Data: Past, Present, & FutureSchool Facilities & Organization Citizens Advisory Panel Meeting
February 10, 2016
Office of Superintendent of Public InstructionInformation and Condition of Schools Implementation Plan
Six Year Implementation PlanDate: January 2015 YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 YEAR 6
Fiscal Year 2010 2011 2012 2013 2014 2015 2016 2017
Project Timeline
Legislative Actions JLARC Final ReportLegislature appropriates $250,000 for system
development.
Legislature provides $1,337,000 for study and survey grants, and completing K‐12 inventory and assessments.
Legislature provides $1,340,000 for study and survey grants, and completing K‐12 inventory and
assessments.
System Development
DSHS interagency agreement; staffing;
design starts; alignment with EDS.
Design continues; development starts; VAX and WASPC data
loadedICOS System Maintenance and PDM
DevelopmentICOS System Development and
MaintenanceICOS System Development and
MaintenanceICOS production goes live with school districts loading data
User InteractionPilot school districts;
Training begin.
school districts begin loading data; consultant data loading begins and continues through various means including: Study
and survey grants; Asset Preservation Program
compliance; district voluntary data entry
School districts with consultant data loading through FEMA grants; Specialized consultant trainings begin for industry
standard data.
Districts continue to update inventory and condition data.
Districts continue to update inventory and condition data.
Milestones
System design completed.
Development complete. WASPC and VAX data migration
completed.
Estimated 43% data collection
complete
System development begins. School districts have access and entering data.
1st Annual School Facility Survey Completed
Data loaded from VAX and WASPC
Data Collection (Study and Survey Grants)
System Design and Development
Data Collection (Districts without SCAP Projects)
Present DataInformation & Condition of Schools (ICOS)
ICOS
SCAP
K-3 Class-Size
Reduction
APPPDM
Inventory &
Condition
Inventory and Condition
Data tracked in the Inventory and Condition module
Facility site information.
GIS mapping, pinpointing the main entrance of a school facility. (This also ties into PDM.)
District building inventory.
Condition rating.
Facility enrollments.
Asset Preservation Program(APP)
3 key components of APP
Commitment from the school board of directors to implement best practices of school building maintenance.
Implementing a plan that is proactive, predictive, or preventative for maintaining a facility over its 30-year expected life cycle.
Annual building condition assessment and a report detailing the result of that assessment to the school board of directors and OSPI.
Pre-Disaster Mitigation (PDM)
Components of PDM
GIS Location Information
Mapping a districts location by latitude and longitude in ICOS assists with determining which natural hazards a district is at risk for.
Reports
In-depth evaluation of potential hazards for each facility. These reports are used to create their pre-disaster plan to submit to EMD.
K-3 Classroom Data & Usage Information
As a result of the K-3 Class-Size Reduction Grant Program:
Classroom usage has been collected, resulting in a deeper level of information.
Student enrollments are being tracked.
School Construction Assistance Program (SCAP)
In addition to ICOS, other data collected includes:
Past and current data tables 2015 | 2014 | 2013 | 2012 | 2011 | 2010
2016 (Preliminary) construction projects qualified for future state funding assistance.
Past and current projects
Future Data
SCAP Facilities Other
D-Forms Expansion of PDM BCA Changes Trigger WASPC
Study & Survey Pivot Tables/Reporting Conversion of Silverlight
Bond/Levy Planning