For : Residential, Commercial, Public building, Agricultural and Industrial roofs
Version 1.2 dated 10/10/12
System EASY ROOF is assured provided that the modules have approvals IEC 61215 and IEC 61730
DATASHEET EASY ROOF
Model “d-3” MONO-FRAME 1676*1001 type - PORTRAIT
Note applicable to the frames whose marking is “d-3”
1
No
n-c
on
trac
tual
info
rmat
ion
an
d v
isu
als.
Su
bje
ct t
o t
ech
nic
al a
me
nd
me
nts
wit
ho
ut
no
tice
.
Synopsis
Standard model “d-3” 1676*1001 Portrait 2
1. Nomenclature ………………………………………………………………………………………..…………………………………………….3
1.1. Parts provided in kit …………………………………………………………….……………..……………………………………………..3
1.2. Optional Parts ………………………………………………………….…………….…………………………………………..……………..3
1.3. Presentation of the parts of the kit Easy-Roof ………………………….………….…………………………………………….4
1.4. Presentation of the principle of assembly ……………………………….…………………………………………………………5
2. Glossary …………………………………………………………………………………………….…………………………………………………5
3. Under lay film ……………………..……………………………………………………………………………………………………………….5
4. Illustration of the possible combinations assemblies …………………………………………………………………………….6
4.1. Possibility of module’s shift in the slope direction of crawling …………………………………………………………...7
5. Preparation of the fasteners …………………………………………………………………………………………………………………8
6. Dimension of the photovoltaic field ………………………………………………………………………………………….……..9-10
6.1. Dimension of the zone of tiles to be removed ………………………………………………….………………….…………..10
7. Technical standard of the installation and Dimensioning of the Easy-Roof support ……………………….11-12
8. Principle of grounding ………………………………………………………………………………………………………………………..13
9. Assembly of instruction of the system Easy-Roof ………………………………………………………………………………..14
9.1. Field PV centered on rake direction.
9.1.1. Removal of the tiles …………………………………………………….………………………………………………..……..15
9.1.2. Positioning of the reference board ….……………………………………………………………………………..15-16
Installation of the skirt’s board ……………………………………………………………………………………….15-16
9.2. Installation of the batter for the PV field
9.2.1. Installation of the battens for assembly with 6 mounting brackets ……………………………………..17
9.2.2. Installation of the battens for assembly with 4 mounting brackets …………………………………18-19
9.2.3. Installation the leaning battens …………..……………………………………………………………………………..20
9.2.4. Skirt installation …………..……………………………………………………….…………………………………………….21
9.3. Field PV positioned at the eave
9.3.1. Removal of the tiles …………………………………..………………………………………………………………….……..22
9.3.2. Positioning of the reference board ……………………………………………….……………………………………..22
9.3.3. Installation of the battens ……………………………………………………………………………………………………23
9.3.4. Positioning of the field to the eave ………………………………..…………………………………………………….23
9.3.5. Installation of the bottom metal sheet ………………………………………………………………..…….24-25-26
9.4. Installation of under lay film ………………………………………………………..…………………………………………………27
9.5. Installation of the system Easy-roof ……………………………………………………………………………………………….27
9.5.1. Installation and fixing of the frames and middle brackets……………………………....28-29-30-31-32
9.5.2. Installation and fixing of the left flashings …………………………………………………………….………..33-34
9.5.3. Installation and fixing of the right flashings …………………………………………………………………….35-36
9.5.4. Installation and fixing of the end brackets ……………………………………..…………………………………….36
9.5.5. Installation and fixing of the top flashings……… …………………………………………….……………………..37
9.6. Installation of the Photovoltaic modules ………………………………………………………………………………………..38
9.7. Grounding …………………………………………………………………………………………………………………………………………39
10. Appendix
10.1. Position specific of the reference board for field PV on eave ………………………………………………………….41
No
n-c
on
trac
tual
info
rmat
ion
an
d v
isu
als.
Su
bje
ct t
o t
ech
nic
al a
me
nd
me
nts
wit
ho
ut
no
tice
.
Assembly guide for in roof mounting system Easy-Roof IRFTS
Standard model “d-3” 1676*1001 Portrait
(1) Dimensions of this batten intended for the support panel can vary according to the design of the frame and the geographical zone of the building site, see the chart p. 11 and 12.
3
Number Designation Item code
1 Frame panel P001D000V30
2 Left flashing P005HD00V02
3 Right flashing P006HD00V02
4 Top flashing P007D000V02
5 Double fixing clamp A002V02
6 Simple fixing clamp A001V02
7 Double bracket A004V02
8 Simple bracket A003V02
9 Stainless steel rounded end screw 6x40 V003V02
10 Stainless steel hexagon screw 5x35 V001V02
11 Stainless steel square nut M5 V002V02
12 Top left flashing (L mounting) P009D000V02
13 Top central flashing (H mounting) P011D000V02
14 Top right flashing ( L mounting) P010D000V02
15 Middle fixing clamp black A002V02N
16 End fixing clamp black A001V02N
17 End bracket black A003V02N
Parts provided in the kit
Optional parts
Number Designation
a Counter sunk head screw six lobes 5x60 stainless-steel(wood)
b Counter sunk head screw six lobes 5x30 stainless-steel(wood)
c skirt
d Batten 100x27 (1)
e Batten 40x13,5
f Batten 60x18
g Batten 180x18 (skirt)
Parts not provided in the kit
1)
1.1)
1.2)
No
n-c
on
trac
tual
info
rmat
ion
an
d v
isu
als.
Su
bje
ct t
o t
ech
nic
al a
me
nd
me
nts
wit
ho
ut
no
tice
.
Standard model “d-3” 1676*1001 Portrait
1
Parts representation
2 3
5 6
7 8
4
12 13 14
4
17 16 15
1.3)
No
n-c
on
trac
tual
info
rmat
ion
an
d v
isu
als.
Su
bje
ct t
o t
ech
nic
al a
me
nd
me
nts
wit
ho
ut
no
tice
.
(Burst View) Glossary
Marking of
moulded parts -
capital letters
Definition
Marking of
moulded parts -
small letters
Assembli
ngDefinition
d-3 frame a-2 Portrait size frame 1580 x 808
A-D Right flashing c Portrait size frame 1351 x 1001
A-G Left flashing d-3 Portrait size frame 1676 x 1001
A-H Top flashing f-2 Landscape size frame 1580 x 808
A-H-D Top right flashing e-2 Landscape size frame 1676 x 1001
A-H-G Top left flashing h Portrait size frame 1651 x 986
A-H-C Top central flashing
Standard model “d-3” 1676*1001 Portrait
Film under the roof
From a 40 degrees slope, we require the use of a film under the roof before fixing the Easy roof integration system . This under roof film must comply with regulations. Under 40 degrees please refer to roofing
regulations.
3 lateral flashings by frame height
5
1.4)
2)
3)
No
n-c
on
trac
tual
info
rmat
ion
an
d v
isu
als.
Su
bje
ct t
o t
ech
nic
al a
me
nd
me
nts
wit
ho
ut
no
tice
.
Use of differents flashings according to the configuration of the photovoltaic field
Multiple combination for the clearing of roof windows or chimney
Roof
window
AH AH
AHC
FRAME
FRAME
AHD AHG
AD
AG
AD
AG
FRAME
AD
AD
FRAME
Chim
ney
AD
AHD
AD
AH
FRAME
FRAME
FRAME FRAME FRAME
FRAME FRAME
FRAME
AH
AG
AG
AG
AG
FRAME
FRAME FRAME FRAME FRAME
FRAME
FRAME FRAME
FRAME
FRAME
FRAME FRAME
FRAME FRAME FRAME
AH AH
AG
AG
AD
AD
AG
AHG
AD
AHD
X column
1 line
Standard model “d-3” 1676*1001 Portrait
A-H-D
A-H-C
A-H-G
6
(3 Flashings)
(3 Flashings)
4)
No
n-c
on
trac
tual
info
rmat
ion
an
d v
isu
als.
Su
bje
ct t
o t
ech
nic
al a
me
nd
me
nts
wit
ho
ut
no
tice
.
Possible shift of the panels in the vertical direction
Shift with constant step
variable shift
X
2/3
1/3
Support batten 100 x 27 End clamp
and bracket
middle clamp and
bracket
frame
Standard model “d-3” 1676*1001 Portrait 7
4.1)
No
n-c
on
trac
tual
info
rmat
ion
an
d v
isu
als.
Su
bje
ct t
o t
ech
nic
al a
me
nd
me
nts
wit
ho
ut
no
tice
.
Parts to be prepared before assembly of the kit
Preparation of the fixing parts
Prepare the middle clamp (5) with the screws M5*35 TBHC (10) and square nuts (11).
Prepare the end clamp (6) with the screws M5*35
TBHC (10) and square nuts (11).
Prepare each end bracket (8) with a screw M5*35 TBHC (10).
Standard model “d-3” 1676*1001 Portrait 8
5)
No
n-c
on
trac
tual
info
rmat
ion
an
d v
isu
als.
Su
bje
ct t
o t
ech
nic
al a
me
nd
me
nts
wit
ho
ut
no
tice
.
12.5
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Cote X 1046 2067 3088 4109 5130 6151 7172 8193 9214 10235 11256 12277 13298 14319 15340 16361
Module number in length
Cote Y1 1850
2 3530
3 5210
4 6890
5 8570
6 10250
7 11930
Module
number in
height
Standard model “d-3” 1676*1001 Portrait
Ex: (1021 X 6) + (2 X 12.5) = 6151 Ex: (1021 X 12) + (2 X 12.5) = 12277
Ex: (1680 X 3) + 170 = 5210
1021 1021 12.5 12.5
180 172
Dimension of the photovoltaic field (Visible Part of the installation)
9
Dimension Y
Dimension X
6)
Dimension Y
Dimension X Width of the field (mm) (1021*Nbx)+(2x12,5)
Dimension of the photovoltaic field
Nby number of modules in the rake direction
Nbx number of modules perpendicular to the rake
Height of the field (mm) (1680*Nby)+170
No
n-c
on
trac
tual
info
rmat
ion
an
d v
isu
als.
Su
bje
ct t
o t
ech
nic
al a
me
nd
me
nts
wit
ho
ut
no
tice
.
Position of the field on the roof
Positioning of the photovoltaic field
Dimension A > Dimension X (for the value X to see page 9)
Dimension A must be positioned with the lower of the tiles.
40 mm MAXIMUM
40 mm MAXIMUM
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Cote L 1398 2419 3440 4461 5482 6503 7524 8545 9566 10587 11608 12629 13650 14671 15692 16713
Module number in length
Cote H 1 1998
2 3678
3 5358
4 7038
5 8718
6 10398
7 12078
Module
number in
height
Standard model “d-3” 1676*1001 Portrait
Ex:(1021 X 3) + (2 X 12.5) + 172+180 = 3440 Ex: (1021 X 12) + (2 X 12.5) + 172+180= 12629
Ex: (1680 X 3) + 318= 5358
Dimension of the Easy-Roof system
10
Dimension H
Dimension L
The length of the batten d* is equal to the dimension L + a sufficient length on each side to lean on the rafter
exterior to the frame.
* Reference nomenclature
6.1)
No
n-c
on
trac
tual
info
rmat
ion
an
d v
isu
als.
Su
bje
ct t
o t
ech
nic
al a
me
nd
me
nts
wit
ho
ut
no
tice
.
Standard model “d-3” 1676*1001 Portrait
The selection and the dimensioning of the battens supporting the EASY-ROOF system are made according to the type of roof structure intended to receive the in roof mounting system. The in roof mounting system is compatible with roofs with a slope from 10 to 50 °. Define using the chart below the dimension of the battens you can use for the assembly. The number of fixings points by PV modules can vary from 4 or 6 according to the batten which will have been selected for the implementation of PV field. The values of the chart below apply only for the geographical zones from 1 to 4 of the regulation snows and wind (NV65
– Eurocode 1) and for an altitude lower than 900m. For zone 5 a technical study and of feasibility will have to be made
on a case-by-case basis.
It is imperative to respect these instructions of dimensioning.
Technical standard
11
EASY ROOF format “d-3”: Document ETN V1
Wood structure (truss or rafters) center distance ≤ 600mmThickness of the battens tiles : 15 (1) 15 (2) 22 25-27 40
Dimension of the support batten : 200minix15 250minix15 180minix22 120minix27 100minix40
Type of assembly : 4 brackets 6 brackets 4 brackets 4 brackets 4 brackets
N°brackets End A003V02 A003V02 A003V02 A003V02 A003V02
Middle A004V02 A004V02 A004V02 A004V02 A004V02
Nb Screw/Fix. Batten 2 2 2 2 2
counter sunk head screw s ix lobes s ta inless -s teel 5x60/32 5x60/32 5x60/32 5x60/32 5x60/32
(Tightening of the clamp screws TBHc M5: 2,4Nm)
Wood structure (truss or rafters) center distance 600 mm ≤ & ≤ 900mmThickness of the battens tiles : 22 (3) 27 40
Dimension of the support batten : 200minix22 200minix27 100minix40
Type of assembly : 6 brackets 4 brackets 4 brackets
N°brackets End A003V02 A003V02 A003V02
Middle A004V02 A004V02 A004V02
Nb Screw/Fix. Batten 2 2 2
counter sunk head screw s ix lobes s ta inless -s teel 5x60/32 5x60/32 5x70/32
(Tightening of the clamp screws TBHc M5: 2,4Nm)
Metal truss 1500 mm (Height angle iron 40 mm)Angle iron thickness: 40 40
Dimension of the support batten : 130minix40 100minix40
Type of assembly: 4 brackets 6 brackets
N°brackets End A003V02 A003V02
Middle A004V02 A004V02
Nb Screw/Fix. Batten 2 2
wingteks 6,3x70 (ref. Etanco 288.883 or 288.889)
(Tightening of the clamp screws TBHc M5: 2,4Nm)
(1) On floor boarding thickness 15 mm
(2) Without floor boarding
(3) Not often with 900mm center distance
(4) ± 3mm
Type of roof structure and dimensionings of the batten for the system Easy Roof
7)
No
n-c
on
trac
tual
info
rmat
ion
an
d v
isu
als.
Su
bje
ct t
o t
ech
nic
al a
me
nd
me
nts
wit
ho
ut
no
tice
.
Standard model “d-3” 1676*1001 Portrait
Technical standard
12
Wood structure (Floor boarding in the rake direction on purlin with center distance 1500)
CAUTION: Support batten in the direction of rake
Thickness of the battens tiles: 15 15 22 25-27 40
Thickness of the boarding 18 (4) 18 (4) 18 (4) 18 (4) 18 (4)
Dimension of the support batten : 200minix15 130minix15 130minix22 110minix27 100minix40
Type of assembly: 4 brackets 6 brackets 4 brackets 4 brackets 4 brackets
N°bracket End A003V02 A003V02 A003V02 A003V02 A003V02
Middle A004V02 A004V02 A004V02 A004V02 A004V02
Nb Screw/Fix. Batten 3 3 3 3 3
counter sunk head screw s ix lobes s ta inless -s teel 5x60/32 5x60/32 5x60/32 5x60/32 5x60/32
(Tightening of the clamp screws TBHc M5: 2,4Nm)
Wood or metal structure (support batten on purlin with center distance 1500 mm)CAUTION: Support batten in the direction of rake
Dimension of the support batten : 220minix30 130minix40
Type of assembly: 6 brackets 6 brackets
N°bracket End A003V02 A003V02
Middle A004V02 A004V02
Nb Screw/Fix. Batten 3 3
counter sunk head screw s ix lobes s ta inless -s teel 5x60/32 5x70/32
Metal: wingteks 6,3x70 (ref. Etanco 288.883 or 288.889)
(Tightening of the clamp screws TBHc M5: 2,4Nm)
Assembly in edge of roof (rake) “D”:We impose an assembly in 6 brackets per module on the panels close to the rake
Type of assembly: 6 brackets
N°bracket End A003V02
Middle A004V02
Assembly in seaside (Band of the 3 kms) “D”:We impose an assembly in 6 brackets by panel on the full PV fieldUnder lay film is obligatory
Under lay film will be posed from the bottom of the field to the ridge if high profile tiles.
Under lay film will be posed from the bottom of the field to the top flashing if:
The high profile tiles are glued to the ridge
Flat tiles
Screws and nuts used for the screwing of the brackets and the flashings: material stainless A2
For the configurations of roofs not listed above, a technical study will have to be made on a case-by-case basis.
(1) On floor boarding thickness 15 mm
(2) Without floor boarding
(3) Not often with 900mm center distance
(4) ± 3mm
7)
These values are given as an indication. Refer to local Building Code.
No
n-c
on
trac
tual
info
rmat
ion
an
d v
isu
als.
Su
bje
ct t
o t
ech
nic
al a
me
nd
me
nts
wit
ho
ut
no
tice
.
To carry out earthing, several solutions are possible: a) To connect the ground wire directly to the PV module. b) To connect the ground wire on a middle bracket (5) for two PV modules.
Standard model “d-3” 1676*1001 Portrait 13
The link between PV module and the bracket connected to the ground will be made via the
fixing clamp. (see the implementation page 39
of this document)
fixing clamp
It is possible to carry out the connection between PV module and the middle bracket (5)
connected to the ground via a claw. (see the
implementation of the manufacturer)
Grounding of PV modules 8)
Claw on PV module
No
n-c
on
trac
tual
info
rmat
ion
an
d v
isu
als.
Su
bje
ct t
o t
ech
nic
al a
me
nd
me
nts
wit
ho
ut
no
tice
.
Instruction of assembly of the Easy-Roof system
Standard model “d-3” 1676*1001 Portrait
9)
* Reference nomenclature
14
(Left side of PV field) (Right side of PV field)
The length “L” of the battenss (d)* to be implemented must imperatively make all the width of PV field
implemented. For the value “L” to see the chart page 10 of this document.
If needed, add to this dimension “L” a sufficient length on each side of PV field so that the ends of the batten lean on the floor on the rafter exterior to the frame.
L
No
n-c
on
trac
tual
info
rmat
ion
an
d v
isu
als.
Su
bje
ct t
o t
ech
nic
al a
me
nd
me
nts
wit
ho
ut
no
tice
.
9.1.1)
Remove the tiles of the photovoltaic field, dimensions L X H (for L and H to see page 10)
1°) To set up the first support batten of reference d*. To position the batten to 430 mm minimum
compared to the top of the first tile in bottom of PV field. To screw the batten follow the recommendations page 11 and 12 to know the type and the number of screws to be set up by crossing of support. 2°) Set up the flooring of the skirt at 30 mm MAXIMUM at the top of the first tiles batten in bottom of
PV field. Use the wood of 40 X 13.5 (E) *, 60 X 18 (F), and 180 X 18 (G).
IMPORTANT: In any case the flooring of the skirt should not exceed the top of the tile. It will have to be
sufficiently low not to raise the end of the Easy-Roof frame in bottom of PV field (see explanation next page). Screw with screws stainless 5x60 milled head.
* Reference nomenclature
9.1.2)
Standard model “d-3” 1676*1001 Portrait
H
L
PV field centered on rake direction This section of the installation manuel relates to only the installations of PV field centered
in the rake direction. For the installations on the eave go directly on page 22 of this
document
15
batten support of reference (d)*
G
E
F
Lower batten
batten support of reference (d)* 1°) 2°)
Installation of the flooring for the skirt
No
n-c
on
trac
tual
info
rmat
ion
an
d v
isu
als.
Su
bje
ct t
o t
ech
nic
al a
me
nd
me
nts
wit
ho
ut
no
tice
.
9.1.2)
Standard model “d-3” 1676*1001 Portrait
Recommendation for the flooring of the skirt
16
1°) the top of the skirt board (G) * must never exceed the top of the tile.
(side view)
(side view)
2°) Be sure frame lean properly on the support batten (d)*. 3°) The frame’s bottom must not lean on the skirt board. Leave a minimum space for the installation of the skirt.
G
G
D
D
* Reference nomenclature
4°) the flooring as well as the skirt will have to be 2 tiles longer on each side of PV field.
g
g
0°
avoid reverse slope
(side view)
(side view)
Top of the batten
Top of the batten
No
n-c
on
trac
tual
info
rmat
ion
an
d v
isu
als.
Su
bje
ct t
o t
ech
nic
al a
me
nd
me
nts
wit
ho
ut
no
tice
.
Installation of the flooring for an assembly with 6 mounting brackets by PV modules
Stage 1: Position and screw the first batten 560 mm of the reference board (installed at the preceding stage). Stage 2: Position and screw the remaining boards to be installed by respecting a distance between centres of
560 mm.
Set up the horizontal flooring for the support of the frames with a number of batten (d)* equal to (3 X no. vertical PV modules) + 1 at the top for the top flashing. To screw the board, follow the recommendations page 11 and 12 to know the type and the number of screws to be used. If the roof has tiles batten, remove the ones being where the support batten will have to be.
Standard model “d-3” 1676*1001 Portrait
9.2.1)
* Reference nomenclature
support batten reference
2
2
2
2
Stage 2
Nb X 560 mm
560 mm
2
1 Stage 1
(View without the rafters and tiles battens)
17
(View without the rafters and battens)
No
n-c
on
trac
tual
info
rmat
ion
an
d v
isu
als.
Su
bje
ct t
o t
ech
nic
al a
me
nd
me
nts
wit
ho
ut
no
tice
.
Standard model “d-3” 1676*1001 Portrait
support batten reference
1
2
3
5
Stage 1
Stage 2
Stage 3
Stage 5
560 mm
1120 mm
1120 mm
560 mm
4 Stage 4
Installation of the flooring for an assembly with 4 mounting brackets by PV module
Stage 1: Position and screw the first board 1120 mm of the reference board (installed at the preceding
stage). Stage 2: Position and screw a second board 560 mm of the preceding one. Stage 3: Position and screw a third board 1120 mm of the preceding one. Stage 4: Repeat stages 2 and 3 as many times as necessary for the higher lines of modules.
Stage 5: Position and screw the last board to 560 mm of the preceding one.
Set up the horizontal flooring for the support of the frames with a number of batten (d)* equal to (3 X no. vertical PV modules) + 1 at the top for the top flashing. To screw the board, follow the recommendations page 11 and 12 to know the type and the number of screws to be used. If the roof has tiles batten, remove the ones being where the support batten will have to be.
9.2.2)
(View without the rafters and tiles battens)
18
(View without the rafters and battens)
* Reference nomenclature
No
n-c
on
trac
tual
info
rmat
ion
an
d v
isu
als.
Su
bje
ct t
o t
ech
nic
al a
me
nd
me
nts
wit
ho
ut
no
tice
.
On an assembly with 4 mounting brackets by module, it is necessary to add and fix battens on each side of
the PV field, with a thickness and width identical to the support board (d)*. These boards will be used for
the fixing of side Flashings. The battens must pass under the frame, and exceed this one of at least 200 mm MINI outside PV field. For a roof without tiles battens, it is imperatively necessary to add a horizontal batten thickness identical to the battens (d)* by line of frame, centered on the height of each line, over all the width of PV field.
Standard model “d-3” 1676*1001 Portrait
9.2.2)
* Reference nomenclature
19
Support board reference
560 mm
Installation of the flooring for an assembly with 4 mounting brackets by PV module
(Left side of PV field) (Right side of PV field)
To add battens
To add battens
To add boards
To add boards
560 mm
200 mm MINI
1°) Position and screw a batten to 560 mm of the preceding one in each interval of
1120 mm
2°) If necessary according to the recommendations, position and screw the battens all over the width of PV field leaning against the battens previously posed.
No
n-c
on
trac
tual
info
rmat
ion
an
d v
isu
als.
Su
bje
ct t
o t
ech
nic
al a
me
nd
me
nts
wit
ho
ut
no
tice
.
Installation of leaning battens
To ensure a good support where the frames overlap it is necessary to set up and to fix a horizontal batten every three support boards (d)* for the assemblies with six fixings, every 2 boards for the assembly with 4 fixings. Put those battens all over the width of PV field. Those battens will be the same thickness as the support boards (d)*. Position at 160 ± 10 mm of the lower board. It is imperative to make this operation for all the lines of frame of the PV field.
Standard model “d-3” 1676*1001 Portrait
9.2.3)
* Reference nomenclature
20
160 ± 10mm
batten support of reference
160 ± 10mm 3 boards
(View without the rafters and tiles battens)
160 ± 10mm 3 boards
(Left side of PV field) (Right side of PV field)
To add battens
To add
battens
160 ± 10mm
160 ± 10mm
Flooring with 6 mounting brackets by PV module
2 boards
(View without the rafters and tiles battens)
2 boards
Flooring with 4 mounting brackets by PV module
No
n-c
on
trac
tual
info
rmat
ion
an
d v
isu
als.
Su
bje
ct t
o t
ech
nic
al a
me
nd
me
nts
wit
ho
ut
no
tice
.
Standard model “d-3” 1676*1001 Portrait
9.2.4) Installation of the skirt Set up the skirt (recommendation mini width 420 mm). Attention not to stick the ends and the
higher edge, in order to be able to flip over the ends. The tiles covering on the flashing will be made according to the tiles model posed on the roof.
Position the top of the skirt to 150 mm MAXIMUM of the reference board (d)*. To make
sure that the tiles are covered with 150 mm MINI.
150 mm MAXIMUM
150 mm MINI
reference support board (d)
21
* Reference nomenclature
Make a flip over of 10 to 15 mm on the higher edge of the skirt all over the width
Make a flip over of 10 to 15 mm on the right and left ends of the skirt on all the height
(Left side of PV field) (Right side of PV field)
No
n-c
on
trac
tual
info
rmat
ion
an
d v
isu
als.
Su
bje
ct t
o t
ech
nic
al a
me
nd
me
nts
wit
ho
ut
no
tice
.
9.3.1)
Remove the tiles of the photovoltaic field, dimensions L X H (for L and H, see page 10)
Set up the first support board of referenceat 320 mm from the first batten or the eave batten. Screw the batten follow the recommendations page 11 and 12 to know the type and the number of screws to be used
* Reference nomenclature
9.3.2)
Standard model “d-3” 1676*1001 Portrait
H
L
support board reference (d)*
PV field positioned at the gutter
22
Installation of the Easy-Roof flooring
This section of the assembly guide relates only to the installations of PV field positionned at the gutter
CAUTION: The low part of PV field (with the gutter) must imperatively be on the same plan as the flooring of the system. In the contrary case the dimension of 320 mm is not applicable any more. It is necessary to move up the PV field in the rake direction. The dimension must be redefined (see annex N°1 page 41).
0°
avoid reverse slope
No
n-c
on
trac
tual
info
rmat
ion
an
d v
isu
als.
Su
bje
ct t
o t
ech
nic
al a
me
nd
me
nts
wit
ho
ut
no
tice
.
9.3.3)
* Reference nomenclature
9.3.4)
Standard model “d-3” 1676*1001 Portrait
Positioning of the field to the gutter
23
Set up the other support boards (d) of the Easy-Roof system, refer in the pages from 17 to 20 of this document.
Installation of the Easy-Roof flooring
Position the frame (1) in the rake direction using two screws of Ø 5 placed in the openings indicated and put them leaning against the reference board (d) in the rake direction
Replace the first tile at the left lower corner, position the first frame (1) at a distance of 40 mm MAXIMUM of the edge of the tile
40 mm MAXIMUM
Reference support board (d)*
No
n-c
on
trac
tual
info
rmat
ion
an
d v
isu
als.
Su
bje
ct t
o t
ech
nic
al a
me
nd
me
nts
wit
ho
ut
no
tice
.
Standard model “d-3” 1676*1001 Portrait
Installation of the bottom metal sheet 9.3.5)
The bottom metal sheet must be aligned with the frames on each side of PV field. Position all the frames of the first rank proceeding as indicated page 23. Make a marking at each
end on the wood. Then remove the frames by slightly them pushing up.
Marking
Marking
Cut the batten above the eave250 mm of each marking and remove it so the remaining batten is on
the same level as the reference board. If the eave board is too high, cut it in height over the entire
length of the batten removed previously.
250 mm 250 mm
24
No
n-c
on
trac
tual
info
rmat
ion
an
d v
isu
als.
Su
bje
ct t
o t
ech
nic
al a
me
nd
me
nts
wit
ho
ut
no
tice
.
Standard model “d-3” 1676*1001 Portrait
Installation of the bottom metal sheet of PV field 9.3.5)
To realize the bottom metal sheet, the A1 angle is equal to 90°+ the angle of inclination of the roof. Example: A1 = 90° +30° = 120°
the L1 dimension is defined by the position of the gutter. Define L1 so that the low end of the metal sheet
is at least 20 mm in the gutter. bracket-NOTE: this kind of metal sheet is applicable only for the PV field positionned at the gutter. See
paragraph 9.3.2 page 22.
(cross section) (cross section)
The length of the metal sheet can be variable. If it’s needed to use several metal sheets, those will
have imperatively to overlap of 100 mm MINI.
Metal sheet in transparency
Align the fold of the metal sheet with the
edge of the batten
25
No
n-c
on
trac
tual
info
rmat
ion
an
d v
isu
als.
Su
bje
ct t
o t
ech
nic
al a
me
nd
me
nts
wit
ho
ut
no
tice
.
Standard model “d-3” 1676*1001 Portrait
Installation of the bottom metal sheet of PV field 9.3.5)
Add a batten or a batten under the bottom metal sheet to support this one. This batten will at least make all the width of PV field. The thickness of this batten will be identical to the thickness of the support boards (d)*.
Align the batten with the higher edge of the bottom metal sheet
Bottom metal sheet in transparency
(View of top)
Set up and fasten the bottom metal sheet all over the width of PV field. Fasten only the top part of the bottom metal sheet.
26
* Reference nomenclature
No
n-c
on
trac
tual
info
rmat
ion
an
d v
isu
als.
Su
bje
ct t
o t
ech
nic
al a
me
nd
me
nts
wit
ho
ut
no
tice
.
Standard model “d-3” 1676*1001 Portrait
9.4)
9.5)
Installation of the film recuperator of condensation
From a 40 degrees slope, we require the use of a film under the roof before fixing the Easy roof integration system . This under roof film must comply with regulations. Under 40 degrees please refer to roofing regulations.
This section of the assembly guide relates to all the installations of PV field in medium of rake or at the gutter.
Installation of system EASY ROOF
27
No
n-c
on
trac
tual
info
rmat
ion
an
d v
isu
als.
Su
bje
ct t
o t
ech
nic
al a
me
nd
me
nts
wit
ho
ut
no
tice
.
Standard model “d-3” 1676*1001 Portrait
9.5.1) Installation of the EASY ROOF system
28
40 mm MAXIMUM
Position the frame (1) in the rake direction using two screws of Ø 5 placed in the openings indicated and put them leaning against the reference board (d)
Replace the first tile at the left lower corner, position the first frame (1) at a distance of 40 mm MAXIMUM of the edge of the tile
Support board reference (d)*
* Reference nomenclature
No
n-c
on
trac
tual
info
rmat
ion
an
d v
isu
als.
Su
bje
ct t
o t
ech
nic
al a
me
nd
me
nts
wit
ho
ut
no
tice
.
Standard model “d-3” 1676*1001 Portrait
9.5.1) Installation of the EASY ROOF system
29
Check the good alignment of the frames before screwing the brackets
1°) Place and interlock another frame above precedent.
2°) Place and interlock another frame on the right of the first frame, repeat the alignment of the operation page 28
3°) Place the superior middle bracket (7) and screw with screws 6x40 STAINLESS (9).
Do not put the other mounting brackets immediately. This operation will be carried out later.
No
n-c
on
trac
tual
info
rmat
ion
an
d v
isu
als.
Su
bje
ct t
o t
ech
nic
al a
me
nd
me
nts
wit
ho
ut
no
tice
.
Standard model “d-3” 1676*1001 Portrait
9.5.1) Installation of the EASY ROOF system
30
Check the good alignment of the frames before screwing the brackets
1 °) Place and interlock two other frame above and on the right of precedent.
2°) Place the superior middle bracket (7) and screw with screws 6x40 STAINLESS (9). Do not put the other mounting brackets immediately. This operation will be carried out later.
3°) If grounding is not done by connecting the cable directly to PV module, carry out this connection by
connecting a wire on the middle brackets (7). This way it grounds two PV modules. Connect only one
mounting bracket by PV module. Carry out this connection each second modules for each line of module.
No
n-c
on
trac
tual
info
rmat
ion
an
d v
isu
als.
Su
bje
ct t
o t
ech
nic
al a
me
nd
me
nts
wit
ho
ut
no
tice
.
Standard model “d-3” 1676*1001 Portrait
9.5.1) Installation of the EASY ROOF system
31
1°) Place and interlock all the other frames.
2°) Place the superior middle bracket (7) and screw with screws 6x40 STAINLESS (9). Do not put the other mounting brackets immediately. This operation will be carried out later.
Each 3 columns check the verticality and the parallelism of the frames by comparing the dimensions D1 and D2
D1 (D1=D2)
D2 (D2=D1)
D1 (D1=D2)
D2 (D2=D1)
No
n-c
on
trac
tual
info
rmat
ion
an
d v
isu
als.
Su
bje
ct t
o t
ech
nic
al a
me
nd
me
nts
wit
ho
ut
no
tice
.
Standard model “d-3” 1676*1001 Portrait
9.5.1) Installation of the EASY ROOF system
32
1°) Place all the remaining middle brackets (7). Make sure the bracket are centered in the frame’s housing. The brackets must be imperatively horizontal. Screw with screws 6x40 STAINLESS (9). Do not immediately put the end bracket. This operation will be carried out later.
Center the bracket in the vertical direction in the positioning hole (for dilation)
Place all the remaining middle bracket(7) to be posed in this zone. Screw with screws 6x40 STAINLESS (9).
Assembly with 4 brackets support by module Assembly with 6 brackets support by module
No
n-c
on
trac
tual
info
rmat
ion
an
d v
isu
als.
Su
bje
ct t
o t
ech
nic
al a
me
nd
me
nts
wit
ho
ut
no
tice
.
Standard model “d-3” 1676*1001 Portrait
9.5.2) Installation of the EASY ROOF system
33
1°) raise the frame slightly and place the first left flashing (2) under the frame. Align with the bottom of
the frame.
2°) Put a screw counter sunk head 5x30 stainless (b). Screw moderately.
3°) Put a screw counter sunk head 5x30 stainless (b) centered on the oblong hole. Screw moderately. VERY IMPORTANT, unscrew one turn, that is mandatory for the dilation. 4°) Raise the frame slightly and place the second left flashing (2) under the frame and above the first flashing. 5°) Center the oblong of the higher flashing on the hole of the lower flashing, put a screw counter sunk
head 5x30 stainless (b). VERY IMPORTANT, unscrew one turn, that is mandatory for the dilation.
6°) Put a screw counter sunk head 5x30 stainless (b). Screw
moderately.
No
n-c
on
trac
tual
info
rmat
ion
an
d v
isu
als.
Su
bje
ct t
o t
ech
nic
al a
me
nd
me
nts
wit
ho
ut
no
tice
.
Standard model “d-3” 1676*1001 Portrait
9.5.2) Installation of the EASY ROOF system
34
7°) Place and fix all remaining left flashings following the preceding instructions 4.5 and 6.
No
n-c
on
trac
tual
info
rmat
ion
an
d v
isu
als.
Su
bje
ct t
o t
ech
nic
al a
me
nd
me
nts
wit
ho
ut
no
tice
.
Standard model “d-3” 1676*1001 Portrait
9.5.3) Installation of the EASY ROOF system
35
1°) Place the first right flashing (3) over the frame. To align with the bottom of the frame.
2°) Put a screw counter sunk head 5x30 stainless (b). Screw moderately.
3°) Put a screw counter sunk head 5x30 stainless (b) centered on the oblong hole. Screw moderately. VERY IMPORTANT, unscrew one turn, that is mandatory for the dilation. 4°) Place the second right flashing (3) over the frame and above the first flashing. 5°) Center the oblong of the higher flashing on the hole of the lower flashing put a screw counter sunk
head 5x30 stainless (b). VERY IMPORTANT, to unscrew one turn, that is mandatory for the dilation.
6°) Put a screw counter sunk head 5x30 stainless (b). Screw
moderately.
No
n-c
on
trac
tual
info
rmat
ion
an
d v
isu
als.
Su
bje
ct t
o t
ech
nic
al a
me
nd
me
nts
wit
ho
ut
no
tice
.
Standard model “d-3” 1676*1001 Portrait
9.5.3) Installation of the EASY ROOF system
36
7°) Place and fix all remaining right flashings following the preceding instructions 4.5 and 6.
9.5.4)
Center the bracket in the vertical direction in the positioning hole (for dilation)
Place all the end brackets (8) to be posed in these zones. Screw with screws 6x40 STAINLESS (9).
Assembly with 4 brackets support by module
Assembly with 6 brackets support by module
No
n-c
on
trac
tual
info
rmat
ion
an
d v
isu
als.
Su
bje
ct t
o t
ech
nic
al a
me
nd
me
nts
wit
ho
ut
no
tice
.
Standard model “d-3” 1676*1001 Portrait
9.5.5) Installation of the EASY ROOF system
37
1°) Place the first top flashing (4) over the frame starting from the right line. Make sure that the top
flashing is well positioned and that it is in abutment against the frame.
2°) Put two screw counter sunk head 5x30 stainless (b). Screw moderately. VERY IMPORTANT, to unscrew
one turn, that is mandatory for the dilation.
Set up two screws counter sunk head 5x30 stainless (b).
Abutment against the frame
3°) Place all remaining top flashing(4) to be posed from right to left by following the preceding instruction 2.
No
n-c
on
trac
tual
info
rmat
ion
an
d v
isu
als.
Su
bje
ct t
o t
ech
nic
al a
me
nd
me
nts
wit
ho
ut
no
tice
.
Standard model “d-3” 1676*1001 Portrait
9.6) Installation of the EASY ROOF system
38
1°) Position the photovoltaic modules. For grounding, see page 39.
3°) Before tightening, raise approximately 3 MINI mm the PV so that it is not any more leaning on its
own weight. VERY IMPORTANT, this play is necessary for dilation.
4)° Fix the photovoltaic modules with the clamps. Use the end clamp (6) on the edge of the field and the
middle clamp (5) for the center, with screws M5*35 TBHC (10) and square nuts (11).
3 mm
2°) Set the height of the screw 3 mm lower than the top of the PV module.
PV module
(end bracket)
3 mm
(end clamp) (middle clamp)
Tightening torque 2.4 Nm
No
n-c
on
trac
tual
info
rmat
ion
an
d v
isu
als.
Su
bje
ct t
o t
ech
nic
al a
me
nd
me
nts
wit
ho
ut
no
tice
.
Standard model “d-3” 1676*1001 Portrait
9.6.1)
39
Put at the ground
If grounding is not done by connecting the cable directly to PV module, carry out the following operations.
1°) Locate the middle bracket connected to the ground during the assembly. (see p. 30)
Length of the clamp
Make scratches here on the PV module
(View with local cut)
Scratch on PV module
Option 1°) Scratch the top of the PV module frame above the brackets connected to the ground. This
ensure connection to the ground via the screws located on clamp.
2°) Make sure then that connection between the PV module and the bracket(5) is less than 2 Ohms.
Option 2°) Place the claw on the back side of the PV module where it will lean so that it is resting against the mounting bracket connected to the ground.
No
n-c
on
trac
tual
info
rmat
ion
an
d v
isu
als.
Su
bje
ct t
o t
ech
nic
al a
me
nd
me
nts
wit
ho
ut
no
tice
.
Standard model “d-3” 1676*1001 Portrait
9.7)
40
Put back the tiles, covering the top flashing up to the point formed by the flashing.
IMPORTANT: For the tiles with high profile, it is imperative to set up a self-adhesive
foam band on the top flashing before replacing the tiles.
Dimension D
For the covering of the side Flashings (2) and (3) it is imperative that the dimension D does not exceed 40 mm.
No
n-c
on
trac
tual
info
rmat
ion
an
d v
isu
als.
Su
bje
ct t
o t
ech
nic
al a
me
nd
me
nts
wit
ho
ut
no
tice
.
0°
0°
> 5°
Appendix 1
Standard model “d-3” 1676*1001 Portrait
Position specific of the reference board for PV field positionned at the gutter
41
“M” to be measured on the roof by observing the following condition
X (mm) = 313 (mm) + M
Reference support board (d)*
* Reference nomenclature
Avoid reverse slopes