVE BEEN DRAWN FROM AVAILABLE RECORDS ANO/OR SURFACE EVIDENCE. THE

    LOCATION OF ALL UTILITIES MAY NOT BE SHOWN OR MAY NOT HAVE BEEN LOCATED. BELOW GROUND LOCATIONS HAVE NOT BEEN PERFORMED.THEREFORE, THE RELATIONSHIP BETWEEN PROPOSED WORK AND EXISTING FACILITIES, STRUCTURES AND UTILITIES MUST BE CONSIDEREDAPPROXIMATE. ALL UTILITIES SHALL BE LOCATED PRIOR TO ANY EARTH WORK OR DIGGING (1-800-922-1987 OR 811). THE CONTRACTOR SHALL BEFULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MAY BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE ANDPRESERVE ANY AND ALL UTILITIES.

    2. CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING ALL SUBSURFACE UTILITY OWNERS PRIOR TO BEGINNING WORK TO DETERMINELOCATION OF UTILITY FACILITIES.

    3. EXISTING CONDITIONS SHALL BE VERIFIED BY THE GENERAL CONTRACTOR. DISCREPANCIES ARE TO BE REPORTED TO THE ENGINEER PRIOR TOCONSTRUCTION.

    4. M.V.E., INC. OR THE ENGINEER ASSUMES NO RESPONSIBILITY OR LIABILITY FOR USE OF THIS GRADING PLAN FOR ANY OTHER PURPOSE THAN OVERLOT GRADING OPERATIONS.

    5. ALL WEEDS, TRASH, DEBRIS, RUBBLE, BROKEN ASPHALT, ORGANIC MATERIAL (EXCLUDING TOPSOIL) AND REFUSE, OR ANY OTHER MATERIAL WHICHWOULD NOT BE DELETERIOUS AS FILL MATERIAL OR INCAPABLE OF SUPPORTING THE BUILDING, VEHICULAR AND/OR OVERBURDEN LOADS TO BEIMPOSED SHALL BE CLEARED, GRUBBED OR EXCAVATED AS THE CASE MAY DICTATE PRIOR TO GRADING AND SHALL BE REMOVED FROM SITE ANDDISPOSED OF LEGALLY.

    6. PROPOSED CONTOURS SHOWN ARE FINISH GRADES AND READ TO TOP OF PAVEMENT AND FINISH SOIL GRADE.

    7. THE CONTRACTOR SHALL BE RESPONSIBLE TO PROTECT GRADED AREAS FROM, AND AS NECESSARY RESTORE TO GRADE, ANY RUTS, WASHES OROTHER CHANGES FROM THE DESIGN ELEVATIONS SHOWN HEREON, UNTIL GRADING WORK IS ACCEPTED BY THE OWNER OR OWNER'SREPRESENTATIVE.

    8. THE CONTRACTOR SHALL ENDEAVOR NOT TO DISTURB ANY OFFSITE AREAS. THE CONTRACTOR SHALL RESTORE TO THE ORIGINAL CONDITION,ADJACENT (OFF-SITE) PROPERTY DISTURBED BY HIS OPERATIONS.

    9. THE GENERAL CONTRACTOR SHALL STRIP TOPSOIL FROM CONSTRUCTION AREAS AND STOCKPILE TOPSOIL AT AREA SHOWN ON THIS PLAN. PLACETOPSOIL WITH APPROPRIATE EROSION CONTROL AND IN A MANNER SO AS TO NOT CONFLICT WITH OTHER TRADES AND CONSTRUCTIONPROCESS.

    10. ALL GRADING SHALL BE DONE TO INSURE POSITIVE DRAINAGE AWAY FROM FOUNDATIONS AND STRUCTURES.

    11. FINISHED GRADE OF ALL PERVIOUS EARTH SURFACES THAT CONTACT FOUNDATION WALLS SHALL BE A MINIMUM OF 6" BELOW ANY UNTREATEDWOOD MATERIAL OR IN ACCORDANCE WITH APPLICABLE CODES AND THE RECOMMENDATIONS OF THE OWNER'S GEOTECHNICALENGINEERING REPORT OR DESIGN.

    12. PERVIOUS EARTH SURFACES SHALL SLOPE AWAY FROM ALL FOUNDATION WALLS AT A MINIMUM RATE OF 6" IN 10 FEET (5%) FOR THE FIRST 10 FEETADJACENT TO THE FOUNDATION OR IN ACCORDANCE WITH APPLICABLE CODES AND THE RECOMMENDATIONS OF THE OWNER'SGEOTECHNICAL ENGINEERING REPORT OR DESIGN.

    13. CONCRETE OR OTHER IMPERVIOUS SURFACES THAT CONTACT FOUNDATION WALLS SHALL SLOPE AWAY FROM ALL FOUNDATION WALLS AT AMINIMUM RATE OF 1/4" PER FOOT (2.00%) OR IN ACCORDANCE WITH APPLICABLE CODES AND THE RECOMMENDATIONS OF THE OWNER'SGEOTECHNICAL ENGINEERING REPORT OR DESIGN.

    14. ANY FILL MATERIAL REQUIRED TO BRING GRADES UP TO PROPOSED ELEVATIONS SHALL BE PROVIDED BY THE CONTRACTOR.

    15. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DISTRIBUTING TOPSOIL THROUGHOUT THE LAWN AND PLANTING AREAS ACCORDING TOAPPROVED LANDSCAPE PLANS, BY OTHERS.

    16. THE NATURE OF WORK PROPOSED BY THIS PLAN IS GRADING AND THE EXTENT OF SAID PROPOSED GRADING IS SHOWN BY THE EXISTING ANDPROPOSED CONTOURS HEREON.

    17. CONTRACTOR SHALL USE MECHANICAL METHODS TO GO FROM THE EXISTING TO PROPOSED CONTOURS IN ACCORDANCE WITH THIS GRADINGPLAN. QUALITY CONTROL OF SOILS AND GRADING OPERATION WILL BE AS DIRECTED BY OWNERS GEOTECHNICAL ENGINEER.

    18. CONTRACTOR IN THE PERFORMANCE OF HIS GRADING WORK SHALL, AT ALL TIMES, WHETHER OR NOT SPECIFICALLY DIRECTED BY OWNER ORENGINEER, STRICTLY OBSERVE SAFETY PROVISIONS OF ALL FEDERAL, STATE AND MUNICIPAL LAWS AND BUILDING AND CONSTRUCTION CODESRELATING TO PUBLIC SAFETY. CONTRACTOR SHALL CONTINUOUSLY CONDUCT HIS GRADING OPERATIONS WORK IN A MANNER THAT SUCH WORKWILL NOT BECOME A HAZARD TO LIFE AND LIMB, ENDANGER PROPERTY OR ADVERSELY AFFECT THE SAFETY, USE OR STABILITY OF THE PUBLIC WAY,DRAINAGE CHANNEL OR OTHER PROPERTY SHOWN ON THIS GRADING PLAN. GRADING OPERATIONS WORK COMPLETED IN ACCORDANCE WITHTHIS GRADING PLAN WILL NOT BECOME A HAZARD TO LIFE AND LIMB, ENDANGER PROPERTY OR ADVERSELY AFFECT THE SAFETY, USE OR STABILITYOF THE PUBLIC WAY, DRAINAGE CHANNEL, OR OTHER PROPERTY SHOWN ON THIS GRADING PLAN.

    19. WHENEVER OWNER, ENGINEER OR CITY SAFETY DIRECTOR OR HIS DESIGNATED REPRESENTATIVE BECOMES AWARE OF CONTRACTORS FAILURE TOCOMPLY WITH APPLICABLE SAFETY REGULATIONS, THE OWNER, ENGINEER OR CITY SAFETY DIRECTOR OR HIS DESIGNATED REPRESENTATIVE WILLINFORM THE CONTRACTOR WHO SHALL TAKE IMMEDIATE STEPS TO REMEDY THE NONCOMPLIANCE.

    20. CONTRACTOR SHALL PROVIDE APPROPRIATE EROSION CONTROL MEASURES DURING EARTHWORK OPERATIONS TO CONTROL EROSION ANDSEDIMENT TRANSFER TO ADJACENT PROPERTIES. EROSION CONTROL MEASURES ARE NOT LIMITED TO THOSE NOTED ON THE EROSION CONTROLPLAN.

    A. ALL DISTURBED AREAS SHALL BE REVEGETATED OR OTHERWISE LANDSCAPED AFTER CONSTRUCTION IN ACCORDANCE WITH THEREVEGETATION GUIDELINES CONTAINED IN THE STANDARD EROSION CONTROL NOTES ON THIS PLAN AND IN ACCORDANCE WITH THEAPPROVED LANDSCAPE PLAN FOR THIS PROJECT. THE APPROVED LANDSCAPE PLAN DEPICTS SOD AND SEEDING AREAS WITH SPECIFIEDTYPES AND AMOUNTS.

    B. NETTING WILL BE PLACED ON CONSTRUCTED SLOPES GREATER THAN 3:1. SLOPE VALUES ARE ARE SHOWN ON THE PLAN. NETTING SHALL BEGREENFIX AMERICA WS072 OR EQUAL AGRICULTURAL STRAW BLANKET WITH PHOTODEGRADABLE NETTING ON BOTH SIDES. NETTING SHALLBE INSTALLED ACCORDING TO MANUFACTURER'S SPECIFICATIONS.

    C. STRAW BALES WILL BE PLACED AT TOP OF NEWLY CONSTRUCTED SLOPES OF 3:1 OR GREATER AT SELECTED LOCATIONS AS REQUIRED.

    D. PLACE SILT FENCE AS SHOWN ON THE EROSION CONTROL PLAN AND AS MAY BE REQUIRED TO PREVENT SEDIMENT MOVEMENT TO ADJACENTPROPERTY. STRAW BALES OR EROSION CONTROL LOGS MAY BE SUBSTITUTED WITH APPROVAL OF THE ENGINEER.

    22. ALL WORK IN THE PUBLIC RIGHT-OF-WAY SHALL BE PERFORMED ACCORDING TO THE EL PASO COUNTY STANDARD SPECIFICATIONS, LATESTREVISION.

    STANDARD EL PASO COUNTY GRADING & EROSION CONTROL PLAN NOTES1. STORMWATER DISCHARGES FROM CONSTRUCTION SITES SHALL NOT CAUSE OR THREATEN TO CAUSE POLLUTION, CONTAMINATION, OR DEGRADATION OF STATE WATERS. ALL WORK AND EARTHDISTURBANCE SHALL BE DONE IN A MANNER THAT MINIMIZES POLLUTION OF ANY ON-SITE OR OFF-SITE WATERS, INCLUDING WETLANDS.

    2. NOTWITHSTANDING ANYTHING DEPICTED IN THESE PLANS IN WORDS OR GRAPHIC REPRESENTATION, ALL DESIGN AND CONSTRUCTION RELATED TO ROADS, STORM DRAINAGE AND EROSIONCONTROL SHALL CONFORM TO THE STANDARDS AND REQUIREMENTS OF THE MOST RECENT VERSION OF THE RELEVANT ADOPTED EL PASO COUNTY STANDARDS, INCLUDING THE LANDDEVELOPMENT CODE, THE ENGINEERING CRITERIA MANUAL, THE DRAINAGE CRITERIA MANUAL, AND THE DRAINAGE CRITERIA MANUAL VOLUME 2. ANY DEVIATIONS FROM REGULATIONS ANDSTANDARDS MUST BE REQUESTED, AND APPROVED, IN WRITING.

    3. A SEPARATE STORMWATER MANAGEMENT PLAN (SMWP) FOR THIS PROJECT SHALL BE COMPLETED AND AN EROSION AND STORMWATER QUALITY CONTROL PERMIT (ESQCP) ISSUED PRIOR TOCOMMENCING CONSTRUCTION. MANAGEMENT OF THE SWMP DURING CONSTRUCTION IS THE RESPONSIBILITY OF THE DESIGNATED QUALIFIED STORMWATER MANAGER OR CERTIFIED EROSIONCONTROL INSPECTOR. THE SWMP SHALL BE LOCATED ON SITE AT ALL TIMES DURING CONSTRUCTION AND SHALL BE KEPT UP TO DATE WITH WORK PROGRESS AND CHANGES IN THE FIELD.

    4. ONCE THE ESQCP IS APPROVED AND A “NOTICE TO PROCEED” HAS BEEN ISSUED, THE CONTRACTOR MAY INSTALL THE INITIAL STAGE EROSION AND SEDIMENT CONTROL MEASURES ASINDICATED ON THE APPROVED GEC. A PRECONSTRUCTION MEETING BETWEEN THE CONTRACTOR, ENGINEER, AND EL PASO COUNTY WILL BE HELD PRIOR TO ANY CONSTRUCTION. IT IS THERESPONSIBILITY OF THE APPLICANT TO COORDINATE THE MEETING TIME AND PLACE WITH COUNTY STAFF.

    5. CONTROL MEASURES MUST BE INSTALLED PRIOR TO COMMENCEMENT OF ACTIVITIES THAT COULD CONTRIBUTE POLLUTANTS TO STORMWATER. CONTROL MEASURES FOR ALL SLOPES,CHANNELS, DITCHES, AND DISTURBED LAND AREAS SHALL BE INSTALLED IMMEDIATELY UPON COMPLETION OF THE DISTURBANCE.

    6. ALL TEMPORARY SEDIMENT AND EROSION CONTROL MEASURES SHALL BE MAINTAINED AND REMAIN IN EFFECTIVE OPERATING CONDITION UNTIL PERMANENT SOIL EROSION CONTROLMEASURES ARE IMPLEMENTED AND FINAL STABILIZATION IS ESTABLISHED. ALL PERSONS ENGAGED IN LAND DISTURBANCE ACTIVITIES SHALL ASSESS THE ADEQUACY OF CONTROL MEASURES AT THESITE AND IDENTIFY IF CHANGES TO THOSE CONTROL MEASURES ARE NEEDED TO ENSURE THE CONTINUED EFFECTIVE PERFORMANCE OF THE CONTROL MEASURES. ALL CHANGES TO TEMPORARYSEDIMENT AND EROSION CONTROL MEASURES MUST BE INCORPORATED INTO THE STORMWATER MANAGEMENT PLAN.

    7. TEMPORARY STABILIZATION SHALL BE IMPLEMENTED ON DISTURBED AREAS AND STOCKPILES WHERE GROUND DISTURBING CONSTRUCTION ACTIVITY HAS PERMANENTLY CEASED ORTEMPORARILY CEASED FOR LONGER THAN 14 DAYS.

    8. FINAL STABILIZATION MUST BE IMPLEMENTED AT ALL APPLICABLE CONSTRUCTION SITES. FINAL STABILIZATION IS ACHIEVED WHEN ALL GROUND DISTURBING ACTIVITIES ARE COMPLETE AND ALLDISTURBED AREAS EITHER HAVE A UNIFORM VEGETATIVE COVER WITH INDIVIDUAL PLANT DENSITY OF 70 PERCENT OF PRE-DISTURBANCE LEVELS ESTABLISHED OR EQUIVALENT PERMANENTALTERNATIVE STABILIZATION METHOD IS IMPLEMENTED. ALL TEMPORARY SEDIMENT AND EROSION CONTROL MEASURES SHALL BE REMOVED UPON FINAL STABILIZATION AND BEFORE PERMITCLOSURE.

    9. ALL PERMANENT STORMWATER MANAGEMENT FACILITIES SHALL BE INSTALLED AS DESIGNED IN THE APPROVED PLANS. ANY PROPOSED CHANGES THAT EFFECT THE DESIGN OR FUNCTION OFPERMANENT STORMWATER MANAGEMENT STRUCTURES MUST BE APPROVED BY THE ECM ADMINISTRATOR PRIOR TO IMPLEMENTATION.

    10. EARTH DISTURBANCES SHALL BE CONDUCTED IN SUCH A MANNER SO AS TO EFFECTIVELY MINIMIZE ACCELERATED SOIL EROSION AND RESULTING SEDIMENTATION. ALL DISTURBANCES SHALL BEDESIGNED, CONSTRUCTED, AND COMPLETED SO THAT THE EXPOSED AREA OF ANY DISTURBED LAND SHALL BE LIMITED TO THE SHORTEST PRACTICAL PERIOD OF TIME. PRE-EXISTING VEGETATIONSHALL BE PROTECTED AND MAINTAINED WITHIN 50 HORIZONTAL FEET OF A WATERS OF THE STATE UNLESS SHOWN TO BE INFEASIBLE AND SPECIFICALLY REQUESTED AND APPROVED.

    11. COMPACTION OF SOIL MUST BE PREVENTED IN AREAS DESIGNATED FOR INFILTRATION CONTROL MEASURES OR WHERE FINAL STABILIZATION WILL BE ACHIEVED BY VEGETATIVE COVER. AREASDESIGNATED FOR INFILTRATION CONTROL MEASURES SHALL ALSO BE PROTECTED FROM SEDIMENTATION DURING CONSTRUCTION UNTIL FINAL STABILIZATION IS ACHIEVED. IF COMPACTIONPREVENTION IS NOT FEASIBLE DUE TO SITE CONSTRAINTS, ALL AREAS DESIGNATED FOR INFILTRATION AND VEGETATION CONTROLMEASURES MUST BE LOOSENED PRIOR TO INSTALLATION OF THE CONTROL MEASURE(S).

    12. ANY TEMPORARY OR PERMANENT FACILITY DESIGNED AND CONSTRUCTED FOR THE CONVEYANCE OF STORMWATER AROUND, THROUGH, OR FROM THE EARTH DISTURBANCE AREA SHALL BEA STABILIZED CONVEYANCE DESIGNED TO MINIMIZE EROSION AND THE DISCHARGE OF SEDIMENT OFF SITE.

    13. CONCRETE WASH WATER SHALL BE CONTAINED AND DISPOSED OF IN ACCORDANCE WITH THE SWMP. NO WASH WATER SHALL BE DISCHARGED TO OR ALLOWED TO ENTER STATE WATERS,INCLUDING ANY SURFACE OR SUBSURFACE STORM DRAINAGE SYSTEM OR FACILITIES. CONCRETE WASHOUTS SHALL NOT BE LOCATED IN AN AREA WHERE SHALLOW GROUNDWATER MAY BEPRESENT, OR WITHIN 50 FEET OF A SURFACE WATER BODY, CREEK OR STREAM.

    14. DURING DEWATERING OPERATIONS OF UNCONTAMINATED GROUND WATER MAY BE DISCHARGED ON SITE, BUT SHALL NOT LEAVE THE SITE IN THE FORM OF SURFACE RUNOFF UNLESS ANAPPROVED STATE DEWATERING PERMIT IS IN PLACE.

    15. EROSION CONTROL BLANKETING OR OTHER PROTECTIVE COVERING SHALL BE USED ON SLOPES STEEPER THAN 3:1.

    16. CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL OF ALL WASTES FROM THE CONSTRUCTION SITE FOR DISPOSAL IN ACCORDANCE WITH LOCAL AND STATE REGULATORYREQUIREMENTS. NO CONSTRUCTION DEBRIS, TREE SLASH, BUILDING MATERIAL WASTES OR UNUSED BUILDING MATERIALS SHALL BE BURIED, DUMPED, OR DISCHARGED AT THE SITE.

    17. WASTE MATERIALS SHALL NOT BE TEMPORARILY PLACED OR STORED IN THE STREET, ALLEY, OR OTHER PUBLIC WAY, UNLESS IN ACCORDANCE WITH AN APPROVED TRAFFIC CONTROL PLAN.CONTROL MEASURES MAY BE REQUIRED BY EL PASO COUNTY ENGINEERING IF DEEMED NECESSARY, BASED ON SPECIFIC CONDITIONS AND CIRCUMSTANCES.

    18. TRACKING OF SOILS AND CONSTRUCTION DEBRIS OFF-SITE SHALL BE MINIMIZED. MATERIALS TRACKED OFF-SITE SHALL BE CLEANED UP AND PROPERLY DISPOSED OF IMMEDIATELY.

    19. THE OWNER/DEVELOPER SHALL BE RESPONSIBLE FOR THE REMOVAL OF ALL CONSTRUCTION DEBRIS, DIRT, TRASH, ROCK, SEDIMENT, SOIL, AND SAND THAT MAY ACCUMULATE IN ROADS,STORM DRAINS AND OTHER DRAINAGE CONVEYANCE SYSTEMS AND STORMWATER APPURTENANCES AS A RESULT OF SITE DEVELOPMENT.

    20. THE QUANTITY OF MATERIALS STORED ON THE PROJECT SITE SHALL BE LIMITED, AS MUCH AS PRACTICAL, TO THAT QUANTITY REQUIRED TO PERFORM THE WORK IN AN ORDERLY SEQUENCE. ALLMATERIALS STORED ON-SITE SHALL BE STORED IN A NEAT, ORDERLY MANNER, IN THEIR ORIGINAL CONTAINERS, WITH ORIGINAL MANUFACTURER’S LABELS.

    21. NO CHEMICAL(S) HAVING THE POTENTIAL TO BE RELEASED IN STORMWATER ARE TO BE STORED OR USED ONSITE UNLESS PERMISSION FOR THE USE OF SUCH CHEMICAL(S) IS GRANTED INWRITING BY THE ECM ADMINISTRATOR. IN GRANTING APPROVAL FOR THE USE OF SUCH CHEMICAL(S), SPECIAL CONDITIONS AND MONITORING MAY BE REQUIRED.

    22. BULK STORAGE OF ALLOWED PETROLEUM PRODUCTS OR OTHER ALLOWED LIQUID CHEMICALS IN EXCESS OF 55 GALLONS SHALL REQUIRE ADEQUATE SECONDARY CONTAINMENT PROTECTIONTO CONTAIN ALL SPILLS ONSITE AND TO PREVENT ANY SPILLED MATERIALS FROM ENTERING STATE WATERS, ANY SURFACE OR SUBSURFACE STORM DRAINAGE SYSTEM OR OTHER FACILITIES.

    23. NO PERSON SHALL CAUSE THE IMPEDIMENT OF STORMWATER FLOW IN THE CURB AND GUTTER OR DITCH EXCEPT WITH APPROVED SEDIMENT CONTROL MEASURES.

    24. OWNER/DEVELOPER AND THEIR AGENTS SHALL COMPLY WITH THE “COLORADO WATER QUALITY CONTROL ACT” (TITLE 25, ARTICLE 8, CRS), AND THE “CLEAN WATER ACT” (33 USC 1344), INADDITION TO THE REQUIREMENTS OF THE LAND DEVELOPMENT CODE, DCM VOLUME II AND THE ECM APPENDIX I. ALL APPROPRIATE PERMITS MUST BE OBTAINED BY THE CONTRACTOR PRIOR TOCONSTRUCTION (1041, NPDES, FLOODPLAIN, 404, FUGITIVE DUST, ETC.). IN THE EVENT OF CONFLICTS BETWEEN THESE REQUIREMENTS AND OTHER LAWS, RULES, OR REGULATIONS OF OTHERFEDERAL, STATE, LOCAL, OR COUNTY AGENCIES, THE MOST RESTRICTIVE LAWS, RULES, OR REGULATIONS SHALL APPLY.

    25. ALL CONSTRUCTION TRAFFIC MUST ENTER/EXIT THE SITE ONLY AT APPROVED CONSTRUCTION ACCESS POINTS.

    26. PRIOR TO CONSTRUCTION THE PERMITTEE SHALL VERIFY THE LOCATION OF EXISTING UTILITIES.

    27. A WATER SOURCE SHALL BE AVAILABLE ON SITE DURING EARTHWORK OPERATIONS AND SHALL BE UTILIZED AS REQUIRED TO MINIMIZE DUST FROM EARTHWORK EQUIPMENT AND WIND.

    28. THE SOILS REPORT FOR THIS SITE HAS BEEN PREPARED BY ____________________________________ AND SHALL BE CONSIDERED A PART OF THESE PLANS.

    29. AT LEAST TEN (10) DAYS PRIOR TO THE ANTICIPATED START OF CONSTRUCTION, FOR PROJECTS THAT WILL DISTURB ONE (1) ACRE OR MORE, THE OWNER OR OPERATOR OF CONSTRUCTIONACTIVITY SHALL SUBMIT A PERMIT APPLICATION FOR STORMWATER DISCHARGE TO THE COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT, WATER QUALITY DIVISION. THEAPPLICATION CONTAINS CERTIFICATION OF COMPLETION OF A STORMWATER MANAGEMENT PLAN (SWMP), OF WHICH THIS GRADING AND EROSION CONTROL PLAN MAY BE A PART. FORINFORMATION OR APPLICATION MATERIALS CONTACT:

    COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENTWATER QUALITY CONTROL DIVISIONWQCD – PERMITS4300 CHERRY CREEK DRIVE SOUTHDENVER, CO 80246-1530ATTN: PERMITS UNIT

    BENCHMARK

    EN

    GIN

    EE

    RS

    SU

    RV

    EY

    OR

    SM

    VE

    , IN

    C.

    MV

    E, I

    NC

    .

    ,

    ..

    EN

    GIN

    EE

    RS

    SU

    RV

    EY

    OR

    S

    CHECKED BY _____

    DESIGNED BY

    ___________________

    CHECKED BY _____ ___________________

    REVISIONS

    OF

    AS-BUILTS BY

    MVE DRAWING

    MVE PROJECT

    DRAWN BY

    SHEET

    61092

    Monument SmallEngine Storage

    -GEC-ND

    C1.2NOTES & DETAILS

    2 5OCTOBER 11, 2019

    1. PCD FILE NO. PPR-18-013 GEC PLANS APPROVED. 08/23/18

    2. SITE CHANGES 09/27/19

    3. EPC RESUBMITTAL 10/11/19

    Z:\6

    1092

    \_Sh

    eet D

    wgs

    \610

    92-G

    EC-N

    D.d

    wg,

    10/

    14/2

    019

    9:14

    :08

    AM

    , TJC

    AD

    D

    AutoCAD SHX Text1-800-922-1987

    AutoCAD SHX TextBEFORE

    AutoCAD SHX TextDIG...

    AutoCAD SHX TextYOU

    AutoCAD SHX TextCALL

    AutoCAD SHX Text1-800-922-1987

    AutoCAD SHX TextR

    AutoCAD SHX TextLOCATORS

    AutoCAD SHX TextAND WASTEWATER

    AutoCAD SHX TextELECTRIC, WATER

    AutoCAD SHX TextAND MARKING GAS,

    AutoCAD SHX TextFOR LOCATING

    AutoCAD SHX TextO

    AutoCAD SHX TextL

    AutoCAD SHX TextL

    AutoCAD SHX TextF

    AutoCAD SHX TextB

    AutoCAD SHX TextE

    AutoCAD SHX TextO

    AutoCAD SHX TextR

    AutoCAD SHX TextE

    AutoCAD SHX TextL

    AutoCAD SHX TextU

    AutoCAD SHX TextY

    AutoCAD SHX TextO

    AutoCAD SHX TextA

    AutoCAD SHX TextC

    AutoCAD SHX TextR

    AutoCAD SHX TextD

    AutoCAD SHX TextG

    AutoCAD SHX TextI

    AutoCAD SHX TextO

    AutoCAD SHX TextD

    AutoCAD SHX TextA

    AutoCAD SHX TextR

    AutoCAD SHX TextO

    AutoCAD SHX TextC

    AutoCAD SHX TextF

    AutoCAD SHX TextO

    AutoCAD SHX TextCALL UTILITY

    AutoCAD SHX TextBEFORE YOU DIG,

    AutoCAD SHX Text48 HOURS

    AutoCAD SHX TextE

    AutoCAD SHX TextC

    AutoCAD SHX TextT

    AutoCAD SHX TextY

    AutoCAD SHX TextT

    AutoCAD SHX TextI

    AutoCAD SHX TextL

    AutoCAD SHX TextI

    AutoCAD SHX TextT

    AutoCAD SHX TextU

    AutoCAD SHX TextO

    AutoCAD SHX TextN

    AutoCAD SHX TextT

    AutoCAD SHX TextA

    AutoCAD SHX TextC

    AutoCAD SHX TextI

    AutoCAD SHX TextF

    AutoCAD SHX TextI

    AutoCAD SHX TextN

    AutoCAD SHX TextO

    AutoCAD SHX TextI

    AutoCAD SHX TextE

    AutoCAD SHX TextT

    AutoCAD SHX TextN

    AutoCAD SHX Text2ND STREET

    AutoCAD SHX Text3RD STREET

    AutoCAD SHX Text4TH STREET

    AutoCAD SHX Text5TH STREET

    AutoCAD SHX TextWASHINGTON

    AutoCAD SHX TextMITCHELL AVE.

    AutoCAD SHX TextMONUMENT LAKE ROAD

    AutoCAD SHX TextFORMER COLO.SPGS.-DENVER ROAD

    AutoCAD SHX TextCOLORADO

    AutoCAD SHX TextHIGHWAY 105

    AutoCAD SHX TextD&RG RAIL ROAD

    AutoCAD SHX TextSITE

    AutoCAD SHX TextNTS

    AutoCAD SHX TextCULVERT

    AutoCAD SHX TextPIPE

    AutoCAD SHX TextPIPE

    AutoCAD SHX TextCULVERT

    AutoCAD SHX TextTYPE L RIPRAP

    AutoCAD SHX TextFLARED END SECTION

    AutoCAD SHX TextMIRIFI FW 700 OR EQUAL

    AutoCAD SHX TextFLOW

    AutoCAD SHX TextFILTER FABRIC

    AutoCAD SHX TextFLOW

    AutoCAD SHX Text9"

  • 37'

    5'

    1.50

    '

    WQCV PIPERIM=59.76'

    EMERGENCYSPILLWAY=60.00'POND BTM

    EL=58.5'

    27'

    MONUMENT SMALL ENGINE STORAGESAND FILTER BASIN POND SECTION

    SCALE = 1"=10'

  • Stormwater Facility Name:

    Facility Location & Jurisdiction:

    User Input: Watershed Characteristics User Defined User Defined User Defined User DefinedWatershed Slope = 0.020 ft/ft Stage [ft] Area [ft^2] Stage [ft] Discharge [cfs]

    Watershed Length = 561 ft 0.00 1,322 0.00 0.00Watershed Area = 2.96 acres 0.25 1,453 0.25 0.05

    Watershed Imperviousness = 63.3% percent 0.50 1,619 0.50 0.05Percentage Hydrologic Soil Group A = 0.0% percent 0.75 1,763 0.75 0.05Percentage Hydrologic Soil Group B = 100.0% percent 1.00 1,912 1.00 0.05

    Percentage Hydrologic Soil Groups C/D = 0.0% percent 1.25 2,065 1.25 0.061.50 2,335 1.50 0.93

    User Input 17 1.75 2,538 1.75 1.352.00 2,750 2.00 1.642.25 2,972 2.25 7.74   2.50 3,203 2.50 19.30

    WQCV Treatment Method = 12.00 hours

    After completing and printing this worksheet to a pdf, go to:https://maperture.digitaldataservices.com/gvh/?viewer=cswdifcreate a new stormwater facility, and attach the pdf of this worksheet to that record.

    Routed Hydrograph ResultsDesign Storm Return Period = WQCV 2 Year 5 Year 10 Year 50 Year 100 Year

    One‐Hour Rainfall Depth = 0.60 1.19 1.50 1.75 2.25 2.52 inCalculated Runoff Volume = 0.049 0.168 0.226 0.291 0.441 0.523 acre‐ft

    OPTIONAL Override Runoff Volume = acre‐ftInflow Hydrograph Volume = 0.049 0.168 0.225 0.291 0.440 0.522 acre‐ft

    Time to Drain 97% of Inflow Volume = 13.4 13.0 12.6 12.1 11.2 10.6 hoursTime to Drain 99% of Inflow Volume = 15.4 15.2 14.6 14.3 13.6 13.3 hours

    Maximum Ponding Depth = 1.08 1.81 2.04 2.09 2.21 2.28 ftMaximum Ponded Area = 0.05 0.06 0.06 0.06 0.07 0.07 acres

    Maximum Volume Stored = 0.041 0.079 0.093 0.096 0.104 0.108 acre‐ft

    Location for 1‐hr Rainfall Depths (use dropdown):

    Workbook Protected Worksheet Protected

    Stormwater Detention and Infiltration Design Data Sheet

    Monument Small Engine Storage ‐ Sand Filter Basin

    137 N. Monument Lake Road, El Paso County, Colorado

    61092 SDI_Design_Data_v1.08.xlsm, Design Data 10/14/2019, 11:00 AM

  • WQCV_Trigger = 1RunOnce= 1

    CountA= 1Draintime Coeff= 0.8

    0 1 2 3#N/A#N/A0 1 2 3

    #N/A#N/A

    Check Data Set 1 Check Data Set 1

    Area

    Discharge

    Stormwater Detention and Infiltration Design Data Sheet

    0

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    0.1 1 10

    FLOW

     [cfs]

    TIME [hr]

    100YR IN

    100YR OUT

    50YR IN

    50YR OUT

    10YR IN

    10YR OUT

    5YR IN

    5YR OUT

    2YR IN

    2YR OUT

    WQCV IN

    WQCV OUT

    0

    0.5

    1

    1.5

    2

    2.5

    0.1 1 10 100

    POND

    ING DE

    PTH [ft

    ]

    DRAIN TIME [hr]

    100YR

    50YR

    10YR

    5YR

    2YR

    WQCV

    61092 SDI_Design_Data_v1.08.xlsm, Design Data 10/14/2019, 11:00 AM

    61092 ds_impound_form-s61092 Hazard Classification Statement61092 Pond Plan & Planned Structure Location Map61092 Pond SectionSheets and ViewsModel

    61092 SDI_Design_Data_v1.08