21
DANUBE INFORMATION SERVICES CONFERENCE DISC 2012 Vukovar / Croatia, 12th-13th December, 2012 Traffic Management System of vessels on the Canal Danube - Black Sea and Information on inland water transport Ro-RIS ACN

DANUBE INFORMATION SERVICES CONFERENCE DISC 2012 Vukovar / Croatia, 12th-13th December, 2012

Embed Size (px)

DESCRIPTION

DANUBE INFORMATION SERVICES CONFERENCE DISC 2012 Vukovar / Croatia, 12th-13th December, 2012. Traffic Management System of vessels on the Canal Danube - Black Sea and Information on inland water transport Ro-RIS ACN. C O N T E N T :. General information Services provided by Ro-RIS ACN - PowerPoint PPT Presentation

Citation preview

Page 1: DANUBE INFORMATION SERVICES  CONFERENCE DISC 2012 Vukovar / Croatia, 12th-13th December, 2012

DANUBE INFORMATION SERVICES CONFERENCE DISC 2012

Vukovar / Croatia, 12th-13th December, 2012

Traffic Management System of vessels on the Canal Danube - Black Sea and Information on inland water transport Ro-RIS ACN

Page 2: DANUBE INFORMATION SERVICES  CONFERENCE DISC 2012 Vukovar / Croatia, 12th-13th December, 2012

General information

Services provided by Ro-RIS ACN

System architecture

Components of Ro-RIS ACN

Page 3: DANUBE INFORMATION SERVICES  CONFERENCE DISC 2012 Vukovar / Croatia, 12th-13th December, 2012

Agreement developed with EU founds and implementing by UTI SYSTEMS

The project is executed in the context of the national achieving Ro-RIS System that will cover Danube river, Canal Danube - Black Sea and the Romanian sector of the Black Sea.

Page 4: DANUBE INFORMATION SERVICES  CONFERENCE DISC 2012 Vukovar / Croatia, 12th-13th December, 2012

General information (continuation)The system will be fully integrated on the national system Ro-RIS, structured like a regional system. Compared to others regional systems, the regional system Ro-RIS - ACN will have additional functions related to management of Canal Danube - Black Sea.

Giurgiu

Page 5: DANUBE INFORMATION SERVICES  CONFERENCE DISC 2012 Vukovar / Croatia, 12th-13th December, 2012

Canal Danube – Black Sea

Page 6: DANUBE INFORMATION SERVICES  CONFERENCE DISC 2012 Vukovar / Croatia, 12th-13th December, 2012

Services provided by Ro-RIS ACN• Information services about the waterways of the

Danube - Black Sea Canal• Planning trips• Traffic Information• Traffic Management• Management of ports and terminals• Fleet management and cargo• Disaster Mitigation• Lock Management• Automatic Invoicing

Page 7: DANUBE INFORMATION SERVICES  CONFERENCE DISC 2012 Vukovar / Croatia, 12th-13th December, 2012

System Architecture

CCTV

Ro – RIS ACN Network

CCTV

CCTV

AGGREGATIONVHF AGGREGATION

AISAGGREGATION

WEATHER

AGGREGATIONCCTV

REDISTRIBUTIONVHF REDISTRIBUTION

AIS

REDISTRIBUTIONCCTV

LAN

COMMAPS

MANAGEMENTTARGETS SENSORS

RULES EVA;UATION

ALARMS MANAGEMENT

CONTINUOS RECORDS

SHIP MANAGEMENT

OPERATIONS MANAGEMENT

AGREGATION

DISTRIBUTION

PROCESSING

WANWAN

Page 8: DANUBE INFORMATION SERVICES  CONFERENCE DISC 2012 Vukovar / Croatia, 12th-13th December, 2012

The system is supported by implementing the following components:1.Communication subsystem

2.IT infrastructure

3.Video Monitoring subsystem

4.Software applications

Page 9: DANUBE INFORMATION SERVICES  CONFERENCE DISC 2012 Vukovar / Croatia, 12th-13th December, 2012

1. Communication subsystem

The strength point of the Ro-RIS ACN System is the communications system which belongs to ACN and shows 5 levels of redundancy.

Page 10: DANUBE INFORMATION SERVICES  CONFERENCE DISC 2012 Vukovar / Croatia, 12th-13th December, 2012

1.1 Radio Communications (Microlink) Subsystem

Page 11: DANUBE INFORMATION SERVICES  CONFERENCE DISC 2012 Vukovar / Croatia, 12th-13th December, 2012

1.2 VHF Communication subsystem (VHF for VTS)

Page 12: DANUBE INFORMATION SERVICES  CONFERENCE DISC 2012 Vukovar / Croatia, 12th-13th December, 2012

1.3 AIS Subsystem

Page 13: DANUBE INFORMATION SERVICES  CONFERENCE DISC 2012 Vukovar / Croatia, 12th-13th December, 2012

1.4 Fiber Optic Infrastructure

Page 14: DANUBE INFORMATION SERVICES  CONFERENCE DISC 2012 Vukovar / Croatia, 12th-13th December, 2012

2. IT Infrastructure

All hardware equipment's serving one or more subsystems (servers, storage, racks, ups, workstations, printers etc.)

Page 15: DANUBE INFORMATION SERVICES  CONFERENCE DISC 2012 Vukovar / Croatia, 12th-13th December, 2012

3. Video monitoring subsystem

Consists of:-21 PTZ video cameras-Dedicated servers-Recorders-Video storage systems-Workstations-Basic video monitoring applications

Page 16: DANUBE INFORMATION SERVICES  CONFERENCE DISC 2012 Vukovar / Croatia, 12th-13th December, 2012

4. Software applicationsDesktop application for management of

vessel traffic river ECDIS typeElectronic ship reporting Lock managementStatistics vessel traffic• Dangerous goods• Support service to reduce the effects of

calamitiesCCTV

Page 17: DANUBE INFORMATION SERVICES  CONFERENCE DISC 2012 Vukovar / Croatia, 12th-13th December, 2012

ECDIS–Tracking System traffic through AIS

Provides an accurate and updated image regarding the ships location.Records the data in order to be displayed and analyzed. Displays the status of sea traffic on digital maps S52.It exchanges the data with other information systems in RO-RIS ACNMonitors compliance of traffic rules and alerts unauthorized situations.

Page 18: DANUBE INFORMATION SERVICES  CONFERENCE DISC 2012 Vukovar / Croatia, 12th-13th December, 2012

Lockage managementTraffic queues management.

Lockage planning (ETA operation; Suggesting lockage plan)

- Integrated with AIS and ERI - It receives data about voyages- Makes automatic course lockage- It follows the priority rules based on cargo (freight) or type of vessels - Exclusion rules that the operators have in their plannings - Integrate the water level system

Page 19: DANUBE INFORMATION SERVICES  CONFERENCE DISC 2012 Vukovar / Croatia, 12th-13th December, 2012

Monitoring ships that carry dangerous goods Alerting traffic supervisors Proper data management about

dangerous cargo Integrating data base IMDG Planning the situations when there are

incidents Observing the course of situations and

collaboration with dispetchers in this period

Alerting the local authorities Simulation frame and supervisors’

training for projection of case studies and operating on these with proper tools.

Page 20: DANUBE INFORMATION SERVICES  CONFERENCE DISC 2012 Vukovar / Croatia, 12th-13th December, 2012

The main service for reducing the effects of disastersIt represents the incidents sheet.

It takes data from the other systems to offer a proper image particularly about the sizes and risks.Observing the course of activities and assures the electronic alert.

Page 21: DANUBE INFORMATION SERVICES  CONFERENCE DISC 2012 Vukovar / Croatia, 12th-13th December, 2012

Thanks for your Attention!

Dorin Craciun

System Administrator RoRIS ACNPhone: 0040758029898Email: [email protected]