Date: To, The Members Secretary, District Level Environmental Impact Assessment Committee, Pali (Raj.). Subject : Regarding Environmental clearance of Gudha Quartz & Feldspar Applied area Near village – Gudha , Tehsil - Raipur, Distt. – Pali, Applied Area – 4.80 Hects., M.L. No. 06/1994 (2/2013). Dear Sir, On above subject I am submitting here with Form-1(M), Pre-Feasibility Report, approved Mining Plan with PMCP with all essential documents for grant of E.C. for your kind perusal of above said case. Thanking You Sir, Yours Faithfully, Sitaram Soni Applicant

Date: To, · 7. Certificate regarding mine lease not falling in Aravalli hills issued by concern ME/AME of DMG Y 8. Analysis Report (Air, Water, Soil, Noise) issued from NABL/MoEF

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Date: To, · 7. Certificate regarding mine lease not falling in Aravalli hills issued by concern ME/AME of DMG Y 8. Analysis Report (Air, Water, Soil, Noise) issued from NABL/MoEF

Date:

To,

The Members Secretary,

District Level Environmental Impact Assessment Committee,

Pali (Raj.).

Subject : Regarding Environmental clearance of Gudha Quartz & Feldspar

Applied area Near village – Gudha , Tehsil - Raipur, Distt. – Pali, Applied

Area – 4.80 Hects., M.L. No. 06/1994 (2/2013).

Dear Sir,

On above subject I am submitting here with Form-1(M), Pre-Feasibility

Report, approved Mining Plan with PMCP with all essential documents for

grant of E.C. for your kind perusal of above said case.

Thanking You Sir,

Yours Faithfully,

Sitaram Soni

Applicant

Page 2: Date: To, · 7. Certificate regarding mine lease not falling in Aravalli hills issued by concern ME/AME of DMG Y 8. Analysis Report (Air, Water, Soil, Noise) issued from NABL/MoEF

File No. M.L. No. 06/1994 (2/2013)

Check list for B2 Category Projects

S.

No.

Particulars Doc.

(Y/N)

Remark

1. Form -1M (As per MoEF notification / Direction of SEAC) Y

2. Pre Feasibility Report (As per MoEF notification / Direction of

SEAC)

Y

3. Affidavits for projects being claimed under Category B2 by the

Project Proponent on Rs. 100 & 50/-

Y

4. Affidavits for projects being claimed under Category B2 by the

RQP/Consultant on Rs. 100 & 50/-

Y

5. Copy of Approved Mining Plan with PMCP Y

6. Copy of Lease Documents Y

7. Certificate regarding mine lease not falling in Aravalli hills issued by

concern ME/AME of DMG

Y

8. Analysis Report (Air, Water, Soil, Noise) issued from NABL/MoEF

Accredited Lab.

9. All Four Side Photographs showing Project Site

10. Photo ID Proof of Project Proponent

11. Disclosure of Consultant Engaged (Annexure C) Y

12. Annexure E (Part A,B& C) Land use, as per SEAC Raj. Format Y

13. Statement of Commitments by the PP for compliance during Post EC

period (Annexure F)

Y

14. Format of Mines (Annexure H) Y

15. EMP Y

Page 3: Date: To, · 7. Certificate regarding mine lease not falling in Aravalli hills issued by concern ME/AME of DMG Y 8. Analysis Report (Air, Water, Soil, Noise) issued from NABL/MoEF

APPENDIX VIII (See Paragraph 6)

FORM 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY

‘B2’ FOR LESS THAN AND EQUAL TO FIVE HECTARE

BASIC INFORMATION a. Name of the Mining

Lease site Gudha Quartz & Feldspar Applied area of

Sitaram Soni (M.L. No. 06/1994 (2/2013))

b. Location /site (GPS Co-ordinates)

Latitude : 26°15’19.58” to 26°15’29.36” N

Longitude : 74°20’30.21” to 74°20’36.04” E

c. Size of the Mining Lease (Hectare)

4.80 Hects.

d. Capacity of Mining Lease (TPA)

35798 Tones Per Annum

e. Period of Mining Lease 50 Years from date of registration

f. Expected cost of the Project

20 lakh

g. Contact Information Applicant:

Sitaram Soni

R/o Nagelav, Tehsil

& Distt. Ajmer (Raj.)

305001

Mobile No.:

9649463983

R.Q.P.:

Ramesh Chandra Sharma C/o Saimaa Giominhydrotech, Opp. Baba Ramdev Ji Mandir, Gali no. 8, Bhruntiya Soorsagar,Jodhpur 342024 Contact No. - 9829220600 E-mail:- [email protected]

ENVIRONMENT SENSITIVITY

S. No.

Areas Distance in kilometer / Details

1. Distance of project site from nearest rail or road bridge over the concerned River, Rivulet, Nallah etc.

Not Available

2. Distance from infrastructural facilities Railway line

Piplaj (Ajmer Ahmedabad Broad gauge) at 9.5 Kms. in SE

Page 4: Date: To, · 7. Certificate regarding mine lease not falling in Aravalli hills issued by concern ME/AME of DMG Y 8. Analysis Report (Air, Water, Soil, Noise) issued from NABL/MoEF

National Highway State Highway Major District Road Any Other Road Electric transmission line pole or tower Canal or check dam or reservoirs or lake or ponds In-take for drinking water pump house Intake for Irrigation canal pumps

NH 8 at 10 Kms. in SE SH 59 at 5.5 Kms. in East Beawar Lambiya (SH39) at 5Kms. in West Karnos Nagelao Road at 2.0 kms. in north

Power Line at 1.5 Kms. in West - - -

3. Areas protected under international conventions, national or local legislation for their ecological , landscape, cultural or other related value

Not Available in 15 Kms. radius

4. Areas which are important or sensitive for ecological reasons –Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests

Lilri River at 3.7 Kms. in South

5. Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration

Not Available in 15 Kms. radius

6. Inland, coastal , marine or underground waters

Not Available in 15 Kms. radius

7. State, National boundaries Not Available in 15 Kms. radius 8. Routes or facilities used by the public

for access to recreation or other tourist, pilgrim areas

NA

9. Defense installations NA

10. Densely populated or built-up area, distance form nearest human habitation

Shivpura at 1.5 km. from area

11. Areas occupied by sensitive man-made land uses (hospitals ,schools ,places of worship, community facilities)

Babra at 9.5 km. from area

12. Areas containing important ,high quality or scarce resources (ground water resources ,surface resources, forestry, agriculture, fisheries, tourism , minerals)

NA

Page 5: Date: To, · 7. Certificate regarding mine lease not falling in Aravalli hills issued by concern ME/AME of DMG Y 8. Analysis Report (Air, Water, Soil, Noise) issued from NABL/MoEF

13. Areas already subjected to pollution or environmental damage .(those where existing legal environmental standards are exceeded )

NA

14. Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion , flooding or extreme or adverse climatic conditions )

Not Available

15. Is proposed mining site located over or near fissure /fracture for ground water recharge

Not Available

16. Whether the proposal involves approval or clearance under the following Regulations or Acts ,namely:-

(a) The Forest (Conservation ) Act,1980

(b) The Wildlife (Protection )Act , 1972:

(c) The Coastal Regulation Zone Notification ,2011 If yes, details of the same and their status to be given

No No No

17. Forest land involved (hectares) No forest land involved

18. Whether there is any litigation pending against the project and /or land in which the project is purpose to be set up?

(a) Name of the Court (b) Case No. (c) Orders or direction of the Court ,

if any , and its relevance with the proposed project.

No litigation pending against the

project

(Signature of Project Proponent Along with name and address)

Page 6: Date: To, · 7. Certificate regarding mine lease not falling in Aravalli hills issued by concern ME/AME of DMG Y 8. Analysis Report (Air, Water, Soil, Noise) issued from NABL/MoEF

PRE-FEASIBILITY

REPORT

Page 7: Date: To, · 7. Certificate regarding mine lease not falling in Aravalli hills issued by concern ME/AME of DMG Y 8. Analysis Report (Air, Water, Soil, Noise) issued from NABL/MoEF

EXECUTIVE SUMMARY 1.0 INTRODUCTION

The Pre Feasibility Report for Gudha Quartz & Feldspar Applied Area, ML No.

06/1994 (2/2013), Near Village- Gudha, Tehsil –Raipur, Distt.- Pali (Raj.) for an

area of 4.80 hects. for mineral Quartz & Feldspar is prepared in favor of Mr.

Sitaram Soni, R/o Nagelav, Tehsil & Distt.- Ajmer (Raj.).

The Mining Lease was applied on dated 31/05/1994 for mineral quartz &

feldspar for an area of 4.80 hects. State Govt. issued letter of intent vide

Government order No. DMG/Sojat/CC-12/P1(1)/06/1994 (2/2013)/82, dated

17/01/2013.

The Mining Plan with Progressive Mine Closure Plan of above said applied area

was approved by Superintending Mining Engineer, Jodhpur Circle, Jodhpur for

a period of five years from date of registration.

The proposed rate of production is 35798 TPA of Quartz & Feldspar from Mine.

The lease area is comprised of Government land (Khasra no. 964). The estimated

project cost is Rs. 20 lakh. The expected life of mine is 16 years.

This mining project falls under Category “B-2”.

Page 8: Date: To, · 7. Certificate regarding mine lease not falling in Aravalli hills issued by concern ME/AME of DMG Y 8. Analysis Report (Air, Water, Soil, Noise) issued from NABL/MoEF

1.1 Salient features of the project

Project Name Gudha Quartz & Feldspar Applied area of Sitaram Soni

Location of mine Village - Gudha

Tehsil - Raipur

District - Pali

State – Rajasthan

Lat-Long of the area Latitude : 26°15’19.58” to 26°15’29.36” N

Longitude : 74°20’30.21” to 74°20’36.04” E

Toposheet number 45J/7

Land use Govt. waste Land – 4.80 Ha

Minerals of mine Quartz & Feldspar

Total Geological reserves 775385 tonnes

Total Mineable reserves 558277 Tonnes

Life of mine 16 year

Proposed production of

area

35798 TPA

Method of mining Opencast semi-mechanized

No of working days 295

Water demand Total water requirement is about 3.00 KLD= 1 KLD (Drinking

& Domestic Uses) +1 KLD (Dust Suppression) + 1 KLD

(Green Belt )

Sources of water Nearby village

Man power 15

Nearest railway station Piplaj railway station at 9.5 Kms. From lease area

Nearest airport Not available in 15 Kms. radius

Seismic Zone Zone III

Page 9: Date: To, · 7. Certificate regarding mine lease not falling in Aravalli hills issued by concern ME/AME of DMG Y 8. Analysis Report (Air, Water, Soil, Noise) issued from NABL/MoEF

1.2 Present land Use Plan

S. No. Activity Present Land (in Hects.)

1. Mining pits 0.00

2. Mineral stack yard 0.00

3. Waste Dump 0.00

4. Infrastructure inclusive of office,

workshop & plants etc.

0.00

5. Road/ Kacha way 0.00

6. Township/village/ school 0.00

7. Nallah 0.00

8. Area under Plantation 0.00

Total Land Use 4.80

Note: This is a fresh applied area.

1.3 Proposed Planning

Mining method - Semi-mechanized method

Project cost - Rs. 20 lakh

Production - Quartz & Feldspar – 35798 TPA

1.4 Conclusion

The Quartz & Feldspar excavated from the mine is used in Ceramics, Glass

manufacturing Ferrosilicon, Induction Furnaces Ling and Electric Ling

Indicators and in Paints. Quartz & Feldspar is used in Glass, Ceramics,

Abrasives and Electrodes (as flux coating welding rods and inductors).

Page 10: Date: To, · 7. Certificate regarding mine lease not falling in Aravalli hills issued by concern ME/AME of DMG Y 8. Analysis Report (Air, Water, Soil, Noise) issued from NABL/MoEF

2.0 INTRODUCTION OF THE PROJECT/BACKGROUND INFORMATION

2.1 Identification of Project and Proponent

The Pre Feasibility Report for Gudha Quartz & Feldspar Applied Area, ML No.

06/1994 (2/2013), Near Village- Gudha, Tehsil –Raipur, Distt.- Pali (Raj.) for an

area of 4.80 hects. for mineral Quartz & Feldspar is prepared in favor of Mr.

Sitaram Soni, R/o Nagelav, Tehsil & Distt.- Ajmer (Raj.).

The Mining Lease was applied on dated 31/05/1994 for mineral quartz &

feldspar for an area of 4.80 hects. State Govt. issued letter of intent vide

Government order No. DMG/Sojat/CC-12/P1(1)/06/1994 (2/2013)/82, dated

17/01/2013.

The Mining Plan with Progressive Mine Closure Plan of above said applied area

was approved by Superintending Mining Engineer, Jodhpur Circle, Jodhpur for

a period of five years from date of registration.

2.2 Brief Information about the project

The proposed rate of production is 35798 TPA of Quartz & Feldspar from Mine.

The lease area is comprised of Government land. The estimated project cost is Rs.

20 lakh. The expected life of mine is 16 years.

Water requirement for the proposed project for drinking use, dust suppression

and green belt will be 3.0 KLD, which will be taken from nearby village.

2.3 Need for used Project and Its Importance to the Country or Region

Quartz & Feldspar excavated from the mine is used in Ceramics, Glass

manufacturing Ferrosilicon, Induction Furnaces Ling and Electric Ling Indicators

and in Paints. Quartz & Feldspar is used in Glass, Ceramics, Abrasives and

Electrodes (as flux coating welding rods and inductors).

Page 11: Date: To, · 7. Certificate regarding mine lease not falling in Aravalli hills issued by concern ME/AME of DMG Y 8. Analysis Report (Air, Water, Soil, Noise) issued from NABL/MoEF

2.4 Demands-Supply Gap

There are expansion in many ceramic industries so, Demand of Quartz &

Feldspar is increased in compare to supply.

2.5 Imports vs. Indigenous Production

The quantity of mineral produced will meet the requirement to be imported.

2.6 Export Possibility

There is no proposal to export the Mineral.

2.7 Domestic/Export Markets

DOMESTICE MARKET

The finished product of Quartz & Feldspar will be used for saleable purpose in the local market.

EXPORT MARKET

The proposed mining activity is for consumption only for Ceramics, Glass manufacturing Ferrosilicon, Induction Furnaces Ling and Electric Ling Indicators and in Paints etc.

2.8 Employment Generation

The proposed mining activity will provide employment to about 15 workers. The

workers will be hired mostly from the nearby village.

3.0 PROJECT DESCRIPTION

3.1 Type of Project Including Interlinked and Interdependent Project , If Any

The mine is over an area of 4.80 hectares. The proposed is 35798 TPA. This is an

independent mining project and there are so interlinked project involved. The

project falls under Category “B-2” Project or activity 1 (a) As per MoEF Office

Memorandum No. J- 13012/12/2013-IA-II (I) dated 24.12.2013.

Page 12: Date: To, · 7. Certificate regarding mine lease not falling in Aravalli hills issued by concern ME/AME of DMG Y 8. Analysis Report (Air, Water, Soil, Noise) issued from NABL/MoEF

3.2 Location

The mining leases area is located at village – Gudha, Tehsil- Raipur, District-

Pali, Rajasthan. The Key plan showing 10 km radius of study area is attached.

The mining leases area falls in Survey in India Toposheet is 45J/8.

Latitude : 26°15’19.58” to 26°15’29.36” N

Longitude : 74°20’30.21” to 74°20’36.04” E

3.3 Details of Alternate Sites

Not Applicable

3.4 Size or magnitude of operation

The mine area is of 4.80 ha and during five year total production of useable

material shall be approximately 133015 tonnes. The mine will be worked on the

day time only. The average number of working days in the year would be 295.

Geological and mineable reserves

3.5 Geology :

a) General Geology and Local Geology

Geological configuration of Pali district is quite complex. It is comprised

of heterogeneous assemblage of different litho units of igneous,

sedimentary and metamorphic origin.

CATEGORY RESERVES

Total Geological Reserve 775385 tonnes

Total Mineable Reserve 558277 Tonnes

Page 13: Date: To, · 7. Certificate regarding mine lease not falling in Aravalli hills issued by concern ME/AME of DMG Y 8. Analysis Report (Air, Water, Soil, Noise) issued from NABL/MoEF

The geological Sequence Worked out by G.S.I. is given as under:

Supergroup/Age Group Lithology

Quaternary Alluvium &wind blown sand

Nagaur Group Sandstone, gypsum & siltstone

Marwar Supergroup Bilara Group Limestone, chert& dolomite

Jodhpur Group Sandstone, shale, boulders, chert

Middle to U. Proterozoic Malani Igneous Suite Granite (Jolor type)

Rhyolite &pyroclastics

with dykes of granophyre

Erinpura Granite Granite and gneiss

Punagarh Group Basic volcanic with pillow

lava, meta tuff, quartzite,

shale, slate phyllite,

bedded chert

Delhi Supergroup Sirohi Group Phyllite, mica schist, biotite

Lower to Middle schist, dolomitic marble,

Proterozoic Migmatite & gneisses epidiorite, Hornblende

Sendra-Ambaji Granite Granite and gneiss

Phulad Ophiolite Suite Hornblendes schist,

amphibolite, pyroxene

granulite, gabbro &

ultramafics.

Page 14: Date: To, · 7. Certificate regarding mine lease not falling in Aravalli hills issued by concern ME/AME of DMG Y 8. Analysis Report (Air, Water, Soil, Noise) issued from NABL/MoEF

Kumbhalgarh Group Calc schist, marble, granite

schist/amphibolite, biotite

schist, quartzite, mica

schist and migmatite

The oldest & prominent rock exposed along district belongs to Delhi supergroup

comprising southern, eastern and north eastern margine of the metamorphosed

ferruginous and massive classics.

With subordinate chemogenic sediments and associated intrusive and extrusive

phases. Rocks of this Supergroup have been further classified in Kumbhalgarh,

Sirohi & Punagarh Groups.

The Delhi's are succeeded by a sequence of un metamorphosed sedimentary rocks

comprised of sandstone, limestone, siltstone, gypsum beds, This Super group is

further divided into Jodhpur Group, Bhilwara Group & Nagaur Group.

The Delhi's are intruded by granites and rhyolite. The predominant is the

Erinpura Granite.

b) Mineral Resources

Pali district is endowed with wide variety of minerals. Both metallic and non

metallic minerals are found. Good quality deposits of asbestos, limestone,

gypsum, magnesite, quartz are found which have been exploited for last so many

years.

Feldspar Quartz

The pegmatite occurring around Beranthia Khurd, Bhanuira, Kalyanpura,

Kalakot, Raira in Raipur tehsil near villages Nana in Bali tehsil and Sitapura in

Sojat tehsil consist mainly of quartz & feldspar. The feldspar is of pink variety.

Page 15: Date: To, · 7. Certificate regarding mine lease not falling in Aravalli hills issued by concern ME/AME of DMG Y 8. Analysis Report (Air, Water, Soil, Noise) issued from NABL/MoEF

3.6 Project Description With Process Details

3.6.1 Method of Mining

Following design parameters are set for casting the mining proposal for next four

year periods:

Category of Mine Category B

Method of Mining Opencast Semi Mechanised Method

Production Target The annual production of Quartz & Feldspar is

proposed as 35798 TPA.

Bench Height & Width Height: 3m.

Width: Width will not be less than height i.e. 3m.

Drilling & Blasting No drilling & blasting is required in future.

Pit Slope The edge of excavation shall be adequately sloped

and secured so as to prevent danger from fall of

sides as per the Regulation 106 of the Metalliferous

Mines Regulation, 1961. The face slope will be at 70°

and overall bench slope will maintain at 45°.

Excavation & loading Manual / Mechanised Method

Transportation Dumpers/Trucks

Production Details : The Proposed Production of mineral in next five years:

Year Total

ROM

(in M.T.)

50% Rec.

Mineral

(in M.T.)

10%

Subgrade

(in M.T.)

40%

Waste (in

M.T.)

Over

Burden

(in M.T.)

Waste +

OB (in

M.T.)

I Year 60137 19859 3971 15887 20420 36307

II Year 53726 21283 4257 17026 11160 28186

III Year 61158 25058 5012 20044 11044 31088

IV Year 74060 31017 6204 24812 12027 36839

V Year 88821 35798 7160 28639 17224 45863

Total (in M.T.) 337902 133015 26604 106408 71875 178283

Page 16: Date: To, · 7. Certificate regarding mine lease not falling in Aravalli hills issued by concern ME/AME of DMG Y 8. Analysis Report (Air, Water, Soil, Noise) issued from NABL/MoEF

3.7 Raw Material Required Along with Estimated Quantity, Likely Source,

Marketing Area of Final Product/S, Mode of Transport of Raw Material and

Finished Product

No raw material will be required for production. In the operation phase mineral

will be excavated by semi-mechanized method and loaded directly into

trucks/tractors to end users. Eventually the finished product will be supplied to

the market .

3.8 Resource Optimization / Recycling and Reuse

Not envisaged.

3.9 Availability of Water Its Source, Energy/ Power Requirement and Source

3.9.1 Water Requirement

Water required is 3.0 KLD . It is proposed to obtain water for drinking from

nearby village.

3.9.2 Power

The operation will be done only from sun set hence there is no power

requirement for light in the quarry area.

3.10 Quantity of Wastes to be generated (Liquid And Solid) and Scheme for

their Management/ Disposal

3.10.1 Solid Waste Generation & its Disposal

During the plan period 178283 tones waste will be generated which be stacked

around existing dumps in west direction and stabilized by proper plantation &

multiple slices of benches in dump.

3.10.2 Liquid Effluent

Negligible quantity

Page 17: Date: To, · 7. Certificate regarding mine lease not falling in Aravalli hills issued by concern ME/AME of DMG Y 8. Analysis Report (Air, Water, Soil, Noise) issued from NABL/MoEF

4.0 SITE ANALYSIS

4.1 Connectivity

Mine area is well connected to Raipur Tehsil Head quarter.

4.2 Landform, Landuse And Land Ownership

Major portion of applied area possesses mild hilly furtain. The altitude of the

area is 432 to 438 mRL.

Land Ownership

The proposed lease area is Govt. Waste land in khasra no. 964.

Present land Use Plan

S. No. Activity Present Land (in Hects.)

1. Mining pits 0.00

2. Mineral stack yard 0.00

3. Waste Dump 0.00

4. Infrastructure inclusive of office,

workshop & plants etc.

0.00

5. Road/ Kacha way 0.00

6. Township/village/ school 0.00

7. Nallah 0.00

8. Area under Plantation 0.00

Total Land Use 4.80

4.3 Topography

Major portion of applied area possesses mild hilly furtain. The altitude of the

area is 432 to 438 mRL.

Page 18: Date: To, · 7. Certificate regarding mine lease not falling in Aravalli hills issued by concern ME/AME of DMG Y 8. Analysis Report (Air, Water, Soil, Noise) issued from NABL/MoEF

4.4 Existing Land Use Pattern

S. No. Activity Present Land (in Hects.)

1. Mining pits 0.00

2. Mineral stack yard 0.00

3. Waste Dump 0.00

4. Infrastructure inclusive of office,

workshop & plants etc.

0.00

5. Road/ Kacha way 0.00

6. Township/village/ school 0.00

7. Nallah 0.00

8. Area under Plantation 0.00

Total Present Land Use 4.80

4.5 Existing Infrastructure

Road is near to the working site. Manpower is cheaply available.

4.6 Soil Classification

Soil orders is mainly of Light brown colour, soft & loose soil.

4.7 Climatic data from secondary sources

The district receives an annual rainfall of 415 mm. The winter season remains

reasonably cold when minimum temperature is 10 to 23° C and the average

temperature remains at 18° C. During summer highest temperature goes upto

43° C but the average temperature is recorded to be 33° C.

5.0 PLANING BRIEF

5.1 Planning Concept

Opencast semi mechanized method of mining with bench formation of 3m height

& 3m width is proposed in the lease area. Production will be carried out by

means of JCB, loader & excavator without drilling and blasting. Loading of

mineral will be done manually as well as by loader.

Page 19: Date: To, · 7. Certificate regarding mine lease not falling in Aravalli hills issued by concern ME/AME of DMG Y 8. Analysis Report (Air, Water, Soil, Noise) issued from NABL/MoEF

5.2 Land use Planning

Details of land use Existing and Proposed Period are given below:

5.3 Assessment of Infrastructure Demand (Physical & Social)

On the basis of the preliminary site visit, the infrastructure demand in the village

was assessed on the basis of need priority. The assessment will be made in the

socio economic survey and submitted at the time of final presentation regarding

EC.

5.4 Amenities/ Facilities, Mines office, Workshop etc.

Proper site services such as First Aid, temporary shelter, Drinking will be

provided to the mine workers.

Sr.

No. Head

Existing

Land Use

(In

Hects.)

Additional

Requirement

during plan

period (In

Hects.)

Total Land Use at

the end of Plan

Period

(In Hects.)

A B C D E = (C+D)

1. Area under mining 0.00 1.0128 1.0128

2. Storage for Top Soil 0.00 0.0307 0.0307

3. Dump / Overburden 0.00 0.5661 0.5661

4. Mineral Storage 0.00 0.0031 0.0031

5.

Infrastructure

(office, workshop &

plants etc.)

0.00 0.0125 0.0125

6. Road 0.00 0.1131 0.1131

7. Plantation 0.00 0.1125 0.1125

8. Subgrade stack yard 0.00 0.1502 0.1502

Total land use 0.00 2.001 2.001

Total Area 4.80 4.80 4.80

Page 20: Date: To, · 7. Certificate regarding mine lease not falling in Aravalli hills issued by concern ME/AME of DMG Y 8. Analysis Report (Air, Water, Soil, Noise) issued from NABL/MoEF

Transport of Men and Material:

Workers from nearby village will be engaged for mining and transportation

purposes. They will come for work on foot .

The material from the mine will be transported by trucks/ tractors.

6.0 PROPOSED INFRASTRUCTURE

6.1 Industrial Area (Processing Area)

No infrastructure is proposed.

6.2 Residential Area (Non Processing Area)

As local workers from nearby areas will be engaged for the mining activity, no

residential area/ housing is proposed.

6.3 Green Belt

Plantation will be done in the 7.5 m barrier zone along the periphery of the

mining lease area.

6.4 Social Infrastructure

The following rural activities are being proposed to be done in the region under

Rural Development Programme.

Rural Health service

Educational Development Programme.

Self-employment, resource development

Conservation of cultural activities

Agricultural development & environmental protection

Page 21: Date: To, · 7. Certificate regarding mine lease not falling in Aravalli hills issued by concern ME/AME of DMG Y 8. Analysis Report (Air, Water, Soil, Noise) issued from NABL/MoEF

6.5 Connectivity

Mine area is well connected to Raipur Tehsil Head quarter.

6.6 Drinking Water Management

Water for drinking is required to be 3.0 KLD. It is proposed to obtain water from

nearby village.

6.7 Sewerage System

Domestic waste water will be treated into septic tank following by soak pit

6.8 Industrial Waste Management

Not applicable

6.9 Solid Waste management

Solid waste generation is expected from the mining operations which will be

used for backfilling.

6.10 Power Requirement & Supply / source

The operation will be done only during the day light; hence there is no power

requirement for the project at site.

7.0 REHABILITION AND RESETTLEMENT (R&R) PLAN

Not Applicable as no person or family will be rooted, needing any resettlement

of rehabilitation.

Page 22: Date: To, · 7. Certificate regarding mine lease not falling in Aravalli hills issued by concern ME/AME of DMG Y 8. Analysis Report (Air, Water, Soil, Noise) issued from NABL/MoEF

8.0 PROJECT SCHEDULE & COST ESTIMATES

8.1 Likely Date of Start of Construction and Likely Date of Completion

No construction activities are proposed. The mining activity will commence only

after receiving environmental clearance.

8.2 Estimated Project Cost Along With Analysis In Terms of Economic

Viability of the Project

Initial cost of the project has been estimated as Rs. 20 Lacs.

9.0 ANALYSIS F PROPOSAL (FINAL RECOMMENDATIONS)

The proposed mine will be economical benefits to the state by the way of Royalty

for mineral and to the local people by way of direct and secondary employment

opportunities. The mining activities as proposed are the backbone of all

construction and infrastructure project as the raw material for construction is

available only from such mining . The mineral extracted is in high demand at the

local market for real estate industry.

Thus the project will bring about socio-economic improvement of the area and

will prove beneficial to the area.

Page 23: Date: To, · 7. Certificate regarding mine lease not falling in Aravalli hills issued by concern ME/AME of DMG Y 8. Analysis Report (Air, Water, Soil, Noise) issued from NABL/MoEF

Annex- C

Disclosure of Consultants# Engaged

Name of the Project

Nature of consultancy Name and address

of the Consultant/expert

Approvals, if any from (NABL/DGMS/IBM/ NRBPT/MOEF/CPCB/others etc)*, give reference

EIA/ EMP Organization NA NA

Env. Coordinator FAE-LU FAE-AP FAE-AQ FAE-WP FAE-EB FAE-NV FAE-SE FAE-HG FAE-GS FAE-RH FAE-SW

Environmental Monitoring & analysis

NA NA

Hydro geological study NA NA

Soil investigation NA NA

Mining plan NA NA

Rainwater Harvesting NA NA

Risk Assessment NA NA

Architectural Plan NA NA

Fire Fighting/Utilities plan NA NA

Services (STP/ETP design)etc.

NA NA

Others, such as project consultants etc

Ramesh Chandra Sharma RQP/AJM/349/2014/A

* Only Govt./Statutory Approvals to be mentioned. Put NA where not applicable. Add brief resume where required.

#RQPs (for ‘B2”category mines projects) to submit copy of valid document of Central/State Govt.

I hereby accept all the liabilities and obligations associated with the working and results of the above organizations

submitted herein with the report

Note:- The Consultant should submit the Accreditation letter from NABET regarding approval of

sectors and experts.

(Sitaram Soni)

Seal of the Project Proponent

Page 24: Date: To, · 7. Certificate regarding mine lease not falling in Aravalli hills issued by concern ME/AME of DMG Y 8. Analysis Report (Air, Water, Soil, Noise) issued from NABL/MoEF

Annexure –E

Information to be submitted by all Mining Sector Projects

Part-(A)

LAND: STAGE WISE LAND USE AND RECLAMATION AREA (Ha.)

Sr.

No. Head

Existing

Land Use

(In

Hects.)

Additional

Requirement

during plan

period (In

Hects.)

Total Land Use at

the end of Plan

Period

(In Hects.)

A B C D E = (C+D)

1. Area under mining 0.00 1.0128 1.0128

2. Storage for Top Soil 0.00 0.0307 0.0307

3. Dump / Overburden 0.00 0.5661 0.5661

4. Mineral Storage 0.00 0.0031 0.0031

5.

Infrastructure

(office, workshop &

plants etc.)

0.00 0.0125 0.0125

6. Road 0.00 0.1131 0.1131

7. Plantation 0.00 0.1125 0.1125

8. Subgrade stack yard 0.00 0.1502 0.1502

Total land use 0.00 2.001 2.001

Total Area 4.80 4.80 4.80

Page 25: Date: To, · 7. Certificate regarding mine lease not falling in Aravalli hills issued by concern ME/AME of DMG Y 8. Analysis Report (Air, Water, Soil, Noise) issued from NABL/MoEF

Annexure –E

Part-(B)

Post Mining Plan (Conceptual) Land Pattern Of ML Area (Ha.)

POST MINING LAND USE OF CORE ZONE WITH ENVIRONMENT MANAGEMENT

S.

No.

Description Land Use (In Ha.)

Plantation Water Body Public

Use

Undisturbed Total

1 Top Soil Dump - - - nil -

2 External Waste Dump 0.00 - - nil 0.00

3 (a) Excavation (Voids) nil 1.8589 - nil 1.8589 Ha

(b) Excavation

(backfilled) 1.5121 - - nil 1.5121 ha

4 Road nil - - nil nil

5 Built Up Area nil - - nil nil

6 Township Area nil - - nil nil

7 Afforestation 2.1706 - - nil 2.1706 ha

8 Mineral Storage nil - - nil nil

Total 4.80 ha 4.80 ha - nil 4.80 ha

Page 26: Date: To, · 7. Certificate regarding mine lease not falling in Aravalli hills issued by concern ME/AME of DMG Y 8. Analysis Report (Air, Water, Soil, Noise) issued from NABL/MoEF

Annexure –E

Part-(C)

Ecology: Stage wise Cumulative Plantation

REQUIREMENTS FOR PLANTS FOR AFFORESTATION AND RECLAMATION

Year Un-worked Area Waste Dump

(Outside)

Inside Dump

(Reclaimed Area)

Top Soil Dumps Total

Area (Ha.) No. of

Trees

Area (Ha.) No. of

Trees

Area (Ha.) No. of

Trees

Area (Ha.) No. of

Trees

Area (Ha.) No. of

Trees

I 0.025 100 Nil - Nil - Nil - 0.025 100

II 0.025 100 Nil - Nil - Nil - 0.025 100

III 0.025 100 Nil - Nil - Nil - 0.025 100

IV 0.025 100 Nil - Nil - Nil - 0.025 100

V 0.025 100 Nil - Nil - Nil - 0.025 100

Total 0.10 500 Nil - Nil - Nil - 0.10 500

Page 27: Date: To, · 7. Certificate regarding mine lease not falling in Aravalli hills issued by concern ME/AME of DMG Y 8. Analysis Report (Air, Water, Soil, Noise) issued from NABL/MoEF

Annexure –F

Statement of Commitments by the PP for Compliance during Post E.C. Period.

Gudha Quartz & Feldspar Applied area of Sitaram Soni, (M.L. No.-06/1994 (2/2013), Lease

area 4.80 hects.), N/v Gudha, Tehsil – Raipur, Distt.- Pali (Raj.) with proposed rate of production

is 35798 TPA of mineral Quartz & Feldspar

Following are the commitment related to the above mentioned project agreed by the project proponent during

EIA presentation to the SEAC for compliance and presented for verification during post EC period, to RPCB

and MoEF along with other EC conditions.

S.

No.

Commitments under Various Heads Final Responsibility (Status

of compliance)

1. All the haul roads in the lease area will be made

compact & water spraying will be done,

therefore, generation of dust by movement of

truck which carry mineral outside the lease area

is less..

PFR & Power

point

presentation

Sitaram Soni

2. Periodical air quality monitoring for PM10, NO2

and SO2 will be done as per guidelines.

PFR & Power

point

presentation

Sitaram Soni

3. Plantation will be done on both sides of the road

to arrest air borne dust & prevent its spread

outside the lease area.

PFR & Power

point

presentation

Sitaram Soni

4. Plantation will be taken up around the lease

boundary & along the haul roads. The plantation

minimizes propagation of noise.

PFR & Power

point

presentation

Sitaram Soni

5. No waste water generation is envisaged during

the mining process. The domestic sewage

generated from office toilets is routed to soak

pits via septic tanks.

PFR & Power

point

presentation

Sitaram Soni

6. Proper maintenance, oiling and grissing of

machines at regular intervals will be done to

reduce generation of noise.

PFR & Power

point

presentation

Sitaram Soni

7. All the haul roads in the lease area will be made

compact & water spraying will be done,

therefore generation of dust by movement of

truck carry mineral outside the lease area is less..

PFR & Power

point

presentation

Sitaram Soni

Date: /2017 Signature ------------------------------

Name & Designation: Sitaram Soni

of Project Proponent :- Lessee

Page 28: Date: To, · 7. Certificate regarding mine lease not falling in Aravalli hills issued by concern ME/AME of DMG Y 8. Analysis Report (Air, Water, Soil, Noise) issued from NABL/MoEF

Annexure H

Format for Mines

File No.:

Name of the Project (with production and location address):-

Gudha Quartz & Feldspar Applied area of Sitaram Soni, (M.L. No.-06/1994 (2/2013), Lease area

4.80 hects.), N/v Gudha, Tehsil – Raipur, Distt.- Pali (Raj.) with proposed rate of production is

35798 TPA of mineral Quartz & Feldspar

Name of the Project Proponent (with address, e-mail):-

Sitaram Soni S/o Jagdish Prasad Soni, R/o Nagelav, Tehsil & Distt.- Ajmer, Rajasthan.

Name of the Consultant (with address, e- mail):-

Ramesh Chandra Sharma C/o Saimaa Giominhydrotech, Opp. Baba Ramdev Ji Mandir, Gali no. 8,

Bhruntiya Soorsagar,Jodhpur 342024 Contact No. – 9829220600 E-mail:- [email protected]

1. 1

.

Category / Item

no.(in Schedule):

1(a)B2

2. 2

.

Location of Project N/v Gudha, Tehsil – Raipur, Distt.- Pali (Raj.)

3. 3

.

Project Details

M.L. No.

/Production capacity

M.L.No- 06/1994 (2/2013)

Area- 4.80 Hects.

Production (TPA)- 35798 TPA

4. 4

.

Project Cost: 20 Lakh

5. 5

.

Water Requirement

& Source

Total water requirement is about 3.0 KLD= 1 KLD (Drinking & Domestic

Uses) +1 KLD (Dust Suppression) + 1 KLD (Green Belt )

6. 6

.

Fuel & Energy:- Diesel will be used in Tractors & JCB.

7. 7

.

Application No. &

Date & documents

submitted :-

Page 29: Date: To, · 7. Certificate regarding mine lease not falling in Aravalli hills issued by concern ME/AME of DMG Y 8. Analysis Report (Air, Water, Soil, Noise) issued from NABL/MoEF

8. 8 Information about

Aravalli Certificate.

Enclosed

9. Date of

Air/Water/Noise

Monitoring

Enclosed

10. Information about

500 mts composite

map

Not Required

11. Environment

Management Plan

0.50 lacs per year

12. CSR /ESR Activates 1.00 lacs per year

13. Green Belt/

Plantation

0.25 lacs per year

14. Budgetary Breakup

for Labour

0.50 lacs per year

15. Present Status :-

The mine is fresh applied area.

Page 30: Date: To, · 7. Certificate regarding mine lease not falling in Aravalli hills issued by concern ME/AME of DMG Y 8. Analysis Report (Air, Water, Soil, Noise) issued from NABL/MoEF

AFFIDAVIT (By Project Proponent)

This is to certify that :

I, Sitaram Soni S/o Jagdish Prasad Soni, R/o Nagelav, Distt. Ajmer (Raj.), Project Proponent of

Gudha Quartz & Feldspar Applied area, M.L. No. 06/1994 (2/2013), Area – 4.80 Hects. near

Village - Gudha, Tehsil – Raipur, District - Pali do herby solemnly state as follows :

1. “No expansion /modernization activity has been undertaken in violation of the provision

of EIA notification”.

2. I hereby give undertaking that the data and information given in the application,

enclosures and other documents are true to the best of my knowledge and belief and I am

aware that if any part of the data and information submitted is found to be false or

misleading at any stage, the project will be rejected and clearance given, if any to the

Project will be revoked at our risk and cost.

3. I hereby also submit this undertaking as part of the EIA Report, owning the contents

(information and data) of the EIA Report”.

4. “There is no litigation pending against the project and/or land in which the project is

proposed to be set up and that for any such litigation whatsoever, the sole responsibility

will be borne by the Project Proponent.”

5. No any violation of provisions of EIA Notification date: 14.09.2006, and amendments

made thereafter, circulars and O.M. issued their under.

Date…………………….. Signature of PP with Postal address

Sitaram Soni S/o Jagdish Prasad Soni,

Place……………………. R/o Nagelav, District Ajmer (Raj.)

Page 31: Date: To, · 7. Certificate regarding mine lease not falling in Aravalli hills issued by concern ME/AME of DMG Y 8. Analysis Report (Air, Water, Soil, Noise) issued from NABL/MoEF

AFFIDAVIT (By Project Proponent)

This is to certify that :

I, Sitaram Soni S/o Jagdish Prasad Soni, R/o Nagelav, Distt. Ajmer (Raj.), Project Proponent of

Gudha Quartz & Feldspar Applied area, M.L. No. 06/1994 (2/2013), Area – 4.80 Hects. near

Village - Gudha, Tehsil – Raipur, District - Pali do herby solemnly state as follows :

1. My Environmental Consultant for submission of the project report for obtaining EC is

Ramesh Chandra Sharma.

2. That I have applied for the above said Project whose total area is 4.80 Hects.

3. That all the documents required as per the MoEF OM no. L-11011/47/2011-IA.II(M)

Dated. 24.6.2013, OM no.J-13012/12//1213-IA-II(I), Date: 24.12.2013 and amendments

made till today have been submitted for obtaining EC.

4. That the MoEF OM no. J-13012/12/1213-ia-ii(i), Date: 24.12.2013 is applicable on this

project and the project falls under the under the category ‘B2’ as categorized in the MoEF

OM on.J-13012/12/1213-IA-II(I), Date: 24.12.2013.

Date…………………….. Signature of PP with Postal address

Sitaram Soni S/o Jagdish Prasad Soni,

Place……………………. R/o Nagelav, District Ajmer (Raj.)

Page 32: Date: To, · 7. Certificate regarding mine lease not falling in Aravalli hills issued by concern ME/AME of DMG Y 8. Analysis Report (Air, Water, Soil, Noise) issued from NABL/MoEF

AFFIDAVIT (By Consultant/RQP)

This is to certify that :

1. I, Ramesh Chandra Sharma S/o Madan Lal Sharma, C/o Saimaa Giominhydrotech, Opp.

Baba Ramdev Ji Mandir, Gali no. 8, Bhruntiya Soorsagar, Jodhpur, Mining &

Environment Consultant for Gudha Quartz & Feldspar Applied area, M.L. No. 06/1994

(2/2013), Area – 4.80 Hects. near Village - Gudha, Tehsil – Raipur, District - Pali and

My Project Proponent for E.C. is Sitaram Soni.

2. That details and the data presented are factually correct, as per along with other

information is also to be submitted.

3. No any violation of provisions of EIA Notification Date: 14.09.2006, and amendments

made thereafter, circulars and O.M. issued their under.

Date…………………….. Signature of Consultant with Postal address

Ramesh Chandra Sharma S/o Madan Lal Sharma,

C/o Saimaa Giominhydrotech, Opp. Baba

Ramdev Ji Mandir, Gali no. 8, Bhruntiya

Place……………………. Soorsagar, District Jodhpur (Raj.)

Page 33: Date: To, · 7. Certificate regarding mine lease not falling in Aravalli hills issued by concern ME/AME of DMG Y 8. Analysis Report (Air, Water, Soil, Noise) issued from NABL/MoEF

AFFIDAVIT (By Consultant/RQP)

This is to certify that :

1. I, Ramesh Chandra Sharma S/o Madan Lal Sharma, C/o Saimaa Giominhydrotech, Opp.

Baba Ramdev Ji Mandir, Gali no. 8, Bhruntiya Soorsagar, Jodhpur, (Raj.), Mining &

Environment Consultant for Gudha Quartz & Feldspar Applied area, M.L. No. 06/1994

(2/2013), Area – 4.80 Hects. near Village - Gudha, Tehsil – Raipur, District - Pali and

My Project Proponent for E.C. is Sitaram Soni.

2. That I have prepared the project report for EC for the above said Project whose total area

is 4.80 hect.

3. That all the documents required as per the MoEF OM no. L-1101/47/2011-IA.II(M)

Dated. 24.6.2013 and OM no.J-13012/12/1213-IA-II (I), Date: 24.12.2013 have been

submitted for obtaining EC.

4. That the MoEF OM no.J-13012/12/1213-IA-II(I), Date: 24.12.2013 is applicable on this

project and the project falls under the category ‘B2’ as categorized in the MoEF OM

no.J-13012/12/1213-IA-II(I), Date: 24.12.2013.

Date…………………….. Signature of Consultant with Postal address

Ramesh Chandra Sharma S/o Madan Lal Sharma,

C/o Saimaa Giominhydrotech, Opp. Baba

Ramdev Ji Mandir, Gali no. 8, Bhruntiya

Place……………………. Soorsagar, District Jodhpur (Raj.)

Page 34: Date: To, · 7. Certificate regarding mine lease not falling in Aravalli hills issued by concern ME/AME of DMG Y 8. Analysis Report (Air, Water, Soil, Noise) issued from NABL/MoEF

ENVIRONMENT MANAGEMENT PLAN

OF

MINOR MINERAL MINING

N/V. GUDHA, TEHSIL RAIPUR, DISTT. PALI (RAJ)

(Prepared as per model EMP/Performa dated 26.05.2016,

prescribed by MoEF for B2 cases)

IN FAVOR OF

S.No. M.L. NO. NAME OF

APPLICANT

MINERAL AREA

1. 06/1994

(2/2013)

SITARAM SONI QUARTZ &

FELDSPAR

4.80

HECTS.

PREPARED BY

Ramesh Chandra Sharma(M.Sc. Geo)

RQP/AJM/349/2014/A VALID UP TO 13.08.2024

RQP/SME/JODHPUR/2012/02 VALID UP TO 12.12.2017

e-mail : [email protected] +91 98292-20600

SAIMAA GEOMINHYDROTECH

“Sai Prasad” Opp. Baba Ramdev Ji Mandir,

Gali no. 8, Bhruntiya Soorsagar,Jodhpur 342024

Page 35: Date: To, · 7. Certificate regarding mine lease not falling in Aravalli hills issued by concern ME/AME of DMG Y 8. Analysis Report (Air, Water, Soil, Noise) issued from NABL/MoEF

INTRODUCTION

The Environment Management Plan (EMP) is required to ensure

sustainable development in the mining lease area. EMP covers the genesis

of pollution & the proposed measures required for meeting the prevailing

statutory requirements of gaseous emissions, waste water discharge

characteristics, noise level etc. for environment management purpose in

connection with the mining & mining related activities in mining lease

(ML) area.

Objective of EMP:

1. To establish the environmental scenario.

2. To anticipate the impacts of proposed future mining operation on the

environment.

3. To prepare detailed action plan for implementation for mitigitive

measures.

4. To suggest preventive & mitigate measures to minimize adverse

impact & to maximize beneficial impacts.

5. To prepare a compensatory afforestation scheme.

6. To suggest a monitoring program.

7. To suggest the society or association responsible for environmental

control & protective measures.

8. To prepare a capital cost estimate for EMP.

Page 36: Date: To, · 7. Certificate regarding mine lease not falling in Aravalli hills issued by concern ME/AME of DMG Y 8. Analysis Report (Air, Water, Soil, Noise) issued from NABL/MoEF

1.1 LAND USE PATTERN:

The mined out land planning is required to be done to ensure that:

a. As soon as the land matures, it shall be ready for future best use.

b. At all the times mining pits and the roads shall be maintained in safe

condition to prevent land slides etc. and stability shall not be

disturbed.

c. Water drainage shall be maintained and cleaned in a manner that

surface water shall not cause quarry flooding.

The present land use pattern is as indicated in the following Table:

Present land use pattern

S. No. Activity Present Land (in Hects.)

1. Mining pits 0.00

2. Mineral stack yard 0.00

3. Waste Dump 0.00

4. Infrastructure inclusive of office,

workshop & plants etc.

0.00

5. Road/ Kacha way 0.00

6. Township/village/ school 0.00

7. Nallah 0.00

8. Area under Plantation 0.00

Total Present Land Use 4.80

Page 37: Date: To, · 7. Certificate regarding mine lease not falling in Aravalli hills issued by concern ME/AME of DMG Y 8. Analysis Report (Air, Water, Soil, Noise) issued from NABL/MoEF

Proposed Land use pattern

1.2 AIR ENVIRONMENT MANAGEMENT

The only source to pollute air shall be the generation of dust while

undertaking drilling and the semi mechanized mining operation including

sizing the mineral. The level of dust concentration shall be practically of

very low order during sizing. Drilling may generate air borne dust which

will be suppressed at source by wet drilling.

Sr.

No. Head

Existing

Land Use

(In

Hects.)

Additional

Requirement

during plan

period (In

Hects.)

Total Land Use at

the end of Plan

Period

(In Hects.)

A B C D E = (C+D)

1. Area under mining 0.00 1.0128 1.0128

2. Storage for Top Soil 0.00 0.0307 0.0307

3. Dump / Overburden 0.00 0.5661 0.5661

4. Mineral Storage 0.00 0.0031 0.0031

5.

Infrastructure

(office, workshop &

plants etc.)

0.00 0.0125 0.0125

6. Road 0.00 0.1131 0.1131

7. Plantation 0.00 0.1125 0.1125

8. Subgrade stack yard 0.00 0.1502 0.1502

Total land use 0.00 2.001 2.001

Total Area 4.80 4.80 4.80

Page 38: Date: To, · 7. Certificate regarding mine lease not falling in Aravalli hills issued by concern ME/AME of DMG Y 8. Analysis Report (Air, Water, Soil, Noise) issued from NABL/MoEF

Dust suppression system (water spraying) would be adopted at mine

working & loading points.

Excavation operation shall be suspended during very strong wind

condition.

Afforestation for control of dust.

Plantation of wide leaf trees, creepers & tall grass along approach

road.

Water spraying will be done on the evacuation road near mines for

dust suppression.

Trucks will be covered with tarpaulin to stop dust emission.

Dumping of OB waste for optimum height so as to reduce the dust.

Air quality should be regularly monitored.

1.3 CONTROL OF GASEOUS POLLUTION

The only source to pollute air is the generation of dust while undertaking

the mechanized mining operation including sizing the mineral. But the

level of dust concentration is practically of very low order. The measures

proposed are to follow the norms of mask, water spraying and plantation.

1.4 NOISE & VIBRATION ENVIRONMET

Generation of ground vibration and noise is practically nil, and low enough

with the mechanized mining operation to have any adverse impact on this

account to the workers and local inhabitants.

Drilling & Blasting will not be used because mineral is soft in nature. So,

there is not arising question of vibration.

However the following measures should be undertaken:

1. Regular monitoring of noise level should be done inside & outside

the ML boundary.

2. Ear muffs will be used during high noise activity.

3. Regular maintenance of machineries shall be done.

Page 39: Date: To, · 7. Certificate regarding mine lease not falling in Aravalli hills issued by concern ME/AME of DMG Y 8. Analysis Report (Air, Water, Soil, Noise) issued from NABL/MoEF

1.5 WATER MANAGEMENT

Surface Water The working pits and proposed waste rock dumpsites

shall be away from any seasonal water stream. Thus there will be no

impact of mining in the natural flow of water and the drainage system

in the lease area.

Ground water The water table in the area is sufficiently below (30-35m)

the ground surface and therefore, quantity as well as quality-wise, the

ground water in the area is not likely to be effected at all.

Water quality The mineral produced and the waste rocks generated are

not likely to pollute the water quality in any manner.

1 Mining will not intersect with the ground water table and any

drainage pattern.

2 No effluent will be generated due to mining activates.

3 Retaining wall all along the toe of dumps shall be constructed.

4 Formation of water garland to regulate & drain the rain water from

pit & directs its course away from dumping area.

5 Water harvesting system will be adopt for old pits in the ML area.

1.6 SOLID WASTE AND TOP SOIL MANAGEMENT

Small quantity of top soil will be generate during mining operation in ML

area which will be stacked separately for plantation purpose. It is proposed

to dump in systematic manner like multiple terracing & dumping yard will

be as per rule. At present, No dump lies at the site proposed. The dump

generated was used for road filling in the nearby villages. Now the lessee

Page 40: Date: To, · 7. Certificate regarding mine lease not falling in Aravalli hills issued by concern ME/AME of DMG Y 8. Analysis Report (Air, Water, Soil, Noise) issued from NABL/MoEF

proposes to stack the waste generated in the NE part of the lease area

statutory barrier in the non-mineralised zone.

1.7 GREEN BELT DEVELOMENT

In the ML area, plantation will be done in Mining lease periphery. It is proposed to plant 100 saplings per year of Neem, Babool, Jamun, Gulmohar & Local Species etc, in Mining lease periphery & along the roadside also in dump yard. One workman will be deputed for maintenance of plantation during mansoon period. If required, forest dept. Officers will be consulted for type of plantation suitable for this area. The survival rate is 70%. The year wise plantation is shown in following table.

Year Saplings

1st Year 100

2nd Year 100

3rd Year 100

4th Year 100

5th Year 100

TOTAL 500

1.8 SOCIO ECONOMIC ENVIRONMENT

Funds will be provided for deployed labours & nearby villagers

following activities-

To provide fund for public welfare.

To provide drinking water facility in nearby villages

Assistance for health camp and free medicine.

Clothes distribution to poor peoples.

Educational support to poor student especially for girls.

Page 41: Date: To, · 7. Certificate regarding mine lease not falling in Aravalli hills issued by concern ME/AME of DMG Y 8. Analysis Report (Air, Water, Soil, Noise) issued from NABL/MoEF

1.9 OCCUPATIONAL HEALTH & SAFETY

All the safety measures as per the mine regulations will be provided. For

safety purpose the following measures are also proposed:

1. Barbed wire fencing is proposed around all the pits, to check the

inadvertent entry of livestock in the mining area (excavation).

2. Security Guard are proposed for ward and watch duty and for

security purpose. He will not allow any unauthorized person and

livestock near the cutting of the proposed workings.

3. The safe workings are proposed in the supervision of technical and

qualified supervisory staff.

4. Suitable and properly maintained first-aid outfit is kept at the Area.

5. Dust masks are provided to the persons exposed to dust.

6. Suitable protective footwear are provided.

7. Use of ear protection (ear plugs and ear muff) are provided

8. Health camps are arranged for local villagers and workers.

For occupational health & safety purpose, 50000 Rupees will be provided

by lessee.

1.10 BUDGET ALLOCATED FOR EMP

S. No. Particulars Capital Cost (in rupees)

1. Pollution monitoring – Air, water, noise & soil

15000/- per year

2. Dust suppression 10000/- per year

3. Plantation including maintenance 25000/- per year

4. Wire fencing at plantation site 10000/- per year

5. Rainwater harvesting 10000/- per year

6. Houl road & other roads repair & maintenance

5000/- per year

Total 75000/- per year

Page 42: Date: To, · 7. Certificate regarding mine lease not falling in Aravalli hills issued by concern ME/AME of DMG Y 8. Analysis Report (Air, Water, Soil, Noise) issued from NABL/MoEF

SUMMARY

As per above discussion there is no measure impact on the environment due to

mining except fugitive emission in the form of dust generated during handling and

loading of mineral. The adequate preventive measures will be adopted to contain

the various pollutants within permissible limits. Plantation development will be

carried out in the mine premises, along the approach roads, around Govt. buildings,

schools approx 100 trees per year. It will prove an effective pollution mitigate

technique, and help avoid soil erosion during monsoon season. Employment

opportunities will be provided to the locals as extraction of minerals from the mine

site is an important prevailing occupation for them for their livelihood. A budget of

50000 Rs. Per year for Occupational Health and Safety and budget of 75000 Rs.

Per year for EMP are proposed for area.

Signature of PP R.Q.P.