LOCATION RESTRICTION DATE CONTRACTOR COST PHILADELPHIA PA 73 E & W (New State Rd.) Road Reconstruction: LANE CLOSURES between Levick St. & Cottman Ave. 9 AM - 3 PM 11/12/17-11/18/17 Walsh Construction Company $212.3 million *I-95 North Bridge Inspection: LEFT LANE CLOSED between Enterprise Ave. & Broad St. (PA 611). 9 AM - 3 PM. 11/13/17-11/16/17 Pickering, Corts & Summerson *US 1 N & S (Roosevelt Extension) Drain Cleaning/Debris Removal: INTERMITTENT LANE RESTRICTIONS between I-76 & 9th St. 9:30 AM - 2 PM. 11/13/17-11/16/17 Maintenance *I-676 E & W Drain Cleaning/Debris Removal: INTERMITTENT LANE RESTRICTIONS between I-76 & I-95. 9:30 AM - 2 PM. 11/13/17-11/16/17 Maintenance *I-95 N & S Drain Cleaning/Debris Removal: INTERMITTENT LANE RESTRICTIONS between Phila. Int. Airport & PA 63 (Woodhaven Rd.). 9:30 AM - 2 PM. 11/13/17-11/16/17 Maintenance *I-76 E & W Drain Cleaning/Debris Removal: INTERMITTENT LANE RESTRICTIONS between US 1 (City Ave.) & 26th St. 9:30 AM - 2 PM. 11/13/17-11/16/17 Maintenance *I-76 West Shielding: RIGHT LANE CLOSURE between South St. off Ramp & 676 Vine St. Expressway. 9 PM - 5 AM. 11/13/17-11/16/17 Buckley & Company, Inc. $103.5 million DATE: 11-16-2017 PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 6-0 TRAFFIC RESTRICTION BULLETIN (NOTE: SCHEDULES ARE SUBJECT TO WEATHER CONDITIONS) (All restrictions 24 hours/day, 7 days/week unless otherwise noted) PENNDOT ROADWAY MAINTENANCE HOTLINE 1-800-FIX- ROAD Log on to www.511pa.com or call 511 from any phone to check conditions on major highways. 11/16/2017 Page 1 of 28

DATE: 11-16-2017...PA 73 E & W (New State Rd.) Road Reconstruction: LANE CLOSURES between Levick St. & Cottman Ave. 9 AM - 3 PM 11/12/17-11/18/17 Walsh Construction Company $212.3

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: DATE: 11-16-2017...PA 73 E & W (New State Rd.) Road Reconstruction: LANE CLOSURES between Levick St. & Cottman Ave. 9 AM - 3 PM 11/12/17-11/18/17 Walsh Construction Company $212.3

LOCATION RESTRICTION DATE CONTRACTOR COST

PHILADELPHIA

PA 73 E & W (New State Rd.) Road Reconstruction: LANE CLOSURES between

Levick St. & Cottman Ave. 9 AM - 3 PM

11/12/17-11/18/17 Walsh Construction

Company

$212.3 million

*I-95 North Bridge Inspection: LEFT LANE CLOSED between

Enterprise Ave. & Broad St. (PA 611). 9 AM - 3 PM.

11/13/17-11/16/17 Pickering, Corts &

Summerson

*US 1 N & S (Roosevelt Extension) Drain Cleaning/Debris Removal: INTERMITTENT

LANE RESTRICTIONS between I-76 & 9th St. 9:30

AM - 2 PM.

11/13/17-11/16/17 Maintenance

*I-676 E & W Drain Cleaning/Debris Removal: INTERMITTENT

LANE RESTRICTIONS between I-76 & I-95. 9:30 AM -

2 PM.

11/13/17-11/16/17 Maintenance

*I-95 N & S Drain Cleaning/Debris Removal: INTERMITTENT

LANE RESTRICTIONS between Phila. Int. Airport &

PA 63 (Woodhaven Rd.). 9:30 AM - 2 PM.

11/13/17-11/16/17 Maintenance

*I-76 E & W Drain Cleaning/Debris Removal: INTERMITTENT

LANE RESTRICTIONS between US 1 (City Ave.) &

26th St. 9:30 AM - 2 PM.

11/13/17-11/16/17 Maintenance

*I-76 West Shielding: RIGHT LANE CLOSURE between South

St. off Ramp & 676 Vine St. Expressway. 9 PM - 5

AM.

11/13/17-11/16/17 Buckley & Company,

Inc.

$103.5 million

DATE: 11-16-2017

PENNSYLVANIA DEPARTMENT OF TRANSPORTATION

ENGINEERING DISTRICT 6-0

TRAFFIC RESTRICTION BULLETIN

(NOTE: SCHEDULES ARE SUBJECT TO WEATHER CONDITIONS)

(All restrictions 24 hours/day, 7 days/week unless otherwise noted)

PENNDOT ROADWAY MAINTENANCE HOTLINE 1-800-FIX- ROAD

Log on to www.511pa.com or call 511 from any phone to check conditions on major highways.

11/16/2017 Page 1 of 28

Page 2: DATE: 11-16-2017...PA 73 E & W (New State Rd.) Road Reconstruction: LANE CLOSURES between Levick St. & Cottman Ave. 9 AM - 3 PM 11/12/17-11/18/17 Walsh Construction Company $212.3

LOCATION RESTRICTION DATE CONTRACTOR COST

Passyunk Ave. Bridge Rehabilitation: RIGHT LANE CLOSED on Hon.

Robert C. Donatuccu Memorial Bridge over Schuylkill

River. 9 AM - 3 PM.

11/13/17-11/17/17 Buckley & Company,

Inc.

$33.5 million

Walnut Lane Debris Removal & Concrete Repair: LANE

CLOSURES between Magdelena St. & Park Lane

Drive. Weekdays. 9 AM - 3 PM.

11/13/17-11/17/17 Buckley & Company,

Inc.

$14 million

Parkside Ave. Milling & Paving: LANE RESTRICTIONS between N.

52nd St. & Girard Ave. 9 AM - 3 PM & 7 PM - 6 AM.

11/13/17-11/17/17 Tony DePaul & Son $8.8 million

JFK Blvd. East Bridge Rehabilitation: CLOSED & DETOURED

between 20th St. & Schuylkill Ave. DETOUR

POSTED. 24-HOUR DETOUR

11/13/17-11/17/17 Abbonizio

Contractors, Inc.

$15.8 million

Lewis St./Wheatsheaf Lane Shared Pathway: PARKING LANE CLOSED between

Aramingo Ave. & Delaware Ave. 7 AM - 4 PM.

11/13/17-11/17/17 James J. Anderson $869,700.00

US 1 N & S (Roosevelt Blvd.) ITS Installation: LANE RESTRICTIONS between

Byberry Rd. & Hornig Rd. 9 PM - 5 AM.

11/13/17-11/17/17 Wampole-Miller, Inc. $15 million

US 1 N & S (Roosevelt Blvd.) Fiber Backbone Installation: LANE RESTRICTIONS

between Comly St. & Old Trevose Rd. 9 AM - 3 PM.

11/13/17-11/17/17 Wampole-Miller, Inc. $15 million

Ridge Ave. Trench/Foundations: LANE CLOSURES between

Poplar St. & Spring Garden St. 9 AM - 3 PM.

11/13/17-11/17/17 Armour and Sons

Electric

$1,698,438.00

22nd St. on-ramp to I-676 West Base Repair: RAMP CLOSED & DETOURED. 9 AM -

3 PM. DETOUR POSTED.

11/16/17 Maintenance

*I-76 West Shielding: CLOSED & DETOURED between South St.

off Ramp & 676 Vine St. Expressway. 11 PM - 5 AM.

DETOUR POSTED

11/16/17 Buckley & Company,

Inc.

$103.5 million

*I-95 North Bridge Inspection: LEFT LANE CLOSED between

Enterprise Ave. & Broad St. (PA 611). 9 AM - 3 PM.

11/17/17 Pickering, Corts &

Summerson

*US 1 South Bridge Inspection: RIGHT LANE CLOSED between

Henry Ave. & Wissahickon Ave. 7 AM - 11 AM.

11/18/17 Ammann & Whitney

11/16/2017 Page 2 of 28

Page 3: DATE: 11-16-2017...PA 73 E & W (New State Rd.) Road Reconstruction: LANE CLOSURES between Levick St. & Cottman Ave. 9 AM - 3 PM 11/12/17-11/18/17 Walsh Construction Company $212.3

LOCATION RESTRICTION DATE CONTRACTOR COST

*I-95 North Bridge Inspection: LEFT LANE CLOSED between

Enterprise Ave. & Broad St. (PA 611). 8 AM - 4 PM.

11/19/17 Pickering, Corts &

Summerson

*I-76 E & W Strip Seal Replacement: WESTBOUND LANE

CLOSURE between Montgomery Drive & US 1 (City

Ave.). 8 PM - 5 AM.

11/20/17-11/21/17 Loftus Construction $7.5 milliom

US 1 South off-ramp to I-76 West Approach Rehabilitation: LANE NARROWING ON

THE RAMP. 8 PM - 5 AM.

11/20/17-11/21/17 Loftus Construction $7.5 million

*US 1 N & S (Roosevelt Blvd.) Milling & Paving: LANE CLOSURES between Bucks

County line & 9th St. 9 AM - 3 PM.

11/20/17-11/21/17 H&K Group, Inc. $7.6 million

Ridge Ave. Trench/Foundations: LANE CLOSURES between

Girard Ave. & 15th St. 9 AM - 3 PM.

11/20/17-11/22/17

& 11/24/17

Armour and Sons

Electric

$1,698,438.00

Lewis St./Wheatsheaf Lane Shared Pathway: PARKING LANE CLOSED between

Aramingo Ave. & Delaware Ave. 7 AM - 4 PM.

11/20/17-11/24/17 James J. Anderson $869,700.00

JFK Blvd. East Bridge Rehabilitation: CLOSED & DETOURED

between 20th St. & Schuylkill Ave. 24-HOUR

DETOUR. DETOUR POSTED.

11/20/17-8/2018 Abbonizio

Contractors, Inc.

$15.8 million

JFK Blvd. West Bridge Rehabilitation: CLOSED & DETOURED

between 20th St. & Schuylkill Ave. 9 PM - 5 AM.

DETOUR POSTED.

12/1/17-12/4/17 Abbonizio

Contractors, Inc.

$15.8 million

PA 73 E & W (New State Rd.) Road Reconstruction: LANE CLOSURES between

Levick St. & Cottman Ave. 9 AM - 3 PM

11/5/17-11/11/17 Walsh Construction

Company

$212.3 million

Girard Ave. on-ramp to I-95 North Bridge Demolition: CLOSED & DETOURED between

Fletcher St. & Richmond St. 9 PM - 5 AM. DETOUR

POSTED.

11/6/17-11/7/17 James J. Anderson $211 million

Aramingo Ave. on-ramp to I-95

South

Deck & Joint Repair: RAMP CLOSED & DETOURED.

8 PM - 5 AM. DETOUR POSTED.

11/6/17-11/9/17 Maintenance

JFK Blvd. East Bridge Rehabilitation: CLOSED & DETOURED

between 20th St. & Schuylkill Ave. DETOUR

POSTED. 24-HOUR DETOUR

11/6/17-11/10/17 Abbonizio

Contractors, Inc.

$15.8 million

11/16/2017 Page 3 of 28

Page 4: DATE: 11-16-2017...PA 73 E & W (New State Rd.) Road Reconstruction: LANE CLOSURES between Levick St. & Cottman Ave. 9 AM - 3 PM 11/12/17-11/18/17 Walsh Construction Company $212.3

LOCATION RESTRICTION DATE CONTRACTOR COST

Parkside Ave. Milling & Paving: LANE RESTRICTIONS between N.

52nd St. & Girard Ave. 9 AM - 3 PM & 7 PM - 6 AM.

11/6/17-11/10/17 Tony DePaul & Son $8.8 million

Lewis St./Wheatsheaf Lane Shared Pathway: PARKING LANE CLOSED between

Aramingo Ave. & Delaware Ave. 7 AM - 4 PM.

11/6/17-11/10/17 James J. Anderson $869,700.00

Passyunk Ave. Bridge Rehabilitation: RIGHT LANE CLOSED on Hon.

Robert C. Donatuccu Memorial Bridge over Schuylkill

River. 9 AM - 3 PM.

11/6/17-11/10/17 Buckley & Company,

Inc.

$33.5 million

Walnut Lane Debris Removal & Concrete Repair: LANE

CLOSURES between Magdelena St. & Park Lane

Drive. Weekdays. 9 AM - 3 PM.

11/6/17-11/10/17 Buckley & Company,

Inc.

$14 million

Henry Ave. Bridge Deck Rehabilitation: RIGHT LANE CLOSED

between Hermit Lane & School House Lane. 24-

HOUR RESTRICTIONS.

11/6/17-12/6/17 Loftus Construction,

Inc.

$11.7 million

Walnut Lane Debris Removal & Concrete Repair: LANE

CLOSURES between Magdelena St. & Park Lane

Drive. Weekdays. 9 AM - 3 PM.

11/6/17-11/10/17 Buckley & Company,

Inc.

$14 million

Passyunk Ave. Bridge Rehabilitation: RIGHT LANE CLOSED on Hon.

Robert C. Donatuccu Memorial Bridge over Schuylkill

River. 9 AM - 3 PM.

11/6/17-11/10/17 Buckley & Company,

Inc.

$33.5 million

US 1 N & S (Roosevelt Blvd.) ITS Installation: LANE RESTRICTIONS between

Byberry Rd. & Hornig Rd. 9 PM - 5 AM.

11/6/17-11/10/17 Wampole-Miller, Inc. $15 million

US 1 N & S (Roosevelt Blvd.) Fiber Backbone Installation: LANE RESTRICTIONS

between Comly St. & Old Trevose Rd. 9 AM - 3 PM.

11/6/17-11/10/17 Wampole-Miller, Inc. $15 million

*US 1 N & S (Roosevelt Blvd.) Milling & Paving: LANE CLOSURES between Bucks

County line & 9th St. 9 AM - 3 PM & 7 PM - 5 AM.

Friday 7 PM - Saturday 9 AM.

11/13/17-11/18/17 H&K Group, Inc. $7.6 million

Parkside Ave. Median Installation: CLOSED & DETOURED between

Belmont Ave. & 41st St. 24-HOUR DETOUR.

DETOUR POSTED.

10/30/17-11/3/17 Fairmount Park

Conservancy

11/16/2017 Page 4 of 28

Page 5: DATE: 11-16-2017...PA 73 E & W (New State Rd.) Road Reconstruction: LANE CLOSURES between Levick St. & Cottman Ave. 9 AM - 3 PM 11/12/17-11/18/17 Walsh Construction Company $212.3

LOCATION RESTRICTION DATE CONTRACTOR COST

Delaware Ave. Milling & Paving: LANE RESTRICTIONS between

Oregon Ave. & Walt Whitman Bridge. 7 AM - 4 PM &

7 PM - 5 AM.

10/30/17-11/3/17 Tony DePaul & Son $550,000.00

US 1 N & S (Roosevelt Blvd.) ITS Installation: LANE RESTRICTIONS between

Byberry Rd. & Hornig Rd. 9 PM - 5 AM.

10/30/17-11/3/17 Wampole-Miller, Inc. $15 million

Schuylkill Ave. Bridge Rehabilitation: TRAFFIC SWITCH WITH NO

RIGHT TURN at Walnut onto Schuylkill. 24-HOUR

RESTRICTIONS.

8/28/17-12/31/17 Buckley & Company,

Inc.

$103 million

Holme Ave. Bridge Repair: LANE CLOSURE between Longford St.

& Arthur St. 24-HOUR RESTRICTIONS.

8/7/17-5/2018 Road-Con, Inc. $1.3 million

I-676 West Ramp to 22nd St. Bridge Construction: RAMP REDUCED TO ONE

LANE 24-HOUR

7/21/17-12/15/17 Buckley & Company,

Inc.

$64.8 million

Aramingo Ave. Utility Installation: LANE CLOSURES between

Wheatsheaf Lane & I-95 interchange. 9 AM - 3 PM.

7/20/17-4/1/18 A.P. Construction,

Inc.

$87 million

Palmer St. Overhead Bridge Construction: CLOSED &

DETOURED between Wildey St. & Delaware Ave. 24-

HOUR DETOUR. DETOUR POSTED.

6/15/16-5/1/18 James J. Anderson $211 million

Montgomery Ave. Bridge Demoliltion: CLOSED & DETOURED between

Wildy St. & Delaware Ave. 24-HOUR DETOUR.

DETOUR POSTED.

6/15/17-5/1/18 James J. Anderson $211 million

Columbia Ave. Bridge Demolition: CLOSED & DETOURED between

Wildey St. & Delaware Ave. 24-HOUR DETOUR.

DETOUR POSTED.

6/5/17-11/14/17 James J. Anderson $211 million

18th St. Roadwork: CLOSED & DETOURED between Vine St.

Local E/B & Vine St. Local W/B. 24-HOUR

CLOSURE. DETOUR POSTED.

5/15/17-1/2018 Buckley & Company,

Inc.

$64.8 million

22nd St. Bridge Construction: TRAFFIC PATTERN CHANGE

on bridge over I-676 between Ben Franklin Parkway &

Race St.

11/7/16-11/30/18 Buckley & Company,

Inc.

$64.8 million

21st St. Bridge Construction: TRAFFIC PATTERN CHANGE

on bridge over I-676 between Ben Franklin Parkway &

Race St.

11/7/16-11/30/18 Buckley & Company,

Inc.

$64.8 million

11/16/2017 Page 5 of 28

Page 6: DATE: 11-16-2017...PA 73 E & W (New State Rd.) Road Reconstruction: LANE CLOSURES between Levick St. & Cottman Ave. 9 AM - 3 PM 11/12/17-11/18/17 Walsh Construction Company $212.3

LOCATION RESTRICTION DATE CONTRACTOR COST

Olney Ave. Roadwork: LANE RESTRICTIONS between Broad St.

(PA 611) & Rising Sun Ave. 9 AM - 3 PM.

12/2/15-11/2017 Armour and Sons

Electric

$4.7 million

Sergeant St. Bridge Work: CLOSED & DETOUR between Salmon

St. & Richmond St. 24-HOUR DETOUR. DETOUR

POSTED.

12/28/15-12/2018 James J. Anderson $211 million

Huntingdon St. Bridge Work: CLOSED & DETOUR between Salmon

St. & Richmond St. 24-HOUR DETOUR. DETOUR

POSTED.

12/28/15-12/2018 James J. Anderson $211 million

Somerset St. Bridge Work: CLOSED & DETOUR between Salmon

St. & Richmond St. 24-HOUR DETOUR. DETOUR

POSTED.

12/28/15-12/2018 James J. Anderson $211 million

Delaware Ave. Reconstruction: NEW TRAFFIC PATTERN between

Columbia Ave. & Aramingo Ave. 24-HOUR

RESTRICTIONS.

4/1/15-10/2018 James J. Anderson $211.7 million

BUCKS COUNTY

State Rd., Bristol Twp. Railroad Crossing Surface Replacement: CLOSED &

DETOURED between River Rd. & Mack Drive. Friday

5 PM thru Monday 5 AM. DETOUR POSTED.

11/10/17-11/13/17 Dow Chemical

PA 32 (River Rd.), Bridgeton Twp. Tree Removal: LANE RESTRICTIONS at Narrows Hill

Rd. 9 AM - 3 PM.

11/13/17-11/15/17 Bustleton Services

*US 1 North (Lincoln Hwy.),

Bensalem, Morrisville twps.

Large Sign Repair: LANE SHIFTS between Street Rd.

& Pennsylvania Ave. Interchanges. 9 AM - 3 PM.

11/13/17-11/17/17 J. Fletcher Creamer &

Son, Inc.

$644,888.00

Marienstein Rd., Nockamixon,

Bridgeton twps.

Road Work: LANE RESTRICTIONS between PA 611

(Easton Rd.) & PA 32 (River Rd.). 9 AM - 3 PM.

11/13/17-11/17/17 J.D. Morrissey, Inc. $3.2 million

*I-95 N & S, Middletown Twp. Shoulder Topsoil & Stone Placement:

INTERMITTENT LANE CLOSURES between New

Falls Rd. & Newtown-Yardley Interchange. 7 PM - 5

AM.

11/13/17-11/17/17 James J. Anderson $29,633,134

Trumbauersville Rd., Milford Twp. Pipe Replacement: CLOSED & DETOURED between

Esten Rd. & Weisel Rd. 8 AM - 4 PM. DETOUR

POSTED.

11/15/17-11/17/17 Maintenance

11/16/2017 Page 6 of 28

Page 7: DATE: 11-16-2017...PA 73 E & W (New State Rd.) Road Reconstruction: LANE CLOSURES between Levick St. & Cottman Ave. 9 AM - 3 PM 11/12/17-11/18/17 Walsh Construction Company $212.3

LOCATION RESTRICTION DATE CONTRACTOR COST

2nd St. Pike, Northampton Twp. Utility Installation: LANE CLOSURE between Tartan

Rd. & Twining Ford Rd. Weekdays. 9 AM - 3 PM.

11/15/17-11/22/17 PECO Energy

*I-95 South off-ramp to Taylorsvile

Rd. North, Lower Makefield Twp.

Road Work: RAMP CLOSED & DETOURED. 8 PM -

6 AM. DETOUR POSTED.

11/16/17 Delaware River Joint

Toll Bridge

Commission

Red Hill Rd., Tinicum Twp. Pipe Replacement: CLOSED & DETOURED between

Mountain View Lane & Dark Hollow Rd. 8 AM - 4 PM.

DETOUR POSTED.

11/20/17-11/21/17 Maintenance

US 1 North (Lincoln Hwy.),

Bensalem, Morrisville twps.

Large Sign Maintenance: LANE RESTRICTIONS

between Street Rd. & Pennsylvania Ave.

Interchanges. 9 AM - 3 PM.

11/20/17-11/21/17 J. Fletcher Creamer &

Son, Inc.

$644,888.00

Second Street Pike, Upper

Southampton Twp.

Base Repair: LANE RESTRICTIONS between PA 132

(Street Rd.) & Pinewood Rd. 9 AM - 3 PM.

11/20/17-11/22/17 Upper Southampton

Township Municipal

Authority

Second Street Pike, Upper

Southampton Twp.

Base Repair: LANE RESTRICTIONS between Lynne

Drive & Hiview Drive. 9 AM - 3 PM.

11/20/17-11/22/17 Upper Southampton

Township Municipal

Authority

PA 132 (Street Rd.), Upper

Southampton Twp.

Base Repair: LANE RESTRICTIONS between

Morning Glory Drive & Marigold Ave. 9 AM - 3 PM.

11/20/17-11/22/17 Upper Southampton

Township Municipal

Authority

PA 611 South, Doylestown Twp.,

Doylestown Bor.

Line Painting: RIGHT LANE CLOSED between N.

Broad St. & W. State St. 9 AM - 3 PM.

11/20/17-11/22/17 Rohm and Haas

Chemicals, LLC

Newportville Rd., Bristol Twp. Utility Installation: LANE CLOSURE between Hilary

Ave. & Dixon Ave. Weekdays. 9 AM - 3 PM.

11/21/17-11/22/17 PECO Energy

Main St., Chalfont Bor. Utility Installation: LANE RESTRICTIONS at Westview

Ave. 9 AM - 3 PM.

11/20/17-11/22/17

& 11/27/17-

11/28/17

PECO Energy

Rocky Ridge Rd., Richland Twp. Bridge Replacement: CLOSED & DETOURED

between Rock Hill Rd. & Paletown Rd. 24-HOUR

DETOUR. DETOUR POSTED.

11/27/17-4/13/18 Loftus Construction,

Inc.

$11.7 million

PA 611 (Easton Rd.), Durham Twp. Bridge Inspection: LANE CLOSURE between PA 212

(Durham Rd.) & Durham St. 9 AM - 3 PM.

11/29/17 AECOM

11/16/2017 Page 7 of 28

Page 8: DATE: 11-16-2017...PA 73 E & W (New State Rd.) Road Reconstruction: LANE CLOSURES between Levick St. & Cottman Ave. 9 AM - 3 PM 11/12/17-11/18/17 Walsh Construction Company $212.3

LOCATION RESTRICTION DATE CONTRACTOR COST

County Line Rd., Upper

Southampton Twp.

Utility Installation: LANE CLOSURE between Somers

Drive & Mann Rd. Weekdays. 9 AM - 3 PM.

11/30/17-12/1/17 PECO Energy

*I-95 N & S, Middletown Twp. Traffic Marking Installation: INTERMITTENT LANE

CLOSURES between New Falls Rd. & Newtown-

Yardley Interchange. 7 PM - 5 AM.

11/6/17-11/10/17 James J. Anderson $29,633,134

Marienstein Rd., Nockamixon,

Bridgeton twps.

Road Work: LANE RESTRICTIONS between PA 611

(Easton Rd.) & PA 32 (River Rd.). 9 AM - 3 PM.

11/6/17-11/10/17 J.D. Morrissey, Inc. $3.2 million

University Ave. Line Stripping: LANE CLOSURES between Civic

Center Blvd. & 34th St. 7 AM - 4 PM.

11/6/17-11/10/17 Guidemark, Inc. $6.3 million

Durham Rd., Bensalem, Bristol twps. Bridge Beams: CLOSED & DETOURED between New

Rodger Rd. & New Falls Rd. 7 AM - 3 PM & 8 PM - 5

AM. DETOUR POSTED.

11/6/17-11/11/17 Pennsylvania

Turnpike Commission

$142 million

Buckingham, Warrington, Solebury,

New Britain twps.; Doylestown Bor.

Line Painting: SLOW MOVING OPERATION TO

PAINT TRAFFIC LINES. MOTORISTS ARE

ADVISED TO REMAIN AN AMPLE DISTANCE

BEHIND THE PAINTING TRUCK & STAY OFF

TRAFFIC LINES. 9 AM - 3 PM.

11/6/17-11/17/17 PennDOT $29.6 million

PA 611 (Easton Rd.), Warrington

Twp.

Curb Ramp Installation: LANE CLOSURES at

Steeplechase Drive; Turk Rd.; Almshouse Rd.; Edison

Furlong Rd.; New Britain Rd./Sauerman Rd.; Bristol

Rd.; Kelly Rd.; Freedoms Way/Oxford Drive;

Doylestown Plaza. 9 AM - 3 PM.

11/6/17-11/17/17 James D. Morrissey $4.3 million

US 1 North, Bensalem, Morrisville

twps.

Large Sign Structure Repair: LANE SHIFTS between

Street Rd. & Pennsylvania Ave. Interchanges. 9 AM -

3 PM.

11/6/17-11/10/17 J. Fletcher Creamer &

Son, Inc.

N. Pine St., Langhorne Bor. Utility Installation: LANE CLOSURE between E.

Winchester Ave. & Summit Ave. Weekdays. 9 AM - 3

PM.

11/6/17-11/13/17 PECO Energy

County Line Rd., Warrington,

Horsham twps.

Utility Work: LANE RESTRICTIONS between Folly Rd.

& Keith Valley Rd. Weekdays. 9 AM - 3 PM.

11/6/17-11/30/17 Underground

Services, Inc.

11/16/2017 Page 8 of 28

Page 9: DATE: 11-16-2017...PA 73 E & W (New State Rd.) Road Reconstruction: LANE CLOSURES between Levick St. & Cottman Ave. 9 AM - 3 PM 11/12/17-11/18/17 Walsh Construction Company $212.3

LOCATION RESTRICTION DATE CONTRACTOR COST

W. State Rd., Doylestown Twp. Utility Installation: LANE CLOSURE between Franklin

St. & Clinton St. Weekdays. 9 AM - 3 PM.

11/9/17-11/16/17 PECO Energy

County Line Rd., Horsham Twp. Utility Installation: CLOSED & DETOURED between

Chestnut Lane & Keith Valley Rd. Weekdays. 9 PM -

6 AM. DETOUR POSTED.

10/30/17-11/30/17 Horsham Township

Water & Sewer

Authority

Langhorne Yardley Rd., Lower

Makefield Twp.

Milling & Paving: LANE RESTRICTIONS between

Stoney Hill Rd. & Yardley Newtown Rd. Weekdays. 7

AM - 5 PM.

10/31/17-12/1/17 Blooming Glen

Contractors, Inc.

$4.4 million

East Park Ave., Sellersville Bor. Utility Installation: LANE RESTRICTIONS between

Main St. & Herbert St. Weekdays. 9 AM - 3 PM.

10/23/17-11/17/17 North Penn Water

Authority

Bath Rd., Bristol Twp. Utility Installation: LANE RESTRICTIONS between

Bayard St. & Lower Bucks Hospital Entrance.

Weekdays. 9 AM - 3 PM.

10/23/17-11/30/17 PECO Energy

Kumry Rd., Milford Twp. Milling & Paving: LANE RESTRICTIONS between

Sleepy Hollow Rd. & Creamery Rd. 7 AM - 5 PM.

10/16/17-12/1/17 Blooming Glen

Contractors, Inc.

$3.7 million

N. Broad St., Hatfield Twp. Sidewalk Installation: LANE RESTRICTIONS between

Montgomery St. & Lynwood Rd. Weekdays. 9 AM - 3

PM.

9/25/17-11/15/17 Bencardino

Excavating, Inc.

$155,000.00

Walnut St., Perkasie Bor. Bridge Replacement: CLOSED & DETOURED

between PA 152 & Constitution Ave. 24-HOUR

DETOUR. DETOUR POSTED.

9/25/17-11/25/18 H&K Group, Inc.

Street Rd., New Hope Bor. Bridge Rehabilitation: CLOSED & DETOURED

between Atkinson Rd. & Windy Bush Rd. 24-HOUR

DETOUR. DETOUR POSTED.

9/25/17-11/30/17 Loftus Construction,

Inc.

$6.8 million

Sugan Rd., Solebury Twp. Bridge Rehabilitation: CLOSED & DETOURED

between Creamery Rd. & Paxson Rd. 24-HOUR

CLOSURE. DETOUR POSTED.

10/2/17-5/5/18 J.D. Eckman, Inc. $7,407,987.00

*I-95 North, Lower Makefield Twp. Roadwork: LANE CLOSURES between PA 332

(Yardley-Newtown Rd.) & NJ state line. 24-HOUR

RESTRICTIONS POSSIBLE.

9/16/17-Indef. Delaware River Joint

Toll Bridge

Commission

11/16/2017 Page 9 of 28

Page 10: DATE: 11-16-2017...PA 73 E & W (New State Rd.) Road Reconstruction: LANE CLOSURES between Levick St. & Cottman Ave. 9 AM - 3 PM 11/12/17-11/18/17 Walsh Construction Company $212.3

LOCATION RESTRICTION DATE CONTRACTOR COST

*I-95 South, Lower Makefield Twp. Roadwork: LANE CLOSURES between JJ state line &

PA 332 (Yardley-Newtown Rd.). 24-HOUR

RESTRICTIONS POSSIBLE.

9/16/17-Indef. Delaware River Joint

Toll Bridge

Commission

PA 32 (River Rd.), Lower Makefield

Twp.

Roadwork: LANE RESTRICTIONS between Woodside

Rd. & I-95. 24-HOUR RESTRICTIONS POSSIBLE.

9/16/17-Indef. Delaware River Joint

Toll Bridge

Commission

Woodside Rd., Lower Makefield

Twp.

Roadwork: ALTERNATING TRAFFIC between River

Rd. & Mt. Eyre Rd. 24-HOUR RESTRICTIONS

POSSIBLE.

9/16/17-Indef. Delaware River Joint

Toll Bridge

Commission

Taylorsville Rd., Lower Makefield

Twp.

Roadwork: LANE CLOSURES between Woodside Rd.

& Highland Drive. 24-HOUR RESTRICTIONS

POSSIBLE.

9/16/17-Indef. Delaware River Joint

Toll Bridge

Commission

PA 413 (New Rodgers Rd.), Bristol

Twp.

Bridge Rehabilitation: CLOSED & DETOURED

between Plumbridge Drive & Bath Rd./Durham Rd. 8

PM - 5 AM. DETOUR POSTED.

8/20/17-12/18/17 Pennsylvania

Turnpike Commission

$142 million

PA 413 (New Rodgers Rd.), Bristol

Twp.

Bridge Rehabilitation: LANE RESTRICTIONS & 15-

MINUTE STOPPAGES between Plumbridge Drive &

Bath Rd./Durham Rd. 7 AM - 3 PM & 8 PM - 5 AM.

8/20/17-12/18/17 Pennsylvania

Turnpike Commission

$142 million

Durham Rd., Bristol Twp. Roadwork: LANE RESTRICTIONS between PA 413 &

New Falls Rd. 7 AM - 3 PM.

8/20/17-12/18/17 Pennsylvania

Turnpike Commission

$142 million

Durham Rd., Bristol Twp. Roadwork: CLOSED & DETOURED between PA 413

& New Falls Rd. 8 PM - 5 AM. DETOUR POSTED.

8/20/17-12/18/17 Pennsylvania

Turnpike Commission

$142 million

Loux Covered Bridge over Cabin

Run on Carver-Wismer Road,

Bedminster Township

CLOSED & DETOURED INDEFINITELY: Due to

structural damage sustained from an oversized vehicle

DETOUR POSTED

8/1/17-Indef.

Steinsburg Rd., Milford Twp. Bridge Replacement: CLOSED & DETOURED

between Hieter Rd. & Wentz Rd. 24-HOUR DETOUR.

DETOUR POSTED.

2/27/17-11/10/17 Pennsylvania

Turnpike Commission

$29.10 million

11/16/2017 Page 10 of 28

Page 11: DATE: 11-16-2017...PA 73 E & W (New State Rd.) Road Reconstruction: LANE CLOSURES between Levick St. & Cottman Ave. 9 AM - 3 PM 11/12/17-11/18/17 Walsh Construction Company $212.3

LOCATION RESTRICTION DATE CONTRACTOR COST

Trumbauersville Rd., Milford Twp. Bridge Replacement: CLOSED & DETOURED

between Canary Rd. & Esten Rd. 24-HOUR

DETOUR. DETOUR POSTED.

2/27/17-11/10/17 Pennsylvania

Turnpike Commission

$29.10 million

County Line Rd., Warrington,

Horsham, Montgomery twps.

Utility Installation: LANE RESTRICTIONS between

East Kulp Rd. & Stump Rd. 7 AM - 3 PM.

3/7/16-9/2018 James D. Morrissey,

Inc.

$14.8 million

*PA 263 (York Rd.), Warwick Twp. Road Reconstruction: LANE CLOSURES between

Bristol Rd. & Sugar Bottom Rd. Weekdays. 7 AM -

4:30 PM.

3/17/14-12/22/17 J.D. Eckman, Inc. $31.6 million

Headquarters Rd., Tinicum Twp. Bridge Damage: CLOSED & DETOURED between

Red Hill Rd. & Tankhannen Rd. DETOUR POSTED.

3/2/11-Indef. $29.2 million

CHESTER COUNTY

PA 282 (Creek Rd.), East Caln Twp. Milling & Paving: LANE RESTRICTIONS at Norwood

Rd. 9 AM - 3 PM.

11/13/17-11/17/17 Metropoliton Group

Whitford Rd., West Whiteland Twp. Utility Installation: LANE RESTRICTIONS between

Lindenwood Drive & Waterloo Rd. 9 AM - 3 PM.

11/13/17-11/17/17 PECO Energy

Darby Rd., Tredyffrin Twp. Utility Installation: LANE CLOSURE between Craig

Ave. & Woodland Terrace. Weekdays. 9 AM - 3 PM.

11/13/17-11/20/17 PECO Energy

Westbourne Rd., Westtown Twp. Utility Installation: LANE CLOSURE between Street

Rd. & Barnview Rd. Weekdays. 9 AM - 3 PM.

11/13/17-11/20/17 PECO Energy

Ridge Rd., East Coventry Twp. Utility Installation: LANE CLOSURE between Fulmer

Rd. & Porters Mill Rd. Weekdays. 9 AM - 3 PM.

11/13/17-11/20/17 PECO Energy

Unionville Wawaset Rd., Pocopson,

East Bradford twps.

Paving: LANE RESTRICTIONS between Wawaset

Rd. & Creek Rd. 9 AM - 3 PM.

11/14/17 Allan Myers $3.7 million

Birmingham Rd., Birmingham, East

Bradford twps.

Paving: LANE RESTRICTIONS between Old

Wilmington Pike & Lenape Rd. 9 AM - 3 PM.

11/14/17 Allan Myers $3.7 million

King Rd., Whiteland Twp. Utility Installation: LANE CLOSURE between Ship Rd.

& Bittersweet Lane. Weekdays. 9 AM - 3 PM.

11/14/17-11/21/17 PECO Energy

11/16/2017 Page 11 of 28

Page 12: DATE: 11-16-2017...PA 73 E & W (New State Rd.) Road Reconstruction: LANE CLOSURES between Levick St. & Cottman Ave. 9 AM - 3 PM 11/12/17-11/18/17 Walsh Construction Company $212.3

LOCATION RESTRICTION DATE CONTRACTOR COST

Embreeville Rd., Newlin Twp. Pipe Installation: CLOSED & DETOURED between

Brandywine Drive & Stargazers Rd. 9 AM - 2 PM.

DETOUR POSTED.

1116/17 Maintenance

Sugartown Rd., Easttown Twp. Trench Restoration: LANE RESTRICTIONS between

Evergreen Lane & Black Swan Rd. 9 AM - 3 PM.

11/16/17 PECO Energy

Limestone Rd., Parkesburg Bor. Utility Installation: LANE RESTRICTIONS between

West First Ave. & West Sixth Ave. Weekdays. 9 AM -

3 PM.

11/16/17-1/15/18 Pennsylvania

American Water

Company

Whiteford Rd., West Whiteland Twp. Utility Installation: LANE RESTRICTIONS between

Lindenwood Drive & Waterloo Rd. 9 AM - 3 PM.

11/20/17-11/21/17 PECO Energy

Jennersville Rd., Penn Twp. Core Boring: LANE RESTRICTIONS at Old Baltimore

Pike. 9 AM - 3 PM.

11/20/17-11/22/17 Penn Township

Authority

W. Strasburg Rd., West Chester Bor. Utility Installation: CLOSED & DETOURED between

N. Bradford Ave. & Everhart Ave. 9 AM - 3 PM.

DETOUR POSTED.

11/20/17-11/24/17 Aqua Pennsylvania

Valley Ave., Atglen Bor. Utility Installation: LANE CLOSURE between Norwood

St. & Chester St. Weekdays. 9 AM - 3 PM.

11/20/17-11/27/17 PECO Energy

Newtown Rd., Easttown Twp. Utility Installation: CLOSED & DETOURED between

Sugartown Rd. & Waterloo Rd. Weekdays. 9 AM - 3

PM. DETOUR POSTED.

11/20//17-1/19/18 PECO Energy

US 322 (Hannum Ave.), West

Chester Bor.

Utility Installation: CLOSED & DETOURED between

Washington St. & Wayne St. Weekdays. 9 AM - 3

PM. DETOUR POSTED.

11/27/17-12/22/17 Aqua Pennsylvania

Horseshoe Pike, Honey Brook Twp. Utility Installation: LANE CLOSURE between Village

Square & Roberts Lane. Weekdays. 9 AM - 3 PM.

12/4/17-12/11/17 PECO Energy

Kennett, New Garden, Caln, West

Goshen, Charlestown, Schuylkill,

Tredyffrin twps.

Line Painting: SLOW MOVING OPERATION TO

PAINT TRAFFIC LINES. MOTORISTS ARE

ADVISED TO REMAIN AN AMPLE DISTANCE

BEHIND THE PAINTING TRUCK & STAY OFF

TRAFFIC LINES. 9 AM - 2:30 PM.

11/6/17-11/17/17 PennDOT $29.6 million

11/16/2017 Page 12 of 28

Page 13: DATE: 11-16-2017...PA 73 E & W (New State Rd.) Road Reconstruction: LANE CLOSURES between Levick St. & Cottman Ave. 9 AM - 3 PM 11/12/17-11/18/17 Walsh Construction Company $212.3

LOCATION RESTRICTION DATE CONTRACTOR COST

PA 41 (Gap Newport Pike), London

Grove Twp.

Road Widening: LANE CLOSURES & LONG TERM

LANE SHIFTS between Mosquito Lane & Penwyck

Lane. Weekdays. 9 AM - 3 PM.

11/6/17-11/21/17 Road-Con, Inc. $1 million

Kaolin Rd., New Garden, Kennett

twps.

Paving & Pavement Marking: LANE RESTRICTIONS

between Ewart Rd. & Red Clay Circle Bridge. 9 AM -

3 PM.

11/10/17 Allan Myers $3.7 million

Lincoln Hwy., Coatesville City Utility Installation: LANE RESTRICTIONS between

First Ave. & Church St. Weekdays. 9 AM - 3 PM.

10/23/17-12/15/17 Pennsylvania

American Water

Company

Business U.S. 30 W (Lincoln

Highway), Coatesville City

Utility Installation: LANE RESTRICTIONS between

First Ave & Church St. Weekdays. 9 AM - 3 PM.

10/16/17-12/15/17 Pennslyvania

American Water Co.

Business US 30 West, City of

Coatesville

Utility Installation: LANE RESTRICTIONS between

First Ave. & Church St. Weekdays. 9 AM - 3 PM.

10/10/17-12/15/17 Pennsylvania

American Water

Company

PA 282 (Wallace Ave.),

Downingtown Bor.

Sidewalk Installation: LANE SHIFT between

Pennsylvania Ave. & US 30 (Lancaster Ave.).

Weekdays. 9 AM - 3 PM.

9/11/17-11/30/17 Downingtown

Borough

West Baltimore Pike, Kennett Twp. Curb/Sidewalk Installation: LANE CLOSURE between

Penns Manor Rd. & Mill St. Weekdays. 8 AM - 4 PM.

7/31/17-12/31/17 Ply-Mar Construction

Co., Inc.

$830,403.50

West Cypress St., Kennett Twp. Curb/Sidewalk Installation: LANE CLOSURE between

Scarlett Rd. & Mill St. Weekdays. 8 AM - 4 PM.

7/31/17-12/31/17 Ply-Mar Construction

Co., Inc.

$830,403.50

Rosedale Rd., Kennett Twp. Curb/Sidewalk Installation: LANE CLOSURE between

Walnut St. & MacFarlan Rd. Weekdays. 8 AM - 4

PM.

7/31/17-12/31/17 Ply-Mar Construction

Co., Inc.

$830,403.00

PA 352 (Chester Rd.), East Goshen

Twp.

Pipe Installation: TRUCK DETOUR at Boot Rd. 24-

HOUR CLOSURE. DETOUR POSTED.

5/15/17-11/17/17 Sunoco Pipeline L.P. $29.17 million

Brandywine Creek Rd., Newlin Twp. Barrier Installation: LANE CLOSURE between Green

Valley Rd. & Powell Rd. 24-HOUR RESTRICTIONS.

3/3/17-Indef. Maintenance $29.3 million

11/16/2017 Page 13 of 28

Page 14: DATE: 11-16-2017...PA 73 E & W (New State Rd.) Road Reconstruction: LANE CLOSURES between Levick St. & Cottman Ave. 9 AM - 3 PM 11/12/17-11/18/17 Walsh Construction Company $212.3

LOCATION RESTRICTION DATE CONTRACTOR COST

*US 422 East, North Coventry Twp. Road & Bridge Construction: LANE CLOSURES

between PA 724 (Schuylkill Rd.) & Sanatoga

interchanges. 9 AM - 2 PM & 5 PM - 5 AM.

12/23/16-12/29/17 J.D. Eckman, Inc. $73.3 million

*US 422 West, North Coventry Twp. Road & Bridge Construction: LANE CLOSURES

between Sanatoga & PA 724 (Schuylkill Rd.)

interchanges. 7 PM - 1 PM.

12/23/16-12/29/17 J.D. Eckman, Inc. $73.3 million

Hollow Rd., West Vincent, East

Vincent twps.

Bridge Damage: CLOSED & DETOURED between

French Creek Rd. & Pughtown Rd. 24-HOUR

DETOUR. DETOUR POSTED.

11/20/16-Indef. PennDOT

Ross Fording Rd., West Fallowfield

Twp.

Bridge Damage: CLOSED & DETOURED between

Creek Rd. & Bryson Rd. 24-HOUR DETOUR.

DETOUR POSTED.

7/2/15-Indef. PennDOT $29.2 million

PA 724 ramp to US 422 East, East

Coventry Twp.

Ramp/Bridge Construction: RAMP CLOSED &

DETOURED. DETOUR POSTED.

5/27/15-3/2018 J.D. Eckman, Inc. $73.3 million

*US 422 E & W, North Coventry

Twp.

Bridge Construction: REDUCED TO ONE LANE

between Stowe & PA 100 Interchange. 24-HOUR

RESTRICTION.

11/27/14-9/2018 J.D. Eckman, Inc. $36 million

*US 422 E & W, North Coventry

Twp.

Road Construction: TRAFFIC PATTERN SHIFT

between Sanatoga & PA 724 (Schuylkill Rd.)

interchanges. 24-HOUR PATTERN.

2/2/13-8/2018 J.D. Eckman, Inc. $73.3 million

DELAWARE COUNTY

Rosetree Rd., Upper Providence

Twp.

Base Repair: LANE RESTRICTIONS between PA 352

(Middletown Rd.) & PA 252 (Providence Rd.). 6 PM -

6 AM.

11/12/17-11/13/17 Allan Myers $3.8 million

Rosetree Rd., Upper Providence

Twp.

Paving: LANE RESTRICTIONS between PA 352

(Middletown Rd.) & PA 252 (Providence Rd.). 9 AM -

3 PM.

11/13/17-11/17/17 Allan Myers $3.8 million

*I-476 N & S, Radnor, Haverford,

Marple twps.

ITS Conduit & Fiber Installation: RIGHT SHOULDER

CLOSED between I-76 & I-95. 9 AM - 3 PM.

11/13/17-11/17/17 Wampole-Miller, Inc. $15 million

*I-95 N & S, City of Chester Painting/Inspection & Repair: LANE RESTRICTIONS

between I-476 & PA 352/320. 10 PM - 5 AM.

11/13/17-11/17/17 South State, Inc. $16.6 million

11/16/2017 Page 14 of 28

Page 15: DATE: 11-16-2017...PA 73 E & W (New State Rd.) Road Reconstruction: LANE CLOSURES between Levick St. & Cottman Ave. 9 AM - 3 PM 11/12/17-11/18/17 Walsh Construction Company $212.3

LOCATION RESTRICTION DATE CONTRACTOR COST

*I-95 South, City of Chester Concrete Repair: SHOULDER CLOSURE between I-

476 & PA 352/320. 7 AM - 4 PM.

11/13/17-11/17/17 South State, Inc. $16.6 million

Garnet Mine Rd., Concord, Bethel

twps.

Tree Removal: LANE RESTRICTIONS between

Woods Edge Drive & Bethel Rd. 9 AM - 3 PM.

11/13/17-11/17/17 Knight Bros.

Eagle Rd., Haverford Twp. ADA Ramp Repairs: LANE RESTRICTIONS between

Pennview Ave. & East Darby Rd. 9 AM - 3 PM.

11/13/17-11/17/17 Philadelphia Freedom

Valley YMCA

*US 30 E & W (Lancaster Ave.),

Radnor Twp.

Pedestrian Bridge Construction: LANE CLOSURES

between PA 320 (Spring Mill Rd.) & Ithan Ave. 9 AM -

3 PM.

11/13/17-11/18/17 Neshaminy

Constructors, Inc.

$3.7 million

*US 322 E & W (Conchester Hwy.),

Concord Twp.

Reconstruction & Road Widening: PERIODIC LANE

RESTRICTIONS between US 1 (Baltimore Pike) & PA

261 (Foulk Rd). 9 AM - 3 PM & Possible 7 AM - 7 PM

Saturday

11/13/17-11/18/17 J.D. Eckman, Inc. $62.7 million

Ellis Rd., Haverford Twp. Utility Installation: LANE CLOSURE between Garlor

Drive & Lawrence Rd. Weekdays. 9 AM - 3 PM.

11/15/17-11/22/17 PECO Energy

Baltimore Ave., Media Bor. Utility installation: LANE CLOSURE between State St.

& Lemon St. Weekdays. 9 AM - 3 PM.

11/15/17-11/22/17 PECO Energy

Brookhaven Rd., Rose Valley Bor. Utility Installation: LANE CLOSURE between Garnet

Lane & Sackville Lane. Weekdays. 9 AM - 3 PM.

11/16/17-11/22/17 PECO Energy

West 9th St., Chester City Utility Repair: LANE CLOSURE between Jeffrey St. &

Yarnall St. 9 AM - 3 PM.

11/17/17 Horizon Services

*US 322 E & W (Conchester Hwy.),

Concord Twp.

Reconstruction & Road Widening: PERIODIC LANE

RESTRICTIONS between US 1 (Baltimore Pike) & PA

261 (Foulk Rd). 9 AM - 3 PM & Possible 7 AM - 7 PM

Saturday

11/20/17-11/21/17 J.D. Eckman, Inc. $62.7 million

Edgmont on-ramp to I-95 South, City

of Chester

Painting/Inspection: RAMP CLOSED & DETOURED.

9 AM - 3 PM. DETOUR POSTED.

11/20/17-11/21/17 South State, Inc. $16.6 million

11/16/2017 Page 15 of 28

Page 16: DATE: 11-16-2017...PA 73 E & W (New State Rd.) Road Reconstruction: LANE CLOSURES between Levick St. & Cottman Ave. 9 AM - 3 PM 11/12/17-11/18/17 Walsh Construction Company $212.3

LOCATION RESTRICTION DATE CONTRACTOR COST

*I-95 N & S, City of Chester Painting/Inspection & Repair: LANE RESTRICTIONS

between I-476 & PA 352/320. 10 PM - 5 AM.

11/20/17-11/21/17 South State, Inc. $16.6 million

*I-95 N & S, City of Chester Painting/Inspection & Repair: SHOULDER

CLOSURES between I-476 & PA 352/320. 7 AM - 4

PM.

11/20/17-11/21/17 South State, Inc. $16.6 million

Steel Rd., Haverford Twp. Utility Installation: LANE CLOSURE between Royal

Ave. & Central Ave. Weekdays. 9 AM - 3 PM.

11/20/17-11/21/17 PECO Energy

*US 30 E & W (Lancaster Ave.),

Radnor Twp.

Pedestrian Bridge Construction: LANE CLOSURES

between PA 320 (Spring Mill Rd.) & Ithan Ave. 9 AM -

3 PM.

11/20/17-11/22/17 Neshaminy

Constructors, Inc.

$3.7 million

Larkin Rd., Upper Chichester Twp. Utility Installation: LANE RESTRICTIONS between

Chichester Ave. & Whitney Ave. Weekdays. 9 AM -

3 nPM.

11/20/17-12/8/17 PECO Energy

MacDade Blvd., Glenolden Bor. Utility Installation: LANE RESTRICTIONS between

Dalmas Ave. & Werner Ave. Weekdays. 9 AM - 3

PM.

11/20/17-12/29/17 Aqua Pennsylvania

Edgmont on-ramp to I-95 South, City

of Chester

Painting/Inspection: RAMP CLOSED & DETOURED.

9 AM - 3 PM. DETOUR POSTED.

11/27/17-12/1/17 South State, Inc. $16.6 million

*US 30 E & W (Lancaster Ave.),

Radnor Twp.

Pedestrian Bridge Construction: LANE CLOSURES

between PA 320 (Spring Mill Rd.) & Ithan Ave. 6 PM -

5 AM.

11/28/17-12/1/17 Neshaminy

Constructors, Inc.

$3.7 million

West Rose Valley Rd., Nether

Providence Twp.

Utility Installation: LANE CLOSURE between Cedar

Lane & Bickmore Drive. Weekdays. 9 AM - 3 PM.

12/4/17-12/11/17 PECO Energy

*I-476 N & S, Radnor, Haverford,

Marple twps.

ITS Conduit & Fiber Installation: RIGHT SHOULDER

CLOSED between I-76 & I-95. 9 AM - 3 PM.

11/6/17-11/10/17 Wampole-Miller, Inc. $15 million

11/16/2017 Page 16 of 28

Page 17: DATE: 11-16-2017...PA 73 E & W (New State Rd.) Road Reconstruction: LANE CLOSURES between Levick St. & Cottman Ave. 9 AM - 3 PM 11/12/17-11/18/17 Walsh Construction Company $212.3

LOCATION RESTRICTION DATE CONTRACTOR COST

Radnor, Haverford, Upper Darby,

Springfield, Marple, Newtown twps.

Line Painting: SLOW MOVING OPERATION TO

PAINT TRAFFIC LINES. MOTORISTS ARE

ADVISED TO REMAIN AN AMPLE DISTANCE

BEHIND THE PAINTING TRUCK & STAY OFF

TRAFFIC LINES. 9 AM - 2:30 PM.

11/6/17-11/17/17 PennDOT

Baltimore Ave., Lansdowne Bor. Traffic Signal Upgrade: LANE RESTRICTIONS at

Lansdowne Ave.; Wycombe Ave.; Union Ave.; Martin

Drive; Walsh Rd. & Mansfield Ave. 9 AM - 3 PM.

11/6/17-11/17/17 Lenni Electric $4.1 million

Baltimore Ave., Upper Darby Twp.,

Lansdowne Bor.

Traffic Signal Upgrade: LANE RESTRICTIONS

between Lansdowne Ave.; Penn Blvd./4th St.;

Wycombe Ave.; Burmont Rd.; Scottdale Rd. & Church

Lane. 9 AM - 3 PM.

11/6/17-11/17/17 Lenni Electric $4.1 million

Baltimore Ave., Clifton Heights Bor.,

Upper Darby Twp.

Road Widening: LANE RESTRICTIONS at Springfield

Rd.; Church Lane; Delmar Drive; Diamond St. & Home

Depot Drive. 9 AM - 3 PM.

11/6/17-11/17/17 Lenni Electric $4.1 million

S. Bryn Mawr Ave., Radnor Twp. Paving: LANE RESTRICTIONS between Sproul Rd. &

S. Ithan Rd. 7 PM - 5 AM.

11/6/17-11/10/17 Loftus Construction,

Inc.

$7.5 million

PA 3 (West Chester Pike),

Haverford, Upper Darby twps.

Curb Ramp Reconstruction: LANE CLOSURE at Brief

Ave., Carol Blvd.; State Rd.; Copley Rd.; Terminal

Square & Pennock Ave. 9 AM - 3 PM.

11/6/17-11/10/17 L.C. Costa

Contractors, Inc.

$5.9 million

PA 3 (Market St.), Millbourne Bor. Curb Ramp Reconstruction: LANE CLOSURE at

Chatham Rd.; Forge Rd.; Copley Rd.; Terminal

Square & Millbourne Ave. 9 AM - 3 PM.

11/6/17-11/17/17 L.C. Costa

Contractors, Inc.

$5.9 million

E. Baltimore Ave., Lansdowne Bor. ADA Curb Ramp Replacement: LANE CLOSURE at

1st St.; 2nd St.; Baltimore St. & E. Baltimore St.;

Rigby St.; Lexington Ave.; Wildwood Ave.; Melrose

Ave.; Hirst Ave.; Maple Ave.; Legion Ter.; Lewis Ave.

& Third St. 9 AM - 3 PM.

11/6/17-11/17/17 L.C. Costa

Contractors, Inc.

$7.2 million

Springfield Ave., Clifton Heights Bor. Curb Ramp Reconstruction: LANE CLOSURE at

Diamond St.; Madison St.; Woodlawn Ave.; Clifton

Ave. & Broadway Ave. 9 AM - 3 PM.

11/6/17-11/17/17 L.C. Costa

Contractors, Inc.

$4.1 million

11/16/2017 Page 17 of 28

Page 18: DATE: 11-16-2017...PA 73 E & W (New State Rd.) Road Reconstruction: LANE CLOSURES between Levick St. & Cottman Ave. 9 AM - 3 PM 11/12/17-11/18/17 Walsh Construction Company $212.3

LOCATION RESTRICTION DATE CONTRACTOR COST

US 1 (Baltimore Ave.), Clifton

Heights Bor.

Curb Ramp Reconstruction: LANE CLOSURES at

Church St.; Marple Ave.; Jackson Ave.; Springfield

Ave.; Bishop Ave. & Glenwood Ave. 9 AM - 3 PM.

11/6/17-11/17/17 L.C. Costa

Contractors, Inc.

$4.1 million

*US 30 E & W (Lancaster Ave.),

Radnor Twp.

Pedestrian Bridge Construction: LANE CLOSURES

between PA 320 (Spring Mill Rd.) & Ithan Ave. 9 AM -

3 PM.

11/6/17-11/11/17 Neshaminy

Constructors, Inc.

$3.7 million

Edgmont on-ramp to I-95 South, City

of Chester

Painting/Inspection: RAMP CLOSED & DETOURED.

9 AM - 3 PM. DETOUR POSTED.

11/6/17-11/17/17 South State, Inc. $16.6 million

*I-95 N & S, Lower Chichester,

Upper Chichester, Chester, Upland,

Ridley, Tinicum twps. Chester City

Large Sign Maintenance: LANE CLOSURES between

PA 491 (Naamans Rd.) & Bartram Ave. 8 PM - 5

AM.

10/30/17-11/4/17 Carr & Duff, Inc. $2.1 million

*US 30 E & W (Lancaster Ave.),

Radnor Twp.

Pedestrian Bridge Construction: LANE CLOSURES

between PA 320 (Spring Mill Rd.) & Ithan Ave. 9 AM -

3 PM.

10/30/17-11/4/17 Neshaminy

Constructors, Inc.

$3.7 million

PA 320 South (Chester Rd.),

Swarthmore Bor.

Drainage Pipe Repair: LANE RESTRICTIONS ON

THE NORTH SIDE OF THE ROUNDABOUT where

Chester Rd. intersects Fieldhouse Lane & Rutgers

Ave. Weeknights. 6 PM - 6 AM.

11/1/17-11/10/17 Borough of

Swarthmore

*US 202 South, Concord Twp. Median & Curb Replacement: LANE RESTRICTIONS

at Pyle Rd. Weekdays. 9 AM - 3 PM.

10/23/17-11/20/17 Metro

Storage/Chaddsford

LLC

Kirk Lane, Upper Providence Twp. Utility Installation: LANE RESTRICTIONS at Oakcrest

Lane, Willowbrook Lane & W. 3rd St. Weekdays. 9

AM - 3 PM.

10/23/17-11/17/17 Aqua Pennsylvania

Conestoga Rd., Radnor Twp. Utility Installation: CLOSED & DETOURED between

South Devon Ave. & Lenoir Ave. Weekdays. 9 AM - 3

PM. DETOUR POSTED.

10/23/17-11/24/17 PECO Energy

Meetinghouse Rd., Upper Chichester

Twp.

Utility Installation: LANE RESTRICTIONS between

Locust St. & Friends Way. Weekdays. 9 AM - 3 PM.

10/25/17-11/25/17 Chester Water

Authority

11/16/2017 Page 18 of 28

Page 19: DATE: 11-16-2017...PA 73 E & W (New State Rd.) Road Reconstruction: LANE CLOSURES between Levick St. & Cottman Ave. 9 AM - 3 PM 11/12/17-11/18/17 Walsh Construction Company $212.3

LOCATION RESTRICTION DATE CONTRACTOR COST

*US 30 E & W (Lancaster Ave.),

Radnor Twp.

Pedestrian Bridge Construction: SIDEWALK CLOSED

between PA 320 (Spring Mill Rd.) & Ithan Ave. 24 hour

Closure

10/2/17-12/6/17 Neshaminy

Constructors, Inc.

$3.7 million

Bethel Rd., Concord Twp. Curb Installation: LANE RESTRICTIONS between

Smithbridge Rd. & Featherbed Lane. Weekdays. 9

AM - 3 PM.

10/5/17-11/17/17 Valley Point Church

Conestoga Rd., Radnor Twp. Utility Installation: CLOSED & DETOURED between S.

Devon Ave. & Lenoir Ave. 9 AM - 3 PM. DETOUR

POSTED.

9/25/17-11/24/17 PECO Energy

Chestnut St., City of Chester Bridge Deck Reconstruction: CLOSED & DETOURED

between 12th St. & 13th. DETOURED POSTED.

9/25/17-1/11/18 South State, Inc. $16.8 million

Burmont Rd., Haverford Twp. Utility Installation: LANE RESTRICTIOMS between

Glendale Rd. & Township Line 9 AM - 3 PM

Weekdays

9/5/17-12/8/17 Aqua Pennsylvania

S. Oak Ave., Aldan, Clifton Heights

bors.

Utility Installation: CLOSED & DETOURED between

Baltimore Pike & Providence Rd. Weekdays. 9 AM -

3 PM. DETOUR POSTED.

9/11/17-12/29/17 Aqua Pennsylvania

Garrett Rd., Upper Darby Twp. Utility Installation: CLOSED & DETOURED between

Lansdowne Ave. & PA 3 (West Chester Pike).

Weekdays. 9 AM - 3 PM. DETOUR POSTED.

9/11/17-12/29/17 Aqua Pennsylvania

Fairview Rd., Ridley Twp. Utility Installation: CLOSED & DETOURED between

MacDade Blvd. & PA 13 (Chester Pike). Weekdays.

9 AM - 3 PM. DETOUR POSTED.

8/22/17-11/24/17 Aqua Pennsylvania

Potter St., City of Chester Deck Replacement: CLOSED & DETOURED between

13th St. & 12th St. 24-HOUR DETOUR. DETOUR

POSTED.

8/14/17-2/14/18 South State, Inc. $16.6 million

Station Rd., Concord Twp. Road Construction: CLOSED & DETOURED between

Concord Rd. & PA 322 (Conchester Hwy.). 24-HOUR

DETOUR. DETOUR POSTED.

8/7/17-10/20/18 Road-Con, Inc. $29.20 million

Chester Creek Rd., Middletown

Twp., Brookhaven Bor.

Utility Installation: CLOSED & DETOURED between

Dutton Mill Rd. & Bridgewater Rd. Weekdays. 7 AM -

5 PM. DETOUR POSTED.

7/12/17-12/31/17 Middletown Township

Sewer Authority

$29.31 million

11/16/2017 Page 19 of 28

Page 20: DATE: 11-16-2017...PA 73 E & W (New State Rd.) Road Reconstruction: LANE CLOSURES between Levick St. & Cottman Ave. 9 AM - 3 PM 11/12/17-11/18/17 Walsh Construction Company $212.3

LOCATION RESTRICTION DATE CONTRACTOR COST

Morton Ave., City of Chester Road/Curb Reconstruction: CLOSED & DETOURED

between US 13 (E. 9th St.) & PA 291 (E. 4th St.). 24-

HOUR DETOUR. DETOUR POSTED.

6/20/17-12/27/17 South State, Inc. $16.6 million

Baltimore Pike, Springfield Twp. Utility Installation: LANE RESTRICTIONS between

Thomson Rd. & PA 320 (Sproul Rd.). 9 AM - 3 PM.

6/12/17-12/8/17 Aqua Pennsylvania

S. Bryn Mawr Ave., Radnor Twp. Bridge Reconstruction: LANE WIDTHS NARROWED

between PA 320 (Sproul Rd.) & S. Ithan Ave.

5/30/17-12/15/17 Loftus Construction,

Inc.

$7.5 million

Creek Rd., Middletown Twp.,

Brookhaven Bor.

Pipe Installation: CLOSED & DETOURED between

Bridgewater Rd. & Dutton Mill Rd. Weekdays. 7 AM -

5 PM. DETOUR POSTED.

5/15/17-12/31/17 Middletown Township

Sewer Authority

Crosby St., City of Chester Pedestrian Bridge Rehabilitation: Between 13th St. &

12th St.

3/27/17-11/29/17 South State, Inc. $16.6 million

College Ave., Haverford Twp. Bridge Construction: CLOSED & DETOURED

between Spring Mill Rd. & Haverford Rd. 24-HOUR

DETOUR. DETOUR POSTED.

11/29/16-5/2018 Road-Con, Inc. $5.2 million

MONTGOMERY COUNTY

US 1 South (City Ave.), Lower

Merion Twp.

Tree Removal: LANE RESTRICTIONS between 64th

St. & Hollingsworth Rd. 9 AM - 3 PM.

11/13/17 Knight Bros.

PA 100 North, Upper Pottsgrove

Twp.

Milling & Paving: LANE RESTRICTIONS between

Farmington Rd. & Moyer Rd. 9 AM - 3 PM.

11/13/17 Allan Myers $6.7 million

Pawlings Rd., Lower Providence

Twp.

Core Boring: LANE RESTRICTIONS between Pawling

Rd. & Station Ave. 9 AM - 3 PM.

11/13/17 Oak Mills Inc.

*US 422 East, West Pottsgrove,

North Coventry, Douglass twps.

Resurfacing: CLOSED & DETOURED at the split with

Benjamin Franklin Hwy. 9 PM - 5 AM. DETOUR

POSTED.

11/13/17-11/14/17 H&K Group, Inc. $35 million

11/16/2017 Page 20 of 28

Page 21: DATE: 11-16-2017...PA 73 E & W (New State Rd.) Road Reconstruction: LANE CLOSURES between Levick St. & Cottman Ave. 9 AM - 3 PM 11/12/17-11/18/17 Walsh Construction Company $212.3

LOCATION RESTRICTION DATE CONTRACTOR COST

Ramp from Stowe Interchange

(Grosstown Rd.) to Eastbound &

Westbound US 422, West

Pottsgrove, North Coventry,

Douglass twps.

Road Work: RAMP CLOSED & DETOURED. 9 PM -

5 AM. DETOUR POSTED.

11/13/17-11/14/17 H&K Group, Inc. $35 million

Limerick Center Rd., Limerick Twp. Manhole Adjustments & Paving: LANE

RESTRICTIONS between Linfield Rd. & Laurel Drive.

9 AM - 3 PM.

11/13/17-11/17/17 Allan Myers $6.7 million

*I-76 E & W, Upper Merion Twp. Structural Steel Rust Removal: LANE CLOSURES

between Gulph Mills & King of Prussia Interchanges.

9 PM - 5 AM.

11/13/17-11/17/17 Loftus Construction,

Inc.

$5.5 million

*I-76 E & W, Upper Merion Twp. Structural Steel Rust Removal: SHOULDER

CLOSURES between Gulph Mills & King of Prussia

Interchanges. 7 AM - 3 PM.

11/13/17-11/17/17 Loftus Construction,

Inc.

$5.5 million

*US 422 West, Lower Pottsgrove

Twp.

Sign Installation: RIGHT LANE CLOSED between

Sanatoga & PA 724 (Schuylkill Rd.) exits. 7 AM - 1

PM.

11/14/17 J.D. Eckman, Inc. $73.3 million

US 422 East, Lower Pottsgrove Twp. Sign Installation: RIGHT LANE CLOSED between

Keim St. exit & Sanatoga exit. 9 AM - 2 PM.

11/15/17 J.D. Eckman, Inc. $73.3 million

*I-76 E & W, Upper Merion Twp. Line Painting: ROLLING LANE CLOSURES between

US 202 & I-476 Interchanges. 10 AM - 2 PM.

11/15/17-11/17/17 J.D. Eckman, Inc. $21.1 million

Egypt Rd., Upper Providence Twp. Pavement Restoration: LANE RESTRICTIONS

between Green Tree Rd. & Page Lane. Weekdays. 9

AM - 3 PM.

11/16/17-11/17/17 Pennsylvania

American Water

Company

Joshua Rd., Whitemarsh Twp. Emergency Roadway Repair: CLOSED & DETOURED

between Stenton Ave. & Flourtown Rd. Friday 8 PM

thru Saturday 8 PM.

11/17/17-11/18/17 PennDOT

Pennlyn Blue Bell Pike, Whitpain

Twp.

Utility Installation: LANE RESTRICTIONS between

Hoover Rd. & Stenten Ave. 8 AM - 3 PM.

11/20/17 PECO Energy

11/16/2017 Page 21 of 28

Page 22: DATE: 11-16-2017...PA 73 E & W (New State Rd.) Road Reconstruction: LANE CLOSURES between Levick St. & Cottman Ave. 9 AM - 3 PM 11/12/17-11/18/17 Walsh Construction Company $212.3

LOCATION RESTRICTION DATE CONTRACTOR COST

*I-76 E & W, Upper Merion, Lower

Merion twps., West Conshohocken

Bor.

Litter & Debris Removal & Sweeping: MOVING

OPERATION WITH LANE CLOSURES between I-276

(PA turnpike) & US 1 (City Ave.) 9 AM - 3 PM.

11/20/17-11/21/17 Maintenance

PA 100 N & S, Upper Pottsgrove,

Douglass twps., Pottstown Bor.

Litter & Debris Removal & Sweeping: MOVING LANE

CLOSURES between US 422 & County Line Rd. 9

AM - 3 PM.

11/20/17-11/21/17 Maintenance

*I-476 N & S, Plymouth, Lower

Merion twps., West Conshohocken

Bor.

Litter & Debris Removal & Sweeping: MOVING

OPERATION WITH LANE CLOSURES between

Turnpike/I-276 Interchange & County Line Rd. 9 AM -

3 PM.

11/20/17-11/21/17 Maintenance

*US 422 E & W, Lower Providence,

Upper Providence, Limerick, Lower

Pottsgrove, North Coventry twps.

Litter & Debris Removal & Sweeping: MOVING

OPERATION between PA 100 (Pottstown Pike) & PA

363 (Trooper Rd.). 9 AM - 3 PM.

11/20/17-11/21/17 Maintenance

Egypt Rd., Upper Providence Twp. Pavement Restoration: LANE RESTRICTIONS

between Green Tree Rd. & Page Lane. Weekdays. 9

AM - 3 PM.

11/20/17-11/22/17 Pennsylvania

American Water

Company

Meyers Rd., Perkiomen Twp. Subbase & Paving: LANE RESTRICTIONS between

Seitz Rd. & Miller Rd. 9 AM - 3 PM.

11/20/17-11/22/17 H&K Group, Inc. $11.3 million

PA 29 (Gravel Pike), Perkiomen

Twp.

Pole Relocations & Paving: LANE RESTRICTIONS

between Miller Rd. & Harrison Ave. 9 AM - 3 PM.

11/2017-11/22/17 H&K Group, Inc. $11.3 million

Fitzwatertown Rd., Upper Dublin

Twp.

Utility Installation: LANE CLOSURE between North

Hills Ave. & David Drive. Weekdays. 9 AM - 3 PM.

11/20/17-11/27/17 PECO Energy

N. Trooper Rd., East Norriton Twp. Utility Installation: LANE CLOSURE between

Germantown Pike & Cirak Ave. Weekdays. 9 AM - 3

PM.

11/20/17-11/27/17 PECO Energy

PA 73 (Skippack Pike), Whitpain

Twp.

Utility Installation: LANE CLOSURE between Cresline

Drive & DeKalb Pike. Weekdays. 9 AM - 3 PM.

11/20/17-11/27/17 PECO Energy

PA 29 (Gravel Pike), Perkiomen

Twp.

Utility Installation: LANE CLOSURE between Bridge

St. & Maple Ave. Weekdays. 9 AM - 3 PM.

11/20/17-11/27/17 PECO Energy

11/16/2017 Page 22 of 28

Page 23: DATE: 11-16-2017...PA 73 E & W (New State Rd.) Road Reconstruction: LANE CLOSURES between Levick St. & Cottman Ave. 9 AM - 3 PM 11/12/17-11/18/17 Walsh Construction Company $212.3

LOCATION RESTRICTION DATE CONTRACTOR COST

Flourtown Rd, Whitemarsh Twp. Utility installation: CLOSED & DETOURED between

Joshua Rd. & Plymouth Rd. Weekdays. 9 AM - 3 PM.

DETOUR POSTED.

11/20/17-12/11/17 PECO Energy

Main St., Trappe Bor. Utility Installation: LANE RESTRICTIONS at First Ave.

Weekdays. 9 AM - 3 PM.

11/27/17-12/1/17 PECO Energy

PA 29 (Bridge St.), Upper

Providence Twp., Phoenixville Bor.

Bridge Inspection: LANE CLOSURE between PA 29

(Starr St.) & Walnut St. 9 AM - 3 PM.

11/28/17-11/29/17 AECOM

W. Broad st., Souderton Bor. Utility Installation: LANE CLOSURE between Penn

Ave. & Franklin Ave. 9 AM - 3 PM.

12/5/17-12/6/17 PECO Energy

Butler Pike, Whitemarsh, Plymouth

twps.

Utility installation: LANE RESTRICTIONS between

Franklin St. & Woodbin Way. Weekdays. 9 AM - 3

PM.

12/11/17-1/20/18 PECO Energy

*I-76 E & W, West Conshohocken

Bor., Upper Merion, Lower Merion

twps.

Concrete Patching: LANE CLOSURES between US

202 & US 1 (City Ave.) 9 PM - 9 AM.

11/10/17-11/11/17 J.D. Eckman, Inc. $21.1 million

*I-76 E & W, Upper Merion, Lower

Merion twps.

Concrete Patching: LANE CLOSURES between US

202 & US 1 (City Ave.) 9 PM - 5 AM & 9 PM - 9 AM

(weekends)

11/12/17-11/18/17 J.D. Eckman, Inc. $21.1 million

Montgomery Ave., Lower Merion

Twp.

Emergency Beam Replacement: CLOSED &

DETOURED between Old Gulph Rd. & Spring Mill Rd.

Weeknights. 8 PM - 5 AM. DETOUR POSTED.

11/13/17-11/17/17 Loftus Construction,

Inc.

$6.8 million

High St., Pottstown Bor. ADA Ramp Construction: LANE CLOSURE at Adams

St.; Franklin St.; Charlotte St.; Hanover St.; Penn St.;

Evans St.; Madison St.& Washington St. 9 AM - 3 PM.

11/13/17-11/17/17 Road-Con, Inc. $13.3 million

N. Adams St., Pottstown Bor. ADA Ramp Construction: LANE CLOSURE at

Washington St. 9 AM - 3 PM.

11/13/17-11/17/17 Road-Con, Inc. $13.3 million

N. Adams St., Pottstown Bor. ADA Ramp Construction: LANE CLOSURE at

Madison St. 9 AM - 3 PM.

11/13/17-11/17/17 Road-Con, Inc. $13.3 million

11/16/2017 Page 23 of 28

Page 24: DATE: 11-16-2017...PA 73 E & W (New State Rd.) Road Reconstruction: LANE CLOSURES between Levick St. & Cottman Ave. 9 AM - 3 PM 11/12/17-11/18/17 Walsh Construction Company $212.3

LOCATION RESTRICTION DATE CONTRACTOR COST

N. Adams St., Pottstown Bor. ADA Ramp Construction: LANE CLOSURE at Franklin

St. 9 AM - 3 PM.

11/13/17-11/17/17 Road-Con, Inc. $13.3 million

*I-476 N & S, Lower Merion Twp.,

West Conshohocken Bor.

ITS Conduit & Fiber Installation: RIGHT SHOULDER

CLOSED between I-76 & I-95. 9 AM - 3 PM.

11/13/17-11/17/17 Wampole-Miller, Inc. $15 million

PA 611 (Easton Rd.), Upper

Moreland Twp.

Material Delivery: SOUTHBOUND RIGHT LANE

CLOSED between Maryland Rd. & Wyandotte Rd. 9

PM - 6 AM.

11/13/17-11/17/17 Pennsylvania

Turnpike Commission

Ford St., Bridgeport Bor. Utility Installation: LANE CLOSURE between 6th St. &

5th St. Weekdays. 9 AM - 3 PM.

11/14/17-11/21/17 PECO Energy

PA 23 (Conshohocken State Rd.),

Lower Merion Twp.

Concrete Repairs: LANE RESTRICTIONS at Mill

Creek Rd. Weekdays. 9 AM - 3 PM.

11/16/17-11/22/17 Bill Anskis Co., Inc.

2nd Ave., Royersford Bor. Utility Installation: LANE CLOSURE between Green

St. & Arch St. Weekdays. 9 AM - 3 PM.

11/16/17-11/22/17 PECO Energy

Wambold Rd., Lower Salford Twp. Trench Restoration: LANE RESTRICTIONS between

Cassell Rd. & Fretz Rd. 9 AM - 3 PM.

11/17/17 PECO Energy

*I-76 E & W, West Conshohocken

Bor., Upper Merion, Lower Merion

twps.

Concrete Patching: LANE CLOSURES between US

202 & US 1 (City Ave.) 9 PM - 9 AM.

11/17/17-11/18/17 J.D. Eckman, Inc. $21.1 million

*I-76 East, Lower Merion Twp. Tree Removal: RIGHT LANE CLOSED between PA

23 (Conshohocken Rd.) & Gladwyne Interchanges.

5:30 AM - 1 PM.

11/18/17 Asplundh

N. Pleasant View Rd., Lower

Pottsgrove Twp.

Utility Installation: LANE RESTRICTIONS between

Donna Lane & Bleim Rd. Weekdays. 9 AM - 3 PM.

11/20/17-1/19/18 PECO Energy

Bleim Rd., Lower Pottsgrove Twp. Utility Installation: LANE RESTRICTIONS between

North Pleasant View Rd. & Spring Valley Rd.

Weekdays. 9 AM - 3 PM.

11/20/17-1/19/18 PECO Energy

11/16/2017 Page 24 of 28

Page 25: DATE: 11-16-2017...PA 73 E & W (New State Rd.) Road Reconstruction: LANE CLOSURES between Levick St. & Cottman Ave. 9 AM - 3 PM 11/12/17-11/18/17 Walsh Construction Company $212.3

LOCATION RESTRICTION DATE CONTRACTOR COST

*I-76 E & W, West Conshohocken

Bor., Upper Merion, Lower Merion

twps.

Concrete Patching: LANE CLOSURES between US

202 & US 1 (City Ave.) 9 PM - 9 AM.

11/3/17-11/4/17 J.D. Eckman, Inc. $21.1 million

PA 611 (Old York Rd.), Abington

Twp.

Bridge Work: LANE RESTRICTIONS between Jericho

Rd. & Hamilton Ave. 9 PM - 5 AM

11/5/17-11/10/17 J.D. Eckman, Inc. $3.6 million

*I-76 E & W, Upper Merion, Lower

Merion twps.

Concrete Patching: LANE CLOSURES between US

202 & US 1 (City Ave.) 9 PM - 5 AM & 9 PM - 9 AM

(weekends)

11/5/17-11/11/17 J.D. Eckman, Inc. $21.1 million

Evansburg Rd., Skippack Twp. Utility Installation: LANE RESTRICTIONS between

Township Line Rd. & Reagan Drive. 9 AM - 3 PM.

11/6/17-11/10/17 Skippack Township

Sewer Authority

PA 611 (Old York Rd.), Abington

Twp.

Bridge Work: LANE RESTRICTIONS between Jericho

Rd. & Hamilton Ave. 9 AM - 3 PM.

11/6/17-11/10/17 J.D. Eckman, Inc. $3.6 million

Jenkintown Rd., Abington Twp. Line Stripping: LANE CLOSURES between Linden

Ave. & Sylvania Ave. 7 AM - 4 PM.

11/6/17-11/10/17 Guidemark, Inc. $6.3 million

High St., Pottstown Bor. ADA Ramp Construction: LANE CLOSURE at Adams

St.; Franklin St.; Charlotte St.; Hanover St.; Penn St.;

Evans St.; Madison St.& Washington St. 9 AM - 3 PM.

11/6/17-11/10/17 Road-Con, Inc. $13.3 million

Norristown, Upper Providence,

Lower Providence, Limerick,

Whitemarsh twps.

Line Painting: SLOW MOVING OPERATION TO

PAINT TRAFFIC LINES. MOTORISTS ARE

ADVISED TO REMAIN AN AMPLE DISTANCE

BEHIND THE PAINTING TRUCK & STAY OFF

TRAFFIC LINES. 9 AM - 3 PM.

11/6/17-11/10/17 PennDOT $29.6 million

*I-476 N & S, Lower Merion Twp.,

West Conshohocken Bor.

ITS Conduit & Fiber Installation: RIGHT SHOULDER

CLOSED between I-76 & I-95. 9 AM - 3 PM.

11/6/17-11/10/17 Wampole-Miller, Inc. $15 million

Limerick Center Rd., Limerick Twp. Manhole Adjustments & Paving: LANE

RESTRICTIONS between Linfield Rd. & Laurel Drive.

9 AM - 3 PM.

11/6/17-11/11/17 Allan Myers $6.7 million

11/16/2017 Page 25 of 28

Page 26: DATE: 11-16-2017...PA 73 E & W (New State Rd.) Road Reconstruction: LANE CLOSURES between Levick St. & Cottman Ave. 9 AM - 3 PM 11/12/17-11/18/17 Walsh Construction Company $212.3

LOCATION RESTRICTION DATE CONTRACTOR COST

PA 309 (Bethlehem Pike), Colmar

Twp.

Curb & Inlet Work: RIGHT LANE CLOSED between

Line Lexington Rd .& Triwigtown Rd. Weekdays. 9

AM - 3 PM.

11/6/17-11/29/17 A. Amsterdam

County Line Rd., Warrington,

Horsham twps.

Utility Work: LANE RESTRICTIONS between Folly Rd.

& Keith Valley Rd. Weekdays. 9 AM - 3 PM.

11/6/17-11/30/17 Underground

Services, Inc.

County Line Rd., Souderton Bor. Curb & Sidewalk Installation: LANE RESTRICTIONS

between Chestnut St. & Central Ave. Weekdays. 9

AM - 3 PM.

11/6/17-12/8/17 Souderton Borough

Authority

Meetinghouse Rd., Worchester Twp. Tree Removal: LANE RESTRICTIONS between

Evansburg Rd. & Collegeville Rd. 9 AM - 3 PM

11/7/17-11/18/17 Asplundh

Troxel Rd., Towamencin Twp. Utility Installation: LANE CLOSURE at Musket Circle.

Weekdays. 9 AM - 3 PM.

11/9/17-11/16/17 PECO Energy

Harriton Rd., Lower Merion Twp. Utility Installation: LANE RESTRICTIONS at Gatemore

Drive. Weekdays. 9 AM - 3 PM.

10/30/17-12/1/17 Aqua Pennsylvania

PA 73 Skippack Pike), Skippack

Twp.

Utility Installation: LANE RESTRICTIONS between

Collegeville Rd. & Od Forty Foot Rd. Weekdays. 9

AM - 3 PM.

10/30/17-11/17/17 Skippack Township

Sewer Authority

Egypt Rd., Upper Providence Twp. Utility Installation: LANE RESTRICTIONS between

Green Tree Rd. & Page Lane. Weekdays. 9 AM - 3

PM.

10/23/17-11/16/17 Pennsylvania

American Water

Company

PA 113 (Harleysville Pike), Lower

Salford Twp.

Utility Installation: LANE RESTRICTIONS between PA

63 (Sumneytown Pike) & Oak Drive. Weekdays. 9

AM - 3 PM.

10/23/17-11/30/17 PECO Energy

Bleim Rd., Lower Pottsgrove Twp. Utility Installation: CLOSED & DETOURED between

New Hanover Square Rd. & Pleasantview Rd. 9 AM -

3 PM. Saturdays. 7 AM - 7 PM. DETOUR POSTED.

10/25/17-12/29/17 Borough of Pottstown

Layfayette Ave., Whitemarsh Twp. Utility Installation: LANE RESTRICTIONS between

Layfayette Ave. Connector & PA 73 (Skippack Pike).

Weekdays. 9 AM - 3 PM.

10/16/17-11/30/17 Ambler Borough

Water Department

11/16/2017 Page 26 of 28

Page 27: DATE: 11-16-2017...PA 73 E & W (New State Rd.) Road Reconstruction: LANE CLOSURES between Levick St. & Cottman Ave. 9 AM - 3 PM 11/12/17-11/18/17 Walsh Construction Company $212.3

LOCATION RESTRICTION DATE CONTRACTOR COST

Old Forty Foot Rd., Lower Salford

Twp.

Bridge Rehabilitation: CLOSED AND DETOURED

between Township Line Rd. & Kober Rd. 24-HOUR

CLOSURE.

10/30/17-6/2/18 J.D. Eckman, Inc. $7.4 million

Egypt Rd., Upper Providence Twp. Utility Installation: LANE RESTRICTIONS between

Green Tree Rd. & Page Lane. Weekdays. 9 AM - 3

PM.

10/2/17-11/16/17 Pennsylvania

American Water

Company

Argyle Rd., Lower Merion Twp. Utility Installation: LANE RESTRICTIONS between

Chatham Rd. & Wynnewood Rd. Weekdays. 9 AM - 3

PM.

9/26/17-11/30/17 Aqua Pennsylvania

Church Rd., Cheltenham Twp. Utility Installation: CLOSED & DETOURED between

Washington Lane & York Rd. Weekdays. 9 AM - 3

PM. DETOUR POSTED.

8/24/17-12/29/17 Aqua Pennsylvania

PA 363 (Trooper Rd.), Lower

Providence Twp.

Road Widening & Utility Installation: LANE

RESTRICTIONS between Eisenhower Ave. &

Shannondell Blvd. Weeknights. 7 PM - 5 AM.

7/17/17-11/30/17 Forge 20 LLC

PA 23 ramp to US 422 East, Upper

Merion, West Norriton twps.

Ramp Reconstruction: RAMP CLOSED &

DETOURED. 24-HOUR DETOUR. DETOUR

POSTED.

7/10/17-11/2017 J.D. Eckman, Inc. $97.4 million

W. Wynnewood Rd, Lower Merion

Twp.

Utility Installation: LANE RESTRICTIONS between E.

County Line Rd. & Ballytore Rd. Weekdays. 9 AM - 3

PM.

6/5/17-12/8/17 Aqua Pennsylvania

Buchert Rd., Pottsgrove Twp. Curb Ramp Construction: LANE CLOSURE at

Pleasantview Rd.; N. Washington St. & Mervine St. 9

AM - 3 PM.

5/30/17-12/1/17 Highway Materials,

Inc.

$4.8 million

Mervine St., Lower Pottsgrove Twp,

Pottstown Bor.

Curb Ramp Construction: LANE CLOSURE at N.

Franklin St. 9 AM - 3:30 PM.

5/30/17-12/1/17 Highway Materials,

Inc.

$4.8 million

Plank Rd., Perkiomen Twp. Excavation/Grading/Paving: CLOSED & DETOURED

between PA 29 (Gravel Pike) & PA 73 (Skippack

Pike). 24-HOUR DETOUR. DETOUR POSTED.

5/2/17-11/30/17 H&K Group, Inc. $11.3 million

Otts Rd., Perkiomen Twp. Excavation/Grading/Paving: CLOSED & DETOURED

between Miller Rd. & PA 29 (Gravel Pike). 24-HOUR

DETOUR. DETOUR POSTED.

5/2/17-5/2019 H&K Group, Inc. $11.3 million

11/16/2017 Page 27 of 28

Page 28: DATE: 11-16-2017...PA 73 E & W (New State Rd.) Road Reconstruction: LANE CLOSURES between Levick St. & Cottman Ave. 9 AM - 3 PM 11/12/17-11/18/17 Walsh Construction Company $212.3

LOCATION RESTRICTION DATE CONTRACTOR COST

PA 63 (Main St.), Lower Salford Twp. Roadway & Culvert Widening: LANE RESTRICTIONS

between PA 113 (Harleysville Pike) & Carrie Lane.

Weekdays. 9 AM - 3 PM.

3/15/17-11/1/17 Lower Salford

Township

$29.1 million

*US 422 East, Lower Pottsgrove

Twp.

Road & Bridge Construction: LANE CLOSURES

between PA 724 (Schuylkill Rd.) & Sanatoga

Interchanges. 5 PM - 5 AM.

1/23/17-11/29/17 J.D. Eckman, Inc. $73.3 million

*US 422 West, Lower Pottsgrove

Twp.

Road & Bridge Construction: WEEKEND LANE

CLOSURES between Sanatoga & PA 724 (Schuylkill

Rd.) Interchanges. 7 PM - 1 PM.

1/23/17-11/29/17 J.D. Eckman, Inc. $73.3 million

County Line Rd., Warrington,

Horsham, Montgomery twps.

Utility Installation: LANE RESTRICTIONS between

Kulp Rd. & Stump Rd. 7 AM - 3 PM.

3/7/16-9/2018 James D. Morrissey,

Inc.

$14.8 million

Baligomingo Rd., West

Conshohocken Bor.

Slope Stabilization: CLOSED & DETOURED between

PA 23 (Front St.) & Portland Rd. 24-HOUR DETOUR.

DETOUR POSTED.

6/27/15-Indef. $29.27 million

PA 724 ramp to US 422 East, Lower

Pottsgrove Twp.

Roadwork: RAMP CLOSED & DETOURED. 24-

HOUR CLOSURE. DETOUR POSTED.

5/27/15-3/2018 J.D. Eckman, Inc. $73.3 million

*US 422 E & W, Lower Pottsgrove

Twp.

Road Construction: TRAFFIC PATTERN SHIFT

between Sanatoga & PA 724 (Schuylkill Rd.)

Interchanges. 24-HOUR PATTERN.

2/2/13-8/2018 J.D. Eckman, Inc. $73.3 million

*US 422 E & W, West Pottsgrove

Twp.

Bridge Construction: REDUCED TO ONE LANE

between Stowe & PA 100 Interchange. 24-HOUR

RESTRICTION.

11/27/14-9/2018 J.D. Eckman, Inc. $36 million

County Line Rd., Upper Merion Twp. Road Work: CLOSED & DETOURED WEEKDAYS

between PA 23 & Gulph Rd. 7 AM Mondays thru 5 PM

Fridays. 24-HOUR CLOSURE. DETOUR POSTED.

5/9/14-12/29/17 Valley Forge National

Historical Park

$29.29 million

11/16/2017 Page 28 of 28