Upload
eve-howell
View
29
Download
0
Embed Size (px)
DESCRIPTION
ECE 100: Introduction to Engineering Design Modeling Assignment No. 3 Inventory Management Using PID Control (Continued); Stochastic Modeling. Daniel E. Rivera Department of Chemical and Materials Engineering Arizona State University. Some Course Business Items…. - PowerPoint PPT Presentation
Citation preview
ECE 100: Intro to Engineering Design, Presentation No. 14
Daniel E. RiveraDepartment of Chemical and Materials Engineering
Arizona State University
ECE 100: Introduction to Engineering Design
Modeling Assignment No. 3Inventory Management Using PID Control
(Continued); Stochastic Modeling
ECE 100: Intro to Engineering Design, Presentation No. 14
Some Course Business Items…
• Modeling Assignment No. 2 currently being graded and will be returned on Thursday
• Please calculate Inventory Holding costs on the basis of on-hand (and not net) stock. Otherwise you may get negative total costs…
• Use office hours, other means of communication if you are having problem understanding the assignments.
ECE 100: Intro to Engineering Design, Presentation No. 14
Modeling Assignment No. 3
• Add an engineering-based Proportional-Integral-Derivative (PID) decision policy to your previous Excel-based simulation that compares the four EOQ strategies.
• Use your simulation to determine which choice of controlled variable (net stock or inventory position) is “best” suited for this application.
• Evaluate each choice of controlled variable for a 60-day time period; generate both deterministic and stochastic simulations.
• Details provided in the Modeling Assignment No. 3 sheet.
ECE 100: Intro to Engineering Design, Presentation No. 14
Coming Up
• Thursday, March 13: Modeling Assignment No. 3 due. Project 1 description will be distributed. We will return to ECG 347 for this class session.