Upload
alexia
View
223
Download
0
Embed Size (px)
DESCRIPTION
Damage-Assessment Marikina City, PhilippinesTyphoon, Flood, Fire
Citation preview
A. CLEARING OPERATIONManpower Php. 1,810,042.80Equipment Fuel Php. 550,000.00
B. DAMAGE STRUCTURES 1. Market Mall (roofing / lighting) Php. 6,000,000.002. Covered Court (Champaca/St. Benedict) Php. 2,400,000.003. DOJ Building Php. 300,000.004. Teatro Php. 300,000.00
C. ROADS / SIDEWALK (potholes) Php. 3,000,000.00
D. RIP-RAP Php. 5,000,000.00Php. 19,360,042.80
E. DAMAGE POLE1. Meralco pole 14 2. Government pole 13. PLDT 6
TYPHOON GLENDADAMAGED ASSESSMENT
July 17, 2014
DRAGON ST., SAN ROQUE
SHALE ST., PARANG
B.SOLIVEN NANGKA BANABA COR. BALIMBING
REPAIR & MAINTENANCE PROJECTS
Project Title / Description Project Cost1. Repair / Rehab of Existing Dilapidated Sidewalk,
Curbs & Gutter @ Various Streets within Marikina City Php. 1,499,917.622. Sectional Blocking Repair of Various Streets
within Marikina City Php. 1,999,765.883. Patching of Cold Mixed @ Various Streets
within Marikina City Php. 499,910.254. Asphalt Overlay @ Various Streets within
Marikina City Php. 699,122.235. Replacement of Fiber Glass Roof of Market Zone
@ Kap. Venciong St., Sto. Nino, Marikina City Php. 1,805,496.316. Repair of Multi-Purpose Gymnasium Affection by Typhoon
Glenda @ St. Benedict Subd., Nangka, Marikina City Php. 1,805,699.047. Sectional Blocking Repair of Rancho 1 gate, Rancho Ave.,
Concepcion 2, Marikina City Php. 412,341.298. Repair / Maintenance of Vehicle Php. 1,000,000.00
Php. 9,722,252.62
TYPHOON MARIODAMAGED ASSESSMENT
August 19, 2014
43
C-5 BY PASS ROAD
CLEARING OPERATION
44
C-5 BY PASS ROAD
45
SM TERMINAL PARKINGMARCOS HIGH WAY
46
BALUBAD /BAYABAS ST., NANGKA
47
ALONG KABAYANI ROAD, BALUBAD NANGKA
48
ROAD DIKETUMANA
50
51
DOA PETRA
52
TUMANA