I am an Intern Architect, currently working in SERA Architecture's office on the Collaborative Life Sciences Building in Portland, OR
Citation preview
CONTENTS
2010 - Xi Xi Wetlands Preserve - Net Zero Design Charette
2011 - “Testing the Double Skin Facade: Jaqua Academic Learning Center”
2011 - University of British Columbia - School of Integrated Planning and Design (IPD)
2012 - OUS/OHSU Collaborative Life Sciences Building
2010 - Xi Xi Wetlands Preserve - Net Zero Design Charette
2011 - “Testing the Double Skin Facade: Jaqua Academic Learning Center”
2011 - University of British Columbia - School of Integrated Planning and Design (IPD)
2012 - OUS/OHSU Collaborative Life Sciences Building
OUS/OHSU COLLABORATIVE LIFE SCIENCES BUILDING
LEVEL 2 NORTH69' 0"
LEVEL 3 NORTH84' 0"
1.72 15A423
2A423
4A423
A4241
A4363
A4231
3' 4
1/2"
4 1/2"
10'
10 1/
2"6'
6"
6' 0
"1'
6"
1' 6
"
LINE OFREVEAL
5A708
22
A721
G3
G5
32R6
21E6
2A781
22
A723
9' 0
"
3' 7
1/2"
LEVEL 150' 3"
LEVEL 2 NORTH69' 0"
LEVEL 3 NORTH84' 0"
PARK 140' 0"
A
LEVEL 1M NORTH54' 6"
07 42 13METAL WALLPANELSWD1
05 12 00 HSSTUBE STEEL
08 44 13 ALUMFRAMEDCURTAIN WALLG5
07 42 13METAL WALLPANELSWD2
22 00 00 SDPIPE BEYONDWD2
A7812
2' 0"
2' 1 1/2"
A7241
A7085
A71212
A71210
A7127
LINE OF REVEAL
1"4'
0 1/
2"3'
4 1/
4"8'
0"
3' 7
3/4"
1' 6
"1'
5 3/4"
10'
11 1/
2"4 1
/2"12
' 2 1
/2"1'
5"
A
B
2 1
07 42 13METAL WALLPANELSWD1
05 12 00 HSS TUBE STEEL
08 44 13 ALUM FRAMEDCURTAIN WALLG5
07 42 13 METALWALL PANELSWD2/32R6
39'
0"
30' 4"
11' 1 1/2"
1' 5 1/2"
1' 7
"1'
9"
3' 5
"5'
2"
5' 2
"5'
2"
5' 2
"3'
7"
1' 7
"1'
9"
1' 7"1' 7"3' 8"5' 3"5' 3"3' 8"1' 7"1' 7"
A72123
A72122
A
B
2 1
1' 7
"7'
0"
6' 1
1"5'
2"
5' 2
"3'
5"
1' 9
"
1' 7" 1' 7" 3' 8" 5' 3" 5' 3" 3' 6" 1' 9" 1' 7"
1' 9
"
27'
6"
1' 9" 17' 6" 1' 9"
A72123
A72122
LEVEL 150' 3"
LEVEL 2 NORTH69' 0"
LEVEL 3 NORTH84' 0"
PARK 140' 0"
A B
LEVEL 1M NORTH54' 6"
2A423
4A423
A4361
A4221
A4221
9' 0
"2'
4 1/
2"4'
1 1/
2"
LINE OFREVEAL
1A706
22
A721
23A721
2A781
12A712
10A712
7A712
23
A723
1A724
21E6
G3
G5
6A712
32R6
22
A723
9' 0
"
3' 7
1/2"
3"3'
1 1/
2"4 1
/2"10
' 10
1/2"
XP1N110
1' 1
1"
10'
3"
3"5 1
/4"
07 42 13
07 42 13
07 42 13
COMPOSITE SHEETS LEGEND
UNITIZED, NOMINAL 7" DEEP. ALL VISIONUNLESS OTHERWISE NOTED.
UNITIZED, NOMINAL 7" DEEP.
BUTT GLAZED, CAPTURED TOP AND BOTTOM
METAL WALL PANELALUMINUM CORRUGATED. PERFORATED, U.O.N.
METAL WALL PANEL.ALUMINUM CORRUGATED. SCREEN CONDITIONPERFORATED, U.O.N.
METAL WALL PANEL. WALL CLADDING.
ALUMINUM FRAMED SKYLIGHTS, 8" DEEP.
METAL WALL PANEL AND SCREEN CONDITION
METAL WALL PANEL. SCREEN CONDITION,FINISHED CLADDING ON BOTH SIDES
UNITIZED, NOMINAL 9" DEEP. ALL VISION.
07 42 13 METAL WALL PANEL. WALL CLADDING.
07 42 13
METAL WALL PANEL. WALL CLADDING.07 42 13
07 42 13 METAL WALL PANEL. WALL CLADDING.
METAL WALL PANEL. WALL CLADDING.07 42 13
21E6
21F0
33R6
29E6
28R4
28R0
34E1
25F6
07 42 13 METAL WALL PANEL.ALUMINUM CORRUGATED. SCREEN CONDITION PERFORATED, U.O.N.
31F0
35E1 07 42 13
METAL WALL PANEL. WALL CLADDING.07 42 13 32R6
METAL WALL PANEL. WALL CLADDING.07 42 13 32U0
G2
G3
G4
G5
S1
WA / 21E6 AND 21F0 REFER TO SPECIFICATIONS(07 42 13 CORRUGATED, % PERFORATED)SEE ENLARGED ELEVATIONS A315A323B FORPERFORATION TYPES AND PATTERN
CLEAR VISION
1. SEE SHEET A011 FOR WALL ASSEMBLIES2. SEE A310A AND A310B FOR WALL AND GLAZING TYPE LOCATIONS3. SEE ENLARGED ELEVATIONS FOR PERFORATION TYPE LOCATIONS
08 43 13
08 43 13
08 43 13
08 43 13
08 63 00
21
ISSUE DATE:PROJECT NO.:
CHECKED BY:
REVISIONS
Thes
e dra
wing
s and
their
conte
nt ar
e the
prop
erty
of SE
RA A
rchite
cts In
c. an
d are
to be
utiliz
ed on
this
proje
ct. R
epro
ducti
on of
any p
art o
f this
mater
ial, w
ithou
t the e
xpre
ss w
ritten
perm
ission
of S
ERA
Arch
itects
Inc.
is pr
ohibi
ted.
SER
A AR
CH
ITEC
TS C
OPY
RIG
HT
2012
ST
3920
S.W
. Mac
adam
Ave
nue,
MC
104
Por
tland
, Ore
gon
9723
9
1/27
/201
2 11
:02:
51 A
M
A423
01/30/1210082
ADDE
NDUM
D
OU
S/C
LSB
OU
S / O
HSU
CO
LLA
BO
RA
TIVE
LIF
E SC
IEN
CES
BU
ILD
ING
& O
HSU
SK
OU
RTE
S TO
WER
EXTERIORCOMPOSITE
1/4" = 1'0" 3ENLARGED NORTH ELEVATION DENTIST LOBBY
6AXONOMETRIC DENTAL LOBBY CANOPY
1/4" = 1'0" 5SECTION METAL CANOPY
1/4" = 1'0" 2ENLARGED ROOF PLAN DENTIST LOBBY CANOPY 1/4" = 1'0" 4DENTIST LOBBY CANOPY_RCP
1/4" = 1'0" 1ENLARGED WEST ELEVATION DENTIST LOBBY
KEYPLAN
21E6
32R6
G5
G3
LEVEL 1 CONCRETE AND BELOWPER PREVIOUSLY PERMITTED
SEPARATE PACKAGE
17 ADDENDUM C 2012.01.1121 ADDENDUM D 2012.01.30
21
I worked for SERA Architects and CO Architects on the Collaborative Life Sciences Building, which is being built on the south waterfront in Portland, OR(documents from CLSB are provided with the permission of SERA Architects)
SERA Architects and CO Architects - Portland, OR
My fi rst task on the project was setting up perspective renderings for the Portland Design Review Committee.
I worked on the Structure and Envelope permit set, laying out the exterior composite sheets, and cleaned up the line work on the drawings.
LEVEL 150' 3"
LEVEL 2 NORTH69' 0"
LEVEL 3 NORTH84' 0"
PARK 140' 0"
345 4.7
LEVEL 1M NORTH54' 6"
4A424
2A424
3A424
A4233
5' 3"5' 3"5' 3"5' 3"5' 3"5' 3"5' 3"5' 3"5' 3"5' 3"5' 3"5' 3"5' 3"
3' 4
1/2"
11'
3"4'
1 1/
2"2'
4 1/
2"6'
0"
1' 6
"1'
6"
6' 0
"
A4251
A4363
LINE OFREVEAL
8A712
4A712
2A724
G3
21E6
G5
21E6 CEILINGBEYOND
32R6
16
A721 08 33 26COILING GRILLE
08 33 26 COILING GRILLE
345
A
4.7
5' 3"5' 3"3' 8"1' 7"1' 7"17' 10"1' 7"1' 7"12' 7"1' 7"1' 7"3' 8"
1' 9
"6"
7"
1' 4
1/2"
FACE OFFINISH
FACE OFGLASS
FACE OFFINISH
FACE OFFINISH 12 93 00 BOLLARDS
21
FACE OFDOOR
LOADING DOCK DOORGARAGE EXIT GARAGE ENTRANCE
3' 4
" 1' 7
"1'
9"
9"
345
A
4.7
3' 8" 12' 7" 17' 10" 5' 3"5' 3"3' 8"1' 7"1' 7" 1' 7"1' 7" 1' 7"1' 7"
1' 9
"5"7"
FACE OFCOLUMN
FACE OFGLASS
A72111
A72123
A72116
FACE OFCOLUMN
FACE OFCOLUMN
LEVEL 150' 3"
LEVEL 2 NORTH69' 0"
LEVEL 3 NORTH84' 0"
PARK 140' 0"
A
LEVEL 1M NORTH54' 6"
2' 4
1/2"
3' 7
1/2"
8' 0
"3'
4 1/
2"3'
10"
3 1/2"
3' 3
"
1' 0
"
10'
4 1/2"
5"
FACE OFMETAL PANEL
FACE OFGLASS
A7242
A71212
A71210
A7127
32U0
32R6
3' 4
3/8"
LINE OFREVEAL
2' 1 1/2" 1"
7 1/8"
07 42 13
07 42 13
07 42 13
COMPOSITE SHEETS LEGEND
UNITIZED, NOMINAL 7" DEEP. ALL VISIONUNLESS OTHERWISE NOTED.
UNITIZED, NOMINAL 7" DEEP.
BUTT GLAZED, CAPTURED TOP AND BOTTOM
METAL WALL PANELALUMINUM CORRUGATED. PERFORATED, U.O.N.
METAL WALL PANEL.ALUMINUM CORRUGATED. SCREEN CONDITIONPERFORATED, U.O.N.
METAL WALL PANEL. WALL CLADDING.
ALUMINUM FRAMED SKYLIGHTS, 8" DEEP.
METAL WALL PANEL AND SCREEN CONDITION
METAL WALL PANEL. SCREEN CONDITION,FINISHED CLADDING ON BOTH SIDES
UNITIZED, NOMINAL 9" DEEP. ALL VISION.
07 42 13 METAL WALL PANEL. WALL CLADDING.
07 42 13
METAL WALL PANEL. WALL CLADDING.07 42 13
07 42 13 METAL WALL PANEL. WALL CLADDING.
METAL WALL PANEL. WALL CLADDING.07 42 13
21E6
21F0
33R6
29E6
28R4
28R0
34E1
25F6
07 42 13 METAL WALL PANEL.ALUMINUM CORRUGATED. SCREEN CONDITION PERFORATED, U.O.N.
31F0
35E1 07 42 13
METAL WALL PANEL. WALL CLADDING.07 42 13 32R6
METAL WALL PANEL. WALL CLADDING.07 42 13 32U0
G2
G3
G4
G5
S1
WA / 21E6 AND 21F0 REFER TO SPECIFICATIONS(07 42 13 CORRUGATED, % PERFORATED)SEE ENLARGED ELEVATIONS A315A323B FORPERFORATION TYPES AND PATTERN
CLEAR VISION
1. SEE SHEET A011 FOR WALL ASSEMBLIES2. SEE A310A AND A310B FOR WALL AND GLAZING TYPE LOCATIONS3. SEE ENLARGED ELEVATIONS FOR PERFORATION TYPE LOCATIONS
08 43 13
08 43 13
08 43 13
08 43 13
08 63 00
21
ISSUE DATE:PROJECT NO.:
CHECKED BY:
REVISIONS
Thes
e dra
wing
s and
their
conte
nt ar
e the
prop
erty
of SE
RA A
rchite
cts In
c. an
d are
to be
utiliz
ed on
this
proje
ct. R
epro
ducti
on of
any p
art o
f this
mater
ial, w
ithou
t the e
xpre
ss w
ritten
perm
ission
of S
ERA
Arch
itects
Inc.
is pr
ohibi
ted.
SER
A AR
CH
ITEC
TS C
OPY
RIG
HT
2012
ST
3920
S.W
. Mac
adam
Ave
nue,
MC
104
Por
tland
, Ore
gon
9723
9
1/27
/201
2 11
:03:
04 A
M
A424
01/30/1210082
ADDE
NDUM
D
OU
S/C
LSB
OU
S / O
HSU
CO
LLA
BO
RA
TIVE
LIF
E SC
IEN
CES
BU
ILD
ING
& O
HSU
SK
OU
RTE
S TO
WER
EXTERIORCOMPOSITE
5AXONOMETRIC
1/4" = 1'0" 1ENLARGED ELEVATION NORTH TOWER B
1/4" = 1'0" 3ENLARGED PLAN LEVEL 1
1/4" = 1'0" 2ENLARGED PLAN LEVEL 1M NORTH
1/4" = 1'0" 4SECTION AT PARKING ENTRY
KEYPLAN
G3
G5
32U0
32R6
LEVEL 1 CONCRETE AND BELOWPER PREVIOUSLY PERMITTED
SEPARATE PACKAGE
21 ADDENDUM D 2012.01.30
21
OUS/OHSU COLLABORATIVE LIFE SCIENCES BUILDING
I worked for SERA Architects and CO Architects on the Collaborative Life Sciences Building, which is being built on the south waterfront in Portland, OR (documents from CLSB are provided with the permission of SERA Architects)
Once the exterior permits were submitted, I moved to the Interiors team, and took over the 1500 door schedule. I coordinated with hardware and security consultants, standardized the
doors used on the project, created details of many different interior elements, and helped to clean up the floor and ceiling plans
I also created and updated enclosure detail drawings for the Envelope package.
FACE
OF
META
LPA
NEL
03 30 00 CONCRETE CURB SEESTRUCTURAL
07 62 00 BLACK ALUMINUM FLASHING 2" MIN ABOVE WALKINGSURFACE, VARY HEIGHT OFFLASHING TO ACCEPT WALKINGSURFACE SLOPE
07 90 05 JOINT SEALERS TYPE 9
WALL ASSEMBLY PERSHEET A310 AND A011
8" M
IN
T. O. CURB
T. O.WALKINGSURFACE
07 17 13 BENTONITE PANELWATERPROOFING PREVIOUSPACKAGE
ALIGN
32 13 13 SITE CONCRETE SEE LANDSCAPE
09 29 00 GYPSUM BOARD SEPARATE PACKAGE
07 62 00 METAL FLASHING
07 17 13 STAINLESS STEELFASTENERS 12" O.C. MAX
07 21 00 THERMAL INSULATION TYPE 22 SEPARATE PACKAGE
07 21 00 THERMAL INSULATION TYPE 1
FACE
OF
FINI
SH
03 30 00 CONCRETE CURB
07 17 13 BENTONITE PANELWATERPROOFING PREVIOUS PACKAGE
FINISH
WALL ASSEMBLY PERSHEET A310 AND A011
SLOPE GRADE AWAY FROMBUILDING @ 2% MIN.
07 25 01 WATER SHEDDINGMEMBRANE
2" M
IN
T. O. CURB
6" M
IN CONCRETE CURB
07 62 00 STAINLESS STEELFLASHING
ALIGN
07 21 00 THERMAL INSULATION TYPE 22 SEPARATE PACKAGE
07 21 00 THERMAL INSULATION TYPE 1
09 29 00 GYPSUM BOARD SEPARATE PACKAGE
1"
SEAL PENETRATIONSBENEATH SILL PAN
CONC
MIN
SEALANT OVERFASTENER HEADS
2"
WATERPROOFING FROMBELOW AS OCCURS
08 44 13 SILLEXTENSION
FACE
OF
GLAS
S
07 62 00 ALUMINUM FLASHING,PAINTED BLACK
08 44 13 ALUMINUM FRAMECURTAIN WALL PER SHEETA310 A & B
07 90 05 SEALANT WITH BACKER ROD
07 90 05 SEALANT
4"
07 90 05 SEALANT WITH WEEPS
INTERIOR FINISH SEP. PACKAGE
07 62 00 ALUMINUMBACK ANGLE WITHEND DAM
2" M
IN
21
1"
SEAL PENETRATIONSBENEATH SILL PAN
CONC
RETE
SEALANT OVERFASTENER HEADS
WATERPROOFING FROMBELOW AS OCCURS
08 43 13 SILLEXTENSION
FACE
OF
GLAS
S
08 44 13 ALUMINUM FRAME CURTAINWALL PER SHEET A310 A & B
07 90 05 SEALANTWITH BACKER ROD,WEEPS, TYP
MIN.6"
SLOPE GRADE AWAY FROMBUILDING @ 2% MIN.
07 62 00 ALUMINUM FLASHING,PAINTED BLACK
07 90 05 SEALANT
07 62 00 ALUMINUMBACK ANGLE WITHEND DAM
2" M
IN
21
SEAL PENETRATIONSBENEATH SILL PAN
SEALANT OVERFASTENER HEADS
WATERPROOFING FROMBELOW AS OCCURS
08 44 13 SILLEXTENSION
FACE
OF
GLAS
S
08 44 13 ALUMINUM FRAME CURTAINWALL PER SHEET A310 A & B
07 90 05 SEALANT05 50 00 STEEL GRATE
05 50 00 STEEL ANGLE SEESTRUCT
07 62 00 ALUMINUM FLASHING,PAINTED BLACK
07 90 05 SEALANT WITH BACKER ROD
07 90 05 SEALANT
07 62 00 ALUMINUMBACK ANGLE WITHEND DAM
2" M
IN
21
SEAL PENETRATIONSBENEATH SILL PAN
SEALANT OVERFASTENER HEADS
WATERPROOFING FROMBELOW AS OCCURS
07 90 05 SEALANT
CL O
FGL
ASS
07 62 00 BLACK ALUMINUM SILL PANWITH END DAM, SET IN SEALANT
08 44 13 ALUMINUM FRAMECURTAIN WALL PER SHEETA310 A & B
0' 4
"
07 90 05 SEALANT
08 44 13 STAINLESS STEELSHOE
1 1/2"
1" 1" 6"
07 90 05 AIR SEAL
MIN2"
SEAL PENETRATIONSBENEATH SILL PAN
SEALANT OVERFASTENER HEADS
WATERPROOFINGFROMBELOW AS OCCURS
1 1/
4"MI
N LA
P
CL O
FGL
ASS
07 62 00 BLACK ALUMINUMSILL PAN WITH END DAM,SLOPED 2% MIN AWAYFROM BLDG
08 44 13 ALUMINUM FRAMECURTAIN WALL PER SHEETA310 A & B
07 90 05 SEALANT
08 44 13 STAINLESSSTEEL SHOE
1" 1" 9 1/2"
07 90 05 AIR SEAL
08 44 13 ALUMINUMCOPING
07 90 05 SEALANTWITH WEEPS, TYP
07 90 05 SEALANT UNDER SILL PAN,WITH AIR SEAL, TYP
MIN.2"
08 44 13 BACK ANGLE
MINI
MUM
8"
SEAL PENETRATIONS
SEALANT OVERFASTENER HEADS
07 62 00 ALUMINUMFLASHING, PAINTEDBLACK
08 44 13 ALUMINUMFRAME CURTAIN WALL PER SHEET A310 A & B
9 1/2"
07 90 05 SEALANT
08 91 00 FRAMELESSLOUVER
07 90 05 SEALANT
GYPSUM BD. SEPERATE PACKAGE
05 12 00 STEELSUPPORT
08 44 13 ALUM.PANEL
2"
FACE
OF
GLAS
S
2" M
IN
07 42 13 METAL WALL PANEL TYPE WD2
1"
SEAL PENETRATIONSBENEATH SILL PAN
CONC
RETE
MIN
SEALANT OVERFASTENER HEADS
2"
WATERPROOFING FROMBELOW AS OCCURS
08 44 13 SILLEXTENSION
FACE
OF
GLAS
S
07 90 05 SEALANT WITH BACKER ROD
08 44 13 ALUMINUM FRAME CURTAINWALL PER SHEET A310 A & B
07 62 00 ALUMINUM FLASHING,PAINTED BLACK
4"
07 90 05 SEALANT WITH WEEPS,BACKER ROD
07 62 00 ALUMINUMBACK ANGLE WITHEND DAM
07 90 05 SEALANT
2" M
IN
21
1"
SEAL PENETRATIONSBENEATH SILL PAN
CONC
RETE
SEALANT OVERFASTENER HEADS
WATERPROOFING FROMBELOW AS OCCURS
08 44 13 SILLEXTENSION
FACE
OF
GLAS
S
08 44 13 ALUMINUM FRAME CURTAINWALL PER SHEET A310 A & B
GYP. BD.FINISH SEPARATEPACKAGE
07 90 05 SEALANTWITH BACKER ROD,WEEPS, TYP
MIN.6"
SLOPE GRADE AWAY FROMBUILDING @ 2% MIN.
07 21 00 THERMAL INSULATION TYPE 4
07 62 00 ALUMINUM FLASHING,PAINTED BLACK
07 90 05 SEALANT
07 62 00 ALUMINUMBACK ANGLE WITHEND DAM
2" M
IN
21
2"
SEAL PENETRATIONSBENEATH SILL PAN
CONC
RETE
SEALANT OVERFASTENER HEADS
WATERPROOFING FROMBELOW AS OCCURS
08 44 13 SILLEXTENSION
FACE
OF
GLAS
S
08 44 13 ALUMINUM FRAME CURTAINWALL PER SHEET A310 A & B
07 90 05 SEALANTWITH BACKER ROD, WEEPS, TYP
GYPSUM BOARD SEPARATE PACKAGE
07 21 00 THERMALINSULATION TYPE 1
07 42 13 METAL WALL PANEL TYPE WD2
07 62 00 ALUMINUM FLASHING,PAINTED BLACK
07 90 05 SEALANT
07 62 00 ALUMINUMBACK ANGLE WITHEND DAM
2" M
IN
21
1"
SEAL PENETRATIONSBENEATH SILL PAN
CONC
RETE
MIN
SEALANT OVERFASTENER HEADS
2"
WATERPROOFING FROMBELOW AS OCCURS
08 44 13 SILLEXTENSION
FACE
OF
GLAS
S
08 44 13 ALUMINUM FRAM CURTAINWALL SEE SHEET A310 A & B
4"
07 62 00 ALUMINUM FLASHING,PAINTED BLACK
07 90 05 SEALANT WITH BACKERROD, WEEPS
07 90 05 SEALANT
07 62 00 ALUMINUMBACK ANGLE WITHEND DAM
2" M
IN
21
KEYPLANFA
CE O
FME
TAL
PANE
L
03 30 00 CONCRETE CURB SEESTRUCTURAL
07 62 00 BLACK ALUMINUM FLASHING 2" MIN ABOVE WALKINGSURFACE, VARY HEIGHT OFFLASHING TO ACCEPT WALKINGSURFACE SLOPE
07 90 05 JOINT SEALERS TYPE 9
WALL ASSEMBLY PERSHEET A310 AND A011
8" M
IN
T. O. CURB
T. O.WALKINGSURFACE
ALIGN
32 13 13 SITE CONCRETE SEE LANDSCAPE
09 29 00 GYPSUM BOARD SEPARATE PACKAGE
07 17 13 BITUMINOUSDAMPPROOFING SEPARATE PACKAGE
ISSUE DATE:PROJECT NO.:
CHECKED BY:
REVISIONS
Thes
e dra
wing
s and
their
conte
nt ar
e the
prop
erty
of SE
RA A
rchite
cts In
c. an
d are
to be
utiliz
ed on
this
proje
ct. R
epro
ducti
on of
any p
art o
f this
mater
ial, w
ithou
t the e
xpre
ss w
ritten
perm
ission
of S
ERA
Arch
itects
Inc.
is pr
ohibi
ted.
SER
A AR
CH
ITEC
TS C
OPY
RIG
HT
2012
B A
C D
ST
3920
S.W
. Mac
adam
Ave
nue,
MC
104
Por
tland
, Ore
gon
9723
9
1/27
/201
2 9:
19:2
7 A
M
A709
01/30/1210082
ADDE
NDUM
D
OU
S/C
LSB
OU
S / O
HSU
CO
LLA
BO
RA
TIVE
LIF
E SC
IEN
CES
BU
ILD
ING
& O
HSU
SK
OU
RTE
S TO
WER
EXTERIORDETAILS GRADE
3" = 1'0" 1WA AT PAVING B0.8/1
3" = 1'0" 2WA AT PLANTING B0.8C0.5/1
3" = 1'0" 3G2 AT PAVING
3" = 1'0" 4G2 AT PLANTING
3" = 1'0" 5G2 AT GRATE
3" = 1'0" 6G4 AT ATRIUM
3" = 1'0" 7G4 AT DISPLAY (WEST)
3" = 1'0" 8G5 AT LOUVER (SOUTH)
3" = 1'0" 9G5 AT PAVING
3" = 1'0" 10G5 AT PLANTING
3" = 1'0" 11G5 AT FASCIA
3" = 1'0" 12G5 AT CURB
6
51
2
4
3
7
810
11 11
9
12
17
17
3" = 1'0" 13WA AT PAVING B0.8/1
17
13
17
17
17 ADDENDUM C 2012.01.1121 ADDENDUM D 2012.01.30
LEVEL 1 CONCRETE AND BELOWPER PREVIOUSLY PERMITTED
SEPARATE PACKAGE
6
21
KEYPLAN
1FAC
E O
F SY
STEM
0' 6"
FAC
E O
FC
ON
CR
ETE
08 44 13 SILLEXTENSIONEND CAPBEYOND
08 44 13 ALUMINUMFRAMED CURTAIN WALL PER A310 A & B BEYOND
FINISH FLOOR40'10 1/4"
EXTERIORINTERIOR
PROPERTYLINE2' 0"
07 21 00 THERMALINSULATION TYPE 21
PARK 140'0"
0' 7
1/4"
SLOPE TO DRAINAWAY FROM BUILDING
0' 7" 1' 11"
FAC
E O
FC
ON
CR
ETE
21
1FAC
E O
F SY
STEM
0' 5"
FAC
E O
FC
ON
CR
ETE
08 44 13 SILLEXTENSION
08 44 13 ALUMINUMFRAMED CURTAINWALL PER A310 A & B
FINISH FLOOR40'7 1/4"
EXTERIORINTERIOR
PROPERTYLINE2' 0"
07 21 00 THERMALINSULATION TYPE 21
PARK 140'0"
0' 7
1/4"
SLOPE TO DRAINAWAY FROM BUILDING
0' 7" 1' 11"
FAC
E O
FC
ON
CR
ETE
1' 0
"
GYP. BD. FINISH SEPERATE PACKAGE
CONCRETE CURB
21
21
21
A70911
EXTERIORINTERIOR
1
FAC
E O
F SY
STEM
FINISH FLOOR39'6 1/4"
PARK 140'0"
TOP OF CONCRETE(SLOPED TO MATCHGRADE)
VARI
ES
GYP
. BD
. FIN
ISH
PROPERTYLINE
07 42 13 METALPANEL TYPE WA
1' 0"0' 4 5/8"
FAC
E O
FC
ON
CR
ETE
1' 11"WALL ASSEMBLY PERSHEET A310 AND A011
A7092
FAC
E O
F SY
STEM
0' 10"
1
EXTERIORINTERIOR
FAC
E O
F SL
AB
LEVEL 150'3"
1' 1"
1' 11"
FAC
E O
FC
ON
CR
ETE
0' 11"
TOP OF CONCRETE
4' 6
"
08 44 13 ALUMINUMFRAMED CURTAINWALL PER A310 A & B
PROPERTYLINE
LEVEL 1 SLABBEYOND
07 21 00 THERMALINSULATION TYPE 21
05 50 00 STEEL GRATE
08 44 13 SILLEXTENSION
07 84 00 EDGE OFSLAB FIRESTOPPING
2' 0"
A7095
08 44 13 SILLEXTENSION
FAC
E O
F SY
STEM
1
EXTERIORINTERIOR
LEVEL 150'3"
STAIR LANDING45'2"
1' 11"
FAC
E O
FC
ON
CR
ETE
TOP OF CONCRETE(SLOPED TO MATCHGRADE)
VARI
ES
08 44 13 ALUMINUMFRAMED CURTAIN WALL PER A310 A & B
PROPERTYLINE
08 44 13 SILLEXTENSION
CONCRETECOLUMNBEYOND
05 12 00COLUMN
LEVEL 1 SLAB
05 51 00GUARDRAIL
08 44 13 SILLEXTENSION
2' 0"
A7094
FAC
E O
F SY
STEM
0' 2"
D
EXTERIORINTERIOR
FAC
E O
FC
ON
CR
ETE
LEVEL 150'3"
TOP OF CONCRETE
08 44 13 ALUMINUMFRAMED CURTAINWALL PER A310 A & B
08 44 13 SILLEXTENSION
07 21 00 THERMALINSULATION TYPE 21
VARI
ES (S
LOPE
D)
4' 4"10' 8"
4' 6"10' 10"
EXTERIORCONCRETE STAIR
08 44 13 ALUMINUMFASCIA
A70911
FAC
E O
F SY
STEM
D
EXTERIORINTERIOR
LEVEL 150'3"
TOP OF CONCRETE(SLOPED TO DRAIN)
08 44 13 ALUMINUMFRAMED CURTAINWALL PER A310 A & B
08 44 13 SILLEXTENSION
07 21 00 THERMALINSULATION TYPE 21
4' 6"10' 10"
VARI
E S
ROOF ASSEMBLY PERSHEET A312 & A004
SLOPE TO DRAINAWAY FROM BUILDING
A7093
MIN0' 7"
UNLESS OTHERWISE NOTED8' 0" MINIMUM
FAC
E O
F SY
STEM
3
EXTERIORINTERIOR
FAC
E O
FC
ON
CR
ETE
LEVEL 150'3"
08 44 13 ALUMINUMFRAMED CURTAIN WALL PER A310 A & B
INTERIOR FINISH SLAB
07 21 00 THERMALINSULATION TYPE 21
3' 11"
ROOF ASSEMBLY PERSHEET A312 & A004
SLOPE TO DRAINAWAY FROM BUILDING
A7096
MIN
7"
07 21 00 1" THERMALINSULATION TYPE ??
INSULATION EXTENDS8' FROM BUILDING
21
ISSUE DATE:PROJECT NO.:
CHECKED BY:
REVISIONS
Thes
e dra
wing
s and
their
conte
nt ar
e the
prop
erty
of SE
RA A
rchite
cts In
c. an
d are
to be
utiliz
ed on
this
proje
ct. R
epro
ducti
on of
any p
art o
f this
mater
ial, w
ithou
t the e
xpre
ss w
ritten
perm
ission
of S
ERA
Arch
itects
Inc.
is pr
ohibi
ted.
SER
A AR
CH
ITEC
TS C
OPY
RIG
HT
2012
B A
C D
ST
3920
S.W
. Mac
adam
Ave
nue,
MC
104
Por
tland
, Ore
gon
9723
9
1/27
/201
2 9:
13:4
7 AM
A706
01/30/1210082
ADDE
NDUM
D
OU
S/C
LSB
OU
S / O
HSU
CO
LLA
BO
RA
TIVE
LIF
E SC
IEN
CES
BU
ILD
ING
& O
HSU
SK
OU
RTE
S TO
WER
EXTERIORDETAILS GRADE
GENERAL NOTES WALL ASSEMBLIESALL FIRE PARTITIONS AND FLOORS SHALL BE CAULKED AROUND PERIMETER WITH AN ULAPPROVED NONHARDENING SEALANT AND COMPLY WITH AN APPROVED UL ASSEMBLY
REFERENCE CODE COMPLIANCE SUMMARY AND PLANS FOR RATED WALL LOCATIONS
REFERENCE STRUCTURAL FOR BEARING AND SHEAR WALL REQUIREMENTS.
METAL WALL ASSEMBLIES TO EXTEND TO UNDERSIDE OF STRUCTURE ABOVE, UNLESSDETAILED OTHERWISE.
METAL STUD MATERIAL THICKNESS IS DESIGNBUILD. CONTRACTOR TO COORDINATEMETAL STUD MATERIAL THICKNESS AND SPACING OF INDIVIDUAL WALLS TO MEETALLOWABLE LIMITING WALL HEIGHT CRITERIA. SIZING SHALL MEET THE REQUIREMENTS OFTHE TESTED ASSEMBLY AS APPLICABLE.
PROVIDE DEFLECTION HEADS AT NONBEARING WALLS WHICH TERMINATE AT THEUNDERSIDE OF STRUCTURE.
SEE 07 00 00 ENVELOPE PERFORMANCE CRITERIA FOR ADDITIONAL INFORMATION.
WHERE STUD WIDTHS CONFLICT WITH STRUCTURAL, STRUCTURAL GOVERNS.
SEE A002 FOR ADDITIONAL METAL PANEL ASSEMBLIES.
PROVIDE DOUBLE, FACE TO FACE, 54 MIL STUDS AT ALL METAL STUD DOOR JAMBSLOCATION
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
ASSEMBLY TAG KEY
02C1
ASSEMBLY NUMBER
INSULATION DESIGNATION
PRIMARY FRAMING MEMBER SIZE (WALL ONLY)
PRIMARY WALL FRAMING MEMBER SIZE CODE
1 5/8" METAL STUDMETAL FRAMING
2 1/2" METAL STUD3 5/8" METAL STUD4" METAL STUD6" METAL STUD8" METAL STUD7/8" FURRING CHANNEL1 1/2" FURRING CHANNEL2 1/2" METAL CH SHAFT WALL STUD4" METAL CH SHAFT WALL STUD6" METAL CH SHAFT WALL STUDWOOD FRAMING*NOMINAL 2x4, 3x4, OR 4x4 WOOD STUDNOMINAL 2x6, 3x6, OR 4x6 WOOD STUDNOMINAL 2x8, 3x8, OR 4x8 WOOD STUDNOMINAL 2x10, 3x10, OR 4x10 WOOD STUDCEMENTITIOUS WALLS**CONCRETENOMINAL 4" CMUNOMINAL 6" CMUNOMINAL 8" CMUNOMINAL 10" CMUNOMINAL 12" CMU
ABCDEFGHJKL
MNPQ
RSTUVX*REFERENCE STRUCTURAL DOCUMENTS FOR BEARING AND SHEAR WALL REQUIREMENTS**REFERENCE STRUCTURAL DOCUMENTS FOR BEARING AND REINFORCING REQUIREMENTS
WALL INSULATION DESIGNATION0 = NONE1 = ACOUSTIC BATT INSULATION2 = THERMAL BATT INSULATION3 = RIGID INSULATION (SECTION 07 21 00 THERMAL INSULATION)4 = SPRAY APPLIED INSULATION (SECTION 07 21 00 THERMAL INSULATION)5 = LOOSE FILL INSULATION (SECTION 07 21 00 THERMAL INSULATION)6 = MINERAL WOOL INSULATION (SECTION 07 21 00 THERMAL INSULATION)
NOTE:FOR ALL WALLS TO RECIEVE ACOUSTIC INSULATION, HEAD AND SILL TRACKS ARE TO BE SET INFULL BEDS OF ACOUSTIC SEALANT. EACH LAYER OF GYPSUM BOARD IS TO RECIEVE ACONTINUOUS BEAD OF SEALANT WHERE IT INTERSECTS OTHER MATERIALS.
3/4" = 1'0" 1WEST GRID AB/1 AT ENTRY
3/4" = 1'0" 2WEST GRID AC/1
3/4" = 1'0" 3WEST GRID C/1
3/4" = 1'0" 4WEST GRID D/1_01
3/4" = 1'0" 5WEST GRID D/1_02
3/4" = 1'0" 6WEST GRID D/12
3/4" = 1'0" 7WEST GRID D/23 & GH/3
3/4" = 1'0" 8WEST GRID EG & HK/3
12
4 5 6
7
3
LEVEL 1 CONCRETE AND BELOWPER PREVIOUSLY PERMITTED
SEPARATE PACKAGE
21 ADDENDUM D 2012.01.30
8
LEGEND FRAME TYPES
A SINGLEAA DOUBLE
X
1
A831
1
A8311
A831
1
A831
C
D
B
1
A831
A SIM
1
A831
A
VARI
ES
VARIES
VARIES
VARI
ES
B
X = GLAZINGWIDTH ATSIDELITE
X
VARIES
VARI
ES
C
VARI
ES
D
VARIES
VARI
ES VARI
ES1
A831
1
A831
1
A831
1
A831
1
A831
1
A831
C
D
B
B SIM
A
1
A831
A
SIM AT ACOUSTICALLYRATED DOORS
C SIM
C SIM
1
A831
C SIMB SIM1
A831
F SINGLEFF DOUBLE
N SINGLENN DOUBLE
GFG V
LEGEND DOOR TYPES
HEIG
HT
WIDTH
HEIG
HT
WIDTH
HEIG
HT
WIDTH
HEIG
HT
WIDTH
HEIG
HT
WIDTH
6"
6"
6"
6"
10"
HEIG
HT
WIDTH
J
HEIG
HT
WIDTH
A SINGLEAA DOUBLE
FINI
SH O
PENI
NG H
EIGH
T
E
WIDTH
HEIG
HT
X12
"
WIDTH
HEIG
HT
C
GLASS ASSCHEDULED
K
..
NL
HEIG
HT
WIDTH
6"18
"
FINISH OPENING WIDTH
WIDTH6"
30"
12" 48"
HEIG
HT
VN
BX SINGLEBBX DOUBLE(B24 = 24" TALL
LOUVER PANEL)
6"
6" 6"
WIDTH
HEIG
HT
LOW
ER P
ANEL
STR
ANSL
UCEN
T
7
A831
C
7
A831
B
7
A831
A
6"
6"
12"
6" 6" 10"
GENERAL NOTES DOOR SCHEDULEAT FIRE RATED DOORS, PROVIDE FIRE RATED GLAZING IN DOOR VISION LITES (WHEREOCCURS), IN LIEU OF CLEAR TEMPERED GLASS – RATING AS INDICATED. SIDELIGHT GLAZING(WHERE INDICATED) SHALL BE PROTECTED WITH SPRINKLERS – SEE DEFERRED SUBMITTALDESIGN BUILD SPRINKLER DRAWINGS.
PAINT ALL DOORS AND FRAMES TO MATCH WALL, SHEEN PER 09 21 23, TYPICAL UNLESSNOTED OTHERWISE.
A.
B.
ISSUE DATE:PROJECT NO.:
CHECKED BY:
REVISIONS
Thes
e dra
wing
s and
their
conte
nt ar
e the
prop
erty
of SE
RA A
rchite
cts In
c. an
d are
to be
utiliz
ed on
this
proje
ct. R
epro
ducti
on of
any p
art o
f this
mater
ial, w
ithou
t the e
xpre
ss w
ritten
perm
ission
of S
ERA
Arch
itects
Inc.
is pr
ohibi
ted.
SER
A AR
CH
ITEC
TS C
OPY
RIG
HT
2012
PRPR
2750
S.W
. Moo
dy A
venu
eP
ortla
nd, O
rego
n 97
239
3/29
/201
2 5:
02:2
0 P
M
A952
04/02/1210082
PROG
RAM
AND
INTE
RIOR
S: P
ERMI
T SE
T
OU
S / O
HSU
CO
LLA
BO
RA
TIVE
LIF
E SC
IEN
CES
BU
ILD
ING
& O
HSU
SK
OU
RTE
S TO
WER
EXTERIORDOORSCHEDULE
DOOR OPENING SCHEDULE EXTERIOR
MARK NAME
DOOROPENING
FIRERATING
DOOR FRAME
GLAZING
DETAILS
NOTESSIZE
TYPE MATL FINHWSET TYPE MATL FIN HEAD JAMB SILLW H
X1A001 6' 0" 8' 6" NR FG ALUM MFR E03 AG MFR MFR Y ELECTRIC LOCKX1AL001.1 3' 7
3/16"8' 6" NR NS ALUM MFR E02 AG MFR MFR Y AUTO OPEN, ELECTRIC LOCK,
EMERGENCY POWERX1AL001.2 3' 7
3/16"8' 6" NR NS MFR MFR E02 AG MFR MFR Y AUTO OPEN, ELECTRIC LOCK,
EMERGENCY POWERX1AL001.3 3' 7
3/16"8' 6" NR NS MFR MFR E02 AG MFR MFR Y AUTO OPEN, ELECTRIC LOCK,
EMERGENCY POWERX1AL001.4 3' 7
3/16"8' 6" NR NS MFR MFR E02 AG MFR MFR Y AUTO OPEN, ELECTRIC LOCK,
EMERGENCY POWERX1AL001.5 3' 7
3/16"8' 6" NR NS MFR MFR E02 NS MFR MFR Y AUTO OPEN, ELECTRIC LOCK,
EMERGENCY POWERX1AL001.6 3' 7
3/16"8' 6" NR NS MFR MFR E02 AG MFR MFR Y AUTO OPEN, ELECTRIC LOCK,
EMERGENCY POWERX1AL001.7 3' 7
3/16"8' 6" NR NS MFR MFR E02 AG MFR MFR Y AUTO OPEN, ELECTRIC LOCK,
EMERGENCY POWERX1AL001.8 3' 7
3/16"8' 6" NR NS MFR MFR E02 AG MFR MFR Y AUTO OPEN, ELECTRIC LOCK,
EMERGENCY POWERX1AL001.9 3' 7
3/16"8' 6" NR NS MFR MFR E02 AG MFR MFR Y AUTO OPEN, ELECTRIC LOCK,
EMERGENCY POWERX1AL001.10
3' 73/16"
8' 6" NR NS MFR MFR E02 AG MFR MFR Y AUTO OPEN, ELECTRIC LOCK,EMERGENCY POWER
X1AL001.11
3' 73/16"
8' 6" NR NS MFR MFR E02 AG MFR MFR Y AUTO OPEN, ELECTRIC LOCK,EMERGENCY POWER
X1AL001.12
3' 73/16"
8' 6" NR NS MFR MFR E02 AG MFR MFR Y AUTO OPEN, ELECTRIC LOCK,EMERGENCY POWER
X1AL001.13
3' 73/16"
8' 6" NR NS MFR MFR E02 AG MFR MFR Y AUTO OPEN, ELECTRIC LOCK,EMERGENCY POWER
X1AL001.14
3' 73/16"
8' 6" NR NS MFR MFR E02 AG MFR MFR Y AUTO OPEN, ELECTRIC LOCK,EMERGENCY POWER
X1AL001.15
3' 73/16"
8' 6" NR NS MFR MFR E02 AG MFR MFR Y AUTO OPEN, ELECTRIC LOCK,EMERGENCY POWER
X1AL001.16
3' 73/16"
8' 6" NR NS MFR MFR E02 AG MFR MFR Y AUTO OPEN, ELECTRIC LOCK,EMERGENCY POWER
X1AL001.17
3' 73/16"
8' 6" NR NS MFR MFR E02 AG MFR MFR Y AUTO OPEN, ELECTRIC LOCK,EMERGENCY POWER
X1AL001.18
3' 73/16"
8' 6" NR NS MFR MFR E02 AG MFR MFR Y AUTO OPEN, ELECTRIC LOCK,EMERGENCY POWER
X1AL001.19
3' 73/16"
8' 6" NR NS MFR MFR E02 AG MFR MFR Y AUTO OPEN, ELECTRIC LOCK,EMERGENCY POWER
X1AL001.20
3' 411/32"
8' 6" NR NS MFR MFR E02 AG MFR MFR Y AUTO OPEN, ELECTRIC LOCK,EMERGENCY POWER
X1AV002.1 7' 83/32"
8' 6" NR FG MFR MFR E25 AG MFR MFR Y CARD READER, ELECTRIC LOCK
X1AV004.1 7' 919/32"
8' 6" NR FG MFR MFR E01 AG MFR MFR Y CARD READER W/ AUTO DOOROPENER
X1AV006.1 7' 719/32"
8' 6" NR FG MFR MFR E25 AG MFR MFR Y ELECTRIC LOCK
X1AV008.1 7' 713/32"
8' 6" NR FG MFR MFR E01 AG MFR MFR Y CARD READER W/ AUTO DOOROPENER
X1N002.1 3' 41/2"
8' 41/2"
NR FG MFR MFR E29 FG MFR MFR Y KEY LOCK, INFRASTRUCTURE ONLYFOR MONITOR AND ALARM
X1N002.2 6' 0" 8' 6" NR FG MFR MFR E29 FG MFR MFR Y KEY LOCK, INFRASTRUCTURE ONLYFOR MONITOR AND ALARM
X1N072 3' 61/2"
8' 6" NR F MFR MFR E07 F MFR MFR N KEY LOCK
X1N090 3' 61/2"
8' 6" NR F MFR MFR E08 F MFR MFR N CARD READER, ELECTRIC LOCK
X1N099A 23' 07/8"
22' 0" NR OHCD MFR PTD E09 OHCD MFR PTD N SLOTS, MONITORED
X1N099D 23' 07/8"
22' 0" NR OHCD MFR PTD E09 OHCD MFR PTD N SLOTS, MONITORED
X1NS001A.1
3' 2" 8' 41/2"
NR FG MFR MFR E10 FG MFR MFR Y MONITORED, EGRESS ONLY
X1NS001A.2
3' 2" 8' 41/2"
NR FG MFR MFR E30 FG MFR MFR Y MONITORED, EGRESS ONLY
X1NS001A.3
3' 2" 8' 41/2"
NR FG MFR MFR E30 FG MFR MFR Y MONITORED, EGRESS ONLY
X1NS002 8' 0" 8' 6" NR FG MFR MFR E04 FG MFR MFR YX1NV001.1 3' 1" 8' 6" NR FG MFR MFR E31 FG MFR MFR YX1NV001.2 3' 1" 8' 6" NR FG MFR MFR E32 FG MFR MFR YX1NV001.3 3' 1" 8' 6" NR FG MFR MFR E32 FG MFR MFR YX1S050.1 3' 6" 7' 4" NR FG MFR MFR E06 FG MFR MFR Y ALARMED, MONITOREDX1S050.2 3' 6" 8' 2
21/32"NR FG MFR MFR E06 FG MFR MFR Y ALARMED, MONITORED
X1SS004 6' 4" 8' 6" NR FG MFR MFR E22 FG MFR MFR Y ELECTRIC LOCKX4A001 3' 0" 7' 6" NR FG MFR MFR E12 FG MFR MFR YX4A002 7' 0" 6' 0" NR F HM PTD E13 F HM PTD NX4A022 2' 11
15/16"6' 0" NR FG MFR MFR E14 FG MFR MFR Y
X6SE.1 6' 0" 7' 0" NR LL HM PTD E15 F HM PTD NX6SE.2 3' 0" 7' 0" NR F HM PTD E16 F HM PTD NX1300 6' 0" 7' 0" NR F HM PTD E19 F HM PTD YX1301.1 3' 0" 7' 0" NR F HM PTD E20 F HM PTD YX1301.2 3' 0" 7' 0" NR F HM PTD E20 F HM PTD NX1302 6' 0" 7' 0" NR F HM PTD E21 F HM PTD NXP1A100.1 13' 8
1/8"8' 0" NR NN MFR MFR E09 OHCG MFR MFR N
XP1A100.2 14' 11/8"
8' 0" NR OHCG MFR MFR E09 OHCG MFR MFR N
XP1A100B 3' 0" 7' 0" 45 F HM PTD E23 F HM PTD NXP1A100C 6' 0" 7' 0" 45 F HM PTD E24 F HM PTD NXP1N110 6' 8
7/32"8' 6" NR FG ALUM MFR E05 FG MFR MFR Y
XP1S30 9' 8" 7' 223/32"
NR SD ALUM MFR E17 SD MFR MFR Y
XP1SV001 4' 0" 7' 0" NR F HM PTD HM HM PTD STOREROOM
DOOR OPENING SCHEDULE CODES
NO NUMBERRATING FIRE RATED ASSEMBLY LISTED AND LABELED IN HOURS INDICATED.NR NOT FIRE RATEDMATL MATERIALFIN FINISHTHK THICKNESSHDWR HARDWARE GROUP PER SECTION 08 71 00.DETAIL PER DRAWING NUMBER ON SHEET NUMBER INDICATED. NONEPFN PREFINISHEDPTD PAINTEDCLR CLEAR FINISH
XX DOUBLE DOOR OF X TYPEX/Y UNEVEN LEAF DOOR X IS THE LARGER LEAF TYPE, Y IS THE SMALLER
DOOR CODESDOOR MATERIAL CODES:
ALUM ALUMINUM DOOR OR FRAME PER SECTION 08 43 13.OH OVERHEAD COILING DOOR TYPE# PER SECTION 08 33 23.CG OVERHEAD COILING GRILLE TYPE# PER SECTION 08 33 26.CD COILING COUNTER DOOR TYPE# PER SECTION 08 33 13.FGL FIBERGLASS DOOR OR FRAME PER SECTION 08 16 13.HM HOLLOW METAL DOOR OR FRAME PER SECTION 08 11 13.HML LEADLINED HOLLOW METAL DOOR OR FRAME PER SECTION 13 49 00PFN PREFINISHED METAL DOOR FRAME PER SECTION 08 11 17.VIN VINYL DOOR OR FRAME PER SECTION 08 53 13.WD WOOD DOOR PER SECTION 08 14 16 OR WOOD FRAME PER
SECTION 06 20 00.WDL LEADLINED WOOD DOOR PER SECTION 13 49 00SC SOLID CORE WOOD DOOR PER SECTION 08 14 16.HC HOLLOW CORE WOOD DOOR PER SECTION 08 14 16.GL FRAMELESS GLASS ENTRANCE PER SECTION 08 41 26
1 36" ACTIVE LEAF2 40" ACTIVE LEAF3 RADITION SHIELDED4 DOOR WITH ACOUSTIC SEALS PER SECTION 08 71 005 ACOUSTICAL HOLLOW METAL DOOR WITH ACOUSTICAL
GROUTED HOLLOW METAL FRAME PER SECTION 08 11 13.
THIS SCHEDULE IS PROVIDED FOR REFERENCE ONLY. THESE DOORS ARE PART OF THE STRUCTURE AND ENVELOPE PACKAGE
05 45 00 STUDS@ 1'4" OC
3' 2
"MA
X UN
O
7' 2
"TY
P UN
O
MFR'S SCREWS, ANCHOR INTO STUDS@ 2'8" OC & AT ENDS, TOP & BOTTOM
MARKER OR TACK BOARD
8A AGAINST WALL 8B ABOVE MARKER BD
TYPE 1BACKING PLATE 3" TYP
AS REQ'D
11 52 13MOTORIZEDPROJECTIONSCREEN
PROJECTION SCREEN
CEILING PER RCP
MARKERBOARD ASSEMBLY
PROJECTION SCREEN
CEILING PER RCP
11 52 13 MOTORIZEDPROJECTION SCREEN
05 50 00 THREADEDEXP BOLT, TYP
05 50 00 (1) DIAGONALBRACE @ EA CORNERAT 90° PER 18/, SIM
05 50 00THREADEDCOUPLING05 50 00 GALV THREADEDROD 3/8" Ø
3/8" ØMB (TYP)
05 50 00UNISTRUTP1546
05 50 00UNISTRUTP1000
CEILING
2 1/2"
MAX
TOILET PARTITION
05 50 00 C5x9 CONT
18A SUSPENDED 18B SUPPORTED @ ENDSNOTE: FOR TYP INFORMATION SEE "18A"
05 50 00 GALV THREADEDROD 3/8" Ø @ 4'0" OC
05 50 00 DIAGONALBRACE
05 50 00 EXPBOLTS TYPE A
CEILING
05 50 00 GALV THREADEDROD 3/8" Ø @ 10'0" MAX
3'x3"x1/4" TX @ EA END;4"x4" BASE PLATE ANCHOREDW/IN PARTITION W/ (2) 3/8" ØEXP BOLT, 2" MIN EMBED;ANCHOR TO CEILING PER STRUCT
05 50 00 1/8" x2" x6" x6"BENT PLATE, EA END
05 50 00 C8x11.5 CONT
19A AT DUCT PENETRATIONS 19B SUPPORTED @ ENDSNOTE: FOR TYP INFORMATION SEE "18A"NOTE: FOR TYP INFORMATION SEE "18A"
WHERE DETAIL 18 CANNOT BE USED
05 50 00UNISTRUTP1000
07 92 00 SEALANT ATPENETRATIONS
05 50 00 DIAGONALBRACE
05 50 00 GALV THREADEDROD 3/8" Ø @ 4'0" OC
05 50 00 C5x9 CONT
CEILING CEILING
05 50 00 CONTINUOUSSLOTTED FRAMINGASSEMBLY P5000 MIN
BACKING PLATE 1TYPE 1
2' 4
1/2"
0' 3
"
4' 3
"
0' 3
"0'
3"
5' 5
"
28A PLAN
PROJECTION
28B
DIAGONALBRACE
MOUNTING HOLESPACING PER MFR
PROJECTORMOUNTING PLATE
SUSPENDEDUNISTRUT
28B SECTION
45.00°
COOR
DINA
TE W
ITH
EQUI
P5'
0" M
AXMA
X 12
"
VIDEO PROJECTORMAX 200 LBS
PERMFR
PROJECTOR MOUNTINGPLATE
09 29 00 GB
05 50 00HTHR 050THREADED ROD
05 50 00UNISTRUT P4101
05 50 00UNISTRUT P1000
3/8" ØMB (TYP)
05 00 00UNISTRUT P1546
03 30 00 CONC SLAB/JOIST PER STRUCT05 50 00UNISTRUT P1546
05 50 00UNISTRUT P1000TCOMP POST BEYOND
05 50 00EXP BOLTSTYPE A
0' 1 1/2"0' 1
1/2"
0' 6
"
SST BOLT W/ HOCKED END
1/8" BENT PLATE, 1 1/2"WIDE, PAINTED TOMATCH CEILING
CUT METAL CEILINGTO ALLOW BENT PLATETO PENETRATE
THREADED ROD ANDDIAGONAL BRACING PER8B/A9.19 SIM
VIVARIUM GUARD RAILS VIVARIUM EDSTROM EQUIPMENT
0' 3
"0'
3"
0' 8
"
2' 1
0"
COORDINATEBACKING PLATE TYPE 1ELEV HGT W/EQUIPMENT MFR,EDSTROM INDUSTRIES
BACKING PLATETYPE 1 (TYP)
GUARD RAILPER PLAN &ELEVATIONS
VIVARIUM VR1 AHU
PROVIDE BACKING AT ALL WALLSIN ROOMS WITH VR1 EQUIPMENT.SEE ELEV X/AX.XX
AIR HANDLING UNITFOR VR1
CEILING BACKING FOR AHU.COORDINATE LOCATION W/EQUIPMENT MFR.
PROVIDE BACKING FOR VENTILATED CAGERACK UNITS.COORDINATE BACKING PLATEELEV HGT W/ EQUIPMENT MFR.
0' 3
"0'
3"
SEE WALL TYPE
SEE
WAL
L TYP
E
13 49 00 LEAD DISK, TYP
13 49 00 LEADLINED GB
13 49 00 LEAD STRIPAT METAL STUD, TYP
SEE WALL TYPE
SEE
WAL
L TYP
E
OUTSIDE CORNERB INSIDE CORNERC
13 49 00 LEAD STRIP ATMETAL STUD, 4" WIDE AT
CORNER, TYP
SEE WALL TYPE
JOINTA
13 49 00 LEADSTRIP AT METALSTUD, TYP
13 49 00 LEADLINED GB
13 49 00 LEAD DISK, TYP
VISION OPAQUE08 44 13 SHADOWBOXOR SPANDREL PANEL
AIR CAVITY
08 44 13 FINISHEDALUMINUM PANEL
1/4" RECESSEDCAULKING
2 1/2" METALFRAMING
08 44 13 FINISHALUM SILL BELOW
VISION
GYP. BRD.
CONC. COLUMN
SLOTCONNECTION
09 29 00 JOINTCOMPOUND
ANGLE VARIES
+2' 6" (3' 0")
09 21 16 5/8" GB
EOS
VISION
AT MULLION, VISION / VISION
FOR TYPICAL INFO, SEE DETAIL 13
VISION
08 44 13 FINISHALUM SILL BELOW
0'
1"
08 44 13 FINISHEDALUMINUM PANEL.FILL WITH MINERALWOOL WHERERATED PARTITONSOCCUR
FIRE SEALAS REQ'D
3"
FOR RATED PARTITIONS, ORACOUSTIC PARTITION TYPES 52,53 57, 58 & 61 SEE 16 & 20/A711OF THE STRUCTURE ANDENVELOPE PACKAGE.
COLUMN
ISSUE DATE:PROJECT NO.:
CHECKED BY:
REVISIONS
Thes
e dra
wing
s and
their
conte
nt ar
e the
prop
erty
of SE
RA A
rchite
cts In
c. an
d are
to be
utiliz
ed on
this
proje
ct. R
epro
ducti
on of
any p
art o
f this
mater
ial, w
ithou
t the e
xpre
ss w
ritten
perm
ission
of S
ERA
Arch
itects
Inc.
is pr
ohibi
ted.
SER
A AR
CH
ITEC
TS C
OPY
RIG
HT
2012
PRPR
2750
S.W
. Moo
dy A
venu
eP
ortla
nd, O
rego
n 97
239
3/29
/201
2 4:
54:1
1 P
M
A804
04/02/1210082
PROG
RAM
AND
INTE
RIOR
S: P
ERMI
T SE
T
OU
S / O
HSU
CO
LLA
BO
RA
TIVE
LIF
E SC
IEN
CES
BU
ILD
ING
& O
HSU
SK
OU
RTE
S TO
WER
INTERIORDETAILS FRAMINGDETAILS
1/2" = 1'0" 19ANCHORS @ MKR & TACK BD
1 1/2" = 1'0" 22ANCHOR MOTOR PROJ SCREEN
1 1/2" = 1'0" 1SECTION TYP SUSPENDED TOILET PARTITION HANGER BEAM
1 1/2" = 1'0" 2SUSPENDED TOILET PART. HANGER BEAM @ DUCT CROSSOVERS
1/2" = 1'0" 18BACKINGOFOI MODULAR FURN.
1/2" = 1'0" 21TYP ANCHOR VIDEO PROJ 1 1/2" = 1'0" 26ANCHOR DETAIL VIDEO PROJ
3" = 1'0" 17CEILING HUNG SCREEN
1/2" = 1'0" 8TYP VIVARIUM BACKING LOC 1/2" = 1'0" 3TYP VIVARIUM BACKING LOC
1 1/2" = 1'0" 5PROTECTED STEEL COLUMNS
1 1/2" = 1'0" 4PROTECTED STEEL COLUMNS
3" = 1'0" 10TYP LEAD LINED PARTITION
1 1/2" = 1'0" 11SPANDREL CLOSURE @ COL.
1 1/2" = 1'0" 6CLG TO EXT WALL (JAMB SIM)
1 1/2" = 1'0" 7GWB FURRING WALL UNDER SILL
SEE OWNER PROVIDED FURNITUREDRAWINGS FOR LOCATIONS
1 1/2" = 1'0" 9PLAN TYP PARTITION TO CW
“TESTING THE DOUBLE SKIN FACADE: JAQUA ACADEMIC LEARNING CENTER”
I conducted research on the new John E. Jaqua Center for Academic Study on the University of Oregon campus. The double-glazed facade of the building begged for empirical study of its thermal and daylight performance. This study led to two papers, one of which was published and presented at the National SOLAR Conference 2011.
University of Oregon - Eugene, OR
“TESTING THE DOUBLE SKIN FACADE: JAQUA ACADEMIC LEARNING CENTER”
When the temperature readings did not follow my predictions, I looked for likely culprits for interference. The wind rose above shows the annual wind averages for the area, but the northerly winds are the predominant wind direction in the summer, leading to my theory shown in the “Observed Air Movement” graphic. ZGF and Interface Engineering took interest in this, and began research the following summer to verify how much difference operable shades would make.
Expected Air Movement
North Wall
South Wall
North Wall
South Wall
Observed Air Movement
E S W
9:00 Noon 3:00 6:00E S W E S W E S W
110˚F/43˚C105˚F/41˚C100˚F/38˚C
95˚F/35˚C90˚F/32˚C85˚F/29˚C80˚F/27˚C75˚F/24˚C70˚F/21˚C65˚F/18˚C
Exterior Roof Temp
E, W and S Facade temperatures, looking South through the atrium
92˚F33˚C
89˚F32˚C
85˚F29˚C
86˚F30˚C
83˚F28˚C
73˚F23˚C
72˚F22˚C
86˚F30˚C
91˚F32˚C
89˚F32˚C
85˚F29˚C
101˚F38˚C
99˚F37˚C
81˚F27˚C
93˚F34˚C
89˚F32˚C
80˚F27˚C
89˚F32˚C
87˚F31˚C
69˚F21˚C
81˚F27˚C
93˚F34˚C
90˚F32˚C
85˚F29˚C
70˚F21˚C
68˚F20˚C
68˚F20˚C
78˚F26˚C
76˚F24˚C
73˚F23˚C
81˚F27˚C
92˚F33˚C
87˚F31˚C
85˚F29˚C
83˚F28˚C
81˚F27˚C
80˚F27˚C
112˚F44˚C
90˚F32˚C
100˚F38˚C
UNIVERSITY OF BRITISH COLUMBIA - SCHOOL OF INTEGRATED PLANNING AND DESIGN
For my thesis studio at University of Oregon, I designed an addition to the facilities at UBC, to facilitate the integration of their Architecture, Landscape Architecture and Urban Planning departments. The existing facilities are scattered across campus,and the departments did not have any interdisciplinary programs.
UBC wanted sustainability to be a centerpiece of the design. My first task in the studio was to compare LEED Canada, LEED 3.0 and the Living Building Challenge. To take the best advantage of the natural resources available, I employed long, narrow East-West boxes. Sunlight could penetrate deeper, and natural ventilation could ventilate the entire width. In order to connect the different boxes, a north-south corridor with its own distinctive character connected the pedestrian mall to the south all the way to the plaza to the north. Laserre Hall, the current location of the Planning department, and some of the Architecture program was to remain. It is a building of some historical significance, designed by Thompson, Berwick and Pratt and built in 1962. It is a notable example of BC Modernism, and the school’s preference was to preserve the building’s character.
University of British Columbia - Vancouver, British Columbia, Canada
UNIVERSITY OF BRITISH COLUMBIA - SCHOOL OF INTEGRATED PLANNING AND DESIGN
For my thesis studio at University of Oregon, I designed an addition to the facilities at UBC, to facilitate the integration of their Architecture, Landscape Architecture and Urban Planning departments. The existing facilities are scattered across campus,and the departments did not have any interdisciplinary programs.
Heat Recovery Ventilator Passive Solar
Heated Sun-Space
Water Wall Panel Inserts
Fiber-Reinforced Precast Con-crete Sandwich panels
PV and Solar Hot Water Panels
Hot air ventilated on warm days, circulated on cold days
Radiant Hydronic Floor Slabs
Sun Shade/Light Shelves protect from direct Sun
The northern bar was dedicated mostly to the studio spaces, with some multi-purpose rooms on the ground floor. The site was roated off of due south, providing a challenge for passive
solar design. In order to emphasize good passive solar design, I broke the south facade of the studio spaces so that a significant portion of the south facade faces due south for solar heat gain,
and more logical shading.
The sun space serves as a buffer for the solar heat energy in the warmer months, allowing the hot air to vent out the top, while serving as a solar heat collector in the colder months, venting the warm air to the interior. A heat recovery ventilator was
incorporated on the north wall, to keep the heat and moisture consistent while providing fresh air to the full length of the building. I learned about water wall inserts that are designed to be installed under windows, and incorporated these in the design, to help
balance the temperature further. These would be covered in the warmer months, to prevent excess heat, and exposed in the cooler months to help transfer solar energy into the studio space.
The existing Lasserre building needed both structural and thermal reinforcement. I solved this with a moment frame, welded to the existing concrete columns, which were reinforced with carbon fiber straps, to protect against blowouts.The moment frame became the host of a second skin, to provide an adequate thermal barrier outside the 1960’s concrete building.The existing studios have jalousie windows, which could be opened when needed to allow warmer or cooler air in from the cavity created between the two skins.
The middle wing housed most of the faculty offi ces on two fl oors, which opened to a double-height meeting space. The intention being that faculty from the three disciplines would be mixed in a semi-open offi ce plan, sharing offi ces, and meeting with students in the double-height space. The space that was open to the sun was shielded by shading devices, designed to block the summer sun, and let the winter sun in.The roofs of both the studio and offi ce wings were sloped to allow the best angle for mounted PV arrays.
The North-South connecting corridor ran all the way from the pedestrian “Art Walk” to the south through to the plaza in front of the Frederick Wood Theatre to the north.The corridor itself has a distinctive character, with wood accents, vertical slats shading the east and west glazing, and much of the vertical circulation. All of the collaborative spaces for students were in or adjacent to the corridor. Some of the distinctive character from each of the east-west wings bleeds over into the corridor where they intersect. Break-out spaces for the studios, A student lounge outside the faculty/student meeting space, a coffee shop on the entry level between the promenade to the east and the courtyard.From the Art walk to the south, a person could look through the entry to the corridor, and see through to the theatre plaza to the north.
Memorial Rd Lasserre O�ce Wing Studio Wing Frederic Wood Theatre Crescent Rd
Xi Xi Wetlands Preserve - Net Zero Design Charette
In the summer of 2010, I was invited with a group of sustainable design experts to China to design a net-zero visitors’ center for a wetland preserve. The twelve of us traveled to Hangzhou, and worked in some of the existing buildings on the preserve to design, calculate and model the facility. At the end of the 10 days we presented the design to the government of Hangzhou.
Hangzhou, China
Memorial Rd Lasserre O�ce Wing Studio Wing Frederic Wood Theatre Crescent Rd
Our sponsor, a local news anchor and celebrity, in describing her vision for the project said that she pictured “postcards” of the facility and the area. We took inspiration from this to frame postcard-sized views of the rendered digital model for the presentation, first to her, then to the collective government of Hangzhou.
My primary role in the project was building the digital model, once the initial design was far enough along to start modeling. Two of us built the digital model in Sketchup, and then rendered the postcard scenes in Photoshop from views we cut from the Sketchup model. We each took one of the two main buildings and did the intial modeling, then combined them and blended some details. Then we took a dozen different views from themodel to render.I also spent time working onthe physical models, which were set up in thegovernment building wherewe made the presentation.