Darwin Green
Darwin Green – Introducing the team
BDW Homes Cambridgeshire Division Adam Knight – Operations Director David Rix – Technical Project Manager Justice Nyakatawa – Planner
INFRASTRUCTURE WORKS
Infrastructure Works
Infrastructure Works
Works progress well including: • Main arterial routes through the site are now complete to
base course level.
• Main arterial road drainage works are 100% complete
• Strategic services pipework is installed across the site. • Earthworks to central park on-going
• Temporary haul road connection is being made to allow site
access from Histon Road to alleviate Huntingdon Road.
• Application for the Histon Road utility compound is being made to allow electrical energising of the site.
• Temporary access for the Public Right of Way is near completion for use.
Infrastructure Works
Main spine route over local centre looking south towards Huntingdon Rd
Infrastructure Works
Central Park and earth works looking north towards Histon Rd
Infrastructure Works
Main Spine Road and earth works
Infrastructure Works
Main spine road now links up with Histon Road to the North
Infrastructure Works
Works Commencing on Public Right of Way to West Swales now formed
Infrastructure Works
Road 5 being formed providing access to BDW2 Pavilion Quarter
Darwin Green One – BDW1
BDW1 – First Residential Phase
PROGRAMME
• R & S completed
• Foundations to Residential units
commenced and 75% complete
• Marketing Suite will be formed in first
apartment block with an adjacent car park
and show home
• Sales Launch anticipated in Later Summer
2018
BDW1 – First Residential Phase
PROGRAMME
• Adoptable road & sewers completed
• Private drainage completed
• Foundations 100% complete
• Brickwork at 1st lift dwellings
BDW1 – First Residential Phase
APARTMENT BLOCK & MARKETING SUITE • Marketing Suite will be formed
in first apartment block with an
adjacent car park and show
home
• Sales Launch anticipated in
Later Summer 2018
BDW1 – First Residential Phase
STREETSCENE
- BDW1 WEST
BDW1 – First Residential Phase
STREETSCENE
- BDW1 EAST
Darwin Green One – Local Centre
Local Centre
Local Centre will consist of the following:
• 114 residential apartments of which 40%
will be affordable.
• Library
• Community Rooms
• Health Centre
• Retail Units – Use Classes A1, A2, A3, A4
and A5
Preparing information to submit pre-
commencement planning conditions
Anticipate commencing foundation in July 2018
BDW1
Local Centre
Local Centre will consist of the following:
• 114 residential apartments of which 40%
will be affordable.
• Library
• Community Rooms
• Health Centre
• Retail Units – Use Classes A1, A2, A3, A4
and A5
Preparing information to submit pre-
commencement planning conditions
Foundations have commenced
BDW1
Local Centre
Next Phase: Planning
BDW2 – Pavilion Quarter [Immediate Context]
Views of The Square
BDW2 – Pavilion Quarter
Views of The Square The next residential phase of Darwin Green will be the Pavilion Quarter. The Pavilion Quarter is located in the South-east corner of the site. The key consultants (Architects, Landscaping, Drainage, etc.) are on board progressing the scheme and discussions with LPA on the emerging scheme on-going. Around 320 units on the site, including Locally Equipped Area of Play (LEAP) and allotments Targeted submission is first quarter of 2019.
BDW2 – Parameter Plan [Building Heights]
Views of The Square
BDW2 – Parameter Plan [Access]
Views of The Square
BDW2 – Parameter Plan [Landscape]
Views of The Square
Communication
Darwin Green website is active and is updated monthly. For any updates on construction and planning please follow the following link:
http://www.darwingreen-consultation.co.uk/ A newsletter for October has been uploaded on the website. The website is monitored and all comments/questions posted promptly directed to the relevant people to review/address.
Communication
Any Questions?