DatacentreDatacentreOptimization Optimization for Cloudfor Cloud

Modular Design for achieving Modular Design for achieving Energy-EfficiencyEnergy-Efficiency

●Wesley LIMWesley LIM●Data Center Efficiency Practice●Sun Microsystems

Page 2: Datacentre Datacentre Optimization Optimization for Cloud for

2

AgendaAgenda● Today's Datacentre ChallengesToday's Datacentre Challenges● Best Practices to Future-proof Best Practices to Future-proof

DatacentreDatacentre● Sun's POD PrincipleSun's POD Principle● Sun Sun DatacentreDatacentre Efficiency Efficiency Consulting Services Consulting Services

Page 3: Datacentre Datacentre Optimization Optimization for Cloud for

3

Today's DatacentreChallenges

Page 4: Datacentre Datacentre Optimization Optimization for Cloud for

4

Demand Users Services Access

Power Costs Space Heat

2003 2005 NextGeneration

40120

800Watts perSquare Foot

Data Center

Ever-changing IT demands• Costs, Demand and Capacity are Colliding...

> Innovation in technology & businesses demands for compute capacity> Power and cooling costs surging, insufficient capacity> Limits to existing floor space and new real estate

Page 5: Datacentre Datacentre Optimization Optimization for Cloud for

5

200848 Blade Servers

768 Processor Cores28.5kW Heat Load

200014 x 3U Servers28 Processors2kW Heat Load

Rack Densities Increasing

27x More Processors>10x More Heat

Reality:More compute per watt

More watts per rack

Old racks now fit into asingle blade

Page 6: Datacentre Datacentre Optimization Optimization for Cloud for

6

Reality: Heterogeneous Data Centers

Industry average is between 4-6kw/cabinet> 20kw Skyscrapers will be integrated

Must deal with small buildings & skyscrapers

Page 7: Datacentre Datacentre Optimization Optimization for Cloud for

7

The Nature of Data Centers• Space, power, cooling and connectivity envelope

> Power and cooling most important> Don't deploy maximum capacity day one, but still build for the future

• Think watts per rack, not per square foot> Handle heterogeneity at the start> Forget about raised floors for cooling

• Rate of change> Be prepared to be more flexible

• Connectivity requirements> Ethernet, Fibre Channel, Infiniband

Page 8: Datacentre Datacentre Optimization Optimization for Cloud for

8

Best Practices to Future-Proof Your Data Center

Strategies to improve your Datacentre efficiency

Page 9: Datacentre Datacentre Optimization Optimization for Cloud for

9

Strategies for New / Greenfield Facility

• Design with key considerations:> Set your business goals> Determine cooling architecture - Heat load /

rack> Review power distribution approach> Determine your cabling strategy

Page 10: Datacentre Datacentre Optimization Optimization for Cloud for

10

Tier-IV Data Center Power Flow

HV Transformers ATS UPSs

Generators

External Batteries

PDUs

Chillers

CDUs CRAHs

InRowCoolers

IT Loads

ThermalStore

Raised Floor Support Space Real Estate

Grid

Pumps

A Bus

B Bus

Water A

Water B

Fire, Security, Lighting, etc..

2(N+1)

Page 11: Datacentre Datacentre Optimization Optimization for Cloud for

11

Tier-IV Data Center Power Losses

IT Loads

Raised Floor Support Space Real Estate

Fire, Security, Lighting, etc..

Chillers33%

UPSs, Transformers

12%

CRACs13%

Generator,Switching 1%

Misc2%

Systems33%

PDUs5%

2(N+1) Right-sizing = Matching Tier of your Data Center facility with Business requirement

Page 12: Datacentre Datacentre Optimization Optimization for Cloud for

12

Cooling System Issues

• Effective to < 6 kW per rack• Trend to increase raised floor height• Hot spots need more open floor tiles

> Reduces cooling for other racks> Mixture causes air delivery temperatures

to be reduced

• 60 percent of cooling does no work> Random intermixing of hot/cold air

Traditional Design: Computer room air conditioners (CRAC) or air handlers (CRAH) on the data center perimeter, cooling through a raised floor

Page 13: Datacentre Datacentre Optimization Optimization for Cloud for

13

The Limits of Raised Floors•High density raised floor deployments makes it difficult to maintain even and predictable server temperatures>Heat from one server can impact the reliability of another!

Page 14: Datacentre Datacentre Optimization Optimization for Cloud for

14

Limits to Raised Floors•Floor load consideration>IT loads increasingly heavier – racks are beginning to weigh beyond 1

Metric Ton each – and designing raised floors will soon require calculation of point loads and rolling loads (but would a facility provider be able to know these at design phase?)

•Increasing Infrastructure costs> Increasing heat densities require much higher – and more expensive –

raised floors height

•Decreasing energy efficiency>Raised floors can be very efficient at low heat densities but become much

less efficient as air velocities and sub-floor pressures increase•Increased design costs>High density raised floors require much more careful designs (i.e. CFD

modeling)

Page 15: Datacentre Datacentre Optimization Optimization for Cloud for

15

Limits to Raised Floors• Fire suppression

● Fire suppression is generally focus on isolation of smaller zones and release of a clean agent to extinguish the fire in that zone.

● With raised floor, you instantly double the number of zones you must monitor, and deploy fire suppression systems into.

• Cleanliness● Unless it was installed yesterday, all sort of dirt, dust, debris will

accumulate and lurk beneath every raised floor in actual production.

● Pollutants and contaminants in the air will lead to higher risk of failure.

Page 16: Datacentre Datacentre Optimization Optimization for Cloud for

16

Cooling System SolutionContaining the hot aisle and adding closely coupled cooling puts cooling capacity where it is needed

• POD is self-contained from a cooling perspective● It removes its own heat, matching load● Room air conditioning to meet habitation requirements

• POD eliminates random intermixing of air● Data center inlet temperatures can be raised, safely

● POD handles hot spots● Modular, plug-in units can be added and moved to support

heterogeneous, rapidly changing environments

Page 17: Datacentre Datacentre Optimization Optimization for Cloud for

17

Deploy Closely Coupled CoolingUnderstanding the differences between room-oriented, row-oriented and rack-oriented cooling

• Targeted right sized cooling where it is required

• Efficient and Optimized air flow

Page 18: Datacentre Datacentre Optimization Optimization for Cloud for

18

In-Row Cooling with Hot Aisle Containment

Page 19: Datacentre Datacentre Optimization Optimization for Cloud for

19

Overhead Cooling

Page 20: Datacentre Datacentre Optimization Optimization for Cloud for

20

Power Distribution Issues

• Consumes valuable floor space• Imposes cooling load• Cables impede airflow• Changes

> Requires time and expense> Exposes all connected systems to risk and

downtime> Difficult to change and cables often

abandoned in place

• Cable home runs wastes copper

Traditional Design: PDUs on the floor with whips going to racks; or breaker panels with whips

Page 21: Datacentre Datacentre Optimization Optimization for Cloud for

21

Electrical Busway Solution

• Requires no floor space or cooling> Transformers moved outside the

data center

• Snap-in cans with short whips> Non-disruptive> Reduced copper consumption> No in-place abandonment> Significant time reduction – from

months to minutes

• Supports multiple Tier levels> Use multiple busways

Modular overhead, hot-pluggable busway with conductors to handle multiple voltages and phases

Page 22: Datacentre Datacentre Optimization Optimization for Cloud for

22

Cabling Issues

• Difficult to change> Cable trays are static> Interconnect mechanisms change more

frequently

• Huge amounts of cable per rack> Rack of 1U or blade servers can have

>300 cables

• Wastes copper, increases weight• Increasing density makes the

problem worse

Traditional Design: Home run cabling from each rack to centralized intermediate distribution frames (IDFs)

Page 23: Datacentre Datacentre Optimization Optimization for Cloud for

23

Cabling Solution

• Easy to change• Easy to scale• Cable lengths are short• Relatively small number of uplinks

to aggregation layer switching• Localizing switching simplifies

design and creates building blocks – rooms inside of rooms

• Can cut cabling costs by up to 75%

Patch panels with expansion capacity at each rack position, move IDFs into PODs to make them more self-sufficient

Page 24: Datacentre Datacentre Optimization Optimization for Cloud for

24

Sun's POD Principle

Building Block for the Future

Page 25: Datacentre Datacentre Optimization Optimization for Cloud for

25

Traditional Data Center designs vs.Next-Generation Data Center

Traditional Datacentre designs:•Lower efficiency, high PUE, high OPEX•As business and technology changes, adaptability of DC to future needs may require modifications

Next-Generation Datacentre designs:•Based on Sun's POD Principle•Higher efficiency / PUE, lower OPEX•Modular, scalable, flexible•Future-proofed

Page 26: Datacentre Datacentre Optimization Optimization for Cloud for

26

Modular POD ComponentsPhysical Design● Influenced by cooling, brick and mortar

and/or container

Cooling – Closely Coupled● In-row or overhead, hot-aisle

containment, and passive

Power Distribution● On-tap, overhead or under-floor

busway

Cabling● Recommended localized switching in

each POD

Page 27: Datacentre Datacentre Optimization Optimization for Cloud for

27

Sun's POD Principle

• Unit of Scale for a data center, ~20 racks – building block

• Self-contained, independent of the room• Efficiency achieved from putting

resources where they are needed> Bringing cooling closer to the heat source

• Flexibility from modular, snap-in systems that scale POD components up and down

Small, self-contained group of racks that optimize power, cooling and cabling efficiencies based around a common hot or cold aisle

Page 28: Datacentre Datacentre Optimization Optimization for Cloud for

28

KPI's & Strategies for a Service Provider

Page 29: Datacentre Datacentre Optimization Optimization for Cloud for

29

KPI : Power Usage Efficiency•The power efficiency of a data center is described by the relationship between the power used by the IT, and the total power used by the facility>Typically expressed as a number or as a percent:>e.g. PUE of 2.0 = DCE of 50%*

IT Equipment Power

IT Equipment Power + Infrastructure Power Power UtilizationEfficiency (PUE) =

IT Equipment Power + Infrastructure Power

IT Equipment Power Data CenterEfficiency (DCE) = %

* PUE and DCE are Green Grid terms – which differ from Uptime terms, etc …

Page 30: Datacentre Datacentre Optimization Optimization for Cloud for

30

KPI : Data Center Efficiency•Space Utilization Efficiency – How much of the space you have built are usable/chargeable

Space Utilization Efficiency = Chargeable floor space

Total facility floor space

•Operating Leverage>A higher Operating leverage means greater fixed cost commitments that have to be met even when utilization / chargeable volume declines>Objective is to lower fixed costs – i.e. unavoidable running costs

Operating Leverage = Fixed Costs

Total Costs

Page 31: Datacentre Datacentre Optimization Optimization for Cloud for

31

KPI : Data Center Efficiency•Marginal Cost and Marginal Revenue>Marginal Cost (MC) is the change in total cost associated with a unit change in quantity.>Marginal Revenue (MR) is the rate of change in total revenue with respect to quantity sold.>Marginal Analysis aids decision making that can be applied to financial decisions. In order to maximize profits, MR = MC

Marginal Cost = Change in Total Cost

per kW of new IT load hosted

Marginal Revenue = Change in Total Revenue

per kW of new IT load hosted

= d TC

d Q (kW)

= d TR

d Q (kW)

Page 32: Datacentre Datacentre Optimization Optimization for Cloud for

32

Top 5 Efficiency Strategies for a Facility Service Provider / SSO1)Improve Cooling Efficiency2)Improve power distribution3)Match Infrastructure to SLAs by Multi-Tier/Zone4)Growing with Ease - Applying Modularity5)Cost Control – Metering & Charging

Page 33: Datacentre Datacentre Optimization Optimization for Cloud for

33

1. Improve Cooling Efficiency•Right-size the cooling system>Measure and monitor cooling capacity vs IT load>Implement capacity management for the cooling system•Optimize chiller performance>Use free cooling (where available), airside or waterside economizers, variable frequency drives, thermal buffers•Optimize air flow within the room>Ensure the room is well sealed, use hot/cold aisles, seal cut-outs, optimize perforated tile layout, increase raised floor height, use blanking panels, high airflow doors and hot-air containment•Adopt new ASHRAE guidelines

Page 34: Datacentre Datacentre Optimization Optimization for Cloud for

34

New ASHRAE Guidelines

Page 35: Datacentre Datacentre Optimization Optimization for Cloud for

35

2. Improve Power Distribution•Right-size the power delivery system>Monitor power usage throughout the system

• E.g. UPS, PDU, Power Strip>Implement capacity planning for the power delivery system>Consider charge backs for power consumption•Deliver higher voltage circuits to the rack>E.g. 3 Phase, 208V today - perhaps higher in future>Minimizes power losses and infrastructure provisioning (less cables, conduits, breakers, etc..)•DC power is not recommended at this point>Higher costs, insufficient standards, fewer products, fewer trained people, etc..>Energy savings are not substantially better than high voltage power deliver

Page 36: Datacentre Datacentre Optimization Optimization for Cloud for

36

3. Match Infrastructure to SLAs by Multi-Tier/Zone

•Customer segmentation - Infrastructure capacity should be right-sized for your customer's IT load, service levels, risk tolerance>e.g. – Capacity (kW), Availability (%), Scheduled downtime (min/yr), Single Failure vs. Multi-Failure•Infrastructure needs to be over-provisioned for sites with high Tier ratings. This has a big impact on power efficiency>e.g. - Tier-IV site at 30% utilization is only 33% efficient*•New architectures are evolving to address this>e.g. - Multi-tier, Modified Tier-IV>Zoning the facility to different tiers, catering to different customer segments with differing needs, e.g. high-density zone with localized/closely-coupled cooling and a general/low-density zone with room-oriented cooling.•These architectures require less infrastructure and energy, but are more complex to design, build and maintain

Page 37: Datacentre Datacentre Optimization Optimization for Cloud for

37

4. Growing with Ease - Applying Modularity

•Minimizing CAPEX investment by enabling growth through modular design and allowing charge-back to your customers>Power distribution>Cooling systems>Cabling Structure

5. Cost Control – Metering & Charging•Unable to anticipate what IT load each new customer will bring in?•Metering on actual usage at rack / suite level>Charge-back for actual power utilization

Page 38: Datacentre Datacentre Optimization Optimization for Cloud for

38

Sun Datacentre Efficiency Consulting Services

Page 39: Datacentre Datacentre Optimization Optimization for Cloud for

39

Sun Datacentre Efficiency Portfolio

*All projects are considered turn-key solutions in which Sun oversees entire project management of the solution including vendor and partner management, deployment schedule, leveraging proven best practices, quality assurance and delivering business results to budget.

IT Business Strategy Consulting• Eco Policy/Social Resp. • Legislative, DR• Availability/Agility/TTM

• Open Work Consulting

• Long-term planning• Refresh or Replace• Technology options• Sourcing strategies

• Site Selection & Site Acquisition• Design Services

> Lifecycle Planning> Building Information Modeling

• Build, Commission, Move, Populate

Datacenter Strategy Datacenter Design & Build

• Application Modernization• Infrastructure

Modernization

• Eco Consulting & Assessments

• Consolidation Services • Migration Services• Virtualization Services

• Managed & Remote Operations• Virtualization Best Practices

Datacenter Modernization Datacenter Optimization Datacenter Operations

Page 40: Datacentre Datacentre Optimization Optimization for Cloud for

40

DCE Cloud Services – Evaluate your readiness●Business

Key business drivers & KPIsEconomic environmentCompetitive landscapeCapex and Opex targetsAsset management & disposalCompliance, security, privacyGovernance, decision making

●Organization/CultureStructure & logisticsCulture orientation & emphasisDecision making topologySecurity & privacy policies, trainingCompliance, governance, trainingInformation sharing &

communicationInformal norms & policies

●Technology24 month technology roadmapCurrent “Cloud-like”

initiatives/POCsBilling, metering, SLAsDeployment & support processManagement, tracking, reportingCompliance, security, privacyResources & training

Operations IT Infrastructure support Datacenter/facility plans: -consolidation, migration -build, co-locate, other Deployment & support process Management, tracking, reporting Resources & training

Page 41: Datacentre Datacentre Optimization Optimization for Cloud for

41

Data Centre Facility Design (Greenfield) •Core Concepts>Holistic perspective – balancing availability vs. efficiency>Scalable, repeatable, modular architecture>Modular right-sizing power and cooling >Simplified, flexible cabling and plumbing>Facilitates growth>Vendor independent>Lifecycle Planning - Flexible & Scale cost with use>Building Information Modelling (BIM)

Entering a New Age of Engineered Datacentre

Page 42: Datacentre Datacentre Optimization Optimization for Cloud for

42

Data Center design

Example of BIM model for one engagement

Page 43: Datacentre Datacentre Optimization Optimization for Cloud for

43

Data Center design

Example of site model for one engagement

Page 44: Datacentre Datacentre Optimization Optimization for Cloud for

44

Data Center design

Example of data center layout for one engagement

Page 45: Datacentre Datacentre Optimization Optimization for Cloud for

45

Data Center design

Example of data center layout for one engagement

Page 46: Datacentre Datacentre Optimization Optimization for Cloud for

46

A group of racks or benches with a common hot or cold aisle used as a building block to simplify data-center design for

power, cooling, & cabling

The POD Architecture

Vendor Independent, Slab or Raised Floor, Flexible, Scalable, High Density

Page 47: Datacentre Datacentre Optimization Optimization for Cloud for

47

A group of racks or benches with a common hot or cold aisle used as a building block to simplify datacenter design for power, cooling, & cabling

The POD Architecture

Vendor Independent, Slab or Raised Floor, Flexible, Scalable, High Density

Page 48: Datacentre Datacentre Optimization Optimization for Cloud for

48

Additional Thoughts

Page 49: Datacentre Datacentre Optimization Optimization for Cloud for

49

Best Practices = Competitive Weapon•Align Facilities, IT & Engineering>Partnering nets significant short term & long term savings http://www.sun.com/aboutsun/environment/docs/aligning_business_organizations.pdf

•Hardware Replacement>Apply new hardware solutions and extend the life of your DC http://www.sun.com/aboutsun/environment/docs/creating_energy_efficient_dchw_consolidation.pdf

•Simplify Datacentre design with the POD concept>Power: Modular, Scalable, Smart http://www.sun.com/aboutsun/environment/docs/powering_energy_efficientdc.pdf

>Cooling: Adaptable, Scalable, Smart http://www.sun.com/aboutsun/environment/docs/cooling_energy_effiicientdc.pdf

>Cabling: Distributed vs Centralized http://www.sun.com/aboutsun/environment/docs/connecting_energy_efficientdc.pdf>Measurement: Visibility gives you power to control http://www.sun.com/aboutsun/environment/docs/accurately_measure_dcpower.pdf

•Video: http://www.sun.com/aboutsun/environment/media/datacenter_tour.xml

Page 50: Datacentre Datacentre Optimization Optimization for Cloud for

50

Sun Blueprint•Released June 10, 2008•Download: http://sun.com/blueprints•1st of 9 chapters to be released over the next 12 months

Page 51: Datacentre Datacentre Optimization Optimization for Cloud for

Wesley [email protected]

Thank You

Page 52: Datacentre Datacentre Optimization Optimization for Cloud for

52

Other Successful Sites Globally

Camberley (UK)

Prague (CZ) Bangalore (India)

Trondheim (Norway)

●Consolidation and relocation of EMEA mission critical datacenter●80% space reduction – 2,200 ft2 (204 m2) down to 450 ft2 (42 m2)●3,600 ft2 (334 m2) total build-out●50% utility reduction●Base cooling with Liebert XD (first install of XDO in EMEA)

●Datacenter supporting the growing engineering site●2,600 ft2 (242 m2) of modular datacenter●Liebert XD, base cooling under 10%, first install of XD in EMEA●Highly efficient, expandable datacenter

●50%+ reduction on equipment footprint●17% power reduction●154% Compute capacity increase●3,000 ft2 (280 m2) Datacenter●16 Datacenters down to 1●Innovative design in the region - PCQuest award for best IT implementation in 2007

●Consolidation of four R&D labs into new datacenter●Database stress testing●High density – 10kW/rack, expandable to 16kW/rack●1,190 ft2 (110 m2) datacenter●Second highest density in our portfolio

Reality:Modular, scalable, fully redundant datacenter supporting long

term growth.

Page 53: Datacentre Datacentre Optimization Optimization for Cloud for

53

Data Center Space Constraints

•The single biggest reason cited for running out of capacity is insufficient space (39% of respondents)

Page 54: Datacentre Datacentre Optimization Optimization for Cloud for

54

Data Center Heat Densities

Page 55: Datacentre Datacentre Optimization Optimization for Cloud for

55

Why do we care about Heat?•Hot servers are less reliable than cool ones>For every increase of 7'C above 21'C, long-term electronics reliability falls by 50%

•In order to maintain correct server temperatures, ASHRAE recommends server inlet temperatures remain between 20'C to 25'C•The temperature of a server is directly related to the power it uses (kW) and the air it draws (CFM)

ASHRAE: American Society of Heating, Refrigerating and Air-Conditioning Engineers

Page 56: Datacentre Datacentre Optimization Optimization for Cloud for

56

Raised Floor Cooling•“The hardware manufacturer shall design the equipment ... for a temperature change from intake to exhaust (delta T) of not less than 15'F nor more than 20'F.”* - Uptime Institute

CFM: Cubic Feet per Minute; Measurement of air volume velocity and is often used in measuring air flow from cooling diffusers.

Page 57: Datacentre Datacentre Optimization Optimization for Cloud for

57

Cooling Capacity per Tile•4kW of IT load requires about 600 CFM of airflow – pretty much the maximum for a single tile! >3.5kW is 1 Ton of AC per tile!

Page 58: Datacentre Datacentre Optimization Optimization for Cloud for

58

In Row Cooling Requires Less PowerExample Using Overhead Cooling Units

Annual Power Consumption

0.00

0.10

0.20

0.30

0.40

0.50

0.60

Traditional CWCRAC @

100% Capacity

Traditional CWCRAC @

50% Capacity

Liebert XD/XDV @

100% Capacity

Liebert XD/XDV @

50% Capacity

kW p

ow

er t

o c

oo

l 1 k

W o

f se

nsi

ble

hea

t

Fan

Pump (XD)

Pump (CW)

Chiller

27% Lower

32% Lower

Input Power - ComparisonInput Power - Comparison

Overhead rack-based cooling @ 100% CapacityOverhead rack-based cooling @ 50% Capacity