22
Data Buoy Cooperation Data Buoy Cooperation Panel Panel Hester Viola [email protected]

Data Buoy Cooperation Panel Hester Viola [email protected]

Embed Size (px)

Citation preview

Page 1: Data Buoy Cooperation Panel Hester Viola viola@jcommops.org

Data Buoy Cooperation Data Buoy Cooperation PanelPanel

Hester [email protected]

Page 2: Data Buoy Cooperation Panel Hester Viola viola@jcommops.org

2

DBCP statusDBCP status

• Status of the Buoy network globally

• Monthly reports and maps

• GTS data dissemination

• Deployment opportunities

• JCOMM and the International context

• WMO – sustained observing systems

• Iridium Pilot Project

Page 3: Data Buoy Cooperation Panel Hester Viola viola@jcommops.org

3

DBCP Global Network StatusDBCP Global Network Status

Page 4: Data Buoy Cooperation Panel Hester Viola viola@jcommops.org

4

DBCP Monthly reportsDBCP Monthly reports

• Monthly static maps – www.jcommops.org

MAP ROOM– JCOMM maps– DBCP maps of sensors, iridium

buoys, delays and barometer buoys

• Deployment opportunities – Monthly email to

[email protected]

• Buoy Quality Control feedback loaded into database

Page 5: Data Buoy Cooperation Panel Hester Viola viola@jcommops.org

5

DBCP interactive mapsDBCP interactive maps

• Monthly - http://w4.jcommops.org/website/DBCP/• Daily - http://w4.jcommops.org/website/DBCP_RT/ plus

7 day tracks• JCOMM map - http://w4.jcommops.org/website/JCOMM

Page 6: Data Buoy Cooperation Panel Hester Viola viola@jcommops.org

6

Web Map ServicesWeb Map Services

• Arctic Map Monthly - http://w4.jcommops.org/website/DBCPN/

http://w4.jcommops.org/wmsconnector/com.esri.wms.Esrimap?request=getMap&ServiceName=DBCPN&Service=wms

Page 7: Data Buoy Cooperation Panel Hester Viola viola@jcommops.org

7

GTS data disseminationGTS data dissemination

• WMO Global Telecommunication System used to disseminate data in real time.

• Details on http://www.jcommops.org/DBCP/gts • Assistance from myself and CLS (Argos) to

share data easily.• Data checks:

– Metadata and timeliness www.jcommops.org or www.osmc.noaa.gov

– Data Quality control on http://www.meteo.shom.fr/qctools/ and via monthly statistics

Page 8: Data Buoy Cooperation Panel Hester Viola viola@jcommops.org

8

Deployment opportunities 08-Deployment opportunities 08-0909

• Argo Planning Map:

• Please: email JCOMMOPS with new opportunities - research cruises, ships travelling up to the Arctic etc

http://w4.jcommops.org/website/Argo, Plans(c)

Page 9: Data Buoy Cooperation Panel Hester Viola viola@jcommops.org

9

  Number of Air Pressure reports on the GTS (Drifting Buoys) from 2002-2007 

100000

150000

200000

250000

300000

350000

400000

06/2002 12/2002 06/2003 12/2003 06/2004 12/2004 06/2005 12/2005 06/2006 12/2006 06/2007 12/2007 06/2008

Month/Year

GT

S A

cc

ep

ted

Re

po

rts

Barometer BuoysBarometer Buoys

• JCOMM aims to have all buoys in high latitudes measuring Air Pressure

• Barometer Upgrades (SVPB) offered by drifting buoy manufacturers through financial support by the GDP (AOML)

http://www.jcommops.org/dbcp/svpb_upgrade.html

Page 10: Data Buoy Cooperation Panel Hester Viola viola@jcommops.org

10

JCOMM and the International JCOMM and the International contextcontext

• Two important meetings next year– Ocean Observations 09– JCOMM III

• New JCOMM website www.jcomm.info

• Enter contact details

Page 11: Data Buoy Cooperation Panel Hester Viola viola@jcommops.org

11

WMO Sustained observing systemsWMO Sustained observing systems

• WMO fully supports the ongoing efforts and

research coming from the IPY

• Sustained Arctic Observing Network

– 3 workshops in total (3rd one in October)

– www.arcticobserving.com

• WMO Congress (Cg-XV, 2007) established a

Global Cryosphere Watch (GCW).

Page 12: Data Buoy Cooperation Panel Hester Viola viola@jcommops.org

12

Iridium Pilot ProjectIridium Pilot Project

• Seeks to evaluate the feasibility of Iridium

technology for real-time telecommunication

of drifter data

– under various conditions e.g. in wide temperature

ranges, remote ocean areas and in rough seas,

where the buoy will be frequently submerged

• DBCP funds used to “upgrade” 50 Argos

buoys to Iridium ($500 each) to be deployed

worldwide, to allow inexpensive access to

Iridium Buoys

Metocean Iridium Buoy

NAL Research 9601 modem

Page 13: Data Buoy Cooperation Panel Hester Viola viola@jcommops.org

13

Page 14: Data Buoy Cooperation Panel Hester Viola viola@jcommops.org

14

http://www.jcommops.org/dbcp/iridium-pp/http://www.jcommops.org/dbcp/iridium-pp/

• Number deployed so far: 73

• Number on GTS today: 44– Australia 2– India 2– USA 3– UK 3– France 4– ESURFMAR 30

• Need buoys in the Polar regions, Pacific ocean and central Atlantic

Page 15: Data Buoy Cooperation Panel Hester Viola viola@jcommops.org

15

FindingsFindings

• Arctic buoys

• Transmission and data format

• Timeliness / delays

• Positioning

• Buoy and Transmission costs

Page 16: Data Buoy Cooperation Panel Hester Viola viola@jcommops.org

16

Global Status May 2008Global Status May 2008

Page 17: Data Buoy Cooperation Panel Hester Viola viola@jcommops.org

17

Iridium Buoys in the ArcticIridium Buoys in the Arctic

• Météo France and SAMS both deployed Iridium buoys in the Arctic, and found:1. Iridium drifters didn't report

when the temperature was below  -35C. SBD modem 9601 doesn't work below this temperature.

2. due to the cold conditions, the batteries drained faster than at mid-latitudes

Meteo France Buoy in the Arctic

Page 18: Data Buoy Cooperation Panel Hester Viola viola@jcommops.org

18

Data TransmissionData Transmission

Example of email received from Iridium with attached data in .sbd file

From: [email protected] To: [email protected], [email protected]: Fri, Jun 13, 2008 at 9:11 AMSubject: SBD Msg From Unit: 300034012620430

MOMSN: 1946 MTMSN: 0 Time of Session (UTC): Fri Jun 13 07:11:09 2008 Session Status: 00 - Transfer OK Message Size (bytes): 17

Unit Location: Lat = -16.278109 Long = 86.554414 CEPradius = 4

SBMmessage.sbd attached

Iridium transmission format (version 3.2) »

Page 19: Data Buoy Cooperation Panel Hester Viola viola@jcommops.org

19

Data Timeliness Results (1)Data Timeliness Results (1)

From E-SURFMAR Jean Rolland.5th DB-TAG-Reykjavik – 20th May-21st May

Page 20: Data Buoy Cooperation Panel Hester Viola viola@jcommops.org

20

Results (2)Results (2)

Page 21: Data Buoy Cooperation Panel Hester Viola viola@jcommops.org

21

PositionPosition

• For meteorological purposes, the Iridium Location is sufficiently accurate. (GPS not necessary)• Less drain on the battery • Less expensive

Page 22: Data Buoy Cooperation Panel Hester Viola viola@jcommops.org

22

COSTS (€)COSTS (€)

SVP-B TRANSMISSION

ARGOS 2150

(15 x 12 + 6 x365) = 2370

2835 (Tax included)

IRIDIUM SBD via Meteo

France2400

(13.30 x 12 + 0,028x24x365) = 404,88

485 (Tax included)

1€ = 1,50 $