Data Logger/ Daily Meter Reading Data Logger/ Daily Meter Reading ProcessesProcesses
Data Logger/ Daily Meter Reading Data Logger/ Daily Meter Reading ProcessesProcesses
New Daily Metered Site
DM Service Provider receives a request from Gas Shipper for installation of daily meter reading equipment
Quotation provided
On quotation acceptance New MPR – Meter Details manually added using data from
Connection/Disconnection Store Datalogger information added to UK-Link to allow DM nomination to
be made in Gemini Datalogger details updated when installation is completed
Daily Read Process
Collect a reading for the start/end of each gas day (06:00)
Carry out initial tolerance validation on readings received
Deliver reading to UK-Link (xoserve)
UK-Link validates and delivers DM readings to Shippers before 11.00 a.m. each day via the IX
Where readings are not collected estimates are calculated within S&M based on D-7 consumption
Sweep up files are provided for readings collected after the deadline and loaded into UK-Link
DM readings/consumptions are collected every 4 hours during the gas day
Daily Read Delivery Service
National Grid – Network Operations•Deliver DM Firm / Interruptible consumption data, separately, every 4 hours, within 1 hour after collection•Deliver 7am DM Firm/ Interruptible consumption data, separately at 8am•Deliver DM Firm/ Interruptible consumption data, separately, for the previous 24 hours by 10am each day
Demand Forecasting - Xoserve•Deliver DM, Unique and NDM firm readings, validated by specified routines on D+14 following collection•Biannually increase delivery to meet issued schedule
Daily Read file - xoserveDeliver 6am readings by 8:30am for onward delivery to shippers by 11am (Liable Process)Deliver daily sweep up files of late readings by 4.30pm
Unique Site File - XoserveDeliver 6am readings for Unique Sites by 10am
Unique Site Readings to Gas ShippersDeliver 6am reading, by fax, to gas shippers prior to 11am (Liable Process)
Bulletin Board ServiceProvider Gas Shippers with a facility to access hourly data at four hourly intervals of each gas day
DM Annual Check Read
Arrange a DM Check Read/Site Visit every 12 months
Validates the accuracy of the datalogger
Input the Check Read/Resync site visit on UK-Link
Instigates DM Reconciliation
Each resync investigated to account for drift. Drift then manually input onto UK-Link
UK-Link pro-rates drift across reconciliation period
Daily Read Errors & Consumption Adjustments
Where the Daily Read Equipment is deemed not to be functioning correctly; up to D+5 the Shipper can request that the consumption is adjusted
Faulty metering equipments – Consumption Adjustments are agreed between Shippers and DM Service Provider
DM Service Provider pass the adjustment details to xoserve
DM consumption issues are also identified by National Grid, Network Operations Team; who refer these to the shipper for investigation
Daily Read Charges
Daily Meter Reading Charge Charge for the collection/delivery of Daily Meter Readings to gas shippers
Datalogger Rental Charge Rental charge covering the maintenance of the datalogger
Daily charges specified in the DM Service Providers Charging Statements
Invoice created monthly of relevant charges for each shipper by Network
Passed to xoserve for issue to Gas Shippers
DM Liabilities
Deliver 97.5% of readings to Gas Shippers on a monthly basis. Readings must be delivered by 11.00 a.m. on D+1 of each Gas day during the month
Where daily readings are not delivered for 4 consecutive days, on the following day and every subsequent day liabilities are paid
DM Service Provider monitor and calculate the DM read performance for these standards and provide these to xoserve on a monthly basis