DAM SAFETY MANAGEMENT: Operational phase of the dam life cycle
GESTION DE LA SÉCURITÉ des barrages en exploitation
Bulletin 154
2017
INTERNATIONAL COMMISSION ON LARGE DAMSCOMMISSION INTERNATIONALE DES GRANDS BARRAGES
61, avenue Kléber, 75116 ParisTéléphone : (33-1) 47 04 17 80 - Fax : (33-1) 53 75 18 22
http://www.icold-cigb.org./ 154
Dam
saf
ety
man
agem
ent:
Ope
rati
onal
pha
se o
f th
e da
m li
fe c
ycle
G
esti
on d
e la
séc
urit
é de
s ba
rrag
es e
n ex
ploi
tati
on
Cover/Couverture :Cover illustration: WAC Bennett Dam Spillway Maintenance/Resurfacing work / Illustration en
couverture : Resurfaçage à l'évacuateur de crues du barrage WAC Bennett
AVERTISSEMENT – EXONÉRATION DE RESPONSABILITÉ :
Les informations, analyses et conclusions contenues dans cet ouvrage n'ont pas force de Loi et ne doivent pas être considérées comme un substitut aux réglementations officielles imposées par la Loi. Elles sont uniquement destinées à un public de Professionnels Avertis, seuls aptes à en apprécier et à en déterminer la valeur et la portée.
Malgré tout le soin apporté à la rédaction de cet ouvrage, compte tenu de l'évolution des techniques et de la science, nous ne pouvons en garantir l'exhaustivité.
Nous déclinons expressément toute responsabilité quant à l'interprétation et l'application éventuelles (y compris les dommages éventuels en résultant ou liés) du contenu de cet ouvrage.
En poursuivant la lecture de cet ouvrage, vous acceptez de façon expresse cette condition.
NOTICE – DISCLAIMER:
The information, analyses and conclusions in this document have no legal force and must not be considered as substituting for legally-enforceable official regulations. They are intended for the use of experienced professionals who are alone equipped to judge their pertinence and applicability.
This document has been drafted with the greatest care but, in view of the pace of change in science and technology, we cannot guarantee that it covers all aspects of the topics discussed.
We decline all responsibility whatsoever for how the information herein is interpreted and used and will accept no liability for any loss or damage arising therefrom.
Do not read on unless you accept this disclaimer without reservation.
Original text in EnglishFrench translation by Michel Poupart (France) & Marc Balissat (Switzerland)
Layout by Nathalie Schauner
Texte original en anglaisTraduction en français par Michel Poupart (France) & Marc Balissat (Suisse)
Mise en page par Nathalie Schauner
1
INTERNATIONAL COMMISSION ON LARGE DAMSCOMMISSION INTERNATIONALE DES GRANDS BARRAGES
61, avenue Kléber, 75116 ParisTéléphone : (33-1) 47 04 17 80 - Fax : (33-1) 53 75 18 22
http://www.icold-cigb.org./
DAM SAFETY MANAGEMENT: Operational phase of the dam life cycle
GESTION DE LA SÉCURITÉ des barrages en exploitation
2
COMMITTEE ON DAM SAFETY
COMITE DE LA SECURITE DES BARRAGES
(2015-2018)Chairman/Président
Canada P.A. Zielinski
Vice-Chairmen/ Vice-Présidents
Nertherlands/Pays-Bas H. Janssen
The United States/États-Unis C.G. Tjoumas
Members/Membres
Argentina/Argentine F. Giuliani
Australia/Australie S. McGrath
Austria/Autriche E. Netzer
Brazil/Brésil F. De Gennaro Castro
Bulgaria/Bulgarie D. Toshev
Canada D.N.D. Hartford
China/Chine Z. Xu
Czech Republic/République Tchèque
Finland/Finlande R. Kuusiniemi
France M. Poupart
Germany/Allemagne H.U. Sieber
India/Inde A.K. Bajaj
Iran M. Ghaemian
Italy/Italie C. Ricciardi
Japan/Japon H. Kotsubo
Korea/Corée T-S. Yoo
Lesotho B. Rafoneke
Norway/Norvège G. Holm Midttømme
Pakistan M. Mustaq Chaudry
Portugal A.F. Da Silva Gomes
Russia/Russie E.N. Bellendir
Serbia/Serbie I. Tucovic
Slovenia/Slovenie N. Humar
South Africa/Afrique du Sud C. Oosthuizen
Spain/Espagne J.C. De Cea
Sweden/Suède A. Nilsson
Switzerland/Suisse M. Balissat
Turkey/Turquie T. Dinçergök
United Kingdom/Royaume-Uni A. Hughes
Venezuela N. Castillejo
3
COMMITTEE ON DAM SAFETY
COMITE DE LA SECURITE DES BARRAGES
(2015-2018)Chairman/Président
Canada P.A. Zielinski
Vice-Chairmen/ Vice-Présidents
Nertherlands/Pays-Bas H. Janssen
The United States/États-Unis C.G. Tjoumas
Members/Membres
Argentina/Argentine F. Giuliani
Australia/Australie S. McGrath
Austria/Autriche E. Netzer
Brazil/Brésil F. De Gennaro Castro
Bulgaria/Bulgarie D. Toshev
Canada D.N.D. Hartford
China/Chine Z. Xu
Czech Republic/République Tchèque
Finland/Finlande R. Kuusiniemi
France M. Poupart
Germany/Allemagne H.U. Sieber
India/Inde A.K. Bajaj
Iran M. Ghaemian
Italy/Italie C. Ricciardi
Japan/Japon H. Kotsubo
Korea/Corée T-S. Yoo
Lesotho B. Rafoneke
Norway/Norvège G. Holm Midttømme
Pakistan M. Mustaq Chaudry
Portugal A.F. Da Silva Gomes
Russia/Russie E.N. Bellendir
Serbia/Serbie I. Tucovic
Slovenia/Slovenie N. Humar
South Africa/Afrique du Sud C. Oosthuizen
Spain/Espagne J.C. De Cea
Sweden/Suède A. Nilsson
Switzerland/Suisse M. Balissat
Turkey/Turquie T. Dinçergök
United Kingdom/Royaume-Uni A. Hughes
Venezuela N. Castillejo
SOMMAIRE CONTENTS
1. INTRODUCTION 1. INTRODUCTION2. PRINCIPES GENERAUX DE LA
SECURITE DES BARRAGES2. OVERARCHING PRINCIPLES OF DAM
SAFETY3. SYSTÈME DE GESTION DE LA
SECURITE DES BARRAGES3. DAM SAFETY MANAGEMENT
SYSTEMS4. MESURES D’ORGANISATION 4. ORGANIZATIONAL ARRANGEMENTS5. ACTIVITES POUR LA SECURITE DES
BARRAGES5. DAM SAFETY ACTIVITIES
APPENDIX A: REVIEW OF ICOLD BULLETINSAPPENDIX B: DECISION MAKING IN DAM SAFETY
REFERENCES REFERENCES
4
TABLE DES MATIÈRES
1. INTRODUCTION ........................................................................................................................2. PRINCIPES GENERAUX DE LA SECURITE DES BARRAGES ...............................................
2.1. Justification des barrages .....................................................................................................2.2. Objectif fondamental de sécurité des barrages ...................................................................2.3. Responsabilité de la sécurité en exploitation .......................................................................2.4. Rôle du Gouvernement ........................................................................................................2.5. Leadership et Management de la sécurité ...........................................................................2.6. Mesures de protection : un équilibre entre des objectifs divergents ....................................2.7. Limitation des risques, individuels et sociétaux ...................................................................2.8. Durée de vie des barrages et des réservoirs .......................................................................2.9. Préparation de plans d’intervention en cas d’urgence .........................................................
3. SYSTÈME DE GESTION DE LA SÉCURITÉ DES BARRAGES ...............................................3.1. Généralités ...........................................................................................................................3.2. Management du cycle de vie ...............................................................................................3.3. Système de management intégré ........................................................................................3.4. Systèmes de gestion de la sécurité des barrages ...............................................................3.5. Politiques et objectifs ............................................................................................................
3.5.1. Politique de sécurité des barrages .............................................................................3.5.2. Gouvernance ..............................................................................................................
3.6. Elaboration ..........................................................................................................................3.6.1. Structure organisationnelle .........................................................................................3.6.2. Objectifs de performance et leurs mesures ................................................................3.6.3. Revue de sûreté .........................................................................................................
3.6.3.1. Exigences générales .......................................................................................3.6.3.2. Analyse de la sécurité et documentation .........................................................3.6.3.3. Prise de décision .............................................................................................
3.7. Mise en œuvre ....................................................................................................................3.7.1. Gestion des processus ...............................................................................................3.7.2. Gestion des modifications ...........................................................................................3.7.3. Responsabilités et pouvoirs ........................................................................................3.7.4. Gestion des Ressources .............................................................................................3.7.5. Contrôle des enregistrements et des documents .......................................................3.7.6. Maintenance et réhabilitations ....................................................................................
3.8. Mesure et évaluation de la performance .............................................................................3.9. Audit, Revue et Rapports ....................................................................................................3.10. Amélioration continue ........................................................................................................
4. MESURES D’ORGANISATION ..................................................................................................4.1. Introduction ..........................................................................................................................4.2. Valeurs et structure du propriétaire .....................................................................................
4.2.1. Culture de la sécurité ..................................................................................................
22
28
28
28
30
32
34
36
38
38
42
44
44
46
48
50
52
52
52
56
56
56
58
58
60
60
62
62
64
64
66
68
68
7070
72
5
23
29
29
29
31
33
35
37
39
39
43
45
45
47
49
51
53
53
53
57
57
57
59
59
61
61
63
63
65
65
67
69
69
71
7173
TABLE OF CONTENTS
1. INTRODUCTION .......................................................................................................................2. OVERARCHING PRINCIPLES OF DAM SAFETY ...................................................................
2.1. Justification for Dams...........................................................................................................2.2. Fundamental Dam Safety Objective ...................................................................................2.3. Responsibility for Operational Integrity and Safety ..............................................................2.4. Role of Government .............................................................................................................2.5. Leadership and Management for Safety .............................................................................2.6. Balancing of Protection across Competing Objectives ........................................................2.7. Limitation of Risk to Individuals and Society........................................................................2.8. Sustainability of Dams and Reservoirs ................................................................................2.9. Emergency Preparedness and Response ...........................................................................
3. DAM SAFETY MANAGEMENT SYSTEMS ..............................................................................3.1. General.................................................................................................................................3.2. Life-Cycle Management ......................................................................................................3.3. Integrated Management Systems ........................................................................................3.4. Dam Safety Management Systems......................................................................................3.5. Policies and Objectives .......................................................................................................
3.5.1. Dam Safety Policy ......................................................................................................3.5.2. Governance ................................................................................................................
3.6. Planning ..............................................................................................................................3.6.1. Organizational Structure .............................................................................................3.6.2. Performance Targets and Performance Measures ....................................................3.6.3. Safety Review .............................................................................................................
3.6.3.1. General Requirements ....................................................................................3.6.3.2. Safety Analysis and Documentation ................................................................3.6.3.3. Decision Making ..............................................................................................
3.7. Implementation ....................................................................................................................3.7.1. Process Management .................................................................................................3.7.2. Change Management .................................................................................................3.7.3. Accountabilities, Responsibilities and Authorities .......................................................3.7.4. Resource Management ..............................................................................................3.7.5. Records and Document Control .................................................................................3.7.6. Maintenance and Repairs ...........................................................................................
3.8. Performance Monitoring and Evaluation .............................................................................3.9. Audit, Review and Reporting ...............................................................................................3.10. Continuous Improvement ..................................................................................................
4. ORGANIZATIONAL ARRANGEMENTS ....................................................................................4.1. Introduction ..........................................................................................................................4.2. Owner’s Values and Structure ............................................................................................
4.2.1. Safety Culture .............................................................................................................
6
4.2.2. Développement d’une politique ..................................................................................4.2.3. Gouvernance ..............................................................................................................
4.3. Sécurité des barrages : rôles et responsabilités .................................................................4.3.1. Mise en œuvre d’une politique ....................................................................................
4.3.1.1 Mise en œuvre de la sécurité des barrages. .....................................................4.3.1.2. Principes de démonstration de la sécurité ......................................................4.3.1.3. Normes (objectifs de comportement et normes de sécurité) ..........................
4.3.2. Rôles et responsabilités ..............................................................................................4.3.3. Planification .................................................................................................................4.3.4. Gestion des activités liées à la sécurité des barrages ...............................................
4.3.4.1. Exploitation, entretien et essais........................................................................4.3.4.2. Surveillance, données techniques et contrôle des performances....................4.3.4.3. Revues de sécurité des barrages.....................................................................4.3.4.4. Comportement problématique ou défectueux des barrages. ...........................4.3.4.5. Planification interne et actions en cas d’urgence. ............................................4.3.4.6. Planification externe en cas d’urgence et tests. ...............................................4.3.4.7. Conseil et revues de management externes....................................................4.3.4.8 Amélioration continue. .......................................................................................4.3.4.9. Audits, revues et rapports.................................................................................4.3.4.10. Communications et documents. .....................................................................
4.4. Prise de décision .................................................................................................................4.4.1. Principes de décision ..................................................................................................4.4.2. Contexte de la décision ..............................................................................................4.4.3. Incertitude ...................................................................................................................4.4.4. Rôle du jugement ........................................................................................................4.4.5. Cadres de la décision .................................................................................................
4.4.5.1. Cadre recourant aux normes ...........................................................................4.4.5.2. Cadre généralement adopté ............................................................................4.4.5.3. Cadre basé sur le risque .................................................................................4.4.5.4. Cadre faisant appel au risque .........................................................................
4.5. Planification générale d’un programme de sécurité ............................................................4.6. Mise en place des préparatifs de gestion pour la sécurité des barrages ............................
4.6.1. Activités sur un barrage .............................................................................................4.6.2. Identification des dangers, modes de rupture et effets d’une rupture s ....................4.6.3. Philosophie de la sécurité technique .........................................................................4.6.4. Principes techniques pour garantir la sécurité ...........................................................
5. ACTIVITÉS POUR LA SÉCURITÉ DES BARRAGES ...............................................................5.1. Gestion des activités ............................................................................................................
5.1.1. Considérations générales sur la gestion des activités ...............................................5.1.2. Documentation, enregistrements et rapports .............................................................5.1.3. Consignes d’exploitation.............................................................................................5.1.4. Procédures de maintenance.......................................................................................5.1.5. Planification et ordonnancement ................................................................................5.1.6. Évaluation et suivi des problèmes et défauts de sécurité des barrages ....................
TABLE DES MATIÈRES
1. INTRODUCTION ........................................................................................................................2. PRINCIPES GENERAUX DE LA SECURITE DES BARRAGES ...............................................
2.1. Justification des barrages .....................................................................................................2.2. Objectif fondamental de sécurité des barrages ...................................................................2.3. Responsabilité de la sécurité en exploitation .......................................................................2.4. Rôle du Gouvernement ........................................................................................................2.5. Leadership et Management de la sécurité ...........................................................................2.6. Mesures de protection : un équilibre entre des objectifs divergents ....................................2.7. Limitation des risques, individuels et sociétaux ...................................................................2.8. Durée de vie des barrages et des réservoirs .......................................................................2.9. Préparation de plans d’intervention en cas d’urgence .........................................................
3. SYSTÈME DE GESTION DE LA SÉCURITÉ DES BARRAGES ...............................................3.1. Généralités ...........................................................................................................................3.2. Management du cycle de vie ...............................................................................................3.3. Système de management intégré ........................................................................................3.4. Systèmes de gestion de la sécurité des barrages ...............................................................3.5. Politiques et objectifs ............................................................................................................
3.5.1. Politique de sécurité des barrages .............................................................................3.5.2. Gouvernance ..............................................................................................................
3.6. Elaboration ..........................................................................................................................3.6.1. Structure organisationnelle .........................................................................................3.6.2. Objectifs de performance et leurs mesures ................................................................3.6.3. Revue de sûreté .........................................................................................................
3.6.3.1. Exigences générales .......................................................................................3.6.3.2. Analyse de la sécurité et documentation .........................................................3.6.3.3. Prise de décision .............................................................................................
3.7. Mise en œuvre ....................................................................................................................3.7.1. Gestion des processus ...............................................................................................3.7.2. Gestion des modifications ...........................................................................................3.7.3. Responsabilités et pouvoirs ........................................................................................3.7.4. Gestion des Ressources .............................................................................................3.7.5. Contrôle des enregistrements et des documents .......................................................3.7.6. Maintenance et réhabilitations ....................................................................................
3.8. Mesure et évaluation de la performance .............................................................................3.9. Audit, Revue et Rapports ....................................................................................................3.10. Amélioration continue ........................................................................................................
4. MESURES D’ORGANISATION ..................................................................................................4.1. Introduction ..........................................................................................................................4.2. Valeurs et structure du propriétaire .....................................................................................
4.2.1. Culture de la sécurité ..................................................................................................
76
76
76
76
80
84
86
86
90
92
92
92
102
104
104
106
106
106
106
108
108
108
108
110
110
110
114
114
118
120
120
120
122
122124
124
124
126
126
128
7
4.2.2. Policy Development ....................................................................................................4.2.3. Governance ................................................................................................................
4.3. Dam Safety Functions, Roles and Responsibilities ............................................................4.3.1. Policy Implementation .................................................................................................
4.3.1.1 Dam Safety Implementation. .............................................................................4.3.1.2. Principles of Safety Demonstration .................................................................4.3.1.3. Standards (Performance Goals and Safety Standards) ..................................
4.3.2. Roles and Responsibilities ..........................................................................................4.3.3. Planning ......................................................................................................................4.3.4. Management of Dam Safety Activities ........................................................................
4.3.4.1. Operation, Maintenance and Testing ...............................................................4.3.4.2. Surveillance, Technical Data and Performance Monitoring. ............................4.3.4.3. Dam Safety Reviews. .......................................................................................4.3.4.4. Performance Concerns and Deficiencies in Dam Performance.......................4.3.4.5. Internal Emergency Planning and Response. ..................................................4.3.4.6. External Emergency Planning and Testing. .....................................................4.3.4.7. External Advice and Management Reviews.....................................................4.3.4.8 Continuous Improvement. .................................................................................4.3.4.9. Audit, Review and Reporting. ...........................................................................4.3.4.10. Communications and Records. ......................................................................
4.4. Decision Making ..................................................................................................................4.4.1. Decision Principles .....................................................................................................4.4.2. Decision Context .........................................................................................................4.4.3. Uncertainty ..................................................................................................................4.4.4. Role of Judgment ........................................................................................................4.4.5. Decision Frameworks .................................................................................................
4.4.5.1. Standards-Based Framework ..........................................................................4.4.5.2. Generally Accepted Framework ......................................................................4.4.5.3. Risk-Based Framework ...................................................................................4.4.5.4. Risk-Informed Framework ...............................................................................
4.5. Overall Program Planning ...................................................................................................4.6. Implementation of Management Arrangements for Dam Safety .........................................
4.6.1. Activities at a Dam .....................................................................................................4.6.2. Identification of Hazards, Failure Modes and Failure Effects ....................................4.6.3. Safety Engineering Philosophy ..................................................................................4.6.4. Engineering Principles for Safety Assurance ............................................................
5. DAM SAFETY ACTIVITIES ........................................................................................................5.1. Management Arrangements for Dam Safety Activities ........................................................
5.1.1. Management Arrangements - General Considerations..............................................5.1.2. Documentation, Records and Reporting ....................................................................5.1.3. Operating Procedures.................................................................................................5.1.4. Maintenance Procedures............................................................................................5.1.5. Planning and Scheduling ............................................................................................5.1.6. Assessment and Tracking of Dam Safety Issues and Deficiencies ...........................
TABLE OF CONTENTS
1. INTRODUCTION .......................................................................................................................2. OVERARCHING PRINCIPLES OF DAM SAFETY ...................................................................
2.1. Justification for Dams...........................................................................................................2.2. Fundamental Dam Safety Objective ...................................................................................2.3. Responsibility for Operational Integrity and Safety ..............................................................2.4. Role of Government .............................................................................................................2.5. Leadership and Management for Safety .............................................................................2.6. Balancing of Protection across Competing Objectives ........................................................2.7. Limitation of Risk to Individuals and Society........................................................................2.8. Sustainability of Dams and Reservoirs ................................................................................2.9. Emergency Preparedness and Response ...........................................................................
3. DAM SAFETY MANAGEMENT SYSTEMS ..............................................................................3.1. General.................................................................................................................................3.2. Life-Cycle Management ......................................................................................................3.3. Integrated Management Systems ........................................................................................3.4. Dam Safety Management Systems......................................................................................3.5. Policies and Objectives .......................................................................................................
3.5.1. Dam Safety Policy ......................................................................................................3.5.2. Governance ................................................................................................................
3.6. Planning ..............................................................................................................................3.6.1. Organizational Structure .............................................................................................3.6.2. Performance Targets and Performance Measures ....................................................3.6.3. Safety Review .............................................................................................................
3.6.3.1. General Requirements ....................................................................................3.6.3.2. Safety Analysis and Documentation ................................................................3.6.3.3. Decision Making ..............................................................................................
3.7. Implementation ....................................................................................................................3.7.1. Process Management .................................................................................................3.7.2. Change Management .................................................................................................3.7.3. Accountabilities, Responsibilities and Authorities .......................................................3.7.4. Resource Management ..............................................................................................3.7.5. Records and Document Control .................................................................................3.7.6. Maintenance and Repairs ...........................................................................................
3.8. Performance Monitoring and Evaluation .............................................................................3.9. Audit, Review and Reporting ...............................................................................................3.10. Continuous Improvement ..................................................................................................
4. ORGANIZATIONAL ARRANGEMENTS ....................................................................................4.1. Introduction ..........................................................................................................................4.2. Owner’s Values and Structure ............................................................................................
4.2.1. Safety Culture .............................................................................................................
77
77
77
77
81
85
87
87
91
93
93
93
103
105
105
107
107
107
107
109
109
109
109
111
111
111
115
115
119
121
121
121
123
123125
125
125
127
127
129
8
5.1.7. Collecte et traitement des incidents et accidents .......................................................5.1.8. Développement et maintien des compétences...........................................................
5.2. Activités opérationnelles .......................................................................................................5.2.1. Passage des crues ....................................................................................................
5.2.1.1. Prévision hydrologique ....................................................................................5.2.1.2. Passage des crues ..........................................................................................5.2.1.3. Surveillance et essais ......................................................................................5.2.1.4. Formation des exploitants ...............................................................................
5.2.2. Surveillance et auscultation ........................................................................................5.2.2.1. Inspection visuelle ...........................................................................................5.2.2.2. Auscultation .....................................................................................................
5.2.3. Analyse et interprétation des données .......................................................................5.2.4. Maintenance et essais ................................................................................................5.2.5. Revues de sécurité .....................................................................................................5.2.6. Plans d’urgence ..........................................................................................................
5.2.6.1. Mesures de précaution et de prévention .........................................................5.2.6.2. Exigences pour les opérations d’urgence .......................................................
5.3. Activités correctives et d’amélioration ..................................................................................5.3.1. Introduction .................................................................................................................5.3.2. Processus d’évaluation des défauts ...........................................................................5.3.3. Études des actions d’améliorations de la sécurité .....................................................
5.3.3.1. Actions correctives transitoires ........................................................................5.3.3.2. Actions correctives de long terme ...................................................................
4.2.2. Développement d’une politique ..................................................................................4.2.3. Gouvernance ..............................................................................................................
4.3. Sécurité des barrages : rôles et responsabilités .................................................................4.3.1. Mise en œuvre d’une politique ....................................................................................
4.3.1.1 Mise en œuvre de la sécurité des barrages. .....................................................4.3.1.2. Principes de démonstration de la sécurité ......................................................4.3.1.3. Normes (objectifs de comportement et normes de sécurité) ..........................
4.3.2. Rôles et responsabilités ..............................................................................................4.3.3. Planification .................................................................................................................4.3.4. Gestion des activités liées à la sécurité des barrages ...............................................
4.3.4.1. Exploitation, entretien et essais........................................................................4.3.4.2. Surveillance, données techniques et contrôle des performances....................4.3.4.3. Revues de sécurité des barrages.....................................................................4.3.4.4. Comportement problématique ou défectueux des barrages. ...........................4.3.4.5. Planification interne et actions en cas d’urgence. ............................................4.3.4.6. Planification externe en cas d’urgence et tests. ...............................................4.3.4.7. Conseil et revues de management externes....................................................4.3.4.8 Amélioration continue. .......................................................................................4.3.4.9. Audits, revues et rapports.................................................................................4.3.4.10. Communications et documents. .....................................................................
4.4. Prise de décision .................................................................................................................4.4.1. Principes de décision ..................................................................................................4.4.2. Contexte de la décision ..............................................................................................4.4.3. Incertitude ...................................................................................................................4.4.4. Rôle du jugement ........................................................................................................4.4.5. Cadres de la décision .................................................................................................
4.4.5.1. Cadre recourant aux normes ...........................................................................4.4.5.2. Cadre généralement adopté ............................................................................4.4.5.3. Cadre basé sur le risque .................................................................................4.4.5.4. Cadre faisant appel au risque .........................................................................
4.5. Planification générale d’un programme de sécurité ............................................................4.6. Mise en place des préparatifs de gestion pour la sécurité des barrages ............................
4.6.1. Activités sur un barrage .............................................................................................4.6.2. Identification des dangers, modes de rupture et effets d’une rupture s ....................4.6.3. Philosophie de la sécurité technique .........................................................................4.6.4. Principes techniques pour garantir la sécurité ...........................................................
5. ACTIVITÉS POUR LA SÉCURITÉ DES BARRAGES ...............................................................5.1. Gestion des activités ............................................................................................................
5.1.1. Considérations générales sur la gestion des activités ...............................................5.1.2. Documentation, enregistrements et rapports .............................................................5.1.3. Consignes d’exploitation.............................................................................................5.1.4. Procédures de maintenance.......................................................................................5.1.5. Planification et ordonnancement ................................................................................5.1.6. Évaluation et suivi des problèmes et défauts de sécurité des barrages ....................
132
132
132
134
134
136
136
136
136
138
138
140
140
140
140
140
142
142
142
146
146
148
150
150
152
154
154
154156
158
158
9
5.1.7. Incident and Accident Reporting.................................................................................5.1.8. Skill Development and Training, Knowledge Retention and Maintenance.................
5.2. Dam Safety Operational Activities ........................................................................................5.2.1. Flood Routing .............................................................................................................
5.2.1.1. Hydrological Forecast ......................................................................................5.2.1.2. Operational Flood Routing ...............................................................................5.2.1.3. Surveillance and Tests ....................................................................................5.2.1.4. Operator Training ............................................................................................
5.2.2. Surveillance and Monitoring .......................................................................................5.2.2.1. Visual inspection ..............................................................................................5.2.2.2. Monitoring ........................................................................................................
5.2.3. Analysis and Interpretation of Data ............................................................................5.2.4. Maintenance and Testing ...........................................................................................5.2.5. Dam Safety Reviews ..................................................................................................5.2.6. Emergency Planning Preparedness and Response ..................................................
5.2.6.1. Preventive and Precautionary Measures ........................................................5.2.6.2. Emergency Operations Requirements ............................................................
5.3. Dam Safety Improvement Activities .....................................................................................5.3.1. Introduction .................................................................................................................5.3.2. Deficiency Assessment Process .................................................................................5.3.3. Dam Safety Improvement Actions Study ....................................................................
5.3.3.1. Interim remedial Actions ..................................................................................5.3.3.2. Long Term Remedial Works ............................................................................
APPENDIX A: REVIEW OF ICOLD BULLETINS ...........................................................................APPENDIX B: DECISION MAKING IN DAM SEFETY ...................................................................
1. Safety Decision Making – Implicit Consideration of Risk .....................................2. Safety Decision Making – Explicit Consideration of Risk .....................................
2.1. General Concept ..............................................................................................2.2. Tolerability and Acceptability Criteria ............................................................2.2.1. Explicit Individual Risk Criteria ...................................................................2.2.2. Risk Criteria Derived from Standards .........................................................2.2.3. Societal Risks Criteria ................................................................................
2.3. Demonstration of ALARP .................................................................................2.3.1. Cost Benefit Analysis (CBA) .......................................................................2.3.2. Cost Effectiveness Analysis (CEA) ............................................................2.3.3. Disproportionality ........................................................................................2.3.4. Societal Concerns ......................................................................................
3. Alternative Safety Decision Making – Explicit Consideration of Risk ...................3.1. Legal Framework Considerations ....................................................................3.2. Disproportionality and ALARP Justification .....................................................
4. Programmatic Decision Making ............................................................................4.1. Implicit Consideration of Risk ...........................................................................4.2. Explicit Consideration of Risk ...........................................................................
References .......................................................................................................
4.2.2. Policy Development ....................................................................................................4.2.3. Governance ................................................................................................................
4.3. Dam Safety Functions, Roles and Responsibilities ............................................................4.3.1. Policy Implementation .................................................................................................
4.3.1.1 Dam Safety Implementation. .............................................................................4.3.1.2. Principles of Safety Demonstration .................................................................4.3.1.3. Standards (Performance Goals and Safety Standards) ..................................
4.3.2. Roles and Responsibilities ..........................................................................................4.3.3. Planning ......................................................................................................................4.3.4. Management of Dam Safety Activities ........................................................................
4.3.4.1. Operation, Maintenance and Testing ...............................................................4.3.4.2. Surveillance, Technical Data and Performance Monitoring. ............................4.3.4.3. Dam Safety Reviews. .......................................................................................4.3.4.4. Performance Concerns and Deficiencies in Dam Performance.......................4.3.4.5. Internal Emergency Planning and Response. ..................................................4.3.4.6. External Emergency Planning and Testing. .....................................................4.3.4.7. External Advice and Management Reviews.....................................................4.3.4.8 Continuous Improvement. .................................................................................4.3.4.9. Audit, Review and Reporting. ...........................................................................4.3.4.10. Communications and Records. ......................................................................
4.4. Decision Making ..................................................................................................................4.4.1. Decision Principles .....................................................................................................4.4.2. Decision Context .........................................................................................................4.4.3. Uncertainty ..................................................................................................................4.4.4. Role of Judgment ........................................................................................................4.4.5. Decision Frameworks .................................................................................................
4.4.5.1. Standards-Based Framework ..........................................................................4.4.5.2. Generally Accepted Framework ......................................................................4.4.5.3. Risk-Based Framework ...................................................................................4.4.5.4. Risk-Informed Framework ...............................................................................
4.5. Overall Program Planning ...................................................................................................4.6. Implementation of Management Arrangements for Dam Safety .........................................
4.6.1. Activities at a Dam .....................................................................................................4.6.2. Identification of Hazards, Failure Modes and Failure Effects ....................................4.6.3. Safety Engineering Philosophy ..................................................................................4.6.4. Engineering Principles for Safety Assurance ............................................................
5. DAM SAFETY ACTIVITIES ........................................................................................................5.1. Management Arrangements for Dam Safety Activities ........................................................
5.1.1. Management Arrangements - General Considerations..............................................5.1.2. Documentation, Records and Reporting ....................................................................5.1.3. Operating Procedures.................................................................................................5.1.4. Maintenance Procedures............................................................................................5.1.5. Planning and Scheduling ............................................................................................5.1.6. Assessment and Tracking of Dam Safety Issues and Deficiencies ...........................
133133
133
135
135137
137
137
137
139
139
141
141
141
141
141
143
143
143
147
147
149
151
151
153
155
155
155
157
159
159
11
5.1.7. Incident and Accident Reporting .................................................................................
5.1.8. Skill Development and Training, Knowledge Retention and Maintenance .................
5.2. Dam Safety Operational Activities ........................................................................................
5.2.1. Flood Routing .............................................................................................................
5.2.1.1. Hydrological Forecast ......................................................................................
5.2.1.2. Operational Flood Routing ..............................................................................
5.2.1.3. Surveillance and Tests ....................................................................................
5.2.1.4. Operator Training ............................................................................................
5.2.2. Surveillance and Monitoring .......................................................................................
5.2.2.1. Visual inspection ..............................................................................................
5.2.2.2. Monitoring ........................................................................................................
5.2.3. Analysis and Interpretation of Data ............................................................................
5.2.4. Maintenance and Testing ...........................................................................................
5.2.5. Dam Safety Reviews ..................................................................................................
5.2.6. Emergency Planning Preparedness and Response ..................................................
5.2.6.1. Preventive and Precautionary Measures ........................................................
5.2.6.2. Emergency Operations Requirements ............................................................
5.3. Dam Safety Improvement Activities .....................................................................................
5.3.1. Introduction .................................................................................................................
5.3.2. Deficiency Assessment Process ................................................................................
5.3.3. Dam Safety Improvement Actions Study ....................................................................
5.3.3.1. Interim remedial Actions ..................................................................................
5.3.3.2. Long Term Remedial Works ............................................................................
APPENDIX A: REVIEW OF ICOLD BULLETINS ...........................................................................
APPENDIX B: DECISION MAKING IN DAM SEFETY ...................................................................
1. Safety Decision Making – Implicit Consideration of Risk .....................................
2. Safety Decision Making – Explicit Consideration of Risk .....................................
2.1. General Concept ..............................................................................................
2.2. Tolerability and Acceptability Criteria ..............................................................
2.2.1. Explicit Individual Risk Criteria ...................................................................
2.2.2. Risk Criteria Derived from Standards .........................................................
2.2.3. Societal Risks Criteria ................................................................................
2.3. Demonstration of ALARP .................................................................................
2.3.1. Cost Benefit Analysis (CBA) .......................................................................
2.3.2. Cost Effectiveness Analysis (CEA) ............................................................
2.3.3. Disproportionality ........................................................................................
2.3.4. Societal Concerns ......................................................................................
3. Alternative Safety Decision Making – Explicit Consideration of Risk ...................
3.1. Legal Framework Considerations ....................................................................
3.2. Disproportionality and ALARP Justification .....................................................
4. Programmatic Decision Making ............................................................................
4.1. Implicit Consideration of Risk ...........................................................................
4.2. Explicit Consideration of Risk ...........................................................................
References .......................................................................................................
161187
187
189
189191
192
193
194
195
195
197
197
199
200
200
201
204
204
204
206
12
FIGURES ; TABLEAUX
Fig. 1 Panorama de la sécurité des barragesFig. 2 Exemple de la répartition des coûts de la rupture d’un barrageFig. 3 Éléments d’un système de managementFig. 4 Éléments d’un système de gestion de la sécurité des barragesFig. 5 Exemple de politique de sécurité pour les barragesFig. 6 Processus d’exploitationFig. 7 Processus intégré de prise de décision (prenant en compte le risque)Fig. 8 Relations au sein du système de gestion de la sécuritéFig. 9 Caractéristique d’une forte culture de sécuritéFig. 10 Exemple d’une structure de gouvernanceFig. 11 Activités concernant la sécurité des barragesFig. 12 Hiérarchie des fonctions du système de managementFig. 13 Gestion de la sécurité des barrages – Fonctions détailléesFig. 14 (Quelques) Paramètres pour l’établissement de prioritéFig. 15 Cadre pour établir le contexte de la décision (UKOOA, 1999)Fig. 16 Forme générale de critères d’acception du risque (Pays-Bas)Fig. 17 Tolérance du risqueFig. 18 Processus d’évaluation systématique de la sécuritéFig. 19 Planification préliminaire et définition des priorités
Fig. 20 Finalisation de la planification et mise en place d’améliorations de la sécurité
Fig. 21 Modèle d’arbre de défaillance des dangers et modes de ruptureFig. 22 Modèle de gestion du risque en forme de nœud papillon
Tableau 1 Matrice des rôles et responsabilités (RACI)
FIGURES; TABLES; BOXES
Fig. 1 Context for Dam SafetyFig. 2 Example of Distribution of Costs of Dam FailuresFig. 3 Elements of a Management SystemFig. 4 Elements of Dam Safety Management SystemFig. 5 Example of Dam Safety Policy StatementFig. 6 Systematic “Operation” ProcessFig. 7 Integrated (Risk-informed) Decision MakingFig. 8 Integrated (Risk-informed) Decision MakingFig. 9 Characteristics of Strong Safety CultureFig. 10 Example of a Governance StructureFig. 11 Dam Safety Activities to be managedFig. 12 Hierarchy of System Management FunctionsFig. 13 Detailed Dam Safety Management FunctionsFig. 14 (Some) Dimensions of a Prioritization FrameworkFig. 15 Framework for Setting Decision Context (UKOOA, 1999)Fig. 16 General Form of Risk Acceptance Criteria (the Netherlands)Fig. 17 Tolerability of Risk FrameworkFig. 18 Systematic Safety Assessment ProcessFig. 19 Preliminary Planning and PrioritizationFig. 20 Finalization of Plans and Implementation of Dam Safety ImprovementsFig. 21 Fault tree Model of Hazards and Failure ModesFig. 22 Bow-Tie Risk Management ModelFig. B1 Levels of Risk and the ALARP PrincipleFig. B2 NSW DSC Societal Risk Requirements for Existing DamsFig. B3 Change of Disproportionality Factor with RiskFig. B4 Societal Risk Criteria in the NetherlandsFig. B5 Individual and Societal Risk Guidelines for Existing DamsFig. B6 Individual and Societal Risk Guidelines for New DamsFig. B7 Annual Probability of Failure and Annualized Life Loss
Table 1 Roles and Responsibilities (RACI) MatrixTable A1 Number of ICOLD Bulletins Addressing Engineering ActivitiesTable A1 Number of ICOLD Bulletins Addressing Maintenance ActivitiesTable A4 Number of ICOLD Bulletins Addressing Operation ActivitiesTable B1 ALARP Justification for Risk Just Below Tolerable Risk Limit
Box 1 Explanation of terms – activities and hazardsBox 2 Review – conceptual framework
13
FIGURES ; TABLEAUX
Fig. 1 Panorama de la sécurité des barragesFig. 2 Exemple de la répartition des coûts de la rupture d’un barrageFig. 3 Éléments d’un système de managementFig. 4 Éléments d’un système de gestion de la sécurité des barragesFig. 5 Exemple de politique de sécurité pour les barragesFig. 6 Processus d’exploitationFig. 7 Processus intégré de prise de décision (prenant en compte le risque)Fig. 8 Relations au sein du système de gestion de la sécuritéFig. 9 Caractéristique d’une forte culture de sécuritéFig. 10 Exemple d’une structure de gouvernanceFig. 11 Activités concernant la sécurité des barragesFig. 12 Hiérarchie des fonctions du système de managementFig. 13 Gestion de la sécurité des barrages – Fonctions détailléesFig. 14 (Quelques) Paramètres pour l’établissement de prioritéFig. 15 Cadre pour établir le contexte de la décision (UKOOA, 1999)Fig. 16 Forme générale de critères d’acception du risque (Pays-Bas)Fig. 17 Tolérance du risqueFig. 18 Processus d’évaluation systématique de la sécuritéFig. 19 Planification préliminaire et définition des priorités
Fig. 20 Finalisation de la planification et mise en place d’améliorations de la sécurité
Fig. 21 Modèle d’arbre de défaillance des dangers et modes de ruptureFig. 22 Modèle de gestion du risque en forme de nœud papillon
Tableau 1 Matrice des rôles et responsabilités (RACI)
FIGURES; TABLES; BOXES
Fig. 1 Context for Dam SafetyFig. 2 Example of Distribution of Costs of Dam FailuresFig. 3 Elements of a Management SystemFig. 4 Elements of Dam Safety Management SystemFig. 5 Example of Dam Safety Policy StatementFig. 6 Systematic “Operation” ProcessFig. 7 Integrated (Risk-informed) Decision MakingFig. 8 Integrated (Risk-informed) Decision MakingFig. 9 Characteristics of Strong Safety CultureFig. 10 Example of a Governance StructureFig. 11 Dam Safety Activities to be managedFig. 12 Hierarchy of System Management FunctionsFig. 13 Detailed Dam Safety Management FunctionsFig. 14 (Some) Dimensions of a Prioritization FrameworkFig. 15 Framework for Setting Decision Context (UKOOA, 1999)Fig. 16 General Form of Risk Acceptance Criteria (the Netherlands)Fig. 17 Tolerability of Risk FrameworkFig. 18 Systematic Safety Assessment ProcessFig. 19 Preliminary Planning and PrioritizationFig. 20 Finalization of Plans and Implementation of Dam Safety ImprovementsFig. 21 Fault tree Model of Hazards and Failure ModesFig. 22 Bow-Tie Risk Management ModelFig. B1 Levels of Risk and the ALARP PrincipleFig. B2 NSW DSC Societal Risk Requirements for Existing DamsFig. B3 Change of Disproportionality Factor with RiskFig. B4 Societal Risk Criteria in the NetherlandsFig. B5 Individual and Societal Risk Guidelines for Existing DamsFig. B6 Individual and Societal Risk Guidelines for New DamsFig. B7 Annual Probability of Failure and Annualized Life Loss
Table 1 Roles and Responsibilities (RACI) MatrixTable A1 Number of ICOLD Bulletins Addressing Engineering ActivitiesTable A1 Number of ICOLD Bulletins Addressing Maintenance ActivitiesTable A4 Number of ICOLD Bulletins Addressing Operation ActivitiesTable B1 ALARP Justification for Risk Just Below Tolerable Risk Limit
Box 1 Explanation of terms – activities and hazardsBox 2 Review – conceptual framework
14
PREAMBULE
“L'art de l’ingénieur est intrinsèquement basé sur l’appréciation des risques. Cela est traditionnellement fondé en grande partie sur le jugement, renforcé par l'expérience. Au fur et à mesure que les techniques d'analyse des risques proposées dans la littérature deviennent de plus en plus sophistiquées, les ingénieurs et les professionnels ont préféré utiliser des approches éprouvées et basées sur le jugement plutôt que sur de nouvelles techniques. Il est pourtant nécessaire d'améliorer les méthodes d'analyse de risques dans l'ingénierie des barrages et des autres structures ayant un fort impact de sécurité. C’est particulièrement pertinent lorsque les financements des travaux de réhabilitation sont limités et que les dépenses doivent contribuer à une réduction optimale du risque. "(US National Academy, 1983)1
En 2003, la CIGB a demandé au Comité de la sécurité des barrages d’analyser le besoin de mise à jour du bulletin CIGB 59 « Sécurité des barrages, recommandations », publié en 1987. Ce bulletin était le premier document émis par le Comité de la sécurité des barrages, créé en 1982, et avait une importance capitale car il traitait directement la question posée par la CIGB, décrite ainsi dans le préambule du bulletin :
“Le Comité de la sécurité des barrages a été créé comme organe de coordination pour assurer une approche intégrée de tous les comités techniques de la CIGB vis-à-vis des questions de sécurité, pour orienter des actions lorsque des insuffisances ou des lacunes sont décelées, pour définir une philosophie de la sécurité commune et pour préparer des lignes directrices générales sur la sécurité des barrages conformes à cette philosophie."
Le Bulletin 59 débute par l’établissement des bases philosophiques de la sécurité des barrages, et souligne les principes et exigences de base qui doivent présider au développement des méthodes et des techniques pour garantir que ces principes et exigences seront respectés pendant toute la durée de vie du barrage. Le Bulletin reconnait que la demande sociétale pour des barrages plus sûrs se traduit par une augmentation des dépenses ; en présence d’objectifs antagonistes entre l’efficacité économique et la sécurité, le partage optimum de ressources limitées n’est alors pas possible sans l’évaluation globale de la sécurité qui passe par une estimation du risque total de rupture du barrage. A cette époque (1987) le Bulletin conclut qu’une estimation crédible de ce risque n’est pas réalisable, et encourage le développement et la pratique d’une approche probabiliste. En résumé, les concepts de l’évaluation et de la gestion de la sécurité décrit dans le bulletin sont essentiellement déterministes, tout en introduisant des aspects semi probabilistes pour certains domaines de l’analyse de la sécurité.
En 2005, le Comité de la sécurité des barrages publia le Bulletin 130 – « Évaluation des risques pour la gestion de la sûreté des barrages, un état des lieux des bénéfices, méthodes et applications actuelles ». Ce nouveau bulletin signale que la pression sociétale pour plus de transparence et de responsabilité dans les décisions concernant la sécurité exige une profonde mutation dans la philosophie de la prise de décisions. Le Bulletin 130 s’appuie sur les progrès significatifs du développement et de la pratique des méthodes tenant compte du risque dans le domaine des« évaluations de sécurité », et définit le cadre général d’une approche basée sur le risque pour les décisions concernant la sécurité des barrages. Ce nouveau bulletin a été perçu par certains professionnels comme une attaque contre les méthodes traditionnelles d’appréciation de la sécurité décrites dans le bulletin 59. La position du comité sur la sécurité des barrages est différente, et rappelée ci-dessous.
L’approche traditionnelle de l’appréciation de la sécurité des barrages (basée sur des standards et référentiels) débute par la formulation des exigences de sécurité et des critères associés à des classifications préétablies à partir des aléas naturels ou des conséquences d’une rupture de barrage. Les incertitudes ne sont pas traitées explicitement mais prises en compte indirectement par le choix de
1 Safety of Existing Dams: Evaluation and Improvement. Committee on the Safety of Existing Dams. National Research Council.
National Academy Press, Washington, D.C. 1983.
coefficients de sécurité et de valeurs conservatives pour les charges et les résistances.
La plupart de ces lacunes dans le processus d’appréciation de la sécurité des barrages peuvent, « en principe », être éliminées par une mise en œuvre appropriée de l’approche utilisant ou tenant compte des risques. Le bulletin 130 a mis en exergue les principales limitations de cette approche basée sur le risque (quantification des probabilités, estimation des conséquences, définition de l’acceptabilité par la société du concept de risque acceptable), et il est encourageant de constater que des progrès significatifs ont été réalisés dans tous ces domaines depuis l’édition de ce bulletin en 2005. Le « en principe » de la phrase ci-dessus pourra bientôt être enlevé, et la perspective qu’une appréciation du risque crédible et argumentée fournisse une base solide à une gestion des barrages par le risque devient de plus en plus réaliste.
Actuellement la communauté des barragistes est divisée entre une majorité lentement décroissante de ceux pour qui l’approche traditionnelle est la seule digne de foi ; une minorité qui dénie la validité des concepts de l’école traditionnelle ; et finalement, un troisième groupe qui gagne lentement mais sûrement de l’audience, et qui pense que le développement systématique mais graduel des techniques de l’analyse de risques dans le domaine de l’appréciation et de la gestion de la sécurité des barrages est la voie de progrès. Ce développement doit être conditionné aux progrès réalisés tant sur les méthodes analytiques de l’appréciation des risques, que sur la disponibilité des ressources humaines et financières. Les analyses de risques requièrent davantage, en temps et en coûts, et elles exigent des connaissances et des compétences différentes de l’approche traditionnelle ; il n’est donc pas surprenant qu’une approche graduelle soit indispensable.
Cette observation nous amène finalement au point principal de ce préambule. Les barrages sont des structures différentes de toutes autres réalisations techniques. Ce qui les différencie est leur longévité, et par voie de conséquence, la longueur exceptionnelle de leur vie sur un plan économique. La durée de vie caractéristique d’un barrage bien conçu dépasse facilement 100 ans. Il y a de très nombreux exemples de barrages encore en service en Europe dont la construction remonte à la révolution industrielle. On peut citer également des barrages en Iran construit il y a deux millénaires (les barrages de Bahman et de Mizan respectivement au premier et au quatrième siècle de notre ère) et qui sont encore en service. Parmi les différentes phases du cycle de vie d’un barrage (conception –dimensionnement – construction – exploitation – réhabilitation – déclassement) la phase exploitation est la plus longue, et impose que l’Entité responsable du barrage mette en place un processus à même de traiter tous les aspects de la sécurité du barrage. Ce processus doit être conçu de manière à rester efficace, et à être préservé de toutes les perturbations, internes ou externes, sur de longues périodes de temps. Un tel système doit donc être en mesure d’identifier, de suivre et de traiter efficacement tous les problèmes, potentiels ou réels, pouvant affecter la sécurité du barrage.
La difficulté de cette tâche augmente significativement quand l’Entité gère un parc de barrages. La taille de ce parc peut compliquer sérieusement la priorisation des activités et des urgences pour le traitement des nombreux problèmes rencontrés. Dans le domaine industriel ou commercial, la méthode permettant de s’assurer de la réalisation de la totalité des activités opérationnelles s’appelle « système de management ». Ces systèmes établissent une méthode systématique et cohérente permettant, à partir des politiques, principes et valeurs d’une entité exploitant des barrages, d’aboutir à des activités industrielles et commerciales. Puisque les impacts de sécurité liés à la présence ou l’exploitation d’un barrage peuvent affecter le public, les biens et l’environnement, ces principes et ces politiques doivent être en accord avec l’intérêt général de la population. L’intérêt général est généralement du ressort des lois et règlements nationaux.
Dès la phase initiale de développement de ce Bulletin, et avec l’accord du Comité de sécurité des Barrages, le groupe de travail arriva à la conclusion que la sécurité des barrages pendant leur phase d’exploitation constituait l’enjeu principal, et le plus urgent à traiter vu le nombre de barrages existants. Mais pendant l’écriture du bulletin il a été très vite évident que la gestion de la sécurité des autres phases de la vie des barrages devrait être abordée et que ce travail doit être une priorité pour les travaux futurs du Comité.
Ce bulletin traite de l’élaboration et la mise en œuvre d’un système de gestion de la sécurité (SGS) des barrages en exploitation. Il met l’accent sur la structure générale d’une approche systémique pour la gestion de la sécurité, et s’efforce de mettre au point un système abordant les différentes interdépendances et englobant toutes les dispositions nécessaires pour assurer une bonne gestion de
PREAMBULE
“L'art de l’ingénieur est intrinsèquement basé sur l’appréciation des risques. Cela est traditionnellement fondé en grande partie sur le jugement, renforcé par l'expérience. Au fur et à mesure que les techniques d'analyse des risques proposées dans la littérature deviennent de plus en plus sophistiquées, les ingénieurs et les professionnels ont préféré utiliser des approches éprouvées et basées sur le jugement plutôt que sur de nouvelles techniques. Il est pourtant nécessaire d'améliorer les méthodes d'analyse de risques dans l'ingénierie des barrages et des autres structures ayant un fort impact de sécurité. C’est particulièrement pertinent lorsque les financements des travaux de réhabilitation sont limités et que les dépenses doivent contribuer à une réduction optimale du risque. "(US National Academy, 1983)1
En 2003, la CIGB a demandé au Comité de la sécurité des barrages d’analyser le besoin de mise à jour du bulletin CIGB 59 « Sécurité des barrages, recommandations », publié en 1987. Ce bulletin était le premier document émis par le Comité de la sécurité des barrages, créé en 1982, et avait une importance capitale car il traitait directement la question posée par la CIGB, décrite ainsi dans le préambule du bulletin :
“Le Comité de la sécurité des barrages a été créé comme organe de coordination pour assurer une approche intégrée de tous les comités techniques de la CIGB vis-à-vis des questions de sécurité, pour orienter des actions lorsque des insuffisances ou des lacunes sont décelées, pour définir une philosophie de la sécurité commune et pour préparer des lignes directrices générales sur la sécurité des barrages conformes à cette philosophie."
Le Bulletin 59 débute par l’établissement des bases philosophiques de la sécurité des barrages, et souligne les principes et exigences de base qui doivent présider au développement des méthodes et des techniques pour garantir que ces principes et exigences seront respectés pendant toute la durée de vie du barrage. Le Bulletin reconnait que la demande sociétale pour des barrages plus sûrs se traduit par une augmentation des dépenses ; en présence d’objectifs antagonistes entre l’efficacité économique et la sécurité, le partage optimum de ressources limitées n’est alors pas possible sans l’évaluation globale de la sécurité qui passe par une estimation du risque total de rupture du barrage. A cette époque (1987) le Bulletin conclut qu’une estimation crédible de ce risque n’est pas réalisable, et encourage le développement et la pratique d’une approche probabiliste. En résumé, les concepts de l’évaluation et de la gestion de la sécurité décrit dans le bulletin sont essentiellement déterministes, tout en introduisant des aspects semi probabilistes pour certains domaines de l’analyse de la sécurité.
En 2005, le Comité de la sécurité des barrages publia le Bulletin 130 – « Évaluation des risques pour la gestion de la sûreté des barrages, un état des lieux des bénéfices, méthodes et applications actuelles ». Ce nouveau bulletin signale que la pression sociétale pour plus de transparence et de responsabilité dans les décisions concernant la sécurité exige une profonde mutation dans la philosophie de la prise de décisions. Le Bulletin 130 s’appuie sur les progrès significatifs du développement et de la pratique des méthodes tenant compte du risque dans le domaine des« évaluations de sécurité », et définit le cadre général d’une approche basée sur le risque pour les décisions concernant la sécurité des barrages. Ce nouveau bulletin a été perçu par certains professionnels comme une attaque contre les méthodes traditionnelles d’appréciation de la sécurité décrites dans le bulletin 59. La position du comité sur la sécurité des barrages est différente, et rappelée ci-dessous.
L’approche traditionnelle de l’appréciation de la sécurité des barrages (basée sur des standards et référentiels) débute par la formulation des exigences de sécurité et des critères associés à des classifications préétablies à partir des aléas naturels ou des conséquences d’une rupture de barrage. Les incertitudes ne sont pas traitées explicitement mais prises en compte indirectement par le choix de
1 Safety of Existing Dams: Evaluation and Improvement. Committee on the Safety of Existing Dams. National Research Council.
National Academy Press, Washington, D.C. 1983.
15
FOREWORD
“Engineering is inherently based on weighing of risk. Traditionally, this has been drawn to a large extent from judgment reinforced by experience. As techniques of risk analysis offered in the literature have become increasingly sophisticated, practical engineers and related professionals have preferred to apply time-tested judgmental approaches rather that new techniques. Yet there is a need to improve methods of risk analysis for the engineering of dams and other structures whose safety is important to the public interest. This especially applies where funding for remedial work is limited and expenditures must be directed to achieve an optimum reduction of risk.” (US National Academy, 1983)2
In 2003 the Committee on Dam Safety (CODS) was asked to review and assess the need to
update ICOLD Bulletin 59 - Dam Safety Guidelines. Issued in 1987, the Bulletin was the first document prepared by the ICOLD Committee on Dam Safety, which was created in 1982. The primary importance of Bulletin 59 was in directly addressing the challenge posed to the Committee by ICOLD. This challenge was described in the Foreword to the Bulletin as follows:
“The Committee on Dam Safety was established as a coordinating body to assure an integrated approach of all (ICOLD) Technical Committees to safety issues, to guide toward action where shortcomings or gaps may be perceived, to define a common safety philosophy and to prepare general guidelines on dam safety outlined along this philosophy.” Bulletin 59 began with the establishment of philosophical foundations of dam safety, and
outlined the basic principles and requirements which should govern the development of methods and techniques ensuring that these principles and requirements are met during the entire life cycle of a dam. The Bulletin acknowledged that growing societal demand for safer dams involved an increase in expenditures and that the optimal allocation of limited resources (in the presence of conflicting objectives of economic efficiency and safety) was not possible without assessing the overall safety of the dam through an estimation of the total risk3 of a dam failure. The Bulletin concluded that at that time (1987) credible estimation of such risks was not achievable, but it also encouraged the development and application of a probabilistic approach. In summary, the concepts of assessing and managing dam safety outlined in the Bulletin were predominantly of a deterministic character, and introduced various semi-probabilistic components in some areas of safety analysis.
In 2005 the CODS issued Bulletin 130 – Risk Assessment in Dam Safety Management: A
Reconnaissance of Benefits, Methods and Current Applications. The new Bulletin pointed out that steadily growing societal demands for transparency and accountability in the areas of decision making which affect safety required a profound philosophical change in how the decision-making framework should be formulated. Taking into account the significant progress in the development and application of advanced risk-informed and risk-based methods in the fields of safety assessments, the Bulletin outlined a general framework of a risk-informed approach to decision making in dam safety. This new Bulletin has been perceived by some professionals in the dam engineering field as an attack on the traditional ways of assessing dam safety outlined in Bulletin 59. However, the position of the CODS on this subject is different, and the reasons are explained below.
The traditional approach to dam safety assessment (often called standards-based) begins with
the establishment of safety requirements and criteria associated with a predetermined classification system reflecting either the hazard potential or the consequences of dam failure. The uncertainty is not addressed directly and it is accounted for in an indirect manner by applying safety coefficients and conservatively safe values for resistance variables and loads.
Most of these deficiencies in the process of assessing the safety of dams can, in principle, be 2 Safety of Existing Dams: Evaluation and Improvement. Committee on the Safety of Existing Dams. National Research Council.
National Academy Press, Washington, D.C. 1983. 3 In this document the term ‘risk’ refers to the characterization of both the probability of adverse consequences resulting from dam failure and their magnitude. Detailed considerations with regard to ‘risk’ can be found in ICOLD Bulletin 130.
FOREWORD
“Engineering is inherently based on weighing of risk. Traditionally, this has been drawn to a large extent from judgment reinforced by experience. As techniques of risk analysis offered in the literature have become increasingly sophisticated, practical engineers and related professionals have preferred to apply time-tested judgmental approaches rather that new techniques. Yet there is a need to improve methods of risk analysis for the engineering of dams and other structures whose safety is important to the public interest. This especially applies where funding for remedial work is limited and expenditures must be directed to achieve an optimum reduction of risk.” (US National Academy, 1983)2
In 2003 the Committee on Dam Safety (CODS) was asked to review and assess the need to update ICOLD Bulletin 59 - Dam Safety Guidelines. Issued in 1987, the Bulletin was the first document prepared by the ICOLD Committee on Dam Safety, which was created in 1982. The primary importance of Bulletin 59 was in directly addressing the challenge posed to the Committee by ICOLD. This challenge was described in the Foreword to the Bulletin as follows:
“The Committee on Dam Safety was established as a coordinating body to assure an integrated approach of all (ICOLD) Technical Committees to safety issues, to guide toward action where shortcomings or gaps may be perceived, to define a common safety philosophy and to prepare general guidelines on dam safety outlined along this philosophy.”
Bulletin 59 began with the establishment of philosophical foundations of dam safety, and outlined the basic principles and requirements which should govern the development of methods and techniques ensuring that these principles and requirements are met during the entire life cycle of a dam. The Bulletin acknowledged that growing societal demand for safer dams involved an increase in expenditures and that the optimal allocation of limited resources (in the presence of conflicting objectives of economic efficiency and safety) was not possible without assessing the overall safety of the dam through an estimation of the total risk3 of a dam failure. The Bulletin concluded that at that time (1987) credible estimation of such risks was not achievable, but it also encouraged the development and application of a probabilistic approach. In summary, the concepts of assessing and managing dam safety outlined in the Bulletin were predominantly of a deterministic character, and introduced various semi-probabilistic components in some areas of safety analysis.
In 2005 the CODS issued Bulletin 130 – Risk Assessment in Dam Safety Management: A Reconnaissance of Benefits, Methods and Current Applications. The new Bulletin pointed out that steadily growing societal demands for transparency and accountability in the areas of decision making which affect safety required a profound philosophical change in how the decision-making framework should be formulated. Taking into account the significant progress in the development and application of advanced risk-informed and risk-based methods in the fields of safety assessments, the Bulletin outlined a general framework of a risk-informed approach to decision making in dam safety. This new Bulletin has been perceived by some professionals in the dam engineering field as an attack on the traditional ways of assessing dam safety outlined in Bulletin 59. However, the position of the CODS on this subject is different, and the reasons are explained below.
The traditional approach to dam safety assessment (often called standards-based) begins with the establishment of safety requirements and criteria associated with a predetermined classification system reflecting either the hazard potential or the consequences of dam failure. The uncertainty is not addressed directly and it is accounted for in an indirect manner by applying safety coefficients and conservatively safe values for resistance variables and loads.
Most of these deficiencies in the process of assessing the safety of dams can, in principle, be 2 Safety of Existing Dams: Evaluation and Improvement. Committee on the Safety of Existing Dams. National Research Council.
National Academy Press, Washington, D.C. 1983.3 In this document the term ‘risk’ refers to the characterization of both the probability of adverse consequences resulting from dam failure and their magnitude. Detailed considerations with regard to ‘risk’ can be found in ICOLD Bulletin 130.
16
coefficients de sécurité et de valeurs conservatives pour les charges et les résistances.
La plupart de ces lacunes dans le processus d’appréciation de la sécurité des barrages peuvent, « en principe », être éliminées par une mise en œuvre appropriée de l’approche utilisant ou tenant compte des risques. Le bulletin 130 a mis en exergue les principales limitations de cette approche basée sur le risque (quantification des probabilités, estimation des conséquences, définition de l’acceptabilité par la société du concept de risque acceptable), et il est encourageant de constater que des progrès significatifs ont été réalisés dans tous ces domaines depuis l’édition de ce bulletin en 2005. Le « en principe » de la phrase ci-dessus pourra bientôt être enlevé, et la perspective qu’une appréciation du risque crédible et argumentée fournisse une base solide à une gestion des barrages par le risque devient de plus en plus réaliste.
Actuellement la communauté des barragistes est divisée entre une majorité lentement décroissante de ceux pour qui l’approche traditionnelle est la seule digne de foi ; une minorité qui dénie la validité des concepts de l’école traditionnelle ; et finalement, un troisième groupe qui gagne lentement mais sûrement de l’audience, et qui pense que le développement systématique mais graduel des techniques de l’analyse de risques dans le domaine de l’appréciation et de la gestion de la sécurité des barrages est la voie de progrès. Ce développement doit être conditionné aux progrès réalisés tant sur les méthodes analytiques de l’appréciation des risques, que sur la disponibilité des ressources humaines et financières. Les analyses de risques requièrent davantage, en temps et en coûts, et elles exigent des connaissances et des compétences différentes de l’approche traditionnelle ; il n’est donc pas surprenant qu’une approche graduelle soit indispensable.
Cette observation nous amène finalement au point principal de ce préambule. Les barrages sont des structures différentes de toutes autres réalisations techniques. Ce qui les différencie est leur longévité, et par voie de conséquence, la longueur exceptionnelle de leur vie sur un plan économique. La durée de vie caractéristique d’un barrage bien conçu dépasse facilement 100 ans. Il y a de très nombreux exemples de barrages encore en service en Europe dont la construction remonte à la révolution industrielle. On peut citer également des barrages en Iran construit il y a deux millénaires (les barrages de Bahman et de Mizan respectivement au premier et au quatrième siècle de notre ère) et qui sont encore en service. Parmi les différentes phases du cycle de vie d’un barrage (conception –dimensionnement – construction – exploitation – réhabilitation – déclassement) la phase exploitation est la plus longue, et impose que l’Entité responsable du barrage mette en place un processus à même de traiter tous les aspects de la sécurité du barrage. Ce processus doit être conçu de manière à rester efficace, et à être préservé de toutes les perturbations, internes ou externes, sur de longues périodes de temps. Un tel système doit donc être en mesure d’identifier, de suivre et de traiter efficacement tous les problèmes, potentiels ou réels, pouvant affecter la sécurité du barrage.
La difficulté de cette tâche augmente significativement quand l’Entité gère un parc de barrages. La taille de ce parc peut compliquer sérieusement la priorisation des activités et des urgences pour le traitement des nombreux problèmes rencontrés. Dans le domaine industriel ou commercial, la méthode permettant de s’assurer de la réalisation de la totalité des activités opérationnelles s’appelle « système de management ». Ces systèmes établissent une méthode systématique et cohérente permettant, à partir des politiques, principes et valeurs d’une entité exploitant des barrages, d’aboutir à des activités industrielles et commerciales. Puisque les impacts de sécurité liés à la présence ou l’exploitation d’un barrage peuvent affecter le public, les biens et l’environnement, ces principes et ces politiques doivent être en accord avec l’intérêt général de la population. L’intérêt général est généralement du ressort des lois et règlements nationaux.
Dès la phase initiale de développement de ce Bulletin, et avec l’accord du Comité de sécurité des Barrages, le groupe de travail arriva à la conclusion que la sécurité des barrages pendant leur phase d’exploitation constituait l’enjeu principal, et le plus urgent à traiter vu le nombre de barrages existants. Mais pendant l’écriture du bulletin il a été très vite évident que la gestion de la sécurité des autres phases de la vie des barrages devrait être abordée et que ce travail doit être une priorité pour les travaux futurs du Comité.
Ce bulletin traite de l’élaboration et la mise en œuvre d’un système de gestion de la sécurité (SGS) des barrages en exploitation. Il met l’accent sur la structure générale d’une approche systémique pour la gestion de la sécurité, et s’efforce de mettre au point un système abordant les différentes interdépendances et englobant toutes les dispositions nécessaires pour assurer une bonne gestion de
17
FOREWORD
“Engineering is inherently based on weighing of risk. Traditionally, this has been drawn to a large extent from judgment reinforced by experience. As techniques of risk analysis offered in the literature have become increasingly sophisticated, practical engineers and related professionals have preferred to apply time-tested judgmental approaches rather that new techniques. Yet there is a need to improve methods of risk analysis for the engineering of dams and other structures whose safety is important to the public interest. This especially applies where funding for remedial work is limited and expenditures must be directed to achieve an optimum reduction of risk.” (US National Academy, 1983)2
In 2003 the Committee on Dam Safety (CODS) was asked to review and assess the need to update ICOLD Bulletin 59 - Dam Safety Guidelines. Issued in 1987, the Bulletin was the first document prepared by the ICOLD Committee on Dam Safety, which was created in 1982. The primary importance of Bulletin 59 was in directly addressing the challenge posed to the Committee by ICOLD. This challenge was described in the Foreword to the Bulletin as follows:
“The Committee on Dam Safety was established as a coordinating body to assure an integrated approach of all (ICOLD) Technical Committees to safety issues, to guide toward action where shortcomings or gaps may be perceived, to define a common safety philosophy and to prepare general guidelines on dam safety outlined along this philosophy.”
Bulletin 59 began with the establishment of philosophical foundations of dam safety, and outlined the basic principles and requirements which should govern the development of methods and techniques ensuring that these principles and requirements are met during the entire life cycle of a dam. The Bulletin acknowledged that growing societal demand for safer dams involved an increase in expenditures and that the optimal allocation of limited resources (in the presence of conflicting objectives of economic efficiency and safety) was not possible without assessing the overall safety of the dam through an estimation of the total risk3 of a dam failure. The Bulletin concluded that at that time (1987) credible estimation of such risks was not achievable, but it also encouraged the development and application of a probabilistic approach. In summary, the concepts of assessing and managing dam safety outlined in the Bulletin were predominantly of a deterministic character, and introduced various semi-probabilistic components in some areas of safety analysis.
In 2005 the CODS issued Bulletin 130 – Risk Assessment in Dam Safety Management: A Reconnaissance of Benefits, Methods and Current Applications. The new Bulletin pointed out that steadily growing societal demands for transparency and accountability in the areas of decision making which affect safety required a profound philosophical change in how the decision-making framework should be formulated. Taking into account the significant progress in the development and application of advanced risk-informed and risk-based methods in the fields of safety assessments, the Bulletin outlined a general framework of a risk-informed approach to decision making in dam safety. This new Bulletin has been perceived by some professionals in the dam engineering field as an attack on the traditional ways of assessing dam safety outlined in Bulletin 59. However, the position of the CODS on this subject is different, and the reasons are explained below.
The traditional approach to dam safety assessment (often called standards-based) begins with the establishment of safety requirements and criteria associated with a predetermined classification system reflecting either the hazard potential or the consequences of dam failure. The uncertainty is not addressed directly and it is accounted for in an indirect manner by applying safety coefficients and conservatively safe values for resistance variables and loads.
Most of these deficiencies in the process of assessing the safety of dams can, in principle, be 2 Safety of Existing Dams: Evaluation and Improvement. Committee on the Safety of Existing Dams. National Research Council.
National Academy Press, Washington, D.C. 1983.3 In this document the term ‘risk’ refers to the characterization of both the probability of adverse consequences resulting from dam failure and their magnitude. Detailed considerations with regard to ‘risk’ can be found in ICOLD Bulletin 130.
eliminated by an appropriate application of either the risk-based or the risk-informed approach. Bulletin 130 pointed out the major limitations of the risk approach, (quantification of probabilities, estimation of consequences, definition and societal acceptability of the tolerable risk concept), and it is encouraging to note that major progress has been made in all of these areas since the issuance of the Bulletin in2005. Therefore, the time when the conditional term “in principle” can be dropped from the sentence above is getting closer and the expectation that a credible and comprehensive risk assessment could provide a solid basis for a transparent and effective risk management of dams is becoming more and more realistic.
At the present, the dam engineering community is divided between the slowly declining majority which insists that the traditional approach is the only one which can be trusted; a minority constituted of those who deny the validity of the traditional school concepts; and finally the third group which is slowly but constantly gaining more support, and which is of the opinion that the systematic but gradual expansion of risk techniques into the area of dam safety assessment and management is the proper way to proceed. The expansion should be conditional not only on the satisfactory progress in developing the analytic site of the risk assessment process, but also on the availability of financial and human resources. Taking into account that risk-based analyses not only cost more, both in terms of time and financial input, but also that they demand a different set of skills and knowledge than traditional dam engineering, the necessity for a gradual approach should not be surprising.
And that observation finally brings us to the main point of this foreword. Dams are structures that differ from many other engineering creations. What makes them different is the longevity of service, and thereby, the exceptional length of their economic life. The typical life cycle of a properly engineered dam can easily exceed 100 years. There are numerous examples of dams still in operation in Europe whose construction goes back to the times of the Industrial Revolution. There are also dams in Iran, built thousands years ago (Bahman Dam and Mizan Dam built in the 1st and 4th century A.D., respectively) and still in operation. Within the complete life cycle of a dam (concept – design –construction – commissioning – operation – rehab/decommissioning) the operational phase is the longest, and requires that the organization responsible for the dam has a process in place that is fully capable of addressing all aspects of dam safety. This process should be developed in such a manner that it remains effective over long periods of time and be immune from all external and internal disturbances during that period. Thus, such system should be able to identify, track and address effectively all potential and actual problems that can impact the safety of the dam.
The complexity of the task increases significantly when the organization has a portfolio of dams. The size of the portfolio can add significant complications to the prioritization of actions and the prioritization of urgency in solving numerous identified problems. In industry or in commerce, the method by which integrity of all operational activities being carried out is assured is known as a management system. Such systems establish a systematic and consistent way of translating a dam-owning organization’s principles, policies and values into the outputs of industrial or commercial activities. Since the safety impacts of dam presence or operation may affect people, property and the environment, these principles and policies have to be in agreement with the general interest of the population. These interests are usually protected by the country’s laws and government regulations.
Quite early in the initial stage of this Bulletin's development, the Working Group with the consensus of the CODS came to the conclusion that the management of dam safety in the operational phase is possibly the most challenging, and, taking into account the sheer number of existing dams, also the most urgently needed. However, what also became readily apparent during our work on this Bulletin is that another document dealing with the development and implementation of the modern safety management approach to other phases of the dam life cycle should be considered as a priority task for the CODS in the future.
This Bulletin is devoted to the development and the implementation of a dam safety management system for dams in the operational phase of their life cycle. It outlines the general structure of a systems approach to safety management, and strives to develop a system that can address all the interdependencies, and encompass all the arrangements necessary to ensure proper dam safety management. The outline is built on the principles established in Bulletins 59 and 130, as well as the general philosophy that informs them both. In that respect this Bulletin is not intended to update or replace the Bulletin 59 which although written in 1987 is still valid and should remain as a primary source of guidance for these professionals who are applying traditional approach to dam safety.
18
coefficients de sécurité et de valeurs conservatives pour les charges et les résistances.
La plupart de ces lacunes dans le processus d’appréciation de la sécurité des barrages peuvent, « en principe », être éliminées par une mise en œuvre appropriée de l’approche utilisant ou tenant compte des risques. Le bulletin 130 a mis en exergue les principales limitations de cette approche basée sur le risque (quantification des probabilités, estimation des conséquences, définition de l’acceptabilité par la société du concept de risque acceptable), et il est encourageant de constater que des progrès significatifs ont été réalisés dans tous ces domaines depuis l’édition de ce bulletin en 2005. Le « en principe » de la phrase ci-dessus pourra bientôt être enlevé, et la perspective qu’une appréciation du risque crédible et argumentée fournisse une base solide à une gestion des barrages par le risque devient de plus en plus réaliste.
Actuellement la communauté des barragistes est divisée entre une majorité lentement décroissante de ceux pour qui l’approche traditionnelle est la seule digne de foi ; une minorité qui dénie la validité des concepts de l’école traditionnelle ; et finalement, un troisième groupe qui gagne lentement mais sûrement de l’audience, et qui pense que le développement systématique mais graduel des techniques de l’analyse de risques dans le domaine de l’appréciation et de la gestion de la sécurité des barrages est la voie de progrès. Ce développement doit être conditionné aux progrès réalisés tant sur les méthodes analytiques de l’appréciation des risques, que sur la disponibilité des ressources humaines et financières. Les analyses de risques requièrent davantage, en temps et en coûts, et elles exigent des connaissances et des compétences différentes de l’approche traditionnelle ; il n’est donc pas surprenant qu’une approche graduelle soit indispensable.
Cette observation nous amène finalement au point principal de ce préambule. Les barrages sont des structures différentes de toutes autres réalisations techniques. Ce qui les différencie est leur longévité, et par voie de conséquence, la longueur exceptionnelle de leur vie sur un plan économique. La durée de vie caractéristique d’un barrage bien conçu dépasse facilement 100 ans. Il y a de très nombreux exemples de barrages encore en service en Europe dont la construction remonte à la révolution industrielle. On peut citer également des barrages en Iran construit il y a deux millénaires (les barrages de Bahman et de Mizan respectivement au premier et au quatrième siècle de notre ère) et qui sont encore en service. Parmi les différentes phases du cycle de vie d’un barrage (conception –dimensionnement – construction – exploitation – réhabilitation – déclassement) la phase exploitation est la plus longue, et impose que l’Entité responsable du barrage mette en place un processus à même de traiter tous les aspects de la sécurité du barrage. Ce processus doit être conçu de manière à rester efficace, et à être préservé de toutes les perturbations, internes ou externes, sur de longues périodes de temps. Un tel système doit donc être en mesure d’identifier, de suivre et de traiter efficacement tous les problèmes, potentiels ou réels, pouvant affecter la sécurité du barrage.
La difficulté de cette tâche augmente significativement quand l’Entité gère un parc de barrages. La taille de ce parc peut compliquer sérieusement la priorisation des activités et des urgences pour le traitement des nombreux problèmes rencontrés. Dans le domaine industriel ou commercial, la méthode permettant de s’assurer de la réalisation de la totalité des activités opérationnelles s’appelle « système de management ». Ces systèmes établissent une méthode systématique et cohérente permettant, à partir des politiques, principes et valeurs d’une entité exploitant des barrages, d’aboutir à des activités industrielles et commerciales. Puisque les impacts de sécurité liés à la présence ou l’exploitation d’un barrage peuvent affecter le public, les biens et l’environnement, ces principes et ces politiques doivent être en accord avec l’intérêt général de la population. L’intérêt général est généralement du ressort des lois et règlements nationaux.
Dès la phase initiale de développement de ce Bulletin, et avec l’accord du Comité de sécurité des Barrages, le groupe de travail arriva à la conclusion que la sécurité des barrages pendant leur phase d’exploitation constituait l’enjeu principal, et le plus urgent à traiter vu le nombre de barrages existants. Mais pendant l’écriture du bulletin il a été très vite évident que la gestion de la sécurité des autres phases de la vie des barrages devrait être abordée et que ce travail doit être une priorité pour les travaux futurs du Comité.
Ce bulletin traite de l’élaboration et la mise en œuvre d’un système de gestion de la sécurité (SGS) des barrages en exploitation. Il met l’accent sur la structure générale d’une approche systémique pour la gestion de la sécurité, et s’efforce de mettre au point un système abordant les différentes interdépendances et englobant toutes les dispositions nécessaires pour assurer une bonne gestion de la sécurité du barrage. Son plan est fondé sur les principes et la philosophie générale établis dans les bulletins 59 et 130. À cet égard ce bulletin n'est pas destiné à mettre à jour ou remplacer le Bulletin 59 qui, bien que rédigé en 1987, est toujours valable et doit le rester en tant que principale source de conseils pour les professionnels qui utilisent l'approche traditionnelle de la sécurité des barrages.
Il est nécessaire ici de faire une observation à propos du processus de prise de décision inclus dans la gestion de la sécurité des barrages existants. La nature de ce processus de prise de décision peut être très variable selon les différents problèmes rencontrés sur les barrages en exploitation. On peut d’une part prendre des décisions en comparant les résultats d’une analyse déterministe et les mesures in situ aux exigences réglementaires et aux normes. D’un autre côté, si une approche prenanten compte le risque est utilisée, la partie analytique devient beaucoup plus complexe, mais le résultat de la comparaison de l’évaluation des risques fournit un tableau de l’état de la sécurité, et permet une complète transparence de la prise de décision en comparant les risques évalués à des critères de tolérabilité des risques. Ce bulletin ne prend pas position sur le type de prise de décision qui devrait être adopté. Le système de gestion de la sécurité présenté dans le bulletin est compatible avec l’une ou l’autre approche.
En conclusion, les auteurs et le Comité de la Sécurité des Barrages espèrent sincèrement que ce bulletin sera utile pour l’élaboration, la mise en œuvre, la révision et l’amélioration de la gestion de la sécurité des barrages à tous les niveaux des organisations.
PRZEMYSLAW A. ZIELINSKIPrésident du Comité de la Sécurité des Barrages
19
eliminated by an appropriate application of either the risk-based or the risk-informed approach. Bulletin 130 pointed out the major limitations of the risk approach, (quantification of probabilities, estimation of consequences, definition and societal acceptability of the tolerable risk concept), and it is encouraging to note that major progress has been made in all of these areas since the issuance of the Bulletin in2005. Therefore, the time when the conditional term “in principle” can be dropped from the sentence above is getting closer and the expectation that a credible and comprehensive risk assessment could provide a solid basis for a transparent and effective risk management of dams is becoming more and more realistic.
At the present, the dam engineering community is divided between the slowly declining majority which insists that the traditional approach is the only one which can be trusted; a minority constituted of those who deny the validity of the traditional school concepts; and finally the third group which is slowly but constantly gaining more support, and which is of the opinion that the systematic but gradual expansion of risk techniques into the area of dam safety assessment and management is the proper way to proceed. The expansion should be conditional not only on the satisfactory progress in developing the analytic site of the risk assessment process, but also on the availability of financial and human resources. Taking into account that risk-based analyses not only cost more, both in terms of time and financial input, but also that they demand a different set of skills and knowledge than traditional dam engineering, the necessity for a gradual approach should not be surprising.
And that observation finally brings us to the main point of this foreword. Dams are structures that differ from many other engineering creations. What makes them different is the longevity of service, and thereby, the exceptional length of their economic life. The typical life cycle of a properly engineered dam can easily exceed 100 years. There are numerous examples of dams still in operation in Europe whose construction goes back to the times of the Industrial Revolution. There are also dams in Iran, built thousands years ago (Bahman Dam and Mizan Dam built in the 1st and 4th century A.D., respectively) and still in operation. Within the complete life cycle of a dam (concept – design –construction – commissioning – operation – rehab/decommissioning) the operational phase is the longest, and requires that the organization responsible for the dam has a process in place that is fully capable of addressing all aspects of dam safety. This process should be developed in such a manner that it remains effective over long periods of time and be immune from all external and internal disturbances during that period. Thus, such system should be able to identify, track and address effectively all potential and actual problems that can impact the safety of the dam.
The complexity of the task increases significantly when the organization has a portfolio of dams. The size of the portfolio can add significant complications to the prioritization of actions and the prioritization of urgency in solving numerous identified problems. In industry or in commerce, the method by which integrity of all operational activities being carried out is assured is known as a management system. Such systems establish a systematic and consistent way of translating a dam-owning organization’s principles, policies and values into the outputs of industrial or commercial activities. Since the safety impacts of dam presence or operation may affect people, property and the environment, these principles and policies have to be in agreement with the general interest of the population. These interests are usually protected by the country’s laws and government regulations.
Quite early in the initial stage of this Bulletin's development, the Working Group with the consensus of the CODS came to the conclusion that the management of dam safety in the operational phase is possibly the most challenging, and, taking into account the sheer number of existing dams, also the most urgently needed. However, what also became readily apparent during our work on this Bulletin is that another document dealing with the development and implementation of the modern safety management approach to other phases of the dam life cycle should be considered as a priority task for the CODS in the future.
This Bulletin is devoted to the development and the implementation of a dam safety management system for dams in the operational phase of their life cycle. It outlines the general structure of a systems approach to safety management, and strives to develop a system that can address all the interdependencies, and encompass all the arrangements necessary to ensure proper dam safety management. The outline is built on the principles established in Bulletins 59 and 130, as well as the general philosophy that informs them both. In that respect this Bulletin is not intended to update or replace the Bulletin 59 which although written in 1987 is still valid and should remain as a primary source of guidance for these professionals who are applying traditional approach to dam safety.
A comment is needed with respect to the decision-making processes involved in managing the safety of existing dams. Depending on the various decision-making problems which may occur during a dam's operation, the nature of this process can vary substantially. On the one hand, these decisions can be made using the approach of simply comparing the outcomes of deterministic analyzes and observed values with standards and safety requirements. On the other hand, if the risk-informed approach is to be used, then the analytic part becomes much more complex, but the resulting comparison of assessed risks provides a more complete picture of the safety status, and ensures full transparency of the decision-making process by comparing the assessed risk with the tolerable risk criteria. This Bulletin is in a way neutral with respect to which type of decision-making approach should be selected. The safety management system presented in the Bulletin allows for the use of either of the two approaches.
In conclusion, the authors and the entire Committee on Dam Safety sincerely hope that the Bulletin will be helpful in developing, implementing, reviewing and improving the management of dam safety at all organizational levels.
PRZEMYSLAW A. ZIELINSKIChairman, Committee on Dam Safety
20
REMERCIEMENTS
Le Comité de la sécurité des barrages et les représentants officiels de la CIGB remercient chaleureusement les membres du groupe de travail et le soutien fourni par leurs organisations. Le texte final de ce bulletin est le fruit d’un effort collectif de tout le comité qui a validé les orientations générales et fourni une contribution précieuse au cours de la période allant de 2004 à 2010. Le groupe de travail a assuré le travail de conversion de ces orientations en guide technique pour la gestion des risques des barrages. Le groupe non seulement a agi en tant que forum d'échange d'idées, mais il a aussi contribué à examiner et à commenter les nombreuses versions projets. Enfin, la rédaction des versions projets et la préparation du texte final ont été effectuées par :
1. Dr. D.N.D. Hartford, Principal Engineering Scientist, BC Hydro, Canada – soutien financier et en nature fourni par BC Hydro ;
2. Mr. M. Poupart, Attaché sûreté hydraulique à Electricité de France, actuellement Consultant indépendant, France - soutien financier et en nature fourni par Electricité de France ;
3. Dr. P. A. Zielinski, Manager Technology and Dam Safety, Ontario Power Generation, Canada - soutien financier et en nature fourni par Ontario Power Generation ;
Les autres membres du groupe de travail :
4. Dr. D.S. Bowles, Director, Institute for Dam Safety Risk Management and Professor, UWRL/Civil and Environmental Engineering, Utah State University, and Principal, RAC Engineers & Economists, United States of America - soutien financier et en nature fournipar Utah State University ;
5. Ing. F.L. Giuliani, Director – Dam Safety, ORSEP - Organismo Regulador de Seguridad de Presas, Argentina - soutien financier et en nature fourni par ORSEP;
6. Mr. J.P.F.M. Janssen MSc Eng. – Rijkswaterstaat, the Netherlands - soutien financier et en nature fourni par Rijkswaterstaat ;
7. Prof. R. Lafitte – Professor, Swiss Federal Institute of Technology, Switzerland.8. Mr. S. McGrath – General Manager Infrastructure, Goulburn-Murray Water, Australia -
soutien financier et en nature fourni par Goulburn-Murray Water ;9. Mr. D. Stewart – Managing Director, Goulburn-Murray Water, Australia - soutien
financier et en nature fourni par Goulburn-Murray Water.
Il faut souligner l'effort important fourni par les membres de ce groupe dont le travail a joué un rôle décisif pour l’aboutissement de sa mission. Les compétences et l’expérience des membres du groupe de travail couvraient un large spectre des parties prenantes de la sécurité des barrages –gouvernement, organismes de contrôles, propriétaires, bureaux d’études et universités. Cette vision globale sur les aspects du contrôle, de l’organisation, du management et de l’ingénierie de la gestion de la sécurité des barrages aidera, espérons-le, les lecteurs de ce bulletin à élaborer et à mettre en œuvre des systèmes de gestion des risques barrage pour les entités propriétaires ou exploitants.
Un remerciement final à Mme C. Raska de BC Hydro qui a consacré de son temps pour organiser et éditer la version finale, qui rend ce bulletin plus facile à lire.
21
ACKNOWLEDGMENTS
The Committee on Dam Safety and the ICOLD Executive gratefully acknowledge the contribution of members of the Committee’s Working Group and the support provided by their sponsoring organizations. The final text of the Bulletin is the result of the collective effort of the entire CODS which continued providing general guidance and valuable input during the period of 2004 to 2010. The task of converting this guidance into technical guidelines for managing dams’ risks rested with the Working Group. The Group not only acted as a forum for exchange of ideas but was also instrumental in reviewing and commenting on numerous drafts. Finally, the task of writing the drafts and preparing the final text was carried out by:
1. Dr. D.N.D. Hartford, Principal Engineering Scientist, BC Hydro, Canada – financial and in kind assistance provided by BC Hydro;
2. Mr. M. Poupart, previously Dam Safety Advisor at Electricité de France, presently Independent Consultant, France - financial and in kind assistance provided by Electricité de France;
3. Dr. P. A. Zielinski, Manager Technology and Dam Safety, Ontario Power Generation, Canada - financial and in kind assistance provided by Ontario Power Generation;
The other members of the Working Group:
4. Dr. D.S. Bowles, Director, Institute for Dam Safety Risk Management and Professor, UWRL/Civil and Environmental Engineering, Utah State University, and Principal, RAC Engineers & Economists, United States of America - financial and in kind assistance provided by Utah State University;
5. Ing. F.L. Giuliani, Director – Dam Safety, ORSEP - Organismo Regulador de Seguridad de Presas, Argentina - financial and in kind assistance provided by ORSEP;
6. Mr. J.P.F.M. Janssen MSc Eng. – Rijkswaterstaat, the Netherlands - financial and in kind assistance provided by Rijkswaterstaat;
7. Prof. R. Lafitte – Professor, Swiss Federal Institute of Technology, Switzerland.8. Mr. S. McGrath – General Manager Infrastructure, Goulburn-Murray Water, Australia -
financial and in kind assistance provided by Goulburn-Murray Water;9. Mr. D. Stewart – Managing Director, Goulburn-Murray Water, Australia - financial and
in kind assistance provided by Goulburn-Murray Water;
It needs to be stressed that the effort provided by the members of the Working Group was extensive and its work was instrumental for completion of the task. The knowledge and experience of Working Group members covered the wide spectrum of potential stakeholders of dam safety – the government, the regulators, the owners, the consultants and the academia. This breadth of perspective on regulatory, organizational, managerial and engineering aspects of dam safety management can hopefully provide the readers of this Bulletin with the help in designing and implementation of the modern comprehensive management system for managing risks of dam owning and operating organizations.
The final acknowledgement is extended to Ms. C. Raska from BC Hydro who volunteered her time and performed an extensive editing work of the final draft and made this Bulletin better organized and easier to read.
44
12
3. SYSTÈME DE GESTION DE LA SÉCURITÉ DES BARRAGES
3.1. GÉNÉRALITÉS Dans la plupart des sites de production industriels5, un « système de management » est la
méthode permettant la mise en œuvre des activités industrielles et assurant que l’activité industrielle est bien effectuée. Globalement, le système de management définit une méthode systématique et consistante pour transformer les valeurs, les principes et les politiques d’une entreprise de production en produits ou résultats d’une activité industrielle ou commerciale. Ceci est réalisé via une série de tâches liées entre elles et permettant l’atteinte d’un équilibre entre toutes les activités, comme illustré sur la Fig. 3.
Fig. 3
Éléments d’un système de management
Les politiques et les objectifs fixent une direction claire pour atteindre tous les objectifs de l’organisation. Ces politiques et objectifs incluent les stratégies qui permettent de concilier des objectifs internes antagonistes et donnent les moyens et les méthodes de priorisation entre ces objectifs de manière à assurer le succès global de l’entreprise.
L’étape d’élaboration fixe des objectifs et des cibles à atteindre, développe des plans pour la mise en œuvre, et définit les standards de performance. Une évaluation complète des risques et incertitudes pouvant impacter négativement la production et l’atteinte des objectifs, ainsi que la prise en compte des imprévus par des plans de contingence, doivent normalement précéder la phase de la mise en œuvre. Cette étape inclut également la détermination des ressources nécessaires à l’atteinte des objectifs.
L’étape de mise en œuvre met en place une structure de gestion efficace et un système de procédures qui assure l’atteinte des objectifs.
Le suivi et l’évaluation des performances informent sur l’efficacité de l’activité et sur la capacité du système de gestion à respecter les objectifs définis. Les critères de performance sont ceux qui ont été définis lors de l’étape d’élaboration. 5Le terme “industriel” doit être compris dans un sens large, non limité aux seules industries manufacturières.
Politiques et Objectifs
Élaboration
Mise en œuvre
Suivi et évaluationdes performances
Audits, revues et rapports
Amélioration continue
12
3. SYSTÈME DE GESTION DE LA SÉCURITÉ DES BARRAGES
3.1. GÉNÉRALITÉS Dans la plupart des sites de production industriels5, un « système de management » est la
méthode permettant la mise en œuvre des activités industrielles et assurant que l’activité industrielle est bien effectuée. Globalement, le système de management définit une méthode systématique et consistante pour transformer les valeurs, les principes et les politiques d’une entreprise de production en produits ou résultats d’une activité industrielle ou commerciale. Ceci est réalisé via une série de tâches liées entre elles et permettant l’atteinte d’un équilibre entre toutes les activités, comme illustré sur la Fig. 3.
Fig. 3
Éléments d’un système de management
Les politiques et les objectifs fixent une direction claire pour atteindre tous les objectifs de l’organisation. Ces politiques et objectifs incluent les stratégies qui permettent de concilier des objectifs internes antagonistes et donnent les moyens et les méthodes de priorisation entre ces objectifs de manière à assurer le succès global de l’entreprise.
L’étape d’élaboration fixe des objectifs et des cibles à atteindre, développe des plans pour la mise en œuvre, et définit les standards de performance. Une évaluation complète des risques et incertitudes pouvant impacter négativement la production et l’atteinte des objectifs, ainsi que la prise en compte des imprévus par des plans de contingence, doivent normalement précéder la phase de la mise en œuvre. Cette étape inclut également la détermination des ressources nécessaires à l’atteinte des objectifs.
L’étape de mise en œuvre met en place une structure de gestion efficace et un système de procédures qui assure l’atteinte des objectifs.
Le suivi et l’évaluation des performances informent sur l’efficacité de l’activité et sur la capacité du système de gestion à respecter les objectifs définis. Les critères de performance sont ceux qui ont été définis lors de l’étape d’élaboration. 5Le terme “industriel” doit être compris dans un sens large, non limité aux seules industries manufacturières.
Politiques et Objectifs
Élaboration
Mise en œuvre
Suivi et évaluationdes performances
Audits, revues et rapports
Amélioration continue
45
3. DAM SAFETY MANAGEMENT SYSTEMS
3.1. GENERAL In most of the industrial1 operations, a “management system” is the method by which operational
activities are carried out and the integrity of the industrial activity is assured. Broadly, the management system establishes a systematic and consistent way of transforming an operating organization’s values, principles, policies and procedures into the products or outputs of industrial or commercial activities, through a set of linked sub-activities that achieve an appropriate balance across all activities, as illustrated in Fig. 3.
Fig. 3
Elements of a Management System
Policies and Objectives should set a clear direction to follow in achieving all of the goals of the organization. Typically, these policies and objectives will cover strategies to accommodate competing internal objectives and provide a means to strike a balance between these objectives in a way that ensures overall success of the endeavour.
Planning sets objectives and targets to be achieved, develops plans for implementation, and defines performance standards. Comprehensive assessment of risks and uncertainties that could adversely impact the operation and achievement of the objectives, and the development of contingency plans, would normally precede the implementation of the plan. This step also includes determination of resources required to achieve the objectives.
Implementation activities put in place an effective management structure and system of procedures that ensure that the objectives are achieved.
Monitoring and Evaluation of performance provides information on the effectiveness of the activity and whether the management system is maintaining operation within its defined objectives.
1 The term “industrial” should be understood in a broad sense and not as related to only manufacturing industries.
Policies and Objectives
Planning
Implementation
Monitoring and Evaluation
Audit, Review and Reporting
Continual Improvement
50
16
Fig. 4
Éléments d’un système de gestion de la sécurité des barrages
3.5. POLITIQUES ET OBJECTIFS
3.5.1. Politique de sécurité des barrages Les documents définissant les politiques constituent la base d’un SGS. Ils indiquent clairement
l’engagement du management, au plus haut niveau, de fixer les priorités de gestion des risques, les buts et les objectifs, et finalement, de souligner la volonté d’amélioration continue.
La politique de sécurité des barrages doit :
Indiquer clairement que les exigences de sécurité sont prioritaires par rapport à tout autre aspect de la gestion de l’organisation, y compris les aspects économiques et les besoins de la production,
Inclure un engagement à développer, mettre en œuvre et conserver une culture de sécurité, avec l’engagement de communiquer cet engagement dans l’entreprise,
La politique de sécurité fixe une orientation claire à l’Entreprise. Objectif du programme de la sécurité des barrages
Objectifs de performance Identification des aléas et des risques (appréciation du risque) Responsabilité de l’Entreprise Gestion de l’Information
Structure de management pour différentes phases du cycle de vieMaintenance et réhabilitations Gestion des modifications Plans d’urgence
Analyse et évaluation des performances Inspection, contrôle et mesuresRapports d’incidents et d’accident
Revue des performancesAudit interne et externe
Modifications des politiques et du programme à partir : ‐ Des audits, revues et rapports ‐ Des mesures et de l’évaluation
de la performance Politiques et Objectifs
Élaboration
Mise en œuvre
Suivi et évaluation des performances
Audits, revues et rapports
Amélioration continue
3.4. DAM SAFETY MANAGEMENT SYSTEMS
A Dam Safety Management System (DSMS) should consist of systematic and comprehensive
processes in order to ensure that the dam safety risks are properly managed and that all aspects of safety management are integrated or aligned with the organization’s overall management structure.
The DSMS provides a formal organized process by which safety of the dam is ensured and
maintained throughout its lifetime, from the conceptual phase, through design, construction and operational stage to decommissioning. The formalization of the process is achieved by development of a series of policies, procedures, directives and instructions. The complete set of such documents has to be developed and implemented in such a way that logical and functional links between individual documents are preserved and that they are linked appropriately to the risks that the dams can pose to people, property, and the environment.
Fig. 3 is enhanced to provide further details about the general structure of the dam safety
management system, as shown in Fig. 4. These elements are outlined in Sections 3.5 to 3.10.
Fig. 4
Elements of Dam Safety Management System
3.5. POLICIES AND OBJECTIVES
51
16
Fig. 4
Éléments d’un système de gestion de la sécurité des barrages
3.5. POLITIQUES ET OBJECTIFS
3.5.1. Politique de sécurité des barrages Les documents définissant les politiques constituent la base d’un SGS. Ils indiquent clairement
l’engagement du management, au plus haut niveau, de fixer les priorités de gestion des risques, les buts et les objectifs, et finalement, de souligner la volonté d’amélioration continue.
La politique de sécurité des barrages doit :
Indiquer clairement que les exigences de sécurité sont prioritaires par rapport à tout autre aspect de la gestion de l’organisation, y compris les aspects économiques et les besoins de la production,
Inclure un engagement à développer, mettre en œuvre et conserver une culture de sécurité, avec l’engagement de communiquer cet engagement dans l’entreprise,
La politique de sécurité fixe une orientation claire à l’Entreprise. Objectif du programme de la sécurité des barrages
Objectifs de performance Identification des aléas et des risques (appréciation du risque) Responsabilité de l’Entreprise Gestion de l’Information
Structure de management pour différentes phases du cycle de vieMaintenance et réhabilitations Gestion des modifications Plans d’urgence
Analyse et évaluation des performances Inspection, contrôle et mesuresRapports d’incidents et d’accident
Revue des performancesAudit interne et externe
Modifications des politiques et du programme à partir : ‐ Des audits, revues et rapports ‐ Des mesures et de l’évaluation
de la performance Politiques et Objectifs
Élaboration
Mise en œuvre
Suivi et évaluation des performances
Audits, revues et rapports
Amélioration continue
3.4. DAM SAFETY MANAGEMENT SYSTEMS
A Dam Safety Management System (DSMS) should consist of systematic and comprehensive
processes in order to ensure that the dam safety risks are properly managed and that all aspects of safety management are integrated or aligned with the organization’s overall management structure.
The DSMS provides a formal organized process by which safety of the dam is ensured and
maintained throughout its lifetime, from the conceptual phase, through design, construction and operational stage to decommissioning. The formalization of the process is achieved by development of a series of policies, procedures, directives and instructions. The complete set of such documents has to be developed and implemented in such a way that logical and functional links between individual documents are preserved and that they are linked appropriately to the risks that the dams can pose to people, property, and the environment.
Fig. 3 is enhanced to provide further details about the general structure of the dam safety
management system, as shown in Fig. 4. These elements are outlined in Sections 3.5 to 3.10.
Fig. 4
Elements of Dam Safety Management System
3.5. POLICIES AND OBJECTIVES
60
3.6.3.2. Analyse de la sécurité et documentation
L’approche traditionnelle
L’approche basée sur le risque
3.6.3.3. Prise de décision
61
3.6.3.2. Safety Analysis and Documentation
The traditional approach
The risk-based approach
3.6.3.3. Decision Making
62
L’approche traditionnelle
L’approche basée sur le risque
3.6.3.3. Prise de décision
22
Fig. 7
Processus intégré de prise de décision (prenant en compte le risque)
3.7. MISE EN ŒUVRE
3.7.1. Gestion des processus Le SGS doit identifier tous les processus nécessaires à l’atteinte des objectifs de performance
et au respect des exigences de sécurité. Il doit également veiller à ce que ces processus soient mis en œuvre, évalués et améliorés en permanence. Le SGS doit enfin définir comment les processus sont mis en œuvre et contrôlés.
Dans l'élaboration des processus individuels, il faut identifier les points suivants :
Tous les aléas et les risques qui sont raisonnablement prévisibles pendant la durée de vie du barrage ;
Le séquençage et les interactions avec les autres processus ; Les entrées et sorties du processus ; Les critères de mesure.
Si l’organisation n’a pas un système de gestion intégré, il faut veiller à identifier l’ensemble des
processus en place et leurs interactions avec le SGS. De même, au plus bas niveau de l'organisation, le SGS doit spécifier comment les différentes
activités de différents groupes impliqués dans un processus particulier du SGS sont planifiées et gérées efficacement.
Le SGS doit garantir qu’il y a un responsable pour chaque processus, ayant autorité pour :
Élaborer et documenter le processus ; Assurer l’efficacité des relations et interfaces avec les autres processus ;
PROCESSUS DECISIONNEL
INTEGRE
Cadre réglementaire
Analyse déterministe de la sécurité
Analyse de risques
Connaissance des risques
Données d’accidents et d’incidents
Culture de la sécurité
Culture du risque
Conditions externes
Suivi des performances
Aspects opérationnels Ressources
Marges de sécurité
ACTION
63
The traditional approach
The risk-based approach
3.6.3.3. Decision Making
Fig. 7
Integrated (Risk-informed) Decision Making
3.7. IMPLEMENTATION
3.7.1. Process Management The DSMS must identify all processes that are needed to achieve the safety performance goals
and meet safety requirements. It also has to ensure that these processes are implemented, assessed and continually improved. The DSMS should also determine methods to ensure both implementation and control of the processes.
In developing individual processes, the following aspects should be identified:
All hazards and risks reasonably foreseeable for the current life-cycle stage of dam system;
Sequencing and interactions with other processes; Process inputs and outputs; Measurement criteria.
If the DSMS is not a part of a fully integrated management system, special care should be taken
in identifying how many other processes are in place in the organization and how they interrelate with the DSMS.
Similarly, at the lower organizational level, the DSMS has to specify how different activities
between different groups involved in a single DSMS process are planned and managed in an effective manner.
The DSMS must have provisions ensuring that each process has a designated individual with
responsibility and authority for:
72
27
Un processus de revue du système de management par la direction générale doit être prévu
dans le SGS. Ce processus porte non seulement sur l'efficacité du SGS mais également sur l’examen de toutes les interfaces et les interrelations avec d'autres systèmes de gestion.
Fig. 8
Relations au sein du système de gestion de la sécurité
3.10. AMÉLIORATION CONTINUE Un des objectifs du SGS est l'amélioration continue de tous les processus qui le constituent.
Les possibilités d'amélioration doivent être identifiés sur la base de :
La revue du système de gestion ; L'évaluation interne et les audits indépendants ; Les contributions de la ligne hiérarchique.
Ces trois types de contribution peuvent concerner uniquement des possibilités d'amélioration
des différents niveaux de l'organisation. On peut identifier et mettre en œuvre des améliorations à plusieurs niveaux :
Au niveau du système de gestion, par la révision de la structure de gestion, la révision
de processus individuels, ou la mise en œuvre de nouveaux processus ; Au niveau du processus ; Au niveau de l’activité, par l'amélioration des activités réalisées au sein des processus
existants.
Management de première ligne
Processus de mesures et de suivi
Analyse et évaluation
Actions correctives
Évaluation interne
Revue du système de gestion de la sécurité (SGS)
Direction générale
Audit indépendant
Amélioration continue
Mesure et Évaluation de la
Performance
Audit, Revue et Rapport
73
for management system review. The process should address not only effectiveness of the DSMP but should also examine all interfaces and interrelations with other managed systems.
Fig. 8
Relationships within Dam Safety Management System
3.10. CONTINUOUS IMPROVEMENT Continuous improvement of all processes constituting the DSMS should be one of the objectives
of the DSMS. Opportunities for improvement should be identified on the basis of:
Management system review; Internal assessment and independent audit; Input from line management.
Input from these three activities can relate improvement opportunities with the unique
perspectives of different levels of the organization. Improvements can be identified and implemented at several levels:
Level of the management system by revision of the management structure, revision of
existing individual processes, or by implementation of new processes; Process level; Working level by improvement of activities conducted within the existing processes.
Continuous improvement processes should include the following elements:
Reason for improvement;
76
La promotion de la sécurité
La sécurité comme valeur clairement reconnue
Une responsabilité clairement établie vis-à-vis de la sécurité
78
La promotion de la sécurité
La sécurité comme valeur clairement reconnue
Une responsabilité clairement établie vis-à-vis de la sécurité
L’Intégration de la sécurité dans toutes les activités
La sécurité s’apprend
79
increasingly stated in publicly available Social Responsibility Reports. For example, a company may value the environment and may require specific consideration of environmental impacts in its operations and in its evaluation of options. Responsible Entities value their dams and as a matter of principle often assign expenditures on dam safety a higher priority than other operational expenditures in order to protect the operations and to prevent catastrophic losses.
One of the cornerstones of the organization’s system of values and principles is the presence
of a proper safety culture. The organization should recognize the enormous value of a strong and robust safety culture in achieving its objectives and should ensure that the basic elements (see Fig. 9) are in place.
Fig. 9 Characteristics of Strong Safety Culture
(from Management System for Nuclear Installations, IAEA Safety Guide GS-G-3.5, 2009)
Leadership for safety requires that all levels of management, especially senior management, be clearly committed to safety. Involvement of management in all safety aspects is clearly visible and the organization ensures that the necessary skills are available. The organization strives for relationships built on trust, full openness, good communication and efficient conflict resolution mechanisms.
That safety is a clearly recognized value can be reflected by high priority given to safety in allocation of resources and in business plans. High priority to safety also has to be clearly shown in communication and decision making. The entire staff has to be convinced that safety is at least as important as production and management at levels should reinforce safety conscious behaviour and encourage social acceptance.
Clear accountability for safety requires that ownership of the safety concept be evident at all levels of the organization and refer to the entire workforce. Roles and responsibilities are clearly defined and understood, and delegation of responsibility and authority is carried out in a way that ensures clear accountabilities at all levels. Level of compliance with regulations and internal safety procedures is high.
81
Learning driven attribute
Leadership for safety
safety is a clearly recognized value
Clear accountability for safety
Full integration of safety into all activities
86
34
combinent souvent de telle manière que les deux fonctions fondamentales se retrouvent en conflit. D’habitude la phase d’implémentation est de la responsabilité du groupe qui exploite le barrage tandis que la détermination du niveau de sécurité est faite si possible indépendamment du management de l’exploitation, mais en consultation avec le conseil d’administration (ceci n’exclut pas une consultation préalable du management de l’exploitation).
Une forme générale de structure de gouvernance, mais nullement la seule valable, avec une relation
de surveillance et d’information indépendante des opérations d’exploitation, est présentée dans la Fig. 10.
Fig. 10(*) Exemple d’une structure de gouvernance
(*) voir figures en couleur à la fin du bulletin La mise en place de mesures de sécurité a lieu dans l’unité d’exploitation. Une autre structure
pourrait placer la supervision de la sécurité également dans l’unité d’exploitation avec un mode de reporting légèrement différent. Dans un troisième modèle l’implémentation des mesures de sécurité pourrait se faire en dehors de l’unité d’exploitation.
Il y a lieu de relever que l’inventaire des barrages est décisif pour la mise en place d’une politique
de sécurité et qu’il doit être clairement défini et mis à jour. Le type d’information y figurant (pas forcément accessible au public) est laissé à l’appréciation de l’unité en charge ou est fixé par une réglementation officielle. L’inventaire fait partie du “registre des actifs” de l’organisation et peut être un sous-registre d’un portefeuille beaucoup plus large d’actifs, pour lequel un système global de gestion des actifs peut exister.
EXEMPLE D’INFORMATION FIGURANT DANS L’INVENTAIRE D’UN BARRAGE
Information technique - Nom du barrage - Emplacement - Type du barrage - Hauteur du barrage - Longueur du couronnement - Volume du réservoir - Année de construction
Information sur la sécurité - Classe de potentiel de danger - Buts de l’exploitation - Mesures en cas d’urgence - Population concernée ; infrastructure concernée ; système écologique concerné ;
culture et héritage concernés ; fonctions d’exploitation concernées (des prévisions de pertes peuvent être aussi mentionnées)
- Rapports sur la sécurité Information financière - Contribution du barrage à l’exploitation - Coût total d’une rupture du barrage (pertes des tierces parties au minimum) - Coûts de réparation ou de reconstruction après accident
4.3. SÉCURITÉ DES BARRAGES : RÔLES ET RESPONSABILITÉS
4.3.1. Mise en œuvre d’une politique La mise en œuvre d’une politique de sécurité des barrages implique de rendre les fonctions
présentées dans la Fig. 1 (et reprises avec davantage de détails dans la Fig. 11) complètement opérationnelles pour atteindre les objectifs recherchés.
Quand le comportement d’un barrage indique qu’il y a des déficiences réelles ou potentielles,
le passage d’activités de surveillance de la sécurité du barrage à celles d’amélioration de la sécurité peut être très complexe, hautement itératif et très accaparant en termes de ressources – afin de
90
4.3.1.1. Mise en œuvre de la sécurité des barrages
4.3.1.2. Principes de démonstration de la sécurité
91
4.3.1.1. Dam Safety Implementation
4.3.1.2. Principles of Safety Demonstration
4.3.1.3. Standards (Performance Goals and Safety Standards)
92
4.3.1.1. Mise en œuvre de la sécurité des barrages
4.3.1.2. Principes de démonstration de la sécurité
4.3.1.3. Normes (objectifs de comportement et normes de sécurité)
93
4.3.1.2. Principles of Safety Demonstration
4.3.1.3. Standards (Performance Goals and Safety Standards)
Accountable
Responsible
Consulted
Informed
94
4.3.1.3. Normes (objectifs de comportement et normes de sécurité)
garante
responsable
consultées
informées
104
4.3.4.1. Exploitation, entretien et essais
4.3.4.2. Surveillance, données techniques et contrôle des performances
4.3.4.3. Revues de sécurité des barrages
105
4.3.4.1. Operation, Maintenance and Testing
4.3.4.2. Surveillance, Technical Data and Performance Monitoring
4.3.4.3. Dam Safety Reviews
4.3.4.4. Performance Concerns and Deficiencies in Dam Performance
4.3.4.5. Internal Emergency Planning and Response
106
4.3.4.1. Exploitation, entretien et essais
4.3.4.2. Surveillance, données techniques et contrôle des performances
4.3.4.3. Revues de sécurité des barrages
4.3.4.4. Comportement problématique ou défectueux des barrages
4.3.4.5. Planification interne et actions en cas d’urgence
4.3.4.6. Planification externe en cas d’urgence et tests
4.3.4.7. Conseil et revues de management externes
4.3.4.8. Amélioration continue
107
4.3.4.2. Surveillance, Technical Data and Performance Monitoring
4.3.4.3. Dam Safety Reviews
4.3.4.4. Performance Concerns and Deficiencies in Dam Performance
4.3.4.5. Internal Emergency Planning and Response
4.3.4.6. External Emergency Planning and Testing
4.3.4.7. External Advice and Management Reviews
4.3.4.8. Continuous Improvement
4.3.4.9. Audit, Review and Reporting
108
4.3.4.4. Comportement problématique ou défectueux des barrages
4.3.4.5. Planification interne et actions en cas d’urgence
4.3.4.6. Planification externe en cas d’urgence et tests
4.3.4.7. Conseil et revues de management externes
4.3.4.8. Amélioration continue
4.3.4.9. Audits, revues et rapports
4.3.4.10. Communications et documents
109
4.3.4.6. External Emergency Planning and Testing
4.3.4.7. External Advice and Management Reviews
4.3.4.8. Continuous Improvement
4.3.4.9. Audit, Review and Reporting
4.3.4.10. Communications and Records
Safety decisions
Programmatic decisions
110
4.3.4.9. Audits, revues et rapports
4.3.4.10. Communications et documents
Décisions sur la sécurité
Décisions d’ordre programmatique
Définition des différents aspects de la décision
Identification des options possibles
Déterminer les bases de la décision et leur importance relative
Examiner les options de la décision
Calibrer les bases de la décision
Préparer et documenter la recommandation de décision
Préparer et documenter la décisionMettre en œuvre, communiquer et évaluer l’efficacité de la décision
112
Décisions sur la sécurité
Décisions d’ordre programmatique
Définition des différents aspects de la décision
Identification des options possibles
Déterminer les bases de la décision et leur importance relative
Examiner les options de la décision
Calibrer les bases de la décision
Préparer et documenter la recommandation de décision
Préparer et documenter la décisionMettre en œuvre, communiquer et évaluer l’efficacité de la décision
113
4.3.4.10. Communications and Records
Safety decisions
Programmatic decisions
Define the decision issue(s)
Identify the decision options
Determine the decision bases and their relative importance
Examine the decision options
Calibrate the decision bases
Make and document the decision recommendation
Make and document decisionImplement, communicate and review the effectiveness of the decision
115
Define the decision issue(s)
Identify the decision options
Determine the decision bases and their relative importance
Examine the decision options
Calibrate the decision bases
Make and document the decision recommendation
Make and document decisionImplement, communicate and review the effectiveness of the decision
118
Incertitude
Incertitude
Incertitude
4.4.5.1. Cadre recourant aux normes
4.4.5.2. Cadre généralement adopté
attendues normalementles plus improbables,
mais possibles
119
Uncertainty
Uncertainty
Uncertainty
4.4.5.1. Standards-Based Framework
4.4.5.2. Generally Accepted Framework
120
4.4.5.1. Cadre recourant aux normes
4.4.5.2. Cadre généralement adopté
attendues normalementles plus improbables,
mais possibles
4.4.5.3. Cadre basé sur le risque
4.4.5.4. Cadre faisant appel au risque
Risque largement acceptable –
Risque inacceptable
Risque tolérable
121
4.4.5.1. Standards-Based Framework
4.4.5.2. Generally Accepted Framework
expected normallymost unlikely but possible
“for two reasons”
4.4.5.3. Risk-Based Framework
4.4.5.4. Risk-Informed Framework
Broadly acceptable risk
Unacceptable risk
Tolerable risk
122
4.4.5.3. Cadre basé sur le risque
4.4.5.4. Cadre faisant appel au risque
Risque largement acceptable –
Risque inacceptable
Risque tolérable
123
expected normallymost unlikely but possible
“for two reasons”
4.4.5.3. Risk-Based Framework
4.4.5.4. Risk-Informed Framework
Broadly acceptable risk
Unacceptable risk
Tolerable risk
140
5.2.1.1. Prévision hydrologique
5.2.1.2. Passage des crues
5.2.1.3. Surveillance et essais
5.2.1.4. Formation des exploitants
5.2.2.1. Inspection visuelle
5.2.2.2. Auscultation
La lecture des capteurs
La télémesure
141
5.2.1.1. Hydrological Forecast
5.2.1.2. Operational Flood Routing
5.2.1.3. Surveillance and Tests
5.2.1.4. Operator Training
142
5.2.2.1. Inspection visuelle
5.2.2.2. Auscultation
La lecture des capteurs
La télémesure
L’étalonnage et la maintenance des capteurs
La fréquence des mesures et des inspections
Les inspections et mesures d’auscultation spécifiques :
143
5.2.1.2. Operational Flood Routing
5.2.1.3. Surveillance and Tests
5.2.1.4. Operator Training
5.2.2.1. Visual inspection
5.2.2.2. Monitoring
Readings of the sensors
Remote monitoring
Sensors calibration and maintenance
Readings and inspection frequency
144
L’étalonnage et la maintenance des capteurs
La fréquence des mesures et des inspections
Les inspections et mesures d’auscultation spécifiques :
Le stockage des données
145
5.2.2.1. Visual inspection
5.2.2.2. Monitoring
Readings of the sensors
Remote monitoring
Sensors calibration and maintenance
Readings and inspection frequency
Specific inspections and monitoring sensors readings
Data storage
152
5.2.6.1. Mesures de précaution et de prévention
5.2.6.2. Exigences pour les opérations d’urgence
167
“we have only a few uncertainties about the way to achieve maximum dam safety; namely, by having all levels of personnel assigned to a dam project apply the utmost care and competence to every aspect and phase of its design, construction, operation and maintenance.”
168
“we have only a few uncertainties about the way to achieve maximum dam safety; namely, by having all levels of personnel assigned to a dam project apply the utmost care and competence to every aspect and phase of its design, construction, operation and maintenance.”
“structural form [that] together with the foundation and environment will, most economically:
169
“structural form [that] together with the foundation and environment will, most economically:
Sediment yield
Sediment deposits
Sedimentation control
Secondary effects
193
2.2.1. Explicit Individual Risk Criteria
2.2.2. Risk Criteria Derived from Standards
Sa T
PLOL = PIDF x PDamFailure/IDF x PFatality/DamFailure
PLOL
PIDF
PDamFailure/IDF
PFatality/DamFailure
2.2.2. Risk Criteria Derived from Standards
Sa T
PLOL = PIDF x PDamFailure/IDF x PFatality/DamFailure
PLOL
PIDF
PDamFailure/IDF
PFatality/DamFailure
194
2.2.2. Risk Criteria Derived from Standards
Sa T
PLOL = PIDF x PDamFailure/IDF x PFatality/DamFailure
PLOL
PIDF
PDamFailure/IDF
PFatality/DamFailure
PLOL = PIDF
PLOL < PIDF
AEP = PIDF = 10-4
PLOL 10-4
2.2.3. Societal Risks Criteria
195
2.3.1. Cost Benefit Analysis (CBA)
2.3.1. Cost Benefit Analysis (CBA)
Nr B C
N
ii
i
N
ii
i
rCr
B
BCR
N
iiii
rCB
ENPVE
N
ii
iN
ii
i
rCE
rBENPVE
p,q,
L (p-q).
196
Nr B C
N
ii
i
N
ii
i
rCr
B
BCR
N
iiii
rCB
ENPVE
N
ii
iN
ii
i
rCE
rBENPVE
p,q,
L (p-q).
r, B C
iN
ii qp
rqpLqpLBE
BE r B
2.3.2. Cost Effectiveness Analysis (CEA)
CSSLU
RIU LOLELOLE
CCSSL
C ELOL1 LOLR
CSSLA
RI
RIRIA LOLELOLE
OEOERCERCECCSSL
RC1
RCR O1 OR
CSSLA
CSSLU
CSSLA
2.3.3. Disproportionality
197
r, B C
iN
ii qp
rqpLqpLBE
BE r B
2.3.2. Cost Effectiveness Analysis (CEA)
CSSLU
RIU LOLELOLE
CCSSL
C ELOL1 LOLR
CSSLA
RI
RIRIA LOLELOLE
OEOERCERCECCSSL
RC1
RCR O1 OR
CSSLA
CSSLU
CSSLA
2.3.3. Disproportionality
204
Tolerable or Acceptable: A Comparison of Risk Regulation in the United Kingdom and in the Netherlands. Risk Analysis
The Assessment and Management of Third Party Risk Around a Major Airport. J. of Hazardous Materials
3. Australian National Committee on Large Dams. Guidelines on Risk Assessment.
Landslide Risk Management Concepts and Guidelines
Societal RiskThoughts on the design of design floods
Risk-based Decision Making in the Transportation Sector
ALARP Evaluation: Using Cost Effectiveness and Disproportionality to Justify Risk Reduction
Dam Safety GuidelinesThe Scaled Risk Integral – A Simple Numerical Representation of Case
of Societal Risk for Land Use Planning in the Vicinity of Major Accident Hazards
205
Tolerable or Acceptable: A Comparison of Risk Regulation in the United Kingdom and in the Netherlands. Risk Analysis
The Assessment and Management of Third Party Risk Around a Major Airport. J. of Hazardous Materials
3. Australian National Committee on Large Dams. Guidelines on Risk Assessment.
Landslide Risk Management Concepts and Guidelines
Societal RiskThoughts on the design of design floods
Risk-based Decision Making in the Transportation Sector
ALARP Evaluation: Using Cost Effectiveness and Disproportionality to Justify Risk Reduction
Dam Safety GuidelinesThe Scaled Risk Integral – A Simple Numerical Representation of Case
of Societal Risk for Land Use Planning in the Vicinity of Major Accident Hazards
206
Tolerable or Acceptable: A Comparison of Risk Regulation in the United Kingdom and in the Netherlands. Risk Analysis
The Assessment and Management of Third Party Risk Around a Major Airport. J. of Hazardous Materials
3. Australian National Committee on Large Dams. Guidelines on Risk Assessment.
Landslide Risk Management Concepts and Guidelines
Societal RiskThoughts on the design of design floods
Risk-based Decision Making in the Transportation Sector
ALARP Evaluation: Using Cost Effectiveness and Disproportionality to Justify Risk Reduction
Dam Safety GuidelinesThe Scaled Risk Integral – A Simple Numerical Representation of Case
of Societal Risk for Land Use Planning in the Vicinity of Major Accident Hazards
Dam safety policy for spillway design floods
Landslide and Boulder Falls from Natural terrain: Interim Risk Guidelines
Legal Framework Considerations in the Development of Risk Acceptance Criteria
The Tolerability of Risk from Nuclear Power Stations
Reducing Risk Protecting PeopleUnderstanding and Responding to Societal Concerns
Nuclear Safety Directorate – Business Management System
18. Nomenclature for Hazard and Risk Assessment in the Process Industries.
Flood Risk Calculated with Different Risk Measures. Proc
Standard Methods for Land-use Planning to Determine the Effects on Societal Risk.
“Safety goals for high-hazard dams: are dams too safe?”
The dilemma of toxic substance regulation
Interim Tolerable Risk Guidelines for US Army Corps of Engineers Dams
Risk Criteria for Land Use Safety PlanningUniversal Risk Scales - A Tool for
Developing Risk Criteria by Consensus.
Methods and Models for the Assessment of Third Party Risk due to Aircraft Accidents in the Vicinity of Airports and Their Implications for Societal Risk
Quantified Societal Risk and Policy Making. Kluwer Academic Publishers
Common Risk Criteria for National Test Ranges: Inert Debris
Application of Risk-Based Strategies to Workers’ Health and Safety Protection: UK Experience Reed Business Information
An Anatomy of Risk
Technical Advisory Committee on Water Defenses. Some Considerations of an Acceptable Level of Risk in the Netherlands
Benefit-Cost Analysis Guide (draft).
Acceptable Risk as Basis for Design. Reliability Engineering and System Safety
Risk Assessment and Risk Communication in Civil Engineering. IABSE Conference Report on Safety, Risk and Reliability – Trends in Engineering, Malta
207
Dam safety policy for spillway design floods
Landslide and Boulder Falls from Natural terrain: Interim Risk Guidelines
Legal Framework Considerations in the Development of Risk Acceptance Criteria
The Tolerability of Risk from Nuclear Power Stations
Reducing Risk Protecting PeopleUnderstanding and Responding to Societal Concerns
Nuclear Safety Directorate – Business Management System
18. Nomenclature for Hazard and Risk Assessment in the Process Industries.
Flood Risk Calculated with Different Risk Measures. Proc
Standard Methods for Land-use Planning to Determine the Effects on Societal Risk.
“Safety goals for high-hazard dams: are dams too safe?”
The dilemma of toxic substance regulation
Interim Tolerable Risk Guidelines for US Army Corps of Engineers Dams
Risk Criteria for Land Use Safety PlanningUniversal Risk Scales - A Tool for
Developing Risk Criteria by Consensus.
Methods and Models for the Assessment of Third Party Risk due to Aircraft Accidents in the Vicinity of Airports and Their Implications for Societal Risk
Quantified Societal Risk and Policy Making. Kluwer Academic Publishers
Common Risk Criteria for National Test Ranges: Inert Debris
Application of Risk-Based Strategies to Workers’ Health and Safety Protection: UK Experience Reed Business Information
An Anatomy of Risk
Technical Advisory Committee on Water Defenses. Some Considerations of an Acceptable Level of Risk in the Netherlands
Benefit-Cost Analysis Guide (draft).
Acceptable Risk as Basis for Design. Reliability Engineering and System Safety
Risk Assessment and Risk Communication in Civil Engineering. IABSE Conference Report on Safety, Risk and Reliability – Trends in Engineering, Malta
Safety of Dams, Probable Maximum Flood and the Selection of Inflow Design Floods.
210
1
Fi
g. 1
Pa
nora
ma
de la
séc
urité
des
bar
rage
s
CH
APIT
RE
2 –
PRIN
CIP
ES F
ON
DAM
ENTA
UX
DE
LA S
ECU
RIT
E D
ES B
ARR
AGES
CH
APIT
RE
3 –
SYST
EMES
DE
GES
TIO
N D
E LA
SEC
UR
ITE
DES
BAR
RAG
ES
CH
APIT
RE
4 –
MES
UR
ES D
’OR
GAN
ISAT
ION
CH
APIT
RE
5 –
ACTI
VITE
S PO
UR
LA
SEC
UR
ITE
DES
BAR
RAG
ES
Elab
orat
ion
de s
olut
ions
cor
rect
ives
Activ
ités
d’ex
ploi
tatio
n lié
es à
la s
écur
ité
Activ
ités
corr
ectiv
es e
t d’a
mél
iora
tion
Rev
ue d
e sé
curit
éen
exp
loita
tion
Oui
Non
ou
ince
rtain
Obj
ectif
s de
per
form
ance
at
tein
ts ?
Activ
ités
d’ex
ploi
tatio
n co
uran
tes
(y c
ompr
is l
a m
aint
enan
ce) d
ans
le c
adre
des
crit
ères
de
conc
eptio
n
Con
trai
ntes
d’e
xplo
itatio
nad
ditio
nnel
les
Surv
eilla
nce
et a
uscu
ltatio
n co
uran
te
Surv
eilla
nce
renf
orcé
e
Dém
antè
lem
ent
du b
arra
ge?
Oui
Non
Ret
our à
l’ex
ploi
tatio
n no
rmal
e Expl
oita
tion
« pr
uden
te »
Réd
uctio
n de
s co
nséq
uenc
es d
e l’a
nom
alie
Cor
rect
ion
de
l’ano
mal
ie
Acce
ptat
ion
du ri
sque
Mis
e ho
rs s
ervi
ce
212
2
Fi
g. 2
Ex
empl
e de
la ré
parti
tion
des
coût
s de
la ru
ptur
e d’
un b
arra
ge
109
Uni
té m
onét
aire
(p
.ex..
US
Dol
lars
)
Ris
ques
por
tés
par l
e pr
oprié
taire
Ris
ques
por
tés
par
le m
arch
é de
l’as
sura
nce
Ris
ques
de
plus
en
plus
por
tés
et g
éré
par l
a so
ciét
é
Ris
ques
por
tés
et
géré
s pa
r la
Soci
été
Lim
ite d
’app
licat
ion
des
conc
epts
de
risqu
es in
dust
riels
RIS
QU
E IN
DU
STR
IEL
RIS
QU
E SO
CIÉ
TAL
Lim
ite th
éoriq
ue d
u m
arch
é de
l’a
ssur
ance
(var
iabl
e en
fonc
tion
du
mar
ché
de l’
assu
ranc
e)
214
3
Fi
g. 6
Pr
oces
sus
d’ex
ploi
tatio
n El
abor
atio
n de
sol
utio
ns c
orre
ctiv
es
Act
ivité
s d’
expl
oita
tion
liées
à la
séc
urité
Act
ivité
s co
rrec
tives
et d
’am
élio
ratio
n
Legal Fr a mewo r k &
Sta tu to r y A
u th o i ti e s
Intervention ordonnée par l’autorité
Cadre légal et Autorités statutaires
Oui
Non
ou
ince
rtain
?O
bjec
tifs
de p
erfo
rman
ce
atte
ints
?
Activ
ités
d’ex
ploi
tatio
n co
uran
te
(y c
ompr
is la
mai
nten
ance
) dan
s le
cadr
e de
s cr
itère
s de
con
cept
ion
C
ontr
aint
es d
’exp
loita
tion
addi
tionn
elle
s
Surv
eilla
nce
et e
xplo
itatio
n co
uran
te
Surv
eilla
nce
renf
orcé
e
Dém
antè
lem
ent
du b
arra
ge?
Oui
Non
Ret
our à
l’ex
ploi
tatio
n co
uran
te
Expl
oita
tion
“pru
dent
e”
Réd
uctio
n de
sco
nséq
uenc
esde
l’an
omal
ieC
orre
ctio
n de
l’a
nom
alie
Acce
ptat
ion
du ri
sque
Mis
e ho
rs s
ervi
ce
Rev
ue d
e sé
curit
éen
exp
loita
tion
Prév
ue
216
4
Fi
g. 1
0 Ex
empl
e d’
une
stru
ctur
e de
gou
vern
ance
Unité de production 2 avec d’autres dangers
Unité de production 3 avec d’autres dangers
Unité de production 1 avec d’autres dangers
Chi
ef E
xecu
tive
Offi
cer (
CEO
)
Supe
rvis
ion
de
l’exp
loita
tion
Expe
rts
pour
qu
estio
ns e
xter
nes
Expe
rts
pour
qu
estio
ns in
tern
es
Con
seil
d’ad
min
istr
atio
n
Dél
égat
ion
du c
onse
il
A
utor
ité ré
gula
tric
e
Supe
rvis
ion
de la
sé
curit
é de
s ba
rrag
es
218
5
Fig.
11
Activ
ités
conc
erna
nt la
séc
urité
des
bar
rage
s
Le b
arra
ge re
mpl
it-il
tout
es le
s ex
igen
ces
Activ
ités
d’ex
ploi
tatio
n
Surv
eilla
nce
de ro
utin
e
Mes
ures
cor
rect
ives
Oui
Rev
ue d
e la
Sé
curit
é du
ba
rrag
e
Non
ou
ince
rtai
n?
Mis
e ho
rs
serv
ice
-Exp
loite
r et m
aint
enir
le b
arra
ge
en a
ccor
d av
ec le
s ob
ject
ifs d
e sé
curit
é - A
ssur
er le
s pr
épar
atifs
en
cas
d’ur
genc
e
Acco
rd d
e l’a
utor
ité –
“La
sécu
rité
du b
arra
ge e
st s
uffis
ante
”
Acce
pter
le
risqu
e R
édui
re le
s co
nséq
uenc
es
inac
cept
able
s
Amél
iore
r le
barr
age
à un
ni
veau
acc
epta
ble
Faire
les
amél
iora
tions
né
cess
aire
s
Exam
iner
les
optio
ns
Dém
ante
ler l
e ba
rrag
e ?
Oui
Oui
O
ui
Non
Non
Des
mes
ures
ad
inte
rimso
nt-e
lles
disp
onib
les
et
suffi
sant
es ?
Le b
arra
ge p
eut-i
l êtr
e re
ndu
asse
z sû
r pou
r êtr
e ex
ploi
té ?
Intervention de l’autorité – La sécurité du barrage est suffisante
Supervision de l’autorité
Non
ou
ince
rtai
n?
2206
Fig. 12 Hiérarchie des fonctions du système de management
Autorité régulatrice
Conseil d’administration
Délégation du Conseil
Chief Exucutive
Officer (CEO)
Supervision opérative
Supervision de la sécurité
Experts pour questions internes
Experts pour questions externes
Fonction de la gestion d’entreprise
Politiques et Objectifs
Amélioration continue
Planning
Audit, Revue et Reporting Implémentation
Contrôle et Évaluation
Politiques et Objectifs
Politiques et Objectifs
Amélioration continue
Amélioration continue
Planning Plannification
Audit, Revue et Reporting Implémentation
Contrôle et Évaluation
Implémentation Audit, Revue et Reporting
Contrôle et Évaluation
Fonctions du management opérationnel Fonction de la gestion des actifs
Gestion du programme de sécurité Fonction
Gestion de la sécurité des barrages Tâches
Politiques et Objectifs
Politiques et Objectifs
Amélioration continue
Amélioration continue
Audit, Revue et Reporting
Audit, Revue et Reporting
Contrôle et Évaluation
Contrôle et Évaluation
Plannification Planning
Implémentation Implémentation
ACTIVITE DE LA SECURITE DES BARRAGES
Inspections et auscultation des barrages
Revues de la sécurité des barrages
Services d’ingénierie
Améliorations de la sécurité des barrages
Entretien et préparation locales en cas d’urgence
Entretien et préparation locales en cas d’urgence
Expl
oite
r l’U
nité
1
avec
d’a
utre
s da
nger
s
Expl
oite
r l’U
nité
2
avec
d’a
utre
s da
nger
s
Expl
oite
r l’U
nité
3
avec
d’a
utre
s da
nger
s
Fig. 12
Hierarchy of System Management Functions
222
7
Fig. 13 Gestion de la sécurité des barrages – Fonctions détaillées
17. Audit et revue 1. Développer la stratégie d’entreprise, politique et organisation
2. Etablir le cadre, les politiques et les attentes
3. Etablir un lien avec les organes de régularion et l’industrie
4. Fixer des priorités et un programme
5. Evaluer la conformité, contrôler le profil de risque
6. Etablir des exigences pour l’exploitation, la maintenance et
la surveillance de la sécurité des barrages
7. Gérer le programme de sécurité des barrages
8. Evaluer les risques, modes de rupture et conséquences
9. Mener un contrpole et une surveillance de routine
Le barrage remplit-il toutes les exigences
de sécurités ? 10. Revue de la
sécurité du barrages
NON OU INCERTAIN
Le barrage peut-t-il être mis aisément en conformité totale ?
NON
NON
La sécurité du barrage est-elle suffisante dans l’intérim
OUI
OUI
OUI
11. Exploiter et maintenant un barrage en conformité avec les objectifs de sécurité.
Rapporter selon exigences
12. Se préparer à des situations urgentes
13. Développer des options de gestion du risque
Quelle est l’option préférée ?
14. Améliorer le barrage (au niveau
exigé)
14. Améliorer le barrage (à un
niveau
15. Réduire les conséquances inacceptables
16. Confirmer l’approbation du régulateur : le barrage est suffisament sûr
Fig. 13 Detailed Dam Safety Management Functions
224
8
Etape Activité fonctionnelle RE-D DSA RE-S A&OM Op-M Op-Dir
1 Etablir des structures de propriété C2 Etablir un cadre de gouvernance de la sécurité des barrages, des principes, des
processus de supervision et des objectifs. Approuver le manuel de gestion de la sécurité GR 2 Etablir un inventaire portant sur la sécurité des barrages et une classification des
conséquences GR C C
2
Superviser le développement de directives techniques et de méthodologies à implémenter dans le programme de sécurité des barrages
GR
CI
2 Etablir des exigences pour les comptes-rendus et les revues GR I 3 Assurer le leadership au sein de la communauté en charge de la sécurité des barrages GR 3 Maintenir la connaissance des pratiques internationales GR CI 3 Etablir le contact avec le régulateur; confirmer la compréhension de la régulation;
obtenir que les objectifs de sécurité des barrages soient acceptés. GR C CI 3 Contrôler et informer sur la conformité avec la régulation ; soumettre les documents de
conformité G R
3 Superviser la gestion de la sécurité et des cas d’urgence au niveau de l’entreprise GR C 3 Approuver les communications externes concernant la gestion de la sécurité et des cas
d’urgence GR
3 Approuver les communications externes sur la sécurité des barrages G R 4 Donner la priorité aux projets de sécurité des barrages et proposer un programme pour
la réduction des risques G R G A
4 Approuver les méthodes d’établissement des priorités ; revoir le programme proposé pourla réduction des risques
GR 4 Approuver le programme proposé pour la réduction des risques GR4 Maintenir un profil de risque du portfolio (c’est-à-dire une matrice des risques) G C R 4 Mesurer la réduction effective du risque par rapport à la prédiction R G5 Evaluer la conformité avec le système de gestion de la sécurité des barrages G R 6 Gérer des comités indépendants d’experts-conseils G C R 6 Participer à l’audit périodique de l’entreprise sur la sécurité des barrages GR6 Implémenter des mesures correctives au vu des résultats des audits ou revues G R C 7 Obtenir l’approbation juridique pour des projets de sécurité des barrages GR CI 7 Obtenir l’autorisation du régulateur pour l’exploitation GR CI 8 Gérer les données de sécurité des barrages GR 8 Etablir un lien avec le service des communications de l’entreprise et approuver la
sécurité des barrages C C GR
8 Rapporter trimestriellement au directeur en charge de la mise en place du programmede sécurité des barrages
I I R G
8 Rapporter trimestriellement au Comité sur l’état et la gouvernance de la sécurité desbarrages
GR C CI I
8 Préparer le rapport annuel sur le comportement du/des barrage(s) R G8 Informer le directeur de la sécurité des barrages avant de soumettre les informations sur
le projet de sécurité des barrages au Conseil d’administration GR
9 Etablir des procédures et des standards pour la mise en place du programme desécurité des barrages
C R G
10 Evaluer les dangers, les modes de rupture et leurs conséquences pour tous lesbarrages
C GR 11 Développer et documenter les exigences EMS pour chaque barrage GR 11 Planifier et implémenter des stratégies et des objectifs EMS R G12 Exploiter et maintenir les sites de barrage de manière à atteindre les exigences et les objectifs R G12 Gérer la sécurité des sites de barrage en accord avec les exigences de l’entreprise S R G12 Gérer la sécurité du public sur les sites de barrage en accord avec les exigences de
l’entreprise S R G
13 Gérer la préparation en cas d’urgence et maintenir des plans d’action pour tous lesbarrages
R G
13 Maintenir des capacités de réponse en cas d’urgence pour les aménagements debarrage
R G
13 Réagir à des conditions inhabituelles et des incidents sur les barrages I C R G13 Informer le régulateur sur les cas d’urgence GR C 13 Fournir une conduite pour des réactions gérées à des incidents de sécurité des ouvrages GR C I14 Planifier et implémenter un programme de surveillance GR 15 Gérer un programme de revue de la sécurité des barrages (DSR) et en assurer le suivi C C GR 16 Identifier, évaluer et surveiller les déficiences actuelles et potentielles ; déterminer les
actions C GR
16 Planifier et implémenter des recherches de défauts et des évaluations de la sécurité C R G16 Approuver les méthodes et les résultats d’évaluation de la sécurité G R C 16 Développer des options pour la sécurité des barrages et recommander des exigences pour
les projets R G
16 Choisir les mesures adéquates pour la gestion de la sécurité GR C C17 Planifier et implémenter des projets d’amélioration de la sécurité C R G17 Identifier les modifications planifiées sur les barrages; fournir l’information pour les
justifier (agence de régulation) CI R G
17 Obtenir l ’approbation du régulateur pour la modification G R CI 17 Confirmer que le barrage correspond aux exigences du projet C I R G18 Eliminer les conséquences inacceptables R G
Tableau 1 Matrice des rôles et responsabilités (RACI)
Table 1 Roles and Responsibilities (RACI) Matrix
Step Functional Activity RE-D DSA RE-S A&OM Op-M Op-Dir1 Establish Ownership Structures C2 Establish dam safety governance framework, policies, oversight processes and
expectations. Approve Dam Safety Management Manual. AR
2 Establish dam safety inventory and consequence classifications AR C C
2 Oversee development of technical guidelines and methodologies for implementation in dam safety program AR CI
2 Establish requirements for reporting and review AR I3 Provide leadership ro wider dam safety community AR3 Maintain knowledge of international practices AR CI3 Liaise with regulator; confirm interpretation of Regulation; obtain acceptance of
dam safety goals; AR C CI
3 Monitor & report regulatory compliance; submit compliance documents A R3 Oversee corporate security and emergency mgmt AR C3 Approve external communications re security and emergency management AR3 Approve external communications re dam safety A R4 Prioritize dam safety projects and propose program for risk reduction C R C A4 Approve prioritization methods; review proposed risk reduction program AR4 Approve proposed plan for risk reductions AR4 Maintain portfolio risk profile (i.e. risk matrix) A C R4 Measure risk reduction performance vs. forecast R A5 Assess compliance with Dam Safety Management System A R6 Manage Independent Advisory Boards A C R6 Assist periodic corporate audit of dam safety AR6 Implement corrective action to address audit/review results A R C7 Provide jurisdictional approvals to dam safety projects AR CI7 Obtain regulatory consent to operate AR CI8 Manage dam safety records AR8 Liaise with Corporate Communications and approve dam safety
i tiC C AR
8 Report quarterly to Director on dam safety program implementation I I R A8 Report quarterly to Board on dam safety status and governance AR C CI I8 Prepare annual report on dam performance R A8 Inform Director of Dam Safety before submitting dam safety project briefings to
Board of Directors AR
9 Establish procedures & standards for implementation of dam safety program C R A10 Assess hazards, failure modes and consequences for all dams C AR11 Develop & document OMS requirements for each dam AR11 Plan and implement portfolio OMS strategies & goals R A12 Operate and maintain dam sites to meet requirements and goals R A12 Manage security at dam sites consistent with Corpproate requirements S R A12 Manage public safety at dam sites consistent with Corporate requirements S R A13 Manage emergency preparedness and maintain response plans for all dams R A13 Maintain emergency response capability for dam facilities R A13 Respond to unusual conditions and incidents at the dam I C R A13 Report emergencies to regulator AR C13 Provide direction for managed response to dam safety incidents AR C I14 Plan and implement surveillance program AR15 Manage program of Dam Safety Reviews (DSR) and follow-up C C AR16 Identify, assess, monitor actual & potential deficiencies; determine action
i dC AR
16 Plan and implement deficiency investigations and safety assessments C R A16 Approve safety assessment methods and results A R C16 Develop dam safety options and recommend requirements for projects R A16 Choose preferred safety management measure AR C C17 Plan and implement safety improvement projects C R A17 Identify planned alteration to dam (regulatory); provide information to support
l tCI R A
17 Obtain regulatory approval for alteration to dam A R CI17 Confirm if dam meets project requirements C I R A18 Eliminate unacceptable consequences R A
225
Table 1 Roles and Responsibilities (RACI) Matrix
Step Functional Activity RE-D DSA RE-S A&OM Op-M Op-Dir1 Establish Ownership Structures C2 Establish dam safety governance framework, policies, oversight processes and
expectations. Approve Dam Safety Management Manual. AR
2 Establish dam safety inventory and consequence classifications AR C C
2 Oversee development of technical guidelines and methodologies for implementation in dam safety program AR CI
2 Establish requirements for reporting and review AR I3 Provide leadership ro wider dam safety community AR3 Maintain knowledge of international practices AR CI3 Liaise with regulator; confirm interpretation of Regulation; obtain acceptance of
dam safety goals; AR C CI
3 Monitor & report regulatory compliance; submit compliance documents A R3 Oversee corporate security and emergency mgmt AR C3 Approve external communications re security and emergency management AR3 Approve external communications re dam safety A R4 Prioritize dam safety projects and propose program for risk reduction C R C A4 Approve prioritization methods; review proposed risk reduction program AR4 Approve proposed plan for risk reductions AR4 Maintain portfolio risk profile (i.e. risk matrix) A C R4 Measure risk reduction performance vs. forecast R A5 Assess compliance with Dam Safety Management System A R6 Manage Independent Advisory Boards A C R6 Assist periodic corporate audit of dam safety AR6 Implement corrective action to address audit/review results A R C7 Provide jurisdictional approvals to dam safety projects AR CI7 Obtain regulatory consent to operate AR CI8 Manage dam safety records AR8 Liaise with Corporate Communications and approve dam safety
i tiC C AR
8 Report quarterly to Director on dam safety program implementation I I R A8 Report quarterly to Board on dam safety status and governance AR C CI I8 Prepare annual report on dam performance R A8 Inform Director of Dam Safety before submitting dam safety project briefings to
Board of Directors AR
9 Establish procedures & standards for implementation of dam safety program C R A10 Assess hazards, failure modes and consequences for all dams C AR11 Develop & document OMS requirements for each dam AR11 Plan and implement portfolio OMS strategies & goals R A12 Operate and maintain dam sites to meet requirements and goals R A12 Manage security at dam sites consistent with Corpproate requirements S R A12 Manage public safety at dam sites consistent with Corporate requirements S R A13 Manage emergency preparedness and maintain response plans for all dams R A13 Maintain emergency response capability for dam facilities R A13 Respond to unusual conditions and incidents at the dam I C R A13 Report emergencies to regulator AR C13 Provide direction for managed response to dam safety incidents AR C I14 Plan and implement surveillance program AR15 Manage program of Dam Safety Reviews (DSR) and follow-up C C AR16 Identify, assess, monitor actual & potential deficiencies; determine action
i dC AR
16 Plan and implement deficiency investigations and safety assessments C R A16 Approve safety assessment methods and results A R C16 Develop dam safety options and recommend requirements for projects R A16 Choose preferred safety management measure AR C C17 Plan and implement safety improvement projects C R A17 Identify planned alteration to dam (regulatory); provide information to support
l tCI R A
17 Obtain regulatory approval for alteration to dam A R CI17 Confirm if dam meets project requirements C I R A18 Eliminate unacceptable consequences R A
2269
Fig. 14 (Quelques) Paramètres pour l’établissement de priorité
Fig. 15 Cadre pour établir le contexte de la décision (UKOOA, 1999)
Conséquence à ne pas subir Max.
Min.
Basse Efficacité financière Haute
Haute Im
port
ance
pou
r la
sécu
rité
Conséquence à ne pas subir trop souvent
Importance pour le processus
de prise de décision
Codes et normes
A
B
C
Contexte de la décision Moyens de contrôle
Vérification
Revue d’experts
Analyse comparative
Partie prenante externe : consultation
Partie prenante interne : consultation
Rien de nouveau ou d’inhabituel Risques bien compris Pratique établie Pas d’implication majeure des parties prenantes
Implications du cycle de vie Transfert ou partage des risques Incertitude ou écart par rapport à la pratique usuelle Importantes implications économiques
Très innovateur ou posant un défiPoints de vue et perception des parties prenantes très marqués Transfert/partage des risques important Grandes incertitudes
Fig. 14
(Some) Dimensions of a Prioritization Framework
Fig. 15
Framework for Setting Decision Context (UKOOA, 1999)
227
Fig. 14
(Some) Dimensions of a Prioritization Framework
Fig. 15
Framework for Setting Decision Context (UKOOA, 1999)
22810
Fig. 16
Forme générale de critères d’acception du risque (Pays-Bas)
Fig. 17 Tolérance du risque
Inacceptable
Réduction souhaitable
Negligeable
Agmentation du risque
Limites
Domaine non acceptable
Domaine ALARP ou tolérable (prise de
risque seulement si un bénéfice est
attendu)
Domaine largement acceptable (études de détail pas nécessaires
pour démontrer ALARP)
Nécessaire pour conserver l’assurance que le risque demeure
à ce niveau
Tolérable seulement si la réduction du risque n’est pas réalisable ou si son coût est très disproportionné
par rapport à l’amélioration apportée
Risque injustifiable, excepté dans des circonstances
extraordinaires
Tolérable si la réduction du risque dépasse l’amélioration
apportée
Risque négligeable
230 11
Fig. 18 Processus d’évaluation systématique de la sécurité
EVALUATION DE LA SECURITE DE BARRAGES INDIVIDUELS
Réaliser des calculs de base Finaliser les données de sécurité
pour chaque barrage
Développer un modèle spatial et fonctionnel du système
barrage + réservoir
Analyser les dangers et les modes de rupture de manière
détail
Pour chaque élément du barrage déterminer ses principales fonctions:
Retenue de l’eau, ou Contrôle des écoulements
Déterminer le degré de préoccupation au niveau
fonctionnel principal pour les catégories concernées
Compiler une liste de tous les aspects fonctionnels par type de
préoccupation avec des explications
Revoir et contrôler toutes les analyses de modèle et les
raisonnements appliqués aux paramètres de sécurité
Revue Q/R
Rapport d’évaluation de
la sécurité Gérer et maintenir le barrage en
accord avec les objectifs de sécurité; maintenir les préparatifs
pour les cas d’urgence
oui
Le barrage remplit-il toutes les exigences
de sécurité ?
Revue de la sécurité du barrage
Surveillance courante
Prévue
ACTIVITES DE SUPERVISION DE LA SECURITE DU BARRAGE
Fondation
Appui rive gauche Digue de gauche Digue de
droite Appui rive
droite Barrage béton +
vannes
SOUS-SYSTÈME: RETENTION DES EAU
SPATIAL MODEL OF EARTHDAM FLOW CONTROL FUNCTION (steady state condition)
GROUT CURTAIN FOUNDATION
UPSTREAM COFFERDAM
UPSTREAM SHELL
UPSTREAM FILTER
DOWNSTREAM SHELL
DOWSTREAM FILTER & DRAIN
Crest
Max res El. m
UPSTREAM RIP -RAP
CORE
Classer les résultats en catégories de «préoccupation par rapport à la
sécurité»
SYSTEME FONCTIONNELRESERVOIR RETENTION
DES EAUX EVACUATION CONTROLEE
PRODUCTION & MAITRISE
DOMAINE CONCERNE AA L’AVAL
Fig. 18
Systematic Safety Assessment Process
FOUNDATION
UPSTREAM SHELL DOWNSTREAM SHELL
Max res El. m
GROUT CURTAIN
UPSTREAM FILTER
DOWNSTREAM FILTER & DRAIN
Crest
CORE
UPSTREAM COFFERDAM
UPSTREAM RIP -RAP
SPATIAL MODEL OF EARTH DAM FLOW CONTROL FUNCTION (steady state condition)
LEFT ABUTMENT LEFT DAM CONCRETE
DAM + GATERIGHT DAM
RIGHT ABUTMENT
WATER RETAINING SUBSYSTEM
FOUNDATION
RESERVOIR WATER RETENTION
CONTROLLED DISCHARGE
GENERATION & CONTROL
IMMEDIATE DOWNSTREAM AREA
FUNCTIONAL SYSTEM
231
Fig. 18
Systematic Safety Assessment Process
FOUNDATION
UPSTREAM SHELL DOWNSTREAM SHELL
Max res El. m
GROUT CURTAIN
UPSTREAM FILTER
DOWNSTREAM FILTER & DRAIN
Crest
CORE
UPSTREAM COFFERDAM
UPSTREAM RIP -RAP
SPATIAL MODEL OF EARTH DAM FLOW CONTROL FUNCTION (steady state condition)
LEFT ABUTMENT LEFT DAM CONCRETE
DAM + GATERIGHT DAM
RIGHT ABUTMENT
WATER RETAINING SUBSYSTEM
FOUNDATION
RESERVOIR WATER RETENTION
CONTROLLED DISCHARGE
GENERATION & CONTROL
IMMEDIATE DOWNSTREAM AREA
FUNCTIONAL SYSTEM
232 12
Fig. 19 Planification préliminaire et définition des priorités
Préparer la liste des données de sécurité de tous les barrages dans un
ordre donné (p.ex. par bassin hydrographique ou par nom ou emplacement sur une rivière)
Préparer les listes de données de chaque barrage en fonction des
objectifs recherchés (p.ex. barrages classés par catégorie de
conséquences
Editer les listes individuelles de données pour une analyse
d’un point de vue de la gestion (p.ex. définition de priorités)
Contrôle et Q/R pour soumission
Finaliser la liste des priorités pour les interventions requises et dessiner le
graphique sécurité/risque
Evaluer les données sur le plan de l’ingénierie en les pondérant
Réaliser différentes interprétations sur le plan de la politique en pondérant
les données
Examiner les données sous différentes perspectives
Conséquences à ne pas subir trop souvent
Conséquences à ne pas subir Max.
Min.
Efficacité financière Basse Haute
Haute
Impo
rtanc
e po
ur le
risq
ue o
u le
com
porte
men
t
Rassembler toutes les données sur la sécurité dans le manuel “Données de
gestion” (ou sur un fichier électronique)
Fig. 19
Preliminary Planning and Prioritization
23413
Projet technique d’amélioration de la
sécurité par l’ingénieur
Mise au point d’une méthode de travail pour
atteindre les objectifs
Identification des étapes d’amélioration de la
sécurité
Préparation d’un diagramme de GANTT consolidé avec divers plans, ressources et
calendriers
Prévision des mesures de sécurité, préparées
par l’ingénieur, pour chaque étape des plans
du projet
Planification du projet avec ressources et
calendrier
Soumettre plans et prévision de mesures prioritaires au manager en charge de la
sécurité
Le manager en charge de la sécurité revoit les plans ; fait
une prévision consolidée pour un profil sécurité/risque
Préparation d’un diagramme de GANTT par
l’ingénieur, et compléments au plan
ressources et calendrier
ACTIVITES D’AMELIORATION DE LA SECURITE
Le barrage peut-il être amélioré pour remplir toutes les
exigences de sécurité ?
Non ou incertain
Faire les améliorations nécessaires
Faire les améliorations nécessaires
Atténuer les conséquences inacceptables
oui
oui
Non ou incertain
Réduire les conséquence
Développer des options de gestion de la sécurité
Des mesures ad interim sont-elles disponibles et suffisantes?
Quelle est l’option préférée?
Améliorer le barrage Accepter le risque
Accord de l’autorité : « sécurité du barrage est suffisante »
Inte
rven
tion
de l’a
utor
ité :
« sé
curit
é du
bar
rage
n’e
st P
AS s
uffis
ante
»
Durée
2010 2011 2012
Etape 1 de l’amélioration
Plans de mesures prioritaires d’amélioration de la sécurité
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
131j
293j
Fin 2010 2011 2012
1/9/2010
27/2/2012
Q1 Q1 Q1Q2 Q2 Q2 Q3 Q3 Q4 Q4
ID TACHE DEBUT
1
2
Design
Construction
1/12/2009
2/8/2010
Q1 Q1 Q1 Q2 Q2 Q2 Q3 Q3 Q4 Q4
Plan individuel d’amélioration de la sécurité
Etape 2 de l’amélioration
ID
Tâche Début Fin Durée
2010 2011 2012
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
1 Design 1/12/2009 1/6/2010 131j 2 Construction 1/9/2010 7/12/2012 593j
Fig. 20 Finalisation de la planification et mise en place d’améliorations de la sécurité
Fig. 20
Finalization of Plans and Implementation of Dam Safety Improvements
Can the dam readily be made to meet all
safety requirements ?
Make improvements as
required
Yes
Are interim measures available and sufficient ?
No or uncertain
Accept risk
Develop safety management options
Mitigate unacceptable consequences
Reduce consequences
Yes
Improve dam to acceptable level
Improve dam
Authority Acceptance: - "Dam is Safe Enough"
DAM SAFETY IMPROVEMENT ACTIVITIES
Aut
horit
y In
terv
entio
n: -
"Dam
is N
OT
Safe
Eno
ugh"
No or uncertain
Which option is preferred?
235
Fig. 20
Finalization of Plans and Implementation of Dam Safety Improvements
Can the dam readily be made to meet all
safety requirements ?
Make improvements as
required
Yes
Are interim measures available and sufficient ?
No or uncertain
Accept risk
Develop safety management options
Mitigate unacceptable consequences
Reduce consequences
Yes
Improve dam to acceptable level
Improve dam
Authority Acceptance: - "Dam is Safe Enough"
DAM SAFETY IMPROVEMENT ACTIVITIES
Aut
horit
y In
terv
entio
n: -
"Dam
is N
OT
Safe
Eno
ugh"
No or uncertain
Which option is preferred?
236
14
Fig.
21
Mod
èle
d’ar
bre
de d
éfai
llanc
e de
s da
nger
s et
mod
es d
e ru
ptur
e
CAD
RE
DE
L’AN
ALYS
ED
E SÉ
CU
RIT
É
RU
PTU
RE
DU
BAR
RAG
E
RU
PTU
RE
PA
R P
ER
TE
DE
RÉ
SIS
TAN
CE
RU
PTU
RE
PA
R
SU
BM
ER
SIO
N
Sta
bilit
é in
suff
isan
te
sous
les
char
ges
appl
iqué
es
Rev
anch
e in
suffi
sant
eIm
perm
éabi
lité
insu
ffis
ante
R
ésis
tanc
e à
l’usu
re/fi
ssur
atio
n in
suff
isan
te
Cap
acité
d’é
vacu
atio
n di
spon
ible
in
suff
isan
te
RU
PTU
RE
PA
R
SU
BM
ER
SIO
N
Infr
astr
uctu
re e
t pl
ans
Ele
ctro
méc
aniq
ue
Str
uctu
res
hydr
auliq
ues
Barri
ère
étan
che
Mal
veilla
nce
Sism
ique
Mét
éoro
logi
que
Envi
ronn
emen
t de
la re
tenu
e
Mét
éoro
logi
que
Sism
ique
Envi
ronn
emen
t de
la re
tenu
e
Mal
veilla
nce
Barri
ère
étan
che
Str
uctu
res
hydr
auliq
ues
Ele
ctro
méc
aniq
ue
Infr
astr
uctu
re e
t pl
ans
Fréquence (analyse du danger) Analyse de la réponse Mode de rupture
Mouvement de masse (stabilité externe:
déplacement, basculement, résistancesismique)
Perte de support (rupture de la fondation ou d’un
appui)
Changement d’état instantané (liquéfaction, fracturation
hydraulique, fissuration ou liquéfaction sismique)
Affaiblissement: RAG, érosion interne, écrasement,
perte progressive de résistance)
Perte de contrôle des écoule-ments à travers le barrage
(filtres, drains, pompes)
Ecoulements le long d’ inter-faces (appuis, fondation,
water stops)
Dissipation inadéquate des vagues du vent
Cote du plan d’eau trop élevée suite à un glissement
de terrain ou un barrage à l’amont
Capacité d’évacuation non conservée
Perte de fonction aléatoire lors
d’une sollicitation
Règles d’exploitation de la retenue inadéquates
Apports excédant la capacité totale de la retenue et des
organes d’évacuation
Mét
éoro
logi
que
Sism
ique
Envi
ronn
emen
t de
la re
tenu
e
Mal
veilla
nce
Barri
ère
étan
che
Str
uctu
res
hydr
auliq
ues
Ele
ctro
méc
aniq
ue
Infr
astr
uctu
re e
t pl
ans
238
Fi
g. 2
2 M
odèl
e de
ges
tion
du ri
sque
en
form
e de
nœ
ud p
apillo
n ou
du
séis
me
de p
roje
t, le
s m
étho
des
de c
alcu
l, et
c.
Evén
emen
ts, c
ircon
stan
ces
et s
céna
rios
Evén
emen
t non
dés
iré
avec
pot
entie
l de
nuis
ance
ou
de
dom
ma g
e
Activ
ités
tech
niqu
e
Activ
ités
de m
aint
enan
ce
Activ
ités
d’ex
ploi
tatio
n
D A N G E R S
C O N S E Q U E N C E S Nuisance au public et dommages à la
Propriété et à l’environnement
240
Achevé d’imprimer en mai 2017sur les presses de l’Imprimerie Offset Cinq Édition,
85150 La Mothe-Achard
Dépôt légal 2e trimestre 2017, mai 2017, N° d’impression : 2017050031
ISSN 0534 – 8293Imprimé en France
DAM SAFETY MANAGEMENT: Operational phase of the dam life cycle
GESTION DE LA SÉCURITÉ des barrages en exploitation
Bulletin 154
2017
INTERNATIONAL COMMISSION ON LARGE DAMSCOMMISSION INTERNATIONALE DES GRANDS BARRAGES
61, avenue Kléber, 75116 ParisTéléphone : (33-1) 47 04 17 80 - Fax : (33-1) 53 75 18 22
http://www.icold-cigb.org./ 154
Dam
saf
ety
man
agem
ent:
Ope
rati
onal
pha
se o
f th
e da
m li
fe c
ycle
G
esti
on d
e la
séc
urit
é de
s ba
rrag
es e
n ex
ploi
tati
on