25
Government Contracting Solution (GCS DP_046) 6900 East Camelback Rd. Suite 805 Scottsdale, Arizona 85251 Fax: 1-866-877-4705 Cell: 914-299-7743 Email: [email protected] Barbara McElnea Director, Solution Management

Dassian Government Contracting Solution (GCS)

Embed Size (px)

DESCRIPTION

Dassian's Government Contracting Solution is essential for government contractors and service provider firms because it easily manages the most complex contract types offering insight into key contract performance metrics as well as automating the critical and complex billing processes needed by today's government contractor and service provider firms. GCS compliments the capability of SAP® to manage government contracting requirements enabling the much sought after DCAA compliance.

Citation preview

Page 1: Dassian Government Contracting Solution (GCS)

Government Contracting Solution (GCS DP_046)

• 6900 East Camelback Rd. Suite 805 Scottsdale, Arizona 85251

• Fax: 1-866-877-4705

• Cell: 914-299-7743

• Email: [email protected]

Barbara McElnea

Director, Solution Management

Page 2: Dassian Government Contracting Solution (GCS)

Contractors to the U.S. Government must be able to manage multiple contract types in accordance with the strictest regulations, as defined

in the Federal Acquisition Regulation (FAR) and its supplements.

Managing Contract Modifications, Funding Control, Fees, Retentions and ACRNs can be a challenge.

The Dassian Government Contracting Solution is designed to leverage the standard SAP capabilities and to provide additional functionality for modification management as well as billing execution.

Government Contracting Challenges

Page 3: Dassian Government Contracting Solution (GCS)

Extends a standard SAP contract with government specific information.

Records contract modifications of contract value, funded value, and period of performance.

Records external funding and allocates consumed funding during billing.

Allows for costs to be placed on billing hold.

Performs government billing calculations of T&M rates, overheads, funding, fees, and withholds during billing.

Reporting of contract performance and billed values.

Delivered Government Voucher SF 1034/1035.

The Remedy – Dassian’s Government Contracting Solution

Page 4: Dassian Government Contracting Solution (GCS)

Easier to Manage Funding with

Contract Performance

Dashboard and Funding Alerts

Cost Plus,

Time and Material

Fixes Price

Contract Modification

Database for DCAA Reporting

Contract Setup

Contract Data: Prime Cont. # Modifications: Contract & Funding Value Project Assign to CLINs ACRNs

Billing Setup

Ceilings

Fee & Cost Retention

Fees: Fixed, Award, Incentive

Rates

GSA Rate Schedules T&M Billing Rates Billing Overhead Rates

Reporting

Contract Performance Against Funding Invoice History ACRN Distribution

Wednesday, March 20, 2013 4

GCS Contract Management

Page 5: Dassian Government Contracting Solution (GCS)

Maintain DCAA compliance by passing

to suppliers DPAS Rating, Prime Contract, CAS clauses and other

requirements

Saves Procurement time by automating Prime Contract data

to Supply Line

Flow Down Data Fields

Flow Down Fields

Field Values

Field Groups

Specify Receiving Objects

Populate Values

On Contract

Populate Values Contracts Sales Orders Copy Functionality

Display Values In Contract

Displays Populated Fields

Contracts

Sales orders

Flows Down from SD document to SD document

Supply Receiving Objects

Displays Contract Data in Other SAP Replenishment Objects

Purchase Requisitions Purchase Orders WBS Elements

GCS Flow Down – CAS FAR 52.230-2 & Other

Page 6: Dassian Government Contracting Solution (GCS)

Increases Cash Flow by Faster

Invoice Generation

Enables Direct Billing to Payment

Office thus Reducing A/R Aging and Increasing Cash

Flow

Decreases Operating Costs Thru

Automation of Invoicing Process

Review Unbilled

Cost/Billing Holds

Review Unbilled Costs Place on Billing Hold Remove from Billing Hold

Initiate Billing

Billing Extracts Costs from Project Ledger

Will Not Consider Unallowables or Costs on Billing Hold

Billing

Cum. Costs Allow Funding Control & Ceilings Apply Rates Calculate Fees & Retentions Retroactive Rate Adjust.

Reporting

Approval Process SF1034 SF1035 Billed/Unbilled Cost Backup Report Funding Alerts

Wednesday, March 20, 2013 6

GCS Billing

Supports DCAA Audit with Reports tying Source Detail

to Invoice

Page 7: Dassian Government Contracting Solution (GCS)

Contract Setup

Entering Modifications

External Funding Sources

Modification Reporting

Maintaining Rates

Fees

Billing Holds

Inception-To-Date Billing

Forms, SF1034, SF1035, SF1443, DD250

Contract Reporting

Contract Flow Down

Alternate Billing Structure

Retentions

Inside Dassian’s Government Contracting Solution

Page 8: Dassian Government Contracting Solution (GCS)

Contract Setup

Contract Setup Role: Ordering Data – Prime Contract, Task Order, Delivery Order Ext’d Contract Data – Contract Type, DPAS Rating, GSA Schedule, Rate Decks

Contract Flow Down – Customer Defined Contract Fields

Page 9: Dassian Government Contracting Solution (GCS)

Modifications can have incremental contract values or funded values: 1. Contract values or

Funded values can be entered based on Cost or Fees.

2. The values are entered incrementally and the cumulative total is displayed.

3. Values are entered at the contract line item level.

Entering Modifications

Page 10: Dassian Government Contracting Solution (GCS)

• The modifications are shown in a standard SAP ALV grid. The user can sort, summarize, group, filter, choose columns to display and download to Excel.

• All modification data entry fields are available in this ALV grid. • The change log history for each individual modification is available.

Modification Reporting

Page 11: Dassian Government Contracting Solution (GCS)

The External Funding Source tab is where customer supplied ACRNs are entered: •The EFS Value is entered along with the priority. •The billing process will distribute the invoice amounts against each EFS according to the priority. •A blank priority is a proportional distribution while a numeric priority is a specific consumption sequence.

External Funding Sources

Page 12: Dassian Government Contracting Solution (GCS)

The Alternate Billing Structure tab is used to define a billing structure independent of the project accounting structure. • Multiple project wbs elements from various project structures can be assigned to one contract line item. •The billing percentage can be defined so that one project wbs element can be billed against multiple contract line items.

Alternate Billing Structure

Page 13: Dassian Government Contracting Solution (GCS)

The retentions tab is used to enter combinations of retained amounts that need to be applied to an invoice but are not part of the modification entry process such as cost withholds, fee withholds, and labor retentions.

Retentions

Page 14: Dassian Government Contracting Solution (GCS)

T&M Labor Billing Rates are maintained through Dassian’s Flexible Pricing Workbench. The created rate deck is then assigned to the contract in GCS. These rates are then applied during Resource-Related Billing. All billing history is maintained for reporting.

Maintaining Rates: Flexible Pricing

Page 15: Dassian Government Contracting Solution (GCS)

Overhead rates are automatically applied to the contract based on the value assigned in the Contract Setup Overheads field. This is the field which assigns the correct overhead rate deck for billing purposes.

Maintaining Rates: Overhead Rates

Page 16: Dassian Government Contracting Solution (GCS)

There are 3 fee methods: • Percent of Cost • Per Hour • Fixed Amount

Each contract item can have many fees. Each fee can be created as a Fixed Fee, Award Fee or Incentive fee.

Fees

Page 17: Dassian Government Contracting Solution (GCS)

The billing hold functionality is available for all cost plus and time and material contracts. Unbilled costs can be placed on billing hold to exclude from the invoice.

Billing Holds

Page 18: Dassian Government Contracting Solution (GCS)

• The billing hold report serves as a report of unbilled items as well as an application used to place items on billing hold to exclude from the invoice.

• It is possible to place partial amounts or quantities on billing hold.

Billing Holds Cont’d

Page 19: Dassian Government Contracting Solution (GCS)

GCS CP & TM billing is inception-to-date: • Invoices cost values ITD. • Subtracts previously billed values. • EFS distribution based on priority.

Inception-To-Date Billing

Page 20: Dassian Government Contracting Solution (GCS)

SF1034/1035 provided that can be modified to

suit each customer implementation

Invoice Public Voucher SF1034/SF1035

Page 21: Dassian Government Contracting Solution (GCS)

Invoices Progress Payment and DD250

Page 22: Dassian Government Contracting Solution (GCS)

The Billed Cost Report shows all of the costs that have been invoiced and their ITD values as well as current billed values on the invoice

The Unbilled Cost Report shows the costs that have yet to be invoiced. Partial Billed and Billing Hold indicators provide more details

Contract Reporting: Billed Cost / Unbilled Cost

Page 23: Dassian Government Contracting Solution (GCS)

The Contract Performance Tab shows the overall performance of the contract against the contract values and funded values.

The Invoice History tab shows the details of each invoice including the invoice number, voucher number and billing values.

Contract Reporting: Contract Performance & Invoice History

Page 24: Dassian Government Contracting Solution (GCS)

Extends a standard SAP contract with

government specific contract data

Records and reports contract modifications

and ACRNs

Enter Fees, OH Rates, TM Rates and

Retentions which are used for billing

Allows for costs to be placed on billing hold

Performs government billing calculations of various costs during

resource-related billing

Reporting of contract performance,

modifications, billed / unbilled costs

• Mods, ACRNs, Alternate Billing Structure

Contract setup

• TM Rates, OH Rates, Fees, Retentions Billing setup

• Billing Data, Billing Holds, Resource-Related Billing (RRB) Billing

• Contract Performance, Invoice History

• Billed / Unbilled Cost Report

• Modification History

Reporting

Summary – GCS The Solution for Government Contractors

Page 25: Dassian Government Contracting Solution (GCS)

• 6900 East Camelback Rd. Suite 805 Scottsdale, Arizona 85251

• Fax: 1-866-877-4705

• Email: [email protected]

• Email: [email protected]

Dan Murphy,

President

Barbara McElnea

Director, Solution

Management

Thank You!