Upload
vpmohammed
View
218
Download
0
Embed Size (px)
Citation preview
8/13/2019 Data Rates-CD Works-Page 3
1/21
CANAL CD WORKS
RATE ANALYSIS UNIT : 14.00 cum
A. MATERIALS:
Sl No Unit Amount
in Rs.
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total Rs: 0.00
Add for small Tools and Plants @ 1% Rs: 0.00
Add for Contractor's Profit @ 10% Rs: 0.00
Add for Contractor's Overheads @ 5% Rs: 0.00
Total cost of Materials : Rs: 0.00
B. MACHINERY:
Sl No Unit Amount
in Rs.
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total Rs: 0.00
Contd
B. MACHINERY ( Contd ) :
Sl No Unit Amount
in Rs.
Contd
Add for small Tools and Plants @ 1% Rs: 0.00
Add for Contractor's Profit on DPOL / Energy @ 10% Rs: 0.00
Add for Contractor's Overheads @ 5% Rs: 0.00
Total hire charges of Machinery : Rs: 0.00
C. LABOUR:
Sl No Unit Amount
in Rs.
1 Heavy mazdoor Day 2.00 132.00 264.00
0.00 0.00 0.00
Total Rs: 264.00
Add for small Tools and Plants @ 1% Rs: 2.64
Add for Contractor's Profit @ 10% Rs: 26.40
Add for hidden cost on Labour @ 15% Rs: 39.60
Add for Contractor's Overheads @ 5% Rs: 13.20
Total cost of Labour : Rs: 345.84
ABSTRACT:
A. Cost of Materials including royalty charges Rs: 0.00
B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 345.84
TOTAL Rs: 345.84
Add for enabling works @ 1.10% Rs: 3.80
Total cost of 1.5 m additional lift for 14.00 cum Rs: 349.64
Rate per cum Rs: 25.00
SECTION: CANAL C.D WORKS. YEAR : 2010-11 ITEM No: 14
Quantity Rate
in Rs.
Rate
in Rs.
Quantity Rate
Description
Perticulars
Description
Description Quantity Rate
in Rs.
Quantity
in Rs.
40
8/13/2019 Data Rates-CD Works-Page 3
2/21
CANAL CD WORKS
ITEM: Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than
20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded
aggregates for sub-structure works including cost of all materials, machinery, labour,
formwork, scaffolding, cleaning, batching,mixing, placing in position,levelling, vibrating, finishing,
curing etc., complete with initial lead upto 50 m and lift upto 1.5.00 m from surface.
( Cement content : 330 kg / cum with use of super plasticiser )
DATA:For 1 cum CC :- Coarse aggregates : 0.80 cum Blending ratio : 65 :35
Fine aggregate : 0.45 cum Cement content : 330 kg Super plasticizer : 1.00 ltr
Wastage : 1 % for cement and 2 % for coarse & fine aggregates.
Consider 300 / 200 ltr capacity mixer and 50 kg cement per mix for use of 20 mm down CA.
Equivalent volume batching using 0.3 x 0.3 x 0.3 m size boxes assumed for batching of
coarse and fine aggregates.
1. Quantity of concrete per shift :
Cycle time for batching / mixing / unloading 1 mix :
Batching 20-10 mm CA ( 0.079 cum ) : 3.00 min
Batching 10 mm & below CA parellel activity : ---
Batching fine aggregate parellel activity : ---
Batching cement parellel activity : ---
Loading mixer drum & miscellaneous : 1.00 min
Mixing and unloading parellel activity : ---
Add for possible delays in any of the activity : 0.50 min
Total : 4.50 min
No. of mixes per day with 50 min / hr working ( 50 x 8 / 4.5 ) : 89 mixes
Output of CC for 89 mixes ( 89 x 50 / 330 ) say : 13.50 cum
Consider 13.50 cum concrete for rate analysis.
2. Requirement of materials:
Cement for mix with 1 % wastage ( 13.50 x 330 x 1.01 ) : 4500 kg
Cement for incidental works @ 5 kg / cum ( 13.50 x 5 ) : 68 kg
Coarse aggregate 20-10 mm size range ( 13.50 x 0.8 x 0.65 x 1.02 ) : 7.15 cum
Coarse aggregate 10-4.75 mm size ( 13.50 x 0.8 x 0.35 x 1.02 ) : 3.85 cum
Fine aggregate ( 13.50 x 0.45 x 1.02 ) : 6.20 cum
Super plasticiser ( 13.50 x 1.00 x 1.02 ) : 13.75 ltrs
3. Requirement of machinery :
Deploy 300 / 200 ltr capacity concrete mixer for 8 hours for production of concrete.
Deploy 1 Needle vibrater 40 mm dia for 8 hours for vibrating concrete.
Deploy 1 Pump 5 hp for 0.5 hour for water required for concrete mixing / curing / cleaning etc.
Deploy 1 Water tanker 8000 ltr capacity for 1 hour for water required for concrete / curing etc.
4. Formwork & scaffolding :
Consider normal shuttering as concrete is laid in smaller lifts.
Shuttering at 2 sqm / cum of concrete considered for substructure / super structure works.
Shuttering @ 2.00 sqm per cum of concrete ( 13.50 x 2 ) : 27.00 sqmScaffolding / supports for sub / super structure concreting assumed @ 25 % of cost of shuttering.
5. Requirement of workforce ( other than machinery crew ) :
Consider batching of materials and conveyance & laying of concrete by manual labour.
Maistry : 1 No.
Mason Cl I : 1 No.
Heavy mazdoor:
For batching cement : 2 Nos.
For batching 20-10 mm CA : 3 Nos.
41
8/13/2019 Data Rates-CD Works-Page 3
3/21
CANAL CD WORKS
For batching 10-4.75 mm CA : 2 Nos.
For batching FA : 3 Nos.
For remixing & filling mortar pans : 2 Nos.
For loading mortar pans : 2 Nos.
For lift involved for sub / super structures ( lift upto 6 m ) : 2 Nos.
For unloading mortar pans : 2 Nos.
For assisting Mason : 1 No.
Light mazdoor:
For conveying concrete @ 1 per cum : 14 Nos.
For cleaning, curing & miscellaneous : 1 No.
Labour for shuttering per sqm ( Annexure-B Item-8 ) @ Rs: 33.17
Labour for erection & dismantling scaffolding @ 25 % of cost of labour for shuttering.
6. Use rate of materials :
Use rate of shuttering per sqm for 40 uses ( Annexure-A Item-8 ) @ Rs: 151.07
RATE ANALYSIS UNIT : 13.50 cum
A. MATERIALS:
Sl No Unit Amount
in Rs.
1 Cement for mix kg 4500.00 4.00 18000.00
Cement for incidentals @ 5 kg / cum kg 68.00 4.00 272.00
2 Coarse aggregate 20-10 mm cum 7.15 520.00 3718.00
Coarse aggregate 10 mm below cum 3.85 669.00 2575.65
3 Fine aggregate ( screened ) cum 6.20 199.00 1233.80
4 Super Plasticizer ltr 13.75 75.00 1031.25
5 Use rate of shuttering sqm 27.00 151.07 4078.76
Scaffolding @ 25 % of shuttering 1019.69
6 Sundries LS 0.50 30.00 15.00
Total Rs: 31944.15
Add for small Tools and Plants @ 1% Rs: 319.44
Add for Contractor's Profit @ 10% Rs: 3194.42
Add for Contractor's Overheads @ 5% Rs: 1597.21
Add Royalty charges on CA @ ( Included in material rates ) Rs: 0.00
Add Royalty charges on FA @ ( Included in material rates ) Rs: 0.00
Total cost of Materials : Rs: 37055.22
B. MACHINERY:
Sl No Unit Amount
in Rs.
1 Concrete mixer 300 / 200 ltr ( diesel ) Hour 8.00 42.00 336.00
Fuel / Energy charges Hour 8.00 55.00 440.002 5 hp pump ( diesel ) Hour 0.50 7.00 3.50
Fuel / Energy charges Hour 0.50 55.00 27.50
3 Water tanker 8000 ltr Hour 1.00 268.00 268.00
Fuel / Energy charges Hour 1.00 208.00 208.00
4 Needle vibrator 40 mm dia ( petrol ) Hour 8.00 8.00 64.00
Fuel / Energy charges Hour 8.00 15.00 120.00
Total Rs: 1467.00
Add for small Tools and Plants @ 1% Rs: 14.67
Description
Perticulars
in Rs.
Quantity Rate
Quantity Rate
in Rs.
42
8/13/2019 Data Rates-CD Works-Page 3
4/21
CANAL CD WORKS
Add for Contractor's Profit on DPOL / Energy @ 10% Rs: 79.55
Add for Contractor's Overheads @ 5% Rs: 73.35
Total hire charges of Machinery : Rs: 1634.57
C. LABOUR:
Sl No Unit Amount
in Rs.
1 Crew for Concrete mixer Hour 8.00 75.10 600.80
2 Crew for Pump Hour 0.50 35.80 17.90
3 Crew for Water tanker Hour 1.00 56.70 56.70
4 Crew for Vibrator Hour 8.00 53.30 426.40
5 Mason Class-I Day 1.00 159.00 159.00
6 Maistry Day 1.00 141.50 141.50
7 Heavy mazdoor
for batching materials Day 10.00 132.00 1320.00
Contd
C. LABOUR ( Contd ) :
Sl No Unit Amount
in Rs.
Contd
for loading mortar pans Day 4.00 132.00 528.00
for laying Day 5.00 132.00 660.00
8 Light mazdoor
for conveying concrete Day 14.00 130.50 1827.00
for cleaning / washing / curing Day 1.00 130.50 130.50
9 Labour cost for shuttering sqm 27.00 33.17 895.46
Labour cost for scaffolding @ 25 % 223.86
Total Rs: 6987.12
Add for small Tools and Plants @ 1% Rs: 69.87
Add for Contractor's Profit @ 10% Rs: 698.71
Add for hidden cost on Labour @ 15% Rs: 1048.07
Add for Contractor's Overheads @ 5% Rs: 0.00
Total cost of Labour : Rs: 8803.77
ABSTRACT:
A. Cost of Materials including royalty charges Rs: 37055.22
B. Hire charges of Machinery Rs: 1634.57
C. Cost of Labour Rs: 8803.77
TOTAL Rs: 47493.56
Add for enabling works @ 1.10% Rs: 522.43
Total cost for 13.50 cum Rs: 48015.98
Rate per cum Rs: 3557.00
Rate approved per cum Rs: 3557.00
Note : For every additional lift of 1.5 m beyond 1.5 m from surface add / cum Rs: 25.00
SECTION: CANAL C.D WORKS. YEAR : 2010-11 ITEM No: 15
ITEM: Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than
15 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded
aggregates for sub-structure works including cost of all materials, machinery, labour,
Description
Description
Quantity Rate
in Rs.
Quantity Rate
in Rs.
43
8/13/2019 Data Rates-CD Works-Page 3
5/21
8/13/2019 Data Rates-CD Works-Page 3
6/21
CANAL CD WORKS
RATE ANALYSIS UNIT : 13.50 cum
A. MATERIALS:
Sl No Unit Amount
in Rs.
1 Cement for mix kg 3682.00 4.00 14728.00
Cement for incidentals @ 5 kg / cum kg 68.00 4.00 272.00
2 Coarse aggregate 20-10 mm cum 7.15 520.00 3718.00
Coarse aggregate 10 mm below cum 3.85 669.00 2575.65
3 Fine aggregate ( screened ) cum 6.20 199.00 1233.80
4 Super Plasticizer ltr 11.00 75.00 825.00
5 Use rate of shuttering for 40 uses sqm 27.00 151.07 4078.76
Scaffolding @ 25 % of shuttering 1019.69
Contd
A. MATERIALS ( Contd ) :
Sl No Unit Amountin Rs.
Contd
6 Sundries LS 0.50 30.00 15.00
Total Rs: 28465.90
Add for small Tools and Plants @ 1% Rs: 284.66
Add for Contractor's Profit @ 10% Rs: 2846.59
Add for Contractor's Overheads @ 5% Rs: 1423.30
Add Royalty charges on CA @ ( Included in material rates ) Rs: 0.00
Add Royalty charges on FA @ ( Included in material rates ) Rs: 0.00
Total cost of Materials : Rs: 33020.45
B. MACHINERY:
Sl No Unit Amount
in Rs.
1 Concrete mixer 300 / 200 ltr ( diesel ) Hour 8.00 42.00 336.00
Fuel / Energy charges Hour 8.00 55.00 440.00
2 5 hp pump ( diesel ) Hour 0.50 7.00 3.50
Fuel / Energy charges Hour 0.50 55.00 27.50
3 Water tanker 8000 ltr Hour 1.00 268.00 268.00
Fuel / Energy charges Hour 1.00 208.00 208.00
4 Needle vibrator 40 mm dia ( petrol ) Hour 8.00 8.00 64.00
Fuel / Energy charges Hour 8.00 15.00 120.00
Total Rs: 1467.00
Add for small Tools and Plants @ 1% Rs: 14.67
Add for Contractor's Profit on DPOL / Energy @ 10% Rs: 79.55
Add for Contractor's Overheads @ 5% Rs: 73.35
Total hire charges of Machinery : Rs: 1634.57
C. LABOUR:
Sl No Unit Amount
in Rs.
1 Crew for Concrete mixer Hour 8.00 75.10 600.80
2 Crew for Pump Hour 0.50 35.80 17.90
3 Crew for Water tanker Hour 1.00 56.70 56.70
4 Crew for Vibrator Hour 8.00 53.30 426.40
Perticulars
Description
Description Quantity Rate
Quantity Rate
Quantity Rate
Perticulars Quantity Rate
in Rs.
in Rs.
in Rs.
in Rs.
45
8/13/2019 Data Rates-CD Works-Page 3
7/21
CANAL CD WORKS
5 Mason Class-I Day 1.00 159.00 159.00
6 Maistry Day 1.00 141.50 141.50
7 Heavy mazdoor
for batching materials Day 10.00 132.00 1320.00
for loading mortar pans Day 4.00 132.00 528.00
for laying Day 5.00 132.00 660.00
8 Light mazdoor
for conveying concrete Day 14.00 130.50 1827.00
for cleaning / washing / curing Day 1.00 130.50 130.50
9 Labour cost for shuttering sqm 27.00 33.17 895.46
Labour cost for scaffolding @ 25 % 223.86
Total Rs: 6987.12
Contd
C. LABOUR ( Contd ) :
Sl No Unit Amount
in Rs.Contd
Add for small Tools and Plants @ 1% Rs: 69.87
Add for Contractor's Profit @ 10% Rs: 698.71
Add for hidden cost on Labour @ 15% Rs: 1048.07
Add for Contractor's Overheads @ 5% Rs: 349.36
Total cost of Labour : Rs: 9153.13
ABSTRACT:
A. Cost of Materials inluding royalty charges Rs: 33020.45
B. Hire charges of Machinery Rs: 1634.57
C. Cost of Labour Rs: 9153.13
TOTAL Rs: 43808.14
Add for enabling works @ 1.10% Rs: 481.89
Total cost for 13.50 cum Rs: 44290.03
Rate per cum Rs: 3281.00
Rate approved per cum Rs: 3281.00
Note : For every additional lift of 1.5 m beyond 1.5 m from surface add / cum Rs: 25.00
SECTION: CANAL C.D WORKS. YEAR : 2010-11 ITEM No: 16
ITEM: Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than
10 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded
aggregates for sub-structure works including cost of all materials, machinery, labour,
formwork, scaffolding, cleaning, batching,mixing, placing in position,levelling, vibrating, finishing,
curing etc., complete with initial lead upto 50 m and lift upto 1.50 m from surface.
( Cement content : 250 kg / cum with use of super plasticiser )
DATA:For 1 cum CC :- Coarse aggregates : 0.80 cum Blending ratio : 65 :35
Fine aggregate : 0.45 cum Cement content : 250 kg Super plasticizer : 0.75 ltr
Wastage : 1 % for cement and 2 % for coarse & fine aggregates.
Consider 300 / 200 ltr capacity mixer and 50 kg cement per mix for use of 20 mm down CA.
Equivalent volume batching using 0.3 x 0.3 x 0.3 m size boxes assumed for batching of
coarse and fine aggregates.
1. Quantity of concrete per shift :
Description Quantity Rate
in Rs.
46
8/13/2019 Data Rates-CD Works-Page 3
8/21
CANAL CD WORKS
Cycle time for batching / mixing / unloading 1 mix :
Batching 20-10 mm CA ( 0.104 cum ) : 4.00 min
Batching 10 mm & below CA parellel activity : ---
Batching fine aggregate parellel activity : ---
Batching cement parellel activity : ---
Loading mixer drum & miscellaneous : 1.00 min
Mixing and unloading parellel activity : ---
Add for possible delays in any of the activity : 0.50 min
Total : 5.50 min
No. of mixes per day with 50 min / hr working ( 50 x 8 / 5.5 ) : 73 mixes
Output of CC for 73 mixes ( 73 x 50 / 250 ) say : 14.60 cum
Consider 14.60 cum concrete for rate analysis.
2. Requirement of materials:
Cement for mix with 1 % wastage ( 14.60 x 250 x 1.01 ) : 3687 kg
Cement for incidental works @ 5 kg / cum ( 14.60 x 5 ) : 73 kg
Coarse aggregate 20-10 mm size range ( 14.60 x 0.8 x 0.65 x 1.02 ) : 7.75 cumCoarse aggregate 10-4.75 mm size ( 14.60 x 0.8 x 0.35 x 1.02 ) : 4.15 cum
Fine aggregate ( 14.60 x 0.45 x 1.02 ) : 6.70 cum
Super plasticiser ( 14.60 x 0.75 x 1.02 ) : 11.15 ltrs
3. Requirement of machinery :
Deploy 300 / 200 ltr capacity concrete mixer for 8 hours for production of concrete.
Deploy 1 Needle vibrater 40 mm dia for 8 hours for vibrating concrete.
Deploy 1 Pump 5 hp for 0.5 hour for water required for concrete mixing / curing / cleaning etc.
Deploy 1 Water tanker 8000 ltr capacity for 1 hour for water required for concrete / curing etc.
4. Formwork & scaffolding :
Consider normal shuttering as concrete is laid in smaller lifts.
Shuttering at 2 sqm / cum of concrete considered for substructure / super structure works.
Shuttering @ 2.00 sqm per cum of concrete ( 14.60 x 2 ) : 29.20 sqm
Scaffolding / supports for sub / super structure concreting assumed @ 25 % of cost of shuttering.
5. Requirement of workforce ( other than machinery crew ) :
Consider batching of materials and conveyance & laying of concrete by manual labour.
Maistry ( same as in Item : 14 ) : 1 No.
Mason Class I ( same as in Item : 14 ) : 1 No.
Heavy mazdoor ( same as in Item : 14 ) : 19 Nos.
Light mazdoor for conveying concrete @ 1 per cum : 15 Nos.
Light mazdoor for cleaning, curing & miscellaneous : 1 No.
Labour for shuttering per sqm ( Annexure-B Item-8 ) @ Rs: 33.17
Labour for erection & dismantling scaffolding @ 25 % of cost of labour for shuttering.
6. Use rate of materials :
Use rate of shuttering per sqm for 40 uses ( Annexure-A Item-8 ) @ Rs: 151.07
RATE ANALYSIS UNIT : 14.60 cum
A. MATERIALS: Sl No Unit Amount
in Rs.
1 Cement for mix kg 3687.00 4.00 14748.00
Cement for incidentals @ 5 kg / cum kg 73.00 4.00 292.00
2 Coarse aggregate 20-10 mm cum 7.75 520.00 4030.00
Coarse aggregate 10 mm below cum 4.15 669.00 2776.35
3 Fine aggregate ( screened ) cum 6.70 199.00 1333.30
4 Super Plasticizer ltr 11.15 75.00 836.25
Perticulars Quantity Rate
in Rs.
47
8/13/2019 Data Rates-CD Works-Page 3
9/21
CANAL CD WORKS
5 Use rate of shuttering for 40 uses sqm 29.20 151.07 4411.10
Scaffolding @ 25 % of shuttering 1102.78
6 Sundries LS 0.50 30.00 15.00
Total Rs: 29544.78
Add for small Tools and Plants @ 1% Rs: 295.45
Add for Contractor's Profit @ 10% Rs: 2954.48
Add for Contractor's Overheads @ 5% Rs: 1477.24
Add Royalty charges on CA @ ( Included in material rates ) Rs: 0.00
Add Royalty charges on FA @ ( Included in material rates ) Rs: 0.00
Total cost of Materials : Rs: 34271.95
B. MACHINERY:
Sl No Unit Amount
in Rs.
1 Concrete mixer 300 / 200 ltr ( diesel ) Hour 8.00 42.00 336.00
Fuel / Energy charges Hour 8.00 55.00 440.002 5 hp pump ( diesel ) Hour 0.50 7.00 3.50
Fuel / Energy charges Hour 0.50 55.00 27.50
3 Water tanker 8000 ltr Hour 1.00 268.00 268.00
Fuel / Energy charges Hour 1.00 208.00 208.00
4 Needle vibrator 40 mm dia ( petrol ) Hour 8.00 8.00 64.00
Fuel / Energy charges Hour 8.00 15.00 120.00
Total Rs: 1467.00
Add for small Tools and Plants @ 1% Rs: 14.67
Add for Contractor's Profit on DPOL / Energy @ 10% Rs: 79.55
Add for Contractor's Overheads @ 5% Rs: 73.35
Total hire charges of Machinery : Rs: 1634.57
C. LABOUR:
Sl No Unit Amount
in Rs.
1 Crew for Concrete mixer Hour 8.00 75.10 600.80
2 Crew for Pump Hour 0.50 35.80 17.90
3 Crew for Water tanker Hour 1.00 56.70 56.70
4 Crew for Vibrator Hour 8.00 53.30 426.40
5 Mason Class-I Day 1.00 159.00 159.00
6 Maistry Day 1.00 141.50 141.50
7 Heavy mazdoor
for batching materials Day 10.00 132.00 1320.00
for loading mortar pans Day 4.00 132.00 528.00
for laying Day 5.00 132.00 660.00
8 Light mazdoor
for conveying concrete Day 15.00 130.50 1957.50for cleaning / washing / curing Day 1.00 130.50 130.50
9 Labour cost for shuttering sqm 29.20 33.17 968.42
Labour cost for scaffolding @ 25 % 242.10
Total Rs: 7208.82
Add for small Tools and Plants @ 1% Rs: 72.09
Add for Contractor's Profit @ 10% Rs: 720.88
Add for hidden cost on Labour @ 15% Rs: 1081.32
Add for Contractor's Overheads @ 5% Rs: 360.44
Description
Description Quantity Rate
in Rs.
Quantity Rate
in Rs.
48
8/13/2019 Data Rates-CD Works-Page 3
10/21
CANAL CD WORKS
Total cost of Labour : Rs: 9443.56
ABSTRACT:
A. Cost of Materials including royalty charges Rs: 34271.95
B. Hire charges of Machinery Rs: 1634.57
C. Cost of Labour Rs: 9443.56
TOTAL Rs: 45350.07
Add for enabling works @ 1.10% Rs: 498.85
Total cost for 14.60 cum Rs: 45848.92
Rate per cum Rs: 3140.00
Rate approved per cum Rs: 3140.00
Note : For every additional lift of 1.5 m beyond 1.5 m from surface add / cum Rs: 25.00
SECTION: CANAL C.D WORKS. YEAR : 2010-11 ITEM No: 17
ITEM: Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than
20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded
aggregates for well kerb including cost of all materials, machinery, labour, formwork,
scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing
etc., complete with initial lead upto 50 m and all lifts. ( Cement content : 330 kg / cum with
use of super plasticiser )
Note : If water is to be brought from other place add only lead charges @ 500 ltr / cum.
DATA:For 1 cum CC :- Coarse aggregates : 0.80 cum Blending ratio : 65 :35
Fine aggregate : 0.45 cum Cement content : 330 kg Super plasticizer : 1.00 ltr
Wastage : 1 % for cement and 2 % for coarse & fine aggregates.
Consider 300 / 200 ltr capacity mixer and 50 kg cement per mix for use of 20 mm down CA.
Equivalent volume batching using 0.3 x 0.3 x 0.3 m size boxes assumed for batching of
coarse and fine aggregates.
1. Quantity of concrete per shift :
Cycle time for batching / mixing / unloading 1 mix :
Batching 20-10 mm CA ( 0.079 cum ) : 3.00 min
Batching 10 mm & below CA parellel activity : ---
Batching fine aggregate parellel activity : ---
Batching cement parellel activity : ---
Loading mixer drum & miscellaneous : 1.00 min
Mixing and unloading parellel activity : ---
Add for possible delays in any of the activity : 0.50 minTotal : 4.50 min
No. of mixes per day with 50 min / hr working ( 50 x 8 / 4.5 ) : 89 mixes
Output of CC for 89 mixes ( 89 x 50 / 330 ) say : 13.50 cum
Consider 13.50 cum concrete for rate analysis.
2. Requirement of materials:
Cement for mix with 1 % wastage ( 13.50 x 330 x 1.01 ) : 4500 kg
Coarse aggregate 20-10 mm size range ( 13.50 x 0.8 x 0.65 x 1.02 ) : 7.75 cum
Coarse aggregate 10-4.75 mm size ( 13.50 x 0.8 x 0.35 x 1.02 ) : 3.85 cum
49
8/13/2019 Data Rates-CD Works-Page 3
11/21
CANAL CD WORKS
Fine aggregate ( 13.50 x 0.45 x 1.02 ) : 6.20 cum
Super plasticiser ( 13.50 x 1.00 x 1.02 ) : 13.75 ltrs
3. Requirement of machinery :
Deploy 300 / 200 ltr capacity concrete mixer for 8 hours for production of concrete.
Deploy 1 Needle vibrater 40 mm dia for 8 hours for vibrating concrete.
Deploy 1 Pump 5 hp for 0.5 hour for water required for concrete mixing / curing / cleaning etc.
Deploy 1 Water tanker 8000 ltr capacity for 1 hour for water required for concrete / curing etc.
4. Formwork & scaffolding :
Consider normal shuttering as concrete is laid in smaller lifts.
Shuttering at 5.5 sqm / cum of concrete considered for well kerb works.
Shuttering @ 5.50 sqm per cum of concrete ( 13.50 x 5.5 ) : 74.25 sqm
No scaffolding required for well kerb concreting.
5. Requirement of workforce ( other than machinery crew ) :
Consider batching of materials and conveyance & laying of concrete by manual labour.
Maistry ( same as in Item : 14 ) : 1 No.
Mason Class I ( same as in Item : 14 ) : 1 No.Heavy mazdoor ( same as in Item : 14 excluding 2 mazdoor for lifting CC ) : 17 Nos.
Light mazdoor for conveying concrete @ 1 per cum : 14 Nos.
Light mazdoor for cleaning, curing & miscellaneous : 1 No.
Labour for shuttering per sqm ( Annexure-B Item-8 ) @ Rs: 33.17
6. Use rate of materials :
Use rate of shuttering per sqm for 40 uses ( Annexure-A Item-8 ) @ Rs: 151.07
Add 10 % extra for fabrication of curved shuttering & for supports. Rs: 15.11
Total Rs: 166.17
RATE ANALYSIS UNIT : 13.50 cum
A. MATERIALS:
Sl No Unit Amount
in Rs.
1 Cement for mix kg 4500.00 4.00 18000.00
2 Coarse aggregate 20-10 mm cum 7.15 520.00 3718.00
Coarse aggregate 10 mm below cum 3.85 669.00 2575.65
3 Fine aggregate ( screened ) cum 6.20 199.00 1233.80
4 Super Plasticizer ltr 13.75 75.00 1031.25
5 Use rate of curved shutter (40 uses) sqm 74.25 166.17 12338.25
6 Sundries LS 0.50 30.00 15.00
Total Rs: 38911.95
Add for small Tools and Plants @ 1% Rs: 389.12
Add for Contractor's Profit @ 10% Rs: 3891.20
Add for Contractor's Overheads @ 5% Rs: 1945.60
Add Royalty charges on CA @ ( Included in material rates ) Rs: 0.00
Add Royalty charges on FA @ ( Included in material rates ) Rs: 0.00
Total cost of Materials : Rs: 45137.87
B. MACHINERY:
Sl No Unit Amount
in Rs.
1 Concrete mixer 300 / 200 ltr ( diesel ) Hour 8.00 42.00 336.00
Fuel / Energy charges Hour 8.00 55.00 440.00
2 5 hp pump ( diesel ) Hour 0.50 7.00 3.50
Fuel / Energy charges Hour 0.50 55.00 27.50
Perticulars
Description
in Rs.
Quantity Rate
Quantity Rate
in Rs.
50
8/13/2019 Data Rates-CD Works-Page 3
12/21
CANAL CD WORKS
3 Needle vibrator 40 mm dia ( petrol ) Hour 8.00 8.00 64.00
Fuel / Energy charges Hour 8.00 15.00 120.00
Total Rs: 991.00
Add for small Tools and Plants @ 1% Rs: 9.91
Add for Contractor's Profit on DPOL / Energy @ 10% Rs: 58.75
Add for Contractor's Overheads @ 5% Rs: 49.55
Total hire charges of Machinery : Rs: 1109.21
C. LABOUR:
Sl No Unit Amount
in Rs.
1 Crew for Concrete mixer Hour 8.00 75.10 600.80
2 Crew for Pump Hour 0.50 35.80 17.90
3 Crew for Vibrator Hour 8.00 53.30 426.40
4 Mason Class-I Day 1.00 159.00 159.00
5 Maistry Day 1.00 141.50 141.506 Heavy mazdoor
for batching materials Day 10.00 132.00 1320.00
for loading mortar pans Day 4.00 132.00 528.00
for laying Day 3.00 132.00 396.00
7 Light mazdoor
for conveying concrete Day 14.00 130.50 1827.00
for cleaning / washing / curing Day 1.00 130.50 130.50
8 Labour cost for shuttering sqm 74.25 33.17 2462.50
Total Rs: 8009.60
Add for small Tools and Plants @ 1% Rs: 80.10
Add for Contractor's Profit @ 10% Rs: 800.96
Add for hidden cost on Labour @ 15% Rs: 1201.44
Add for Contractor's Overheads @ 5% Rs: 400.48
Total cost of Labour : Rs: 10492.58
ABSTRACT:
A. Cost of Materials including royalty charges Rs: 45137.87
B. Hire charges of Machinery Rs: 1109.21
C. Cost of Labour Rs: 10492.58
TOTAL Rs: 56739.65
Add for enabling works @ 1.10% Rs: 624.14
Total cost for 13.50 cum Rs: 57363.79
Rate per cum Rs: 4249.00
Rate approved per cum Rs: 4249.00
SECTION: CANAL C.D WORKS. YEAR : 2010-11 ITEM No: 18
ITEM: Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than
20 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded
aggregates for well steining including cost of all materials, machinery, labour, formwork,
scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing
etc., complete with initial lead upto 50 m and all lifts. ( Cement content : 300 kg / cum with
use of super plasticiser )
Note : If water is to be brought from other place add only lead charges @ 500 ltr / cum.
Description Quantity Rate
in Rs.
51
8/13/2019 Data Rates-CD Works-Page 3
13/21
CANAL CD WORKS
DATA:For 1 cum CC :- Coarse aggregates : 0.90 cum Blending ratio : 50 :30 : 20
Fine aggregate : 0.40 cum Cement content : 300 kg Super plasticizer : 0.90 ltr
Wastage : 1 % for cement and 2 % for coarse & fine aggregates.
Consider 300 / 200 ltr capacity mixer and 50 kg cement per mix for use of 40 mm down CA.
Equivalent volume batching using 0.3 x 0.3 x 0.3 m size boxes assumed for batching of
coarse and fine aggregates.
1. Quantity of concrete per shift :
Cycle time for batching / mixing / unloading 1 mix :
Batching 40-20 mm CA ( 0.075 cum ) : 3.00 min
Batching 20-10 mm & 10 mm below CA parellel activity : ---
Batching fine aggregate parellel activity : ---
Batching cement parellel activity : ---
Loading mixer drum & miscellaneous : 1.00 min
Mixing and unloading parellel activity : ---
Add for possible delays in any of the activity : 0.50 minTotal : 4.50 min
No. of mixes per day with 50 min / hr working ( 50 x 8 / 4.5 ) : 89 mixes
Output of CC for 89 mixes ( 89 x 50 / 300 ) say : 14.85 cum
Consider 14.85 cum concrete for rate analysis.
2. Requirement of materials:
Cement for mix with 1 % wastage ( 14.85 x 300 x 1.01 ) : 4500 kg
Cement for incidental works @ 2 kg / cum ( 14.85 x 2 ) : 30 kg
Coarse aggregate 40-20 mm size range ( 14.85 x 0.9 x 0.5 x 1.02 ) : 6.80 cum
Coarse aggregate 20-10 mm size range ( 14.85 x 0.9 x 0.3 x 1.02 ) : 4.10 cum
Coarse aggregate 10-4.75 mm size ( 14.85 x 0.9 x 0.2 x 1.02 ) : 2.70 cum
Fine aggregate ( 14.85 x 0.4 x 1.02 ) : 6.05 cum
Super plasticiser ( 14.85 x 0.90 x 1.02 ) : 13.65 ltrs
3. Requirement of machinery :
Deploy 300 / 200 ltr capacity concrete mixer for 8 hours for production of concrete.
Deploy 1 Needle vibrater 40 mm dia for 8 hours for vibrating concrete.
Deploy 1 Pump 5 hp for 0.5 hour for water required for concrete mixing / curing / cleaning etc.
4. Formwork & scaffolding :
Consider normal shuttering as concrete is laid in smaller lifts.
Shuttering at 4 sqm / cum of concrete considered for well steining work.
Shuttering @ 4.00 sqm per cum of concrete ( 14.85 x 4 ) : 59.40 sqm
No scaffolding required for well steining concreting.
5. Requirement of workforce ( other than machinery crew ) :
Consider batching of materials and conveyance & laying of concrete by manual labour.
Maistry ( same as in Item : 8 ) : 1 No.
Mason Class I ( same as in Item : 8 ) : 1 No.
Heavy mazdoor ( same as in Item : 8 ) : 18 Nos.
Light mazdoor for conveying concrete @ 1 per cum : 15 Nos.Light mazdoor for cleaning, curing & miscellaneous : 1 No.
Labour for shuttering per sqm ( Annexure-B Item-8 ) @ Rs: 33.17
6. Use rate of materials :
Use rate of shuttering per sqm for 40 uses ( Annexure-A Item-8 ) @ Rs: 151.07
Add 10 % extra for fabrication of curved shuttering Rs: 15.11
Total Rs: 166.17
RATE ANALYSIS UNIT : 14.85 cum
52
8/13/2019 Data Rates-CD Works-Page 3
14/21
CANAL CD WORKS
A. MATERIALS:
Sl No Unit Amount
in Rs.
1 Cement for mix kg 4500.00 4.00 18000.00
Cement for incidentals @ 2 kg / cum kg 30.00 4.00 120.00
Contd
A. MATERIALS ( Contd ) :
Sl No Unit Amount
in Rs.
Contd
2 Coarse aggregate 40-20 mm cum 6.80 381.00 2590.80
Coarse aggregate 20-10 mm cum 4.10 520.00 2132.00
Coarse aggregate 10 mm below cum 2.70 669.00 1806.30
3 Fine aggregate ( screened ) cum 6.05 199.00 1203.95
4 Super Plasticizer ltr 13.65 75.00 1023.75
5 Use rate of curved shutter (40 uses) sqm 59.40 166.17 9870.606 Sundries LS 0.50 30.00 15.00
Total Rs: 36762.40
Add for small Tools and Plants @ 1% Rs: 367.62
Add for Contractor's Profit @ 10% Rs: 3676.24
Add for Contractor's Overheads @ 5% Rs: 1838.12
Add Royalty charges on CA @ ( Included in material rates ) Rs: 0.00
Add Royalty charges on FA @ ( Included in material rates ) Rs: 0.00
Total cost of Materials : Rs: 42644.39
B. MACHINERY:
Sl No Unit Amount
in Rs.
1 Concrete mixer 300 / 200 ltr ( diesel ) Hour 8.00 42.00 336.00
Fuel / Energy charges Hour 8.00 55.00 440.00
2 5 hp pump ( diesel ) Hour 0.50 7.00 3.50
Fuel / Energy charges Hour 0.50 55.00 27.50
3 Needle vibrator 40 mm dia ( petrol ) Hour 8.00 8.00 64.00
Fuel / Energy charges Hour 8.00 15.00 120.00
Total Rs: 991.00
Add for small Tools and Plants @ 1% Rs: 9.91
Add for Contractor's Profit on DPOL / Energy @ 10% Rs: 58.75
Add for Contractor's Overheads @ 5% Rs: 49.55
Total hire charges of Machinery : Rs: 1109.21
C. LABOUR:
Sl No Unit Amount
in Rs.1 Crew for Concrete mixer Hour 8.00 75.10 600.80
2 Crew for Pump Hour 0.50 35.80 17.90
3 Crew for Vibrator Hour 8.00 53.30 426.40
4 Mason Class-I Day 1.00 159.00 159.00
5 Maistry Day 1.00 141.50 141.50
6 Heavy mazdoor
for batching materials Day 11.00 132.00 1452.00
for loading mortar pans Day 4.00 132.00 528.00
Perticulars
Quantity Rate
in Rs.
Quantity Rate
in Rs.
Perticulars Quantity Rate
in Rs.
in Rs.
Description
Description
Quantity Rate
53
8/13/2019 Data Rates-CD Works-Page 3
15/21
CANAL CD WORKS
for laying Day 3.00 132.00 396.00
7 Light mazdoor
for conveying concrete Day 15.00 130.50 1957.50
for cleaning / washing / curing Day 1.00 130.50 130.50
Contd
C. LABOUR ( Contd ) :
Sl No Unit Amount
in Rs.
Contd
8 Labour cost for shuttering sqm 59.20 33.17 1963.37
Total Rs: 7772.97
Add for small Tools and Plants @ 1% Rs: 77.73
Add for Contractor's Profit @ 10% Rs: 777.30
Add for hidden cost on Labour @ 15% Rs: 1165.95
Add for Contractor's Overheads @ 5% Rs: 388.65
Total cost of Labour : Rs: 10182.59
ABSTRACT:
A. Cost of Materials including royalty charges Rs: 42644.39
B. Hire charges of Machinery Rs: 1109.21
C. Cost of Labour Rs: 10182.59
TOTAL Rs: 53936.18
Add for enabling works @ 1.10% Rs: 593.30
Total cost for 14.85 cum Rs: 54529.48
Rate per cum Rs: 3672.00
Rate approved per cum Rs: 3672.00
SECTION: CANAL C.D WORKS. YEAR : 2010-11 ITEM No: 19
ITEM: Providing and laying insitu M-15 ( 28 days cube compressive strength not less than 15 N / sq
mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded
aggregates for well bottom plug by tremie or skip box method including cost of all materials,
machinery, labour, batching, mixing, placing in position as per detailed specifications etc.,
complete with initial lead upto 50 m and all lifts. ( Cement content : 350 kg / cum with use of
super plasticiser )
DATA:For placing concrete under water by using tremie the slump of concrete shall be about 150 mm.
Minimum cement content as per IS: 456-2000 Clause-14.2.2 : 350 kg / cum.
For 1 cum CC :- Coarse aggregates : 0.80 cum Blending ratio : 65 : 35
Fine aggregate : 0.45 cum Cement content : 350 kg Super plasticizer : 1.05 ltr
Wastage : 1 % for cement and 2 % for coarse & fine aggregates.
Consider 300 / 200 ltr capacity mixer and 50 kg cement per mix for use of 20 mm down CA.
Equivalent volume batching using 0.3 x 0.3 x 0.3 m size boxes assumed for batching of coarse and fine aggregates.
1. Quantity of concrete per shift :
Cycle time for batching / mixing / unloading 1 mix :
Batching 20-10 mm CA ( 0.074 cum ) : 3.00 min
Batching 10 mm & below CA parellel activity : ---
Batching fine aggregate parellel activity : ---
Batching cement parellel activity : ---
Loading mixer drum & miscellaneous : 1.00 min
in Rs.
Description Quantity Rate
54
8/13/2019 Data Rates-CD Works-Page 3
16/21
CANAL CD WORKS
Mixing and unloading parellel activity : ---
Add for possible delays in any of the activity : 0.50 min
Total : 4.50 min
No. of mixes per day with 50 min / hr working ( 50 x 8 / 4.5 ) : 89 mixes
Output of CC for 89 mixes ( 89 x 50 / 350 ) say : 12.70 cum
Use 250 mm dia flanged pipes for tremie.
Consider 12.70 cum concrete for rate analysis.
2. Requirement of materials:
Cement for mix with 1 % wastage ( 12.70 x 350 x 1.01 ) : 4490 kg
Coarse aggregate 20-10 mm size range ( 12.70 x 0.8 x 0.65 x 1.02 ) : 6.75 cum
Coarse aggregate 10-4.75 mm size ( 12.70 x 0.8 x 0.35 x 1.02 ) : 3.60 cum
Fine aggregate ( 12.70 x 0.45 x 1.02 ) : 5.80 cum
Super plasticiser ( 12.70 x 1.05 x 1.02 ) : 13.60 ltrs
3. Requirement of machinery :
Deploy 300 / 200 ltr capacity concrete mixer for 8 hours for production of concrete.Deploy 1 Pump 5 hp for 0.5 hour for water required for concrete mixing / cleaning etc.
4. Formwork & scaffolding :
No shuttering required for well bottom plug concreting.
No scaffolding required for well bottom plug concreting.
5. Requirement of workforce ( other than machinery crew ) :
Consider batching of materials and conveyance & laying of concrete by manual labour.
Maistry : 1 No.
Mason Class I ( Not required as concreting is under water ) ---
Fitter shuttering for erecting tremie : 1 No.
Heavy mazdoor :
Erecting and dismantling tremie : 2 Nos
Batching materials ( same as in Item : 14 ) : 10 Nos
Remixing and loading mortar pans : 4 Nos
Feeding tremie hopper : 2 Nos
Light mazdoor for conveying concrete @ 1 per cum : 13 Nos.
Light mazdoor for cleaning & miscellaneous : 1 No.
6. Use rate of materials :
For use rate of tremie arrangement assume lump sum provision @ 1 % of basic cost of materials.
RATE ANALYSIS UNIT : 12.70 cum
A. MATERIALS:
Sl No Unit Amount
in Rs.
1 Cement for mix kg 4490.00 4.00 17960.00
2 Coarse aggregate 20-10 mm cum 6.75 520.00 3510.00
Coarse aggregate 10 mm below cum 3.60 669.00 2408.40
3 Fine aggregate ( screened ) cum 5.80 199.00 1154.204 Super Plasticizer ltr 13.60 75.00 1020.00
Total Rs: 26052.60
Add for small Tools and Plants @ 1% Rs: 260.53
Add for Contractor's Profit @ 10% Rs: 2605.26
Add for Contractor's Overheads @ 5% Rs: 1302.63
Add for tremie arrangement @ 1% Rs: 260.53
Add Royalty charges on CA @ ( Included in material rates ) Rs: 0.00
Add Royalty charges on FA @ ( Included in material rates ) Rs: 0.00
Perticulars Quantity Rate
in Rs.
55
8/13/2019 Data Rates-CD Works-Page 3
17/21
CANAL CD WORKS
Total cost of Materials : Rs: 30481.54
B. MACHINERY:
Sl No Unit Amount
in Rs.
1 Concrete mixer 300 / 200 ltr ( diesel ) Hour 8.00 42.00 336.00
Fuel / Energy charges Hour 8.00 55.00 440.00
2 5 hp pump ( diesel ) Hour 0.50 7.00 3.50
Fuel / Energy charges Hour 0.50 55.00 27.50
3 Sundries( Hopper etc. ) LS 5.00 30.00 150.00
Total Rs: 957.00
Add for small Tools and Plants @ 1% Rs: 9.57
Add for Contractor's Profit on DPOL / Energy @ 10% Rs: 61.75
Add for Contractor's Overheads @ 5% Rs: 47.85
Total hire charges of Machinery : Rs: 1076.17
C. LABOUR:
Sl No Unit Amount
in Rs.
1 Crew for Concrete mixer Hour 8.00 75.10 600.80
2 Crew for Pump Hour 0.50 35.80 17.90
3 Fitter shuttering Day 1.00 148.50 148.50
4 Maistry Day 1.00 141.50 141.50
5 Heavy mazdoor
for erecting / dismantling tremie Day 2.00 132.00 264.00
for batching materials Day 10.00 132.00 1320.00
for loading mortar pans Day 4.00 132.00 528.00
for feeding tremie hopper Day 2.00 132.00 264.00
6 Light mazdoor
for conveying concrete Day 14.00 130.50 1827.00
Total Rs: 5111.70
Add for small Tools and Plants @ 1% Rs: 51.12
Add for Contractor's Profit @ 10% Rs: 511.17
Add for hidden cost on Labour @ 15% Rs: 766.76
Add for Contractor's Overheads @ 5% Rs: 255.59
Total cost of Labour : Rs: 6696.33
ABSTRACT:
A. Cost of Materials including royalty charges Rs: 30481.54
B. Hire charges of Machinery Rs: 1076.17
C. Cost of Labour Rs: 6696.33
TOTAL Rs: 38254.04 Add for enabling works @ 1.10% Rs: 420.79
Total cost for 12.70 cum Rs: 38674.83
Rate per cum Rs: 3045.00
Rate approved per cum Rs: 3045.00
SECTION: CANAL C.D WORKS. YEAR : 2010-11 ITEM No: 20
ITEM: Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than
Description
Description Quantity Rate
in Rs.
in Rs.
Quantity Rate
56
8/13/2019 Data Rates-CD Works-Page 3
18/21
CANAL CD WORKS
15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded
aggregates for well top plug including cost of all materials, machinery, labour, cleaning,
batching, mixing, placing in position, levelling, vibrating, finishing,curing etc.,complete with initial
lead upto 50 m and all lifts. ( Cement content : 240 kg / cum with use of super plasticiser.
Note : If water is to be brought from other place add only lead charges @ 500 ltrs / cum.
DATA:For 1 cum CC :- Coarse aggregates : 0.90 cum Blending ratio : 50 :30 : 20
Fine aggregate : 0.40 cum Cement content : 240 kg Super plasticizer : 0.75 ltr
Wastage : 1 % for cement and 2 % for coarse & fine aggregates.
Consider 300 / 200 ltr capacity mixer and 50 kg cement per mix for use of 40 mm down CA.
Equivalent volume batching using 0.3 x 0.3 x 0.3 m size boxes assumed for batching of
coarse and fine aggregates.
1. Quantity of concrete per shift :
Cycle time for batching / mixing / unloading 1 mix :
Batching 40-20 mm CA ( 0.094 cum ) : 3.50 min
Batching 20-10 mm & 10 mm below CA parellel activity : ---Batching fine aggregate parellel activity : ---
Batching cement parellel activity : ---
Loading mixer drum & miscellaneous : 1.00 min
Mixing and unloading parellel activity : ---
Add for possible delays in any of the activity : 0.50 min
Total : 5.00 min
No. of mixes per day with 50 min / hr working ( 50 x 8 / 5 ) : 80 mixes
Output of CC for 80 mixes ( 80 x 50 / 240 ) say : 16.65 cum
Consider 16.65 cum concrete for rate analysis.
2. Requirement of materials:
Cement for mix with 1 % wastage ( 16.65 x 240 x 1.01 ) : 4036 kg
Coarse aggregate 40-20 mm size range ( 16.65 x 0.9 x 0.5 x 1.02 ) : 7.65 cum
Coarse aggregate 20-10 mm size range ( 16.65 x 0.9 x 0.3 x 1.02 ) : 4.60 cum
Coarse aggregate 10-4.75 mm size ( 16.65 x 0.9 x 0.2 x 1.02 ) : 3.05 cum
Fine aggregate ( 16.65 x 0.4 x 1.02 ) : 6.80 cum
Super plasticiser ( 16.65 x 0.90 x 1.02 ) : 12.75 ltrs
3. Requirement of machinery :
Deploy 300 / 200 ltr capacity concrete mixer for 8 hours for production of concrete.
Deploy 1 Needle vibrater 40 mm dia for 8 hours for vibrating concrete.
Deploy 1 Pump 5 hp for 0.5 hour for water required for concrete mixing / curing / cleaning etc.
4. Formwork & scaffolding :
No shuttering and scaffolding required for well top plug concreting.
5. Requirement of workforce ( other than machinery crew ) :
Consider batching of materials and conveyance & laying of concrete by manual labour.
Maistry ( same as in Item : 8 ) : 1 No.
Mason Class I ( same as in Item : 8 ) : 1 No.
Heavy mazdoor ( same as in Item : 8 ) : 18 Nos.Light mazdoor for conveying concrete @ 1 per cum : 17 Nos.
Light mazdoor for cleaning, curing & miscellaneous : 1 No.
RATE ANALYSIS UNIT : 16.65 cum
A. MATERIALS:
Sl No Unit Amount
in Rs.
1 Cement for mix kg 4036.00 4.00 16144.00
Perticulars Quantity Rate
in Rs.
57
8/13/2019 Data Rates-CD Works-Page 3
19/21
CANAL CD WORKS
Contd
A. MATERIALS ( Contd ) :
Sl No Unit Amount
in Rs.
Contd
2 Coarse aggregate 40-20 mm cum 7.65 381.00 2914.65
Coarse aggregate 20-10 mm cum 4.60 520.00 2392.00
Coarse aggregate 10 mm below cum 3.05 669.00 2040.45
3 Fine aggregate ( screened ) cum 6.80 199.00 1353.20
4 Super Plasticizer ltr 12.75 75.00 956.25
Total Rs: 25800.55
Add for small Tools and Plants @ 1% Rs: 258.01
Add for Contractor's Profit @ 10% Rs: 2580.06
Add for Contractor's Overheads @ 5% Rs: 1290.03
Add Royalty charges on CA @ ( Included in material rates ) Rs: 0.00
Add Royalty charges on FA @ ( Included in material rates ) Rs: 0.00Total cost of Materials : Rs: 29928.64
B. MACHINERY:
Sl No Unit Amount
in Rs.
1 Concrete mixer 300 / 200 ltr ( diesel ) Hour 8.00 42.00 336.00
Fuel / Energy charges Hour 8.00 55.00 440.00
2 5 hp pump ( diesel ) Hour 0.50 7.00 3.50
Fuel / Energy charges Hour 0.50 55.00 27.50
3 Needle vibrator 40 mm dia ( petrol ) Hour 8.00 8.00 64.00
Fuel / Energy charges Hour 8.00 15.00 120.00
Total Rs: 991.00
Add for small Tools and Plants @ 1% Rs: 9.91
Add for Contractor's Profit on DPOL / Energy @ 10% Rs: 58.75
Add for Contractor's Overheads @ 5% Rs: 49.55
Total hire charges of Machinery : Rs: 1109.21
C. LABOUR:
Sl No Unit Amount
in Rs.
1 Crew for Concrete mixer Hour 8.00 75.10 600.80
2 Crew for Pump Hour 0.50 35.80 17.90
3 Crew for Needle vibrator Hour 8.00 53.30 426.40
4 Mason Class-I Day 1.00 159.00 159.00
5 Maistry Day 1.00 141.50 141.50
6 Heavy mazdoor
for batching materials Day 11.00 132.00 1452.00for loading mortar pans Day 4.00 132.00 528.00
for laying Day 3.00 132.00 396.00
7 Light mazdoor
for conveying concrete Day 17.00 130.50 2218.50
for cleaning / washing / curing Day 1.00 130.50 130.50
Total Rs: 6070.60
Contd
Description
Description
Perticulars
Quantity Rate
in Rs.
in Rs.
Quantity Rate
in Rs.
Quantity Rate
58
8/13/2019 Data Rates-CD Works-Page 3
20/21
CANAL CD WORKS
C. LABOUR ( Contd ) :
Sl No Unit Amount
in Rs.
Contd
Add for small Tools and Plants @ 1% Rs: 60.71
Add for Contractor's Profit @ 10% Rs: 607.06
Add for hidden cost on Labour @ 15% Rs: 910.59
Add for Contractor's Overheads @ 5% Rs: 303.53
Total cost of Labour : Rs: 7952.49
ABSTRACT:
A. Cost of Materials including royalty charges Rs: 29928.64
B. Hire charges of Machinery Rs: 1109.21
C. Cost of Labour Rs: 7952.49
TOTAL Rs: 38990.33
Add for enabling works @ 1.10% Rs: 428.89 Total cost for 16.65 cum Rs: 39419.23
Rate per cum Rs: 2368.00
Rate approved per cum Rs: 2368.00
SECTION: CANAL C.D WORKS. YEAR : 2010-11 ITEM No: 21
ITEM: Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than
20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded
aggregates for well cap including cost of all materials, machinery, labour, formwork,
scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing
etc., complete with initial lead upto 50 m and all lifts. ( Cement content : 330 kg / cum with
use of super plasticiser )
Note : If water is to be brought from other place add only lead charges @ 500 ltr / cum.
DATA:For 1 cum CC :- Coarse aggregates : 0.80 cum Blending ratio : 65 :35
Fine aggregate : 0.45 cum Cement content : 330 kg Super plasticizer : 1.00 ltr
Wastage : 1 % for cement and 2 % for coarse & fine aggregates.
Consider 300 / 200 ltr capacity mixer and 50 kg cement per mix for use of 20 mm down CA.
Equivalent volume batching using 0.3 x 0.3 x 0.3 m size boxes assumed for batching of
coarse and fine aggregates.
1. Quantity of concrete per shift :
Cycle time for batching / mixing / unloading 1 mix :
Batching 20-10 mm CA ( 0.079 cum ) : 3.00 min
Batching 10 mm & below CA parellel activity : ---
Batching fine aggregate parellel activity : ---
Batching cement parellel activity : ---Loading mixer drum & miscellaneous : 1.00 min
Mixing and unloading parellel activity : ---
Add for possible delays in any of the activity : 0.50 min
Total : 4.50 min
No. of mixes per day with 50 min / hr working ( 50 x 8 / 4.5 ) : 89 mixes
Output of CC for 89 mixes ( 89 x 50 / 330 ) say : 13.50 cum
Consider 13.50 cum concrete for rate analysis.
Description Quantity Rate
in Rs.
59
8/13/2019 Data Rates-CD Works-Page 3
21/21
CANAL CD WORKS
2. Requirement of materials:
Cement for mix with 1 % wastage ( 13.50 x 330 x 1.01 ) : 4500 kg
Cement for incidental works @ 5 kg / cum ( 13.50 x 5 ) : 68 kg
Coarse aggregate 20-10 mm size range ( 13.50 x 0.8 x 0.65 x 1.02 ) : 7.15 cum
Coarse aggregate 10-4.75 mm size ( 13.50 x 0.8 x 0.35 x 1.02 ) : 3.85 cum
Fine aggregate ( 13.50 x 0.45 x 1.02 ) : 6.20 cum
Super plasticiser ( 13.50 x 1.00 x 1.02 ) : 13.75 ltrs
3. Requirement of machinery :
Deploy 300 / 200 ltr capacity concrete mixer for 8 hours for production of concrete.
Deploy 1 Needle vibrater 40 mm dia for 8 hours for vibrating concrete.
Deploy 1 Pump 5 hp for 0.5 hour for water required for concrete mixing / curing / cleaning etc.
4. Formwork & scaffolding :
Consider normal shuttering as concrete is laid in smaller lifts.
Shuttering at 1 sqm / cum of concrete considered for well cap works.
Shuttering @ 1.00 sqm per cum of concrete ( 13.50 x 1.0 ) : 13.50 sqm
No scaffolding required for well cap concreting.
5. Requirement of workforce ( other than machinery crew ) :Consider batching of materials and conveyance & laying of concrete by manual labour.
Maistry ( same as in Item : 14 ) : 1 No.
Mason Class I ( same as in Item : 14 ) : 1 No.
Heavy mazdoor ( same as in Item : 14 excluding 2 mazdoors for lifting CC ) : 17 Nos.
Light mazdoor for conveying concrete @ 1 per cum : 14 Nos.
Light mazdoor for cleaning, curing & miscellaneous : 1 No.
Labour for shuttering per sqm ( Annexure-B Item-8 ) @ Rs: 33.17
6. Use rate of materials :
Use rate of shuttering per sqm for 40 uses ( Annexure-A Item-8 ) @ Rs: 151.07
Add 10 % extra for fabrication of curved shuttering Rs: 15.11
Total Rs: 166.17
RATE ANALYSIS UNIT : 13.50 cum
A. MATERIALS:
Sl No Unit Amount
in Rs.
1 Cement for mix kg 4500.00 4.00 18000.00
Cement for incidentals @ 5 kg / cum kg 68.00 4.00 272.00
2 Coarse aggregate 20-10 mm cum 7.15 520.00 3718.00
Coarse aggregate 10 mm below cum 3.85 669.00 2575.65
3 Fine aggregate ( screened ) cum 6.20 199.00 1233.80
4 Super Plasticizer ltr 13.75 75.00 1031.25
5 Use rate of curved shutter (40 uses) sqm 13.50 166.17 2243.32
6 Sundries LS 0.50 30.00 15.00
Total Rs: 29089.02
Add for small Tools and Plants @ 1% Rs: 290.89
Add for Contractor's Profit @ 10% Rs: 2908.90 Add for Contractor's Overheads @ 5% Rs: 1454.45
Add Royalty charges on CA @ ( Included in material rates ) Rs: 0.00
Add Royalty charges on FA @ ( Included in material rates ) Rs: 0.00
Total cost of Materials : Rs: 33743.26
Perticulars Quantity Rate
in Rs.