Upload
vuthuan
View
223
Download
0
Embed Size (px)
Citation preview
Davao City Water District – Citizen’s Charter
July 2014 Page 1
TABLE OF CONTENTS
Vision, Mission and Corporate Philosophy ……………………. 1
DCWD Service Pledge ………………………………………..… 2
Feedback / Redress Mechanisms …………………………… 3
New Service Connection Application …………………………… 5 - 14
Payment of Water Bill …………………………………………. 15 - 20
Customer Services ………………………………………….. 21 - 63
Water Service Reconnection ………………………………….. 64 - 66
Transfer of Water Meter …………………………………………. 67 - 72
DCWD Customer Feedback Form …………………………... 73
Workflow Charts of Frontline Services …………………… 74 - 95
Glossary ………………………………………………………… 96 - 98
DCWD Citizen’s Charter Team 2014 …………………………… 99
Davao City Water District – Citizen’s Charter
July 2014 Page 1
Vision, Mission and Corporate Philosophy
Vision
“Best water and wastewater service provider with utmost care for the people
and environment”
Mission
“We commit to supply potable and affordable water 24 hours a day, provide
wastewater treatment services, operate efficiently, and take a proactive role in
environmental concerns and keep a competent workforce”.
Corporate Philosophy
“Service with Dignity and Honor. “
Davao City Water District – Citizen’s Charter
July 2014 Page 2
DCWD Service Pledge
To you our customer, we, the officers and employees of the Davao City Water District, commit to:
ork efficiently to provide you with frontline services at our: - Bajada office - 7:30 AM – 5:00 PM, Monday to Friday
- Matina office - 7:30 AM – 5:00 PM, Monday to Friday - Toril office - 8:00 AM – 5:00 PM, Monday to Friday - Madapo office - 8:00 AM – 5:00 PM, Monday to Friday - Victoria Plaza Collection Center - 10:00 AM – 7:00 PM, Monday to Sunday - 24-hour hotline service 297-DCWD (3293)
09277988966 (Globe) 09084410653 (Smart) 09255113293 (Sun)
ttend quickly to your reports, complaints, queries and requests;
reat you with courtesy and give consideration to those with special needs;
nsure your satisfaction through our prompt delivery of services; and
egard highly your awareness of our programs through various media, our website www.davao-water.gov.ph and DCWD Facebook page www.Facebook.com/davaowater.
because you deserve only the best service.
W W
A A
T T
E E
R R
Davao City Water District – Citizen’s Charter
July 2014 Page 3
Feedback and Redress Mechanisms
Comments, suggestions, and complaints are welcome through these means:
Customer Feedback Form and drop box provided in all our offices
E-mail address: [email protected]
Facebook page account: www.facebook.com/davaowater
24-hour hotline: 297-3293
Cellular phone: 09277988966 (Globe)
09084410653 (Smart)
09255113293 (Sun)
Davao City Water District – Citizen’s Charter
July 2014 Page 4
Our Five Frontline Services
1) New Service Connection (NSC)
Application
2) Payment of Water Bills
3) Customer Services
4) Water Service Reconnection
5) Transfer of Water Meter
Davao City Water District – Citizen’s Charter
July 2014 Page 5
Schedule of Availability of Service (no noon break):
Phone-in (Monday to Sunday – 24 hour operation):
Contact 297-DCWD (3293)
09277988966 (Globe)
09084410653 (Smart)
09255113293 (Sun)
Website: www.davao-water.gov.ph
E-mail : [email protected]
Customer in-Office (no noon break)
Bajada Office Monday to Friday - 7:30 AM to 5:00 PM
Matina Office Monday to Friday - 7:30 AM to 5:00 PM
Toril Collection Center Monday to Friday - 8:00 AM to 5:00 PM
Victoria Plaza Collection Center Monday to Sunday - 10:00 AM to 7:00 PM
Who May Avail of the Service:
General Public of Davao City within the service areas of DCWD
Requirements:
1) Attendance to Orientation for New DCWD Customers
Bajada office – Monday to Friday at 10:00 AM and at 3:00 PM
Matina office – Tuesday and Thursday at 10:00 AM and at 3:00 PM
2) Valid identification
a) If transacted by applicant
- original and photocopy of one valid identification card or barangay certificate; Police / NBI
Clearance and photocopy of one valid ID of the lot and/or building owner/s (if lot and building are
not owned by the applicant)
b) If transacted by representative
- original and photocopy of representative’s one valid identification card or barangay certificate;
Police / NBI clearance
- one photocopy of applicant’s valid identification card or his / her barangay certificate; Police /
NBI Clearance and photocopy of one valid ID of the lot and/or building owner/s (if lot and
building are not owned by the applicant)
- Special Power of Attorney (SPA), General Power of Attorney (GPA) or Notarized Authorization
Letter
1. NEW SERVICE CONNECTION (NSC) APPLICATION
1. NEW SERVICE CONNECTION (NSC) APPLICATION
Davao City Water District – Citizen’s Charter
July 2014 Page 6
3) Proof of Ownership:
3.1 For Private Property (any of the following)
a) Photocopy of Land Title
b) Photocopy of Notarized Deed of Absolute Sale
c) Photocopy of Notarized Conditional Sale
d) Photocopy of Notarized Deed of Donation
e) Photocopy of Notarized Contract to Sell
f) Photocopy of Building Permit specifically describing therein the location of the lot
g) Original copy of NHA Certification and City Housing
h) Original copy of Certification from Board of Liquidators
3.2 For Heir in a Privately Owned Lot a) Photocopy of Extra-Judicial Settlement of Estate
b) Photocopy of Land Title
c) Photocopy of Notarized Affidavit of Heirship
d) Photocopy of Proof of Heirship (Birth Certificate, etc)
3.3 For Renter / Lessee of a Privately Owned Lot a) Photocopy of current and notarized Lease Contract
b) Photocopy of Land Title
c) Notarized Authorization / Consent from the Lot Owner / Lessor or Special Power of Attorney
d) Notarized Affidavit of Undertaking
3.4 For Informal Settler on a Private Titled Land with Accredited Association
a) Original copy of Certification from the Association signed by the Association President (sealed)
b) Notarized Affidavit of Undertaking
3.5 For Informal Settler in the Government Property
a) Original copy of the Barangay Certification signed by the Barangay Captain with Seal, or
b) Original copy of Certification from Board of Liquidators, if applicable
c) Notarized Affidavit of Undertaking
3.6 For Owner of a Property Acquired through Balikatan
a) Original Copy of Authenticated Notice of Approval from Balikatan
3.7 For Corporate / Business Establishments (any of the following)
a) Photocopy of Lot Title (if owned)
b) Photocopy of current and notarized Lease Contract
3.8 For Owner of a Foreclosed Property
a) Original Copy of the Certification from the Bank, SSS, GSIS or PAG-IBIG, or other housing
institutions
Davao City Water District – Citizen’s Charter
July 2014 Page 7
4) Installation Fee per water meter size (in Peso, subject to change):
½” - P 3,000.00 2” - 32,500.00
¾” - 16,500.00 4” - 63,000.00
1” - 19,000.00 6” - 80,000.00
1& 1/2” - 26,000.00 8” - 122,000.00
How to avail of the service:
Go to Public Assistance Desk Officer (PADO) for priority number, proceed to Commercial Services
Department (CSD) counter and apply for New Service Connection (NSC).
Duration of Transaction:
* Customer In - Office Transaction - 1 hour and 10 minutes
* Under normal condition:
Tee connection will be installed within two working days after contract signing.
Single Line Connection will be installed within six working days after contract signing.
Davao City Water District – Citizen’s Charter
July 2014 Page 8
NEW SERVICE CONNECTION (NSC) APPLICATION
How to avail of the service:
a) Customer with Filled-up Electronic New Service Connection Form (e-form 1) with
Complete Requirements
FIRST VISIT – Customer In-Office Transaction with Filled-up Electronic New Service
Connection Form (e-form 1) with Complete Requirements
STEP CUSTOMER SERVICE PROVIDER DURATION
OF
ACTIVITY
PERSON-IN-
CHARGE and
COUNTER
FEE
(PhP)
FORM / SLIP
1
Go Public Assistance Desk Officer (PADO) for assistance.
Inquire customer's concern, provide priority number. Direct customer to Commercial Services Department (CSD) counter and wait for turn.
1 min
PADO
Priority number
2 Go to CSD Customer Service Attendant (CSA) and apply for New Service Connection (NSC).
Check availability of water service and sufficiency of pressure for approval to attend orientation.
8 mins CSA Orientation Attendance Slip
3 Receive orientation attendance slip. Attend orientation, submit duly filled-up orientation slip, photocopy of one valid ID to NSC facilitator.
Facilitate orientation.
Give Installation
Standard Diagram and
Orientation Attendance
Certificate.
45 mins NSC Orientation Facilitator
Orientation Attendance Slip Installation Standard Diagram Orientation Attendance Certificate
4 Receive Installation Standard Diagram and Orientation Attendance Certificate. Submit the accomplished e-Form 1 and complete requirements to CSA. Receive Inspection Schedule Slip (ISS).
Receive and evaluate the accomplished e-Form1 and requirements. Agree on schedule of inspection date and give Inspection Schedule Slip. Advise customer to wait for the Plumbing Inspection Report (blue card) or call 297-3293 for the result of investigation.
5 mins CSA e-Form 1 Installation Standard Diagram
Orientation Attendance Certificate
Inspection Schedule Slip
END OF FIRST VISIT – CUSTOMER IN-OFFICE TRANSACTION WITH FILLED-UP E- FORM 1 AND COMPLETE REQUIREMENTS
Davao City Water District – Citizen’s Charter
July 2014 Page 9
NEW SERVICE CONNECTION (NSC) APPLICATION
INTERNAL FLOW OF TRANSACTION
After First Visit - a) Customer In-Office with Filled-up Electronic New Service Connection
Application Form (e-form 1) and Complete Requirements After Second Visit - b) Customer In-Office Transaction without Electronic New Service
Connection Application Form (e-form 1)
STEP CUSTOMER SERVICE PROVIDER DURATION
OF
ACTIVITY
PERSON-IN-
CHARGE and
COUNTER
FEE
(PhP)
FORM / SLIP
1 Create New Service Application record on database. Generate control number. Prepare GIS map and determine DMA code. Confirm availability of water service and sign. Log and endorse New Service Connection Application Form (Form 1) to Supervising Utilities / Customer Service Officer (SUCSO) for investigation.
10 mins CSA e-Form 1 / Form 1Orientation
Attendance Certificate
2 Receive and log Form1 and assign inspector.
3 mins SUCSO -Investigation
e-Form 1 / Form 1 Orientation
Attendance Certificate
3 Conduct inspection on site. Issue inspection notice (blue card) to inform customer that plumbing provision has been investigated with findings and instruction. Return Form1 to SUCSO after inspection with investigation remarks
15 mins CSA-Inspector e-Form 1 / Form 1Orientation
Attendance Certificate
4 Receive and log Form1 with investigation remarks and endorse to CSA.
2 mins SUCSO e-Form 1 / Form 1Orientation
Attendance Certificate
5 Update New Service Application record with result of investigation.
2 mins CSA e-Form 1 / Form 1Orientation
Attendance Certificate
END OF INTERNAL FLOW OF TRANSACTION
Note: Internal Flow of Transaction is the same for both
a) Customer In-Office Transaction with Filled-up Electronic New Service Connection Application Form (e-form1)
and Complete Requirements
b) Customer In – Office Transaction without Electronic New Service Connection Application Form (e-form1)
Davao City Water District – Citizen’s Charter
July 2014 Page 10
NEW SERVICE CONNECTION (NSC) APPLICATION
a) Customer with Filled-up Electronic New Service Connection Form (e-form 1) with Complete Requirements
b) Customer without Electronic New Service Connection Application Form
(e-form 1)
SECOND VISIT - a) Customer In-Office Transaction with Filled-up Electronic New Service
Connection Application Form (e-form 1) and Complete Requirements THIRD VISIT - b) Customer In-Office Transaction without Electronic New Service
Connection Application Form (e-form 1)
STEP CUSTOMER SERVICE PROVIDER DURATION
OF
ACTIVITY
PERSON-IN-
CHARGE and
COUNTER
FEE (PhP) FORM / SLIP
1
Go Public Assistance Desk Officer (PADO) for assistance.
Inquire customer's concern, provide priority number. Direct customer to Commercial Services Department (CSD) counter and wait for turn.
1 min
PADO
Priority
number
2 Go to Commercial Services Department (CSD) Counter.
Retrieve Form 1. Access record, review delinquent accounts. Prepare and give Form 2 (JMS Order of Payment)
4 mins CSA
Form 2
3 Receive Form 2, proceed to teller and pay.
Receive Form 2 and
payment. Issue Official
Receipt (OR).
2 mins Teller NSC Service
Fee and
delinquent
accounts , if
any
Form 2
OR
4 Go back to CSD counter and present OR.
Prepare Form 3 (Promissory Note) if applicable, and facilitate signing of Form 4 (Service Connection Contract)
4 mins CSA Form 3
Form 4
5 Receive original copy of Form 4 and Form 3, if applicable.
END OF SECOND VISIT – A) CUSTOMER IN-OFFICE TRANSACTION WITH FILLED E- FORM 1
AND COMPLETE REQUIREMENTS AND THIRD VISIT – B) CUSTOMER IN- OFFICE TRANSACTION WITHOUT E-FORM 1
Davao City Water District – Citizen’s Charter
July 2014 Page 11
NEW SERVICE CONNECTION (NSC) APPLICATION
b) Customer without Electronic New Service Connection Application Form
(e-form 1)
FIRST VISIT - b) Customer In-Office Transaction without Electronic New Service Connection
Application Form (e-form1)
STEP CUSTOMER SERVICE PROVIDER DURATION
OF
ACTIVITY
PERSON-IN-
CHARGE and
COUNTER
FEE (PhP) FORM / SLIP
1
Go Public Assistance Desk Officer (PADO) for assistance.
Inquire customer's concern, provide priority number. Direct customer to Commercial Services Department (CSD) counter and wait for turn.
1 min
PADO
Priority number
2 Go to CSD Customer Service Attendant (CSA) and apply for New Service Connection (NSC).
Check availability of water service and sufficiency of pressure for approval to attend orientation.
8 mins CSA Orientation Attendance Slip
3 Receive orientation attendance slip. Attend orientation, submit duly filled-up orientation slip, photocopy of one valid ID to NSC facilitator.
Facilitate orientation.
Give New Service
Connection Application
Form (Form 1),
Installation Standard
Diagram and
Orientation
Attendance Certificate.
45 mins NSC Orientation Facilitator
Form 1 Orientation
Attendance Slip Installation Standard Diagram Orientation Attendance Certificate
4 Receive Form 1, Installation Standard Diagram and Orientation Attendance Certificate. Comply requirements for submission to CSD CSA.
CSA Form 1 Installation Standard Diagram
Orientation Attendance Certificate
END OF FIRST VISIT - B) CUSTOMER IN- OFFICE TRANSACTION WITHOUT E-FORM 1
Davao City Water District – Citizen’s Charter
July 2014 Page 12
NEW SERVICE CONNECTION (NSC) APPLICATION
b) Customer without Electronic New Service Connection Application Form (e-form 1)
SECOND VISIT - b) Customer In-Office Transaction without Electronic New Service
Connection Application Form (e-form 1)
STEP CUSTOMER SERVICE PROVIDER DURATION OF
ACTIVITY
PERSON-IN-CHARGE and
COUNTER
FEE (PhP) FORM / SLIP
5
Go Public Assistance Desk Officer (PADO) for assistance.
Inquire customer's concern, provide priority number. Direct customer to Commercial Services Department (CSD) counter and wait for turn.
1 min PADO
Priority number
6 Go to CSD Customer Service Attendant (CSA) and submit accomplished New Service Connection Application Form (Form 1) and complete requirements. Receive inspection schedule slip
Receive and evaluate the accomplished Form 1 and requirements. Agree on schedule of inspection date and give Inspection Schedule Slip. Advise customer to wait for the Plumbing Inspection Report (blue card) or call 297-3293 for the result of investigation.
4 mins CSD CSA Form 1 Installation Standard Diagram
Orientation Attendance Certificate
Inspection Schedule Slip
END OF SECOND VISIT – B) CUSTOMER IN- OFFICE TRANSACTION WITHOUT E-FORM 1
Note: Refer to Page 9 for the THIRD VISIT – b) Customer In - Office Transaction without Electronic New Service
Connection Application Form (e-form 1)
Davao City Water District – Citizen’s Charter
July 2014 Page 13
NEW SERVICE CONNECTION (NSC) APPLICATION
INTERNAL FLOW OF TRANSACTION
After Second Visit - a) Customer with Filled-up Electronic New Service Connection
Application Form (e-form 1) and Complete Requirements
After Third Visit - b) Customer In-Office Transaction without Electronic New Service
Connection Application Form (e-form 1)
STEP CUSTOMER SERVICE PROVIDER DURATION
OF
ACTIVITY
PERSON-IN-
CHARGE and
COUNTER
FEE
(PhP)
FORM / SLIP
1 Post New Service Connection service fee.
3 mins Customer Service Attendant (CSA)
e-Form 1 / Form 1 (with attachments)
2 Arrange documents; sort all applications per service area. Prepare Store Requisition Slip (SRS) for withdrawal of materials and attach to New Service Connection Application Form (e- Form 1/ Form 1). Forward documents to Customer Care Division Manager (CCDM) for recommending approval.
18 mins CSA e-Form 1 / Form 1 (with attachments)
SRS
3 Check documents and sign. Forward documents to Commercial Services Department Manager (CSDM).
2 mins CCDM e-Form 1 / Form 1 (with attachments)
SRS
4 Check documents and approve for installation. Return documents to CSA
2 mins CSDM e-Form 1 / Form 1 (with attachments)
SRS
5 Endorse e- Form 1 / Form 1, SRS to CSD Water Maintenance Foreman / leadman.
2 mins CSA e-Form 1 / Form 1 (with attachments)
SRS
6 Receive e- Form 1 / Form 1 and endorse SRS to Storekeeper for withdrawal of materials.
2 mins CSD Foreman e-Form 1 / Form 1 (with attachments)
SRS
7 Receive e- Form 1 / Form 1 and SRS. Process request, issue materials, return Form 1 and give 1 copy of processed SRS.
15 mins Storekeeper e-Form 1 / Form 1 (with attachments)
SRS
8 Receive materials, SRS copy and e- Form 1 / Form 1.
2 mins CSD Installation Crew
e-Form 1 / Form 1 (with attachments)
SRS
Davao City Water District – Citizen’s Charter
July 2014 Page 14
NEW SERVICE CONNECTION (NSC) APPLICATION
INTERNAL FLOW OF TRANSACTION
After Second Visit - a) Customer with Filled-up Electronic New Service Connection
Application Form (e-form 1) and Complete Requirements
After Third Visit - b) Customer In-Office Transaction without Electronic New Service
Connection Application Form (e-form 1)
STEP CUSTOMER SERVICE PROVIDER DURATION
OF ACTIVITY
PERSON-IN-
CHARGE and
COUNTER
FEE
(PhP)
FORM / SLIP
9 Go to site, and install water meter. Inform customer that water service is already available.
Tee Connection – 10 mins Single line – 2 – 5 hours
CSD Installation Crew
e-Form 1 / Form 1 (with attachments)
10 Return accomplished e-Form 1 / Form 1 and Accomplishment Report to CSA
2 mins CSD Installation Crew
e-Form 1 / Form 1 (with attachments) Accomplishment Report
11 Receive accomplished copy of e-Form 1 / Form 1 and Accomplishment Report
2 mins CSA e-Form 1 / Form 1 (with attachments) Accomplishment Report
12 Update New Service Application record. Assign Zone and Book number. Generate account number.
2 mins CSA e-Form 1 / Form 1 (with attachments)
13 Prepare list of installed NSC with duplicate copy of GIS map and submit to ICTD (with indicated meter site)
20 mins/ batch
CSA e-Form 1 / Form 1 (with attachments)
14 Receive documents for tagging of accounts
1 min ICTD Staff e-Form 1 / Form 1 (with attachments)
15 Scan documents and file 4 mins CSA e-Form 1 / Form 1 (with attachments)
END OF INTERNAL FLOW OF TRANSACTION
Under normal condition, water connection will be installed within six (6) working days after contract signing.
Notes:
1) This work standard excludes those applications requiring permits from other agencies (e.g. DPWH, CEO, etc.),
Which processing may take longer.
2) Validity of New Service Connection (NSC) application form (e -Form 1 or Form 1) is 1 year.
3) Validity of orientation attendance certificate is 1 year.
Davao City Water District – Citizen’s Charter
July 2014 Page 15
Schedule of Availability of Service (no noon break):
Phone-in Monday to Sunday (24 hour operation)
Contact 297-DCWD (3293)
09277988966 (Globe)
09084410653 (Smart)
09255113293 (Sun)
Website: www.davao-water.gov.ph
E-mail : [email protected]
Customer in-Office (no noon break)
Bajada Office Monday to Friday - 7:30 AM to 5:00 PM
Matina Office Monday to Friday - 7:30 AM to 5:00 PM
Toril Collection Center Monday to Friday - 8:00 AM to 5:00 PM
Victoria Plaza Collection Center Monday to Sunday - 10:00 AM to 7:00 PM
Special Collection Centers Monthly:
Talomo Barangay Hall - 8:00 AM to 3:00 PM
During last day of the payment due date of scheduled zone
Mintal Barangay Hall -8:00 AM to 3:00 PM
During last day of the payment due date of scheduled zone
Calinan Barangay Hall -8:00 AM to 3:00 PM
During last day of the payment due date of scheduled zone
Who May Avail of the Service:
All DCWD Customers
Requirements:
DCWD water bill
BIR Form 2307 - Tax Withheld Certificate (if applicable)
2. PAYMENT OF WATER BILLS
2. PAYMENT OF WATER BILLS
Davao City Water District – Citizen’s Charter
July 2014 Page 16
How to avail of the service
a) Bajada, Matina, Toril and Victoria Plaza Offices:
1. For customer with or without regular bill paying full or partial
Go to teller, give water bill or account details and payment.
2. For customer with or without disconnection bill paying full arrears
Go to teller, give water bill or account details and payment.
3. For customer without regular / disconnection bill paying multiple accounts
Go to Public Assistance Desk Officer (PADO) for priority number, proceed to Commercial Services
Department (CSD) Counter and ask Form 2 (Order of Payment). Then, go teller, give Form 2 and payment.
4. For customer with or without disconnection bill paying partial arrears
Go to Public Assistance Desk Officer (PADO) for priority number, proceed to Commercial Services
Department (CSD) Counter and ask Form 2 (Order of Payment). Then, go teller, give Form 2 and payment.
5. For customer with BIR Form 2307 – Tax Withheld Certificate
Go to Public Assistance Desk Officer (PADO) for priority number, proceed to Commercial Services
Department (CSD) Counter for evaluation of water bill's computation. Then, go to teller and give water bill,
Form 2, four copies of tax certificate (BIR Form 2307).
b) Special Collection Centers:
1. For customer with or without regular bill paying full or partial
Go to teller, give water bill or account details and payment.
2. For customer with or without disconnection bill paying full arrears
Go to teller, give water bill or account details and payment.
3. For customer without regular / disconnection bill paying multiple accounts
Go to teller, give details per account and payment.
4. For customer with or without disconnection bill paying partial arrears
Go to Public Assistance Desk Officer (PADO) for assistance. PADO calls Commercial Services Department
concerned staff for approval of customer’s partial arrears payment amount. Then, go teller, give water bill or
account details and payment.
5. For customer with BIR Form 2307 – Tax Withheld Certificate
Go to teller, give water bill, and four copies of tax certificate (BIR Form 2307).
Duration of customer transaction per bill:
• With or without bill (single account / paying in full or full arrears) - 1 minute
• With or without bill (multiple accounts / paying in partial) - 5 minutes
• With BIR Form 2307 – Tax Withheld Certificate - 5 minutes
Davao City Water District – Citizen’s Charter
July 2014 Page 17
PAYMENT OF WATER BILLS
How to Avail of the Service: Customer In-Office Transaction
1) Customer with or without Regular Bill Paying Full or Partial 2) Customer with or without Notice of Disconnection paying Full Arrears
STEP CUSTOMER SERVICE PROVIDER DURATION
OF ACTIVITY
PERSON-IN-
CHARGE and
COUNTER
FEE (PhP) FORM / SLIP
1 Go to teller; give water bill if available and payment. If no bill give details of account and payment
Accept payment and issue Official Receipt (OR)
1 min Teller Amount to be paid
OR
2 Receive and check official receipt and count loose change, if any
OR
END OF TRANSACTION – CUSTOMER IN-OFFICE TRANSACTION
Davao City Water District – Citizen’s Charter
July 2014 Page 18
PAYMENT OF WATER BILLS
Customer In-Office Transaction:
3) Customer without regular / disconnection bill, paying multiple accounts 4) Customer with or without disconnection bill paying partial arrears
STEP CUSTOMER SERVICE PROVIDER DURATION
OF
ACTIVITY
PERSON-IN-
CHARGE and
COUNTER
FEE (PhP) FORM / SLIP
1 Go to Public Assistance Desk Officer (PADO) for assistance
Inquire customer's concern, give priority number. Direct customer to Commercial Services Department (CSD) Counter and wait for turn
1 min Public Assistance Desk Officer (PADO)
Priority number
2 Go to CSD Customer Service Attendant (CSA) ask for Form 2 (Order of Payment)
Verify customer record; issue Form 2
3 mins CSA
Amount to be paid
Form 2
3 Go to teller, give Form 2 and payment
Accept Form 2 and payment, issue official receipt, attach Form 2 to file copy of Official Receipt (OR)
1 min Teller Amount to be paid
Form 2 OR
4 Receive and check official receipt and count loose change, if any
OR
END OF TRANSACTION – CUSTOMER IN-OFFICE TRANSACTION
Note:
For Special Collection Centers:
Customer without regular / disconnection water bill, paying multiple accounts, go to teller, give water bill
or account details and payment.
Customer with or without disconnection bill paying partial arrears, go to Public Assistance Desk Officer
(PADO) for assistance. PADO calls Commercial Services Department concerned staff for approval of customer’s
partial payment amount. Then, go teller, give water bill or account details and payment.
Davao City Water District – Citizen’s Charter
July 2014 Page 19
PAYMENT OF WATER BILLS
Customer In-Office Transaction:
5) Customer with BIR Form 2307 - Tax Withheld Certificate
STEP CUSTOMER SERVICE PROVIDER DURATION
OF
ACTIVITY
PERSON-IN-
CHARGE and
COUNTER
FEE (PhP) FORM / SLIP
1 Go to Public Assistance Desk Officer (PADO) for assistance
Inquire customer's concern, provide priority number. Direct customer to Commercial Services Department (CSD) Counter and wait for turn
1 min PADO Priority number
2 Go to CSD Customer Service Attendant (CSA) and ask for Order of Payment (Form 2), if applicable
Check Water Bill and BIR Form 2307. Compute withholding tax, issue Form 2 then advise customer to proceed to teller
2 mins
CSA
Water Bill BIR Form 2307 Form2
3 Go to Teller and give Form 2, 4 copies of Tax Certificate (BIR Form 2307) and payment
Accept Form 2,
payment, retain 3
copies of BIR Form
2307 including original.
For customer's copy,
stamp "Received",
print name and sign.
Issue Official Receipt
and give customer
copy of BIR Form 2307
2 mins Teller Amount to be paid
Water Bill Form2 OR
BIR Form 2307
4 Receive and check copy of BIR Form 2307, Official Receipt, and count loose change, if any
BIR Form 2307
OR
END OF TRANSACTION – CUSTOMER IN-OFFICE TRANSACTION
Note:
For Special Collection Centers:
Customer with BIR Form 2307 – Tax Withheld Certificate, go to teller, give water bill, and four copies of tax
certificate (BIR Form 2307).
Davao City Water District – Citizen’s Charter
July 2014 Page 20
PAYMENT OF WATER BILLS
Internal Flow of Transaction:
5) Customer with BIR Form 2307 - Tax Withheld Certificate
STEP CUSTOMER SERVICE PROVIDER DURATION
OF
ACTIVITY
PERSON-IN-
CHARGE and
COUNTER
FEE (PhP) FORM / SLIP
1 Prepare Batch slip. Forward two copies of BIR Form 2307 including original and transmittal to Customer Service Attendant (CSA)
1 min Teller Batch slip BIR Form 2307
2 Receive documents. Review computation of franchise tax. Prepare Billing Adjustment Memo (BAM) request. Forward to Billing and Accounts Division Manager (BADM)and Commercial Services Department Manager (CSDM)
10 mins
CSA - Billing and Accounts
Batch slip BIR Form 2307 BAM
3 Approve request for BAM 5 mins/ batch
BADM
CSDM
Batch slip BIR Form 2307 BAM
4 Forward approved BAM to Information and Communications Technology Department (ICTD) for updating of customer's account master file.
1 min CSA - Billing and Accounts
BIR Form 2307
BAM
5 Post BAM franchise tax to customer's account master file and make report. Forward report to ICT Division and Department Managers
2 mins/ account
ICTD Staff Report
6 Review and approve report
3 mins ICTD Div and Department Managers
Report
7 Distribute report to ABD and CSD
2 mins ICTD Staff Report
END OF INTERNAL FLOW OF TRANSACTION
Davao City Water District – Citizen’s Charter
July 2014 Page 21
Schedule of Availability of Service (no noon break):
Phone-in Monday to Sunday (24 hour operation)
Contact 297-DCWD (3293)
09277988966 (Globe) 09084410653 (Smart)
09255113293 (Sun)
Phone-in Monday to Friday (8:00 AM to 5:00 PM) Contact 2215132 Madapo Office (For water analysis only)
Website: www.davao-water.gov.ph
E-mail : [email protected]
Customer in-Office (no noon break)
Bajada Office Monday to Friday - 7:30 AM to 5:00 PM
Matina Office Monday to Friday - 7:30 AM to 5:00 PM
Toril Collection Center Monday to Friday - 8:00 AM to 5:00 PM
Madapo Office Monday to Friday - 8:00 AM to 5:00 PM
Victoria Plaza Collection Center Monday to Sunday - 10:00 AM to 7:00 PM
Who May Avail of the Service:
All DCWD Customers
CHANGE OF ACCOUNT NAME
Requirements:
1) Attendance to Orientation
Bajada office - Monday to Friday at 10:00 AM and at 3:00 PM
Matina office - Tuesday and Thursday at 10:00 AM and at 3:00 PM
2) Valid Identification
a) If transacted by account holder:
– Original and photocopy of one valid identification card or barangay clearance
b) If transacted by representative:
– Original and photocopy of representative’s one valid identification card or
barangay clearance;
– One photocopy of account holder’s identification card; and
– Notarized authorization from the account holder.
3. CUSTOMER SERVICES
3. CUSTOMER SERVICES
Davao City Water District – Citizen’s Charter
July 2014 Page 22
3) Proof of ownership (Lot Title, Deed of Sale, etc.)
4) Payment of unpaid charges or outstanding balances, if there are any.
Fee: PhP300.00 (Subject to change)
REPLACEMENT OF STOLEN WATER METER
Requirements:
1) Valid Identification
a) If transacted by account holder: – Original and photocopy of one valid identification card or barangay clearance
– Affidavit
b) If transacted by representative:
– Original and photocopy of representative’s one valid identification card or
barangay clearance;
– One photocopy of account holder’s identification card; and
– Authorization letter from the account holder
– Affidavit
Fee: Current cost of water meter
How to avail of the services:
For inquiry, contact 297-DCWD (3293), 09277988966 (Globe), 09084410653 (Smart),
09255113293 (Sun) or go to Public Assistance Desk Officer (PADO) for assistance, then
proceed to Commercial Services Department (CSD).
For water quality analysis inquiry, contact 2215132.
Phone-in Transaction
TRANSACTION
(Report / Complaint / Query / Request)
ACTION AND DURATION
Phone-in
Status of New Service Connection;
Billing Details
Delivery of Water Bills;
High Water Consumption;
No Water / Low Pressure;
Special Reading of Water Consumption;
Arrangement / Elevation of Water Meter;
Replacement of Water Meter;
Transmission, Distribution, Service Line Leak
Repair;
Water Quality Analysis
Provide feedback upon inquiry within 3
minutes
Davao City Water District – Citizen’s Charter
July 2014 Page 23
Customer In-Office Transaction
TRANSACTION
(Report / Complaint /Query / Request)
ACTION AND DURATION
Senior Citizen Discount Privilege
Registered within 24 hours after submission
of requirements
Special Reading of Water Consumption Provide feedback within 3 working days
after request
High Water Consumption Investigation Provide feedback within 3 working days
after report
Change of Account Name Account name is changed within 24 hours
after contract signing
Replacement of Stolen Water Meter Replace the meter within 24 hours after
completion of requirements
Disconnection of Water Service
Advise settlement of account before
disconnection of water service;
Disconnect within 3 working days
Arrangement / Elevation of Water Meter Arrange / Elevate meter within 3 working
days after request
Replacement of Stuck / Defective Meter Replace stuck / defective meter within 3
working days after request
No Water / Low Pressure Provide feedback upon inquiry or within 6
hours
Transmission, Distribution, Service Line Leak Repair
Repair within 11 hours
Water Quality Analysis
Provide laboratory result within 2 working days after receipt of report /complaint
Release laboratory results of paid request
within 7 working days after payment
Line Flushing Flush within 2 hours after report
Davao City Water District – Citizen’s Charter
July 2014 Page 24
CUSTOMER SERVICES
How to Avail of the Service:
PHONE-IN Report / Complaint / Query / Request on:
Status of New Service Connection Application; Billing Details; Delivery of Water Bills; High Water Consumption Investigation; No Water / Low Pressure; Special Reading of Water Consumption; Arrangement / Elevation of Water Meter; Replacement of Water Meter (Defective and Stolen Water Meter); Transmission, Distribution, Service Line Leak Repair; and Water Quality Analysis
STEP CUSTOMER SERVICE PROVIDER DURATION
OF
ACTIVITY
PERSON-IN-
CHARGE and
COUNTER
FEE (PhP) FORM / SLIP
1 Call any of DCWD hotline numbers:
297-3293 (DCWD) 09277988966(Globe) 09084410653 (Smart) 09255113293 (Sun) 2215132 (For water quality analysis only)
Receive, discuss, and encode in the database customer's name, contact and account details, and concern(s). Browse database. Provide answer to customer if concern can be answered outright or inform customer that concern shall be processed and give feedback within 24 hours. Prepare Job Management System Maintenance Order (JMS MO).
within 3 mins
CIU (Central Information Unit)
END OF CUSTOMER PHONE-IN TRANSACTION
Davao City Water District – Citizen’s Charter
July 2014 Page 25
CUSTOMER SERVICES
LETTER / EMAIL- Report / Complaint / Query / Request on:
Billing Details; Delivery of Water Bills; High Water Consumption Investigation; No Water / Low Pressure; Special Reading of Water Consumption; Arrangement / Elevation of Water Meter; Replacement of Water Meter (Defective and Stolen Water Meter); Transmission, Distribution, Service Line Leak Repair; and Water Quality Analysis
STEP CUSTOMER SERVICE PROVIDER DURATION
OF
ACTIVITY
PERSON-IN-
CHARGE and
COUNTER
FEE
(PhP)
FORM / SLIP
1 Customer sends communication
Receive letter / browse email and forward to concerned department
1 min Receiving department
2 Receive letter / print email and act
2 mins Concerned department
END OF LETTER / EMAIL TRANSACTION
Note: Follow corresponding internal flow of transaction of service availed.
Davao City Water District – Citizen’s Charter
July 2014 Page 26
CUSTOMER SERVICES
BILLING DETAILS
Customer In-Office Transaction:
STEP CUSTOMER SERVICE PROVIDER DURATION
OF
ACTIVITY
PERSON-IN-
CHARGE and
COUNTER
FEE (PhP) FORM / SLIP
1 Go to Public Assistance Desk Officer (PADO) for assistance
Inquire customer's concern, give priority number. Direct customer to Commercial Services Department (CSD) counter and wait for turn
1 min PADO Priority number
2 Go to CSD Customer Service Attendant (CSA)
Receive, discuss, and encode in the database customer’s name, contact details and concern(s). Provide answer to customer. Print and let customer sign the Job Management System Maintenance Order (JMS MO) and give one copy
4 mins CSA
JMS MO
3 Sign JMS MO and receive one copy
CSA JMS MO
END OF CUSTOMER IN-OFFICE TRANSACTION
BILLING DETAILS INQUIRY
Note:
For manual procedure, all pending customer in-office report / complaint / query / request received by Commercial
Services Department (CSD) Customer Service Attendant (CSA) should be endorsed to CIU and Radio Room after
5:00 PM; Customer Assistance CSA must retrieve the same from the CIU and Radio Room not later than 7:30 AM the
following working day.
Davao City Water District – Citizen’s Charter
July 2014 Page 27
CUSTOMER SERVICES
SENIOR CITIZEN DISCOUNT PRIVILEGE
Customer In-Office Transaction:
STEP CUSTOMER SERVICE PROVIDER DURATION
OF
ACTIVITY
PERSON-IN-
CHARGE and
COUNTER
FEE (PhP) FORM / SLIP
1 Go to Public Assistance Desk Officer (PADO) for assistance.
Inquire customer's concern, give priority number. Direct customer to Commercial Services Department (CSD) counter and wait for turn.
1 min PADO
Priority number
2 Go to CSD Customer Service Attendant (CSA)
Receive, discuss, and give Senior Citizen Discount Privilege Application Form to be filled-up.
2 mins CSA
Senior Citizen
Discount Privilege Application Form
3 Receive Application Form, fill-up and return to CSA. Present Office of the Senior Citizen Affairs (OSCA) ID and submit Proof of Residency (Barangay Certification).
Receive and check filled-up application form, OSCA ID and proof of residency. Issue Certificate of Senior Citizen Discount Privilege (CSCDP). Update database.
2 mins CSA Senior Citizen Discount Privilege Application (SCDPA) Form
4 Receive Certificate of Senior Citizen Discount Privilege
Certificate of Senior Citizen Discount Privilege (CSCDP)
END OF CUSTOMER IN-OFFICE TRANSACTION
SENIOR CITIZEN DISCOUNT PRIVILEGE
Davao City Water District – Citizen’s Charter
July 2014 Page 28
CUSTOMER SERVICES
SPECIAL READING OF WATER CONSUMPTION
Customer In -Office Transaction
STEP CUSTOMER SERVICE PROVIDER DURATION
OF
ACTIVITY
PERSON-IN-
CHARGE and
COUNTER
FEE (PhP) FORM / SLIP
1 Go to Public Assistance Desk Officer (PADO) for assistance
Inquire customer's concern, give priority number. Direct customer to Commercial Services Department (CSD) counter and wait for turn
1 min PADO
Priority number
2 Go to Customer Service Attendant (CSA)
Receive, discuss, and encode in the database customer's name, contact details and concern(s).
2 mins CSA
3 Receive photocopy of valid ID. Print and let customer sign Job Management System Maintenance Order (JMS MO). Give one copy. Forward JMS MO to CSA – Billing
2 mins CSA JMS MO
4 Sign JMS MO and receive one copy
JMS MO
END OF CUSTOMER IN-OFFICE TRANSACTION
SPECIAL READING OF WATER CONSUMPTION
Davao City Water District – Citizen’s Charter
July 2014 Page 29
CUSTOMER SERVICES
SPECIAL READING OF WATER CONSUMPTION
Internal Flow of Transaction
STEP CUSTOMER SERVICE PROVIDER DURATION
OF
ACTIVITY
PERSON-IN-
CHARGE and
COUNTER
FEE
(PhP)
FORM / SLIP
1
Receive letter / email / Job Management System Maintenance Order (JMS MO) and / or load / browse database for Special Reading request. Forward to Supervising Utilities / Customer Service Officer (SUCSO) Billing
1 min Customer Service Attendant (CSA) - Billing
JMS MO
2 Receive JMS MO and assign to meter reader to conduct special reading
2 mins Supervising Utilities / Customer Service Officer (SUCSO) - Billing
JMS MO
3 Receive JMS MO. Conduct meter reading on site. Advise customer, if present, to go to office and pay the corresponding computed amount. Accomplish JMS MO and return to SUCSO Billing
5 mins Meter Reader JMS MO
4 Receive accomplished JMS MO. Forward JMS MO to CSA - Billing
2 min SUCSO - Billing JMS MO
5 Receive and log accomplished JMS MO. Prepare batch slip and forward to Information and Communication Technology Department (ICTD)
5 mins CSA - Billing
JMS MO
6 Receive batch slip and accomplished JMS MO. Update database. Return JMS MO to CSA – Billing
5 mins ICTD JMS MO
7 Receive JMS MO and file. 1 min CSA - Billing
JMS MO
END OF INTERNAL FLOW OF TRANSACTION
SPECIAL READING OF WATER CONSUMPTION
Davao City Water District – Citizen’s Charter
July 2014 Page 30
CUSTOMER SERVICES
HIGH WATER CONSUMPTION INVESTIGATION
Customer In-Office Transaction
STEP CUSTOMER SERVICE PROVIDER DURATION
OF
ACTIVITY
PERSON-IN-
CHARGE and
COUNTER
FEE (PhP) FORM / SLIP
1 Go to Public Assistance Desk Officer (PADO) for assistance
Inquire customer's concern, give priority number. Direct customer to Commercial Services Department (CSD) counter and wait for turn
1 min PADO
Priority number
2 Go to CSD Customer Service Attendant (CSA)
Receive, discuss, and encode in the database customer's name, contact details and concern(s). Require photocopy of any valid ID and authorization, if applicable. Provide answer to customer if concern can be answered outright. If not, the customer’s concern will be processed and give feedback within 3 working days
2 mins CSA
3 Give photocopy of valid ID
Receive photocopy of valid ID. Print and let customer sign Job Management System Maintenance Order (JMS MO). Give one copy. Forward JMS MO to CSA – Billing.
2 mins CSA JMS MO
4 Sign JMS MO and receive one copy.
JMS MO
END OF CUSTOMER IN-OFFICE TRANSACTION
HIGH WATER CONSUMPTION INVESTIGATION
Davao City Water District – Citizen’s Charter
July 2014 Page 31
CUSTOMER SERVICES
HIGH WATER CONSUMPTION INVESTIGATION
Internal Flow of Phone-in, Letter / Email and Customer In-Office Transaction
STEP CUSTOMER SERVICE PROVIDER DURATION
OF
ACTIVITY
PERSON-IN-
CHARGE and
COUNTER
FEE
(PhP)
FORM / SLIP
1 Receive letter / Email, load, print Job Management System Maintenance Order (JMS MO), GIS map and Billing Transaction Record (BTR). Attach to Investigator’s Field Report (IFR) Form. Forward to Supervising Utilities / Customer Service Officer (SUCSO) - Investigation
3 mins High Consumption staff / CSA
JMS MO GIS map BTR IFR Form
2 Receive JMS MO (with attachments) and assign to CSA - investigator
1 min SUCSO – Investigation
JMS MO GIS map BTR IFR Form
3 Investigate on site. Accomplish JMS MO, Investigator's Field Report form and return to SUCSO
20 mins CSA - Investigator
JMS MO GIS map BTR IFR Form
4 Receive; log accomplished JMS MO and forward to High Consumption Staff / CSA
1 min SUCSO JMS MO GIS map BTR IFR Form
5 Receive and update database
2 mins High Consumption staff /CSA
JMS MO GIS map BTR IFR Form
6 Browse database and feedback customer of the result within 3 working days.
3 mins CIU staff
END OF INTERNAL FLOW OF PHONE-IN, LETTER / EMAIL AND
CUSTOMER IN-OFFICE TRANSACTION
HIGH WATER CONSUMPTION INVESTIGATION
Davao City Water District – Citizen’s Charter
July 2014 Page 32
CUSTOMER SERVICES
CHANGE OF ACCOUNT NAME
Customer In-Office Transaction
STEP CUSTOMER SERVICE PROVIDER DURATION
OF
ACTIVITY
PERSON-IN-
CHARGE and
COUNTER
FEE (PhP) FORM / SLIP
1 Go to Public Assistance Desk Officer (PADO) for assistance.
Inquire customer's concern, give priority number. Direct customer to Commercial Services Department (CSD) counter and wait for turn.
1 min PADO Priority number
2 Go to CSD Customer Service Attendant (CSA)
Receive and check requirements. Require customer to execute Affidavit, if necessary. Issue Orientation Attendance Slip. Update database.
5 mins
CSA
Orientation Attendance Slip
3 Receive Orientation Attendance Slip. Attend orientation, submit duly filled-up Orientation Attendance Slip, photocopy of one valid ID to Orientation Facilitator
Facilitate orientation.
Give Orientation
Attendance Certificate.
45 mins Orientation Facilitator
Orientation Attendance Slip Orientation Attendance Certificate
4 Receive Attendance Certificate. Go back to CSA
Receive and check
Certificate. Issue Order of
Payment (Form 2) for
Change of Account Name
Service Fee
3 mins CSA Orientation Attendance Certificate Form 2
5 Go to teller and pay Receive Form 2 and
payment. Issue Official
Receipt (OR)
1 min Teller Php300 (subject to change)
Form 2 OR
6 Receive OR and present to CSA
Check OR. Prepare Service
Connection Contract (Form
4)
4 mins CSA Form 4
7 Sign contract and receive one copy
Inform customer that
account name shall be
changed within 24 hours
1 min CSA Form 4
END OF CUSTOMER IN-OFFICE TRANSACTION
CHANGE OF ACCOUNT NAME
Davao City Water District – Citizen’s Charter
July 2014 Page 33
CUSTOMER SERVICES
CHANGE OF ACCOUNT NAME
Internal Flow of Transaction
STEP CUSTOMER SERVICE PROVIDER DURATION
OF
ACTIVITY
PERSON-IN-
CHARGE and
COUNTER
FEE (PhP) FORM / SLIP
1 Prepare Master file Change Request (MCR) and attach to contract. Forward to Supervising Utilities / Customer Service Officer (SUCSO) - Accounts Unit
5 mins CSA MCR
2 Receive, check, approve MCR. Return to CSA
2 mins SUCSO - Accounts Unit
MCR
3 Update database. Generate summary of Change of account name daily requests. Forward to Information and Communications Technology Department (ICTD) staff.
7 mins CSA MCR
4 Receive MCR, update database. Return documents to CSA
3 mins ICTD Staff MCR
5 Check and update database. Close transaction. File.
3 mins CSA
END OF INTERNAL FLOW
CHANGE OF ACCOUNT NAME TRANSACTION
Davao City Water District – Citizen’s Charter
July 2014 Page 34
CUSTOMER SERVICES
REPLACEMENT OF STOLEN WATER METER
Customer In-Office Transaction (Outright Payment)
STEP CUSTOMER SERVICE PROVIDER DURATION
OF
ACTIVITY
PERSON-IN-
CHARGE and
COUNTER
FEE (PhP) FORM / SLIP
1 Go to Public Assistance Desk Officer (PADO) for assistance.
Inquire customer's concern, give priority number and direct to Commercial Services Department (CSD) Counter.
1 min PADO Priority Number
2 Go to CSD Customer Service Attendant (CSA), report lost water meter
Receive, discuss and encode in the database customer’s name, contact details and concern(s). Check billing details. If disconnected, follow reconnection process. If stolen meter, require a photocopy of any valid ID and authorization, if applicable.
4mins CSA
3 Submit requirements. Sign JMS MO; receive one copy and Form 2.
Receive, check requirements and update database. Print and let customer sign JMS MO. Give one copy. Print Form 2 (order of payment) and advise customer to pay at teller cost of meter.
3mins CSA JMS MO Form 2
4 Go to teller and Pay
Receive payment, Form 2 and issue Official Receipt (OR). Attach Form 2 to DCWD OR copy
1 min Teller Current cost of water meter
JMS MO Form 2 OR
5 Receive OR, go back to CSA and present OR
Check OR to validate. Inform customer that the installation of new water meter will be done within 24 hours.
1 min CSA OR
END OF CUSTOMER IN- OFFICE TRANSACTION (OUTRIGHT PAYMENT)
REPLACEMENT OF STOLEN WATER METER
Davao City Water District – Citizen’s Charter
July 2014 Page 35
CUSTOMER SERVICES
REPLACEMENT OF STOLEN WATER METER
First Visit Customer In-Office Transaction (Charge to Account)
STEP CUSTOMER SERVICE PROVIDER DURATION
OF
ACTIVITY
PERSON-IN-
CHARGE and
COUNTER
FEE (PhP) FORM / SLIP
1 Go to Public Assistance Desk Officer (PADO) for assistance.
Inquire customer's concern, direct to Commercial Services Department (CSD) Counter.
1 min PADO Priority Number
2 Go to CSD Customer Service Attendant (CSA), report stolen water meter
Receive, discuss and encode in the database customer’s name, contact details and concern(s). Check billing details. If disconnected, follow reconnection process. If stolen meter, require a photocopy of any valid ID and authorization, if applicable.
4 mins CSA
3 Submit requirements. Sign JMS MO; receive one copy and Form2.
Receive, check requirements and update database. Print and let customer sign JMS MO and give one copy. Print Form 2 (order of payment), advise customer to pay at teller cost of meter. If customer request for terms or "add-to-bill" arrangement, endorse concern to Customer Care Division Manager (CCDM)
3 mins CSA JMS MO Form 2
4 Go to CCDM Evaluate request for “add-to-bill” arrangement.
1 min CCDM JMS MO Form 2
5 Go back CSA
Advise customer to come back for the signing of Promissory Note (PN), Stolen Meter fee shall be added in the next bill and meter shall be installed within 24 hours.
1 min CSA Cost of water meter
JMS MO Form 2
END OF FIRST VISIT CUSTOME IN- OFFICE TRANSACTION (CHARGE TO ACCOUNT)
REPLACEMENT OF STOLEN WATER METER
Davao City Water District – Citizen’s Charter
July 2014 Page 36
CUSTOMER SERVICES
REPLACEMENT OF STOLEN WATER METER
Second Visit Customer In-Office Transaction (Charge to Account)
STEP CUSTOMER SERVICE PROVIDER DURATION
OF
ACTIVITY
PERSON-IN-
CHARGE and
COUNTER
FEE (PhP) FORM / SLIP
1 Go to Public Assistance Desk Officer (PADO) for assistance
Inquire customer's concern, direct to Billing Unit
1 min PADO Priority Number
2 Go to Billing Unit Customer Service Attendant (CSA)
Receive, browse database and encode customer’s name. Prepare and let customer sign Promissory Note (Form 3). Give one copy to customer and one copy for Information and Communications Technology Department (ICTD) staff
3mins CSA Form 3
3 Sign Form 3 and receive one copy
Update database 1 min ICTD Staff Form 3
END OF SECOND VISIT CUSTOMER -IN OFFICE TRANSACTION
REPLACEMENT OF STOLEN WATER METER
Davao City Water District – Citizen’s Charter
July 2014 Page 37
CUSTOMER SERVICES
REPLACEMENT OF STOLEN WATER METER
Internal Flow of Transaction
STEP CUSTOMER SERVICE PROVIDER DURATION
OF
ACTIVITY
PERSON-IN-
CHARGE and
COUNTER
FEE (PhP) FORM / SLIP
1 Prepare Store Requisition Slip (SRS) for replacement of stolen water meter. Forward SRS to Customer Care Division Manager (CCDM) and Commercial Services Department Manager (CSDM) for approval.
4 mins CSA
JMS MO SRS
2 Approve SRS 2 mins CCDM CSDM
JMS MO SRS
3 Update database, forward Job Management System Maintenance Order (JMS MO) and SRS to CSD Water Maintenance Foreman.
2 mins CSA JMS MO SRS
4 Receive JMS MO and SRS. Present JMS MO and give SRS to storekeeper to withdraw materials.
2mins CSD Water Maintenance Foreman
JMS MO SRS
5 Receive JMS MO and SRS. Process SRS and issue materials. Return JMS MO and give one copy of processed SRS.
5 mins Storekeeper JMS MO SRS
6 Receive materials, JMS MO and SRS copy
1 min CSD Water Maintenance Foreman
JMS MO SRS
7 Go to site. Install new meter and inform customer that water meter has been installed. After installation, submit accomplished JMS MO and SRS to CSA
10 mins CD Water Maintenance Foreman
JMS MO SRS
Davao City Water District – Citizen’s Charter
July 2014 Page 38
CUSTOMER SERVICES
REPLACEMENT OF STOLEN WATER METER
Internal Flow of Transaction
STEP CUSTOMER SERVICE PROVIDER DURATION
OF ACTIVITY
PERSON-IN-
CHARGE and
COUNTER
FEE (PhP) FORM / SLIP
8 Receive accomplished JMS MO. Update database and endorse to Information and Communications Technology Department (ICTD). Prepare Debit Memo Request (DMR), Master File Change Request (MCR), if necessary, and attach to JMS MO. Forward to CCDM for approval.
10 mins CSA JMS MO SRS MCR, if
necessary DMR
9 Sign /approve MCR, DMR and JMS MO. Forward to CSA
1 min CCDM JMS MO SRS MCR DMR
10 Receive MCR, DMR and JMS MO. Prepare Debit Memo (DM). Assign control number. Forward documents to Supervising Utilities/Customer Services Officer (SUCSO) Billing.
2mins CSA JMS MO SRS MCR DMR DM
11 Check and counter sign Debit Memo (DM). Forward documents to Accounts and Billing Division Manager (ABDM).
1 min SUCSO Billing DM
12 Approve DM. Forward documents to CSDM for approval.
1 min ABDM JMS MO MCR DMR DM
Davao City Water District – Citizen’s Charter
July 2014 Page 39
CUSTOMER SERVICES
REPLACEMENT OF STOLEN WATER METER
Internal Flow of Transaction
STEP CUSTOMER SERVICE PROVIDER DURATION
OF
ACTIVITY
PERSON-IN-
CHARGE and
COUNTER
FEE (PhP) FORM / SLIP
13 Check and approve DM. Return documents to CSA.
1 min CSDM JMS MO MCR DMR DM
14 Forward documents to ICTD for posting of DM and updating of Meter Details
1 min CSA JMS MO MCR DMR DM
15 Post the DM and update Meter Details. Return documents to CSA-
1 min ICTD Operations staff
JMS MO MCR DMR DM
16 Receive documents. Check customer's database and file.
1 min CSA JMS MO MCR DMR DM
END OF INTERNAL FLOW OF TRANSACTION
REPLACEMENT OF STOLEN WATER METER
Davao City Water District – Citizen’s Charter
July 2014 Page 40
CUSTOMER SERVICES
DISCONNECTION OF WATER SERVICE
First Visit Customer In-Office Transaction
STEP CUSTOMER SERVICE PROVIDER DURATION
OF
ACTIVITY
PERSON-IN-
CHARGE and
COUNTER
FEE (PhP) FORM / SLIP
1 Go to Public Assistance Desk Officer (PADO) for assistance.
Inquire customer's concern, give priority number. Direct to Commercial Services Department (CSD) Counter and wait for turn.
1 min PADO Priority number
2 Go to CSD Customer Service Attendant (CSA). Submit requirements.
Receive, discuss and encode in the database customer's name and concern(s). Inform customer the duration of disconnection:
If no beneficial user - 3 working days
If with beneficial user - within 15 calendar days. Receive requirements, compute outstanding balance. Print and give Order of Payment (Form 2). Advise customer to go to teller and pay, return with the OR.
4 mins
CSA
Form 2
3 Go to teller, give Form 2 and pay.
Receive Form 2 and payment. Give Official Receipt (OR).
1 min Teller Form 2 OR
4 Return to CSA and present OR. Sign JMS Mo and receive one copy.
Check OR and update database. Print Job Management System Maintenance Order (JMS MO), let customer sign and give one copy. Advise customer to contact office to verify marginal bill and settle after disconnection.
3 mins CSA OR JMS MO
END OF FIRST VISIT CUSTOMER IN- OFFICE TRANSACTION
DISCONNECTION OF WATER SERVICE
Davao City Water District – Citizen’s Charter
July 2014 Page 41
CUSTOMER SERVICES
DISCONNECTION OF WATER SERVICE
Second Visit Customer In-Office Transaction (Payment of Marginal Bill)
STEP CUSTOMER SERVICE PROVIDER DURATION
OF
ACTIVITY
PERSON-IN-
CHARGE and
COUNTER
FEE (PhP) FORM / SLIP
5 Go to teller. Give account name and pay marginal bill.
Accept payment, encode name and issue Official Receipt (OR).
1 min Teller OR
6 Go to Commercial Services Department (CSD) Secretary.
Attend to customer. Check OR. Prepare and print Certification of Full Payment. Forward to Commercial Services Department Manager (CSDM) /Customer Care Division Manager (CCDM) for signature.
3 mins CSD Secretary OR Certification of
Full Payment
7 Sign Certification. 1 min CSDM / CCDM
Certification of Full Payment
8 Receive certification.
Release certification. File receipt copy.
1 min CSD Secretary Certification of Full Payment
END OF SECOND VISIT CUSTOMER IN-OFFICE TRANSACTION
DISCONNECTION OF WATER SERVICE
Davao City Water District – Citizen’s Charter
July 2014 Page 42
CUSTOMER SERVICES
DISCONNECTION OF WATER SERVICE
Internal Flow of Transaction (No Beneficial User)
STEP CUSTOMER SERVICE PROVIDER DURATION
OF
ACTIVITY
PERSON-IN-
CHARGE and
COUNTER
FEE (PhP) FORM / SLIP
1 Forward Job Management System Maintenance Order (JMS MO) to Disconnection Office staff / CSA
1 min CSA JMS MO
2 Receive JMS MO, browse database and update file. Record in logbook. Dispatch all requests of the day the next working day.
3 mins Disconnection Office staff / CSA
JMS MO
3 Receive JMS MO and sign logbook. Go to site, execute disconnection. Record latest registered consumption and return document to Disconnection Office-based CSA
10 mins Disconnection Crew
JMS MO
4 Receive completed JMS MO, update database, close transaction, record to logbook and forward to ICTD.
3 mins Disconnection Office staff / CSA
JMS MO
5 Receive accomplished JMS MO and update customer master file. Return JMS MO to Disconnection Office-based CSA.
2 mins ICTD Staff JMS MO
6 Receive and count accomplished JMS MO. Check customer record (database). File.
5 mins / batch of 10 accounts
Disconnection Office staff / CSA
JMS MO
END OF INTERNAL FLOW OF TRANSACTION (NO BENEFICIAL USER)
DISCONNECTION OF WATER SERVICE
Davao City Water District – Citizen’s Charter
July 2014 Page 43
CUSTOMER SERVICES
DISCONNECTION OF WATER SERVICE
Internal Flow of Transaction (With Beneficial User)
STEP CUSTOMER SERVICE PROVIDER DURATION
OF
ACTIVITY
PERSON-IN-
CHARGE and
COUNTER
FEE (PhP) FORM / SLIP
1 Forward JMS MO to Disconnection Office staff / CSA
1 min CSA JMS MO
2 Receive JMS MO, browse database and update file. Record in logbook. Dispatch all requests of the day the next working day.
3mins Disconnection Office staff / CSA
JMS MO
3 Receive JMS MO. Go to site. If with beneficial user, HOLD disconnection. Get name of beneficial user, accomplish JMS MO and let customer sign. Return accomplished JMS MO to Disconnection Office staff / CSA
7mins Disconnection Crew
JMS MO
4 Receive, record accomplished JMS MO. Update database. Forward photocopy of JMS MO to Customer Care Division (CCD) Secretary.
3mins Disconnection Office staff / CSA
JMS MO
5 Prepare and print a letter.
Browse and initial letter. Forward letter to CSD Manager
7mins
CCD Secretary
CCD Manager
JMS MO
Letter
6 Read and sign letter. 2 mins CSD DM Letter
Davao City Water District – Citizen’s Charter
July 2014 Page 44
CUSTOMER SERVICES
DISCONNECTION OF WATER SERVICE
Internal Flow of Transaction (With Beneficial User)
STEP CUSTOMER SERVICE PROVIDER DURATION
OF ACTIVITY
PERSON-IN-
CHARGE and
COUNTER
FEE (PhP) FORM / SLIP
7 Record and forward letter to Disconnection Office staff / CSA
2mins CSD Sec Letter
8
Receive letter. Record details. Dispatch to assigned crew.
2mins Disconnection Office staff / CSA
Letter
9 Deliver letter and let customer acknowledge receipt. Update record. Return copy file to CSD Secretary.
5 mins Designated messenger / Disconnection Crew
Letter
File copy
10 Give photocopy of letter to Disconnection Office-based CSA. File.
1 min CSD Secretary File copy
Note: Disconnection Office-based Customer Service Attendant (CSA) must monitor and wait for ten (10) calendar days from
delivery of letter to beneficial user / occupant before effecting the disconnection of water service.
Davao City Water District – Citizen’s Charter
July 2014 Page 45
CUSTOMER SERVICES
DISCONNECTION OF WATER SERVICE After 10 Calendar Days from Delivery of Letter
Internal Flow of Transaction (With Beneficial User)
STEP CUSTOMER SERVICE PROVIDER DURATION
OF ACTIVITY
PERSON-IN-
CHARGE and
COUNTER
FEE (PhP) FORM / SLIP
11 If no reply from the customer after 10 days, dispatch JMS MO to crew to effect disconnection.
1 min Disconnection Office staff / CSA
JMS MO
12 Receive JMS MO. Go to site and execute disconnection. Record latest registered consumption. Return accomplished JMS MO to Disconnection Office staff / CSA
20 mins Disconnection Crew
JMS MO
13 Receive completed JMS MO, update database, close transaction, record to logbook and forward to ICTD.
3 mins Disconnection Office staff / CSA
JMS MO
14
Receive accomplished JMS MO and update customer master file. Return JMS MO to Disconnection Office-based CSA.
2 mins ICTD Staff JMS MO
15 Receive and count accomplished JMS MO. Check customer record (database). File.
5 mins / batch of 10 accounts
Disconnection Office staff / CSA
JMS MO
END OF INTERNAL FLOW OF TRANSACTION (WITH BENEFICIAL USER)
DISCONNECTION OF WATER SERVICE
Davao City Water District – Citizen’s Charter
July 2014 Page 46
CUSTOMER SERVICES
ARRANGEMENT / ELEVATION OF WATER METER
Customer In-Office Transaction
STEP CUSTOMER SERVICE PROVIDER DURATION
OF
ACTIVITY
PERSON-IN-
CHARGE and
COUNTER
FEE (PhP) FORM / SLIP
1 Go to Public Assistance Desk Officer (PADO) for assistance.
Inquire customer’s concern, provide priority number. Direct customer to Commercial Services Department (CSD) Counter and wait for turn.
1 min
PADO Priority Number
2 Go to CSD Customer Service Attendant (CSA).
Receive, discuss and encode customer’s name, contact details and concern(s). Evaluate request, prepare and print Job Management System Maintenance Order (JMS MO). Let customer to sign the JMS MO. Give
one copy of JMS MO.
4 mins CSA
JMS MO
3 Sign JMS MO and receive one copy.
JMS MO
END OF CUSTOMER IN- OFFICE TRANSACTION
ARRANGEMENT / ELEVATION OF WATER METER
Davao City Water District – Citizen’s Charter
July 2014 Page 47
CUSTOMER SERVICES
ARRANGEMENT / ELEVATION OF WATER METER
Internal Flow of Transaction
STEP CUSTOMER SERVICE PROVIDER DURATION
OF ACTIVITY
PERSON-IN-
CHARGE and
COUNTER
FEE (PhP) FORM / SLIP
1 4:00PM of Day 1 (from Customer In- Office Transaction) Receive letter / email. Prepare, print list of Job Management System Maintenance Order (JMS MO) control numbers by batch and forward to Pipes and Appurtenances Maintenance Department (PAMD) office Staff
5 mins / batch
CSA JMS MO
2 8:00AM of Day 2 Receive JMS MO, get JMS MO control numbers, generate GIS map per account. Forward to PAMD supervisor.
3 mins
PAMD Office Staff
JMS MO
3 Dispatch to caretaker. 2 mins PAMD Supervisor
4 Day 3 (1-2 days depending on workload; leak repairs are prioritized) Execute arrange / elevate meter
30 mins / meter
PAMD Caretaker
5 Prepare accomplishment report and submit to PAMD office staff
5 mins / account
PAMD Caretaker
END OF INTERNAL FLOW OF TRANSACTION
ARRANGEMENT / ELEVATION OF WATER METER
Note: Water meter will be arranged / elevated within 3 working days after customer in-office transaction.
Davao City Water District – Citizen’s Charter
July 2014 Page 48
CUSTOMER SERVICES
REPLACEMENT OF DEFECTIVE WATER METER
Customer In-Office Transaction
STEP CUSTOMER SERVICE PROVIDER DURATION
OF
ACTIVITY
PERSON-IN-
CHARGE and
COUNTER
FEE (PhP) FORM / SLIP
1 Go to Public Assistance Desk Officer (PADO) for assistance.
Inquire customer’s concern, provide priority number. Direct customer to Commercial Services Department (CSD) Counter and wait for turn.
1 min
PADO Priority Number
2 Go to CSD Customer Service Attendant (CSA) and raise concern.
Receive, discuss and encode in the database customer's name, contact details and concern(s). Check billing transaction details. Prepare JMS MO.
4 mins CSA JMS MO
3 Sign JMS MO and receive one copy.
JMS MO
END OF CUSTOMER IN- OFFICE TRANSACTION
REPLACEMENT OF DEFECTIVE WATER METER
Davao City Water District – Citizen’s Charter
July 2014 Page 49
CUSTOMER SERVICES
REPLACEMENT OF DEFECTIVE WATER METER
Internal Flow of Transaction
WITHIN 3 DAYS After Customer In-Office Transaction or Receipt of Letter / Email
STEP CUSTOMER SERVICE PROVIDER DURATION
OF
ACTIVITY
PERSON-IN-
CHARGE and
COUNTER
FEE (PhP) FORM / SLIP
1 Forward letter / email / Job Management System Maintenance Order (JMS MO) to Investigation Staff / Customer Service Attendant (CSA)
1 min SUCSO / CSA
JMS MO
2 Receive letter / email / JMS MO. Print GIS map, Billing Transaction Record (BTR) and attach to Investigator's Field Report (IFR) Form. Dispatch to investigation crew.
4mins Investigation Staff / CSA
JMS MO GIS map BTR IFR Form
3 Go to site and investigate. Return accomplished JMS MO, BTR and IFR form to Investigation CSA
10 mins Investigation Crew
JMS MO GIS map BTR IFR Form
4 Encode investigation findings in database. (A) If meter is defective, prepare JMS MO - Change Meter. Forward to Change -Meter staff / CSA. (B) If result is not conclusive, prepare JMS MO for on-site meter testing. Forward to Water Meter Maintenance Division (WMMD).
5 mins Investigation Staff / CSA
Davao City Water District – Citizen’s Charter
July 2014 Page 50
CUSTOMER SERVICES
REPLACEMENT OF DEFECTIVE WATER METER
(A) Water Meter is Defective
Internal Flow of Transaction
STEP
CUSTOMER
SERVICE PROVIDER
DURATION
OF
ACTIVITY
PERSON-IN-
CHARGE and
COUNTER
FEE (PhP) FORM / SLIP
1
Receive / browse JMS MO, GIS map, Billing Transaction Record (BTR), if applicable. Update database. Record to logbook. Forward JMS MO to Pipes and Appurtenances and Maintenance Department (PAMD) staff
5 mins Change-meter Staff / CSA
JMS MO GIS map BTR Investigator's
Field Report (IFR) Form
3 Receive JMS MO, BT, IFR form. Check list of requests for Change Meter.
4 mins PAMD Staff 1 JMS MO GIS map BTR IFR Form
4 Receive JMS MO. Re-sketch per zone. Dispatch the following day to Change Meter Unit crew.
3 mins PAMD Staff 2 JMS MO GIS map BTR IFR Form
5 Go to site, change defective meter. Inform customer that meter has been changed. Accomplish JMS MO and return to PAMD staff 2.
20 mins Change Meter Crew
JMS MO GIS map BTR IFR Form
5 Receive accomplished JMS MO. Update database. Return accomplished JMS MO and attachments to CSD. Copy furnish ICTD
5 mins PAMD Staff 2 JMS MO
6 Receive JMS MO. Update master file on meter details
2mins ICTD Staff JMS MO
7 Receive JMS MO and file. 1 min Change-meter Staff / CSA
JMS MO
END OF INTERNAL FLOW OF TRANSACTION
REPLACEMENT OF DEFECTIVE WATER METER
Davao City Water District – Citizen’s Charter
July 2014 Page 51
CUSTOMER SERVICES
REPLACEMENT OF DEFECTIVE WATER METER
(B) Water Meter Investigation Result is not Conclusive
Internal Flow of Transaction
STEP CUSTOMER SERVICE PROVIDER DURATION
OF
ACTIVITY
PERSON-IN-
CHARGE and
COUNTER
FEE (PhP) FORM / SLIP
1
Browse database for on-site meter testing request. Print Job Management System Maintenance Order (JMS MO), forward to Meter Technology Unit
5 mins Water Meter Maintenance Division (WMMD) Staff
JMS MO
2 Receive and endorse JMS MO to Field Testing crew.
2 mins Meter Technology Unit
JMS MO
3 Go to site and conduct on-site meter test. Accomplish JMS MO, return to WMMD staff.
30 mins Field Testing Unit
JMS MO
4 If meter is defective, prepare JMS MO for change of meter. If meter is not defective, update database.
3 mins WMMD Staff JMS MO
END OF INTERNAL FLOW OF TRANSACTION
REPLACEMENT OF DEFECTIVE WATER METER
Note: After Step 4, if meter is found defective, follow steps of Internal Flow of Transaction (A) Water Meter is
Defective on page 50.
Davao City Water District – Citizen’s Charter
July 2014 Page 52
CUSTOMER SERVICES
NO WATER / LOW PRESSURE
Internal Flow of Transaction on Report / Complaint / Query / Request on No Water / Low Pressure
from 7:30 am to 5:00 pm
STEP CUSTOMER SERVICE PROVIDER DURATION
OF
ACTIVITY
PERSON-IN-
CHARGE and
COUNTER
FEE (PhP) FORM / SLIP
1 Browse letter / email / database for request / complaint / report on no water / low pressure, prepare logsheet form and dispatch crew via radio
4 mins Pipelines and Appurtenances Maintenance Department (PAMD) staff
2 Receive call, go to site and assess. Report findings to PAMD staff via radio
within11 hours
Caretaker team
3 Receive call, update database.
3mins PAMD staff
4 Browse database and feedback to customer within 24 hours
3mins Central Information Unit (CIU)
END OF INTERNAL FLOW OF TRANSACTION
NO WATER / LOW PRESSURE
Note: If no water / low pressure is caused by water interruption, the Central Information Unit (CIU) staff or
Customer Service Attendant will immediately give feedback to customer upon receiving the call. No need to
send the caretaker team to investigate.
Davao City Water District – Citizen’s Charter
July 2014 Page 53
CUSTOMER SERVICES
NO WATER / LOW PRESSURE
Internal Flow of Transaction on Report / Complaint / Query / Request on No Water / Low Pressure
from 5:00pm to 7:30am and holidays
STEP CUSTOMER SERVICE PROVIDER DURATION
OF
ACTIVITY
PERSON-IN-
CHARGE and
COUNTER
FEE (PhP) FORM / SLIP
1 Browse database for request / complaint / report, prepare and dispatch crew via radio
4 mins Radio Room Staff
2 Receive call, go to site and assess. Report findings to Radio room staff via radio
within 11 hours
Emergency Crew
3 Receive call, update database.
3mins Radio Room Staff
4 Browse database and feedback to customer within 24 hours
3mins Central Information Unit (CIU)
END OF INTERNAL FLOW OF TRANSACTION
NO WATER/LOW PRESSURE
Note: If no water / low pressure is caused by water interruption, the Central Information Unit (CIU) staff will
immediately give feedback to customer upon receiving the call. No need to send emergency crew to
investigate.
Davao City Water District – Citizen’s Charter
July 2014 Page 54
CUSTOMER SERVICES
TRANSMISSION, DISTRIBUTION AND SERVICE LINE LEAK REPAIRS
Customer In-Office Transaction
STEP CUSTOMER SERVICE PROVIDER DURATION
OF ACTIVITY
PERSON-IN-
CHARGE and
COUNTER
FEE (PhP) FORM / SLIP
1 Go to Public Assistance Desk Officer (PADO) for assistance
Inquire customer’s concern; direct customer to Pipelines and Appurtenances Maintenance Department (PAMD) Staff.
1 min
PADO
2 Go to PAMD Staff Receive, discuss and encode in the database customer's name, contact details and concern(s). Ask for location of leak / landmark / account number / nearest meter identifier. Let customer sign the JMS MO and give one copy.
4 mins PAMD staff JMS MO
3 Sign JMS MO and receive one copy
END OF CUSTOMER -IN OFFICE TRANSACTION
TRANSMISSION, DISTRIBUTION AND SERVICE LINE LEAK REPAIRS
Davao City Water District – Citizen’s Charter
July 2014 Page 55
CUSTOMER SERVICES
TRANSMISSION, DISTRIBUTION AND SERVICE LINE LEAK REPAIRS
Internal Flow of Transaction on Transmission, Distribution and Service line Leak Repairs from 7:30 am
to 5:00 pm
STEP CUSTOMER SERVICE PROVIDER DURATION
OF
ACTIVITY
PERSON-IN-
CHARGE and
COUNTER
FEE (PhP) FORM / SLIP
1 Browse letter / email / database. View GIS map to check location. Prepare logsheet and dispatch crew via radio.
5mins Pipelines and Appurtenances Maintenance Department (PAMD) Staff
2 Receive call, go to site, assess, repair and conduct flushing. If service line leak, flush immediately. If mainline leak, call valve crew for flushing.
within 11 hours
Caretaker team
3 After repair / flushing, report to PAMD office staff via radio.
2 mins Caretaker team
4 Receive report, update database.
3mins PAMD Staff
5 Browse database and feedback to customer.
3mins Central Information Unit (CIU)
6 Upon return to office, submit Daily Accomplishment Report (DAR) and completed Leak Repair Form.
1 min Caretaker team DAR Leak Repair
Form
7 Receive DAR and Leak Repair Form. File
1 min PAMD Staff DAR Leak Repair
Form
END OF INTERNAL FLOW OF TRANSACTION
TRANSMISSION, DISTRIBUTION AND SERVICE LINE LEAK REPAIRS
Davao City Water District – Citizen’s Charter
July 2014 Page 56
CUSTOMER SERVICES
TRANSMISSION, DISTRIBUTION AND SERVICE LINE LEAK REPAIRS
Internal Flow of Transaction on Transmission, Distribution and Service line Leak Repairs from 5:00pm
to 7:30am
STEP CUSTOMER SERVICE PROVIDER DURATION
OF
ACTIVITY
PERSON-IN-
CHARGE and
COUNTER
FEE (PhP) FORM / SLIP
1 Browse database. View GIS map to check location. Dispatch crew via radio.
5 mins Radio room staff
2 Receive call, go to site, assess, repair and conduct flushing. If service line leak, flush immediately. If mainline leak, call valve crew for flushing.
within 11 hours
Emergency crew
3 After repair/ flushing, report to Radio room staff via radio.
2 mins Emergency crew
4 Receive report, update database.
3 mins Radio room staff
5 Browse database and feedback to customer.
3 mins Central Information Unit (CIU) Staff
6 Upon return to office, submit Daily Accomplishment Report (DAR) and completed Leak Repair Form.
1 min Emergency crew
DAR Leak Repair
Form
7 Receive DAR and Leak Repair Form. File
1 min PAMD Staff DAR Leak Repair
Form
END OF INTERNAL FLOW OF TRANSACTION
TRANSMISSION, DISTRIBUTION AND SERVICE LINE LEAK REPAIRS
Davao City Water District – Citizen’s Charter
July 2014 Page 57
CUSTOMER SERVICES
WATER QUALITY ANALYSIS (No Payment Required)
Customer In-Office Transaction
STEP CUSTOMER SERVICE PROVIDER DURATION
OF ACTIVITY
PERSON-IN-
CHARGE and
COUNTER
FEE (PhP) FORM / SLIP
1 Go to Public Assistance Desk Officer (PADO) for assistance
Inquire customer’s concern; give priority number. Direct customer to Commercial Services Department (CSD) counter
1 min
PADO Priority number
2 Go to CSD Customer Service Attendant (CSA)
Receive, discuss and encode in the database customer's name, contact details and concern(s). Print and let customer sign Job Management System Maintenance Order (JMS MO) for investigation
4 mins CSA JMS MO
3 Sign JMS MO and receive one copy
JMS MO
END OF CUSTOMER -IN OFFICE TRANSACTION
WATER QUALITY ANALYSIS (NO PAYMENT REQUIRED)
Davao City Water District – Citizen’s Charter
July 2014 Page 58
CUSTOMER SERVICES
WATER QUALITY ANALYSIS (No Payment Required)
Internal Flow of Transaction on Flushing of Pipeline by Pipelines and Appurtenances Maintenance
Department (PAMD)
STEP CUSTOMER SERVICE PROVIDER DURATION
OF
ACTIVITY
PERSON-IN-
CHARGE and
COUNTER
FEE (PhP) FORM / SLIP
1 Browse letter / email / database. View GIS map to check location. Dispatch crew via radio
5 mins Pipelines and Appurtenances Maintenance Department (PAMD) Staff.
2 Receive call, go to site, assess, and conduct flushing. If service line leak, flush immediately. If mainline leak, call valve crew for flushing
within 11 hours
Caretaker team
3 After repair / flushing, report to PAMD staff via radio
2 mins Caretaker team
4 Receive report, update database
3mins PAMD staff
END OF INTERNAL FLOW OF TRANSACTION
WATER QUALITY ANALYSIS (NO PAYMENT REQUIRED)
Davao City Water District – Citizen’s Charter
July 2014 Page 59
CUSTOMER SERVICES
WATER QUALITY ANALYSIS (No Payment Required)
Internal Flow of Transaction on Water Analysis by Production Department (PD)
STEP CUSTOMER SERVICE PROVIDER DURATION OF
ACTIVITY
PERSON-IN-
CHARGE and
COUNTER
FEE
(PhP)
FORM / SLIP
1 Browse letter / email / database. Print Job Management System Maintenance Order (JMS MO), forward to Water Quality Division (WQD) staff
5 mins WQD Staff JMS MO
2 Assign complaint to Quality Control Aide (Water Sample Collector)
2 mins Laboratory staff
JMS MO
3 Go to site, collect water sample for chlorine residual and water analysis. Accomplish JMS MO. Endorse sample to Laboratory staff
30 mins Quality Control Aide
JMS MO
4 Receive water sample. Perform water quality test
Physical-chemical test- 2 hours
Microbiological test –30 mins
Laboratory staff
5 If result of microbiological test is positive, update database. Prepare Job Management System Maintenance Order (JMS MO) for re-flushing. After flushing by PAMD, conduct re-sampling
5 mins Laboratory staff
JMS MO
6 Browse database and feedback to customer result of water quality test
3 mins Central Information Unit (CIU) Staff
END OF INTERNAL FLOW OF TRANSACTION
WATER QUALITY ANALYSIS (NO PAYMENT REQUIRED)
Note:
1) Duration of analysis and preparation of Physical –chemical test – 1 day
2) Duration of incubation, analysis and preparation of Microbiological test –2 days
Membrane Filter Technique (MFT)
Davao City Water District – Citizen’s Charter
July 2014 Page 60
CUSTOMER SERVICES
WATER QUALITY ANALYSIS (Payment Required)
First Visit - Customer In-Office Transaction
STEP CUSTOMER SERVICE PROVIDER DURATION
OF ACTIVITY
PERSON-IN-
CHARGE and
COUNTER
FEE (PhP) FORM / SLIP
1 Pay at nearest DCWD collection center
Receive payment; issue Official Receipt (OR).
1 min
Teller Cost of water analysis
OR
2 Receive OR. Proceed to PD laboratory, Madapo Hills and present OR
Check OR. Browse database, print JMS MO. Let customer to sign JMS MO. Give sterilized bottle, sampling procedure and water sample data sheet.
4 mins Water Quality Division (WQD) Staff
JMS MO Water Sample
Data Sheet
3 Sign JMS MO and receive one copy. Receive sterilized bottle, sampling procedure and data sheet
JMS MO Water Sample
Data Sheet
END OF FIRST VISIT CUSTOMER -IN OFFICE TRANSACTION
WATER QUALITY ANALYSIS (PAYMENT REQUIRED)
Davao City Water District – Citizen’s Charter
July 2014 Page 61
CUSTOMER SERVICES
WATER QUALITY ANALYSIS (PAYMENT REQUIRED)
Second Visit - Customer In-Office Transaction
STEP CUSTOMER SERVICE PROVIDER DURATION
OF
ACTIVITY
PERSON-IN-
CHARGE and
COUNTER
FEE (PhP) FORM / SLIP
1 Go to Production Department (PD) Laboratory, Madapo Hills. Submit water sample and duly filled-up water sample data sheet
Receive water sample and data sheet. Inform customer of test result duration:
Microbiological analysis-
Within 7 working days after submission of sample
Physical - Chemical analysis – within 5 working days after submission of sample
3 mins
Water Quality Division (WQD) Staff
Water Sample Data Sheet
END OF SECOND VISIT CUSTOMER -IN OFFICE TRANSACTION
WATER QUALITY ANALYSIS (PAYMENT REQUIRED)
Davao City Water District – Citizen’s Charter
July 2014 Page 62
CUSTOMER SERVICES
WATER QUALITY ANALYSIS (PAYMENT REQUIRED)
Internal Flow of Transaction after Second Visit of Customer
STEP CUSTOMER SERVICE PROVIDER DURATION OF
ACTIVITY
PERSON-IN-
CHARGE and
COUNTER
FEE
(PhP)
FORM / SLIP
1 Endorse water sample and duly filled-up water sample data sheet to Laboratory staff
1 min Water Quality Division (WQD) Staff
Water Sample Data Sheet
2 Perform water analysis
Physical-chemical analysis – 2 hours
Microbiological analysis –30 mins
Laboratory staff
Water Sample Data Sheet
END OF INTERNAL FLOW OF TRANSACTION
WATER QUALITY ANALYSIS (PAYMENT REQUIRED)
Note:
1) Release laboratory result of Physical - chemical analysis - within 5 working days after receipt of
water sample
2) Release laboratory result of Microbiological analysis
a. Multiple Tube Fermentation Technique (MTFT) – within 7 working days after receipt of water
sample
b. Membrane Filter Technique (MFT) – 5 working days after receipt of water sample
Davao City Water District – Citizen’s Charter
July 2014 Page 63
CUSTOMER SERVICES
WATER QUALITY ANALYSIS (PAYMENT REQUIRED)
Third Visit - Customer in-office Transaction
STEP CUSTOMER SERVICE PROVIDER DURATION
OF
ACTIVITY
PERSON-IN-
CHARGE and
COUNTER
FEE (PhP) FORM / SLIP
1 Go to Production Department (PD) Laboratory, Madapo Hills to get water analysis result
Release result. Provide Feedback Form
2 mins
Water Quality Division (WQD) Staff
Laboratory result
Feedback form
2 Fill-up feedback form
Collect and file filled-up form
2 mins
WQD Staff Feedback form
END OF THIRD VISIT CUSTOMER -IN OFFICE TRANSACTION
WATER QUALITY ANALYSIS (PAYMENT REQUIRED)
Davao City Water District – Citizen’s Charter
July 2014 Page 64
Schedule of Availability of Service (no noon break):
Phone-in (Monday to Sunday – 24 hour operation):
Contact 297-DCWD (3293)
09277988966 (Globe)
09084410653 (Smart)
09255113293 (Sun)
Website: www.davao-water.gov.ph
E-mail : [email protected]
Customer in-Office (no noon break)
Bajada Office Monday to Friday - 7:30 AM to 5:00 PM
Matina Office Monday to Friday - 7:30 AM to 5:00 PM
Toril Collection Center Monday to Friday - 8:00 AM to 5:00 PM
Victoria Plaza Collection Center Monday to Sunday - 10:00 AM to 7:00 PM
Who May Avail of the Service:
Customer who wants to apply for reconnection of water service.
Requirements:
If transacted by account holder:
– original and photocopy of one valid identification card or barangay clearance
If transacted by representative:
– original and photocopy of representative’s one valid identification card or barangay clearance
– one photocopy of account holder’s identification card
– notarized authorization letter from the account holder
Fee (subject to change):
Full payment of arrears and reconnection fee of PhP 200.00
How to Avail of the Service:
Go to Public Assistance Desk Officer (PADO) for priority number, proceed to Commercial Services
Department (CSD) counter and apply for reconnection of water service.
Duration of Transaction: * Customer in-office transaction - 15 minutes
* Under normal condition, water service will be restored within 2 working days after payment of
reconnection fee
4. WATER SERVICE RECONNECTION 4. WATER SERVICE RECONNECTION
Davao City Water District – Citizen’s Charter
July 2014 Page 65
RECONNECTION OF WATER SERVICE
How to Avail of the Service:
Customer In-Office Transaction
STEP CUSTOMER SERVICE PROVIDER DURATION
OF ACTIVITY
PERSON-IN-
CHARGE and
COUNTER
FEE (PhP) FORM / SLIP
1 Go to Public Assistance Desk Officer (PADO) for assistance
Inquire customer's concern, give priority number. Direct to Commercial Services Department (CSD) counter and wait for turn.
1 min PADO Priority number
2 Go to CSD Customer Service Attendant (CSA) and submit requirements for reconnection
Gather information, check customer record. Prepare Order of Payment (form 2). Inform customer of the following:
• If disconnection is beyond one (1) month, field investigation is necessary and reconnection fee shall be collected after the result of investigation.
• If disconnection is less than one (1) month, investigation may not be necessary. Advise customer to go to teller and pay the reconnection fee and arrears.
10 mins CSA Form 2
3 Go to teller, present Form 2 and pay.
Accept payment. Issue Official Receipt (OR)
1 min Teller Full payment of arrears, Reconnection Fee (RF), if disconnected within one month
Form 2 OR
4 Go back to CSA and present OR
Prepare Job Management System Maintenance Order (JMS MO) and give one with indicated date of Reconnection Fee payment, OR Number and requirements submitted.
3 mins CSA JMS MO
OR
5 Sign JMS MO and receive one copy
END OF CUSTOMER-IN OFFICE TRANSACTION
RECONNECTION OF WATER SERVICE
Davao City Water District – Citizen’s Charter
July 2014 Page 66
RECONNECTION OF WATER SERVICE
Internal Flow of Transaction
STEP
CUSTOMER
SERVICE PROVIDER
DURATION
OF
ACTIVITY
PERSON IN
CHARGE and
COUNTER
FEE
(inPhp)
FORM / SLIP
1 Log and prepare Store Requisition Slip (SRS) for withdrawal of materials and attach to Job Management System Maintenance Order (JMS MO). Forward to Customer Care Division Manager (CCDM) for signature.
10 mins CSA JMS MO SRS
2 Check documents and sign. Forward to Commercial Services Department Manager (CSDM) for approval.
2 mins CCDM JMS MO SRS
3 Check documents and approve for reconnection.
2 mins CSDM JMS MO SRS
4 Receive documents. Give SRS to storekeeper and withdraw materials.
2 mins Reconnection crew
JMS MO SRS
5 Receive SRS and process. Issue materials and give one copy of processed SRS.
15 mins Storekeeper JMS MO Processed
SRS
6 Receive materials and one copy of processed SRS.
3 mins Reconnection crew
JMS MO Processed
SRS
7 Go to site and reconnect water service. Inform customer that water service has been reconnected.
15 mins Reconnection crew
JMS MO Processed
SRS
8 Return accomplished JMS MO to CSA
1 min Reconnection crew
JMS MO
9 Update database. Forward JMS MO to ICTD.
2 mins CSA JMS MO
10 Update customer master file. Return to JMS MO to CSA
2mins ICTD Staff JMS MO
11 Receive and file. 1 min CSA JMS MO
END OF INTERNAL FLOW OF TRANSACTION
RECONNECTION OF WATER SERVICE
Note: Under normal working condition, water meter will be reconnected within two (2) working days from payment
and issuance of JMS MO.
Davao City Water District – Citizen’s Charter
July 2014 Page 67
Schedule of Availability of Service (no noon break):
Phone-in (Monday to Sunday – 24 hour operation):
Contact 297-DCWD (3293)
09277988966 (Globe)
09084410653 (Smart)
09255113293 (Sun)
Website: www.davao-water.gov.ph
E-mail : [email protected]
Customer in-Office (no noon break)
Bajada Office Monday to Friday - 7:30 AM to 5:00 PM
Matina Office Monday to Friday - 7:30 AM to 5:00 PM
Toril Collection Center Monday to Friday - 8:00 AM to 5:00 PM
Victoria Plaza Collection Center Monday to Sunday - 10:00 AM to 7:00 PM
Who May Avail of the Service:
Customer who requests for transfer of water meter
Requirements:
If transacted by account holder:
– original and photocopy of one valid identification card or barangay clearance
If transacted by representative:
– original and photocopy of representative’s one valid identification card or barangay clearance
– one photocopy of account holder’s identification card
– authorization letter from the account holder
Fees (subject to change):
a) Tee Connection - PhP 200.00 b) Single Connection - PhP 1,500.00
How to Avail of the Service:
Go to Public Assistance Desk Officer (PADO) for priority number; proceed to Commercial Services
Department (CSD) Counter and request for transfer of water meter.
Duration of Transaction: * Customer in-office transaction – 10 minutes
* Under normal condition, water meter will be transferred within five (5) working days after payment.
5. TRANSFER OF WATER METER 5. TRANSFER OF WATER METER
Davao City Water District – Citizen’s Charter
July 2014 Page 68
TRANSFER OF WATER METER
How to Avail of the Service:
First visit – Customer In-office Transaction
STEP CUSTOMER SERVICE PROVIDER DURATION
OF
ACTIVITY
PERSON IN
CHARGE and
COUNTER
FEE
(inPhp)
FORM / SLIP
1 Go to Public Assistance Desk Officer (PADO) for assistance
Inquire customer's concern, direct to Commercial Services Department (CSD) counter. Give priority number and wait for turn.
1 min PADO Priority number
2 Go to Customer Assistance Counter Customer Service Attendant (CSA) and request for transfer of meter
Evaluate, print and let customer sign Job Management System Maintenance Order (JMS MO). Endorse to Transfer Meter staff / CSA. Advise customer that site inspection will be done within 3 days.
4 mins Transfer Meter Staff / CSA
JMS MO
3 Sign JMS MO and receive one copy
END OF FIRST VISIT CUSTOMER IN-OFFICE TRANSACTION
TRANSFER OF WATER METER
Davao City Water District – Citizen’s Charter
July 2014 Page 69
TRANSFER OF WATER METER
Internal Flow of Transaction
After First Visit – Customer In-office Transaction
STEP CUSTOMER SERVICE PROVIDER DURATION
OF
ACTIVITY
PERSON IN
CHARGE and
COUNTER
FEE
(inPhp)
FORM / SLIP
1 Check / validate and update Database
1 min Transfer Meter (TM) Staff / CSA
JMS MO
2 Print Geographic Information System (GIS) map, Job Management System Maintenance Order (JMS MO), and give to Supervising Utilities / Customer Service Officer (SUCSO) - Investigation
2 mins TM Staff / CSA JMS MO
3 Receive JMS MO with GIS map, check and approve. Assign inspector and give JMS MO.
1 min SUCSO - Investigation
JMS MO
4 Receive JMS MO, conduct inspection and assess transfer meter fee. Note down investigation result in the accomplished form and return to SUCSO.
15 mins CSA - Investigator
Accomplished JMS MO
5 Receive JMS MO. Forward to CSA TM Staff / CSA
2 mins SUCSO - Investigation
Accomplished JMS MO
6 Receive and file accomplished JMS MO. Update database.
2 mins TM Staff / CSA Accomplished JMS MO
7 Inform customer to pay 3 mins TM Staff / CSA
END OF INTERNAL FLOW OF FIRST VISIT CUSTOMER IN-OFFICE TRANSACTION
TRANSFER OF WATER METER
Davao City Water District – Citizen’s Charter
July 2014 Page 70
TRANSFER OF WATER METER
Second Visit – Customer In-office Transaction
STEP CUSTOMER SERVICE PROVIDER DURATION
OF
ACTIVITY
PERSON IN-
CHARGE and
COUNTER
FEE
(inPhp)
FORM / SLIP
3 Go to Public Assistance Desk Officer (PADO) for assistance
Inquire customer's concern, direct to Commercial Services Department (CSD) counter. Give priority number and wait for turn.
1 min PADO Priority number
4 Go to Customer Assistance Counter Customer Service Attendant (CSA)
Retrieve JMS MO. Prepare Order of Payment (Form 2) and give to customer. Advise customer to go to teller and pay then return with the Official Receipt (OR).
2 mins CSA Form 2 JMS MO
5 Go to teller, present Form2 and pay
Accept payment. Issue Official Receipt. Attach Form2 to DCWD official receipt form.
1 min Teller Amount to be paid
Form 2 OR JMS MO
6 Return to CSA and present OR
Record payment details to JMS MO and advise customer that transfer of water meter will be done within five working days.
1 min CSA JMS MO
END OF SECOND VISIT CUSTOMER IN-OFFICE TRANSACTION
TRANSFER OF WATER METER
Davao City Water District – Citizen’s Charter
July 2014 Page 71
TRANSFER OF WATER METER
Internal Flow of Transaction
After Second Visit – Customer In-office Transaction
STEP CUSTOMER SERVICE PROVIDER DURATION
OF
ACTIVITY
PERSON IN-
CHARGE and
COUNTER
FEE
(inPhp)
FORM / SLIP
1 Dispatch and turn-over Job Management System Maintenance Order (JMS MO)to Pipelines and Appurtenances Maintenance Department (PAMD) staff
2 mins Transfer Meter (TM ) staff / CSA
JMS MO
2 Receive JMS MO and check attachments. Forward to PAMD Supervisor.
2 mins PAMD office staff
JMS MO
3 Dispatch JMS MO to Caretaker team
10mins / batch* (5 accounts per batch)
PAMD Supervisor
JMS MO
4 Transfer water meter based on JMS MO
Tee connection – within 30 mins. Single line – within 2 days
Caretaker team JMS MO
5 Accomplish and return JMS MO to PAMD office staff
2 mins / batch*
Caretaker team JMS MO
6 Update database of completed transfer of meter.
3mins PAMD office staff
JMS MO
7 Prepare 3 sets of Batch Slip and photocopy all JMS MO and GIS map. Forward to PAMD Supervisor for signature.
30 mins / batch*
PAMD office staff
JMS MO Batch slip
8 Check documents and sign. Forward documents to PAMD Manager.
2mins / batch*
PAMD Supervisor
JMS MO Batch slip
9 Check documents and sign. Return documents to PAMD Office staff.
2mins / batch*
PAMD Manager JMS MO Batch slip
Davao City Water District – Citizen’s Charter
July 2014 Page 72
TRANSFER OF WATER METER
Internal Flow of Transaction
After Second Visit – Customer In-office Transaction
STEP CUSTOMER SERVICE PROVIDER DURATION
OF
ACTIVITY
PERSON IN-
CHARGE and
COUNTER
FEE
(inPhp)
FORM / SLIP
10 Forward Batch Slip, photocopy of JMS MO and sketch to ICTD for GIS updating and CSD for file.
5mins
PAMD staff
JMS MO Batch slip
11 Receive Batch Slip, photocopy of JMS MO and sketch and update GIS. File.
2mins ICTD staff JMS MO Batch slip
12 Receive and file JMS MO and GIS map.
1 min Transfer Meter (TM ) staff / CSA
JMS MO
END OF INTERNAL FLOW OF TRANSACTION
AFTER SECOND VISIT – CUSTOMER IN-OFFICE TRANSACTION
Note: Under normal working condition, the water meter will be transferred within five (5) working days from payment.
* Based on 2013 data, the average transaction per day is five (5) requests.
Davao City Water District – Citizen’s Charter
July 2014 Page 74
WORKFLOW CHARTS OF
FRONTLINE SERVICES
Davao City Water District – Citizen’s Charter
July 2014 Page 96
GLOSSARY
ACRONYMS:
BAM Billing Adjustment Memo
BaD Billing and Accounts Division
BaADvM Billing and Accounts Division Manager
BIR Bureau of Internal Revenue
BTR Billing Transaction Record
CCD Customer Care Division
CCDvM Customer Care Division Manager
CSCDP Certificate of Senior Citizen Discount Privilege
CSD Commercial Services Department
CSDM Commercial Services Department Manager
CIU Central Information Unit
CSA Customer Service Attendant
CCT Citizen’s Charter Team
DCWD Davao City Water District
DMR Debit Memo Request
ICTD Information and Communications Technology Department
IFR Investigator’s Field Report
ISS Inspection Schedule Slip
GIS Geographic Information System
JMS MO Job Management System Maintenance Order
MCR Masterfile Change Request
MFT Membrane Filter Technique
MTFT Multiple Tube Fermentation Technique
NSC New Service Connection
OSCA Office of the Senior Citizens Affair
OR Official Receipt
PADO Public Assistance Desk Officer
PAMD Pipelines and Appurtenances Maintenance Department
PD Production Department
PN Promissory Note
SCDPA Senior Citizen Discount Privilege Application
SRS Store Requisition Slip
SUCSO Supervising Utilities / Customer Service Officer
TM Transfer Meter
WQD Water Quality Division
Davao City Water District – Citizen’s Charter
July 2014 Page 97
GLOSSARY
FORMS:
Form 1 New Service Connection Application Form
Form 2 Order of Payment
Form 3 Promissory Note
Form 4 Service Connection Contract
JMS MO Job Management System Maintenance Order
Davao City Water District – Citizen’s Charter
July 2014 Page 98
GLOSSARY
TERMS:
Abnormal (irregular) - billing showing an abrupt decrease or increase in water consumption Billing Applicant - person with legal personality who signifies intention to avail of DCWD water service
Account holder - customer; with existing water service connection with DCWD
Account name - complete name of DCWD account holder
Billing Adjustment - final document reflecting entries of adjustment to customer’s account based Memo on BAM request Billing Adjustment - request form of billing adjustment due to error reading, average billing, Memo Request interchanged meters, stuck /defective meters. This is the basis in the preparation of BAM
BIR Form 2307 - tax withheld certificate to be presented by a corporate customer (must be among the country’s top 10,000 corporations) when paying the water bill
Change of Account - request to change the existing account name to a new one due to the Name following reasons: transfer of ownership or rights over the property, transfer
of ownership or rights over the account or change of marital status by the accountholder
Complaint - customer’s problem / concern pertaining to water service
Credit Memo - memo issued to accounts with unposted payments
Debit Memo - memo issued to accounts charged with water service installation fee, administration charge, transfer meter fee, forfeited bill discounts, customer’s returned checks, cancellation of payment due to double posting, charges for service call and reconnection fee and charges for stolen / damaged meters
Debit Memo - request form used as basis in the preparation of a debit memo Request
Disconnection of - termination of water service Water service
Dismounted meter - water meter removed from the vertical pipeline /service connection
Masterfile Change - request form to correct / add information in the customer’s record Request
New Service - Newly installed water service connection Connection
Reconnection of - the act of activating a disconnected water service Water service
Transfer of water - relocation of the water meter to a new location within the premises (house / Meter building) of the account holder / customer
Tee connection - a type of water meter arrangement in a letter T formation Single line - a connection from the mainline having a vertical pipeline where a single water meter will be mounted