Dansko Phase IIIDansko Phase III

West Grove, PAWest Grove, PA

David RosenbergerLighting/ElectricalLighting Advisor: Dr. MistrickElectrical Advisor: Ted Dannerth

Project Team

Owner: Dansko, Inc.

Architect: Bernardon Haber Holloway

MEP/Lighting Design: Brinjac Engineering, Inc.

Structural: Baker, Ingram & Associates

Civil: Gilmore & Associates

Interior: Contract Environments

Geotech: Advanced GeoServices

Construction Management: W.S. Cumby & Son, Inc.

Data/Comm: Tangent Cable

LIGHTING DEPTHAtrium Lighting DesignOpen Office Lighting Design

MECHANICAL BREADTHOpen Office Energy Analysis with High Light Reflectance Ceiling

ELECTRICAL DEPTHEmergency GeneratorCu vs. Al Feeder Material

CONSTRUCTION MANAGEMENT BREADTHIntegrating Luminaires into Furniture

Outline

LIGHTING DEPTHLIGHTING DEPTHAtrium Lighting DesignAtrium Lighting DesignOpen Office Lighting Design

MECHANICAL BREADTHOpen Office Energy Analysis with High Light Reflectance Ceiling

ELECTRICAL DEPTHEmergency GeneratorCu vs. Al Feeder Material

CONSTRUCTION MANAGEMENT BREADTHIntegrating Luminaires into Furniture

Outline

Atrium Lighting Design

…through the space…

Atrium

…draw attention to your feet…

Design Intent – Direction

Atrium

Recessed Perimeter Wallwash

“Ribbons of Light”

Diffusing Lens

Recessed “Basket”

Style Direct/Indirect

StriplightsTranslucent

Acrylic “Shoebox”

Elliptical Reflector Uplight

Square Downlight

Handrail-IntegratedLED Strip

Atrium

Average Illuminance:

16 fc

Maximum/Minimum Illuminance Ratio:

3.25:1

Atrium

Average Illuminance:

16 fc

Maximum/Minimum Illuminance Ratio:

1.57:1

Atrium

Average Illuminance on Task Plane:

31 fc

Maximum/Minimum Illuminance Ratio:

2.25:1

Atrium

LIGHTING DEPTHLIGHTING DEPTHAtrium Lighting DesignOpen Office Lighting DesignOpen Office Lighting Design

MECHANICAL BREADTHOpen Office Energy Analysis with High Light Reflectance Ceiling

ELECTRICAL DEPTHEmergency GeneratorCu vs. Al Feeder Material

CONSTRUCTION MANAGEMENT BREADTHIntegrating Luminaires into Furniture

Outline

Open Office Lighting Design

Open Office

Design Intent – Focus

Production

Design

Presentation

Indirect T5HO Luminaires Integrated

into Furniture

Recessed T5 Downlights with Blade Louvers

Recessed Adjustable MR-16 Downlights

Open Office

Average Illuminance on Task Plane:

36 fc

Maximum/Minimum Illuminance Ratio:

1.56:1

Open Office

Average Illuminance on Ceiling:

78 fc

Maximum/Minimum Illuminance Ratio:

5.42:1

Open Office

Average Illuminance on Task Plane:

34 fc

Maximum/Minimum Illuminance Ratio:

1.19:1

LIGHTING DEPTHAtrium Lighting DesignOpen Office Lighting Design

MECHANICAL BREADTHMECHANICAL BREADTHOpen Office Energy Analysis with Open Office Energy Analysis with High Light Reflectance CeilingHigh Light Reflectance Ceiling

ELECTRICAL DEPTHEmergency GeneratorCu vs. Al Feeder Material

CONSTRUCTION MANAGEMENT BREADTHIntegrating Luminaires into Furniture

Outline

Open Office

High Light Reflectance Ceiling

15% Higher Reflectance than Average Lay-in Ceiling Tile

Allows for a reduction in Lighting Power Density

Component

New Building

($)

Air System Fans 724

Cooling 1,074

Heating 3,998

Pumps 0

Cooling Tower Fans 0

HVAC Sub-Total 5,796

Lights 1,668

Electric Equipment 0

Misc. Electric 0

Misc. Fuel Use 0

Non-HVAC Sub-Total

1,668

Grand Total 7,465

Component

Original Building

($)

Air System Fans 881

Cooling 1,448

Heating 1,336

Pumps 0

Cooling Tower Fans 0

HVAC Sub-Total 3,666

Lights 3,337

Electric Equipment 0

Misc. Electric 0

Misc. Fuel Use 0

Non-HVAC Sub-Total

3,337

Grand Total 7,002

High Light Reflectance Ceiling-Reduced Number of Luminaires

Exposed Structural Ceiling-Standard Layout of Indirect Pendants

LIGHTING DEPTHAtrium Lighting DesignOpen Office Lighting Design

MECHANICAL BREADTHOpen Office Energy Analysis with High Light Reflectance Ceiling

ELECTRICAL DEPTHEmergency GeneratorCu vs. Al Feeder Material

CONSTRUCTION MANAGEMENT BREADTHIntegrating Luminaires into Furniture

Outline

Emergency Generator vs.Battery Ballasts

LIGHTING DEPTHAtrium Lighting DesignOpen Office Lighting Design

MECHANICAL BREADTHOpen Office Energy Analysis with High Light Reflectance Ceiling

ELECTRICAL DEPTHEmergency GeneratorCu vs. Al Feeder Material

CONSTRUCTION MANAGEMENT BREADTHIntegrating Luminaires into Furniture

Outline

Feeder Material: Copper vs. Aluminum

LIGHTING DEPTHAtrium Lighting DesignOpen Office Lighting Design

MECHANICAL BREADTHOpen Office Energy Analysis with High Light Reflectance Ceiling

ELECTRICAL DEPTHEmergency GeneratorCu vs. Al Feeder Material

CONSTRUCTION MANAGEMENT BREADTHCONSTRUCTION MANAGEMENT BREADTHIntegrating Luminaires into FurnitureIntegrating Luminaires into Furniture

Outline

Custom integration of indirect luminaire into office workstation

10-12 week lead time to be UL safety certified

Two Electricians 6.5 hours$527

Thank you!

Questions?