    DATE:

    TIME: 8:30am -5:30 pm

    Technician/s Designation Area Activities/Complaints Status/Remarks

    CommonConducted roving, testing and inspection

    to all electrical equipments.

    All electrical equipments are in good and

    condition.

    CommonConducted double roving, testing and

    inspection to all electrical equipments.

    All electrical equipments are in good and

    condition. Turn over to the next sh

    B1/TA & B1/TB Every hour monitoring of mother meter Done. Turn over to next shift

    B2 Lawton LV Switchgear

    Every after three (3) hours monitoring of

    KiloWatt Hour Meter at Emergency panel

    for B2 Lawton LED only

    Done. Turn over to next shift

    B2 Cameron LV

    Switchgear

    Every after three (3) hours monitoring of

    KiloWatt Hour Meter at Emergency supply

    fo B1 to B3 LED

    Done. Turn over to next shift

    B3 Electrical Room

    Lawton

    Every after three (3) hours monitoring of

    KiloWatt Hour Meter at Emergency supply

    fo B3

    Done. Turn over to next shift

    Conducted roving, testing and inspection

    to all plumbing equipments.

    All plumbing equipments are in good andoperation. All water tank are in norma

    Except Indoor pool water heater

    Attended unit calls DONE

    DAILY REPORT10/12/2011 (Wednesday)

    Common

    Duty Shift Electrician (Unit

    and Common)Alfred Taladtad/Rolly Magistrado

    Rogelio LegaspiDuty Shift Plumber

    (Common )

  • 7/28/2019 Daily Report (10.12.11 @ 830am to 530pm)

    2/9

    Conducted double roving, testing and

    inspection to all plumbing equipments.

    All plumbing equipments are in g

    operation. All water tank are in

    Except Indoor pool water heater.T

    next shift

    Conducted roving, testing and inspection

    to all AC equipments.

    All A/C equipments are in good

    condition.

    Conducted double roving, testing and

    inspection to all AC equipments.

    All A/C equipments are in good

    condition.

    Romy Cabanizas Plumber (Unit )

    Allan Book Electician (Unit)

    Crislie Anecito AC Technician (Unit)

    Cipriano Malakas Carpenter (Unit)

    Alex Maningas Painter (Unit)

    Crisaldo Luna Utility/Carpenter (Common)

    Roberto Carcajante Carpenter (Common)

    Gilbert Hidlao Mason/Utility (Common)

    Rolando Andico Jr. Painter (Common)

    ATTENDED UNIT CALLS

    ATTENDED UNIT CALLS

    ATTENDED UNIT CALLS

    ATTENDED UNIT CALLS

    ATTENDED UNIT CALLS

    ATTENDED UNIT CALLS

    Fabricated console for BMS

    Fabricated console for BMS

    CommonDuty Shift AC Technician

    (Common)Alejo Libre/Crislie Anecito

    ATTENDED UNIT CALLS

  • 7/28/2019 Daily Report (10.12.11 @ 830am to 530pm)

    3/9

    Cesar Molbog Painter (Common)

    GM room

    Conduct brief orientation together with

    facility manager about the operation of the

    building

    Done

    Solar heating panelConduct inspection on the ongoing repair

    of the unit On-Going

    Engineering officeLocating fire protection certificates and

    documentsOn-Going

    PE 1 & PE 2Conduct preventive maintenance, all

    elevators are operationalDone

    ABSENT

    All elevators are operational.

    Shift EngineerMichael Advincula

  • 7/28/2019 Daily Report (10.12.11 @ 830am to 530pm)

    4/9

    GM Room

    Conduct short meeting together with

    GM,OM,FM and shift engr about the

    installation of lights

    Done

  • 7/28/2019 Daily Report (10.12.11 @ 830am to 530pm)

    5/9

  • 7/28/2019 Daily Report (10.12.11 @ 830am to 530pm)

    6/9

  • 7/28/2019 Daily Report (10.12.11 @ 830am to 530pm)

    7/9

  • 7/28/2019 Daily Report (10.12.11 @ 830am to 530pm)

    8/9

  • 7/28/2019 Daily Report (10.12.11 @ 830am to 530pm)

    9/9

    DATE