LOCATION RESTRICTION DATE CONTRACTOR COST
PHILADELPHIA
PA 73 E & W (New State Rd.) Road Reconstruction: LANE CLOSURES between
Levick St. & Cottman Ave. 9 AM - 3 PM
11/12/17-11/18/17 Walsh Construction
Company
$212.3 million
*I-95 North Bridge Inspection: LEFT LANE CLOSED between
Enterprise Ave. & Broad St. (PA 611). 9 AM - 3 PM.
11/13/17-11/16/17 Pickering, Corts &
Summerson
*US 1 N & S (Roosevelt Extension) Drain Cleaning/Debris Removal: INTERMITTENT
LANE RESTRICTIONS between I-76 & 9th St. 9:30
AM - 2 PM.
11/13/17-11/16/17 Maintenance
*I-676 E & W Drain Cleaning/Debris Removal: INTERMITTENT
LANE RESTRICTIONS between I-76 & I-95. 9:30 AM -
2 PM.
11/13/17-11/16/17 Maintenance
*I-95 N & S Drain Cleaning/Debris Removal: INTERMITTENT
LANE RESTRICTIONS between Phila. Int. Airport &
PA 63 (Woodhaven Rd.). 9:30 AM - 2 PM.
11/13/17-11/16/17 Maintenance
*I-76 E & W Drain Cleaning/Debris Removal: INTERMITTENT
LANE RESTRICTIONS between US 1 (City Ave.) &
26th St. 9:30 AM - 2 PM.
11/13/17-11/16/17 Maintenance
*I-76 West Shielding: RIGHT LANE CLOSURE between South
St. off Ramp & 676 Vine St. Expressway. 9 PM - 5
AM.
11/13/17-11/16/17 Buckley & Company,
Inc.
$103.5 million
DATE: 11-16-2017
PENNSYLVANIA DEPARTMENT OF TRANSPORTATION
ENGINEERING DISTRICT 6-0
TRAFFIC RESTRICTION BULLETIN
(NOTE: SCHEDULES ARE SUBJECT TO WEATHER CONDITIONS)
(All restrictions 24 hours/day, 7 days/week unless otherwise noted)
PENNDOT ROADWAY MAINTENANCE HOTLINE 1-800-FIX- ROAD
Log on to www.511pa.com or call 511 from any phone to check conditions on major highways.
11/16/2017 Page 1 of 28
LOCATION RESTRICTION DATE CONTRACTOR COST
Passyunk Ave. Bridge Rehabilitation: RIGHT LANE CLOSED on Hon.
Robert C. Donatuccu Memorial Bridge over Schuylkill
River. 9 AM - 3 PM.
11/13/17-11/17/17 Buckley & Company,
Inc.
$33.5 million
Walnut Lane Debris Removal & Concrete Repair: LANE
CLOSURES between Magdelena St. & Park Lane
Drive. Weekdays. 9 AM - 3 PM.
11/13/17-11/17/17 Buckley & Company,
Inc.
$14 million
Parkside Ave. Milling & Paving: LANE RESTRICTIONS between N.
52nd St. & Girard Ave. 9 AM - 3 PM & 7 PM - 6 AM.
11/13/17-11/17/17 Tony DePaul & Son $8.8 million
JFK Blvd. East Bridge Rehabilitation: CLOSED & DETOURED
between 20th St. & Schuylkill Ave. DETOUR
POSTED. 24-HOUR DETOUR
11/13/17-11/17/17 Abbonizio
Contractors, Inc.
$15.8 million
Lewis St./Wheatsheaf Lane Shared Pathway: PARKING LANE CLOSED between
Aramingo Ave. & Delaware Ave. 7 AM - 4 PM.
11/13/17-11/17/17 James J. Anderson $869,700.00
US 1 N & S (Roosevelt Blvd.) ITS Installation: LANE RESTRICTIONS between
Byberry Rd. & Hornig Rd. 9 PM - 5 AM.
11/13/17-11/17/17 Wampole-Miller, Inc. $15 million
US 1 N & S (Roosevelt Blvd.) Fiber Backbone Installation: LANE RESTRICTIONS
between Comly St. & Old Trevose Rd. 9 AM - 3 PM.
11/13/17-11/17/17 Wampole-Miller, Inc. $15 million
Ridge Ave. Trench/Foundations: LANE CLOSURES between
Poplar St. & Spring Garden St. 9 AM - 3 PM.
11/13/17-11/17/17 Armour and Sons
Electric
$1,698,438.00
22nd St. on-ramp to I-676 West Base Repair: RAMP CLOSED & DETOURED. 9 AM -
3 PM. DETOUR POSTED.
11/16/17 Maintenance
*I-76 West Shielding: CLOSED & DETOURED between South St.
off Ramp & 676 Vine St. Expressway. 11 PM - 5 AM.
DETOUR POSTED
11/16/17 Buckley & Company,
Inc.
$103.5 million
*I-95 North Bridge Inspection: LEFT LANE CLOSED between
Enterprise Ave. & Broad St. (PA 611). 9 AM - 3 PM.
11/17/17 Pickering, Corts &
Summerson
*US 1 South Bridge Inspection: RIGHT LANE CLOSED between
Henry Ave. & Wissahickon Ave. 7 AM - 11 AM.
11/18/17 Ammann & Whitney
11/16/2017 Page 2 of 28
LOCATION RESTRICTION DATE CONTRACTOR COST
*I-95 North Bridge Inspection: LEFT LANE CLOSED between
Enterprise Ave. & Broad St. (PA 611). 8 AM - 4 PM.
11/19/17 Pickering, Corts &
Summerson
*I-76 E & W Strip Seal Replacement: WESTBOUND LANE
CLOSURE between Montgomery Drive & US 1 (City
Ave.). 8 PM - 5 AM.
11/20/17-11/21/17 Loftus Construction $7.5 milliom
US 1 South off-ramp to I-76 West Approach Rehabilitation: LANE NARROWING ON
THE RAMP. 8 PM - 5 AM.
11/20/17-11/21/17 Loftus Construction $7.5 million
*US 1 N & S (Roosevelt Blvd.) Milling & Paving: LANE CLOSURES between Bucks
County line & 9th St. 9 AM - 3 PM.
11/20/17-11/21/17 H&K Group, Inc. $7.6 million
Ridge Ave. Trench/Foundations: LANE CLOSURES between
Girard Ave. & 15th St. 9 AM - 3 PM.
11/20/17-11/22/17
& 11/24/17
Armour and Sons
Electric
$1,698,438.00
Lewis St./Wheatsheaf Lane Shared Pathway: PARKING LANE CLOSED between
Aramingo Ave. & Delaware Ave. 7 AM - 4 PM.
11/20/17-11/24/17 James J. Anderson $869,700.00
JFK Blvd. East Bridge Rehabilitation: CLOSED & DETOURED
between 20th St. & Schuylkill Ave. 24-HOUR
DETOUR. DETOUR POSTED.
11/20/17-8/2018 Abbonizio
Contractors, Inc.
$15.8 million
JFK Blvd. West Bridge Rehabilitation: CLOSED & DETOURED
between 20th St. & Schuylkill Ave. 9 PM - 5 AM.
DETOUR POSTED.
12/1/17-12/4/17 Abbonizio
Contractors, Inc.
$15.8 million
PA 73 E & W (New State Rd.) Road Reconstruction: LANE CLOSURES between
Levick St. & Cottman Ave. 9 AM - 3 PM
11/5/17-11/11/17 Walsh Construction
Company
$212.3 million
Girard Ave. on-ramp to I-95 North Bridge Demolition: CLOSED & DETOURED between
Fletcher St. & Richmond St. 9 PM - 5 AM. DETOUR
POSTED.
11/6/17-11/7/17 James J. Anderson $211 million
Aramingo Ave. on-ramp to I-95
South
Deck & Joint Repair: RAMP CLOSED & DETOURED.
8 PM - 5 AM. DETOUR POSTED.
11/6/17-11/9/17 Maintenance
JFK Blvd. East Bridge Rehabilitation: CLOSED & DETOURED
between 20th St. & Schuylkill Ave. DETOUR
POSTED. 24-HOUR DETOUR
11/6/17-11/10/17 Abbonizio
Contractors, Inc.
$15.8 million
11/16/2017 Page 3 of 28
LOCATION RESTRICTION DATE CONTRACTOR COST
Parkside Ave. Milling & Paving: LANE RESTRICTIONS between N.
52nd St. & Girard Ave. 9 AM - 3 PM & 7 PM - 6 AM.
11/6/17-11/10/17 Tony DePaul & Son $8.8 million
Lewis St./Wheatsheaf Lane Shared Pathway: PARKING LANE CLOSED between
Aramingo Ave. & Delaware Ave. 7 AM - 4 PM.
11/6/17-11/10/17 James J. Anderson $869,700.00
Passyunk Ave. Bridge Rehabilitation: RIGHT LANE CLOSED on Hon.
Robert C. Donatuccu Memorial Bridge over Schuylkill
River. 9 AM - 3 PM.
11/6/17-11/10/17 Buckley & Company,
Inc.
$33.5 million
Walnut Lane Debris Removal & Concrete Repair: LANE
CLOSURES between Magdelena St. & Park Lane
Drive. Weekdays. 9 AM - 3 PM.
11/6/17-11/10/17 Buckley & Company,
Inc.
$14 million
Henry Ave. Bridge Deck Rehabilitation: RIGHT LANE CLOSED
between Hermit Lane & School House Lane. 24-
HOUR RESTRICTIONS.
11/6/17-12/6/17 Loftus Construction,
Inc.
$11.7 million
Walnut Lane Debris Removal & Concrete Repair: LANE
CLOSURES between Magdelena St. & Park Lane
Drive. Weekdays. 9 AM - 3 PM.
11/6/17-11/10/17 Buckley & Company,
Inc.
$14 million
Passyunk Ave. Bridge Rehabilitation: RIGHT LANE CLOSED on Hon.
Robert C. Donatuccu Memorial Bridge over Schuylkill
River. 9 AM - 3 PM.
11/6/17-11/10/17 Buckley & Company,
Inc.
$33.5 million
US 1 N & S (Roosevelt Blvd.) ITS Installation: LANE RESTRICTIONS between
Byberry Rd. & Hornig Rd. 9 PM - 5 AM.
11/6/17-11/10/17 Wampole-Miller, Inc. $15 million
US 1 N & S (Roosevelt Blvd.) Fiber Backbone Installation: LANE RESTRICTIONS
between Comly St. & Old Trevose Rd. 9 AM - 3 PM.
11/6/17-11/10/17 Wampole-Miller, Inc. $15 million
*US 1 N & S (Roosevelt Blvd.) Milling & Paving: LANE CLOSURES between Bucks
County line & 9th St. 9 AM - 3 PM & 7 PM - 5 AM.
Friday 7 PM - Saturday 9 AM.
11/13/17-11/18/17 H&K Group, Inc. $7.6 million
Parkside Ave. Median Installation: CLOSED & DETOURED between
Belmont Ave. & 41st St. 24-HOUR DETOUR.
DETOUR POSTED.
10/30/17-11/3/17 Fairmount Park
Conservancy
11/16/2017 Page 4 of 28
LOCATION RESTRICTION DATE CONTRACTOR COST
Delaware Ave. Milling & Paving: LANE RESTRICTIONS between
Oregon Ave. & Walt Whitman Bridge. 7 AM - 4 PM &
7 PM - 5 AM.
10/30/17-11/3/17 Tony DePaul & Son $550,000.00
US 1 N & S (Roosevelt Blvd.) ITS Installation: LANE RESTRICTIONS between
Byberry Rd. & Hornig Rd. 9 PM - 5 AM.
10/30/17-11/3/17 Wampole-Miller, Inc. $15 million
Schuylkill Ave. Bridge Rehabilitation: TRAFFIC SWITCH WITH NO
RIGHT TURN at Walnut onto Schuylkill. 24-HOUR
RESTRICTIONS.
8/28/17-12/31/17 Buckley & Company,
Inc.
$103 million
Holme Ave. Bridge Repair: LANE CLOSURE between Longford St.
& Arthur St. 24-HOUR RESTRICTIONS.
8/7/17-5/2018 Road-Con, Inc. $1.3 million
I-676 West Ramp to 22nd St. Bridge Construction: RAMP REDUCED TO ONE
LANE 24-HOUR
7/21/17-12/15/17 Buckley & Company,
Inc.
$64.8 million
Aramingo Ave. Utility Installation: LANE CLOSURES between
Wheatsheaf Lane & I-95 interchange. 9 AM - 3 PM.
7/20/17-4/1/18 A.P. Construction,
Inc.
$87 million
Palmer St. Overhead Bridge Construction: CLOSED &
DETOURED between Wildey St. & Delaware Ave. 24-
HOUR DETOUR. DETOUR POSTED.
6/15/16-5/1/18 James J. Anderson $211 million
Montgomery Ave. Bridge Demoliltion: CLOSED & DETOURED between
Wildy St. & Delaware Ave. 24-HOUR DETOUR.
DETOUR POSTED.
6/15/17-5/1/18 James J. Anderson $211 million
Columbia Ave. Bridge Demolition: CLOSED & DETOURED between
Wildey St. & Delaware Ave. 24-HOUR DETOUR.
DETOUR POSTED.
6/5/17-11/14/17 James J. Anderson $211 million
18th St. Roadwork: CLOSED & DETOURED between Vine St.
Local E/B & Vine St. Local W/B. 24-HOUR
CLOSURE. DETOUR POSTED.
5/15/17-1/2018 Buckley & Company,
Inc.
$64.8 million
22nd St. Bridge Construction: TRAFFIC PATTERN CHANGE
on bridge over I-676 between Ben Franklin Parkway &
Race St.
11/7/16-11/30/18 Buckley & Company,
Inc.
$64.8 million
21st St. Bridge Construction: TRAFFIC PATTERN CHANGE
on bridge over I-676 between Ben Franklin Parkway &
Race St.
11/7/16-11/30/18 Buckley & Company,
Inc.
$64.8 million
11/16/2017 Page 5 of 28
LOCATION RESTRICTION DATE CONTRACTOR COST
Olney Ave. Roadwork: LANE RESTRICTIONS between Broad St.
(PA 611) & Rising Sun Ave. 9 AM - 3 PM.
12/2/15-11/2017 Armour and Sons
Electric
$4.7 million
Sergeant St. Bridge Work: CLOSED & DETOUR between Salmon
St. & Richmond St. 24-HOUR DETOUR. DETOUR
POSTED.
12/28/15-12/2018 James J. Anderson $211 million
Huntingdon St. Bridge Work: CLOSED & DETOUR between Salmon
St. & Richmond St. 24-HOUR DETOUR. DETOUR
POSTED.
12/28/15-12/2018 James J. Anderson $211 million
Somerset St. Bridge Work: CLOSED & DETOUR between Salmon
St. & Richmond St. 24-HOUR DETOUR. DETOUR
POSTED.
12/28/15-12/2018 James J. Anderson $211 million
Delaware Ave. Reconstruction: NEW TRAFFIC PATTERN between
Columbia Ave. & Aramingo Ave. 24-HOUR
RESTRICTIONS.
4/1/15-10/2018 James J. Anderson $211.7 million
BUCKS COUNTY
State Rd., Bristol Twp. Railroad Crossing Surface Replacement: CLOSED &
DETOURED between River Rd. & Mack Drive. Friday
5 PM thru Monday 5 AM. DETOUR POSTED.
11/10/17-11/13/17 Dow Chemical
PA 32 (River Rd.), Bridgeton Twp. Tree Removal: LANE RESTRICTIONS at Narrows Hill
Rd. 9 AM - 3 PM.
11/13/17-11/15/17 Bustleton Services
*US 1 North (Lincoln Hwy.),
Bensalem, Morrisville twps.
Large Sign Repair: LANE SHIFTS between Street Rd.
& Pennsylvania Ave. Interchanges. 9 AM - 3 PM.
11/13/17-11/17/17 J. Fletcher Creamer &
Son, Inc.
$644,888.00
Marienstein Rd., Nockamixon,
Bridgeton twps.
Road Work: LANE RESTRICTIONS between PA 611
(Easton Rd.) & PA 32 (River Rd.). 9 AM - 3 PM.
11/13/17-11/17/17 J.D. Morrissey, Inc. $3.2 million
*I-95 N & S, Middletown Twp. Shoulder Topsoil & Stone Placement:
INTERMITTENT LANE CLOSURES between New
Falls Rd. & Newtown-Yardley Interchange. 7 PM - 5
AM.
11/13/17-11/17/17 James J. Anderson $29,633,134
Trumbauersville Rd., Milford Twp. Pipe Replacement: CLOSED & DETOURED between
Esten Rd. & Weisel Rd. 8 AM - 4 PM. DETOUR
POSTED.
11/15/17-11/17/17 Maintenance
11/16/2017 Page 6 of 28
LOCATION RESTRICTION DATE CONTRACTOR COST
2nd St. Pike, Northampton Twp. Utility Installation: LANE CLOSURE between Tartan
Rd. & Twining Ford Rd. Weekdays. 9 AM - 3 PM.
11/15/17-11/22/17 PECO Energy
*I-95 South off-ramp to Taylorsvile
Rd. North, Lower Makefield Twp.
Road Work: RAMP CLOSED & DETOURED. 8 PM -
6 AM. DETOUR POSTED.
11/16/17 Delaware River Joint
Toll Bridge
Commission
Red Hill Rd., Tinicum Twp. Pipe Replacement: CLOSED & DETOURED between
Mountain View Lane & Dark Hollow Rd. 8 AM - 4 PM.
DETOUR POSTED.
11/20/17-11/21/17 Maintenance
US 1 North (Lincoln Hwy.),
Bensalem, Morrisville twps.
Large Sign Maintenance: LANE RESTRICTIONS
between Street Rd. & Pennsylvania Ave.
Interchanges. 9 AM - 3 PM.
11/20/17-11/21/17 J. Fletcher Creamer &
Son, Inc.
$644,888.00
Second Street Pike, Upper
Southampton Twp.
Base Repair: LANE RESTRICTIONS between PA 132
(Street Rd.) & Pinewood Rd. 9 AM - 3 PM.
11/20/17-11/22/17 Upper Southampton
Township Municipal
Authority
Second Street Pike, Upper
Southampton Twp.
Base Repair: LANE RESTRICTIONS between Lynne
Drive & Hiview Drive. 9 AM - 3 PM.
11/20/17-11/22/17 Upper Southampton
Township Municipal
Authority
PA 132 (Street Rd.), Upper
Southampton Twp.
Base Repair: LANE RESTRICTIONS between
Morning Glory Drive & Marigold Ave. 9 AM - 3 PM.
11/20/17-11/22/17 Upper Southampton
Township Municipal
Authority
PA 611 South, Doylestown Twp.,
Doylestown Bor.
Line Painting: RIGHT LANE CLOSED between N.
Broad St. & W. State St. 9 AM - 3 PM.
11/20/17-11/22/17 Rohm and Haas
Chemicals, LLC
Newportville Rd., Bristol Twp. Utility Installation: LANE CLOSURE between Hilary
Ave. & Dixon Ave. Weekdays. 9 AM - 3 PM.
11/21/17-11/22/17 PECO Energy
Main St., Chalfont Bor. Utility Installation: LANE RESTRICTIONS at Westview
Ave. 9 AM - 3 PM.
11/20/17-11/22/17
& 11/27/17-
11/28/17
PECO Energy
Rocky Ridge Rd., Richland Twp. Bridge Replacement: CLOSED & DETOURED
between Rock Hill Rd. & Paletown Rd. 24-HOUR
DETOUR. DETOUR POSTED.
11/27/17-4/13/18 Loftus Construction,
Inc.
$11.7 million
PA 611 (Easton Rd.), Durham Twp. Bridge Inspection: LANE CLOSURE between PA 212
(Durham Rd.) & Durham St. 9 AM - 3 PM.
11/29/17 AECOM
11/16/2017 Page 7 of 28
LOCATION RESTRICTION DATE CONTRACTOR COST
County Line Rd., Upper
Southampton Twp.
Utility Installation: LANE CLOSURE between Somers
Drive & Mann Rd. Weekdays. 9 AM - 3 PM.
11/30/17-12/1/17 PECO Energy
*I-95 N & S, Middletown Twp. Traffic Marking Installation: INTERMITTENT LANE
CLOSURES between New Falls Rd. & Newtown-
Yardley Interchange. 7 PM - 5 AM.
11/6/17-11/10/17 James J. Anderson $29,633,134
Marienstein Rd., Nockamixon,
Bridgeton twps.
Road Work: LANE RESTRICTIONS between PA 611
(Easton Rd.) & PA 32 (River Rd.). 9 AM - 3 PM.
11/6/17-11/10/17 J.D. Morrissey, Inc. $3.2 million
University Ave. Line Stripping: LANE CLOSURES between Civic
Center Blvd. & 34th St. 7 AM - 4 PM.
11/6/17-11/10/17 Guidemark, Inc. $6.3 million
Durham Rd., Bensalem, Bristol twps. Bridge Beams: CLOSED & DETOURED between New
Rodger Rd. & New Falls Rd. 7 AM - 3 PM & 8 PM - 5
AM. DETOUR POSTED.
11/6/17-11/11/17 Pennsylvania
Turnpike Commission
$142 million
Buckingham, Warrington, Solebury,
New Britain twps.; Doylestown Bor.
Line Painting: SLOW MOVING OPERATION TO
PAINT TRAFFIC LINES. MOTORISTS ARE
ADVISED TO REMAIN AN AMPLE DISTANCE
BEHIND THE PAINTING TRUCK & STAY OFF
TRAFFIC LINES. 9 AM - 3 PM.
11/6/17-11/17/17 PennDOT $29.6 million
PA 611 (Easton Rd.), Warrington
Twp.
Curb Ramp Installation: LANE CLOSURES at
Steeplechase Drive; Turk Rd.; Almshouse Rd.; Edison
Furlong Rd.; New Britain Rd./Sauerman Rd.; Bristol
Rd.; Kelly Rd.; Freedoms Way/Oxford Drive;
Doylestown Plaza. 9 AM - 3 PM.
11/6/17-11/17/17 James D. Morrissey $4.3 million
US 1 North, Bensalem, Morrisville
twps.
Large Sign Structure Repair: LANE SHIFTS between
Street Rd. & Pennsylvania Ave. Interchanges. 9 AM -
3 PM.
11/6/17-11/10/17 J. Fletcher Creamer &
Son, Inc.
N. Pine St., Langhorne Bor. Utility Installation: LANE CLOSURE between E.
Winchester Ave. & Summit Ave. Weekdays. 9 AM - 3
PM.
11/6/17-11/13/17 PECO Energy
County Line Rd., Warrington,
Horsham twps.
Utility Work: LANE RESTRICTIONS between Folly Rd.
& Keith Valley Rd. Weekdays. 9 AM - 3 PM.
11/6/17-11/30/17 Underground
Services, Inc.
11/16/2017 Page 8 of 28
LOCATION RESTRICTION DATE CONTRACTOR COST
W. State Rd., Doylestown Twp. Utility Installation: LANE CLOSURE between Franklin
St. & Clinton St. Weekdays. 9 AM - 3 PM.
11/9/17-11/16/17 PECO Energy
County Line Rd., Horsham Twp. Utility Installation: CLOSED & DETOURED between
Chestnut Lane & Keith Valley Rd. Weekdays. 9 PM -
6 AM. DETOUR POSTED.
10/30/17-11/30/17 Horsham Township
Water & Sewer
Authority
Langhorne Yardley Rd., Lower
Makefield Twp.
Milling & Paving: LANE RESTRICTIONS between
Stoney Hill Rd. & Yardley Newtown Rd. Weekdays. 7
AM - 5 PM.
10/31/17-12/1/17 Blooming Glen
Contractors, Inc.
$4.4 million
East Park Ave., Sellersville Bor. Utility Installation: LANE RESTRICTIONS between
Main St. & Herbert St. Weekdays. 9 AM - 3 PM.
10/23/17-11/17/17 North Penn Water
Authority
Bath Rd., Bristol Twp. Utility Installation: LANE RESTRICTIONS between
Bayard St. & Lower Bucks Hospital Entrance.
Weekdays. 9 AM - 3 PM.
10/23/17-11/30/17 PECO Energy
Kumry Rd., Milford Twp. Milling & Paving: LANE RESTRICTIONS between
Sleepy Hollow Rd. & Creamery Rd. 7 AM - 5 PM.
10/16/17-12/1/17 Blooming Glen
Contractors, Inc.
$3.7 million
N. Broad St., Hatfield Twp. Sidewalk Installation: LANE RESTRICTIONS between
Montgomery St. & Lynwood Rd. Weekdays. 9 AM - 3
PM.
9/25/17-11/15/17 Bencardino
Excavating, Inc.
$155,000.00
Walnut St., Perkasie Bor. Bridge Replacement: CLOSED & DETOURED
between PA 152 & Constitution Ave. 24-HOUR
DETOUR. DETOUR POSTED.
9/25/17-11/25/18 H&K Group, Inc.
Street Rd., New Hope Bor. Bridge Rehabilitation: CLOSED & DETOURED
between Atkinson Rd. & Windy Bush Rd. 24-HOUR
DETOUR. DETOUR POSTED.
9/25/17-11/30/17 Loftus Construction,
Inc.
$6.8 million
Sugan Rd., Solebury Twp. Bridge Rehabilitation: CLOSED & DETOURED
between Creamery Rd. & Paxson Rd. 24-HOUR
CLOSURE. DETOUR POSTED.
10/2/17-5/5/18 J.D. Eckman, Inc. $7,407,987.00
*I-95 North, Lower Makefield Twp. Roadwork: LANE CLOSURES between PA 332
(Yardley-Newtown Rd.) & NJ state line. 24-HOUR
RESTRICTIONS POSSIBLE.
9/16/17-Indef. Delaware River Joint
Toll Bridge
Commission
11/16/2017 Page 9 of 28
LOCATION RESTRICTION DATE CONTRACTOR COST
*I-95 South, Lower Makefield Twp. Roadwork: LANE CLOSURES between JJ state line &
PA 332 (Yardley-Newtown Rd.). 24-HOUR
RESTRICTIONS POSSIBLE.
9/16/17-Indef. Delaware River Joint
Toll Bridge
Commission
PA 32 (River Rd.), Lower Makefield
Twp.
Roadwork: LANE RESTRICTIONS between Woodside
Rd. & I-95. 24-HOUR RESTRICTIONS POSSIBLE.
9/16/17-Indef. Delaware River Joint
Toll Bridge
Commission
Woodside Rd., Lower Makefield
Twp.
Roadwork: ALTERNATING TRAFFIC between River
Rd. & Mt. Eyre Rd. 24-HOUR RESTRICTIONS
POSSIBLE.
9/16/17-Indef. Delaware River Joint
Toll Bridge
Commission
Taylorsville Rd., Lower Makefield
Twp.
Roadwork: LANE CLOSURES between Woodside Rd.
& Highland Drive. 24-HOUR RESTRICTIONS
POSSIBLE.
9/16/17-Indef. Delaware River Joint
Toll Bridge
Commission
PA 413 (New Rodgers Rd.), Bristol
Twp.
Bridge Rehabilitation: CLOSED & DETOURED
between Plumbridge Drive & Bath Rd./Durham Rd. 8
PM - 5 AM. DETOUR POSTED.
8/20/17-12/18/17 Pennsylvania
Turnpike Commission
$142 million
PA 413 (New Rodgers Rd.), Bristol
Twp.
Bridge Rehabilitation: LANE RESTRICTIONS & 15-
MINUTE STOPPAGES between Plumbridge Drive &
Bath Rd./Durham Rd. 7 AM - 3 PM & 8 PM - 5 AM.
8/20/17-12/18/17 Pennsylvania
Turnpike Commission
$142 million
Durham Rd., Bristol Twp. Roadwork: LANE RESTRICTIONS between PA 413 &
New Falls Rd. 7 AM - 3 PM.
8/20/17-12/18/17 Pennsylvania
Turnpike Commission
$142 million
Durham Rd., Bristol Twp. Roadwork: CLOSED & DETOURED between PA 413
& New Falls Rd. 8 PM - 5 AM. DETOUR POSTED.
8/20/17-12/18/17 Pennsylvania
Turnpike Commission
$142 million
Loux Covered Bridge over Cabin
Run on Carver-Wismer Road,
Bedminster Township
CLOSED & DETOURED INDEFINITELY: Due to
structural damage sustained from an oversized vehicle
DETOUR POSTED
8/1/17-Indef.
Steinsburg Rd., Milford Twp. Bridge Replacement: CLOSED & DETOURED
between Hieter Rd. & Wentz Rd. 24-HOUR DETOUR.
DETOUR POSTED.
2/27/17-11/10/17 Pennsylvania
Turnpike Commission
$29.10 million
11/16/2017 Page 10 of 28
LOCATION RESTRICTION DATE CONTRACTOR COST
Trumbauersville Rd., Milford Twp. Bridge Replacement: CLOSED & DETOURED
between Canary Rd. & Esten Rd. 24-HOUR
DETOUR. DETOUR POSTED.
2/27/17-11/10/17 Pennsylvania
Turnpike Commission
$29.10 million
County Line Rd., Warrington,
Horsham, Montgomery twps.
Utility Installation: LANE RESTRICTIONS between
East Kulp Rd. & Stump Rd. 7 AM - 3 PM.
3/7/16-9/2018 James D. Morrissey,
Inc.
$14.8 million
*PA 263 (York Rd.), Warwick Twp. Road Reconstruction: LANE CLOSURES between
Bristol Rd. & Sugar Bottom Rd. Weekdays. 7 AM -
4:30 PM.
3/17/14-12/22/17 J.D. Eckman, Inc. $31.6 million
Headquarters Rd., Tinicum Twp. Bridge Damage: CLOSED & DETOURED between
Red Hill Rd. & Tankhannen Rd. DETOUR POSTED.
3/2/11-Indef. $29.2 million
CHESTER COUNTY
PA 282 (Creek Rd.), East Caln Twp. Milling & Paving: LANE RESTRICTIONS at Norwood
Rd. 9 AM - 3 PM.
11/13/17-11/17/17 Metropoliton Group
Whitford Rd., West Whiteland Twp. Utility Installation: LANE RESTRICTIONS between
Lindenwood Drive & Waterloo Rd. 9 AM - 3 PM.
11/13/17-11/17/17 PECO Energy
Darby Rd., Tredyffrin Twp. Utility Installation: LANE CLOSURE between Craig
Ave. & Woodland Terrace. Weekdays. 9 AM - 3 PM.
11/13/17-11/20/17 PECO Energy
Westbourne Rd., Westtown Twp. Utility Installation: LANE CLOSURE between Street
Rd. & Barnview Rd. Weekdays. 9 AM - 3 PM.
11/13/17-11/20/17 PECO Energy
Ridge Rd., East Coventry Twp. Utility Installation: LANE CLOSURE between Fulmer
Rd. & Porters Mill Rd. Weekdays. 9 AM - 3 PM.
11/13/17-11/20/17 PECO Energy
Unionville Wawaset Rd., Pocopson,
East Bradford twps.
Paving: LANE RESTRICTIONS between Wawaset
Rd. & Creek Rd. 9 AM - 3 PM.
11/14/17 Allan Myers $3.7 million
Birmingham Rd., Birmingham, East
Bradford twps.
Paving: LANE RESTRICTIONS between Old
Wilmington Pike & Lenape Rd. 9 AM - 3 PM.
11/14/17 Allan Myers $3.7 million
King Rd., Whiteland Twp. Utility Installation: LANE CLOSURE between Ship Rd.
& Bittersweet Lane. Weekdays. 9 AM - 3 PM.
11/14/17-11/21/17 PECO Energy
11/16/2017 Page 11 of 28
LOCATION RESTRICTION DATE CONTRACTOR COST
Embreeville Rd., Newlin Twp. Pipe Installation: CLOSED & DETOURED between
Brandywine Drive & Stargazers Rd. 9 AM - 2 PM.
DETOUR POSTED.
1116/17 Maintenance
Sugartown Rd., Easttown Twp. Trench Restoration: LANE RESTRICTIONS between
Evergreen Lane & Black Swan Rd. 9 AM - 3 PM.
11/16/17 PECO Energy
Limestone Rd., Parkesburg Bor. Utility Installation: LANE RESTRICTIONS between
West First Ave. & West Sixth Ave. Weekdays. 9 AM -
3 PM.
11/16/17-1/15/18 Pennsylvania
American Water
Company
Whiteford Rd., West Whiteland Twp. Utility Installation: LANE RESTRICTIONS between
Lindenwood Drive & Waterloo Rd. 9 AM - 3 PM.
11/20/17-11/21/17 PECO Energy
Jennersville Rd., Penn Twp. Core Boring: LANE RESTRICTIONS at Old Baltimore
Pike. 9 AM - 3 PM.
11/20/17-11/22/17 Penn Township
Authority
W. Strasburg Rd., West Chester Bor. Utility Installation: CLOSED & DETOURED between
N. Bradford Ave. & Everhart Ave. 9 AM - 3 PM.
DETOUR POSTED.
11/20/17-11/24/17 Aqua Pennsylvania
Valley Ave., Atglen Bor. Utility Installation: LANE CLOSURE between Norwood
St. & Chester St. Weekdays. 9 AM - 3 PM.
11/20/17-11/27/17 PECO Energy
Newtown Rd., Easttown Twp. Utility Installation: CLOSED & DETOURED between
Sugartown Rd. & Waterloo Rd. Weekdays. 9 AM - 3
PM. DETOUR POSTED.
11/20//17-1/19/18 PECO Energy
US 322 (Hannum Ave.), West
Chester Bor.
Utility Installation: CLOSED & DETOURED between
Washington St. & Wayne St. Weekdays. 9 AM - 3
PM. DETOUR POSTED.
11/27/17-12/22/17 Aqua Pennsylvania
Horseshoe Pike, Honey Brook Twp. Utility Installation: LANE CLOSURE between Village
Square & Roberts Lane. Weekdays. 9 AM - 3 PM.
12/4/17-12/11/17 PECO Energy
Kennett, New Garden, Caln, West
Goshen, Charlestown, Schuylkill,
Tredyffrin twps.
Line Painting: SLOW MOVING OPERATION TO
PAINT TRAFFIC LINES. MOTORISTS ARE
ADVISED TO REMAIN AN AMPLE DISTANCE
BEHIND THE PAINTING TRUCK & STAY OFF
TRAFFIC LINES. 9 AM - 2:30 PM.
11/6/17-11/17/17 PennDOT $29.6 million
11/16/2017 Page 12 of 28
LOCATION RESTRICTION DATE CONTRACTOR COST
PA 41 (Gap Newport Pike), London
Grove Twp.
Road Widening: LANE CLOSURES & LONG TERM
LANE SHIFTS between Mosquito Lane & Penwyck
Lane. Weekdays. 9 AM - 3 PM.
11/6/17-11/21/17 Road-Con, Inc. $1 million
Kaolin Rd., New Garden, Kennett
twps.
Paving & Pavement Marking: LANE RESTRICTIONS
between Ewart Rd. & Red Clay Circle Bridge. 9 AM -
3 PM.
11/10/17 Allan Myers $3.7 million
Lincoln Hwy., Coatesville City Utility Installation: LANE RESTRICTIONS between
First Ave. & Church St. Weekdays. 9 AM - 3 PM.
10/23/17-12/15/17 Pennsylvania
American Water
Company
Business U.S. 30 W (Lincoln
Highway), Coatesville City
Utility Installation: LANE RESTRICTIONS between
First Ave & Church St. Weekdays. 9 AM - 3 PM.
10/16/17-12/15/17 Pennslyvania
American Water Co.
Business US 30 West, City of
Coatesville
Utility Installation: LANE RESTRICTIONS between
First Ave. & Church St. Weekdays. 9 AM - 3 PM.
10/10/17-12/15/17 Pennsylvania
American Water
Company
PA 282 (Wallace Ave.),
Downingtown Bor.
Sidewalk Installation: LANE SHIFT between
Pennsylvania Ave. & US 30 (Lancaster Ave.).
Weekdays. 9 AM - 3 PM.
9/11/17-11/30/17 Downingtown
Borough
West Baltimore Pike, Kennett Twp. Curb/Sidewalk Installation: LANE CLOSURE between
Penns Manor Rd. & Mill St. Weekdays. 8 AM - 4 PM.
7/31/17-12/31/17 Ply-Mar Construction
Co., Inc.
$830,403.50
West Cypress St., Kennett Twp. Curb/Sidewalk Installation: LANE CLOSURE between
Scarlett Rd. & Mill St. Weekdays. 8 AM - 4 PM.
7/31/17-12/31/17 Ply-Mar Construction
Co., Inc.
$830,403.50
Rosedale Rd., Kennett Twp. Curb/Sidewalk Installation: LANE CLOSURE between
Walnut St. & MacFarlan Rd. Weekdays. 8 AM - 4
PM.
7/31/17-12/31/17 Ply-Mar Construction
Co., Inc.
$830,403.00
PA 352 (Chester Rd.), East Goshen
Twp.
Pipe Installation: TRUCK DETOUR at Boot Rd. 24-
HOUR CLOSURE. DETOUR POSTED.
5/15/17-11/17/17 Sunoco Pipeline L.P. $29.17 million
Brandywine Creek Rd., Newlin Twp. Barrier Installation: LANE CLOSURE between Green
Valley Rd. & Powell Rd. 24-HOUR RESTRICTIONS.
3/3/17-Indef. Maintenance $29.3 million
11/16/2017 Page 13 of 28
LOCATION RESTRICTION DATE CONTRACTOR COST
*US 422 East, North Coventry Twp. Road & Bridge Construction: LANE CLOSURES
between PA 724 (Schuylkill Rd.) & Sanatoga
interchanges. 9 AM - 2 PM & 5 PM - 5 AM.
12/23/16-12/29/17 J.D. Eckman, Inc. $73.3 million
*US 422 West, North Coventry Twp. Road & Bridge Construction: LANE CLOSURES
between Sanatoga & PA 724 (Schuylkill Rd.)
interchanges. 7 PM - 1 PM.
12/23/16-12/29/17 J.D. Eckman, Inc. $73.3 million
Hollow Rd., West Vincent, East
Vincent twps.
Bridge Damage: CLOSED & DETOURED between
French Creek Rd. & Pughtown Rd. 24-HOUR
DETOUR. DETOUR POSTED.
11/20/16-Indef. PennDOT
Ross Fording Rd., West Fallowfield
Twp.
Bridge Damage: CLOSED & DETOURED between
Creek Rd. & Bryson Rd. 24-HOUR DETOUR.
DETOUR POSTED.
7/2/15-Indef. PennDOT $29.2 million
PA 724 ramp to US 422 East, East
Coventry Twp.
Ramp/Bridge Construction: RAMP CLOSED &
DETOURED. DETOUR POSTED.
5/27/15-3/2018 J.D. Eckman, Inc. $73.3 million
*US 422 E & W, North Coventry
Twp.
Bridge Construction: REDUCED TO ONE LANE
between Stowe & PA 100 Interchange. 24-HOUR
RESTRICTION.
11/27/14-9/2018 J.D. Eckman, Inc. $36 million
*US 422 E & W, North Coventry
Twp.
Road Construction: TRAFFIC PATTERN SHIFT
between Sanatoga & PA 724 (Schuylkill Rd.)
interchanges. 24-HOUR PATTERN.
2/2/13-8/2018 J.D. Eckman, Inc. $73.3 million
DELAWARE COUNTY
Rosetree Rd., Upper Providence
Twp.
Base Repair: LANE RESTRICTIONS between PA 352
(Middletown Rd.) & PA 252 (Providence Rd.). 6 PM -
6 AM.
11/12/17-11/13/17 Allan Myers $3.8 million
Rosetree Rd., Upper Providence
Twp.
Paving: LANE RESTRICTIONS between PA 352
(Middletown Rd.) & PA 252 (Providence Rd.). 9 AM -
3 PM.
11/13/17-11/17/17 Allan Myers $3.8 million
*I-476 N & S, Radnor, Haverford,
Marple twps.
ITS Conduit & Fiber Installation: RIGHT SHOULDER
CLOSED between I-76 & I-95. 9 AM - 3 PM.
11/13/17-11/17/17 Wampole-Miller, Inc. $15 million
*I-95 N & S, City of Chester Painting/Inspection & Repair: LANE RESTRICTIONS
between I-476 & PA 352/320. 10 PM - 5 AM.
11/13/17-11/17/17 South State, Inc. $16.6 million
11/16/2017 Page 14 of 28
LOCATION RESTRICTION DATE CONTRACTOR COST
*I-95 South, City of Chester Concrete Repair: SHOULDER CLOSURE between I-
476 & PA 352/320. 7 AM - 4 PM.
11/13/17-11/17/17 South State, Inc. $16.6 million
Garnet Mine Rd., Concord, Bethel
twps.
Tree Removal: LANE RESTRICTIONS between
Woods Edge Drive & Bethel Rd. 9 AM - 3 PM.
11/13/17-11/17/17 Knight Bros.
Eagle Rd., Haverford Twp. ADA Ramp Repairs: LANE RESTRICTIONS between
Pennview Ave. & East Darby Rd. 9 AM - 3 PM.
11/13/17-11/17/17 Philadelphia Freedom
Valley YMCA
*US 30 E & W (Lancaster Ave.),
Radnor Twp.
Pedestrian Bridge Construction: LANE CLOSURES
between PA 320 (Spring Mill Rd.) & Ithan Ave. 9 AM -
3 PM.
11/13/17-11/18/17 Neshaminy
Constructors, Inc.
$3.7 million
*US 322 E & W (Conchester Hwy.),
Concord Twp.
Reconstruction & Road Widening: PERIODIC LANE
RESTRICTIONS between US 1 (Baltimore Pike) & PA
261 (Foulk Rd). 9 AM - 3 PM & Possible 7 AM - 7 PM
Saturday
11/13/17-11/18/17 J.D. Eckman, Inc. $62.7 million
Ellis Rd., Haverford Twp. Utility Installation: LANE CLOSURE between Garlor
Drive & Lawrence Rd. Weekdays. 9 AM - 3 PM.
11/15/17-11/22/17 PECO Energy
Baltimore Ave., Media Bor. Utility installation: LANE CLOSURE between State St.
& Lemon St. Weekdays. 9 AM - 3 PM.
11/15/17-11/22/17 PECO Energy
Brookhaven Rd., Rose Valley Bor. Utility Installation: LANE CLOSURE between Garnet
Lane & Sackville Lane. Weekdays. 9 AM - 3 PM.
11/16/17-11/22/17 PECO Energy
West 9th St., Chester City Utility Repair: LANE CLOSURE between Jeffrey St. &
Yarnall St. 9 AM - 3 PM.
11/17/17 Horizon Services
*US 322 E & W (Conchester Hwy.),
Concord Twp.
Reconstruction & Road Widening: PERIODIC LANE
RESTRICTIONS between US 1 (Baltimore Pike) & PA
261 (Foulk Rd). 9 AM - 3 PM & Possible 7 AM - 7 PM
Saturday
11/20/17-11/21/17 J.D. Eckman, Inc. $62.7 million
Edgmont on-ramp to I-95 South, City
of Chester
Painting/Inspection: RAMP CLOSED & DETOURED.
9 AM - 3 PM. DETOUR POSTED.
11/20/17-11/21/17 South State, Inc. $16.6 million
11/16/2017 Page 15 of 28
LOCATION RESTRICTION DATE CONTRACTOR COST
*I-95 N & S, City of Chester Painting/Inspection & Repair: LANE RESTRICTIONS
between I-476 & PA 352/320. 10 PM - 5 AM.
11/20/17-11/21/17 South State, Inc. $16.6 million
*I-95 N & S, City of Chester Painting/Inspection & Repair: SHOULDER
CLOSURES between I-476 & PA 352/320. 7 AM - 4
PM.
11/20/17-11/21/17 South State, Inc. $16.6 million
Steel Rd., Haverford Twp. Utility Installation: LANE CLOSURE between Royal
Ave. & Central Ave. Weekdays. 9 AM - 3 PM.
11/20/17-11/21/17 PECO Energy
*US 30 E & W (Lancaster Ave.),
Radnor Twp.
Pedestrian Bridge Construction: LANE CLOSURES
between PA 320 (Spring Mill Rd.) & Ithan Ave. 9 AM -
3 PM.
11/20/17-11/22/17 Neshaminy
Constructors, Inc.
$3.7 million
Larkin Rd., Upper Chichester Twp. Utility Installation: LANE RESTRICTIONS between
Chichester Ave. & Whitney Ave. Weekdays. 9 AM -
3 nPM.
11/20/17-12/8/17 PECO Energy
MacDade Blvd., Glenolden Bor. Utility Installation: LANE RESTRICTIONS between
Dalmas Ave. & Werner Ave. Weekdays. 9 AM - 3
PM.
11/20/17-12/29/17 Aqua Pennsylvania
Edgmont on-ramp to I-95 South, City
of Chester
Painting/Inspection: RAMP CLOSED & DETOURED.
9 AM - 3 PM. DETOUR POSTED.
11/27/17-12/1/17 South State, Inc. $16.6 million
*US 30 E & W (Lancaster Ave.),
Radnor Twp.
Pedestrian Bridge Construction: LANE CLOSURES
between PA 320 (Spring Mill Rd.) & Ithan Ave. 6 PM -
5 AM.
11/28/17-12/1/17 Neshaminy
Constructors, Inc.
$3.7 million
West Rose Valley Rd., Nether
Providence Twp.
Utility Installation: LANE CLOSURE between Cedar
Lane & Bickmore Drive. Weekdays. 9 AM - 3 PM.
12/4/17-12/11/17 PECO Energy
*I-476 N & S, Radnor, Haverford,
Marple twps.
ITS Conduit & Fiber Installation: RIGHT SHOULDER
CLOSED between I-76 & I-95. 9 AM - 3 PM.
11/6/17-11/10/17 Wampole-Miller, Inc. $15 million
11/16/2017 Page 16 of 28
LOCATION RESTRICTION DATE CONTRACTOR COST
Radnor, Haverford, Upper Darby,
Springfield, Marple, Newtown twps.
Line Painting: SLOW MOVING OPERATION TO
PAINT TRAFFIC LINES. MOTORISTS ARE
ADVISED TO REMAIN AN AMPLE DISTANCE
BEHIND THE PAINTING TRUCK & STAY OFF
TRAFFIC LINES. 9 AM - 2:30 PM.
11/6/17-11/17/17 PennDOT
Baltimore Ave., Lansdowne Bor. Traffic Signal Upgrade: LANE RESTRICTIONS at
Lansdowne Ave.; Wycombe Ave.; Union Ave.; Martin
Drive; Walsh Rd. & Mansfield Ave. 9 AM - 3 PM.
11/6/17-11/17/17 Lenni Electric $4.1 million
Baltimore Ave., Upper Darby Twp.,
Lansdowne Bor.
Traffic Signal Upgrade: LANE RESTRICTIONS
between Lansdowne Ave.; Penn Blvd./4th St.;
Wycombe Ave.; Burmont Rd.; Scottdale Rd. & Church
Lane. 9 AM - 3 PM.
11/6/17-11/17/17 Lenni Electric $4.1 million
Baltimore Ave., Clifton Heights Bor.,
Upper Darby Twp.
Road Widening: LANE RESTRICTIONS at Springfield
Rd.; Church Lane; Delmar Drive; Diamond St. & Home
Depot Drive. 9 AM - 3 PM.
11/6/17-11/17/17 Lenni Electric $4.1 million
S. Bryn Mawr Ave., Radnor Twp. Paving: LANE RESTRICTIONS between Sproul Rd. &
S. Ithan Rd. 7 PM - 5 AM.
11/6/17-11/10/17 Loftus Construction,
Inc.
$7.5 million
PA 3 (West Chester Pike),
Haverford, Upper Darby twps.
Curb Ramp Reconstruction: LANE CLOSURE at Brief
Ave., Carol Blvd.; State Rd.; Copley Rd.; Terminal
Square & Pennock Ave. 9 AM - 3 PM.
11/6/17-11/10/17 L.C. Costa
Contractors, Inc.
$5.9 million
PA 3 (Market St.), Millbourne Bor. Curb Ramp Reconstruction: LANE CLOSURE at
Chatham Rd.; Forge Rd.; Copley Rd.; Terminal
Square & Millbourne Ave. 9 AM - 3 PM.
11/6/17-11/17/17 L.C. Costa
Contractors, Inc.
$5.9 million
E. Baltimore Ave., Lansdowne Bor. ADA Curb Ramp Replacement: LANE CLOSURE at
1st St.; 2nd St.; Baltimore St. & E. Baltimore St.;
Rigby St.; Lexington Ave.; Wildwood Ave.; Melrose
Ave.; Hirst Ave.; Maple Ave.; Legion Ter.; Lewis Ave.
& Third St. 9 AM - 3 PM.
11/6/17-11/17/17 L.C. Costa
Contractors, Inc.
$7.2 million
Springfield Ave., Clifton Heights Bor. Curb Ramp Reconstruction: LANE CLOSURE at
Diamond St.; Madison St.; Woodlawn Ave.; Clifton
Ave. & Broadway Ave. 9 AM - 3 PM.
11/6/17-11/17/17 L.C. Costa
Contractors, Inc.
$4.1 million
11/16/2017 Page 17 of 28
LOCATION RESTRICTION DATE CONTRACTOR COST
US 1 (Baltimore Ave.), Clifton
Heights Bor.
Curb Ramp Reconstruction: LANE CLOSURES at
Church St.; Marple Ave.; Jackson Ave.; Springfield
Ave.; Bishop Ave. & Glenwood Ave. 9 AM - 3 PM.
11/6/17-11/17/17 L.C. Costa
Contractors, Inc.
$4.1 million
*US 30 E & W (Lancaster Ave.),
Radnor Twp.
Pedestrian Bridge Construction: LANE CLOSURES
between PA 320 (Spring Mill Rd.) & Ithan Ave. 9 AM -
3 PM.
11/6/17-11/11/17 Neshaminy
Constructors, Inc.
$3.7 million
Edgmont on-ramp to I-95 South, City
of Chester
Painting/Inspection: RAMP CLOSED & DETOURED.
9 AM - 3 PM. DETOUR POSTED.
11/6/17-11/17/17 South State, Inc. $16.6 million
*I-95 N & S, Lower Chichester,
Upper Chichester, Chester, Upland,
Ridley, Tinicum twps. Chester City
Large Sign Maintenance: LANE CLOSURES between
PA 491 (Naamans Rd.) & Bartram Ave. 8 PM - 5
AM.
10/30/17-11/4/17 Carr & Duff, Inc. $2.1 million
*US 30 E & W (Lancaster Ave.),
Radnor Twp.
Pedestrian Bridge Construction: LANE CLOSURES
between PA 320 (Spring Mill Rd.) & Ithan Ave. 9 AM -
3 PM.
10/30/17-11/4/17 Neshaminy
Constructors, Inc.
$3.7 million
PA 320 South (Chester Rd.),
Swarthmore Bor.
Drainage Pipe Repair: LANE RESTRICTIONS ON
THE NORTH SIDE OF THE ROUNDABOUT where
Chester Rd. intersects Fieldhouse Lane & Rutgers
Ave. Weeknights. 6 PM - 6 AM.
11/1/17-11/10/17 Borough of
Swarthmore
*US 202 South, Concord Twp. Median & Curb Replacement: LANE RESTRICTIONS
at Pyle Rd. Weekdays. 9 AM - 3 PM.
10/23/17-11/20/17 Metro
Storage/Chaddsford
LLC
Kirk Lane, Upper Providence Twp. Utility Installation: LANE RESTRICTIONS at Oakcrest
Lane, Willowbrook Lane & W. 3rd St. Weekdays. 9
AM - 3 PM.
10/23/17-11/17/17 Aqua Pennsylvania
Conestoga Rd., Radnor Twp. Utility Installation: CLOSED & DETOURED between
South Devon Ave. & Lenoir Ave. Weekdays. 9 AM - 3
PM. DETOUR POSTED.
10/23/17-11/24/17 PECO Energy
Meetinghouse Rd., Upper Chichester
Twp.
Utility Installation: LANE RESTRICTIONS between
Locust St. & Friends Way. Weekdays. 9 AM - 3 PM.
10/25/17-11/25/17 Chester Water
Authority
11/16/2017 Page 18 of 28
LOCATION RESTRICTION DATE CONTRACTOR COST
*US 30 E & W (Lancaster Ave.),
Radnor Twp.
Pedestrian Bridge Construction: SIDEWALK CLOSED
between PA 320 (Spring Mill Rd.) & Ithan Ave. 24 hour
Closure
10/2/17-12/6/17 Neshaminy
Constructors, Inc.
$3.7 million
Bethel Rd., Concord Twp. Curb Installation: LANE RESTRICTIONS between
Smithbridge Rd. & Featherbed Lane. Weekdays. 9
AM - 3 PM.
10/5/17-11/17/17 Valley Point Church
Conestoga Rd., Radnor Twp. Utility Installation: CLOSED & DETOURED between S.
Devon Ave. & Lenoir Ave. 9 AM - 3 PM. DETOUR
POSTED.
9/25/17-11/24/17 PECO Energy
Chestnut St., City of Chester Bridge Deck Reconstruction: CLOSED & DETOURED
between 12th St. & 13th. DETOURED POSTED.
9/25/17-1/11/18 South State, Inc. $16.8 million
Burmont Rd., Haverford Twp. Utility Installation: LANE RESTRICTIOMS between
Glendale Rd. & Township Line 9 AM - 3 PM
Weekdays
9/5/17-12/8/17 Aqua Pennsylvania
S. Oak Ave., Aldan, Clifton Heights
bors.
Utility Installation: CLOSED & DETOURED between
Baltimore Pike & Providence Rd. Weekdays. 9 AM -
3 PM. DETOUR POSTED.
9/11/17-12/29/17 Aqua Pennsylvania
Garrett Rd., Upper Darby Twp. Utility Installation: CLOSED & DETOURED between
Lansdowne Ave. & PA 3 (West Chester Pike).
Weekdays. 9 AM - 3 PM. DETOUR POSTED.
9/11/17-12/29/17 Aqua Pennsylvania
Fairview Rd., Ridley Twp. Utility Installation: CLOSED & DETOURED between
MacDade Blvd. & PA 13 (Chester Pike). Weekdays.
9 AM - 3 PM. DETOUR POSTED.
8/22/17-11/24/17 Aqua Pennsylvania
Potter St., City of Chester Deck Replacement: CLOSED & DETOURED between
13th St. & 12th St. 24-HOUR DETOUR. DETOUR
POSTED.
8/14/17-2/14/18 South State, Inc. $16.6 million
Station Rd., Concord Twp. Road Construction: CLOSED & DETOURED between
Concord Rd. & PA 322 (Conchester Hwy.). 24-HOUR
DETOUR. DETOUR POSTED.
8/7/17-10/20/18 Road-Con, Inc. $29.20 million
Chester Creek Rd., Middletown
Twp., Brookhaven Bor.
Utility Installation: CLOSED & DETOURED between
Dutton Mill Rd. & Bridgewater Rd. Weekdays. 7 AM -
5 PM. DETOUR POSTED.
7/12/17-12/31/17 Middletown Township
Sewer Authority
$29.31 million
11/16/2017 Page 19 of 28
LOCATION RESTRICTION DATE CONTRACTOR COST
Morton Ave., City of Chester Road/Curb Reconstruction: CLOSED & DETOURED
between US 13 (E. 9th St.) & PA 291 (E. 4th St.). 24-
HOUR DETOUR. DETOUR POSTED.
6/20/17-12/27/17 South State, Inc. $16.6 million
Baltimore Pike, Springfield Twp. Utility Installation: LANE RESTRICTIONS between
Thomson Rd. & PA 320 (Sproul Rd.). 9 AM - 3 PM.
6/12/17-12/8/17 Aqua Pennsylvania
S. Bryn Mawr Ave., Radnor Twp. Bridge Reconstruction: LANE WIDTHS NARROWED
between PA 320 (Sproul Rd.) & S. Ithan Ave.
5/30/17-12/15/17 Loftus Construction,
Inc.
$7.5 million
Creek Rd., Middletown Twp.,
Brookhaven Bor.
Pipe Installation: CLOSED & DETOURED between
Bridgewater Rd. & Dutton Mill Rd. Weekdays. 7 AM -
5 PM. DETOUR POSTED.
5/15/17-12/31/17 Middletown Township
Sewer Authority
Crosby St., City of Chester Pedestrian Bridge Rehabilitation: Between 13th St. &
12th St.
3/27/17-11/29/17 South State, Inc. $16.6 million
College Ave., Haverford Twp. Bridge Construction: CLOSED & DETOURED
between Spring Mill Rd. & Haverford Rd. 24-HOUR
DETOUR. DETOUR POSTED.
11/29/16-5/2018 Road-Con, Inc. $5.2 million
MONTGOMERY COUNTY
US 1 South (City Ave.), Lower
Merion Twp.
Tree Removal: LANE RESTRICTIONS between 64th
St. & Hollingsworth Rd. 9 AM - 3 PM.
11/13/17 Knight Bros.
PA 100 North, Upper Pottsgrove
Twp.
Milling & Paving: LANE RESTRICTIONS between
Farmington Rd. & Moyer Rd. 9 AM - 3 PM.
11/13/17 Allan Myers $6.7 million
Pawlings Rd., Lower Providence
Twp.
Core Boring: LANE RESTRICTIONS between Pawling
Rd. & Station Ave. 9 AM - 3 PM.
11/13/17 Oak Mills Inc.
*US 422 East, West Pottsgrove,
North Coventry, Douglass twps.
Resurfacing: CLOSED & DETOURED at the split with
Benjamin Franklin Hwy. 9 PM - 5 AM. DETOUR
POSTED.
11/13/17-11/14/17 H&K Group, Inc. $35 million
11/16/2017 Page 20 of 28
LOCATION RESTRICTION DATE CONTRACTOR COST
Ramp from Stowe Interchange
(Grosstown Rd.) to Eastbound &
Westbound US 422, West
Pottsgrove, North Coventry,
Douglass twps.
Road Work: RAMP CLOSED & DETOURED. 9 PM -
5 AM. DETOUR POSTED.
11/13/17-11/14/17 H&K Group, Inc. $35 million
Limerick Center Rd., Limerick Twp. Manhole Adjustments & Paving: LANE
RESTRICTIONS between Linfield Rd. & Laurel Drive.
9 AM - 3 PM.
11/13/17-11/17/17 Allan Myers $6.7 million
*I-76 E & W, Upper Merion Twp. Structural Steel Rust Removal: LANE CLOSURES
between Gulph Mills & King of Prussia Interchanges.
9 PM - 5 AM.
11/13/17-11/17/17 Loftus Construction,
Inc.
$5.5 million
*I-76 E & W, Upper Merion Twp. Structural Steel Rust Removal: SHOULDER
CLOSURES between Gulph Mills & King of Prussia
Interchanges. 7 AM - 3 PM.
11/13/17-11/17/17 Loftus Construction,
Inc.
$5.5 million
*US 422 West, Lower Pottsgrove
Twp.
Sign Installation: RIGHT LANE CLOSED between
Sanatoga & PA 724 (Schuylkill Rd.) exits. 7 AM - 1
PM.
11/14/17 J.D. Eckman, Inc. $73.3 million
US 422 East, Lower Pottsgrove Twp. Sign Installation: RIGHT LANE CLOSED between
Keim St. exit & Sanatoga exit. 9 AM - 2 PM.
11/15/17 J.D. Eckman, Inc. $73.3 million
*I-76 E & W, Upper Merion Twp. Line Painting: ROLLING LANE CLOSURES between
US 202 & I-476 Interchanges. 10 AM - 2 PM.
11/15/17-11/17/17 J.D. Eckman, Inc. $21.1 million
Egypt Rd., Upper Providence Twp. Pavement Restoration: LANE RESTRICTIONS
between Green Tree Rd. & Page Lane. Weekdays. 9
AM - 3 PM.
11/16/17-11/17/17 Pennsylvania
American Water
Company
Joshua Rd., Whitemarsh Twp. Emergency Roadway Repair: CLOSED & DETOURED
between Stenton Ave. & Flourtown Rd. Friday 8 PM
thru Saturday 8 PM.
11/17/17-11/18/17 PennDOT
Pennlyn Blue Bell Pike, Whitpain
Twp.
Utility Installation: LANE RESTRICTIONS between
Hoover Rd. & Stenten Ave. 8 AM - 3 PM.
11/20/17 PECO Energy
11/16/2017 Page 21 of 28
LOCATION RESTRICTION DATE CONTRACTOR COST
*I-76 E & W, Upper Merion, Lower
Merion twps., West Conshohocken
Bor.
Litter & Debris Removal & Sweeping: MOVING
OPERATION WITH LANE CLOSURES between I-276
(PA turnpike) & US 1 (City Ave.) 9 AM - 3 PM.
11/20/17-11/21/17 Maintenance
PA 100 N & S, Upper Pottsgrove,
Douglass twps., Pottstown Bor.
Litter & Debris Removal & Sweeping: MOVING LANE
CLOSURES between US 422 & County Line Rd. 9
AM - 3 PM.
11/20/17-11/21/17 Maintenance
*I-476 N & S, Plymouth, Lower
Merion twps., West Conshohocken
Bor.
Litter & Debris Removal & Sweeping: MOVING
OPERATION WITH LANE CLOSURES between
Turnpike/I-276 Interchange & County Line Rd. 9 AM -
3 PM.
11/20/17-11/21/17 Maintenance
*US 422 E & W, Lower Providence,
Upper Providence, Limerick, Lower
Pottsgrove, North Coventry twps.
Litter & Debris Removal & Sweeping: MOVING
OPERATION between PA 100 (Pottstown Pike) & PA
363 (Trooper Rd.). 9 AM - 3 PM.
11/20/17-11/21/17 Maintenance
Egypt Rd., Upper Providence Twp. Pavement Restoration: LANE RESTRICTIONS
between Green Tree Rd. & Page Lane. Weekdays. 9
AM - 3 PM.
11/20/17-11/22/17 Pennsylvania
American Water
Company
Meyers Rd., Perkiomen Twp. Subbase & Paving: LANE RESTRICTIONS between
Seitz Rd. & Miller Rd. 9 AM - 3 PM.
11/20/17-11/22/17 H&K Group, Inc. $11.3 million
PA 29 (Gravel Pike), Perkiomen
Twp.
Pole Relocations & Paving: LANE RESTRICTIONS
between Miller Rd. & Harrison Ave. 9 AM - 3 PM.
11/2017-11/22/17 H&K Group, Inc. $11.3 million
Fitzwatertown Rd., Upper Dublin
Twp.
Utility Installation: LANE CLOSURE between North
Hills Ave. & David Drive. Weekdays. 9 AM - 3 PM.
11/20/17-11/27/17 PECO Energy
N. Trooper Rd., East Norriton Twp. Utility Installation: LANE CLOSURE between
Germantown Pike & Cirak Ave. Weekdays. 9 AM - 3
PM.
11/20/17-11/27/17 PECO Energy
PA 73 (Skippack Pike), Whitpain
Twp.
Utility Installation: LANE CLOSURE between Cresline
Drive & DeKalb Pike. Weekdays. 9 AM - 3 PM.
11/20/17-11/27/17 PECO Energy
PA 29 (Gravel Pike), Perkiomen
Twp.
Utility Installation: LANE CLOSURE between Bridge
St. & Maple Ave. Weekdays. 9 AM - 3 PM.
11/20/17-11/27/17 PECO Energy
11/16/2017 Page 22 of 28
LOCATION RESTRICTION DATE CONTRACTOR COST
Flourtown Rd, Whitemarsh Twp. Utility installation: CLOSED & DETOURED between
Joshua Rd. & Plymouth Rd. Weekdays. 9 AM - 3 PM.
DETOUR POSTED.
11/20/17-12/11/17 PECO Energy
Main St., Trappe Bor. Utility Installation: LANE RESTRICTIONS at First Ave.
Weekdays. 9 AM - 3 PM.
11/27/17-12/1/17 PECO Energy
PA 29 (Bridge St.), Upper
Providence Twp., Phoenixville Bor.
Bridge Inspection: LANE CLOSURE between PA 29
(Starr St.) & Walnut St. 9 AM - 3 PM.
11/28/17-11/29/17 AECOM
W. Broad st., Souderton Bor. Utility Installation: LANE CLOSURE between Penn
Ave. & Franklin Ave. 9 AM - 3 PM.
12/5/17-12/6/17 PECO Energy
Butler Pike, Whitemarsh, Plymouth
twps.
Utility installation: LANE RESTRICTIONS between
Franklin St. & Woodbin Way. Weekdays. 9 AM - 3
PM.
12/11/17-1/20/18 PECO Energy
*I-76 E & W, West Conshohocken
Bor., Upper Merion, Lower Merion
twps.
Concrete Patching: LANE CLOSURES between US
202 & US 1 (City Ave.) 9 PM - 9 AM.
11/10/17-11/11/17 J.D. Eckman, Inc. $21.1 million
*I-76 E & W, Upper Merion, Lower
Merion twps.
Concrete Patching: LANE CLOSURES between US
202 & US 1 (City Ave.) 9 PM - 5 AM & 9 PM - 9 AM
(weekends)
11/12/17-11/18/17 J.D. Eckman, Inc. $21.1 million
Montgomery Ave., Lower Merion
Twp.
Emergency Beam Replacement: CLOSED &
DETOURED between Old Gulph Rd. & Spring Mill Rd.
Weeknights. 8 PM - 5 AM. DETOUR POSTED.
11/13/17-11/17/17 Loftus Construction,
Inc.
$6.8 million
High St., Pottstown Bor. ADA Ramp Construction: LANE CLOSURE at Adams
St.; Franklin St.; Charlotte St.; Hanover St.; Penn St.;
Evans St.; Madison St.& Washington St. 9 AM - 3 PM.
11/13/17-11/17/17 Road-Con, Inc. $13.3 million
N. Adams St., Pottstown Bor. ADA Ramp Construction: LANE CLOSURE at
Washington St. 9 AM - 3 PM.
11/13/17-11/17/17 Road-Con, Inc. $13.3 million
N. Adams St., Pottstown Bor. ADA Ramp Construction: LANE CLOSURE at
Madison St. 9 AM - 3 PM.
11/13/17-11/17/17 Road-Con, Inc. $13.3 million
11/16/2017 Page 23 of 28
LOCATION RESTRICTION DATE CONTRACTOR COST
N. Adams St., Pottstown Bor. ADA Ramp Construction: LANE CLOSURE at Franklin
St. 9 AM - 3 PM.
11/13/17-11/17/17 Road-Con, Inc. $13.3 million
*I-476 N & S, Lower Merion Twp.,
West Conshohocken Bor.
ITS Conduit & Fiber Installation: RIGHT SHOULDER
CLOSED between I-76 & I-95. 9 AM - 3 PM.
11/13/17-11/17/17 Wampole-Miller, Inc. $15 million
PA 611 (Easton Rd.), Upper
Moreland Twp.
Material Delivery: SOUTHBOUND RIGHT LANE
CLOSED between Maryland Rd. & Wyandotte Rd. 9
PM - 6 AM.
11/13/17-11/17/17 Pennsylvania
Turnpike Commission
Ford St., Bridgeport Bor. Utility Installation: LANE CLOSURE between 6th St. &
5th St. Weekdays. 9 AM - 3 PM.
11/14/17-11/21/17 PECO Energy
PA 23 (Conshohocken State Rd.),
Lower Merion Twp.
Concrete Repairs: LANE RESTRICTIONS at Mill
Creek Rd. Weekdays. 9 AM - 3 PM.
11/16/17-11/22/17 Bill Anskis Co., Inc.
2nd Ave., Royersford Bor. Utility Installation: LANE CLOSURE between Green
St. & Arch St. Weekdays. 9 AM - 3 PM.
11/16/17-11/22/17 PECO Energy
Wambold Rd., Lower Salford Twp. Trench Restoration: LANE RESTRICTIONS between
Cassell Rd. & Fretz Rd. 9 AM - 3 PM.
11/17/17 PECO Energy
*I-76 E & W, West Conshohocken
Bor., Upper Merion, Lower Merion
twps.
Concrete Patching: LANE CLOSURES between US
202 & US 1 (City Ave.) 9 PM - 9 AM.
11/17/17-11/18/17 J.D. Eckman, Inc. $21.1 million
*I-76 East, Lower Merion Twp. Tree Removal: RIGHT LANE CLOSED between PA
23 (Conshohocken Rd.) & Gladwyne Interchanges.
5:30 AM - 1 PM.
11/18/17 Asplundh
N. Pleasant View Rd., Lower
Pottsgrove Twp.
Utility Installation: LANE RESTRICTIONS between
Donna Lane & Bleim Rd. Weekdays. 9 AM - 3 PM.
11/20/17-1/19/18 PECO Energy
Bleim Rd., Lower Pottsgrove Twp. Utility Installation: LANE RESTRICTIONS between
North Pleasant View Rd. & Spring Valley Rd.
Weekdays. 9 AM - 3 PM.
11/20/17-1/19/18 PECO Energy
11/16/2017 Page 24 of 28
LOCATION RESTRICTION DATE CONTRACTOR COST
*I-76 E & W, West Conshohocken
Bor., Upper Merion, Lower Merion
twps.
Concrete Patching: LANE CLOSURES between US
202 & US 1 (City Ave.) 9 PM - 9 AM.
11/3/17-11/4/17 J.D. Eckman, Inc. $21.1 million
PA 611 (Old York Rd.), Abington
Twp.
Bridge Work: LANE RESTRICTIONS between Jericho
Rd. & Hamilton Ave. 9 PM - 5 AM
11/5/17-11/10/17 J.D. Eckman, Inc. $3.6 million
*I-76 E & W, Upper Merion, Lower
Merion twps.
Concrete Patching: LANE CLOSURES between US
202 & US 1 (City Ave.) 9 PM - 5 AM & 9 PM - 9 AM
(weekends)
11/5/17-11/11/17 J.D. Eckman, Inc. $21.1 million
Evansburg Rd., Skippack Twp. Utility Installation: LANE RESTRICTIONS between
Township Line Rd. & Reagan Drive. 9 AM - 3 PM.
11/6/17-11/10/17 Skippack Township
Sewer Authority
PA 611 (Old York Rd.), Abington
Twp.
Bridge Work: LANE RESTRICTIONS between Jericho
Rd. & Hamilton Ave. 9 AM - 3 PM.
11/6/17-11/10/17 J.D. Eckman, Inc. $3.6 million
Jenkintown Rd., Abington Twp. Line Stripping: LANE CLOSURES between Linden
Ave. & Sylvania Ave. 7 AM - 4 PM.
11/6/17-11/10/17 Guidemark, Inc. $6.3 million
High St., Pottstown Bor. ADA Ramp Construction: LANE CLOSURE at Adams
St.; Franklin St.; Charlotte St.; Hanover St.; Penn St.;
Evans St.; Madison St.& Washington St. 9 AM - 3 PM.
11/6/17-11/10/17 Road-Con, Inc. $13.3 million
Norristown, Upper Providence,
Lower Providence, Limerick,
Whitemarsh twps.
Line Painting: SLOW MOVING OPERATION TO
PAINT TRAFFIC LINES. MOTORISTS ARE
ADVISED TO REMAIN AN AMPLE DISTANCE
BEHIND THE PAINTING TRUCK & STAY OFF
TRAFFIC LINES. 9 AM - 3 PM.
11/6/17-11/10/17 PennDOT $29.6 million
*I-476 N & S, Lower Merion Twp.,
West Conshohocken Bor.
ITS Conduit & Fiber Installation: RIGHT SHOULDER
CLOSED between I-76 & I-95. 9 AM - 3 PM.
11/6/17-11/10/17 Wampole-Miller, Inc. $15 million
Limerick Center Rd., Limerick Twp. Manhole Adjustments & Paving: LANE
RESTRICTIONS between Linfield Rd. & Laurel Drive.
9 AM - 3 PM.
11/6/17-11/11/17 Allan Myers $6.7 million
11/16/2017 Page 25 of 28
LOCATION RESTRICTION DATE CONTRACTOR COST
PA 309 (Bethlehem Pike), Colmar
Twp.
Curb & Inlet Work: RIGHT LANE CLOSED between
Line Lexington Rd .& Triwigtown Rd. Weekdays. 9
AM - 3 PM.
11/6/17-11/29/17 A. Amsterdam
County Line Rd., Warrington,
Horsham twps.
Utility Work: LANE RESTRICTIONS between Folly Rd.
& Keith Valley Rd. Weekdays. 9 AM - 3 PM.
11/6/17-11/30/17 Underground
Services, Inc.
County Line Rd., Souderton Bor. Curb & Sidewalk Installation: LANE RESTRICTIONS
between Chestnut St. & Central Ave. Weekdays. 9
AM - 3 PM.
11/6/17-12/8/17 Souderton Borough
Authority
Meetinghouse Rd., Worchester Twp. Tree Removal: LANE RESTRICTIONS between
Evansburg Rd. & Collegeville Rd. 9 AM - 3 PM
11/7/17-11/18/17 Asplundh
Troxel Rd., Towamencin Twp. Utility Installation: LANE CLOSURE at Musket Circle.
Weekdays. 9 AM - 3 PM.
11/9/17-11/16/17 PECO Energy
Harriton Rd., Lower Merion Twp. Utility Installation: LANE RESTRICTIONS at Gatemore
Drive. Weekdays. 9 AM - 3 PM.
10/30/17-12/1/17 Aqua Pennsylvania
PA 73 Skippack Pike), Skippack
Twp.
Utility Installation: LANE RESTRICTIONS between
Collegeville Rd. & Od Forty Foot Rd. Weekdays. 9
AM - 3 PM.
10/30/17-11/17/17 Skippack Township
Sewer Authority
Egypt Rd., Upper Providence Twp. Utility Installation: LANE RESTRICTIONS between
Green Tree Rd. & Page Lane. Weekdays. 9 AM - 3
PM.
10/23/17-11/16/17 Pennsylvania
American Water
Company
PA 113 (Harleysville Pike), Lower
Salford Twp.
Utility Installation: LANE RESTRICTIONS between PA
63 (Sumneytown Pike) & Oak Drive. Weekdays. 9
AM - 3 PM.
10/23/17-11/30/17 PECO Energy
Bleim Rd., Lower Pottsgrove Twp. Utility Installation: CLOSED & DETOURED between
New Hanover Square Rd. & Pleasantview Rd. 9 AM -
3 PM. Saturdays. 7 AM - 7 PM. DETOUR POSTED.
10/25/17-12/29/17 Borough of Pottstown
Layfayette Ave., Whitemarsh Twp. Utility Installation: LANE RESTRICTIONS between
Layfayette Ave. Connector & PA 73 (Skippack Pike).
Weekdays. 9 AM - 3 PM.
10/16/17-11/30/17 Ambler Borough
Water Department
11/16/2017 Page 26 of 28
LOCATION RESTRICTION DATE CONTRACTOR COST
Old Forty Foot Rd., Lower Salford
Twp.
Bridge Rehabilitation: CLOSED AND DETOURED
between Township Line Rd. & Kober Rd. 24-HOUR
CLOSURE.
10/30/17-6/2/18 J.D. Eckman, Inc. $7.4 million
Egypt Rd., Upper Providence Twp. Utility Installation: LANE RESTRICTIONS between
Green Tree Rd. & Page Lane. Weekdays. 9 AM - 3
PM.
10/2/17-11/16/17 Pennsylvania
American Water
Company
Argyle Rd., Lower Merion Twp. Utility Installation: LANE RESTRICTIONS between
Chatham Rd. & Wynnewood Rd. Weekdays. 9 AM - 3
PM.
9/26/17-11/30/17 Aqua Pennsylvania
Church Rd., Cheltenham Twp. Utility Installation: CLOSED & DETOURED between
Washington Lane & York Rd. Weekdays. 9 AM - 3
PM. DETOUR POSTED.
8/24/17-12/29/17 Aqua Pennsylvania
PA 363 (Trooper Rd.), Lower
Providence Twp.
Road Widening & Utility Installation: LANE
RESTRICTIONS between Eisenhower Ave. &
Shannondell Blvd. Weeknights. 7 PM - 5 AM.
7/17/17-11/30/17 Forge 20 LLC
PA 23 ramp to US 422 East, Upper
Merion, West Norriton twps.
Ramp Reconstruction: RAMP CLOSED &
DETOURED. 24-HOUR DETOUR. DETOUR
POSTED.
7/10/17-11/2017 J.D. Eckman, Inc. $97.4 million
W. Wynnewood Rd, Lower Merion
Twp.
Utility Installation: LANE RESTRICTIONS between E.
County Line Rd. & Ballytore Rd. Weekdays. 9 AM - 3
PM.
6/5/17-12/8/17 Aqua Pennsylvania
Buchert Rd., Pottsgrove Twp. Curb Ramp Construction: LANE CLOSURE at
Pleasantview Rd.; N. Washington St. & Mervine St. 9
AM - 3 PM.
5/30/17-12/1/17 Highway Materials,
Inc.
$4.8 million
Mervine St., Lower Pottsgrove Twp,
Pottstown Bor.
Curb Ramp Construction: LANE CLOSURE at N.
Franklin St. 9 AM - 3:30 PM.
5/30/17-12/1/17 Highway Materials,
Inc.
$4.8 million
Plank Rd., Perkiomen Twp. Excavation/Grading/Paving: CLOSED & DETOURED
between PA 29 (Gravel Pike) & PA 73 (Skippack
Pike). 24-HOUR DETOUR. DETOUR POSTED.
5/2/17-11/30/17 H&K Group, Inc. $11.3 million
Otts Rd., Perkiomen Twp. Excavation/Grading/Paving: CLOSED & DETOURED
between Miller Rd. & PA 29 (Gravel Pike). 24-HOUR
DETOUR. DETOUR POSTED.
5/2/17-5/2019 H&K Group, Inc. $11.3 million
11/16/2017 Page 27 of 28
LOCATION RESTRICTION DATE CONTRACTOR COST
PA 63 (Main St.), Lower Salford Twp. Roadway & Culvert Widening: LANE RESTRICTIONS
between PA 113 (Harleysville Pike) & Carrie Lane.
Weekdays. 9 AM - 3 PM.
3/15/17-11/1/17 Lower Salford
Township
$29.1 million
*US 422 East, Lower Pottsgrove
Twp.
Road & Bridge Construction: LANE CLOSURES
between PA 724 (Schuylkill Rd.) & Sanatoga
Interchanges. 5 PM - 5 AM.
1/23/17-11/29/17 J.D. Eckman, Inc. $73.3 million
*US 422 West, Lower Pottsgrove
Twp.
Road & Bridge Construction: WEEKEND LANE
CLOSURES between Sanatoga & PA 724 (Schuylkill
Rd.) Interchanges. 7 PM - 1 PM.
1/23/17-11/29/17 J.D. Eckman, Inc. $73.3 million
County Line Rd., Warrington,
Horsham, Montgomery twps.
Utility Installation: LANE RESTRICTIONS between
Kulp Rd. & Stump Rd. 7 AM - 3 PM.
3/7/16-9/2018 James D. Morrissey,
Inc.
$14.8 million
Baligomingo Rd., West
Conshohocken Bor.
Slope Stabilization: CLOSED & DETOURED between
PA 23 (Front St.) & Portland Rd. 24-HOUR DETOUR.
DETOUR POSTED.
6/27/15-Indef. $29.27 million
PA 724 ramp to US 422 East, Lower
Pottsgrove Twp.
Roadwork: RAMP CLOSED & DETOURED. 24-
HOUR CLOSURE. DETOUR POSTED.
5/27/15-3/2018 J.D. Eckman, Inc. $73.3 million
*US 422 E & W, Lower Pottsgrove
Twp.
Road Construction: TRAFFIC PATTERN SHIFT
between Sanatoga & PA 724 (Schuylkill Rd.)
Interchanges. 24-HOUR PATTERN.
2/2/13-8/2018 J.D. Eckman, Inc. $73.3 million
*US 422 E & W, West Pottsgrove
Twp.
Bridge Construction: REDUCED TO ONE LANE
between Stowe & PA 100 Interchange. 24-HOUR
RESTRICTION.
11/27/14-9/2018 J.D. Eckman, Inc. $36 million
County Line Rd., Upper Merion Twp. Road Work: CLOSED & DETOURED WEEKDAYS
between PA 23 & Gulph Rd. 7 AM Mondays thru 5 PM
Fridays. 24-HOUR CLOSURE. DETOUR POSTED.
5/9/14-12/29/17 Valley Forge National
Historical Park
$29.29 million
11/16/2017 Page 28 of 28