Page No. 1 of 16
Date: Nov. 22, 2018 BY HAND DELIVERY/RPAD
To,
The Member Secretary (Industry II)
Ministry of Environment, Forest and Climate Change (MoEFCC) Government of India,
Indira Paryavaran Bhavan,
Aliganj, Jor Bagh Road,
New Delhi – 110 003
KIND ATN: MR. S. K. SHRIVASTAVA
SUB: ADDITIONAL INFORMATION TO OBTAIN EC FOR PROPOSED EXPANSION OF
BULK DRUGS & BULK DRUG INTERMEDIATES IN EXISTING
MANUFACTURING UNIT OF M/S. ANMOL ANTIOXIDANTS PVT. LTD. AT
SURVEY NO. 35 & 36, BEHIND HGI FOUNDARY, VILL: BASKA, TAL: HALOL,
DIST. PANCHMAHAL, GUJARAT-389350.
CATEGORY: A-5(F) – LOCATED OUTSIDE INDUSTRIAL ESTATE
REF NO.: PROPOSAL NO. IA/GJ/IND2/67598/2017 AND EDS SOUGHT ON 06/11/2018
Dear Sir,
This has reference to the above mentioned subject matter. We are submitting herewith
additional information to obtain EC for Proposed Expansion of Bulk Drugs & Bulk Drug
Intermediates in existing Manufacturing Unit of M/s. Anmol Antioxidants Pvt. Ltd.
We request your kind self to grant us EC and oblige us.
Thanking you.
Yours faithfully,
For Anmol Antioxidants Pvt. Ltd.
AUTHORISED SIGNATORY
Page No. 2 of 16
EDS SOUGHT ON 06/11/2018:
Sno. Proposal No. Essential Details Sought on/Reply
Date
Eds
Letter Status
1 IA/GJ/IND2/81554/2017
Please inform/clarify the
following:- - Details of EC and the
compliance status thereof for the
present industrial operations
producing APIs of 21.88 TPM at
the project site. - Whether the
EIA consultant is accredited for
preparing EIA/EMP report for the
projects covered under category
A of item 5(f) of the schedule to
the EIA Notification, 2006. -
Increase in ground water
withdrawal (from the present of
163.65 cum/day) due to the
proposed expansion and the
status of clearance for the same.
06/11/2018
Pending
2 IA/GJ/IND2/81554/2017 verified 03/11/2018 NA
Page No. 3 of 16
Reply to Query:
Sr.
No.
Query as per EDS dated
6/11/2018
Reply Page No.
1 Please inform/clarify the
following:-
Details of EC and the compliance
status thereof for the present
industrial operations producing
APIs of 21.88 TPM at the project
site.
Whether the EIA consultant is
accredited for preparing EIA/EMP
report for the projects covered
under category A of item 5(f) of
the schedule to the EIA
Notification, 2006.
Increase in ground water
withdrawal (from the present of
163.65 cum/day) due to the
proposed expansion and the
status of clearance for the same.
EC was not Obtained because
company obtained CCA before EIA
Notification, 2006.
Company obtained CCA from GPCB
vide letter No. 14777,
Dated: 18/05/2000. CCA Copy is
attached in Annexure-1.
EIA consultants got Stay Oder
against implementation of
Notification regarding NABET/QCI
scheme of MoEFCC, New Delhi
dated March 3,2016, which is
attached in Annexure-2.
Company is withdrawing 9.25 KLD
of water in existing scenario after
expansion it would be 163.65 KLD.
CGWA application for the
withdrawal of 163.65 KLD is
attached as Annexure-3.
4 of 6
7 of 10
11 of 16
Page No. 4 of 16
Answer-1:
EC was not Obtained because company obtained CCA before EIA Notification, 2006.
Company obtained CCA from GPCB vide letter No. 14777, Dated: May 18, 2000.
Page No. 5 of 16
Page No. 6 of 16
Page No. 7 of 16
Answer-2
EIA consultants got Stay Oder against implementation of Notification regarding NABET/QCI
scheme of MoEFCC, New Delhi dated March 3,2016, which is attached in Annexure-2.
Page No. 8 of 16
Page No. 9 of 16
Page No. 10 of 16
Page No. 11 of 16
Answer-3
Company is withdrawing 9.25 KLD of water in existing scenario after expansion it would be
163.65 KLD. Copy of CGWA Application for withdraw of water (163.65 KLD) is attached as
Annexure-3.
Page No. 12 of 16
Page No. 13 of 16
Page No. 14 of 16
Page No. 15 of 16
Page No. 16 of 16